HomeMy WebLinkAboutContract 43168-CO1F Ci f ForWo h CONTRACT N � ORT WOR H_ ty o rt � Change Order Request Project Named Shiver Road 300' West of Stirrup Way to Meridian Lane I City Sec # ' 43168 Client Project #(s)l 01349 DOE 6230 PSReconstruction of Shiver Road from Meridian Lane to 300 feet West of Stirrup Way I DescriptionI I Contractor McClendon Construction Company, Inc. Change Order # 1 Date 1 4/16/2013 City Project Mgr.I Wilma Smith City Inspector Thomas Miller Dept. TPW Water Sewer Totals Select Day Type Original Contract Amount $307,189.45 $307,189.45 180 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders (in M&C Process) Contract Cost to -Date $307,189.45 $307,189.4_5 180 _ Amount of Proposed Change Order $61,062.66 $0.00 $0.00 _ _ _ $61,062.66 52 _ Revised Contract Amount $368,252.11 _ $368,252.11 2.32 Original Funds Available for Change Orders $100,401.75 $100,401.75 Remaining Funds Available for this CO $100,401.75 $100,401.75 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 19.88% MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $383,986.81 JUSTIFICATION (REASONS) FOR CHANGE ORDER Removal for addition of wheelchair ramps at Meridian and Shiver. Addition of a reverse, sidewalk wall and flume to accommodate lower existing grade at back of sidewalk. Jointseal sidewalk where it was moved to curb. Place sod at some locations where it would be more apropriate than hydromulch. Repair of pavement, just W c�"q iIg?,eglace with geogrid, flexbase and thicker concrete. A.tie by.Nov aoG000n OFFICIAL RECORD', o�ooao CITY SECRETARY FT. TORTE, TX 1&7 J. Ks y i , City Se etary It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents m payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. C-, m Contractors Compar)y Name Con !Name) ptrac furs Date McClendon Construction Company, Inc��� v Ins ec r/In e i u ervisor Datg Project Manag-1rogram Ma2L er ~ ate ,t Ass' ept) / �� Date Dif r, Cpntracting Department (Dept) Dte 4 _A a i Aft ey Date Assi City Mam r Date ., upur0Aptioa i# retired) M&C Number I Ail I AdVV VJ tI S lj M&C Date Approved �� 4- W311��-(0 41kZ;;ORTH City of Fort Worth Change Order Request Project Name Shiver Road 300' West of Stirrup Way to Meridian Lane City Sec # 1 43168 Client Project #(s)l 01349 DOE 6230 Project Description ,l Reconstruction of Shiver Road from Meridian Lane to 300 feet West of Stirrup Way Contractor) McClendon Construction Company, Inc. Change Order # 1 Date 4/16/2013 City Project Mgr.1 Wilma Smith City Inspector Thomas Miller Dept. TPW Water Sewer Totals (Select Day Type Original Contract Amount $307,189.45 $307,189.45 180 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders (in M&C Process) Contract Cost to Date $307,189.45 $307,189.45 i 180 _ JAmount of Proposed Change Order $61,062.66 $0.00 $0.00 _ $61,062.66 52 Revised Contract Amount $368,252.11 _ $368,252.11 232 Original Funds Available for Change Orders $100,401.75 $100,401.75 Remaining Funds Available for this CO $100,401.75 $100,401.75 Additional Funding (if necessary) , CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 19.88% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $383,986.81 JUSTIFICATION (REASONS) FOR CHANGE ORDER Removal for addition of wheelchair ramps at Meridian and Shiver. Addition of a reverse, sidewalk wall and flume to accommodate lower existing grade at back of sidewalk. Jointseal sidewalk where it was moved to curb. Place sod at some locations where it would be more apropriate than hydromulch. Repair of pavement, just W of project limits. Replace with geogrid, flexbase and thicker concrete. 