Loading...
HomeMy WebLinkAboutContract 39309CITY SECRETARY CONTRACT NO. 3H SPECIFICATIONS AND CONTRACT so CITY SECRETARY DOCUMENTS FOR O.E. FILE Sanitary Sewer System Rehabilitation :4TRACTOR'S BOND II'` gtract LVlll (58) — Part 2 NSTRUCTION'S C O§ewer Project Number P254-703170106087 .: NT DEPART,'` ---?ENT DOE # 6039 File # X-20874 City Project # 01060 Sanitary Sewer im State Revolving Fund Project - SRF do MIKE MONCRIEF Mayor In the City of Fort Worth, Texas July 2009 DALE A. FISSELER, P.E. City Manager S. FRANK CRUMB, P.E. Director Water Department WILLIAM A. VERKEST, P.E. Director Transportation and Public Works rjngroup Excellence through Ownership �....:e PETER ZLAI. �;. 85495 4100 International Plaza Overton Centre Tower II, Suite 460 7/54 7 Fort Worth, Texas 76109 - - >i --- 0 -- RJN Project No. 18-1855-00 ()FI�I` RECORD RJN GROUP INC. CATti ";FCQFT&1 Excellerve t1rougn OwnersMp Texas Registered Engineering Firm F-3260 12160 Abrams Rd. Suite 400 Dallas TX 75243 we M&C Review Page 1 of CITY COUNCIL AGENDA Official site of the City of Fort Worth, Texas FORT COUNCIL ACTION: Approved on 9/29/2009 - Ord. No. 18851-09-2009 -+spa GR<C_ti�Jv�F �.. 5ia%.T"Y'4wr�,�'fr".":Y„sv�2;�9sM.ca'.A w'-,.. dam..:.. k'.J 1f,-",�.. .s ,.. •: u,•• .eas .-«%,'4�.: �•N.. t."4 �rAN ...k�:T\'gA.r.LS DATE: 9/29/2009 REFERENCE NO.: C-23817 LOG NAME: 60SS58P2- CONATSER CODE: C TYPE: NON -CONSENT PUBLIC NO HEARING: SUBJECT: Authorize a Contract in the Amount of $2,574,825.00 with Conatser Construction TX, LP for Sanitary Sewer Rehabilitation Contract LVIII Part 2 on Sarita Drive, Inman Court, Westdale Drive and Westlake Drive and Adopt Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $114,245.00 from the Water and Sewer Operating Fund to the Sewer Capital Projects Fund; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Projects Fund in the amount of $114,245.00 from available funds; and 3. Execute a contract with Conatser Construction TX, LP in the amount of $2,574,825.00 for Sanitary Sewer Rehabilitation Contract LVIII (58), Part 2. DISCUSSION: On May 13, 2003, (M&C C-19586) the City Council authorized an engineering agreement with RJN Group, Inc. for Sanitary Sewer Rehabilitation Contract LVIII (58). This project, Part 2, provides for sanitary sewer main rehabilitation as indicated on the following streets: Street From To Sarita Drive Inman Court Sarita Court Inman Court Westdale Drive Sarita Drive Westdale Drive Inman Drive Hulen Street Westlake Drive Westdale Drive Loop 820 This project was advertised for bid on June 16 and 23, 2009 in the Fort Worth Star -Telegram. On August 6, 2009, the following bids were received: Bidder Amount Time of Completion Conatser Construction TX, LP $2,574,825.00 210 Calendar Days S.J. Louis Construction, Inc. $2,649,891.00 William J. Schultz, Inc., $2,911,525.00 d/b/a Circle "C" Construction Company AUI Contractors, Inc. $3,522,750.00 Barson Utilities $4,743,400.00 M/WBE - Conatser Construction TX, LP is in compliance with the City's M/WBE Ordinance by committing to 24 percent M/WBE participation. The City's goal on this project is 23 percent. http://apps.cfwnet.org/council_packet/mc—review.asp?ID= I 2248&councildate=9/29/2009 9/29/2009 M&C Review Page 2 of Most State Revolving Loans are granted for construction contracts only. However with this particular loan the City of Fort Worth was authorized to pay for both an engineering agreement (design and survey) and the construction contract. Since no other expenses can be covered by SRF funding, additional appropriations of $114,245.00 ($37,000.00 for construction staking, project management material testing and inspection and $77,245.00 for project contingencies) are needed from the Sewer Capital Projects Fund. The project is located in COUNCIL DISTRICT 3. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and the adoption of the attached appropriation ordinance, funds will be available in the current capital budgets, as appropriated, of the Sewer Capital Projects Fund and The Clean Water State Revolving Fund 2007. TO Fund/Account/Centers 1 &2� P258 476045 703170106OZZ 2)P258 531350 703170106052 2)P258 511010 703170106080 2)P258 541200 703170106087 2) P258 531200 703170106084 2)P258 531350 703170106084 2)P258 511010 703170106085 FROM Fund/Account/Centers $114,245.00 1) PE45 538040 0709020 $114.245.00 3� $10.000.00 $5,000.00 $77,245.00 $8,000.00 $2, 000.00 $12,000.00 Submitted for Citv Manaaer's Office by: Oriainatina Deoartment Head: Additional Information Contact: ATTACHMENTS 60SS58P2-CONATSER MAP.Ddf 60SS58P2-CONATSER revised.doc P254 541200 703170106087 $2,574.825.00 Fernando Costa (6122) S. Frank Crumb (8207) Roberto C. Sauceda (2387) http://apps.cfwnet.org/council_packet/mc_review.asp?ID=12248&councildate=9/29/2009 9/29/2009 s im im in 6W dom i -40 no TX Lp ontractor he ,5:�,.-7 LJ cl-► s-� Street Address WDi i X —, City & State 81'1- 53L+ Telephone Contact Person CONTRACT DOCUMENTS SANITARY SEWER SYSTEM REHABILITATION CONTRACT LVIII (58) — PART 2 SEWER PROJECT NUMBER P254-703170106087 DOE # 6039 File # X-20874 City Project # 01060 Sanitary Sewer State Revolving Fund Project - SRF CITY OF FORT WORTH TARRANT COUNTY, TEXAS RJN GROUP, INC. CONSULTING ENGINEERS FORT WORTH, TEXAS July 2009 wo no L� =, CONTRACT DOCUMENTS r SANITARY SEWER SYSTEM REHABILITATION CONTRACT LVIII (58) — PART 2 MW SEWER PROJECT NUMBER P254-703170106087 ow DOE # 6039 File # X-20874 City Project # 01060 Sanitary Sewer State Revolving Fund Project - SRF July 2009 ow I hereby state that these Contract Documents were prepared under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Texas. w d .. /.:!...................i ..:.. PETER ...Z........... ..... ............. �*:. 85495 aft MW Peter Z. Lai, P.E. Date: �',Z-srz.� -7113101 Registration No. 85495 .. A %w i �F L J 40 up i No no ww Part G —Contract (City of Fort Worth) THE STATE OF TEXAS CITY OF FORT WORTH. TEXAS CONTRACT KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT SEP 29 2009 This Contract made and entered into this the day of A.D., 2009, by and between the CITY OF FORT WORTH, a home -rule municipal corporation situated in Tarrant County, Denton, Parker, and Wise Counties, Texas, by an through its duly authorized Assistant City Manager, ("Owner"), and Conatser Construction TX , LP, ("Contractor"). Owner and Contractor may be referred to herein individually as a "Party" or collectively as the "Parties." WITNESSETH: That said parties have agreed as follows: That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: Sanitary Sewer Rehabilitation Contract LVIII (58), Part 2 on Sarita Drive" Inman Court. Westdale Drive and Westlake Drive 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a period of 210 calendar days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General 10 Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of 630 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans, t Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost — to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not anv such iniurv, damage or death is caused. in whole or in Part, by the negligence or alleged neelieence of Owner, its officers. servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such iniury or damaee is caused in whole or in part by the neelieence or alleeed neelieence of Owner. its officers. servants or emplovees.. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, upon the execution of this Contract, and before beginning work, to make, execute and deliver to City of Fort Worth the following bonds in the name of the City of Fort Worth in a sum equal to the amount of the Contract. All bonds furnish hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the Owner. am B. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the Contract, solely for the protection of all claimants supplying labor and material in the prosecution of the work. C. If the Contract amount is in excess of $100,000, a Performance Bond shall be executed, in the amount of the Contract conditioned on the faithful performance of the work in accordance with the Plans, Specifications, and Contract Documents. Said bond shall solely be for the protection of the Owner. D. A Two-year Maintenance Bond in the Name of the Owner is required for all projects to insure the prompt, full and faithful performance of the general guarantee contained in the Contract Documents. 8. Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work, and for all additions thereto or deductions therefrom, the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates n/aa shall be Two Million Five Hundred Seventy-four Thousand Eight Hundred Twentv-five and no/100.................................................................................................................Dollars, ($2.574.825.00). 91 It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 101 w The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth, Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein. a" It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this instrument to be signed in 8 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed this instrument through its duly authorized officers in 8 counterparts with its corporate seal attached. SEP 29 2009 Done in Fort Worth, Texas, this the day of , A.D., 2009. ME AM _ APPRO AL RECOMMENDED: CITY OF FORT WORTH DIRECTOR, WATER DEPARTMENT FERNANDO COSTA, ASST CITY MANAGER ATTEST: Conatser Construction TX, LP PO Box 15448 Fort Worth, TX 76119 CONTRACTOR CITY SECRETARY (SEAL) B , contract A•athor i zation TITLE Date APPROVED AS TO FORM AND LEGALITY: ADDRESS ASS � . ATTORNEY November 1960 Revised May 1986 Revised September 1992 OFFICIAL RECORD SECRET.AR,, fT: WORTH, TX No M TABLE OF CONTENTS Part A — Notice to Bidders ,.. Special Instructions to Bidders (Water Dept.) City of Fort Worth Minority/Women Business Enterprise Policy Part B — Proposal with Green Cement Compliance Statement .. Part C — General Conditions Part C1 — Supplementary Conditions to Section C Part D — Special Conditions Part DA — Additional Special Conditions Water Department Standard Details Contractor Compliance with Workers' Compensation Law Conflict of Interest Questionnaire Equipment Schedule Experience Record 40 Certificate of Insurance Part F — Bonds (City of Fort Worth) O Performance Bond O Payment Bond O Maintenance Bond Part G — Contract (City of Fort Worth) a' Part H (TWDB Contract Documents) O Supplemental Contract Conditions, ED-004e O Site Certificate, ED-101 .. O Contractor's Act of Assurance, ED-103 O Contractor's Resolution on Authorized Representative, ED-104 O Certification of Contractor Regarding Debarment, SRF-404 O Loan Grant Participation Summary, SRF-373 TC-1 M TABLE OF CONTENTS Part H (TWDB Contract Documents) — continued O SMWBE State Revolving Fund Program Guidance Document ., O Applicant/Entity Affirmative Steps Certification and Goals, WRD-215 O Affirmative Steps Solicitation Report, WRD-216 O Prime Contractor Affirmative Steps Certification and Goals, WRD-217 Aw O SMWBE Self -Certification, WRD-218 (4 copies) Appendix A — Geotechnical Investigation Appendix B — TxDOT Utility Crossing Permit and Specifications Appendix C — Temporary Right -of Entry Forms Appendix D — City of Fort Worth Traffic Control Typicals M Vw .. .. r TC-2 on Part A - Notice To Bidders i Ow moo SHORT FORM NOTICE TO BIDDERS Sealed proposals for the following: FOR: SANITARY SEWER SYSTEM REHABILITATION CONTRACT LVIII (58) — PART 2 DOE # 6039, FILE # X-20874, CITY PROJECT # 01060 SEWER PROJECT NUMBER P254-703170106087 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 will be received at the Purchasing Office until 1:30 p.m., Thursday. Julv 301h, 2009, and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans, General Contract Documents and Specifications for this project may be obtained in the office of RJN Group, Inc., 4100 International Plaza, Overton Centre Tower Il, Suite 460, Fort Worth, Texas 76109. The Plans and Specifications may be purchased on a non-refundable basis for thirty dollars ($30) for each set. These documents contain additional information for prospective bidders. Plans and Specification will be available for pick-up on Friday, July 10`', 2009. The major work will consist of the (approximate) following: The construction of approximately 2800 LF of 8"-18" sanitary sewer pipe by open cut, approximately 300 LF of 8" sanitary sewer pipe by other than open cut, approximately 2550 LF of 18" sanitary sewer pipe by micro tunneling (10'40'+ deep), 28 manholes (5'40'+ deep), and approximately 400 LF of 30" steel casing pipe by Jack and Bore. This contract is contingent upon release of funds from Texas Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. Equal Opportunity in Employment — All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. For additional information, please contact Mr. Roberto C. Sauceda, Project Manager, City of Fort Worth — Water r Department at Telephone Number: (817) 392-2387 or by email: Robert.Sauceda@fortworthgov.org, and/or Peter Z. Lai, P.E., Project Manager, RJN Group, Inc. at (972) 437-4300. aw Advertising Dates: 00 Thursday. July 91h. 2009 Thursdav, Julv 10h, 2009 No ow ow COMPREHENSIVE NOTICE TO BIDDERS Sealed proposals for the following: FOR: SANITARY SEWER SYSTEM REHABILITATION CONTRACT LVIII (58) — PART 2 DOE # 6039, FILE # X-20874, CITY PROJECT # 01060 SEWER PROJECT NUMBER P254-703170106087 Addressed to: CITY OF FORT WORTH PURCHASING DIVISION - 1000 THROCKMORTON ST FORT WORTH TX 76102-6311 ww will be received at the Purchasing Office until 1:30 p.m., Thursday. August 6th. 2009. and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers. Plans, General Contract Documents and Specifications for this project may be obtained in the office of RJN Group, Inc., 4100 International Plaza, Overton Centre Tower H, Suite 460, Fort Worth, Texas 76109. The Plans and Specifications may be purchased on a non-refundable basis for thirty dollars ($30) for each set. These documents contain additional information for prospective bidders. Plans and Specifications will be available for pick-up on Friday, July 171h, 2009. The major work will consist of the (approximate) following: The construction of approximately 2800 LF of 8"-18" sanitary sewer pipe by open cut, approximately 300 LF of 8" sanitary sewer pipe by other than open cut, approximately 2550 LF of 18" sanitary sewer pipe by other than open cut (10'- 40'+ deep), 28 manholes (5'- 40'+ deep), and approximately 400 LF of 30" steel casing pipe by Jack and Bore. Included in the above will be all other miscellaneous items of construction as outlined in the Plans, General Contract Documents and Specifications. NOTICES All bidders will be required to comply with Provision 5159a of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City of Fort Worth Ordinance no. 7400 (Fort Worth City Code Sections 13-A-221 through 13-A-29) prohibiting discrimination in the employment practices. Bid security may be required in accordance with Special Instructions to Bidders. The City of Fort Worth reserves the right to reject any and/or all bids and waive any and/or all formalities. No bid may be withdrawn until the expiration of ninety (90) days from the date bids are opened. The award of contract, if made, will be within ninety (90) days after the opening of bids, but in no case will the award be made until all the necessary investigations are made as to the responsibility of the bidder to whom it is proposed to award the Contract. Bidders are responsible for obtaining all addenda to the contract documents and acknowledging receipt of the addenda by initialing the appropriate spaces on the Addenda Index and Receipt forrii(s). Bids that do not acknowledge receipt of all addenda may be rejected as being non -responsive. Information regarding the status of addenda may be obtained by contacting the City of Fort Worth Project Manager. Bidders, using the printed copy, shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Bidders must complete the proposal section(s) and submit the complete specification book or face rejection of the bid as non -responsive. It is recommended that the bidder make a copy of the forms included in the Minority and Women Business Enterprise section for submittal within the time deadline stated below or the bidder may request a copy of said forms from the City of Fort Worth Project Manager named in this solicitation. COMPREHENSIVE NOTICE TO BIDDERS In accord with the City of Fort Worth Ordinance No. 15530, the City of Fort Worth has goals for the participation of - minority business enterprises and women business enterprises in City of Fort Worth contracts. A copy of the Ordinance can be obtained from the office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONTRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM, GOOD FAITH EFFORT FORM (with "Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received no later than 5:00 p.m., five (5) City of Fort Worth business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the City of Fort Worth received the Documentation. Failure to comply shall render the bid non -responsive. This contract is contingent upon release of funds from Texas Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by a loan from the Texas Water Development Board. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. Equal Opportunity in Employment — All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. VM 09 00 .V SUBMISSION OF BID AND AWARD OF CONTRACT The proposal within this document is designed as a package. In order to be considered an acceptable bid, the Contractor is required to submit a bid for the complete proposal. A bid proposal submittal that is received with the proposal incomplete will be rejected as being non -responsive. The Contractor, who submits the bid with the lowest price, will be the apparent successful bidder for the project. Bidders are hereby informed that the Director of the Water Department reserves the right to evaluate and recommend to the City of Fort Worth City Council the bid that is considered to be in the best interest of the City of Fort Worth. For additional information, please contact Peter Z. Lai, P.E., Engineer, RJN Group, Inc. at Telephone Number: (972) 437- 4300 or by email: plai@rjn.com or Roberto C. Sauceda, Project Manager, City of Fort Worth - Water Department at (817) 392-2387 or email: Robert. Sauceda(iUortworthaov.om DALE A. FISSELER, P.E. CITY MANAGER Advertising Dates: Thursday, July 16`h, 2009 Thursday, July 23 h, 2009 S. FRANK CRUMB, P.E MARTY HENDRIX DIRECTOR, WATER DEPARTMENT CITY SECRETARY By: Tony Sholola, P.E Water Department, Engineering Manager Special Instructions To Bidders (Water Department) ., Uw .. w 4M SPECIAL INSTRUCTIONS TO BIDDERS 1) PREOUALIFICATION REQUIREMENTS: All contractors submitting bids are required to be No prequalified by the Fort Worth Water Department prior to submitting bids. This prequalification process will establish a bid limit based on a technical evaluation and financial analysis of the contractor. It is the bidder's responsibility to submit the following documentation: a current financial statement, an acceptable experience record, an acceptable equipment schedule and any other documents 00 the Department may deem necessary, to the Director of the Water Department at least seven (7) calendar days prior to the date of the opening of bids. IM a) The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate State licensing agency and shall have been so prepared as to reflect the financial status to the submitting company. This statement must be current and not more than one (1) year old. In the MW case that a bidding,date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. ,,. b) For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and technical level as that of the project for which bids are to be received. "" c) The Director of the Water Department shall be the sole judge as to the acceptability for financial qualification to bid on any Fort Worth Water Department project. 4W d) Bids received in excess of the bid limit shall be considered non -responsive and will be rejected as such. e) The City, in its sole discretion, may reject any bid for failure to demonstrate experience and/or expertise. f) Any proposals submitted by a non-prequalified bidder shall be returned unopened, and if WR inadvertently opened, shall not be considered. g) The City will attempt to notify prospective bidders whose qualifications (financial or experience) are not deemed to be appropriate to the nature and/or magnitude of the project. on which bids are to be received. Failure to notify shall not be a waiver of any necessary prequalifrcation. 2. BID SECURITY: A cashier's check, or an acceptable bidder's bond, payable to the City of Fort — Worth, in an amount of not less than five (5%) percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeiture in the event the successful bidder fails to execute the Contract Documents within ten (10) days after the contract has been awarded To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 3. BONDS: A performance bond, a payment bond, and a maintenance bond each for one hundred (100%) percent of the contract price will be required, Reference C 3-3.7. 4. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with the following: 06/04/03 boo (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. No Such prevailing wage rates are included in these contract documents. (b) The contractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in ' the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of D-3 Right to Audit pertain to this inspection. �.. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. SW (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. aw The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. r 5. AMBIGUITY: In the case of ambiguity or lack of clearness in stating prices in the Proposal, the City reserves the right to adopt the most advantageous construction thereof to the City or to reject the Proposal. an 6. BIDDER LICENSE: Bidder must be a licensed Contractor in the State of Texas. 7. NONRESIDENT BIDDERS: Pursuant to Article 601 g, Texas Revised. Civil Statutes, the City of Fort Worth will not award this contract to a nonresident bidder unless the nonresident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder to obtain a comparable contract in the state in which the nomesiderifs principal place of business in located. " "Nonresident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this �. state. This provision does not apply if this contract involves federal funds. The appropriate blanks of the Proposal must be filled out by all nonresident bidders in order for the bid to meet specifications. The failure of a nonresident contractor to do so will automatically disqualify that bidder. 8. PAYMENT: If the bid amount is $25,000.00 or less, the contract amount shall be paid within forty- five (45) calendar days after completion and acceptaice by the City. 9. AGE: In accordance with the policy ("Policy") of the Executive Branch of the Federal Government, Contractor covenants that neither it nor any of its officers, members, agents employees, program participants or subcontractors, while engaged in performing this contract, shall, in connection with the employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate against persons because of their age except on the bases of a bona fide occupational qualification, retirement plan or statutory requirement. _ Contractor further covenants that neither it nor its officers, members, agents, employees, subcontractors, program participants, or persons acting on their behalf, shall specify, in solicitations or 06/04/03 .. ,r advertisements for employees to work on this contract, a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirements. ..r Contractor warrants it will fully comply with the policy and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure to comply with the above referenced Policy .. concerning age discrimination in the performance of this agreement. 10. DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor warrants that it and any and all of its subcontractors will not unlawfully .r discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or employees of Contractor or any of its subcontractors. Contractor warrants it will fully comply with ADA's wo provisions and any other applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged failure to ■p comply with the above referenced laws concerning disability discrimination in the performance of this agreement. 11. MINORITY AND WOMEN BUSINESS ENTERPRISES: In accord with City of Fort Worth a' Ordinance No. 15530, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the MBE/WBE UTILIZATION FORM, SUBCONIRACTOR/SUPPLIER UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("with Documentation") and/or the JOINT VENTURE FORM as appropriate. The Documentation must be received by the managing department no later than 5:00 p.m., five (5) City business days after the bid opening date. The bidder shall obtain a receipt from the appropriate employee of the managing department to whom delivery was made. Such receipt shall be evidence that the documentation was received by the City. Failure to comply shall render the bid non -responsive. Upon request, Contractor agrees to provide the Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or women business enterprise (WBF.) on the contract and payment thereof. Contractor further agrees to permit any audit and/or MW examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate Federal, State or local laws or ordinances relating to false statements. Further, any such misrepresentation of facts (other than a negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three (3) years. 12. FINAL PAYMENT, ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment (less retainage) from the city for each pay period. b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. C. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. 06/04/03 up 7 e. Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable. f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities, or (ii) liquidated damages, city shall make a progress payment in the amount that city deems due and payable. g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days. .. %W un n. No 06/04/03 .. wo City of Fort Worth Minority/Women Business Enterprise Policy aw No mg w no FORT WORTH w w w .w No ow a" City of Fort Worth Minority and Women Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is $25,000 or more, the MWWBE goal is applicable. If the total dollar value of the contract is less than $25,000, the M/W BE goal is not applicable. POLICY STATEMENT 11 is the policy of the City of Fort Worth 10 ensure the full and equitable participation by Minority and Women Business Enterprises (M/WBE) in the procurement of all goods and services to the City on a contractual basis. All requirements and regulations stated in the City's current Minority and Women Business Enterprise Ordinance apply to this bid. MNVBE PROJECT GOALS The City's MNVBE goal on this project is 23 % of the total bid (Base bid applies to Parks and Community Services). COMPLIANCE TO BID SPECIFICATIONS On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's M/WBE Ordinance by either of the following: 1. Meet or exceed the above stated MWWBE goal, or •.. 2. Good Faith Effort documentation, or; 3. Waiver documentation, or; 4. Joint Venture. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MWBE documentation in person to the appropriate employee of the managing department and obtain a date/time receipt. Such receipt shall be evidence that the City received the documentation in the time allocated. A faxed copy will not be accepted. 11. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid .0W Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if no MWWBE participation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid f perform all subcontracting/supplier work: opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening dale_ FAILURE TO COMPLY WITH THE CITY'S MWWBE ORDINANCE, WILL RESULT IN THE BID BEING CONSIDERED NON -RESPONSIVE TO SPECIFICATIONS Any questions, please contact the M/WBE Office at (817) 392-6104. Rev. 11/11/05 ATTACHMENT IA Page 1 of 4 mow FO— =�ORTH City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: I Check applicable block to describe prime ftw pIfi- 1ECT NAM I I M/w/DBE4 NON-MNY/DBE BID DATE .. Sanitary Sewer Rehabilitation, Contract LVIII (58) — Part 2 J ^/ City's MIWBE Project Goal: Prime's M/WBE Project Utilization: �/ PROJECY NUMB P254-703170106087 DOE #6039 ..r 23% JC-4*7 % Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing -w Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. ... The undersigned Offeror agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the no bid being considered non -responsive to bid specifications MNVBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or �+ currently doing business in the marketplace at the time of bid. Marketplace is the geographic area of Tarrant, Parker, Johnson, Collin, Dallas, Denton, Ellis, Kaufman and Rockwall counties_ Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1st tier, a payment by a subcontractor to its supplier is considered 2"4 tier ALL MNVBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division. Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized, the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another MNVBE firm, including M/WBE owner -operators, and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs, including owner -operators, but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. Rev. 5/30103 ATTACHMENT IA Page 2 of 4 FORT NORTH Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N aw (check one) � SUBCONTRACTOR/SUPPLIER T N T Detail Detail Company Name Address i e M w C X M Subcontracting Work Supplies Purchased Dollar Amount ON Telephone/Fax r g B T D R O w B E E C T E A ROBERT GRANADOS TRUCKING 4608 Sandage Su'(F) us w' I / Fort Worth, Texas 76115 (817) 875-2400 ..rr Comic ti�e.+� $ Sit 100. CD M i X COWTOWN REDI-MIX Zed •i PO Box 162327 Fort Worth, Texas 76161 I V v (817) 759-1919 f (817) 759-1716 Tm-r,frc-. � 4,5,•oa � Roadrunner Traffic Supply, Inc. c.Lo,. '+'�1 3200 Marquita Drive �t PP) Fort Worth, Texas 76116 phone: 817-244-4524 fax:817-244-4819 VON HAROS BROTHERS BORING 5112 Mosson Road .. Fort Worth, Texas 76119 V/ (817) 572-6332 I no �V VON MJ PIPELINE INSPECTION, INC. PO Box 851 Dsr u, Y-\ e5 Granbury, TX 76048-0851 Melody Bendewald (817) 946-1126 ..n NATIONAL WATF,RWORKS ` l PO Box 840700 v q s Dallas, Texas 75284 .. (800)252-1557 Rev. 5130/03 ATTACHMENT 1A Page 3 of 4 FORTIVORTH Ir— .. Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority, Women and non-M/WBEs. Please list MNVBE firms first, use additional sheets if necessary. .. Certification (check one) N ° SUBCONTRACTOR/SUPPLIER T N T n Detail Detail Company Name Address i M W C X M Subcontracting Work Supplies Purchased Dollar Amount Telephone/Fax T D r B B R O V4 B E E C T E A As�r� 14 JLB Contracting, LLC PO Box 24131 Fort Worth, Texas 76124 (817) 261-2991 11 O RIN KER MATE MATERIALS `}- �Q 1 i 1 `DOD-, P �P lti/v .. PO Box 730197 V Dallas, Texas 75373 —0197 t/ (817)491-4321 I vow .� Rev. 5/30/03 ORT WORTH ATTACHMENT 1A Page 4 of 4 Total Dollar Amount of M/WBE Subcontractors/Suppliers $ Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ q 55, 500•0D The Contractor will not make additions, deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or designee through the submittal of a ,. Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted, it will affect the final compliance determination. _ By affixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including F M/W/DBE(s) arrangements submitted with the bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one (1) year. 3 /G� A izenature Printed Q a e Title tact Namerl itle (if different) �}se � l „C�n�`1-Y � 1 r �-'� �,n �x , L P g) � -°.S 3� -{ 7 �•f 3 �S I ? � 5 �•� � �/ 5� !o Company Name Telephone and/or Fax ? 0.