Loading...
HomeMy WebLinkAboutContract 56483-A2CSC No. 56483-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 56483 WHEREAS, the City of Fort Worth (CITY) and Teague Nall & Perkins, Inc., (ENGINEER) made and entered into City Secretary Contract No. 56483, (the CONTRACT) which was authorized by M&C 21-0756 on the 28th day of September, 2021 in the amount of $456,745.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $10,440.00 administratively authorized on September 5, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Historic Southside Improvements; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $7,500.00 (Sewer). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $474,685.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [Historic Southside Improvements] Page 1 of 2 [CPN 102932] EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth Dana Bu andoff Dana Burghdoff (Jan M 202410:08 CST) Dana Burghdoff Assistant City Manager DATE: Jan 19, 2024 APPROVAL RECOMMENDED: CGc�<irto,�l�eY tta.��fe� Christopher Harder (Jan 17, 2024 07:02 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's ENGINEER Teague Nall & Perkins, Inc. Jonathan Bengfort, P.E. Director of Engineering Services, Associate Principal DATE: 1 /12/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Preeti KC, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: Mack (Jan 18, 2024 14:11 CST) Douglas W. Black Senior Assistant City Attorney �44�o�Q ppF FORT �p ° °Lo�lO aP, ATTEST: *o.-�" ���o=0°° � .' /� d��� �EXA?oa v Jannette S. Goodall City Secretary M&C : N/A Date: N/A Form 1295: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 Page 2 of 2 [Historic Southside Improvements] [CPN 1029321 Contract Amendment No. 2 To: Preeti KC, PE — City of Fort Worth From: Jonathan Bengfort, CFM, PE CC: Jessica Hilscher, PE; Ryan Jones, PE Date: October 26, 2023 RE: Additional Professional Services Historic Southside Improvements (Project No. 102932) �tnp 1W I Iwww.tnpinc.com engineers surveyors landscape architects TEXAS FORT WORTH DENTON ALLEN HEATH KATY GEORGIA BLAIRSVILLE Preeti, per the City's request, we offer this contract amendment for additional sanitary sewer design services associated with the Historic Southside Improvements project. The City has requested TNP to expand the scope of the project to include additional sewer line replacement along Vickery Blvd from IH35 frontage road to approximately 150 ft east of Missouri Ave. The additional efforts associated with this contract amendment include the following: SEWER - 300 LF 1. Vickery_ Blvd: Final Design and plan preparation for approximately 300 LF of 18" sanitary sewer line replacement with 8' sanitary sewer. ($7,500) FEE ADJUSTMENT Based on the additional effort identified above, TNP is requesting a contract fixed fee amendment amount of $7,500: ORIGINAL CONTRACT AMOUNT: CONTRACT AMENDMENT #1 AMOUNT: CONTRACT AMENDMENT #2 AMOUNT: TOTAL REVISED CONTRACT AMOUNT: Sincerely, tnp League nail & perkins Jonathan Beng ort, P.E. $456,745.00 Lump Sum Services $10,440.00 Lump Sum Services $7,500.00 Lump Sum Services $474,685.00 Lump Sum Services TNP Firm * Registrations Texas Board of Professional Engineers and Land Surveyors I Engineering Firm No. F-230 I Surveying Firm No. 1001 1600 1 101 94381 1 10011601 Georgia Board of Professional Engineers Firm No. PEF007431 I Texas Board of Architectural Examiners Firm No. BR 2673 Level of Effort Spreadsheet AMENDMENT 2-TASK/HOUR BREAKDOWN Water Department Additional Design Services for (Vickery Blvd 18" Sanitary Sewer) HISTORIC SOUTHSIDE IMPROVEMENTS City Project No. 102932 Labor (hours) Survey Survey Project Project � - Task No. Task Description Principal Manager Engineer Rate EIT CADD I RPLS I SUE Crew Total 5250 $175 $160 E7: I4.0 —al ueslgn 0 4 a 1 I Sewer Design Final Construction Plans and Specs 4.2 IVickery Blvd 18" SS Replacement (300 LF) 1 I ! Totals 0 4 1 I Sub consultant Expense Labor Cost! Subconsultant Total Expense Task Sub Total %Complete Remaining Reprotluelion I Cost Budget I MWBE INon-MWBEI $7,5061 0% $7.500 E7,500 0% $7,500 Project Summary 1 Total Hours 52 Total Labor $7,500 1 Total Expense $0 MNUBE Subconsultanf $0 1 Non-MIWBE Subconsultanf $0 1 5% Sub Markup $0.00 MBE/SBE Participation 0.0% I Total Project Cost $7,500 Design Services LOE Spreadsheet - Amendment 2