0 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) ){ aforeat 1,.,/D McClendon Construction Company, Inc j" f'Yq- . /Ay, c � � / } InspectorA $ugenrisor Date Project Mana V/ProgramWar)ager Date Djr or, C Dnfii ctin} De�Dept) Date -e-e t A i A ey Date Assistant City Manaer 4/13 Council Action (if r wired) M&C Number I I I, f( M&C Date Approved G t4r� t U 6 f " RT WORTH. City of Fort Worth Change Order Request Project Name Shiver Road 30V West of Stirrup Way to Meridian Lane City Sec # 1 43168 Client Project #(s)l 01349 DOE 6230 Project Description Reconstruction of Shiver Road from Meridian Lane to 300 feet West of Stirrup Way Reconstruction Contractor McClendon Construction Company, Inc. Change Order # 1 Date 4/16/2013 City Project Mgr.I Wilma Smith City Inspector Thomas Miller Dept. TPW Water Sewer 'Select Day Type] Totals Original Contract Amount $307,189.45 i $307,189.45 180 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders (in M&C Process) Contract Cost to Date $_307,189.45 180 _ JAmProposed Change Order $61,062.66 $0.00 ount of Prop $0.00 _$307,189.45 _ $61,062.66 52 Revised Contract Amount $368,252.11 _ $368,252.11 232 Original Funds Available for Change Orders $100,401.75 $100,401.75 Remaining Funds Available for this CO $100,401.75 $100,401 75 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 19.88% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $383,986.81 JUSTIFICATION (REASONS) FOR CHANGE ORDER Removal for addition of wheelchair ramps at Meridian and Shiver. Addition of a reverse, sidewalk wall and flume to accommodate lower existing grade at back of sidewalk. Jointseal sidewalk where it was moved to curb. Place sod at some locations where it would be more lapropriate than hydromulch. Repair of pavement, just W of project limits. Replace with geogrid, flexbase and thicker concrete. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor (Name) c ontract; igpature Date I McClendon Construction Company, Inc�y F e; , n r : c Supervisor Date Project Manager/Program Manger Date EInspector/Inspection Assis Wep Date Director, Contracting Department (Dept) Date s' 1 C4 A�Vey Date Assistant Citv Manager Date y {8 Council Action (if required) M&C Number ►�- It �` AJ.N-4 VJ t I II M&C Date Approved ('� FORT WORTH. City of Fort Worth Change Order Request Project Name Shiver Road 300' West of Stirrup Way to Meridian Lane Client Project #(s)l 01349 Project Reconstruction of Shiver Road from Meridian Lane to 300 feet West of Stirrup Way Description City sec # 1 43168 DOE 6230 Contractor McClendon Construction Company, Inc. Change Order # 1 1 1 City Project Mgr.1 Wilma Smith CityInspector I Thomas Miller Date 1 4/16/2013 I Dept. TPW Water I Sewer Totals Select Day Type Original Contract Amount $307,189.45 $307,189.45 180 Extras to Date $0.00 Credits to Date $0.00 Pending Change Orders (in M&C Process) Contract Cost to Date $307,189.45 $307,189.45 180 _ Amount of Proposed Change Order $61,062.66 _ $6.60 $6.00 $61,062.66 52 Revised Contract Amount $368,252.11 _ $368,252.11 232__ Original Funds Available for Change Orders $100,401.75 I $100,401.75 Remaining Funds Available for this CO $100,401.75 1 $100,401.75 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 19.88% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $383,986.81 JUSTIFICATION (REASONS) FOR CHANGE ORDER Removal for addition of wheelchair ramps at Meridian and Shiver. Addition of a reverse, sidewalk wall and flume to accommodate lower existing grade at back of sidewalk. Jointseal sidewalk where it was moved to curb. Place sod at some locations where it would be more apropriate than hydromulch. Repair of pavement, just W of project limits. Replace with geogrid, flexbase and thicker concrete. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Nam Contractor (Name) Contract Signature Date McClendon Construction Company, Incl j I I . Inspector/Inspection Supervisor I Date Project Manager/Program Manager Date AssistWnt Director (Dept) Assistant City Attorney M&C Number I I Date Director, Contracting Department (Dept) Qate Date Assistant City Manager Date r Council Action (if required) f r M it M&C Date Approved-� FOR_ T�TH_ City of Fort Worth Change Order Additions Project Name Shiver Road 300' West of Stirrup Way to Meridian Lane City Sec # 43168 Client Project # C204-541200-202230129483 I� Project Description I Reconstruction of Shiver Road from Meridian Lane to 300 feet West of Stirrup Way I Contractor McClendon Construction Company, Inc. Change Order # 0 Date 1 4/10/2013 City Project Mgr. Wilma Smith City Inspector Thomas Miller ADDITIONS I I tM UtSCKIP I IUN UEP I uty Unit Unit Cost I otal 29 Hume wl 4" Curb I NW bb.UU SY $165.3b $9,UY4.25 30 Saw/Remove Curb & SW for Ramp Meridian TPW 1.00 LS $565.00 $bbb.UU 31 Seal Sidewalk at Curb (Sidewalk Moved) TPW 900.00 LF $1.25 $1,12b.UU 32 Grass Sod TPW 258.06 SY $6.50 $'I ,b / / .UU 32 Remove Concrete and Compact Sub grade TPW 491.00 SY $16.75 $8,224.2b 33 Unclassified Excavation (Panel Repair) TPW 135.00 CY $51.65 $b,9l2.1b 34 Fill Material TPW 60.00 CY $7.00 $42U.UU 35 Geogrid TX 140 TPW 430.00 SY $5.45 $2,343.bU 36 8" Flexbase for Subgrade TPW 96.00 CY $48.70 $4,blb.21J 37 9" Concrete Paving (Panel Repair) TPW 452.13 SY $59.60 $26,94b.9b 38 6" Concrete Driveway TPW 413.00 SF $5.75 $2,3/4.15 39 Pre TV of Sewer Line TPW 1.00 LS $500.00 $SUu.UU Existing Items 7 9" 400 PSI Concrete Pavement TPW 51.40 SY $37.50 $1,92/.bU 3 Topsoil TPW 25.00 CY $16.00 $4UU.UU 16 4" Sidewalk 5' Wide TPW 1,623.39 SF $4.00 $b,49J.bb 19 7" Curb TPW 57 1. 00 LF $3.00 $1,/1J.UU Change Order Additions Page 1 of 2 TFW $75,452.71 Water $0.00 Sewer $0.00 Sub Total Additions $75,452.71 Change Order Additions Page 2 of 2 FORT WORTH City of Fort Worth Change Order Deletions Project Name Shiver Road 300' West of Stirrup Way to Meridian Lane Client Project # C204-541200-202230129483 Project Description Reconstruction of Shiver Road from Meridian Lane to 300 feet West of Stirrup Way Contractor McClendon Construction Company, Inc. Change Order # 0 City Project Mgr. Wilma Smith City Inspector I Thomas Miller I I tM UlzbURIP I IUN 15 4" Sidewalk b' Wide l;onstructed with 'Retaining Wall 5 Retaining Wall DELETIUNS utN1 City Sec # 43168 J Date 1 4/10/2013 W1 Unit Unit host 1,3/2.gu 51- $4.bU 20.53 CY $400.00 I otal $b,1 /d.Ub $b'212.UU Change Order Deletions Page 1 of 2 TPW $14,390.05 Water $0.00 Sewer $0.00 Sub Total Deletions $14,390.05 Change Order Deletions Page 2 of 2 MIWBE Breakdown for this Change Order MWBE Sub Type of Service J. Rubio Trucking haul off trucking co # Previous Change Orders Total Total AMOUNT Amount for this CO $2,250.00 $0.00 $2,250.00 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: Shiver Road - Meridian to E. of Shiver Rd _ BuySpeed No (T/PW): IPO-12-00072427 BuySpeed No (Water): N/A I City Project No: 01349 Original M $ C approved 4-3-12, C-25541 Contract No: CS43168 D.O.E. No: 16230 Attachment to Change Order No: 1 Today's Date: 3129113 Original Contract Amount: Extras to Date: Credits to Date: Contract Amount to Date: Amount of Proposed Change Order: Revised Contract Amount: Contingency Funds Avail. for Admin. Change Orders: Remaining Funds Available for Change Orders: Additional Funding (if necessary): TOTAL T/PW Water Sewer $ 307,189.45 $ 307,189.45 $ - $ - $ - $ - $ 307,189.45 $ 307,189.45 $ - $ - $ 61,062.66 $ 61,062.66 $ 368,252.11 $ 368,252.11 $ - $ - $ 100,401.75 $ 100,401.75 $ - $ $ 100,401.75 $ 100,401.75 $ - $ $ 1 $ - $ - Prepared By: Alicia Garcia T/PW Construction Services CITY COUNCIL AGENDAoRrWolzrEl .. ., .. .. _ .v.._, _.r .a—._...avra• s.s'. .,'..�.r..r.z:.b.r. .... ..vM... . a.a Yy..: ...... y...Awq.:-.,...�.�.a..Ye.fiif.y-n T. .