^3Vc Aeyy 14 Samna+s2 dress all Addrbss 1 F► aw�ppj Daft ar Rev. 5/30/03 .. ATTACHMENT 1B Page 1 of 1 00 FORT WORTH �r 00 PRIME COMPANY NAME: City of Fort Worth Prime Contractor Waiver Form PROJECT NAME: low Sanitary Sewer Rehabilitation, Contract LVIII (58) — Part 2 Check applicable block to describe prime MNV/DBE I I NON-MNV/DBE BID DATE City's MfWBE Project Goal: PROJECT NUMBER r P254-703170106087 DOE #6039 23% If both answers to this form are YES, do not complete ATTACHMENT 1C(Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1C. This form is only applicable if both answers are yes. Failure to complete this form, in its entirety and be received by the Mlanaginq Department on or before 5:00 p.m., five (5) City business days after bid opening, exclusive of the bid opening date, will result in the bid being considered non -responsive to bid specifications. w Will you perform this entire contract without subcontractors? YES rr If yes, please provide a detailed explanation that proves based on the size and scope of this project, NO this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO I The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including M/WBE(s) on this contract, the payment therefore and any proposed changes to the original M/WBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the M/WBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or .. debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. w ,r Authorized Signature Printed Signature Title Contact Name (if different) Company Name Phone Number Fax Number r Address Email Address ow City/State/Zip Date Rev. 5/30/03 4W ATTACHMENT 1C Page 1 of 3 low FORT WORTH City of Fort Worth Good Faith Effort Form .. P IME COMPANY NAME: ` j I Check applicable block to describe C_1 j o-n I L prime ROJECT NAME: % I I M/V1//DBE I � NON-M/W/DBE " JI Sanitary Sewer Rehabilitation, Contract LVIII (58) — Part 2 BID DATE Q City's MIWBE Project Goal: PROJECT NUMBER 23% P254-703170106087 DOE #6039 6„ If you have failed to secure MIWBE participation and you have subcontracting and/or supplier opportunities or if your DBE participation is less than the City's project goal, you must complete this form. If the bidder's method of compliance with the MNVBE goal is based upon demonstration of a "good faith effort", the bidder will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 6 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation the facts or intentional discrimination by the bidder. Failure to complete this form, in its entirety with supporting documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non -responsive to bid specifications. V 1.) Please list each and every subcontracting and/or supplier opportunity,) for the completion of this project, regardless of whether it is to be provided by a M/WBE or non-M/WBE. (DO NOT LIST NAMES 11M OF FIRMS) On Combined Projects, list each subcontracting and or supplier opportunity through the 2nd tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities e nr--N Tv,S fip.c ti �Y. n� Li C Conr vYQ+P i2p i ; c. Cn+mil Mir d 0 a 00-0, ow MW low ATTACHMENT 1C Page 2 of 3 2.) Obtain a current (not more than three (3) months old from the bid open date) list of MfWBE subcontractors and/or suppliers from the City's MIWBE Office. ✓Yes No Date of Listing /0,;L/07 3.) Did you solicit bids from MIWBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ILYes (If yes, attach M/WBE mail listing to include name of firm and address and a dated copy of letter mailed.) No 4.) Did you solicit bids from MIWBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? vYes (If yes, attach list to include name of MIWBE firm, person contacted, phone number and date and time of contact.) No NOTE: A facsimile may be used to comply with either 3 or 4, but may not be used for both. If a facsimile is used, attach the fax confirmation, which is to provide MIWBE name, date, time, fax number and documentation faxed. NOTE: If the list of M/WBEs for a particular subcontracting/supplier opportunity is ten (10) or less, the bidder must contact the entire list to be in compliance with questions 3 and 4. If the list of MIWBEs for a particular subcontracting/supplier opportunity is ten (10) or more, the bidder must contact at least two- thirds (2/3) of the list within such area of opportunity, but not less than ten to be in compliance with now questions 3 and 4. 5.) Did you provide plans and specifications to potential M/WBEs or information regarding the location of plans and specifications in order to assist the M/WBEs? .. Yes No 6.) Submit documentation if MIWBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MIWBE was rejected and any supporting documentation the bidder wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the bidder will provide for confidential in -camera access to and inspection of any relevant documentation by City personnel. (Please use additional sheets, if necessary, and attach.) Company Name TelephContact Person Scope of Work on � —fta 0, GL4 ., 14+—, 4.0 Reason for Rejection ... Rev. 05/30/03 ATTACHMENT 1C Page 3 of 3 ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efforts to obtain MNVBE participation on this project. The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance and creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the M/WBE(s) listed was/were contacted in good faith. It is understood that any M/WBE(s) listed in Attachment 1C will be contacted and the reasons for not using them will be verified by the City's B Offic — f &Y1cA.ASR G�/Auoged Signature PNnted Signature pr y, Q Y1+ i Title Contact Name and Title (if different) (1 Company Name Phone Number Fax Number Address ail Address ('l « CpR1 Qk-P9 .. City/StatefZip Date ow .n Rev. 05/30/03 r Part B - Proposal wo m mm W" MW no PART B - PROPOSAL (This proposal must not be removed from this book of Contract Documents.) TO: Dale A. Fisseler, P.E. FROM: (Bidder's Name' rioose,-�G;k ucAio,, -rA LP City Manager 1p . 60A I!Jt.,4 4 $ Fort Worth, Texas Q2 t L Lk) i--(+ n _ TX. "-11.I 1 ci (Address) FOR: Sanitary Sewer Rehabilitation Contract LVIII (58) - Part 2 Sewer Project No. P254-703170106087 DOE # 60391) File # X-20874, City Project # 01060 Pursuant to the foregoing "Notice to Bidders," the undersigned Bidder, having thoroughly examined the plans, specifications, and the site, understands the amount of work to be done and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete the work as provided in the Plans and Specifications, and subject to the inspection and approval of the Director, Water Department of the City of Fort Worth. .. Upon acceptance of this proposal, the bidder is bound to execute a contract and furnish Performance and Payment Bond approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums to -wit: PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE BID Furnish and Install complete in place, including all appurtenant work, the following items: 1. BID 00582 400 LF Pipe — Steel Casing — 30 Inch -Casing Pipe Bore/Jack w/Pressure Grout — Install, per linear foot � it guNd"St Fic+,( Dollars $ 5�D.Do $•DD l,,n Cents 2. BID 00280 2150 LF *Pipe — Sewer — 18 Inch DIP - Other Than Open Cut — Install, per linear foot <,A Uxxir'id 5ix4 Ve- Dollars oa J t7 Cents $ �o $1� 1o. 760 Proposal B-1 Sanitary Sewer Rehabilitation Contract LVIII (58) — Part 2 P254-703170106087 r DOE #6039, File # X-20874 i PAY BID I APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE BID Furnish and Install complete' in place, including all appurtenant work, the following items: 3. BID 00282 1850 LF *Pipe — Sewer — 18 Inch PVC — (All Depths) — Install, per linear foot -1 J 8. Dollars i $ Eaoo $ 15'r, a5D Oa Cents 4. BID 00282 400 LF *Pipe — Sewer — 18 Inch DIP — (All Depths) — Install, per linear foot r. riVj— Dollars $ 1y5. DD 00 Cents 5. BID 00268 250 LF *Pipe — Sewer — 15 Inch PVC — SDR 35 (All '! Depths) — Install, per linear foot Dollars $ $ aD- CC0.00 Cents 6. BID 00259 450 LF *Pipe — Sewer — 12 Inch PVC — SDR 35 (All Depths) — Install, per linear foot 4&IA41 FiJk, Dollars $ Cents 7. BID 00349 250 LF *Pipe — Sewer — 8 Inch DIP — Other Than Open Cut — Install, per linear foot nr -n Ito ��•L DollarsCents $ r 8. BID 00349 25 LF *Pipe — Sewer — 8 Inch HDPE — DR-17 — Other dw Than Open Cut — Install, per linear foot 0,jk �1.11jjtLA `fepj _ D liars "15 ' -NP Proposal B-2 Sanitary Sewer Rehabilitation Contract LVIII (58) - Part 2 P254-703170106087 DOE #6039, File # X-20874 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE BID Furnish and Install complete in place, including all appurtenant work, the following items: 9. BID 00351 130 LF *Pipe - Sewer - 8 Inch PVC - SDR 35 (All Depths) - Install, per linear foot ro r-Ly ;7;Vf— Dollars $ Oo $ WD Cents 10. BID 00351 160 LF *Pipe - Sewer - 8 Inch HDPE - DR-17 (All Depths) - Install, per linear foot F 44-i Dollars Cents 11. BID 00354 1200 LF Sewer Service Line - 4" PVC - Complete In Place - Including Surface Restoration to Match Existing on Private Property and Public ROW - Install, per linear foot ,. ro,(.+-( 17i V4. Dollars N 0 Cents .s 12. BID 00355 30 EA Sewer Service 4" Service Tap - Install, per each 09 I' t�i 1n �'" �i U ACi r�_ Dollars Cents $ MW 13. BID 00356 30 EA Sewer Service - 4" PVC - 2-way Cleanout - aw Install, per each -Tb f e- ` Dollars vb $ q v� 00 no (\M Cents $ -- sm 14. BID 00207 4 EA Manhole - Drop - Std 4' Diam. - (to 6' Depth) - Install, per each ' 6 LIU WN6L Dollars Cents $ 3 \ 5U(�. 00 $ 111 ,0 D Proposal aw Sanitary Sewer Rehabilitation Contract LVIII (58) - Part 2 P254-703170106087 DOE #6039, File # X-20874 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE BID Furnish and Install complete in place, including all appurtenant work, the following items: .w 15. BID 00208 30 VF Manhole — Drop - Std 4' Diam. - Added Depth (Over 6' Depth) — Install, per vertical foot s Dollars $D 0D Qo $ �,00 �Q Cents 16. BID 00213 6 EA Manhole - Std 4' Diam. - (to 6' Depth) — Install, per each r, —T'k MC --T�DL1I-'Arnd Dollars Nn $ �� $ IR OCd• 00 Cents 1 17. BID 00214 5 VF Manhole - Std 4' Diam. - Added Depth (Over 6' Depth) - Install, per vertical foot -,TLj (7 H U 1J d A%a Dollars _ t40 Cents $ 02�.�0 $Avoon.00 —j 18. BID 00944 7 EA Manhole — Drop — Std 5' Diam. - (to 6' Depth) — Install, per each �� Nb ram.{ �► l d 1f�Gi Dollars n bO $� $ 3� �J 00,00 IJ Cents �SoD 19. BID 00945 140 VF Manhole — Drop - Std 5' Diam. - Added Depth (Over 6' Depth) — Install, per vertical foot 111 ` epA U rJa f P.c\ 'F► k+`i D $ q9 DOO. O D Cents 20. BID 00215 12 EA Manhole - Std 5' Diam. - (to 6' Depth) — Install, _ per each v' --T'�\0 L�,Sa Dollars pb $ $ 49X Da *� 1IJ0 Cents ����• Proposal I Sanitary Sewer Rehabilitation Contract LVIII (58) — Part 2 P254-703170106087 DOE #6039, File # X-20874 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID UNIT AMOUNT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE BID Fumish and Install complete in place, including all appurtenant work, the following items: 21. BID 00216 175 VF Manhole - Std 5' Diam. - Added Depth (Over 6' Depth) — Install, per vertical foot so—TV►fee, 4Q Jdj" Dollars Cents $ >\� 22. BID 00211 420 VF Manhole — Paint & Coating — Interior Protective Coating — Install, per vertical foot w ,,tt �_Ntt1J d V,t d. G X44 Dollars N D Cents $---L�u� ► 23. BID 00205 6 EA Manhole — Abandon, per each ,,, T► V I-{ u ^1 d N d Dollars �a Nn Cents $ �JDD.D D $ 3I mow 24. BID 00206 1 EA Manhole — Remove, per each toll Y' d r 06 Dollars $ � dp $ , `! OD Cents t' 25. BID 00198 28 EA Collar — Manhole — 32 Inch — Frame & Cover — Install, per each aI U MCA d,kj Dollars $ c(�Q$ No n Cents 26. BID 00202 4,050 LF Inspection - Pre Construction Cleaning & TV — Study, per linear foot fto W1q Dollars $ rjD $ I b ia5 00 rrf�l Cents Proposal B-5 i Sanitary Sewer Rehabilitation Contract LVIII (58) — Part 2 P254-703170106087 DOE #6039, File # X-20874 PAY BID I APPROX. DESCRIPTION OF ITEMS WITH BID I UNIT AMOUNT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE BID Furnish and Install complete in place, including all appurtenant work, the following items: 27. BID 00201 5,600 LF Inspection - Post Construction Cleaning & TV - Study, per linear foot ■. —T-W b Dollars pa pp $ N O Cents ow 28. BID 00217 28 EA Manhole - Vacuum Test - Services, per each WJ bNe 4UNdV*ck lDollars -,tAJ*) Cents 29. BID 00901 2,900 LF Pipe - Abandon and Fill with Flowable Material, per linear foot (8 Inch to 18 Inch Pipe) x Dollars Cents 30. BID 00372 2,400 LF Trench Safety System (5' Depth) - Install, per linear foot trj 0 Dollars 1 D Cents 31. BID 01174 200 LF Cement Stabilized Backfill - Install, per linear foot sr4 e-60JJ Dollars t7 Cents 32. BID 00423 50 LF Curb & Gutter - Install, per linear foot MW I (11 -(+-� Dollars Cents wr Proposal B-6 $ t -00 $ 4,�tuol $ oo $ 41 9�0,60 $ )F:�,00 $ 3.000.00 $ o b $�D .oD Sanitary Sewer Rehabilitation Contract LVIII (58) — Part 2 P254-703170106087 ` DOE #6039, File # X-20874 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID UNIT ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS PRICE Furnish and Install complete in place, including all appurtenant work, the following items: 33. BID 00401 50 SY Driveway — Install, per square yard Dollars Cents 34. BID 00442 2,200 LF Pavement - 2 Inch HMAC on 6 Inch Flex Base - Temporary — Install, per linear foot w T(N2 IV Dollars .,. N Cents 35. BID 00443 2,200 LF Pavement - 2 Inch Min HMAC on 2/27 Concrete a Base — Install, per linear foot F1 V t' Dollars N 0 Cents 36. BID 00430 400 SY Pavement — 2 Inch Min HMAC on 2/27 Concrete Base — Additional Repair Beyond Trench Width — Install, per square yard Dollars Cents ..e 37. BID 00458 150 LF Pavement - Concrete on 2/27 Concrete Base — Install, per linear foot 1-0 J G fr�j +" Dollars 117 t v Cents 38. BID 00135 100 SY Grass - Seeding — Install, per square yard ' 11 'f 4 p _ Dollars Cents P. AMOUNT BID $ zi!5.ob $ '--� d'-r)00 $ ja .oO $��, -�w vo $ y t).°0 $ 991000.00 $ 30.61 $ Ia 1 '61 $ 4g.ov $ -70,avovD $ '?�.on $ �D,oD Proposal IM r Sanitary Sewer Rehabilitation Contract LVIII (58) — Part 2 P254-703170106087 aw DOE #6039, File # X-20874 PAY BID APPROX. DESCRIPTION OF ITEMS WITH BID ITEM ITEM NO. QUANTITY PRICES WRITTEN IN WORDS Furnish and Install complete in place, including all appurtenant work, the following items: 39. BID 00099 1 LS Storm Water Pollution Prevention Plan < 1 Ac Install, lump sum .. F�f i-1 UJ-"_ tkC Dollars tU D Cents w 40. BID 01189 1 LS Signal — Traffic Control — Design & Provide Install, lump sum -��eP1JDu� nel Dollars !Va Cents no i r N'� we +r. ■/ UNIT AMOUNT PRICE BID Total Amount $ Q 15 `7 q I <3oZ fs .00 '1 o M i 1I ; in ;► ,J e.14u rid re c1---&alan4 `1T1jou sa ✓ nil ` T-uV h4 J I:i J� 7>16 rs ` (In Writing) Proposal B-8 Sanitary Sewer Rehabilitation Contract LVIII (58) — Part 2 P254-703170106087 DOE #6039, File # X-20874 CITY APPROVED PRODUCT * *CONTRACTOR SHALL SELECT TYPE OF PIPE TO BE USED: - STANDARDS C. SPEC. NO. E 1-31 4" thru 36" E1-25 4" thru 15" E 1-27 4" thru 15" E 1-28 18" thru 27" E-100-2 18" thru 48" Consult the "City of Fort Worth, Texas Standard Product List". Failure to provide the information required above may result in rejection of bid as non -responsive. Only products listed above will be allowed for use in this project. Any substitution shall result in *� rejection of bid as non -responsive. w w :.J 00 Proposal .r i • 00 PART B - PROPOSAL (Continued) "W Within ten (10) days after notification by the City, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of this contract. The attached bid security in the amount of 5% is to become the property of the City of Fort Worth, yr Texas, in the event the contract and bond or bonds are not executed and delivered within the time above set forth, as liquidated damages for the delay and additional work caused thereby. The undersigned bidder certified that he has been furnished at least one set of the General Contract Documents and w" General Specifications for Water Department Projects dated January 1, 1978, and that he has read and thoroughly understands all the requirements and conditions of those General Documents and the Specific Contract Documents and appurtenant plans. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.7400. (Complete A or B below, as applicable:) A. The principal place of business of our company is in the State of .. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statue is attached. Nonresident bidders in the State of our principal place of business, are not required to underbid resident bidders. The principal place of business of our company or our parent company or majority owner is in the State of Texas. This contract is issued by an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (F) of the Texas Limited Sales, Excise and Use Tax Act. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under house Bill 11, enacted August 15, 1992. The successful Bidder shall be required to complete the attached Statement of Materials and Other Charges contractor at the time of executing the contract. .r The Bidder agrees to begin construction within 10 calendar days after issue of the work order, and to complete construction within 210 calendar days after the beginning of construction as set forth in the written order to be furnished by the Owner. This project is included in the Administrative Order issued by the U.S. Environmental Protection Agency, and contract completion within the above stipulated contract time will be strictly enforced. I (we) acknowledged receipt of the following addenda to the plans and specifications, all of the provisions and so requirements of which have been taken into consideration in preparation of the foregoing bid: wo Addendum No. 1 (Initials) Addendum No. 2 (Initials) Addendum No. 3 (Initials) Addendum No. 4 (Initials) (SEAL) Date: U t kn C1 �,0ry ec ely ubmitted, TX LIU tloi. Y- Yu if � lTn By: Address:..i�,-"0&,C ISH 419,Ej, KJ0k6,-T X -14 119 Telephone: S I -) - IS 3 y -11 y3 Proposal CJ Part C — General Conditions .. me 4W my +s XW go .w ow .w we of aw ow .. .w PART C - GENERAL CONDITIONS TABLE OF CONTENTS NOVEMBER 1, 1987 TABLE OF CONTENTS C1-1 DEFINITIONS C1-1.1 Definition of Terms C1-1(1) C1-1.2 Contract Documents C1-1(1) C1-1.3 Notice to Bidders C1-1(2) C1-1.4 Proposal C1-1(2) C1-1.5 Bidder C1-1(2) C1-1.6 General Conditions C1-1(2) C1-1.7 Special Conditions C1-1(2) C1-1.8 Specifications C1-1(2) C1-1.9 Bond C1-1(3) C1-1.10 Contract C1-1(3) C1-1.11 Plans C1-1(3) C1-1.12 City C1-1(3) C1-1.13 City Council C1-1(3) C1-1.14 Mayor C1-1(3) C1-1.15 City Manager C1-1(4) C1-1.16 City Attorney C1-1(4) C1-1.17 Director of Public Works C1-1(4) C1-1.18 Director, City Water Department C1-1(4) C1-1.19 Engineer C1-1(4) C1-1.20 Contractor C1-1(4) C1-1.21 Sureties C1-1(4) C1-1.22 The Work or Project C1-1(4) C1-1.23 Working Day C1-1(5) C1-1.24 Calendar Day C1-1(5) C1-1.25 Legal Holiday C1-1(5) C1-1.26 Abbreviations C1-1(5) C1-1.27 Change Order C1-1(6) C1-1.28 Paved Streets and Alleys C1-1(6) C1-1.29 Unpaved Streets and Alleys C1-1(7) C1-1.30 City Streets C1-1(7) C1-1.31 Roadway C1-1(7) C1-1.32 Gravel Street C1-1(7) C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 Proposal Form C2-2(1) C2-2.2 Interpretation of Quantities C2-2(2) C2-2.3 Examination of Contract Documents and Site C2-2(2) C2-2.4 Submitting of Proposal C2-2(3) C2-2.5 Rejection of Proposals C2-2(3) C2-2.6 Bid Security C2-2(3) C2-2.7 Delivery of Proposal C2-2(4) C2-2.8 Withdrawing Proposals C2-2(4) C2-2.9 Telegraphic Modification of Proposals C2-2(4) C2-2.10 Public Opening of Proposals C2-2(4) C2-2.11 Irregular Proposals C2-2(5) C1-1 (1) 9" C2-2.12 Disqualification of Bidders C2-2(5) C3-3 AWARD OF EXECUTION OF DOCUMENTS C3-3.1 Consideration of Proposals C3-3(1) C3-3.2 Minority Business Enterprise/ Women -Owned Business Enterprise Compliance C3-3(1) C3-3.3 Equal Employment Provisions C3-3(1) C3-3.4 Withdrawal of Proposals C3-3(2) C3-3.5 Award of Contract C3-3(2) C3-3.6 Return of Proposal Securities C3-3(2) C3-3.7 Bonds C3-3(2) C3-3.8 Execution of Contract C3-3(4) C3-3.9 Failure to Execute Contract C3-3(4) C3-3.10 Beginning Work C3-3(4) C3-3.11 Insurance C3-3(4) C3-3.12 Contractor's Obligations C3-3(7) �. C3-3.13 Weekly Payroll C3-3(7) C3-3.14 Contractor's Contract Administration C3-3(7) C3-3.15 Venue C3-3(8) C4-4 SCOPE OF WORK C4-4.1 Intent of Contract Documents C4-4(1) C4-4.2 Special Provisions C4-4(1) MP C4-4.3 Increased or Decreased Quantities C4-4(1) C4-4.4 Alteration of Contract Documents C4-4(2) -- C4-4.5 Extra Work C4-4(2) C4-4.6 Schedule of Operations C4-4(4) C4-4.7 Progress Schedules for Water and Sewer Plant Facilities C4-4(4) C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 Authority of Engineer C5-5(1) C5-5.2 Conformity with Plans C5-5(1) C5-5.3 Coordination of Contract Documents C5-5(2) C5-5.4 Cooperation of Contractor C5-5(2) C5-5.5 Emergency and/or Rectification Work C5-5(3) C5-5.6 Field Office C5-5(3) C5-5.7 Construction Stakes C5-5(3) C5-5.8 Authority and Duties of Inspectors C5-5(4) C5-5.9 Inspection C5-5(5) C5-5.10 Removal of Defective and Unauthorized Work C5-5(5) C5-5.11 Substitute Materials or Equipment C5-5(6) C5-5.12 Samples and Tests of Materials C5-5(6) C5-5.13 Storage of Materials C5-5(7) C5-5.14 Existing Structures and Utilities C5-5(7) C5-5.15 Interruption of Service C5-5(8) C5-5.16 Mutual Responsibility of Contractors C5-5(9) C5-5.17 Cleanup C5-5(9) C5-5.18 Final Inspection C5-5(9) C6-6 LEGAL RELATIONS AND PUBLIC +,w RESPONSIBILITY C1-1 (1) .� up C6-6.1 Laws to be Observed C6-6(1) C6-6.2 Permits and Licenses C6-6(1) w C6-6.3 Patented Devices, Materials and Processes C6-6(1) C6-6.4 Sanitary Provisions C6-6(2) C6-6.5 Public Safety and Convenience C6-6(2) C6-6.6 Privileges of Contractor in Streets, Alleys, and Rights -of -Way C6-6(3) C6-6.7 Railway Crossings C6-6(4) ,.� C6-6.8 Barricades, Warnings and Watchmen C6-6(4) C6-6.9 Use of Explosives, Drop Weight, etc. C6-6(6) C6-6.10 Work Within Easements C6-6(6) C6-6.11 Independent Contractor C6-6(8) C6-6.12 Contractor's Responsibility for Damage Claims C6-6(9) C6-6.13 Contractor's Claim for Damages C6-6(9) +.r C6-6.14 Adjustment or Relocation of Public Utilities, etc. C6-6(10) C6-6.15 Temporary Sewer Drain Connections C6-6(10) C6-6.16 Arrangement and Charges of Water �► Furnished by City C6-6(10) C6-6.17 Use of a Section or Portion of the Work C6-6(11) C6-6.18 Contractor's Responsibility for Work C6-6(11) C6-6.19 No Waiver of Legal Rights C6-6(11) .. C6-6.20 Personal Liability of Public Officials C6-6(12) C6-6.21 State Sales Tax C6-6(12) nr C7-7 PROSECUTION AND PROGRESS C7-7.1 Subletting C7-7(1) C7-7.2 Assignment of Contract C7-7(1) C7-7.3 Prosecution of the Work C7-7(1) 09 C7-7.4 Limitations of Operations C7-7(2) C7-7.5 Character of Workmen and Equipment C7-7(2) C7-7.6 Work Schedule C7-7(3) No C7-7.7 Time of Commencement and Completion C7-7(4) C7-7.8 Extension of Time of Completion C7-7(4) C7-7.9 Delays C7-7(5) C7-7.10 Time of Completion C7-7(5) aw C7-7.11 Suspension by Court Order C7-7(6) C7-7.12 Temporary Suspension C7-7(6) C7-7.13 Termination of Contract Due to National Emergency C7-7(7) go C7-7.14 Suspension or Abandonment of the Work and Annulment of Contract C7-7(8) C7-7.15 Fulfillment of Contract C7-7(10) "V C7-7.16 Termination for Convenience of the Owner C7-7(10) C7-7.17 Safety Methods and Practices C7-7(13) .r .r C8-8 C8-8.1 C8-8.2 C8-8.3 C8-8.4 C8-8.5 MEASUREMENT AND PAYMENT Measurement of Quantities Unit Prices Lump Sum Scope of Payment Partial Estimates and Retainage C1-1 (1) C8-8(1) C8-8 (1) C8-8 (1) C8-8(1) C8-8(2) so C8-8.6 Withholding Payment C8-8(3) C8-8.7 Final Acceptance C8-8(3) C8-8.8 Final Payment C8-8(3) C8-8.9 Adequacy of Design C8-8(4) C8-8.10 General Guaranty C8-8(5) C8-8.11 Subsidiary Work C8-8(5) C8-8.12 Miscellaneous Placement of Material C8-8(5) C8-8.13 Record Documents C8-8(5) am PART C — GENERAL CONDITIONS C1-1 DEFINTIONS SECTION C1-1 DEFINITIONS C1-1.1 DEFINITIONS OF TERMS: Whenever in these Contract Documents the following terms or pronouns in place of them are r used, the intent and meaning shall be understood and interpreted as follows: C1-1.2 CONTRACT DOCUMENTS: The Contract Documents are all of the written and drawn documents, such as specifications, bonds, addenda, plans, etc., which govern the terms and performance of ,r the contract. These are contained in the General Contract Documents and the Special Contract Documents. +.r a. GENERAL CONTRACT DOCUMENTS: The General Contract Documents govern all Water Department Projects and include the following items: .r PART A - NOTICE TO BIDDERS (sample) White PART B - PROPOSAL (sample) White PART C - GENERAL CONDITIONS (CITY) Canary Yellow w C1-1 (1) so =J (Developer) Brown PART D - SPECIAL CONDITIONS Green PART E - SPECIFICATIONS El -White E2-Goldenrod E2A-White ..r PERMITS/EASEMENTS Blue PART F - BONDS (Sample) White PART G - CONTRACT (Sample) White s b. SPECIAL CONTRACT DOCUMENTS: The Special Contract Documents are prepared for each specific project as a supplement to the General. Contract Documents and include the following items: PART A - NOTICE TO BIDDERS (Advertisement) Same as .s above PART B - PROPOSAL (Bid) PART C - GENERAL CONDITIONS r PART D - SPECIAL CONDITIONS PART E - SPECIFICATIONS PERMITS/EASEMENTS PART F - BONDS No wr w .r 4W ow we "0 .r C1-1 (1) sw PART G - CONTRACT PART H - PLANS (Usually bound separately) C1-1.3 NOTICE TO BIDDERS: All of the legal publications either actually published in public advertising mediums or furnished directly to interested parties pertaining to the work contemplated under the Contract Documents constitutes the Notice to Bidders. C1-1.4 PROPOSAL: The completed written and signed offer or tender of a bidder to perform the work which the Owner desires to have done, together with the bid security, constitutes the Proposal, which becomes binding upon the Bidder when it is officially received by the Owner, has been publicly opened and read and not rejected by the Owner. C1-1.5 BIDDER: Any person, persons, firm, partnership, company, association, corporation, acting directly or through a duly authorized representative, submitting a proposal for performing the work contemplated under the Contract Documents, constitutes a bidder. C1-1.6 GENERAL CONDITIONS: The General Conditions are the usual construction and contract requirements which govern the performance of the work so that it will be carried on in accordance with the customary procedure, the local statutes, and requirements of the City of Fort Worth's charter and promulgated ordinances. Wherever there may be a conflict between the General Conditions and Special Conditions, the latter shall take precedence and shall govern. C1-1.7 SPECIAL CONDITIONS: Special conditions are the specific requirements which are necessary for the particular project covered by the contract Documents and not specifically covered in the General Conditions. When considered with the General Conditions and other elements of the Contract Documents they provide the information which the Contractor and Owner should have in order to gain a thorough knowledge of the project. C1-1.8 SPECIFICATIONS: The Specifications are that section or part of the Contract Documents which sets forth in detail the requirements which must be met by all materials, construction, workmanship, equipment and services in order to render a completed and useful project. Whenever reference is made to C1-1 (2) w standard specifications, regulations, requirements, statutes, etc., such referred to documents shall become a part of the Contract Documents just as thought they were embodied therein. C1-1.9 BOND: The bond or bonds are the written guarantee or .i security furnished by the Contractor for the prompt and faithful performance of the contract and include the following: ow a. Performance Bond (see paragraph C3-3.7) b. Payment Bond (see paragraph C3-3.7) C. Maintenance Bond (see paragraph C3-3.7) wo d. Proposal or Bid Security (see Special Instructions to Bidders, Part a and C2-2.6) w C1-1.10 CONTRACT: The Contract is the formal signed agreement between the Owner and the Contractor covering the mutual understanding of the two contracting parties about the project ww to be completed under the Contract Documents. C1-1.11 PLANS: The plans are the drawings or reproductions therefrom made by the Owner's representative showing in detail Im the location, dimension and position of the various elements of the project, including such profiles, typical cross -sections, layout diagrams, working drawings, preliminary drawings and such No supplemental drawings as the Owner may issue to clarify other drawings or for- the purpose of showing changes in the work hereinafter authorized by the Owner. The plans are usually .o bound separately from other parts of the Contract Documents, but they are a part of the Contract Documents just as though they were bound therein. ow C1-1.12 CITY: The City of Fort Worth, Texas, a municipal corporation, authorized and chartered under the Texas State ar Statutes, acting by and through its governing body or its City Manager, each of which is required by charter to perform specific duties. Responsibility for final enforcement of Contracts involving the City of Fort Worth is by Charter vested .w in the City Manager. The terms City and Owner are synonymous. C1-1.13 CITY COUNCIL: The duly elected and qualified governing ow body of the City of Fort Worth, Texas. C1-1.14 MAYOR: The officially elected Mayor, or in his absence, V+ the Mayor Pro tem of the City of Fort Worth, Texas. w no C1-1 (3) "W RM on C1-1.15 CITY MANAGER: The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly Aw authorized representative. C1-1.16 CITY ATTORNEY: The officially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized representative. C1-1.17 DIRECTOR OF PUBLIC WORKS: The duly appointed official of the City of Fort Worth, referred to in the Charter as the City Engineer, or his duly authorized representative. C1-1.18 DIRECTOR, CITY WATER DEPARTMENT: The duly appointed Director of the City Water Department of the City of Fort Worth, Texas, or his duly authorized representative, assistant, or agents. C1-1.19 ENGINEER: The Director of Public Works, the Director of the Fort Worth City Water Department, or their duly authorized assistants, agents, engineers, inspectors, or superintendents, acting within the scope of the particular duties entrusted to them. C1-1.20 CONTRACTOR: The person, persons, partnership, company, "* firm, association, or corporation, entering into a contract with the Owner for the execution of the work, acting directly or through a duly authorized representative. A sub -contractor is a ** person, firm corporation, or others under contract with the principal contractor, supplying labor and materials or only labor, for work at the site of the project. C1-1.21 SURETIES: The Corporate bodies which are bound by such bonds are required with and for the Contractor. The sureties engaged are to be fully responsible for the entire and satisfactory fulfillment of the Contract and for any and all requirements as set forth in the Contract Documents and approved changes therein. C1-1.22 THE WORK OR PROJECT: The completed work contemplated in and covered by the Contract Documents, including but not limited to the furnishing of all labor, materials, tools, equipment, and incidentals necessary to produce a completed and serviceable project. 4W MW C14 (4) no aw C1-1.23 WORKING DAY: A working day is defined as a calendar "" day, not including* Saturdays, Sundays, and legal holidays, in which the weather or other conditions not under the control of the Contractor permit the performance of the principal unit of work for a period of not less than seven (7) hours between 7:00 a.m. and 6:00 p.m., with exceptions as permitted in paragraph C7-7.6. s C1-1.24 CALENDAR DAYS: A calendar day is any day of the week or month, no days being excepted. C1-1.25 LEGAL HOLIDAYS: Legal holidays shall be observed as prescribed by the City Council of the City of Fort Worth for .. observance by City employees as follows: 1. New Year's Day January 1 2. M.L. King, Jr. Birthday- Third Monday in January '♦ 3. Memorial Day Last Monday in May 4. Independence Day July 4 5. Labor Day First Monday in September MW 6. Thanksgiving Day Fourth Thursday in November 7. Thanksgiving Friday Fourth Friday in November 8. Christmas Day December 25 # 9. Such other days in lieu of holidays as the City Council may determine. no When one of the above named holidays or a special holiday declared by the City Council, falls on Saturday, the holiday shall be observed on the preceding Friday, or if .it falls on ,e Sunday, it shall be observed on the following Monday by those employees working on working day operations. Employees working calendar day operations will consider the calendar holiday as aw the holiday. C1-1.26 ABBREVIATIONS: Wherever the abbreviations defined herein appear in Contract Documents, the intent and meaning 'w shall be as follows: AASHTO - American Association of State Highway Transportation Officials ASCE - American Society of Civil Engineers LAW - In Accordance With AWWA - American Water Works Association ASA - American Standards Association HI - Hydraulic Institute s =0 Cl-1 (5) qW - Asph. - Asphalt Ave. - Avenue Blvd. - Boulevard CI - Cast Iron CL - Center Line GI - Galvanized Iron Lin. - Linear or Lineal lb. - Pound MH - Manhole mow Max. - Maximum MGD -Million Gallons per Day CFS - Cubic Foot per Second Min. - Minimum Mono. - Monolithic % - Percentum R - Radius I.D. - Inside Diameter O.D. - Outside Diameter - Elev. - Elevation F - Fahrenheit C - Centigrade In. - Inch Ft. - Foot St. - Street CY - Cubic Yard Yd. - Yard SY - Square Yard L.F. - Linear Foot D.I. - Ductile Iron C1-1.27 CHANGE ORDER: A "Change Order" is a written ... supplemental agreement between the Owner and the Contractor covering some added or deducted item or feature which may be found necessary and which was not specifically included in the scope of the project on which bids were submitted. Increase in unit quantities stated in the proposal are not the subject matter of a Change Order unless the increase or decrease is more than 25% of the amount of the particular item or items in the original proposal. All "Change Orders" shall be prepared by the City from information as necessary furnished by the Contractor. C1-1.28 PAVED STREETS AND ALLEYS: A paved street or alley shall be defined as a street or alley having one of the following types of wearing surfaces applied over the natural unimproved surface: w'* C14 (6) aw 00 1. Any type of asphaltic concrete with or without separate base material. 2. Any type of asphalt surface treatment, not including an oiled surface, with or without separate base .r material. 3. Brick, with or without separate base material. 4. Concrete, with or without separate base material. ,,. 5. Any combination of the above. C1-1.29 UNPAVED STREETS OR ALLEYS: An unpaved street, alley, MW roadway or other surface is any area except those defined above for "Paved Streets and Alleys." .� C1-1.30 CITY STREETS: A city street is defined as that area between the right-of-way lines as the street is dedicated. C1-1.31 ROADWAY: The roadway is defined as the area between " parallel lines two (2') feet back of the curb lines or four (41) feet back of the average edge of pavement where no curb exists. C1-1.32 GRAVEL STREET: A gravel street is any unpaved street to which has been added one or more applications of gravel or similar material other than the natural material found on the �► street surface before any improvement was made. ,. A MW .w "W MW Aw No C1-1 (7) UW - so SECTION C—GENERAL CONDITIONS C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL SECTION C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL C2-2.1 PROPOSAL FORM: The Owner will furnish bidders with proposal forms which will contain an itemized list of the items of work to be done or materials to be furnished and upon which bid prices are requested. The Proposal form will state the Bidder's general understanding of the project to be completed, provide a space for furnishing the amount of bid security, and state the basis for entering into a formal contract. The Owner will furnish forms for the Bidder's "Experience Record," "Equipment Schedule," and "Financial Statement," all of which must be properly executed and filed with the Director of the City Water Department one week prior to the hour for opening of bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Liquid assets in the amount of ten (10%) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualification in work of both the same nature and magnitude as that of the project for which bids are to be received. Such experience must have been on projects completed not more than five (5) years prior to the date on which bids are to be received. The Director of the Water Department shall be sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department project. The prospective bidder shall available for the project and additional equipment as may be on which he submits a bid. schedule the equipment he has state that he will rent such required to complete the project C2-2 (1) ..o b" M W M *W "F ow M .. .. C2-2.2 INTERPRETATION OF QUANTITIES: The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and +� Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or ,,. any other requirements of the Contract Documents. C2-2.3 EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF PROJECT: .� Bidders are advised that the Contract Documents on file with the Owner shall constitute all of the information which the Owner will furnish. All additional information and data which the owner will supply after promulgation of the formal contract w documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. Prior to the filing of proposal, bidders are required to read a' and become familiar with the Contract Documents, to visit the site of the project and examine carefully all local conditions, to inform themselves by their own independent research and .w investigations, tests, boring, and by such other means as may be necessary, to gain a complete knowledge of the conditions which will be encountered during the construction of the project. MW They must judge for themselves the difficulties of the work and all attending circumstances affecting the cost of doing the work or the time required for its completion, and obtain all information required to make an intelligent proposal. No information given by the Owner or any representative of the Owner other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon ..� the Owner. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information "r upon which the proposal is to be based. It is mutually agreed that the submission of a proposal in prima -facie evidence that the bidder has made the investigations, examinations and tests MW herein required. Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated in the Contract Documents will not No be allowed. .. C2-2 (2) The logs of Soil Borings, if any, showing on the plans are for general information only and may not be correct. Neither the Owner nor the Engineer guarantees that. the data shown is representative of conditions which actually exist. C2-2.4 SUBMITTING OF PROPOSAL: The bidder shall submit his Proposal on the form furnished by the Owner. All blank spaces applicable to the project contained in the form shall be correctly filled in and the bidder shall state the prices, written in ink in both words and numerals, for which he proposes to do the work contemplated or furnish the materials required. All such prices shall be written legibly. In case of discrepancy between the price written in words and the price written in numerals, the price most advantageous to the City shall govern. If a proposal is submitted -by an individual, his or her name must be signed by his (her) duly authorized agent. If a proposal is submitted by a firm, association, or partnership, the name and address of each member must be given, and the proposal must be signed by a member of the firm association, or partnership, or by a person duly authorized. If a proposal is submitted by 'a company or corporation, the company or corporate name and business address must be given, and the proposal signed by an official or duly authorized agent. The corporate seal must be affixed. Power of Attorney authorizing agents or others to sign proposal must be properly certified and must be in writing and submitted with the proposal. C2-2.5 REJECTION OF PROPOSALS: Proposals may be rejected if they show any alteration of words or figures, additions not called for, conditional or uncalled for alternate' bids, incomplete bids, erasures, or irregularities of any kind, or contain unbalanced values of any items. Proposals tendered or delivered after the official time designated for receipt of proposals shall be returned to the Bidder unopened. C2-2.6 BID SECURITY: No proposal will be considered unless it is accompanied by a "Proposal Security" of the character and in the amount indicated in the "Notice to Bidders" and the "Proposal." The Bid Security is required by the Owner as evidence of good faith on the part of the Bidder, and by way of a guaranty that if awarded the contract, the Bidder will within the required time execute a formal contract and furnish the required performance and other bonds. The bid security of the C2-2 (3) .. .o three lowest bidders will be retained until the contract is awarded or other disposition is made thereof. The bid security *' of all other bidders may be returned promptly after the canvass of bids. •w C2-2.7 DELIVERY OF PROPOSALS: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the City Manager or his representative in the official place ww of business as set forth in the "Notice to Bidders." It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere Jact that a proposal „W was dispatched will not be considered. The Bidder must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL" and the name of .o description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the City Manager, City Hall, Fort Worth, Texas. 'w C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the City Manager, cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a 'o proposal must be made in writing, addressed to the City manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non- aw consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the City Manager prior to the said proposal opening time, and provided further, that _ the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. C2-2.10 PUBLIC OPENING OF PROPOSAL: Proposals which have been properly filed and for which no "Non -consideration Request" has been received will be publicly opened and read aloud by the City Manager or his authorized representative at the time and place indicated in the "Notice to Bidders." All proposals which have been opened and read will remain on file with the owner until "w C2-2 (4) sw top the contract has been awarded. Bidders or their authorized representatives are invited to be present for the opening of bids. C2-2.11 IRREGULAR PROPOSALS: Proposals shall be considered as being "Irregular" if they show any omissions, alterations of form, additions, or conditions not called for, unauthorized alternate bids, or irregularities of any kind. However, the Owner reserves the right to waive any and all irregularities and to make the award of the contract to the best interest of the City. Tendering a proposal after the closing hour is an irregularity which cannot be waived. C2-2.12 DISQUALIFICATION OF BIDDERS: Bidders may be disqualified and their proposals not considered for any of, but not limited to, the following reasons: a. Reasons for believing that collusion exists among bidders. b. Reasonable grounds for believing that any bidder is interested in more than one proposal for work contemplated. C. The bidder being interested in any litigation against the Owner or where the Owner may have a claim against or be engaged in litigation against the bidder. d. The bidder being in arrears on any existing contract or having defaulted on a previous contract. e. The bidder having performed a prior contract in an unsatisfactory manner. f. Lack of competency as revealed by the financial statement, experience record, equipment schedule, and such inquiries as the Owner may see fit to make. g. Uncompleted work which, in the judgment of the Owner, will prevent or hinder the prompt completion of additional work if awarded. h. The bidder not filing with the Owner, one week in advance of the hour of the opening of proposals the following: 1. Financial Statement showing the financial condition of the bidder as specified in Part "A" - Special Instructions. 2. A current experience record showing especially the projects of a nature similar to the one under consideration, which have been successfully completed by the Bidder. L---J W ur 4M 4W 9W MP C2-2 (5) aw MW 3. An equipment schedule showing the equipment the bidder has available for use on the project. The Bid Proposal of a bidder who, in the judgment of the Engineer, is disqualified under the requirements stated herein, "O shall be set aside and not opened. .. aw .. .. No .r r VW .0 r "W s no WO C2-2 (6) Sr w PART C-GENERAL CONDITIONS C3-3 AWARD AND EXECUTION OF DOCUMENTS `o SECTION C3-3 AWARD AND EXECUTION OF DOCUMENTS ,o C3-3.1 CONSIDERATION OF PROPOSALS: After proposals have been opened and read aloud, the proposals will be tabulated on the +� ba.sis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of brining items to a common basis as may be established in the .� Contract Documents. The total obtained by taking the sum of the products of unit 4, prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will -..be considered as the amount of the fto bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re -advertise for new proposals, or to proceed with the work in any manner as may be considered for the best interest of the Owner. C3-3.2 MINORITY BUSINESS ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE: Contractor agrees to provide to Owner, �* upon request, complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) an/or a Woman -Owned Business Enterprise (WBE) on the contract and the payment therefore. Contractor further agrees, upon request by Owner, to allow an audit and/or an examination of any books, records, or files in the possession of Contractor that will substantiate the actual work performed by the MBE or WBE. Any material misrepresentation of any nature will be grounds for termination of the contract and for initiating any action under appropriate federal, state or local laws and ordinances relating to false statements; further, any such misrepresentation may be grounds for disqualification of Contractor at Owner's discretion for bidding on future contracts with the Owner for a period of time of not less than six (6) months. C3-3.3 EQUAL EMPLOYMENT PROVISIONS: The Contractor shall comply with current City Ordinance prohibiting discrimination in employment practices. The Contractor shall post the required N. C3-3 (1) go ,. MW notice to that effect on the project site, and at his request, will be provided assistance by the City of Fort Worth's Equal go Employment Officer who will refer any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may be acquired from the Equal Employment Officer. C3-3.4 WITHDRAWAL OF PROPOSALS: After a proposal has been read by the Owner it cannot be withdrawn by the Bidder within forty- five (45) days after the date on which the proposals were opened. .. C3-3.5 AWARD OF CONTRACT: The Owner reserves the right to withhold final action on the proposals for a reasonable time, not to exceed forty-five (45) days after the date of opening ,W proposals, and in no event will an award be made until after investigations have been made as to the responsibility of the proposed awardee. go The award of the contract, if an award is made, will be to the lowest and best responsible bidder. EW The award of the contract shall not become effective until the Owner has notified the Contractor in writing of such award. C3-3.6 RETURN OF PROPOSAL SECURITIES: As soon as proposed price totals have been determined for comparison of bids, the Owner may, at its discretion, return the proposal security which accompanied the proposals which, in its judgment, would not be considered for the award. All other proposal securities, usually those of the three lowest bidders, will be retained by .. the owner until the required contract has been executed and bond furnished or the Owner has otherwise disposed of the bids, after which they will be returned by the City Secretary. C3-3.7 BONDS: With the execution and delivery of the Contract Documents, the Contractor shall furnish to, and file with the Owner in the amounts herein -required, the following bonds: a. PERFORMANCE BOND: A good and sufficient performance bond in an amount not less than 100 percent of the .. amount of the contract, as evidenced by the proposal and tabulation or otherwise, guaranteeing the full and faithful execution of the work and performance of the contract, and for the protection of the Owner and all other persons against damage by reason of negligence of the Contractor, or improper execution of the work C3-3 (2) +r b. or the use of inferior materials. This performance bond shall guarantee the payment for all labor, materials, equipment, supplies, and services used in the construction of the work, and shall remain in full force and effect until provisions as above stipulated are accomplished and final payment is made on the project by the City. C. MAINTENANCE BOND: A good and sufficient maintenance ++ bond, in the amount of not less than 100 percent of the amount of the contract, as evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful performance of the general guaranty which is set forth in paragraph C8-8.10. d. PAYMENT BOND: A good and sufficient payment bond, in an amount not less than 100 percent of the amount of the contract, as -evidenced by the proposal tabulation or otherwise, guaranteeing the prompt, full and faithful payment of all claimants as defined in Article 5160, Revised Civil Statutes of Texas, 1925, as amended by House Bill 344 Acts 56th Legislature, Regular Session, 1959, effective April 27, 1959, and/or the latest version thereof, supplying labor and materials in the prosecution of the work provided for in the contract being constructed under these specifications. Payment Bond shall remain in force until all payments as above stipulated are made. e. OTHER BONDS: Such other bonds as may be required by these Contract Documents shall be furnished by the low Contractor. No sureties will be accepted by the Owner which are at the time in default or delinquent on any bonds or which are interested in any litigation against the owner. All bonds shall be made on the forms furnished by the Owner and shall be executed by an approved surety company doing business in the City of Fort Worth, Texas, and which is acceptable to the owner. In order to be acceptable, the name of the surety shall be included on the current U.S. Treasury list of acceptable sureties, and the +� amount of bond written by any one acceptable company shall not exceed the amount shown on the Treasury List for that company. Each bond shall be properly executed by both the Contractor and the .Surety Company. 4W No C3-3 (3) no .. r .+ r Should any surety on the contract be determined unsatisfactory at any time by the Owner, notice will be given the Contractor to that effect and the Contractor shall immediately provide a new surety satisfactory to the Owner. No payment will be made under the contract until the new surety or sureties, as required, have qualified and have been accepted by the Owner. The contract shall not be operative nor will any payments be due or paid until approval of the bonds by the Owner. C3-3.8 EXECUTION OF CONTRACT: Within ten (10) days after the .r Owner has by appropriate resolution, or otherwise, awarded the contract, the Contractor shall execute and file with the Owner the Contract and such bonds as may be required in the Contract „„ Documents. C3-3.9 FAILURE TO EXECUTE CONTRACT: The failure of the Awardee w to execute the required bond -or bonds or to sign the required contract within ten (10) days after the contract is awarded shall be considered by the Owner as an abandonment of his proposal, and the Owner may annul the Award. By reason of the r uncertainty of the market prices of material and labor, and it being impracticable and difficult to accurately determine the amount of damages occurring to the Owner by reason of said awardee's failure to execute said bonds and contract within ten (10) days, the proposal security accompanying the proposal shall be the agreed amount of damages which Owner will suffer by M+ reason of such failure on the part of the Awardee and shall thereupon immediately be forfeited to the Owner. .. The filing of a proposal will be considered as an acceptance of this provision by the Bidder. C3-3.10 BEGINNING WORK: The Contractor shall not commence work until authorized in writing to do so by the Owner. Should the Contractor fail to commence work at the site of the project within the time stipulated in the written authorization usually termed the "Work Order" or "Proceed Order", it is agreed that the surety Company will, within ten 910) days after the commencement date set forth in such written authorization, ' commence the physical execution of the contract. C3-3.11 INSURANCE: The Contractor shall not commence work under this contract until he has obtained all the insurance required under the Contract Documents, and such insurance has been approved by the Owner. The prime Contractor shall be ,r ,r C3-3 (4) M. responsible for delivering to the Owner the sub -contractor's certificate of insurance for approval. The prime contractor shall indicate of the certificate of insurance included in the documents for execution whether or not his insurance covers sub- contractors. It is the intention of the Owner that the insurance coverage required herein shall include the coverage of all sub -contractors. a. COMPENSATION INSURANCE: The Contractor shall maintain, during the life of this contract, Workers' Compensation Insurance on all of his employees to be engaged in work on the project under this contract, and for all sub -contractors. . In case any class of employees engaged in hazardous work on the project under this contract is not protected under the Workers' compensation Statute, the Contractor shall provide adequate employer's general liability insurance for the protection of such of his employees not so protected. b. COMPREHENSIVE GENERAL LIABILITY INSURANCE: The Contractor shall procure and shall maintain during the life of this contract Contractor's Comprehensive General Liability Insurance (Public Liability and Property Damage Insurance) in an amount not less than $500,000 covering each occurrence on account of bodily injury, including death, and in an amount not less than $500,000 covering 'each occurrence on account of property damage with $2,000,000 umbrella policy coverage. C. ADDITIONAL LIABILITY: The Contractor shall furnish insurance as separate policies or by additional endorsement to one of the above -mentioned policies, and in the amount as set forth for public liability and property damage, the following insurance: 1. Contingent Liability (covers General Contractor's Liability for acts of sub -contractors). 2. Blasting, prior to any blasting being done. 3. Collapse of buildings or structures adjacent to excavation (if excavations are to be performed adjacent to same). 4. Damage to underground utilities for $500,000. 5. Builder's risk (where above -ground structures are involved). 6. Contractual Liability (covers all indemnification requirements of Contract). C3-3 (5) ON up aw M bw am No ow W aw .. d. AUTOMOBILE INSURANCE - BODILY INJURY AND PROPERTY " DAMAGE: The Contractor shall procure and maintain, during the life of this Contract, Comprehensive Automobile Liability insurance in an amount not less than $250,000 for injuries including accidental death to any one person and subject to the same limit for each person an amount not less than $500,000 on .. account of one accident, and automobile property damage insurance in an amount not less than $100,000. e. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required under the above paragraphs shall provide adequate protection for the Contractor and his sub- contractors, respectively, against damage claims which may arise from operations be by the insured or by anyone directly or indirectly employed by him, and also against any of the following special hazards r which may be encountered in the performance of the Contract. .r .. f. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the Owner with satisfactory proof of coverage by insurance required in these Contract Documents in .m amounts and by carriers satisfactory to the Owner. (Sample attached.) All insurance requirements made upon the Contractor shall apply to the sub -contractor, should the Prime Contractor's insurance not cover the sub -contractor's work operations. g. LOCAL AGENT FOR INSURANCE AND BONDING: The insurance and bonding companies with whom the Contractor's insurance and performance, payment, maintenance and all such other bonds are written shall be represented by an agent or agents having an office located within the city limits of the City of Fort Worth, Tarrant County, Texas. Each such agent shall be a duly qualified agent, one upon whom service of process may be had, and must have authority and power to act on behalf of the insurance and/or bonding company to negotiate and settle with the City of Fort Worth, or .. C3-3 (6) UW uy any other claimant, any claims that the City of Fort Worth or other claimant or any property owner who has been damaged, may have against the Contractor, insurance, and/or bonding company. If the local insurance representative is not so empowered by the insurance or bonding companies, then such authority must be vested in a local agent or claims officer residing in the Metroplex (the Fort Worth -Dallas area.) The name of the agent or agents shall be. set forth on all of such bonds and certificates of insurance. C3-3.12 CONTRACTOR'S OBLIGATIONS: Under the Contract, the Contractor shall pay for all .materials, labor and services when due. 4W C3-3.13 WEEKLY PAYROLL: A, certified copy of each payroll covering payment of wages to all person engaged in work on the project at the site of the project shall be furnished to the Owner's representative within seven (7) days after the close of each payroll period. A copy or copies of the applicable minimum wage rates as set forth in the Contract Documents shall be kept posted in a conspicuous place at the site of the project at all times during the course of the Contract. Copies of the wage rates will be furnished the Contractor, by the Owner; however, '! posting and protection of the wage rates shall be the responsibility of the Contractor. C3-3.14 CONTRACTOR'S CONTRACT ADMINISTRATION: Any Contractor, whether a person, persons, partnership, company, firm association, corporation or other who is approved to do business with and enters into a contract with the City for construction of water and/or sanitary sewer facilities, will have or shall establish a fully operational business office within the Fort Worth -Dallas metropolitan area. The Contractor shall charge, delegate, or assign this office (or he may delegate his Project Superintendent) with full authority to transact all business actions required in the performance of the Contract. This local +� authority shall be made responsible to act for the Contractor in all matters pertaining to the work governed by the Contract whether it be administrative or otherwise and as such shall be empowered, thus delegated and directed, to settle all material, labor or other expenditures, all claims against the work or any other matter associated such as maintaining adequate and appropriate insurance or security coverage for the project. M C3-3 (7) bw "M r Such local authority for administration of the work under the Contract shall be maintained until all business transactions executed as part of the,Contract are complete. Should the Contractor's principal base of operations be other than in the Fort Worth -Dallas metropolitan area, notification of the Contractor's assignment of local authority shall be made in writing to the Engineer in advance of any work on the project, •• appropriately signed and sealed, as applicable, by the Contractor's responsible officers with the understanding that this written assignment of authority to a local representative ,,. shall become part of the project Contract as though bound directly into the project documents. The intent of these requirements is that all matters associated with the Contractor's administration, whether oriented in furthering the r work, or other, are governed directly by local authority. This same requirement is imposed on insurance and surety coverage. Should the Contractor's local'- representative fail to perform to r the satisfaction of the Engineer, the Engineer, at his sole discretion, may demand that such local representative be replaced and the Engineer may, at his sole discretion, stop all work until a new local authority satisfactory to the Engineer is assigned. No credit of working time will be for periods in which work stoppages are in effect fort his reason. C3-3.15 VENUE: Venue of any action herein shall be exclusively in Tarrant County, Texas. r r .r no No MW we r C3-3 (8) .. PART C-GENERAL CONDITIONS C4-4 SCOPE OF WORK SECTION C4-4 SCOPE OF WORK km "W ON C4-4.1 INTENT OF CONTRACT DOCUMENTS: It is the definite intention of these Contract Documents to provide for a complete, useful project which the Contractor undertakes to construct or furnish, all in full compliance with the requirements and intent of the Contract Documents. It is definitely understood that the Contractor shall do all work as provided for in the Contract Documents, shall do all extra of special work as may be considered by the Owner as necessary to complete the project in a satisfactory -and acceptable manner. The Contractor shall, unless otherwise specifically stated in these Contract Documents, furnish all labor, tools, materials, machinery, equipment, special services, and incidentals necessary to the prosecution and completion of the project. C4-4.2 SPECIAL PROVISIONS: Should any work or conditions which are not thoroughly and satisfactorily stipulated or covered by General or Special Conditions of these Contract Documents be anticipated, or should there be any additional proposed work which is not covered by these Contract Documents, then "special Provisions: covering all such work will be prepared by the Owner previous to the time of receiving bids or proposal for such work and furnished to the bidder in the form of Addenda. All such "Special Provisions" shall be considered to be a part of the Contract Documents just as though they were originally written therein. r C 4-4.3 INCREASED OR DECREASED QUANTITIES: The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and if found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices. Such increased or decreased quantity shall not be more than 25 percent of the contemplated quantity of such item or items. When such changes increase or decrease the original quantity of any item or items of work to be done or materials to be furnished by 25 percent or more, then either party to the contract shall upon written request to the other party be entitled to a revised consideration upon that portion of the work above or below the 25 percent of the original quantity stated in the proposal; such revised consideration to be C44 (1) M IPF aw aw determined by special agreement or as hereinafter provided for "Extra Work." No allowance will be made for any changes in "" anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories, shall be interpreted herein as applying to the +� overall quantities or sanitary sewer pipe in each pipe size, but not to the various depth categories. .. C4-4.4 ALTERATION OF CONTRACT DOCUMENTS: By Change Order, the Owner reserves the right to make such changes in the Contract Documents and in the character or quantities of the work as may be necessary or desirable to insure completion in the most satisfactory manner, provided such changes do not materially alter the original Contract Documents or change the general _ nature of the project as a whole. Such changes shall not be considered as waiving or invalidating any condition or provision of the Contract Documents. .. C4-4.5 EXTRA WORK: Additional work made necessary by changes and alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the " Contract Documents, shall be defined as "Extra Work" and shall be performed by the Contractor in accordance with these Contract Documents or approved additions thereto; provided, however, that •• before any extra work is begun a "Change Order" shall be executed or written order issued by the Owner to do the work for payments or credits as shall be determined by one or more combination of the following methods: aw a. Unit bid price previously approved. b. An agreed lump sum. _ C. The actual reasonable cost of (1) labor, (2) rental of equipment used on the extra work for the time so used at Associated General Contractors of America current equipment rental rates, (3) materials entering permanently into the .