✓.,..v . O: �. r _e....s a.. . .. COUNCIL ACTION: Approved on 4/3/2012 - Ordinances No. 20162-04-2012 and 20163-04-2012 DATE: 4/3/2012 REFERENCE NO.: **C-25541 LOG NAME: 20SHIVER ROAD PROJECT 01349 CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Contract with McClendon Construction Company, Inc., in the Amount of $307,189.45 for the Reconstruction of Shiver Road from Meridian Lane to 300 Feet West of Stirrup Way, Utilizing $175,000.00 from 2004 Capital Improvement Program New Development Funds and $232,591.20 from Community Facility Agreement Future Improvements Fund to Provide for Construction Contract Costs, Contingencies and Construction Services for a Project Total in the Amount of $407,591.20 and Adopt Appropriation Ordinances (COUNCIL DISTRICT 2) .-..a.w.v..ra.x.a,n>..4MM4..!'..K<w.K_W.a.Yaa.. R'.s. 4w.b�.f-.-:.rvV-e�.wWruAM.r>rt1'+40Ri.vM3eu0.%WrR.YfNn - i�vM:Msf-,.v'ux RECOMMENDATION: It is recommended that the City Council: 1. Adopt attached appropriation ordinance increasing the estimated receipts and appropriations in the Special Assessments Fund in the amount of $232,591.20 from available funds; 2. Authorize transfer of $232,591.20 from the Special Assessments Fund to the New Development Fund; 3. Adopt attached appropriation ordinance increasing the estimated receipts and appropriations in the New Development Fund in the amount of $232,591.20 from available funds; and 4. Authorize execution of a contract with McClendon Construction Company Inc., in the amount of $307,189.45 for the reconstruction of Shiver Road from Meridian Lane to 300 feet west of Stirrup Way. DISCUSSION: The scope of this project includes paving and storm drain improvements along Shiver Road to provide a three lane roadway from Meridian Lane to 300 feet west of Stirrup Way. Funds were received from the developer for future improvements to Shiver Road through Community Facilities Agreement Nos. 20169, 20140, and 2005058 in the amounts of $67,036.00, $19,170.00 and $209,931.20, respectively. A portion of these funds ($63,546.00) were used to fund the project design contract. The remaining balance is to be used to fund construction. An additional $175,000.00 will be used from the 2004 Capital Improvement Program New Development Funds to cover the City's participation on this project. The project was advertised for bid in the Fort Worth Star-Teleqram on November 3, 2011 and November 10, 2011. The following bids were opened on December 8, 2011: Bidder Bid Amount McClendon Construction Co., Inc. $307,189.45 JLB Contracting, LP $307,972.50 Ed A. Wilson, Inc. $363,377.00 Logname: 202007COCONTRACT5BDIST500947 Page 1 of 2 Jackson Construction, Ltd. $474, 353.00 Staff recommends that the low bid in the amount of $307,189.45 as submitted by McClendon Construction Co., Inc., be selected and a contract awarded. In addition, $100,401.75 will be utilized for contingencies and construction services including surveying, material testing and construction inspection. McClendon Construction Co., Inc., is in compliance with the City's M/ BE Ordinance by committing to 18 percent M/1NBE participation. The City's M/WBE goal on this project is 15 percent. This project is located in COUNCIL DISTRICT 2, MAPSCO 36B and 36C. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the appropriation ordinances, funds will be available in the current capital budget, as appropriated, of the 2004 Capital Improvement Projects New Development Fund. TO Fund/AccountlCenters 1 $232.591.20 GS94 488100 020941369010 1 $232.591.20 S94 538040 020941269010 2&3) $232.591.20 C202 476094 202760134983 31 C202 541200 202760134983 $232.591.20 Submitted for Citv Manager's Office bv: Oriainatina Department Head: Additional information Contact: ATTACHMENTS 20SHIVER ROAD MAP.pdf 20SHIVER ROAD PROJECT 01349 A012 20SHIVER ROAD PROJECT 01349 A012 FROM Fund/Account/Centers 2 $232,591.20 S94 538040 020941369010 4) C202 541200 202760134983 $307.189.45 Fernando Costa (6122) Douglas W. Wiersig (7801) Wilma Smith (8785) C202.doc GS94.doc Logname: 202007COCONTRACT5BDIST500947 Nae '7 "f 7