� project, and (4) actual cost of insurance, bonds, and social security as determined by the Owner, plus a fixed fee to be agreed upon but not to exceed 10% of the actual cost of such extra work. The fixed fee is not to include any additional profit to the Contractor for rental of equipment owned by him and used for the extra work. The .. C44 (2) MW r i d. fee shall be full and complete compensation to cover the cost of superintendence, overhead, other profit, general and all other expense not included in (1), (2), (3), and (4) above. The Contractor shall keep accurate cost records on the form and in the method suggested by the Owner and shall give the Owner access to all accounts, bills, vouchers, and records relating to the Extra Work. No "Change Order" shall become effective until it has been approved and signed by each of the Contracting parties. No claim for Extra Work of any kind will be allowed unless Y.r ordered in writing by the Owner. In case any orders or instructions, either oral or written, appear to the Contractor to involve Extra Work for which he should receive compensation, i he shall make written request to the engineer for written orders authorizing such Extra Work, prior to beginning such work. Should a difference arise as to what does or does not constitute Extra Work or as to the payment thereof, and the Engineer insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep an accurate account of the actual reasonable cost thereof as provided under method (Item C). Claims for extra work will not be paid unless the Contractor shall file his claim with the Owner within five (5) days before the time for making the first estimate after such work is done and unless the claim is supported by satisfactory vouchers and certified payrolls covering all labor and materials expended upon the said Extra Work. M The Contractor shall furnish the Owner such installation records of all deviations from the original Contract Documents as may be necessary to enable the Owner to prepare for permanent record a �. corrected set of plans showing the actual installation. The compensation agreed upon for "extra work" whether or not initiated by a "change order" shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or extra work, whether said costs are r known, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or extra work. VM C4-4 (3) MM ow C4-4.6 SCHEDULE OF OPERATIONS: Before commencing any work under this contract, the Contractor shall submit to the Owner and ' receive the Owner's approval thereof, a `Schedule of Operations," showing by a straight line method the date of commencing and finishing each of the major elements of the contract. There shall be also shown the estimated monthly cost of work for which estimates are to be expected. There shall be presented also a composite graph showing the anticipated +� progress of construction with, the time being plotted horizontally and the percentage of completion plotted vertically. The progress charts shall be prepared on 8 '1 " X 11" sheets and at least five black of blue line prints shall be furnished to the Owner. C4-4.7 PROGRESS SCHEDULES FOR.WATER AND SEWER PLANT FACILITIES: Within Ten (10) days prior to submission of first monthly progress payment, the Contractor shall prepare and submit to the Owner for approval six cdpii�is of the schedule in which the Contractor proposes to carry on the work, the date of which he will start the several major activities (including procurement of materials, plans, and equipment) and the contemplated dates for completing the same. The schedule shall be in the form of a time schedule Critical Path Method (CPM) network diagram. As the work progresses, the Contractor shall enter on the diagram the actual progress at the end of each partial payment periodor at such intervals as directed by the Engineer. The Contractor shall also revise the schedule to reflect any adjustments in MW contract time approved by the Engineer. Three copies of the updated schedule shall be delivered at such intervals as directed by the Owner. As a minimum, the construction schedule shall incorporate all work elements and activities indicated in the proposal and in the technical specifications. Prior to the final drafting of the detailed construction schedule, the contractor shall review the draft schedule with the Engineer to ensure the Contractor's understanding of the contract requirements. ' The following guidelines shall be adhered to in preparing the construction schedule: " a. Milestone dates and final project completion dates shall be developed to conform to time constraints, sequencing requirements and completion time. aw C44 (4) .. M M b. The construction process shall be divided into activities with time durations of approximately fourteen (14) days and construction values not to exceed $50,000. Fabrication, delivery and submittal activities are exceptions to this guideline. C. Durations shall be in calendar days and normal holidays and weather conditions over the duration of the contract shall be accounted for within the won duration of each activity. d. One critical path shall be shown on the construction ,rr schedule. e. Float time is defined as the amount of time between the earliest start date and the latest start date of a chain of activities of the CPM construction schedule. Float time is not 'for the exclusive use or benefit of either the Contractor or the Owner. f. Thirty days shall be used for submittal review unless otherwise specified. dw The construction schedule shall, as a minimum, be divided into general categories as indicated in the Proposal and Technical Specifications and each general category shall be broken down into activities in enough detail to achieve activities of approximately fourteen(14) days' duration. For each general category, the construction schedule shall identify all trades or subcontracts whose work is represented by activities that follow the guidelines of this Section. For each of the trades or subcontracts, the construction schedule shall indicate the following procurements, construction and pre -acceptance activities and events in their logical sequence for equipment and materials. 1. Preparation and transmittal of submittals. MW 2. Submittal review periods. 3. Shop fabrication and delivery. 4. Erection or installation. C44 (5) imm MM am no 5. Transmittal of manufacturer's operation and maintenance instructions. 6. Installed equipment and materials testing. 7. Owner's operator instruction (if applicable). +� 8. Final inspection. 9. Operational testing. 10. Final inspection. If, in the opinion of the Owner, work accomplished falls. behind that scheduled, the Contractor shall take such action as necessary to improve his progress. In addition, the Owner may require the Contractor `to submit a revised schedule .. demonstrating his program and proposed plan to make up lag in scheduled .progress and to insure completion of the work within the contract time. If the Owner finds the proposed plan not acceptable, he may require the Contractor to increase the work force, the construction plant and equipment, the number of work shifts or the overtime operations without additional cost to the Owner. Failure of the Contractor to comply with these requirements .o shall be considered grounds for determination by the Owner that the Contractor is failing to prosecute the work with such diligence as will insure its completion within the time ,o specified. an s U0 No No C4-4 (6) PART C-GENERAL CONDITIONS C5-5 CONTROL OF WORK AND MATERIALS SECTION C5-5 CONTROL OF WORK AND MATERIALS C5-5.1 AUTHORITY OF ENGINEER: The work shall be performed to the satisfaction of the Engineer and in strict compliance with the Contract Documents. He shall decide all questions which arise as to the quality and acceptability of materials furnished, work performed, rate of progress of the work, overall sequence of the construction, interpretation of the Contract Documents, acceptable fulfillment.of the contract, compensation, mutual rights between Contractor and Owner under these Contract Documents, supervision of the work, resumption of operations, and all other questions or disputes which may arise. Engineer will not be responsible -for Contractor's means, methods, techniques, sequences of procedures of construction, or the safety precaution and programs incident thereto, and he will not be responsible for Contractor's failure to perform the work in accordance with the Contract Documents. He shall determine the amount and quality of the work completed and materials furnished, and his decisions and estimates shall be final. His estimates in such event shall be a condition to the right of the Contractor to receive money due him under the Contract. The Owner shall have executive authority to enforce and make effective such necessary decisions and orders as the Contractor fails to carry out promptly. In the event of any dispute between the Engineer and Contractor over the decision of the Engineer on any such matters, the Engineer must, within a reasonable time, upon written request of the Contractor, render and deliver to both the Owner and Contractor, a written decision on the matter in controversy. C5-5.2 CONFORMITY WITH PLANS: The finished project in all cases shall conform with lines, grades, cross -sections, finish, and dimensions shown on the plans or any other requirements otherwise described in the Contract Documents. Any deviation from the approved Contract Documents required by the Engineer during construction will in all cases be determined by the Engineer and authorized by the Owner by Change Order. no on ..t 10 No W M r WN im no C5-5 (1) .w MW aw C5-5.3 COORDINATION OF CONTRACT DOCUMENTS: The Contract ' Documents are made upof several sections, which, taken together, are intended to describe and provide for a complete and useful project, and any requirements appearing in one of the sections is as binding as though it occurred in all sections. In case of discrepancies, figured dimension shall govern over scaled dimensions, plans shall govern over specifications, special conditions shall govern over general conditions and standard specifications, and quantities shown on the plans shall govern over those shown in the proposal. The Contractor shall not take advantage of any apparent error or omission in the Contract Documents, and the Owner shall be permitted to make such corrections or interpretations as may be deemed necessary for the fulfillment of the intent of the Contract Documents. In the event the Contractor discovers an apparent error or discrepancy, he shall immediately call this condition to the attention of the Engineer.' -In the event of a conflict in the �.. drawings, specifications, or other portions of the Contract Documents, which were not reported prior to the award of Contract, the Contractor shall be deemed to have quoted the most expensive resolution of the conflict. C5-5.4 COOPERATION OF CONTRACTOR: The Contractor will be furnished with three sets of the Contract Documents and shall have available on the site of the project at all times one set of such Contract Documents. The Contractor shall give to the work the constant attention necessary to facilitate the progress thereof and shall cooperate with the engineer, his inspector, and other Contractors in every possible way. The Contractor shall at all times have competent personnel available to the project site for proper performance of the work. The Contractor shall provide and maintain at all times at the site of the project a competent, English-speaking superintendent and an assistant who are fully authorized to act as the Contractor's agent on the work. Such superintendent and his assistant shall be capable of reading and understanding the ' Contract Documents and shall receive and fulfill instructions from the Owner, the Engineer, or his authorized representatives. Pursuant to this responsibility of the Contractor, the Contractor shall designate in writing to the project superintendent, to act as the contractor's agent on the work. Such assistant project superintendent shall be a resident of MW C5-5 (2) am Tarrant County, Texas and shall be subject to call, as is the project Superintendent, at any time of the day or night on any day of the week on which the Engineer determines that circumstances require the presence on the project site of a representative of the Contractor to adequately provide for the safety or convenience of the travelling public or the owners of property across which the project extends or the safety of property contiguous to the project routing. WF The Contractor shall provide all facilities to enable the Engineer and his inspector to examine and inspect the workmanship and materials entering into the work. C5-5.5 EMERGENCY AND/OR RECTIFICATION WORK: When, in the opinion of the Owner or Engineer, a condition of emergency exists related to any part of the work, the Contractor, or the Contractor through his designated representative, shall respond with dispatch to a verbal request made by the Owner or Engineer .� to alleviate the emergency condition. Such a response shall occur day or night, whether the project is scheduled on a calendar -day or on a working -day basis. Should the Contractor fail to respond to a request from the Engineer to rectify any discrepancies, omissions, or corrections necessary to conform with the requirements of the project specifications or plans, the Engineer shall give the Contractor written notice that such work or changes are tobe performed. The written notice shall direct attention to the discrepant condition and request the contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall then deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due the Contractor on the project. C5-5.6 FIELD OFFICE: The Contractor shall provide, at no extra compensation, an adequate field office for use of the Engineer, if specifically called for. The field office shall be not less w than 10 by 14 feet in floor area, substantially constructed, well heated; air conditioned, lighted, and weather-proof, so that documents will not be damaged by the elements. C5-5.7 CONSTRUCTION STAKES: The City, through its Engineer, will furnish the Contractor with all lines, grades, and MW CS-5 (3) measurements necessary to the proper prosecution and control of _ the work contracted for under these Contract Documents, and lines, grades and measurements will be established by means of stakes or other customary method of marking a may be found consistent with good practice. These stakes or markings shall be set sufficiently in advance of construction operations to avoid delay. Such stakes or markings, as may be established for the Contractor's use or guidance, shall be preserved by the Contractor until he is authorized by the Engineer to remove them. Whenever, in the .. opinion of the Engineer, any stakes or markings have been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost of replacing such stakes or marks plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. C5-5.8 AUTHORITY AND DUTIES OF CITY INSPECTORS: City Inspectors will be authorized to inspect all work done and to be done and all materials furnished. Such inspection may extend to all or _ any part of the work, and the preparation or manufacturing of the materials to be used or equipment to be installed. A City Inspector may be stationed on the work to report to the Engineer .. the progress of the work and the manner in which it is being performed, any evidence that the materials being furnished or the work being performed by the Contractor fails to fulfill the requirements of the Contract Documents, and to call the attention of the Contractor to any such failure or other infringements. Such inspection or lack of inspection will not .. relieve the Contractor from any obligation to perform the work in accordance with the requirements of the Contract Documents. In case of any dispute arising between the Contractor and the City Inspector as to the materials or equipment furnished or the manner of performing the work, the City Inspector will have authority to reject materials or equipment to suspend work until the question at issue can be referred to, and be decided by, the Engineer. The City Inspector will not, however, be authorized to revoke, alter, enlarge, or release any requirement of these Contract Documents, nor to approve or accept any portion or _ section of the work, nor to issue any instructions contrary to the requirements of the Contract Documents. He will in no case act as superintendent or foreman or perform any other duties for the Contractor, or interfere with the management or operation of the work. He will not accept from the Contractor any compensation in any form for performing any duties. The C5-5 (4) so Contractor shall .regard and obey the directions and instruction of the City Inspector or Engineer when the same are consistent with the obligations of the Contract Documents, provided, however, should the Contractor object to any orders or instructions of the City Inspector, the Contractor may within six days make written appeal to the Engineer for his decision on the matter in controversy. C5-5.9 INSPECTION: The Contractor shall furnish the Engineer with every reasonable facility for ascertaining whether or not the work as performed is in accordance with the requirements of the Contract Documents. If the Engineer so requests, the Contractor shall, at any time before acceptance of the work, remove or uncover such portion of the finished work as may be directed. After examination, the Contractor shall restore said portions 'of the work to the standard required by the Contract Documents. Should the work exposed or examined prove acceptable, the uncovering or removing and replacing of the covering or making good of the parts removed shall be paid for as extra work, but should be work so exposed or examined prove to be unacceptable, the uncovering or removing and the replacing of all adjacent defective or damaged parts shall be at the Contractor'.s expense. No work shall be done or materials used without suitable supervision or inspection. C5-5.10 REMOVAL OF DEFECTIVE AND UNAUTHORIZED WORK: All work., materials, or equipment which has been rejected shall be remedied or removed and replaced in an acceptable manner by the Contractor at his own expense. Work done beyond the lines and grades given or as shown on the plans, except as herein specifically provided, or any Extra Work done without written authority, will be considered as unauthorized and done at the expense of the Contractor and will not be paid for by the Owner. Work so done may be ordered removed at the Contractor's expense. Upon the failure on the part of the Contractor to comply with any order of the Engineer made under the provisions of this paragraph, the Engineer will have the authority to cause defective work to be remedied or removed and replaced and unauthorized work to be removed, and the cost thereof may be deducted from any money due or to become due to the Contractor. Failure to require the removal of any defective or unauthorized work shall not constitute acceptance of such works. C5-5 (5) am 4" WL ., imb "+ W wd M M C5-5.11 SUBSTITUTE MATERIALS OR EQUIPMENT: If the Specifications, law, ordinance, codes or regulations permit Contractor to furnish or use a substitute that is equal to any material or equipment specified, and if contractor wishes to furnish or use a proposed substitute, he shall, prior to the pre -construction conference, make written application to Engineer for approval of such substitute certifying in writing that the proposed substitute will perform adequately the functions called for by the general design, be similar and of equal substance to that specified and be suited to the same use .w and capable of performing the same function as that specified; and identifying all variations of the proposed substitute from that specified and indicating available maintenance service. No substitute shall be ordered or installed without the written approval of Engineer who will be the judge of the equality and may require Contractor to furnish such other data about the proposed substitute as he ddnsiders pertinent. No substitute shall be ordered or installed without such performance guarantee and bonds as Owner may require which shall be furnished at Contractor's expense. Contractor shall indemnify and hold .. harmless Owner and engineer and anyone directly or indirectly employed by either of them from and against the claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. C5-5.12 SAMPLES AND TESTS OR MATERIALS: Where, in the opinion of the Engineer, or as called for in the Contract Documents, tests of materials or equipment are necessary, such tests will be made at the expense of and paid for direct to the testing .. agency by the Owner unless otherwise specifically provided. The failure of the Owner to make any tests of materials shall in no way relieve the Contractor of his responsibility of furnishing materials and equipment fully conforming to the requirements of the Contract Documents. Tests and sampling of materials, unless otherwise specified, will be made in accordance with the latest methods prescribed by the American Society for Testing Materials or specific requirements of the Owner. The Contractor shall provide such facilities as the Engineer may require for _ collecting and forwarding samples and shall not, without specific written permission of the Engineer, use the materials represented by the samples until tests have been made and the materials approved for use. The Contractor will furnish adequate samples without charge to the Owner. In case of concrete, the aggregates, design minimum, and the C5-5 (6) mixing and transporting equipment shall be approved by the Engineer before any concrete is placed, and the Contractor shall be responsible for replacing any concrete which does not meet the requirements of the contract Documents. Tests shall be made at least 9 days prior to the placing of concrete, using samples from the same aggregate, cement, and mortar which are to be used later in the concrete. Should the source of supply change, new tests shall be made prior to the use.of the new materials. C5-5.13 STORAGE OF MATERIALS: All materials which are to be used in the construction operation shall be stored to insure the preservation of the quality and fitness of the work. When directed by the Engineer, they shall be placed on wooden platforms or other hard, clean durable surfaces and not on the ground, and shall be placed under cover when directed. Stored materials shall be placed and located so as to facilitate prompt inspection. C5-5.14 EXISTING STRUCTURES AND UTILITIES: The location and dimensions shown on the Plans relative to existing utilities are based on the best information available. Omission from or the inclusion of utility locations on the Plans is not to be considered as the nonexistence of, or a definite location of, existing underground utilities. The location of many gas mains, water mains, conduits, sewer lines and service lines for all utilities, etc., is unknown to the Owner, and the Owner assumes no responsibility for failure to show any or all such structures and utilities on the Plans or to show them in their exact location. It is mutually agreed that such failure will not be considered sufficient basis for claims for additional compensation for Extra Work or for increasing the pay quantities in any manner whatsoever, unless an obstruction encountered is such as to necessitate changes in the lines and grades of considerable magnitude or requires the building of 'special works, provision for which is not made in the Contract Documents, in which case the provision in these Contract Documents for Extra Work shall apply. It shall be the Contractor's responsibility to verify locations of adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may negotiate such local adjustments as necessary in the construction process to provide adequate clearances. The Contractor shall take all necessary precautions in order to protect all existing utilities, structures and service lines. Verification of existing utilities, structures and service lines shall include C5-5 (7) no notification of all utility companies at least forty-eight (48) hours in advance of construction including exploratory excavation if necessary. All verification of existing utilities and their adjustment shall be considered as subsidiary work. C5-5.15 INTERRUPTION OF SERVICE: a. Normal Prosecution: In the normal prosecution of work where the interruption of service is necessary, the Contractor, at least 24 hours in advance, shall be required to: r 1. Notify the Water Department's Distribution Division of location, time, and schedule of service interruption. 2. Notify each customer personally through .. responsible personnel of time and schedule of the interruption of their service, or 3. In the event that personal notification of a s customer cannot be made, a prepared tag form shall be attached to the customer's entrance doorknob. The tag shall be durable in so composition, and in large bold type shall say: "NOT'ICE" .. Due to Utility Improvement in your neighborhood, your (water) (sewer) service will be interrupted EM on between the hours of and o. This inconvenience will be as short as possible. no EM ww w Thank you, Contractor Address Phone b. Emergency: In the event that an unforeseen service interruption occurs, notice shall be as above, but immediate. C5-5 (8) M M C5-5.16 MUTUAL RESPONSIBILITY OF CONTRACTORS: If, through acts or neglect on the part of the contractor, any other Contractor i or any sub -contractor shall suffer loss or damage on the work, the Contractor agrees to settle with such other Contractor or sub -contractor by agreement or arbitration. If such other Contractor or sub -contractor shall assert any claim against the Owner on account of any damage alleged to have been sustained, the Owner will notify the Contractor, who shall indemnify and save harmless the Owner against any such claim. C5-5.17 CLEAN-UP: Clean-up of surplus and/or waste materials accumulated on the job site during the prosecution of the work under these Contract Documents shall be accomplished in keeping with a daily routine established to the satisfaction of the Engineer._ If, within twenty-four (24) hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the Engineer, the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the Engineer deems appropriate to correct the clean-up deficiencies cited to the contractor in the written notice, and the costs of such direct action, plus 25% of such costs, shall be deducted from monies due or to become due to the Contractor. Upon the completion of the project as a whole as covered by these Contract Documents, and before final acceptance and final payment will be made, the Contractor shall clean and remove from the site of the project all surplus and discarded materials, temporary structures, and debris of every kind. He shall leave the site of all work in a neat and orderly condition equal to that which originally existed. Surplus and waste materials removed from the site of the work shall be disposed of at locations satisfactory to the Engineer. The Contractor shall thoroughly clean all equipment and materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new appearing condition. No extra compensation will be made to the Contractor for any clean-up required on the project. C5-5.18 FINAL INSPECTION: Whenever the work provided for in and contemplated under the Contract Documents has been satisfactorily completed and final clean-up performed, the Engineer will notify the proper officials of the Owner and request that the final inspection be made. Such inspection will be made within 10 days after such notification. After such EW PM C5-5 (9) am w .w a .. w MW r OW final inspection, if the work and materials and equipment are found, satisfactory, the Contractor will be notified in writing of the acceptance of the same after the proper resolution has been passed by the City Council. No time charge will be made against the Contractor between said date of notification of the Engineer and the date of final inspection of the work. C5-5 (10) w PART C-GENERAL CONDITIONS C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY SECTION C6-6 LEGAL RELATIONS AND PUBLIC RESPONSIBILITY M C6-6.1 LAWS TO BE OBSERVED: The Contractor shall at all times observe and comply with all Federal and State Laws and City ordinances and regulations which in any way affect the conduct of the work or his operations, and shall observe and comply with all orders, laws, ordinances and regulations which exist or which may be enacted later by bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof will be considered. The Contractor and his Sureties shall indemnify and save harmless the City and all of its officers, agents, and employees against any and all claims or liability arising from or- based on the violation of any such law, ordinance, regulation, or order, whether it be by himself or his employees. C6-6.2 PERMITS AND LICENSES: The Contractor shall procure all w permits and licenses, pay all charges, costs and fees, and give all notices necessary and incident to the due and lawful prosecution of the work. C6-6.3 PATENTED DEVICES, MATERIALS AND PROCESSES: If the Contractor is required or desires to use any design, device, material, or process covered by letter, patent, or copyright, he shall provide for such use by suitable legal agreement with the patentee or owner of such patent, letter, or copyrighted design. It is mutually agreed and understood that without exception the contract prices shall include all royalties or costs arising from patents, trademarks, and copyrights in any way involved in the work. The Contractor and his sureties shall indemnify, and save harmless, the Owner from any and all claims for infringement by reason of the use of any such patented design, 4 device, material or process, or any trademark or copyright in connection with the work agreed to be performed under these Contract Documents, and shall indemnify the Owner for any cost, expense, or damage which it may be obliged to pay by reason of _ such infringement at any time during the prosecution of the work or after completion of the work, provided, however, that the Owner will assume the responsibility to defend any and all suits i brought for the infringement of any patent claimed to be infringed upon by the design, type of construction or material am C6-6 (1) M so 0 or equipment specified in the Contract Documents furnished the Contractor by the Owner, and to hold the Contractor harmless on account of such suits. C6-6.4 SANITARY PROVISIONS: The Contractor shall establish and no enforce among his employees such regulations in regard to cleanliness and disposal of garbage and waste as will tend to prevent the inception and spread of infectious or contagious .. diseases and to effectively prevent the creation of a nuisance about the work on any property either public or private, and such regulations as are required by Law shall be put into .W immediate force and effect by the Contractor. The necessary sanitary conveniences for use of laborers on the work, properly secluded from public observation, shall be constructed and .. maintained by the Contractor and their use shall be strictly enforced by the Contractor. All such facilities shall be kept in a clean and sanitary condition, free from objectionable odors so as not to cause a nuisance. All sanitary laws and .. regulations of the State of Texas and the City shall be strictly complied with. C6-6.5 PUBLIC SAFETY AND CONVENIENCE: Materials or equipment stored about the work shall be so placed and used, and the work shall at all times be so conducted,, as to cause no greater obstruction or inconvenience to the public than is considered to be absolutely necessary by the Engineer. The Contractor is required to maintain at all times -all phases of his work in such .. a manner as not to impair the safety or convenience of the public, including, but not limited to, safe and convenient ingress and egress to property contiguous to the work area. The Contractor shall make adequate provisions to render reasonable ingress and egress for normal vehicular traffic, except during actual trenching or pipe installation operations, at all .w driveway crossings. Such provisions may include bridging, placement of crushed stone or gravel or such other means of providing proper ingress and egress for the property served by the driveway as the Engineer may approve as appropriate. Other ' means may include the diversion of driveway traffic, with specific approval by the Engineer.. If diversion of traffic is approved by the Engineer, the Contractor shall make arrangements satisfactory to the Engineer for the diversion of traffic and shall, at his own expense, provide all materials and perform all work necessary for the construction and maintenance of roadways and bridges for such diversion of traffic. Sidewalks must not be obstructed except by special permission of the Engineer. .• w C6-6 (2) M No The materials excavated and the construction materials, such as pipe, used in the construction of the work shall be placed so as not to endanger the work or prevent free access to all fire hydrants, fire alarm boxes, police call boxes, water valves, gas valves, or manholes in the vicinity. The Owner reserves the right to remedy any neglect on the part of the Contractor in reference to public convenience and safety which may come to its attention, after twenty-four (24) hours notice in writing to the Contractor, save in cases of emergency when it shall have the right to remedy any neglect without notice, and in either case, the cost of such work done or materials furnished by the Owner or by the City shall be deducted from monies due or to become due to the Contractor. The Contractor, after approval of the Engineer, shall notify the Fire Department Headquarters, Traffic Engineer, and Police Department, when any street or alley is requested to be closed or obstructed or any fire hydrant is to be made inaccessible, and when so directed by the Engineer, shall keep any street, streets, or highways in condition for unobstructed use by fire apparatus. The Contractor shall promptly notify the Fire '~ Department Headquarters when all such obstructed streets, alleys, or hydrants are again placed back in service. Where the Contractor is required to construct temporary bridges _ or make other arrangements for crossing over ditches or streams, his responsibility for accidents in connection with such crossings shall include the roadway approaches as well as the structures of such crossings. The Contractor shall at all times conduct his operation and the use of construction machinery so as not to damage or destroy trees and shrubs located in close proximity to or on the site of the work. Wherever any such damage may be done, the Contractor shall immediately satisfy all claims of property owners, and no payment will be made by the Owner in settlement of such claims. The Contractor shall file with the Engineer a written statement showing all such claims adjusted. C6-6.6 PRIVILEGES OF CONTRACTOR IN STREETS, ALLEYS, AND RIGHT- ` OF -WAY: For the performance of the contract, the Contractor will be permitted to use and occupy such portions . of the public streets and alleys, or other public places or other rights -of- way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in Mkr C6-6 (3) fto writing by the Engineer. A reasonable amount of tools, materials, and equipment for construction purposes may be stored '! in such space, but no more than is necessary to avoid delay in the construction operations. Excavated and waste materials shall be piled or stacked in such a way that does not interfere with the use of spaces that may be designated to be left free and unobstructed, or inconvenience occupants of adjacent property. If the street is occupied by railway tracks, the work shall be carried on in such manner as not to interfere with the operation of trains, loading or unloading of cars, etc. Other contractors of the Owner may, for all purposes required by the .. contract, enter upon the work and premises used by the assistance for the completion of adjoining work. Any additional grounds desired by the Contractor for his use shall be provided by him at his own cost and expense. C6-6.7 RAILWAY CROSSINGS: When the work encroaches upon any right-of-way of any railway,' the City will secure the necessary a easement for the work. Where the railway tracks are to be crossed, the Contractor shall observe all the regulations and instructions of the railway company regarding the methods of performing the work and take all precautions for safety of property and the public. Negotiations with the railway companies for permits shall be done by and through the City. The Contractor shall give the City notice not less than five days prior to the time of his intention to begin work on that portion of the project which is related to the railway w properties. The Contractor will not be given extra or additional compensation for such railway crossings unless specifically set forth in the Contract Documents. C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: Where the work is carried on in or adjacent to any street, alley, or public place, the Contractor shall, at his own expense, furnish, erect, and maintain such barricades, fences, lights and danger signals, and shall provide such watchmen, and shall take all such other precautionary measures for the protection of persons or property and of the work as are necessary. Barricades and fences shall be painted in a color that will be visible at night. From sunset to sunrise the Contractor shall furnish and maintain at least one easily visible burning light at each barricade. A sufficient number of barricades shall be erected and maintained to keep pedestrians away, and vehicles from being driven on or into, any work under construction or being maintained. The Contractor shall furnish watchmen and keep them at their respective assignments in sufficient numbers to protect the work .� and prevent accident or damage. .. C6-6 (4) All installations and procedures shall be consistent with the provisions set forth in the "1980 Texas Manual on Uniform Traffic Control Devices for Streets and Highways", issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d, Vernon's Civil Statutes, pertinent sections being Section Nos. 27, 29, 30 and 31. 40 The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit required construction, the. Contractor shall _ contact the Transportation and Public Works Department, Signs and Markings Division (phone number 870-8075), to remove the .. sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual, and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed." The Contractor will be held responsible for all damage to the work or the public due to failure of barricades, signs, fences, lights, or watchmen to protect them. Whenever evidence is found of such damage to the work, the Engineer may order the damaged portion immediately removed and replaced by the Contractor at the Contractor's own expense. The Contractor's responsibility for the maintenance of barricades, signs, fences and lights, and for providing watchmen shall not cease until the project shall have been completed and accepted by the Owner. No compensation, except as specifically provided in these Contract Documents, will be paid to the Contractor for the work WE and materials involved in the constructing, providing, and maintaining of barricades, signs, fences, and lights or for salaries of watchmen, for the subsequent removal and disposal of hm such barricades, signs, or for any other incidentals necessary for the proper protection, safety, and convenience of the public C6-6 (5) during the contract period, as this work is considered to be subsidiary to the several items for which unit or lump sum prices are requested in the Proposal. C6-6.9 USE OF EXPLOSIVES, DROP WEIGHT, ETC.: Should the �• Contractor elect to use explosives, drop weight, etc., in the prosecution of the work, the utmost care shall be exercised at all times not to endanger life or property. The Contractor .. shall notify the proper representative of any public service corporation, any company, individual, or utility, and the Owner, not less than twenty-four (24) hours in advance of the use of .. any activity which might damage or endanger property along or adjacent to the work. ow Where the use of explosives is to be permitted on the project as specified in the Special Contract Documents, or the use of explosives is requested, the Contractor shall submit notice to the Engineer in writing --twenty-four (24) hours prior to a commencing and shall furnish evidence that he has insurance coverage to protect against any damages and/or injuries arising out of such use of explosives. All claims arising out of the use of explosives shall be investigated and a written report made by the Contractor's .. insurers to the Engineer within ten (10) days after receipt of written notice of the claim to the Contractor from either the City or the claimant. The city shall proceed to give notice to .. the Contractor of any such claim. The use of explosives may be suspended by the Engineer if any complaint is received and such use shall not be resumed until the cause of the complaint has been addressed. Whenever explosives are stored or kept, they shall be stored in no a safe and secure manner and all storage places shall be plainly marked "DANGEROUS EXPLOSIVES" and shall be under the care of a competent watchman at all times. All vehicles in which explosives are being transported shall be plainly marked as no mentioned above and shall, insofar as possible, not use heavy traffic routes. "o C6-6.10 WORK WITHIN EASEMENTS: Where the work passes over, through, or into private property, the Owner will provide such right-of-way or easement privileges as the City may deem me necessary for the prosecution of the work. Any additional rights -of -way or work area considered necessary by the Contractor shall be provided by him at his own expense. Such 4W .w C6-6 (6) 110 .r additional rights -of -way or work area shall be acquired for the benefit of the City. The City shall be notified in writing of the rights so acquired before work begins in the affected area. The Contractor shall not enter upon private property for any purpose without having previously obtained permission from the owner of such property. The Contractor will not be allowed to store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by.the Contractor, and a copy furnished to the Engineer. +* Unless specifically provided otherwise, the Contractor shall clear all rights -of -way or easements of obstructions, which must be removed to make possible proper prosecution of the work as a part of the project construction operations. The Contractor shall be responsible for the preservation of and shall use every precaution to prevent damage to all trees, shrubbery, plants, lawns, fences, culverts, curbing and all other types of structures or improvements, and to all water, sewer and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences, and to all other public or private property along adjacent to the work. The Contractor shall notify the proper representatives of owners or occupants of public or private lands or interest in lands which might be affected by the work. Such notice shall be made at least 48 hours in advance of the beginning of the work. Notices shall be applicable to both public and private utility companies or any corporation, Company, individual, or other, either as owners or occupants whose land or interest in land might be affected by the work. The Contractor shall be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the work, or at any time due to defective work, material or equipment. When and where any direct or indirect damage or injury is done to public or private property on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non -execution thereof on the part of the Contractor, he shall restore or have restored at his own cost and expense such property to a condition at least equal to that existing before such damage or injury was done, by repairing, rebuilding, or otherwise replacing and restoring as may be - directed by the Owner, or he shall make good such damages or injury in a manner acceptable to the owner of the property and the Engineer. C6-6 (7) 4M All fences encountered and removed during construction of this project shall be restored to the original or a better than original condition upon completion of this project. When wire fencing, either wire mesh or barbed wire is to be crossed, the Contractor shall set cross braced posts on either side of permanent easement before the fence is cut. Should additional fence cuts be necessary, the Contractor shall provide cross +�► braced posts at point of the proposed cut in addition to the cross braced posts provided at the permanent easements limits, before the fence is cut.. aw Temporary fencing shall be erected in place of the fencing removed whenever the work is not in progress and when the site „f is vacated overnight, and/or at all times to prevent livestock from entering the construction area. The cost for fence removal, temporary closures and replacement shall be subsidiary so to the various items bid iri the project proposal. Therefore, no separate payment shall be allowed for any service associated with this work. ow In case of failure on the part of the Contractor to restore such property to make good such damage or injury, the Owner may, upon 48-hour written notice under ordinary circumstances, and without notice when a nuisance or hazardous condition results, proceed to repair, rebuilt or otherwise restore such property as may be determined by the Owner to be necessary, and the cost thereby will be deducted from any monies due or to become due to the Contractor under this Contract. C6-6.11 INDEPENDENT CONTRACTOR: It is understood and agreed by the parties hereto that contractor shall perform all work and services hereunder as an independent contractor, and not as an officer, agent, servant or employee of the Owner. Contractor shall have exclusive control of and the exclusive right to control the details of all the work and services performed hereunder, and all persons performing same, and shall be solely responsible for the acts and omissions of its officers, agents, servants, employees, contractors, subcontractors, licensees invitees. The doctrine of respondent superior shall not apply "F as between Owner and Contractor, its officers, agents, employees, contractors and subcontractors, and nothing herein shall be construed as creating a partnership or joint enterprise between Owner and Contractor. 4W 4M C6-6 (8) NM C6-6.12 CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage., personal injury, including death, arising out of, or alleged to arise out of, the work and services to be _ performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not py such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and -� agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers, servants or employees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. M C6-6.13 CONTRACTOR'S CLAIM FOR DAMAGES: Should the Contractor claim compensation for any alleged damage by reason of the acts or omissions of the Owner, he shall within three days after the actual sustaining of such alleged damage, make a written statement to the Engineer, setting out in detail the nature of ` the alleged damage, and on or before the 25th day of the month kPF succeeding that in which any such damage is claimed to have been sustained, the Contractor shall file with the Engineer an itemized statement of the details and amount of such alleged C6-6 (9) No .r damage and, upon request, shall give the Engineer access to all books of account, receipts, vouchers, bills of lading, and other books or papers containing any evidence as to the amount of such alleged damage. Unless such statements shall be filed as herein required, the Contractor's claim for compensation shall be �+ waived, and he shall not be entitled to payment on account of such damages. so C6-6.14 ADJUSTMENT OR RELOCATION OF PUBLIC UTILITIES, ETC: In case it is necessary to change, move, or alter in any manner the property of a public utility or others, the said property shall not be moved or interfered with until orders thereupon have been issued by the Engineer. The right is reserved to the owners of public utilities to enter the geographical limits of the ..� Contract for the purpose of making such changes or repairs to their property that may be necessary by the performance of this contract. a C6-6.15 TEMPORARY SEWER AND DRAIN CONNECTIONS: When existing sewer lines have to be taken up or removed, the Contractor shall, at his own expense and cost, provide and maintain temporary outlets and connections for all private or public drains and sewers. The Contractor shall also take care of all sewage and drainage, which will be received from these drains and sewers, and for this purpose he shall provide and maintain, at his own cost and expense, adequate pumping facilities and temporary outlets or diversions. .. The Contractor, at his own cost and expense, shall construct such troughs, pipes, or other structures necessary, and be me prepared at all times to dispose of drainage and sewage received from these temporary connections until such times as the permanent connections are built and are in service. The .o existing sewers and connections shall be kept in service and maintained under the Contract, except when specified or ordered to be abandoned by the Engineer. All water, sewage, and other waste shall be disposed of in a satisfactory manner so that no s nuisance is created and so that the work under construction will be adequately protected. No C6-6.16 ARRANGEMENT AND CHARGES FOR WATER FURNISHED BY THE CITY: When the Contractor desires to use City water in connection with any construction work, he shall make complete and satisfactory no arrangements with the Fort Worth City Water Department for so doing. aw ow C6-6 (10) City water furnished to the Contractor shall be delivered to the _ Contractor from a connection on an existing City main. All piping required beyond the point of delivery shall be installed by the Contractor at his own expense. The Contractor's responsibility in the use of all existing fire hydrants and/or valves is detailed in Section E2-1.2 USE OF FIRE HYDRANTS AND VALVES in these General Contract Documents. When meters are used to measure the water, the charges, if any, for water will be at the regular established rates. When meters are not used, the charges, if any, will be as prescribed by the City Ordinance, or where no ordinance applies, payment shall be made on estimates and rates established by the Director of the ... Fort Worth Water Department. C6-6.17 USE OF A SECTION OR PORTION OF THE WORK: Whenever, in the opinion of the Engineer, any section or portion of the work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer, and such usage shall not be held to be in any way an acceptance of said work or structure or any part thereof or as a waiver of any of the provisions of these Contract Documents. All necessary repairs and removals of any section of the work so put into use, due to defective materials or workmanship, equipment, or to deficient operations on the part of the Contractor, shall be preformed by the Contractor at his own expense. C6-6.18 CONTRACTOR'S RESPONSIBILITY FOR THE WORK: Until written acceptance by the Owner as provided for in these Contract Documents, the work shall be under the charge and care of the Contractor, and he shall take every necessary precaution to prevent injury or damage to the work or any part thereof by action of the elements or from any cause whatsoever, whether arising from the execution of non -execution of the work. The Contractor shall rebuild, repair, restore, and make good at his _ own expense all injuries or damage to any portion of the work occasioned by any of the causes herein. C6-6.19 NO WAIVER OF LEGAL RIGHTS: Inspection by the engineer or any order by the Owner by payment of money or any payment for or acceptance of any work, or .any extension of time, or any possession taken by the City shall not operate as a waiver of any provision of the Contract Documents. Any waiver of any breach or Contract shall not be held to be a waiver of any other or subsequent breach. C6-6 (11) 40 The Owner reserves the right to correct any error that may be 20 discovered in any estimate that may have been paid and to adjust the same to meet the requirements of the Contract Documents. "o C6-6.20 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In carrying out the provisions of these Contract Documents or in exercising any power of authority granted thereunder, there shall be no a0 liability upon the authorized representatives of the Owner, either personally or otherwise as they are agents and representatives of the City. C6-6.21 STATE SALES TAX: On a contract awarded by the City of Fort Worth, an organization which qualifies for exemption pursuant to the provisions of Article 20.04 (H) of the Texas Limited Sales, Excise, and Use Tax Act, the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued by the Contractor in lieu of the tax shall be subject to and shall comply with the provisions of State Comptroller's Ruling .011, and any other applicable State Comptroller rulings pertaining to the Texas Limited Sales, Excise, and Use Tax Act. On a contract awarded by a developer for the construction of a we publicly -owned improvement in a street right-of-way or other easement which has been dedicated to the public and the City of Fort Worth, an organization which qualifies for exemption 40 pursuant to the provisions of Article 20.04 (H) of the Texas limited Sales, Excise, and Use Tax Act, the Contractor can probably be exempted in the same manner stated above. an Limited Sale, Excise and Use Tax permits and information can be obtained from: so Comptroller of Public Accounts Sale Tax Division Capitol Station 'W Austin, TX wo .o C6-6 (12) RM PART C-GENERAL CONDITIONS C7-7 PROSECUTION AND PROGRESS i SECTION C7-7 PROSECUTION AND PROGRESS C7-7.1 SUBLETTING: The Contractor shall perform with his own organization, and with the assistance of workmen under his immediate superintendence, work -of a value of not less than fifty (500) percent of the value embraced in the contract. If the Contractor sublets any part of the work to be done under these Contract Documents, he will not under any circumstances be ++ relieved of the responsibility and obligation assumed under these Contract Documents. All transactions of the Engineer will be with the Contractor. Subcontractors will be considered only in the capacity of employees or workmen of the Contractor and shall be subject to the same requirements regarding character and competency. The Owner­Wi1 l not recognize any subcontractor �.. on the work. The Contractor shall at all times, when the work is in operation, be represented either in person or by a superintendent, or other designated representative. C7-7.2 ASSIGNMENT OF CONTRACT: The Contractor shall not assign, transfer,. sublet, convey, or otherwise dispose of the contract or his rights, title, or interest in or to the same or any part thereof without the previous consent of the Owner expressed by resolution of the City Council and concurred in by the Sureties. If the Contractor does, without such previous consent, assign, transfer, sublet, convey, or otherwise dispose of the contract or his right, title, or interest therein or any part thereof, to ■F any person or persons, partnership, company, firm or corporation, or does by bankruptcy, voluntary or involuntary, or by assignment under the insolvency laws of any state, attempt to .r dispose of the contract may, at the option of the Owner be revoked and annulled, unless the Sureties shall successfully complete said contract, and in the event of any such revocation or annulment, any monies due or to become due under or by virtue of said contract shall be retained by the Owner as liquidated damages for the reason that it would be impracticable and extremely difficult to fix the actual damages. C7-7.3 PROSECUTION OF THE WORK: Prior to beginning any construction operation, the Contractor shall submit to the r Engineer in five or more copies, if requested by the Engineer, a progress schedule preferably in chart or diagram form, or a r. C7-7 (1) bw 40 so brief outlining in detail and step by step the manner of prosecuting the work and ordering materials and equipment which 'W he expects to follow in order to complete the project in the scheduled time. There shall also be submitted a table of estimated amounts to be -earned by the Contractor during each ow monthly estimate period. The Contractor shall commence the work to be performed under 4W this contract within the time limit stated in these Contract Documents and shall conduct the work in a continuous manner and with sufficient equipment, materials, and labor as is necessary aw to insure its completion within the time limit. The sequence requested of all construction operations shall be so at all times as specified in the Special Contract Documents. Any deviation from such sequencing shall be submitted to the Engineer for his approval. Contractor shall not proceed with wr any deviation until he has -received written approval from the Engineer. Such specification or approval by the Engineer shall not relieve the Contractor from the full responsibility of the complete performance of the Contract. The contract time may be changed only as set forth in Section C7-7.8 "Extension of Time of Completion" of this Agreement, and 'r a progress schedule shall not constitute a change in the contract time. ad C7-7.4 LIMITATIONS OF OPERATIONS: The working operations shall at all times be conducted by the Contractor to create a minimum amount of inconvenience to the public. At any time when, in the judgment of the Engineer, the Contractor has obstructed or closed or is carrying on operations in a portion of a street or public way greater than is necessary for the proper execution of .. the work, the Engineer may require the Contractor to finish the section on which operations are in progress before the work is commenced on any additional section or street. a C7-7.5 CHARACTER OR WORKMEN AND EQUIPMENT: Local labor shall be used by the Contractor when it is available. The Contractor may bring in from outside the City of Fort Worth his key men and his "' superintendent. All other workmen, including equipment operators, may be imported only after the local supply is exhausted. The Contractor shall employ only such .' superintendents, foremen, and workmen who are careful, competent, and fully qualified to perform the duties or tasks assigned to them, and the Engineer may demand and secure the .. rr C7-7 (2) W summary dismissal of any person or persons employed by the Contractor in or about or on the work who, in the opinion of the Owner, shall misconduct himself or be found to be incompetent, disrespectful, intemperate, dishonest, or otherwise objectionable or neglectful in the proper performance of his or their duties, or who neglects or refuses to comply with or carry out the directions of the Owner, and such person or persons shall not be employed again thereon without written consent of the Engineer. �* All workmen shall have sufficient skill, ability, and experience to properly perform the work assigned to them and operate any GML equipment necessary to properly carry out the performance of the assigned duties. The Contractor shall furnish and maintain on the work all such equipment as is considered to be necessary for prosecution of the work in an acceptable manner and at a satisfactory rate of progress. All equipment, tools, and machinery used for handling materials and executing any part of the work shall be subject to the approval of the Engineer and shall be maintained in a satisfactory, safe and efficient working condition. Equipment .. on any portion of the work shall be such that no injury to the work, workmen or adjacent property will result from its use. C7-7.6 WORK SCHEDULE: Elapsed working days shall be computed starting with the first day of work completed as defined in C1- 1.23 "WORKING DAY" or the date stipulated in the "WORK ORDER" ■" for beginning work, whichever comes first. Nothing in these Contract Documents shall be construed as prohibiting the Contractor from working on Saturday, Sunday or Legal Holidays, providing that the following requirements are met: r, a. A request to work on a specific Saturday, Sunday or Legal Holiday must be made to the Engineer no later than the Thursday preceding. b. Any work to be done on the project on _such a specific Saturday, Sunday or Legal Holiday must be, in the •.� opinion of the Engineer, essential to the timely completion of the project. The Engineer's decision shall be final in response to such a request for approval to work on a specific Saturday, Sunday or C7-7 (3) WE 4 r Legal Holiday, and no extra compensation shall be allowed to the Contractor for any work performed on such a specific Saturday, " Sunday or Legal Holiday. Calendar Days shall be defined in C1-1.24 and the Contractor may .e work as he so desires. C7-7.7 TIME OF COMMENCEMENT AND COMPLETION: The Contractor .. shall commence the working operations within the time specified in the Contract Documents and set forth in the Work Order. Failure to do so shall be considered by the Owner as abandonment ,. of the Contract by the Contractor and the Owner may proceed as he sees fit. s The Contractor shall maintain a rate of progress such as will insure that the whole work will be performed and the premises cleaned up in accordance with the Contract Documents and within the time established in such- documents and such extension of time as may be properly authorized by the Owner. C7-7.8 EXTENSION OF TIME COMPLETION: The Contractor's request W-0 for an extension of time of completion shall be considered only when the request for such extension is submitted in writing to the Engineer within seven days from and after the time alleged s cause of delay shall have occurred. Should an extension of the time of completion be requested such request will be forwarded to the City Council for approval. In adjusting the contract time for completion of work, consideration will be given to unforeseeable causes beyond the .v control of and without the fault or negligence of the Contractor, including but limited to acts of the public enemy, acts of the Owner, fire, flood, tornadoes, epidemics, quarantine restrictions, strikes, freight embargoes, or delays of sub- contractors due to such causes. When the date of completion is based on a calendar day bid, a 'w request for extension of time because of inclement weather will not be considered. A request for extension of time due to inability to obtain supplies and materials will be considered aw only when a review of the Contractor's purchase order dates and other pertinent data as requested by the Engineer indicates that the contractor has made a bona fide attempt to secure delivery ow on schedule. This shall include efforts to obtain the supplies and materials from alternate sources in case the first source cannot make delivery. s of C7-7 (4) wr ,.G M If satisfactory execution and completion of the contract should require work and materials in greater amounts or quantities than sm those set forth in the approved Contract Documents, then the contract time may be increased by Change Order. ow C7-7.9 DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the am failure of the City to provide information or material, if any, which is to be furnished by the City. When such extra compensation is claimed, a written statement thereof shall be %go presented by the Contractor to the Engineer and if by him found correct, shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the ow Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work,- -ter by the failure of the City to ... provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City Council; and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. C7-7.10 TIME OF COMPLETION: The time of completion is an essential element of the contract. Each bidder shall indicate in the appropriate place on the last page of the Proposal the number of working days or calendar days that he will require to fully complete this contract or the time of completion will be specified by the City in the Proposal section of the contract documents. The number of days indicated shall be a realistic estimate of the time required to complete the work covered by the specific im contract being bid upon. The amount of time so stated by the successful bidder or the City will become the time of completion specified in the Contract Documents. ON For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, or the increased time granted by the Owner, or as automatically increased by additional work or materials ordered after the contract is signed, the sum per day given in the following in C7-7 (5) fm a" aw schedule, unless otherwise specified in other parts of the Contract Documents, will be deducted from monies due the '" Contractor, not as a penalty, but as liquidated damages suffered by the Owner. AMOUNT OF CONTRACT DAMAGES LIQUIDATED MW Less than $5,000 $35.00 $5,001 to 15,000 45.00 5,001 to 25,000 63.00 .r 25,001 to 50,000 105.00 50,001 to 100,000 154.00 100,001 to 500,000 210.00 so 500,001 to 1,000,000 315.00 1,000,001 to 2,000,000 420.00 2,000,001 and over 630.00 .r The parties hereto understand and agree that any harm to the City caused by the Contractor's delay in completing the work hereunder in the time specified by the Contract Documents would .w be impossible or very difficult to accurately estimate, and that the "Amount of Liquidated Damages Per Day", as set out above, is a reasonable forecast of just compensation due the City for harm "' caused by any delay. C7-7.11 SUSPENSION BY COURT ORDER! The Contractor shall suspend Am operations on such part or parts of the work ordered by any Court, and will not be entitled to additional compensation by virtue of such Court Order. Neither will he be liable to the City in the event the work is suspended by a Court Order. Neither will the Owner be liable to the Contractor by virtue of any Court Order or action for which the Owner is not solely responsible. C7-7.12 TEMPORARY SUSPENSION: The Owner shall have the right to ON suspend the work operation wholly or in part for such period or periods of time as he may deem necessary due to unsuitable weather conditions or any other unfavorable conditions which in the opinion of the Owner or Engineer cause further prosecution "R of the work to be unsatisfactory or detrimental to the interest of the project. During temporary suspension of work covered by this contract, for any reason, the Owner will make no extra No payment for stand-by time of construction equipment and/or construction crews. .. WV C7-7 (6) .. - V= If it should become necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. Im Should the Contractor not be able to complete a portion of the project due to causes beyond the control of and without the fault or negligence of, the Contractor as set forth in Paragraph C7-7.8 EXTENSION OF THE TIME OF COMPLETION, and should it be determined by mutual consent of the Contractor and the Engineer that a solution to allow construction to proceed is not available within a reasonable period of time, then the Contractor may be reimbursed for the cost of moving his equipment off the job and 'returning the necessary equipment to log the job when it is determined by the Engineer that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. No reimbursement shall be allowed if the equipment is moved to another construction project for the City of Fort Worth. ` The Contractor shall not suspend work without written notice from the Engineer and shall proceed with the work operations promptly when notified by the Engineer to so resume operations. C7-7.13 TERMINATION OF CONTRACT DUE TO NATIONAL EMERGENCY: ++ Whenever, because of National Emergency so declared by the President of the United States, or other lawful authority, it becomes impossible for the Contractor to obtain all of the necessary labor, materials, and equipment for the prosecution of the work with reasonable continuity for a period of two months, the Contractor shall, within seven days, notify the City in writing giving a detailed statement of the efforts which have been made and listing all necessary items of labor, materials, and equipment not obtainable. If, after investigation, the Owner finds that such conditions exist and that the inability of the Contractor to proceed is not attributable in whole or in part to the fault or neglect of the Contractor, then if the Owner cannot after reasonable effort assist the Contractor in procuring and making available the necessary labor, materials and equipment within thirty days, the Contractor may request the C7-7 (7) _ U0 .r .r Owner to terminate the contract and the Owner may comply with the request, and the termination shall be conditioned and based upon a final settlement mutually acceptable to both the Owner and the Contractor and final payment shall be made in accordance with the terms of the agreed settlement, which shall include, but not be limited to, the payment for all work executed but no anticipated profits on work which has not been performed. No C7-7.14 SUSPENSION OR ABANDONMENT OF THE WORK AND ANNULMENT OF CONTRACT: The work operations on all or any portion or section of the work under Contract shall be suspended immediately on .o written order of the Engineer or the Contract may be declared cancelled by the City Council for any good and sufficient cause. The following, by way of example, but not of limitation, may be no considered grounds for suspension or cancellation: a. Failure of the Contractor to commence work operations go within the time specified in the Work Order issued by the Owner. b. Substantial evidence that progress of the work operations by Contractor is insufficient to complete the work within the specified time. aw C. Failure of the Contractor to provide and maintain sufficient labor and equipment to properly execute the working operations. .r d. Substantial evidence that the Contractor has abandoned the work. so e. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable ,w to carry on the work satisfactorily. f. Failure on the part of the Contractor to observe any requirements of the Contract Documents or to comply w with any orders given by the Engineer or Owner provided for in these Contract Documents. fe g. Failure of the Contractor to promptly make good any defect in materials or workmanship, or any defects of any nature the correction of which has been directed MW in writing by the Engineer or the Owner. aw .+ C7-7 (8) MW h. Substantial evidence of collusion for the purpose of illegally procuring a contract or perpetrating fraud on the City in the construction of work under contract. i. A substantial indication that the Contractor has made an unauthorized assignment of the contract or any funds due therefrom for the benefit of any creditor or for any other purpose. j. If the Contractor shall, for any cause whatsoever, fail to carry on the working operation in an acceptable manner. k. If the Contractor commences legal action against the Owner. A copy of the suspension order or action of the City Council shall be served on the Contractor's Sureties. When work is suspended for any cause or causes, or when the contract is cancelled, the Contractor shall discontinue the work or such '~ part thereof as the Owner shall designate, whereupon the Sureties may, at their option, assume the contract or that portion thereof which the Owner has ordered the Contractor to discontinue, and may perform the same or may, with the written consent of the Owner, sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon consent of the Owner, sublet the work or that portion of the work as taken over, provided however, that the Sureties shall exercise their option, if at all, within two weeks after the written notice to discontinue the work has been served upon the Contractor and upon the Sureties or their authorized agents. The Sureties, in such event shall assume the Contractor's place in all respects, and shall be paid by the Owner for all work performed by them in accordance with the terms of the Contract Documents. All monies remaining due the Contractor at the time of this default shall thereupon become due and payable to the Sureties as the work progresses, subject to all of the terms of the Contract Documents. In case the Sureties do not, within the specified time, exercise their right and option to assume the contract responsibilities, or that portion thereof which the Owner has ordered the C7-7 (9) 1.0 .r no Contractor to discontinue, then the Owner shall have the power to complete, by contract or otherwise, as it may determine, the ow work herein described or such part thereof as it may deem necessary, and the Contractor hereto agrees that the Owner shall have the right to take possession of and use any materials, No plants, tools, equipment, supplies, and property of any kind provided by the Contractor for the purpose of carrying on the work and to procure other tools, equipment, materials, labor and aw property for the completion of the work, and to charge to the account of the Contractor of said contract expense for labor, materials, tools, equipment, and all expenses incidental .. thereto. The expense so charged shall be deducted by the Owner from such monies as may be due or may become due at any time thereafter to the Contractor under and by virtue of the Contract ow or any part thereof. The Owner shall not be required to obtain the lowest bid for the work completing the contract, but the expense to be deducted shall be the actual cost of the owner of such work. aw In case such expenses shall exceed the amount which would have been payable under the contract if the same had been completed MW by the Contractor, then the Contractor and his Sureties shall pay the amount of such excess to the City on notice from the Owner of the excess due. When any particular part of the work is being carried on by the Owner by contract or otherwise under the provisions of this section, the Contractor shall continue the remainder of the work in conformity with the terms of the �• Contract Documents and in a manner that does not hinder or interfere with performance of the work by the Owner. C7-7.15 FULFILLMENT OF CONTRACT: The Contract will be considered as having been fulfilled, save as provided in any bond or bonds or by law, when all the work and all sections or parts of the project covered by the Contract Documents have been finished and completed, the final inspection made by the Engineer, and the final acceptance and final payment made by the Owner. C7-7.16 TERMINATION FOR CONVENIENCE OF THE OWNER: �.. A. NOTICE OF TERMINATION: The performance of the work under this contract may be terminated by the Owner in whole, or from time to time in part, in accordance MW with this section, whenever the Owner shall determine that such termination is in the best interest of the Owner. Any such termination shall be affected by .. C7-7 (I 0) r r. M mailing a notice of termination to the Contractor specifying the extent to which performance of work under the contract is terminated, and the date upon which such termination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Mail by the Owner. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the Owner regarding such discretionary action. B. CONTRACTOR ACTION: After receipt of a notice of termination, and except as otherwise directed by the .. Engineer, the Contractor shall: 1. Stop work under the contract on the date and to the extent specified in the notice of termination; 2. Place no further orders or subcontracts for _ materials, services or facilities except as may be necessary for completion of such portion of the work under the contract as is not terminated; 3. Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the not5ice of termination; 4. Transfer title to the Owner and deliver in the manner, at the times, and to the extent, if any, directed by the Engineer: a, the fabricated or unfabricated parts, work in process, completed work, supplies and other material produced as a part of, or acquired in connection with the performance of, the work terminated by the notice of termination; and b. the completed, or partially completed plans, drawings, information and other property which, if the contract had been completed, would have been required to be furnished to the Owner. 5. Complete performance of such part of the work as shall not have been terminated by the notice of termination; and C7-7 (11) ft r 6. Take such action as may be necessary, or as the ■w Engineer may direct, for the protection and preservation of the property related to its contract. which is in the possession of the contractor and in which the Owner has or may .. acquire the rest. C. TERMINATION CLAIM: Within 60 days after notice of "' termination, the Contractor shall submit his termination claim to the Engineer in the form and with the certification prescribed by the Engineer. Unless .o one or more extensions in writing are granted by the Owner upon request of the Contractor, made in writing within such 60-day period or authorized extension ow thereof, any and all. such claims shall be conclusively deemed waived. D. AMOUNTS: Subject to the provisions of Item C7-7.16 (C), the Contractor and Owner may agree upon the whole or any part of the amount or amounts to be paid to the contractor by reason of the total or partial termination of work pursuant hereto; provided, that such agreed amount or amounts shall never exceed the .w total contract price as reduced by the amount of payments otherwise made and as further reduced by the contract price of work not terminated. The contract shall be amended accordingly, and the Contractor shall be paid the agreed amount. No amount shall be due for lost or anticipated profits. Nothing in C7-/.16(E) hereafter, prescribing the amount to be paid to the Contractor in the event of failure of the Contractor by reason of the termination of work pursuant to this section, shall be deemed to limit, .. restrict or otherwise determine or affect the amount or amounts which may be agreed upon to be paid to the Contractor pursuant to this paragraph. E. FAILURE TO AGREE: In the event of the failure of the Contractor and the Owner to agree as provided in C7- ,� 7.16 (D) upon the whole amount to be paid to the Contractor by reason of the termination of work pursuant to this section the Owner shall determine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts determined. No amount shall be due for lost 'r or anticipated profits. C7-7 (12) .w F. DEDUCTIONS: In arriving at the amount due the contractor under this section, there shall be deducted .. (a) all unliquidated advance or other payments on account theretofore made to the Contractor, applicable to the terminated portion of this contract; (b) any claim which the Owner may have against the Contractor in connection with this contract; and (c) the agreed price for, or the proceeds of sale of, any materials, supplies or other things kept by the Contractor or sold, pursuant to the provisions of this clause, and not otherwise recovered by or credited to the Owner. *� G. ADJUSTMENT: If the termination hereunder be partial, prior to the settlement of the terminated portion of .,. this contract, the Contractor may file with the Engineer a request in writing for an equitable adjustment of the price or prices specified in the contract relating to the continued portion of the contract (the portion not terminated by the notice of termination), such equitable adjustment as may be agreed upon shall be made in such price or prices; nothing contained herein, however, shall limit the right of the Owner and the contractor to agree upon the amount or amounts to be paid to the Contractor for the completion of the continued portion of the contract when said contract does not contain an established contract price for such continued portion. H. NO LIMITATION OF RIGHTS: Nothing contained in this section shall limit or alter the rights which the 4+ Owner may have for termination of this contract under C7-7.14 hereof entitled "Suspension. or Abandonment of the Work and Amendment of Contract" or any other right .. which Owner may have for default or breach of contract by Contractor. C7-7.17 SAFETY METHODS AND PRACTICES: The Contractor shall be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the work at all times and shall assume all responsibilities for their enforcement. khm The Contractor shall comply with federal, state, and local laws, ordinances, and regulations to protect person and property from injury, including death, or damage in connection with the work. RM hn C7-7 (13) .w .. .. PART C—GENERAL CONDITIONS C8-8 MEASUREMENT AND PAYMENT .w SECTION C8-8 MEASUREMENT AND PAYMENT .. SECTION C8-8.1 MEASUREMENT OF QUANTITIES: The determination of quantities of work performed by the Contractor and authorized by .• the Contract Documents acceptably completed under the terms of the Contract Documents shall be made by the Engineer, based on measurements made by the Engineer. These measurements will be ., made according to the United States Standard Measurements used in common practice, and will be the actual length, area, solid contents, numbers, and weights of the materials and items so installed. C8-8.2 UNIT PRICES: When in the Proposal a "Unit Price" is set forth, the said "Unit Price" -shall include the furnishing by the Noforth, of all labor, tools, materials, machinery, equipment, appliances and appurtenances necessary for the construction of and the completion in a manner acceptable to the Engineer of all "' work to be done under these Contract Documents. The "Unit Price" shall include all permanent and temporary so protection of overhead, surface, and underground structures, cleanup, finished overhead expense, bond, insurance, patent fees, royalties, risk due to the elements and other causes, .. delays, profits, injuries, damages claims, taxes, and all other items not specifically mentioned that may be required to fully construct each item of the work complete in place and in a 60 satisfactory condition for operation. C8-8.3 LUMP SUM: When in the Proposal a "Lump Sum" is set forth, the said "Lump Sum" shall represent the total cost for the Contractor to furnish all labor, tools, materials, machinery, equipment, appurtenances, and all subsidiary work necessary for the construction and completion of all the work to .. provide a complete and functional item as detailed in the Special Contract Documents and/or Plans. '! C8-8.4 SCOPE OF. PAYMENT: The Contractor shall receive and accept the compensation, as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any no C8-8 (1) No M M unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expense incurred by or in consequence of suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or ,r equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any - defetts or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfection, or damage shall have been discovered on or before the final inspection and acceptance of work or during the one year guaranty period after final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Between the 1st and 5th day of each month the Contractor shall submit to the Engineer a 1W statement showing an estimate of the value of the work done during. the previous month, or estimate period, under the Contract Documents. Not later than the loth day of the month, the Engineer shall verify such estimate, and if it is found to be acceptable and the value of work performed since the last partial payment was made exceeds one hundred dollars ($100.00) in amount, 90% of such estimated sum will be paid to the Contractor if the total contract amount is less than $400,000, or 95% of such estimated sum will be paid to the Contractor if the total contract amount is $400,000 or greater, within twenty- five (25) days after the regular estimate period. The City will have the option of preparing estimates on forms furnished by the City. The partial estimate may include acceptable nonperishable materials delivered to the work which are to be incorporated into the work as a permanent part thereof, but which at the time 4 WE C8-8 (2) NP 00 of the estimate have not been installed. Such payment will be allowed on a basis of 850 of the net invoice value thereof. The 'w Contractor shall furnish the Engineer such information as he may request to aid him as a guide in the verification or the preparation of partial estimates. No It is understood that the partial estimate from month to month will be approximate only, and all partial monthly estimates and a payment will be subject to correction in the estimate rendered following the discovery of an error in any previous estimate, and such estimate shall not, in any respect, be taken as an admission of the Owner of the amount of work done or of its quality of sufficiency, or as an acceptance of the work done or the release of the Contractor of any of his responsibilities aw under the Contract Documents. The City reserves the right to withhold the payment of any monthly estimate if the contractor fails to perform the work strictly in accordance with the specifications or provisions of this contract. C8-8.6 WITHHOLDING PAYMENT: Payment on any estimate or estimates may be held in abeyance if the performance of the construction operations is not in accordance with the dw requirements of the Contract Documents. C8-8.7 FINAL ACCEPTANCE: Whenever the improvements provided for no by the Contract Documents have been completed and all requirements of the Contract Documents have been fulfilled on the part of the Contractor, the Contractor shall notify the am Engineer in writing that the improvements are ready for the final inspection. The Engineer shall notify the appropriate officials of the Owner, who will within a reasonable time make no such final inspection, and if the work is satisfactory, in an acceptable condition, and has been completed in accordance with the terms of the Contract Documents and all approved modifications thereof, the Engineer will initiate the processing .w of the final estimate and recommend final acceptance of the project and final payment therefor as outlined in C8-8.8 below. MW C8-8.8 FINAL PAYMENT: Whenever all the improvements provided for by the Contract Documents and all approved modifications thereof shall have been completed and all requirements of the aw Contract Documents have been fulfilled on the part of the Contractor, a final estimate showing the value of the work will be prepared by the Engineer as soon as the necessary .• measurements, computations, and checks can be made. .. C8-8 (3) no km M All prior estimates upon which payment has been made are subject to necessary corrections or revisions in the final payment. The amount of the final estimate, less previous payments and any sums that have been deducted or retained under the provisions of the Contract Documents, will be paid to the Contractor within 60 days after final acceptance by the Owner on a proper resolution of the City Council, provided the Contractor has furnished to •+� the Owner satisfactory evidence of payment as follows: Prior to submission of the final estimate for payment, the Contractor shall execute an affidavit, as furnished by the City, certifying rr that all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full, that the wage scale established by the City Council in ,r the City of Fort Worth has been paid, and that there are no claims pending for personal injury and/or property damages. The acceptance by the Contractor of the last or final payment as aforesaid shall operate as and `shall release the Owner from all claims or liabilities under the Contract for anything done or furnished or relating to the work under Contract Documents or any act or neglect of said City relating to or connected with the Contract. MM The making of the final payment by the Owner shall not relieve the Contractor of any guarantees, or other requirements of the Contract Documents which specifically continue thereafter. no C8-8.9 ADEQUACY OF DESIGN: It is understood that the Owner believes it has employed competent Engineers and designers to No prepare the Contract Documents and all modifications of the approved Contract Documents. It is, therefore, agreed that the Owner shall be responsible for the adequacy of its own design No features, sufficiency of the Contract Documents, the safety of the structure, and the practicability of the operations of the completed project, provided the Contractor has complied with the requirements of the said Contract Documents, all approved modifications thereof, and additions and alterations thereto approved in writing by the Owner. The burden of proof of such compliance shall be upon the Contractor to show that he has `r complied with the said requirements of the Contract Documents, approved modifications thereof, and all approved additions and alterations thereto. C8-8 (4) up 00 No C8-8.10 GENERAL GUARANTY: Neither the final certificate of no payment nor any provision in the Contract Documents nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the .. Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any so defects or damages in the work and pay for any damage to other work resulting therefrom which shall appear within a period of one year from the date of final acceptance of the work unless a ,o longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract which shall assure the performance of the ,o general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. C8-8.11 SUBSIDIARY WORK: Any', -and all work specifically governed so by documentary requirements for the project, such as conditions imposed by the Plans, the General Contract Documents or these Special Contract Documents, in which no specific item for bid dw has been provided for in the Proposal, shall be considered as a subsidiary item of work, the cost of which shall be included in the price bid in the Proposal, for each bid item. Surface .. restoration, rock excavation and cleanup are general items of work which fall in the category of subsidiary work. MW C8-8.12 MISCELLANEOUS PLACEMENT OF MATERIAL: Material may be allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of _ material used, measured to the nearest one -tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual UW amount used for the project. C8-8.13 RECORD DOCUMENTS: Contractor shall keep on record a copy of all specifications, plans, addenda, modifications, shop drawings and samples at the site, in good order and annotated to show all changes made during the construction process. These shall be delivered to Engineer upon completion of the work. r NO ww 71 r E7J ow ow Part C1— Supplementary Conditions To Part C .. ow no was NEW me SECTION Cl: SUPPLEMENTARY CONDITIONS TO PART C - GENERAL CONDITIONS A. General These Supplementary Conditions amend or supplement the General Conditions of the Contract and other provisions of the Contract Documents as indicated below. Provisions which are not so amended or supplemented remain in full force and affect. B. C8-8.5 PARTIAL ESTIMATES AND RETAINAGE: Page C8-8 (2), should be deleted in its entirety and replaced with the following: .. Partial pay estimates shall be submitted by the Contractor or prepared by the City on the 5th day and 20th day of each month that the work is in progress. The estimate shall be proceeded by the City on the 1 Oth day and 25th day respectively. Estimates will be paid •• within 25 days following the end of the estimate period, less the appropriate retainage as set out below. Partial pay estimates may include acceptable nonperishable materials delivered to the work place which are to, be incorporated into the work as a permanent part thereof, but which at the time of the pay estimate have not been so installed. If such materials are included within a pay estimate, payment shall be based upon 85% of the net voice value thereof. - The Contractor will furnish the Engineer such information as may be reasonably requested to aid in the verification or the preparation of the pay estimate. For contracts of less than $400,000 at the time of execution, retainage shall be ten per .. cent (10%). For contracts of $400,000 or more at the time of execution, retainage shall be five percent (5%). Contractor shall pay subcontractors in accord with the subcontract agreement within five .. (5) business days after receipt by Contractor of the payment by City. Contractor's failure to make the required payments to subcontractors will authorize the City to withhold _ future payments from the Contractor until compliance with this paragraph is accomplished. It is understood that the partial pay estimates will be approximate only, and all partial pay estimates and payment of same will be subject to correction in the estimate rendered following the discovery of the mistake in any previous estimate. Partial payment by Owner for the amount of work done or of its quality or sufficiency or acceptance of the no work done; shall not release the Contractor of any of its responsibilities under the Contract Documents. The City reserves the right to withhold the payment of any partial estimate if the Contractor fails to perform the work in strict accordance with the specifications or other provisions of this contract. C. Part C - General Conditions: Paragraph C3-3.11 of the General Conditions is deleted and replaced with D-3 of Part D - Special Conditions. •. D. C3-3.11 INSURANCE: Page C3-3 (6): Delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING" Revised Pg. 1 10/24/02 E. C6-6.12 CONTRACTOR'S RESPONSIBLITY FOR DAMAGE CLAIMS: Page C6-6 (8), is deleted in its entirety and replaced with the following: Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such iniurv, damaze or death is caused, in whole or in part. by the negligence or alleged negligence of Owner. its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not anv such iniury or damage is caused in whole or in part by the negligence or alleged negligence of Owner. its officers, servants or emplovees. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. ,^ The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. F. INCREASED OR DECREASED QUANTITIES: Part C - General Conditions, Section MW C4-4 SCOPE OF WORK, Page C 4-4 (1), revise paragraph C4-4.3 INCREASED OR DECREASED QUANTITIES to read as follows: MP The Owner reserves the right to alter the quantities of the work to be performed or to extend or shorten the improvements at any time when and as found to be necessary, and the Contractor shall perform the work as altered, increased or decreased at the unit prices as established in the contract documents. No allowance will be made for any changes in lost or anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract Documents. Variations in quantities of sanitary sewer pipes in depth categories shall be interpreted herein as applying to the overall quantities of sanitary sewer pipe in each pipe size but not to the various depth categories. bw Revised Pg. 2 10/24/02 G. C3-3.11 INSURANCE: Page C3-3 (7): Add subparagraph "h. ADDITIONAL INSURANCE REQUIREMENTS" Md a. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. b. Certificates of insurance shall be delivered to the City of Fort Worth, contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the contracted project. c. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein. d. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non -renewal, and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. e. Insurers must be authorized to do business in the State of Texas and have a current A.M. Best rating of A: VII or equivalent measure of financial strength and solvency. .. f. Deductible limits, or self -funded retention limits, on each policy must not exceed $10,000.00 per occurrence unless otherwise approved by the City. g. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve in writing any alternative coverage. h. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of recovery in favor of the City. i. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance. j. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self -funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. k. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. Revised 10/24/02 Pg. 3 1. Contractor's liability shall not be limited to the specified amounts of insurance MW required herein. m. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents. H. C8-8.4 SCOPE OF PAYMENT: Delete C8-8.4, Scope of Payment at page C8-8(1) is deleted in its entirety and replaced with the following: The Contractor shall receive and accept the compensation as herein provided, in full payment for furnishing all labor, tools, materials, and incidentals for performing all work contemplated and embraced under these Contract Documents, for all loss and damage arising out of the nature of the work or from the action of the elements, for any unforeseen defects or obstructions which may arise or be encountered during the prosecution which may arise or be encountered during the prosecution of the work at any time before its final acceptance by the Owner, (except as provided in paragraph C5-5.14) for all risks of whatever description connected with the prosecution of the work, for all expenses incurred by or in consequence of the suspension or discontinuance of such prosecution of the working operations as herein specified, or any and all infringements of patents, trademarks, copyrights, or other legal reservations, and for completing the work in an acceptable manner according to the terms of the Contract Documents. The payment of any current or partial estimate prior to the final acceptance of the work by the Owner shall in no way constitute an acknowledgment of the acceptance of the work, materials, or equipment, nor in any way prejudice or affect the obligations of the Contractor to repair, correct, renew, or replace at his own and proper expense any defects or imperfections in the construction or in the strength or quality of the material used or equipment or machinery furnished in or about the construction of the work under contract and its appurtenances, or any damage due or attributed to such defects, which defects, imperfections, or damage shall have been discovered on or before the final inspection and acceptance of the work or during the two (2) year guaranty period after the final acceptance. The Owner shall be the sole judge of such defects, imperfections, or damage, +� and the Contractor shall be liable to the Owner for failure to correct the same as provided herein. I. C8-8.10 GENERAL GUARANTY: Delete C8-8.10, General Guaranty at page C8-8(4) is deleted in its entirety and replaced with the following: Neither the final certificate of payment nor any provision in the Contract Documents, nor partial or entire occupancy or use of the premises by the Owner shall constitute an acceptance of work not done in accordance with the Contract Documents or relieve the Contractor of liability in respect to any express warranties or responsibility for faulty materials or workmanship. The Contractor shall remedy any defects or damages in the work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of final acceptance of the work unless a longer period is specified and shall furnish a good and sufficient maintenance bond in the amount of 100 percent of the amount of the contract r Revised 10/24/02 Pg. 4 WE r r which shall assure the performance of the general guaranty as above outlined. The Owner will give notice of observed defects with reasonable promptness. Any reference to any shorter period of time of warranty contained elsewhere within the specifications shall be resolved in favor of this specifications, it being the City's intent that the Contractor guarantee its work for a period of two (2) years following the date of r acceptance of the project. In the Special Instructions to Bidders, TPW contracts place the following in lieu of the .. existing paragraph 2. J. Part C - General Conditions, Section C2-2 INTERPRETATION AND PREPARATION OF PROPOSAL, Page C2-2 (4) exchange paragraphs C2-2.7, C2-2.8 and C2-2.9 with the following: C2-2.7 DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders." r It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL," and the name or description of the project as designated in the "Notice to Bidders." The envelope shall be addressed to the _ Purchasing Manager, City of Fort Worth Purchasing Division, P.O. Box 17027, Fort Worth, Texas 76102. C2-2.8 WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a proposal must be made in writing, addressed to the City Manager, r and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non -consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed -may, at -the option of the Owner, be returned unopened. C2-2.9 TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal wo K. C3-3.7 BONDS (CITY LET PROJECTS): Reference Part C, General Conditions, dated November 1, 1987; (City let projects) make the following revisions: r Revised Pg. 5 10/24/02 MW 1. Page C3-3(3); the paragraph after paragraph C3-3.7d Other Bonds should be revised to read: In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority from the United States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a .. reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. Pg. C3-3(5) Paragraph C3-3.11 INSURANCE delete subparagraph "a. COMPENSATION INSURANCE". 3. Pg. C3-3(6), Paragraph C3-3.11 INSURANCE delete subparagraph "g. LOCAL AGENT FOR INSURANCE AND BONDING". L. RIGHT TO AUDIT: Part C - General Conditions, Section C8-8 MEASUREMENT AND PAYMENT, Page C8-8 (5), add the following: C8-8.14 RIGHT TO AUDIT: (a) Contractor agrees that the City shall, until the expiration of three (3), years after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The City shall give contractor reasonable advance notice of intended audits. 4W am (b) Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract, and further, that City shall have access during normal working hours to all subcontractor facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article. City shall give subcontractor reasonable advance notice of intended audits. (c) Contractor and subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse the Contractor for the cost of copies as follows: Revised Pg. 6 10/24/02 Wd .. 1. 50 copies and under - 10 cents per page 2, More than 50 copies - 85 cents for the first page plus fifteen cents for each page thereafter M. SITE PREPARATION: so The Contractor shall clear rights -of -way or easements of obstruction which must be removed to make possible proper prosecution of the work as a part of this project construction operations. The contractor's attention is directed to paragraph C6-6.10 work .o within easements, page C6-6(4), part C - General Conditions of the Water Department General Contract Document and General Specifications. •• Clearing and restoration shall be considered as incidental to construction and all costs incurred will be considered to be included in the Linear Foot price of the pipe. _ N. Reference Part C - General Conditions, Section C6-6.8 BARRICADES, WARNINGS AND WATCHMEN: wo 1. Wherever the word Watchmen appears in this paragraph, it shall be changed to the word flagmen. 2. In the first paragraph, lines five (5) and six (6), change the phrase take all such other precautionary measures to take all reasonable necessary measures. .00 O. MINORITY/WOMEN BUSINESS ENTERPRISE COMPLIANCE: Reference Part C (General Conditions), Section C3-3.2 Entitled "MINORITY BUSINESS .. ENTERPRISE/WOMEN-OWNED BUSINESS ENTERPRISE COMPLIANCE" shall be deleted in its entirety and replaced with the following: Upon request, Contractor agrees to provide to Owner complete and accurate information regarding actual work performed by a Minority Business Enterprise (MBE) and/or, a Woman Business Enterprise (WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an MBE and/or WBE. The _ misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation (other than negligent misrepresentation) and/or commission of fraud will result in the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than thee (3) years. Revised Pg. 7 10/24/02 P. WAGE RATES: Section C3-3.13 of the General Conditions is deleted and replaced with +� the following: (a) The contractor shall comply with all requirements of Chapter 2258, Texas Government Code, including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258, Texas Government Code. Such prevailing wage rates are included in these ` contract documents. (b) The contractor shall, for a period of three (3) years following the date of acceptance of .. the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; .. and (ii) the actual per diem wages paid to each worker. These records shall be open at all reasonable hours for inspection by the City. The provisions of Section C-1, L. Right to Audit (Rev. 9/30/02) pertain to this inspection. (c) The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) and (b) above. (d) With each partial payment estimate or payroll period, whichever is less, an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. 6- MM a& hmp Revised Pg. 8 10/24/02 M M " Part D — Special Conditions Water Department PART D - SPECIAL CONDITIONS mw so No .. am J .. No .. D-1 GENERAL............................................................................................. D-2 COORDINATION MEETING.........................................................................................5 D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW ...............5 D- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT................................7 D- 5 CROSSING OF EXISTING UTILITIES..........................................................................7 D- 6 EXISTING UTILITIES AND IMPROVEMENTS..............................................................8 D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES...........................................................8 D- 8 TRAFFIC CONTROL.....................................................................................................9 D- 9 DETOURS...................................................................................................................10 D- 10 EXAMINATION OF SITE.............................................................................................10 D- 11 ZONING COMPLIANCE..............................................................................................10 D- 12 WATER FOR CONSTRUCTION..................................................................................10 D- 13 WASTE MATERIAL.....................................................................................................10 D- 14 PROJECT CLEANUP AND FINAL ACCEPTANCE......................................................10 D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK.................................11 D- 16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES ............................11 D- 17 BID QUANTITIES........................................................................................................11 D- 18 CUTTING OF CONCRETE..........................................................................................12 D- 19 PROJECT DESIGNATION SIGN.................................................................................12 D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT......................................12 D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL........................................................12 D- 22 CRUSHED LIMESTONE BACKFILL............................................................................13 D- 23 2:27 CONCRETE.........................................................................................................13 D- 24 TRENCH EXCAVATION, BACKFILL. AND COMPACTION.........................................13 D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS ............ 14 D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS)................15 D- 27 SANITARY SEWER MANHOLES................................................................................16 D- 28 SANITARY SEWER SERVICES..................................................................................19 D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES................20 D- 30 DETECTABLE WARNING TAPES......................:........................................................23 D- 31 PIPE CLEANING.........................................................................................................23 D- 32 DISPOSAL OF SPOIUFILL MATERIAL.......................................................................23 D- 33 MECHANICS AND MATERIALMEN'S LIEN.................................................................23 D- 34 SUBSTITUTIONS........................................................................................................23 D- 35 PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER ............ Z4 D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES..........................................27 D- 37 BYPASS PUMPING.....................................................................................................28 D- 38 POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER .......... 28 D- 39 SAMPLES AND QUALITY CONTROL TESTING.........................................................30 D- 40 TEMPORARY EROSION, SEDIMENT. AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE)................................................................31 D- 41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES ........................32 D- 42 PROTECTION OF TREES, PLANTS AND SOIL .........................................................32 D- 43 SITE RESTORATION.................................................................................................. 32 D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST..............................................33 D- 45 TOPSOIL. SODDING. SEEDING & HYDROMULCHING.............................................33 D- 46 CONFINED SPACE ENTRY PROGRAM .................................................... .................38 D- 47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION ............................39 D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS)......................39 D- 49 CONCRETE ENCASEMENT OF SEWER PIPE..........................................................40 0312M SC-1 ow PART D - SPECIAL CONDITIONS D- 50 CLAY DAM...................................................................................................................40 D- 51 EXPLORATORY EXCAVATION (D-HOLE).................................................................40 D- 52 INSTALLATION OF WATER FACILITIES....................................................................40 52.1 Polvvinvl Chloride (PVC) Water Pipe...........................................................................40 52.2 Blockinq.......................................................................................................................41 52.3 Tvpe of Casinq Pipe.....................................................................................................41 52.4 Tie -Ins .............................. ........... ................ .................................................................. 41 52.5 Connection of Existinq Mains.......................................................................................41 52.6 Valve Cut-Ins...............................................................................................................42 52.7 Water Services............................................................................................................42 52.8 2-Inch Temporary Service Line....................................................................................44 52.9 Purqinq and Sterilization of Water Lines......................................................................45 52.10 Work Near Pressure Plane Boundaries.......................................................................45 52.11 Water Sample Station .......................... .....................................................................46 52.12 Ductile Iron and Grav Iron Fittings................................................................................46 D- 53 SPRINKLING FOR DUST CONTROL ........................ :................................................. 47 D- 54 DEWATERING............................................................................................................47 D- 55 TRENCH EXCAVATION ON DEEP TRENCHES.........................................................47 D- 56 TREE PRUNING..........................................................................................................47 D- 57 TREE REMOVAL.........................................................................................................48 D- 58 TEST HOLES..............................................................................................................48 D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION....................................................................................................49 D- 60 TRAFFIC BUTTONS....................................................................................................49 D- 61 SANITARY SEWER SERVICE CLEANOUTS..............................................................50 D- 62 TEMPORARY PAVEMENT REPAIR............................................................................50 D- 63 CONSTRUCTION STAKES.................................................................I...............4........ 50 D- 64 EASEMENTS AND PERMITS......................;...............................................................50 D- 65 PRE -CONSTRUCTION NEIGHBORHOOD MEETING............................:...................51 D- 66 WAGE RATES................................................................ ..................................51 D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE.....................................53 D- 68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN1 ACRE)....................................................................t.....................................53 D- 69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS....................................................................................55 D- 70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD............................................56 D- 71 EARLY WARNING SYSTEM FOR CONSTRUCTION ... :............................................. 56 D- 72 AIR POLLUTION WATCH DAYS................................................................................57 D- 73 FEE FOR STREET USE PERMITS AND RE-INSPECTIONS.....................................57 03112109 SC-2 PART D - SPECIAL CONDITIONS This Part D — Special Conditions is complimentary to Part C — General Conditions and Part C1 — Supplementary Conditions to Part C of the Contract. Anything contained in this Part D that is additive to any provision in Part C — General Conditions and part C1 — Supplementary Conditions to Part C of the Contract are to be read together. Any conflict between Part C — General Conditions and Part C1 — Supplementary Conditions of the Contract and this Part D, Part D shall control. FOR: SANITARY SEWER SYSTEM REHABILITATION CONTRACT LVIII (58) — Part 2 FORT WORTH, TEXAS CITY PROJECT NO. 01060, DOE NO. 6039, FILE NO. X-20874 SEWER PROJECT NO. P254-703170106087 "" D-1 GENERAL The order or precedence in case of conflicts or discrepancies between various parts of the .. Contract Documents subject to the ruling of the Engineer shall generally, but not necessarily, follow the guidelines listed below: 1. Plans no 2. Contract Documents 3. Special Conditions so The following Special Conditions shall be applicable to this project under the provisions stated above. The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2) years from date of final acceptance of this project by No the City of Fort Worth and will be required to replace at his expense any part or all of this project which becomes defective due to these causes. aw Subject to modifications as herein contained, the Fort Worth Water Department's General Contract Documents and General Specifications, with latest revisions, are made a part of the General Contract Documents for this project. The Plans, these Special Contract Documents —and -the rules, regulations, requirements, instructions, drawings -or details referred to by manufacturers name, or identification include therein as specifying, referring or implying product control, performance, quality, or other shall be binding upon the contractor. The specifications and drawings shall be considered cooperative; therefore, work or material called for by one and not shown or mentioned in the other shall be accomplished or furnished in a faithful manner as though required by all. Any Contractor performing any work on Fort Worth water or sanitary sewer facilities must be pre - qualified with the Water Department to perform such work in accordance with procedures described in the current Fort Worth Water Department General Specifications, which general specifications shall govern performance of all such work. This contract and project, where applicable, may also be governed by the two following published no specifications, except as modified by these Special Provisions: C 0311M SC-3 PART D - SPECIAL CONDITIONS 1. STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION - CITY OF FORT WORTH 2. STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - NORTH CENTRALTEXAS Any conflict between these contract documents and the above 2 publications shall be resolved in .. favor of these contract documents. A copy of either of these specifications may be purchased at the office of the Transportation and Public Works Director, 1000 Throckmorton Street, 2nd Floor, Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated by the call -out for the pay item by the designer. If not shown, then applicable published specifications in either of these documents may be followed at the discretion of the Contractor. General Provisions shall be those of the Fort Worth document rather than Division 1 of the North Central Texas document. Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document at any time. Failure to bid or fully execute contract without retaining contract documents intact may be grounds for designating bids as "non -responsive" and rejecting bids or voiding contract as appropriate as determined by the City Engineer. INTERPRETATION AND PREPARATION OF PROPOSAL: A. DELIVERY OF PROPOSAL: No proposal will be considered unless it is delivered, accompanied by its proper Bid Security, to the Purchasing Manager or his representative at the official location and stated time set forth in the "Notice to Bidders". It is the Bidder's sole responsibility to deliver the proposal at the proper time to the proper place. The mere fact that a proposal was dispatched will not be considered. The Bidders must have the proposal actually delivered. Each proposal shall be in a sealed envelope plainly marked with the word "PROPOSAL", and the name or description of the project as designated in the "Notice to Bidders". The envelope shall be addressed to the Purchasing Manager, City of Fort Worth Purchasing Division, PO Box 17027, Fort Worth, Texas 76102. .. B. WITHDRAWING PROPOSALS: Proposals actually filed with the Purchasing Manager cannot be withdrawn prior to the time set for opening proposals. A request for non -consideration of a proposal must be made in writing, addressed to the City Manager, and filed with him prior to the time set for the opening of proposals. After all proposals not requested for non -- consideration are opened and publicly read aloud, the proposals for which non -consideration requests have been properly filed may, at the option of the Owner, be returned unopened. ~" C. TELEGRAPHIC MODIFICATION OF PROPOSALS: Any bidder may modify his proposal by telegraphic communication at any time prior to the time set for opening proposals, provided such telegraphic communication is received by the Purchasing Manager prior to the said proposal opening time, and provided further, that the City Manager is satisfied that a written and duly authenticated confirmation of such telegraphic communication over the signature of .. the bidder was mailed prior to the proposal opening time. If such confirmation is not received within forty-eight (48) hours after the proposal opening time, no further consideration will be given to the proposal. 03112109 SCA PART D - SPECIAL CONDITIONS am D-2 COORDINATION MEETING For coordination purposes, weekly meetings at the job site may be required to maintain the project on the desired schedule. The contractor shall be present at all meetings. D-3 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW A. Definitions: aw 1. Certification of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the aw duration of the project. 2. Duration of the project - includes the time from the beginning of the work on the project until the, contractor's/person's work on the project has been completed and accepted by the governmental entity. 3. Persons providing services on the project ("subcontractor" in §406.096)- includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other services related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) or all employees of the Contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide the governmental entity: 1. A certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and 03/12M SC-5 PART D - SPECIAL CONDITIONS 2. No later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. .. F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten (10) days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed s" by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. MW I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project, for the duration of the project; 2. Provide to the Contractor, prior to that person beginning work on the project, a certificate of MW coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a.) A certificate of coverage, prior to the other person beginning work on the project; and b.) A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project. 5. Retain all required certificates of coverage on file for the duration of the project and for one year thereafter. 6. Notify the governmental entity in writing by certified mail or personal delivery, within ten .. (10) days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and 03112109 SC-6 PART D - SPECIAL CONDITIONS 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1)-(7), with the certificates of coverage to be provided to the person for whom they are providing services. i 8. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor .. who will provide services on the project will be covered by worker's compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self -insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the contractor to administrative, criminal, civil penalties or other civil actions. 9. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the " contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. J. The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other .. posting requirements imposed by the Texas Worker's Compensation Act or other Texas Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes: "REQUIRED WORKER'S COMPENSATION COVERAGE The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." Call the Texas Worker's Compensation Commission at (512) 463-3642 to receive information on the legal requirement for coverage, to verify whether your employer has provided the .. required coverage, or to report an employer's failure to provide coverage". D- 4 COORDINATION WITH FORT WORTH WATER DEPARTMENT During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. D- 5 CROSSING OF EXISTING UTILITIES Where a proposed water line crosses over a sanitary sewer or sanitary sewer service line and/or proposed sewer line crosses over a water line and the clear vertical distance is less than 9 feet barrel to barrel, the sanitary sewer or sanitary sewer service line shall be made watertight or be 03✓1M SC-7 PART D - SPECIAL CONDITIONS constructed of ductile iron pipe. The Engineer shall determine the required length of replacement. The material for sanitary sewer mains and sanitary sewer laterals shall be Class 51 Ductile Iron Pipe with polyethylene wrapping. The material for sanitary sewer service lines shall be extra strength cast iron soil pipe with polyethylene wrapping. Adapter fittings shall be a urethane or neoprene coupling ASTM CA25 with series 300 stainless steel compression straps. Backfill, fittings, tie-ins and all other associated appurtenances required are deemed subsidiary work, the cost of which shall be included in the price bid in the Proposal for each bid item. D- 6 EXISTING UTILITIES AND IMPROVEMENTS The plans show the locations of all known surface and subsurface structures. However, the Owner assumes no responsibility for failure to show any or all of these structures on the Plans, or to show them in their exact location. It is mutually agreed that such failure shall not be considered sufficient basis for claims for additional compensation for extra work or for increasing the pay quantities in any manner whatsoever. The Contractor shall be responsible for verifying the locations of and protecting all existing utilities, service lines, or other property exposed by his construction operations. Contractor shall make all necessary provisions (as approved or authorized by the applicable utility company) for the support, protection and/or temporary relocation of all utility poles, gas lines, telephone cables, utility services, water mains, sanitary sewer lines, electrical cables, drainage pipes, and all other utilities and structures both above and below ground during construction. It is understood that the Contractor is not responsible for the permanent relocation of existing utilities in direct conflict with the proposed construction. The Contractor is liable for all damages done to such existing facilities as a result of his operations and any and all cost incurred for the protection and/or temporary relocation of such facilities are deemed subsidiary work and the cost of same and shall be included in the cost bid per linear foot of pipe installed. NO ADDITIONAL COMPENSATION WILL BE ALLOWED. Where existing utilities or service lines are cut, broken or damaged the Contractor shall replace or repair the utilities or service lines with the same type of original material and construction, or better, unless otherwise shown or noted on the plans, at his own cost and expense. The Contractor shall immediately notify the Owner of the damaged utility or service line. He shall cooperate with the Owners of all utilities to locate existing underground facilities and notify the Engineer of any conflicts in grades and alignment. In case it is necessary to change or move the property of any owner of a public utility, such property shall not be moved or interfered with until ordered to do so by the Engineer. The right is reserved to the owner of public utilities to enter upon the limits of the project for the purpose of making such changes or repairs of their property that may be made necessary by performance of this contract. The utility lines and conduits shown on the plans are for information only and are not guaranteed by the City of the Engineer to be accurate as to extent, location, and depth; they are shown on the plans as the best information available at the time of design, from the owners of the utilities involved and from evidences found on the ground. D- 7 CONSTRUCTION TRAFFIC OVER PIPELINES It is apparent that certain construction vehicles could exceed the load bearing capacity of the pipe under shallow bury conditions. It will be the responsibility of the Contractor to protect both the new 031122109 SC-8 i. us MW no Im .. r. PART D - SPECIAL CONDITIONS line and the existing lines from these possibly excessive loads. The Contractor shall not, at any time, cross the existing or new pipe with a truck delivering new pipe to the site. Anv damage to the existing or new pipe will be repaired or replaced by the Contractor, at the Contractor's expense, to the satisfaction of the City. In locations where it is not permissible to cross the existing or proposed pipes without additional protection the Contractor may elect to provide additional protection of the pipes so that more frequent crossings of the pipes are allowed. It still is, however, the responsibility of the Contractor to repair any damage to the existing or proposed lines, if the damage results from any phase of his .. construction operation. D- 8 TRAFFIC CONTROL The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required. The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set •• forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways," codified as Article 6701d Vernon's Civil Statutes, pertinent sections being Section Nos. .. 27, 29, 30 and 31. Unless otherwise included as part. of the Construction documents, the Contractor shall submit a .w traffic control plan (duly sealed, signed and dated by a Registered Professional Engineer (P.E.) in the state of Texas), to the City Traffic Engineer [Tel (817)392-87701 at or before the preconstruction conference. The P.E. preparing the traffic control plan may utilize standard traffic reroute configurations posted as "Typicals" on the City's Buzzsaw website. Although work will not aw begin until the traffic control plan has been reviewed and approved, the Contractor's time will begin in accordance with the timeframe mutually established in the 'Notice to Proceed' issued the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign or other sign, which has been erected by the City. If it is determined that a sign must be removed to permit •• required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division, (Phone Number 817-392-7738) to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with -a- temporary sign meeting the requirements of the above -referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the. _ temporary sign requirements are met. When construction work is completed to the extent that the permanent sign can be reinstalled, the Contractor shall again contact the Signs and Markings Division to reinstall the permanent sign and shall leave his temporary sign in place until such reinstallation is completed. Work shall not be performed on certain locations/streets during "peak traffic periods" as determination by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." The lump sum pay item for traffic control shall cover design and / or installation, and maintenance of the traffic control plan. 0311W9 SC-9 09 PART D -SPECIAL CONDITIONS D-9 DETOURS The contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. D-10 EXAMINATION OF SITE .. It shall be the responsibility of the prospective bidder to visit the project site and make such examinations and explorations as may be necessary to determine all conditions, which may affect construction of this project. Particular attention should be given to methods of providing ingress .� and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during the preparation of the Proposal and all unusual conditions, which may give, rise to later contingencies should be brought to the attention of the Owner prior to the submission of the Proposal. D- 11 ZONING COMPLIANCE During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes. D- 12 WATER FOR CONSTRUCTION The Contractor at his own expense will furnish water for construction. D- 13 WASTE MATERIAL an All waste material shall become the property of the Contractor and shall be disposed of by the Contractor at locations approved by the Engineer. All material shall be disposed of in such a manner as to present a neat appearance and to not obstruct proper drainage or to cause injury to street improvements or to abutting property. D-14 PROJECT CLEANUP AND FINAL ACCEPTANCE The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items. Clean up work shall be done as -directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean-up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of residents' property No If the Engineer does not feel that the jobsite has been kept in an orderly condition, on the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s) will be reduced by 25%. Final cleanup work shall be done for this project as soon as all construction has been completed. No more than seven days shall elapse after completion of construction before the roadway, right- 03112109 SC-10 w PART D - SPECIAL CONDITIONS of -way, or easement is cleaned up to the satisfaction of the Engineer. The Contractor shall make a final cleanup of all parts of the work before acceptance by the City of Fort Worth or its representative. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or -- concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. The City of Fort Worth shall give final acceptance of the completed project work. D- 15 CONSTRUCTION SCHEDULE AND SEQUENCING OF WORK Prior to executing the Contract, it shall be the responsibility of the Contractor to furnish a schedule outlining the anticipated time for each phase of construction with starting and completion dates, including sufficient time being allowed for cleanup. The Contractor shall not commence with water and/or sanitary sewer installation until such time that the survey cut -sheets have been received .. from the City inspector. D- 16 SAFETY RESTRICTIONS - WORK NEAR HIGH VOLTAGE LINES The following procedures will be followed regarding the subject item on this contract: am 1. A warning sign not less than five inches by seven inches, painted yellow with black letters that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING - UNLAWFUL TO OPERATE THIS .. EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." 2. Equipment that may be operated within ten feet of high voltage lines shall have insulating "' cage -type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections. -W 3. When necessary to work within six feet of high voltage electric lines, notification shall be given the power company (ONCOR) who will erect temporary mechanical barriers, de - energize the lines, or raise or lower the lines. The work done by the power company shall mw not be at the expense of the City of Fort Worth. The notifying department shall maintain an accurate log of all such calls to ONCOR, and shall record action taken in each case. = 4. The Contractor is required to make arrangements with the ONCOR company for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. `! 5. No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). D- 17 BID QUANTITIES Bid quantities of the various items in the proposal are for comparison only and may not reflect the actual quantities. There is no limit to which a bid item can be increased or decreased. Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured quantities. To the extent that C4-4.3 conflicts with this provision, this provision controls. No claim will be considered for lost or anticipated profits based upon differences in estimated quantities versus actual quantities. o3/Ivos SC-11 PART D - SPECIAL CONDITIONS D-18 CUTTING OF CONCRETE When existing concrete is cut, such cuts shall be made with a concrete saw. All sawing shall be ow subsidiary to the unit cost of the respective item. D-19 PROJECT DESIGNATION SIGN s Project signs are required at all locations. It shall be in accordance with the attached Figure 30 (dated 9-18-96). The signs may be mounted on skids or posts. The Engineer shall approve the exact locations and methods of mounting. In addition to the 4' x 8' project signs, project signs shall be attached to barricades used where manhole rehabilitation or replacement is being conducted. Signs suspended from barricading shall be placed in such a way that signs do not interfere with reflective paint or coloring on the barricades. Barricade signs shall be in accordance .. with Figure 30, except that they shall be V-0" by 2'-0" in size. The information box shall have the following information: For Questions on this Project Call: w> (817) 392-8306 M-F 7:30 am to 4:30 p.m. or (817) 392-8300 Nights and Weekends Any and all cost for the required materials, labor, and equipment necessary for the furnishing of Project Signs shall be considered as a subsidiary cost of the project and no additional compensation will be allowed. D- 20 CONCRETE SIDEWALK AND DRIVEWAY REPLACEMENT .. At locations in the project where mains are required to be placed under existing sidewalks and/or driveways, such sidewalks and/or driveways shall be completely replaced for the full existing width, between existing construction or expansion joints with 3000 psi concrete with reinforcing steel on a -- sand cushion in accordance with City of Fort Worth Transportation/Public Works Department Standard Specifications for Construction, Item 504. At locations where mains are required to be placed under existing curb and gutter, such curb and gutter shall be replaced to match type and geometry of the removed curb and gutter shall be installed in accordance with City of Fort Worth Public Works Department Standard Specification for Construction, Item 502. Payment for cutting, backfill, concrete, forming materials and all other associated appurtenances .m required, shall be included in the square yard price of the bid item for concrete sidewalk or driveway repair. D- 21 MISCELLANEOUS PLACEMENT OF MATERIAL No Material has been allocated under various bid items in the Proposal to establish unit prices for miscellaneous placement of material. These materials shall be used only when directed by the _ Engineer, depending on field conditions. Payment for miscellaneous placement of material will be made for only that amount of material used, measured to the nearest one -tenth unit. Payment for miscellaneous placement of material shall be in accordance with the General Contract Documents regardless of the actual amount used for the project. 03112109 SC-12 PART D - SPECIAL CONDITIONS D- 22 CRUSHED LIMESTONE BACKFILL Where specified on the plans or directed by the Engineer, Crushed Limestone shall be used for trench backfill on this project. The material shall conform to Public Works Standard Specifications for Street and Storm Drain Construction Division 2 Item 208.2 - Materials and Division 2 Item 208.3 - Materials Sources. Trench backfill and compaction shall meet the requirements of E2-2 Excavation and Backfill, Construction Specifications, General Contract Documents. Payment for crushed limestone backfill in place shall be made at the unit price bid in the Proposal multiplied by the quantity of material used measured in accordance with E2-2.16 Measurement of Backfill Materials, Construction Specifications, and General Contract Documents. D- 23 2:27 CONCRETE Transportation and Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts Figures 1 through 5 refer to using 2:27 Concrete as base repair. Since this call -out includes the word "concrete", the consistent interpretation of the Transportation and Public Works Department is that this ratio specifies two (2) sacks of cement per cubic yard of concrete. D- 24 TRENCH EXCAVATION, BACKFILL, AND COMPACTION 'm Trench excavation and backfill under parking lots, driveways, gravel surfaced roads, within easements, and within existing or future R.O.W. shall be in accordance with Sections E1-2 Backfill and E2-2 Excavation and Backfill of the General Contract -w Documents and Specifications except as specified herein. 1. TRENCH EXCAVATION: In accordance with Section E2-2 Excavation and Backfill, if the ... stated maximum trench widths are exceeded, either through accident or otherwise, and if the Engineer determines that the design loadings of the pipe will be exceeded, the Contractor will be required to support the pipe with an improved trench bottom. The expense of such remedial measures shall be entirely the Contractor's own. All trenching operations shall be confined to the width of permanent rights -of -way, permanent easements, and any temporary construction easements. All excavation shall be in strict compliance with the Trench Safety Systems Special Condition of this document. 2. TRENCH BACKFILL: Trenches which lie outside of existing or future pavement shall be backfilled above the top of the embedment material with Type "C" backfill material. Excavated '" material used for Type "C" backfill must be mechanically compacted unless the Contractor can furnish the Engineer with satisfactory evidence that the P.I. of the excavated material is less than B. Such evidence shall be a test report from an independent testing laboratory and must include representative samples of soils in all involved areas, with a map showing the location and depth of the various test holes. If excavated material is obviously granular in nature, containing little or no plastic material, the Engineer may waive the test report requirement. See E1-2.3, Type "C" or "D" ,.. Backfill, and E2-2.11 Trench Backfill for additional requirements. When Type "C" back -fill material is not suitable, at the direction of the Engineer, Type "B" backfill material shall be used. In general, all backfill material for trenches in existing paved streets shall be in accordance with Figure A. Sand material specified in Figure A shall be obtained from an approved source and shall consist of durable particles free of thin or elongated pieces, lumps of clay, soil, .loam or vegetable matter and shall meet the following gradation: r 03112M SC-13 PART D - SPECIAL CONDITIONS Less than 10% passing the #200 sieve P.I. = 10 or less Im Additionally, the crushed limestone embedment gradation specked in Section E1-3 Crushed Limestone for Embedment of the General Contract Documents and Specifications shall be replaced with the following: �- Sieve Size % Retained .. 1" 0-10 1 /2" 40-75 3/8" 55-90 #4 90-100 #8 95-100 All other provisions of this section shall remain the same. 3. TRENCH COMPACTION: All trench backfill shall be placed in lifts per E2-2.9 Backfill. Trenches which lie outside existing or future pavements shall be compacted to a minimum of 90% " Standard Proctor Density (A.S.T.M. D698) by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Trenches which lie under existing or future pavement shall be backfilled per Figure A with 95% Standard Proctor Density by mechanical devices specifically designed for compaction or a combination of methods subject to approval by the Engineer. Backfill material to be compacted as described above must be within +-4% of its optimum moisture content. The City, at its own expense, will perform trench compaction tests per A.S.T.M. standards on all trench backfill. Any retesting required as a result of failure to compact the backfill material to meet the standards will be at the expense of the Contractor and will be billed at the commercial rates as determined by the City. These soil density tests shall be performed at two (2) foot vertical intervals beginning at a level two (2) feet above the top of the installed pipe and continuing to the top of the _ completed backfill at intervals along the trench not to exceed 300 linear feet. The Contractor will be responsible for providing access and trench safety system to the level of trench backfill to be tested. No extra compensation will be allowed for exposing the backfill layer to be tested or providing trench safety system for tests conducted by the City. 4. MEASUREMENT AND PAYMENT: All material, with the exception of Type "B" backfill, and labor costs of excavation and backfill will be included in the price bid per linear foot of water and sewer pipe. Type "B" backfill shall be paid for at a pre -bid unit price of $15.00 per cubic yard. D- 25 TRENCH PAVEMENT (PERMANENT) REPAIR (E2-19) FOR UTILITY CUTS The unit price bid under the appropriate bid item of the proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement as detailed in the Public Works Department typical sections for Pavement and Trench Repair for Utility Cuts, Figures 2000-1 through 2000-3. The results of the street cores that were conducted on the project streets, to determine HMAC w. depths on existing streets, are provided in these specifications and contract documents. 03112109 SC-14 PART D - SPECIAL CONDITIONS aw All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be backfilled and the top nine (9) inches shall be filled with required materials as shown on paving .o details, compacted and level with the finished street surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. All residential driveways shall be accessible at night and over weekends. .. It has been determined by the Transportation and Public Works Department that the strip of existing HMAC pavement between the existing gutter and the edge of the trench pavement repair ow will not hold up if such strip of existing pavement is two (2) feet or less in width. Therefore, at the locations in the project where the trench wall is three (3) feet or less from the lip of the existing gutter, the Contractor shall be required to remove the existing paving to such gutter. aw The pavement repair shall then be made from a minimum distance of twelve (12) inches outside the trench wall nearest the center of the street to the gutter line. ow The pavement shall be replaced within a maximum of five (5) working days, providing job placement conditions will permit repaving. If paving conditions are not suitable for repaving, in the opinion of the Owner, the repaving shall be done at the earliest possible date. aw A permit must be obtained from the Construction Services Section by the Contractor in conformance with Ordinance No. 3449 and/or Ordinance No. 792 to make utility cuts in the street. .. The Construction Services section will inspect the paving repair after construction. This permit requirement may be waived if work is being done under a Performance Bond and inspected by the Construction Services section. D- 26 SITE SPECIFIC TRENCH SAFETY SYSTEM (COVERS ALL PROJECTS) A. GENERAL: This specification covers the trench safety requirements for all trench excavations exceeding depth of five (5) feet in order to protect workers from cave-ins. The requirements of this item govern all trenches for mains, manholes, vaults, service lines, and all other appurtenances. The design for the trench safety shall be signed and sealed by a Registered .. Professional Engineer licensed in Texas. The trench safety plan shall be specific for each water and/or sanitary sewer line included in the project. _ B. STANDARDS: The latest version of the U.S. Department of Labor, Occupational Safety and Health Administration Standards, 29 CFR Part 1926, Sub -Part P - Excavations, are hereby, made a part of this specification and shall be the minimum governing requirements for trench safety. C. DEFINITIONS: 1. TRENCHES - A trench is referred to as a narrow excavation made below the surface of the ground in which the depth is greater than the width, where the width measured at the bottom is not greater than fifteen (15) feet. 2. BENCHING SYSTEM - Benching means excavating the sides of a trench to form one or a series of horizontal level or steps, usually with vertical or near -vertical surfaces between .. levels. INO 03112109 SC-15 MW PART D - SPECIAL CONDITIONS 3. SLOPING SYSTEM - Sloping means excavating to form sides of a trench that are inclined away from the excavation. 4. SHIELD SYSTEM - Shields used in trenches are generally referred to as "trench boxes" or "trench shields". Shield means a structure that is able to withstand the forces imposed on it by a cave-in and protect workers within the structure. Shields can be permanent structures or can be designed to be portable and move along as the work progresses. Shields can be either pre -manufactured or job -built in accordance with OSHA standards. 5. SHORING SYSTEM - Shoring means a structure such as a metal hydraulic, mechanical or timber system that supports the sides of a trench and which is designed to prevent cave- ins. Shoring systems are generally comprised of cross -braces, vertical rails, (uprights), horizontal rails (wales) and/or sheeting. D. MEASUREMENT - Trench depth is the vertical measurement from the top of the existing ground to the bottom of embedment or bottom of excavation. The quantity of trench safety systems shall be based on the linear foot amount of trench depth greater than five (5) feet. E. PAYMENT - Payment shall be full compensation for safety system design, labor, tools, materials, equipment and incidentals necessary for the installation and removal of trench safety systems. D- 27 SANITARY SEWER MANHOLES A. GENERAL: The installation, replacement, and/or rehabilitation of sanitary sewer manholes will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. All manholes shall be in accordance with sections E1-14 Materials for Sanitary Sewer Manholes, Valve Vaults, Etc., and E2-14 Vault and Manhole Construction of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. For new sewer line installations, the Contractor shall temporarily plug all lines at every open manhole under construction in order to keep debris out of the dry sewer lines. The plugs shall not be removed until the applicable manhole complete with cone section has been constructed and the lid installed to keep out debris as a result of additional construction. 1. CONCRETE COLLARS: Concrete collars will be required on all manholes specified as per COO. W. Standard Detail SAN-009. 2: DELETED 3. LIFT HOLES: All lift holes shall be plugged with a pre -cast concrete plug. The lift hole shall be sealed on the outside of the manhole with Ram-Nek or an approved equal sealant. The lift hole shall be sealed on the inside of the manhole with quick setting cement grout. 4. FINAL RIM ELEVATIONS: Manhole rims in parkways, lawns and other improved lands shall be at an elevation not more than one (1) nor less than one-half (1/2) inch above the surrounding ground. Backfill shall provide a uniform slope from the top of manhole casting for not less than three (3) feet each direction to existing finish grade of the ground. The grade of all surfaces shall be checked for proper slope and grade by string lining the entire area regarded near the manhole. 03112109 SC-16 .. .. r. .. ow .. PART D - SPECIAL CONDITIONS Manholes in open fields, unimproved land, or drainage courses shall be at an elevation shown on the drawings or minimum of 6 inches above grade. 5 MANHOLE COVERS: All lids shall have pick slots ,in ,lieu of.pick holes. ,Manhole frames and covers shall be PAMREX, or approved -equal, with 30-inch clear opening. Covers shall MW set flush with the rim of the frame and shall have no larger than 1/8-inch gap between the frame and cover. Bearing surfaces shag be machine finished. Locking manhole lids and frames will be restricted to locations within the 100-yearfloodplain and areas specifically aw designated on the plans'. 6. SHALLOW CONE MANHOLES: Shallow manhole construction will be used when manhole depth is four (4) feet or less. All shallow cone manholes shall be built in accordance with Figure 105. All shallow cone manholes shall have a cast iron lid and frame with pick slots. NOTE: MANHOLES PER FIGURE 106 WILL NOT BE ALLOWED. 7. MANHOLE STEPS: No manhole steps are to be installed on any sanitary sewer manhole. MW 8. EXTERIOR SURFACE COATING: Exterior surfaces of all manholes shall be coated with two mop coats of coal tar epoxy, Koppers "Bitumastic Super Service Black" Tnemec "46- aw 450 Heavy Tnemecol," or equal to, a minimum or 14 mils dry film thickness. 9. MANHOLE JOINT SEALING: All interior and/or exterior joints on concrete manhole ow sections constructed for the City of Fort Worth Water Department, excluding only the joints using a trapped type performed 0-ring rubber gasket shall require Bitumastic joint sealants as per Figure M. This sealant shall be pre -formed and trowelable Bitumastic as manufactured by Kent -Seal, Ram-Nek, E-Z Stick, or equal. The joint sealer shall be supplied in either extruded pipe form or suitable cross -sectional area or flat -tape and shall be sized as recommended by the manufacturer and approved by the Engineer. The joint sealer shall be protected by a suitable removable wrapper and shall not in any way depend on oxidation, evaporation, or any other chemical action for either its adhesive properties or cohesive strength. The Joint •• sealer shall remain totally flexible without shrinking, hardening, or oxidizing regardless of the length of time it is exposed to the elements. The manufacturer shall furnish an affidavit - attesting to the successful use of the product as a pre -formed flexible joint sealant on ,. concrete pipe and manhole sections for a period of at least five years. B. EXECUTION: 1. INSTALLATION OF JOINT SEALANT: Each grade adjustment ring and manhole frame shall be sealed with the above -specified materials. All surfaces to be in contact with the joint sealant shall be thoroughly cleaned of dirt, sand, mud, or other foreign matter. The manufacturer shall apply a primer to all surfaces prior to installing the joint sealant in accordance with the recommendations. The protective wrapper shall remain on the joint sealant until immediately prior to the placement of the pipe in the trench. After removal of the protective wrapper, the joint sealant shall be kept clean. Install frames and cover over aw 03✓12109 SC-17 am r PART D - SPECIAL CONDITIONS manhole opening with the bottom of the rings resting on Bitumastic joint sealer. Frames and grade rings shall rest on two (2) rows (inside and outside) of Bitumastic joint sealer. 2. SEALING AND/OR ADJUSTING EXISTING MANHOLES: Excavate (rectangular full depth 00 saw cut if in pavement) adjacent to the manhole to expose the entire manhole frame and a minimum of 6 inches of the manhole wall keeping the sides of the trench nearly vertical. MW Remove manhole frame from the manhole structure and observe the condition of the frame and grade rings. Any frame or grade ring that is not suitable for use as determined by the Engineer shall be replaced. Grade rings that are constructed of brick, block materials other on than pre -cast concrete rings, or where necessary and approved by the Engineer, shall be replaced with a pre -cast flattop section. Pre -cast concrete rings, or a pre -cast concrete flattop section will be the only adjustments allowed. No In brick or block manholes, replace the upper portion of the manhole to a point 24 inches below the frame. if the walls or cone section below this level are structurally unsound, notify the Engineer prior to replacement of the grade rings and manhole frame. Existing No brickwork, if damaged by the Contractor, shall be replaced at the Contractor's expense. Wire brush manhole frame and exposed manhole surfaces to remove dirt and loose debris. sm Coat exposed manhole surfaces with an approved bonding agent followed by an application of quick setting hydraulic cement to provide a smooth working surface. If the inside diameter of the manhole is too large to safely support new adjustment rings or frames, a flat top section shall be installed. am Joint surfaces between the frames, adjustment rings, and cone section shall be free of dirt, stones, debris and voids to ensure a watertight seal. Place flexible gasket joint material along the inside and outside edge of each joint, or use trowelable material in lieu of pre- formed gasket material. Position the butt joint of each length of joint material on opposite sides of the manhole. No steel shims, wood, stones, or any material not specifically accepted by the Engineer may be used to obtain final surface elevation of the manhole frame. In paved areas or future paved areas, castings shall be installed by using a straight edge not less than ten (10) feet long so that the top of the casting will conform to the slope and finish elevation of the paved surface. The top of the casting shall be 1/8 inch below the - finished elevation. Allowances for the compression of the joint material shall be made to assure a proper final grade elevation. 3. EXPOSED EXTERIOR SURFACES: All exposed exterior surfaces shall be coated with two mop coats of coal tar epoxy. Kopper "Bitumastic Super Service Black": Tnemec "46No - 450 Heavy Tnemecol", or equal, to a minimum of 14 mils dry film thickness. 4. The exterior surface of all pre -cast section joints shall be thoroughly cleaned with a wire brush and then waterproofed with a 1/2-inch thick coat of trowelable bitumastic joint sealant from 6-inches below to 6-inches above the joint. The coated joint shall then be wrapped with 6 mil plastic to protect the sealant from damage during backfilling. 03/12/09 SC-18 .. PART D - SPECIAL CONDITIONS w- C. MEASUREMENT AND PAYMENT: The price bid for new manhole installations shall include all labor, equipment, and materials necessary for construction of the manhole including, but not limited to, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. The price bid for reconstruction of existing manholes shall include all labor equipment and MW materials necessary for construction of new manhole, including, but not limited to, excavation, backfill, disposal of materials, joint sealing, lift hole sealing and exterior surface coating. Payment shall not include pavement replacement, which if required, shall be paid separately. MW The price bid for adjusting and/or sealing of existing manholes shall include all labor, equipment and materials necessary for adjusting and/or sealing the manhole, including but not limited to, joint sealing, lift hole sealing, and exterior surface coating. Payment for concrete collars will be made per each. Payment for manhole inserts will be made per each. D- 28 SANITARY SEWER SERVICES " Any reconnection, relocation, re-routes, replacement, or new sanitary sewer service shall be required as shown on the plans, and/or as described in these Special Contact Documents in addition to those located in the field and identified by the Engineer as active sewer taps. The service connections shall be constructed by the Contractor utilizing standard factory manufactured tees. City approved factory manufactured saddle taps may be used, but only as directed by the Engineer. The decision to use saddle taps as opposed to tees shall be made on a case -by -case •• basis. The Contractor shall be responsible for coordinating the scheduling of tapping crews with building owners and the Engineer in order that the work be performed in an expeditious manner. A minimum of 24 hours advance notice shall be given when taps will be required. Severed service .. connections shall be maintained as specified in section C6-6.15. D. SEWER SERVICE RECONNECTION: When sewer service reconnection is called for the _ Contractor shall vertically adjust the existing sewer service line as required for reconnection and furnish a new tap. The fittings used for vertical adjustment shall consist of a maximum bend of 45 degrees. The tap shall be located so as to line up with the service -line -and avoid any horizontal adjustment. For open cut applications, all sanitary sewer service lines shall be replaced to the property or easement line, or as directed by the Engineer. Sanitary sewer services on sewers being rehabilitated using pipe enlargement methods shall be replaced to the property or easement line or as directed by the Engineer. Procedures listed below for Sewer Service Replacement shall be adhered to for the installation of any sewer service line including the incidental four (4) feet of service line which is included in the price bid for Sanitary Sewer Taps. Payment for work such as backffll, saddles, tees, fittings incidental four (4) feet .. of service line and all other associated appurtenances required shall be included in the price bid for Sanitary Sewer Taps. .. E. SEWER SERVICE REPLACEMENT: All building sewer services encountered during construction shall be adjusted and/or replaced by the Contractor as directed by the Engineer as required for the connection of the sewer service line. If the sewer service line is in such condition or adjustment necessitates the replacement of the sewer service line, all work shall be performed by a licensed plumber. The Engineer shall determine the length of the replacement. All sewer services shall be installed at a minimum of two (2) percent slope or as 03112109 SC-19 ww PART D - SPECIAL CONDITIONS to approved by the Engineer. For situations involving sewer service re-routing, whether on public or private property, the City shall provide line and grade for the sewer service lines as shown on the project plans. Prior to installing the applicable sewer main or lateral and the necessary service lines, the Contractor shall verify (by de -holing at the building clean -out) the elevations (shown on the plans) at the building clean -out and compare the data with the elevation at the proposed connection point on the sewer main, in order to ensure that the two (2) percent minimum slope (or as specified by the Engineer) requirement is satisfied. Elevations shall also be verified at all bend locations on the service re-route. All applicable sewer mains, laterals and affected service lines that are installed without pre -construction de -holing at the affected residences (to verify design elevations) shall be removed and replaced as necessary at the Contractor's expense in the event grade conflicts are brought to light after de -holing is conducted. All elevation information obtained by the Contractor shall be submitted to the Inspector. The Engineer shall be immediately notified in the event that the two (2) percent minimum slope is not satisfied. If the Contractor determines that a different alignment for the re-route is more beneficial than shown on the plans, the Contractor shall obtain and submit all relevant elevation information for the new alignment to the Inspector and shall be responsible for ensuring that the two (2) percent minimum grade (or as approved by the Engineer) is satisfied. Prior to backfilling, the Contractor shall double check the grade of the installed service line and submit signed documentation verifying that the line has been installed as designed to the Engineer. The Contractor, at its sole expense, shall be required to uncover any sewer service for which no grade verification has been submitted. All re-routes that are not installed as designed or fail to meet the City code shall be reinstalled at the Contractor's expense. The Contractor shall ensure that the service line is backfilled and compacted in accordance with the City Plumbing Code. Connection to the existing sewer service line shall be made with appropriate adapter fittings. The fitting shall be a urethane or neoprene coupling A.S.T.M. C-425 with series 300 stainless steel compression straps. The Contractor shall remove the existing clean -out and plug the abandoned sewer service line. The contractor shall utilize schedule 40 PVC for all sanitary sewer service re-routes or relocations located on private property. Furthermore, the contractor shall utilize the services of a licensed plumber for all service line work on private property. Permits) must be obtained from the City of Fort Worth Development Department for all service line work on private property and all work related to the service line must be approved by a City of Fort Worth Plumbing Inspector. A copy of the plumbing permit shall be provided to the Engineer prior to beginning work on the sanitary sewer service re-route and proof of final acceptance by the Plumbing Inspector shall be provided to the Engineer upon completion of the sanitary sewer re-route. Payment for work and materials such as backfill, removal of existing clean -outs, plugging the abandoned sewer service line, double checking the grade of the installed service line, pipe fittings, surface restoration on private property (to match existing), and all other associated work for service replacements in excess of four (4) linear feet shall be included in the linear foot price bid for sanitary sewer service line replacement on private property or public right of way. Payment for all work and material involving the "tap" shall be included in the price bid for sanitary sewer service taps. D- 29 REMOVAL, SALVAGE, AND ABANDONMENT OF EXISTING FACILITIES Any removal, salvaging and/or abandonment of existing facilities will necessarily be required as shown on the plans, and/or described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. This work shall be done in accordance with 03112109 SC-20 .. Im s No to Im No .. M. PART D - SPECIAL CONDITIONS .. Section E2-1.5 Salvaging of Material and E2-2.7 Removing Pipe, of the General Contract Documents and Specifications, unless amended or superseded by requirements of this Special Condition. A. SALVAGE OF EXISTING WATER METER AND METER BOX: Existing water meter and meter box shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. B. SALVAGE OF EXISTING WATER METER AND CONCRETE VAULT LID: Existing water aw meter and concrete vault lid shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The concrete vault shall be demolished in place to a point not less than 18 inches below final grade. The concrete vault shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. C. SALVAGE OF EXISTING FIRE HYDRANTS: Existing fire hydrants shall be removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. D. SALVAGE OF EXISTING GATE VALVE: Existing gate valve and valve box and lid shall be W. removed and returned to the Water Department warehouse by the Contractor in accordance with Section E2-1.5 Salvaging of Materials. The void area caused by the valve removal shall be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with existing surrounding surface and grade. If the valve is in a concrete vault, the vault shall be demolished in place to a point no less than 18" below final grade. E. ABANDONMENT OF EXISTING GATE VALVE: Existing gate valve and box lid shall be abandoned by first closing the valve to the fully closed position and demolishing the valve box no in place to a point not less than 18 inches below final grade. Concrete shall then be used as_ backfill material to match existing grade. F. ABANDONMENT OF EXISTING VAULTS: Vaults to be demolished in place shall have top slab and lid removed and vault walls demolished to a point not less than 18" below final grade. The void area caused shall then be backfilled and compacted in accordance with backfill -■ method as specified in Section E2-2.9 Backfill. Backfill material shall be suitable excavated material approved by the Engineer. Surface restoration shall be compatible with the existing surrounding grade. G. ABANDONMENT OF MANHOLES: Manholes to be abandoned in place shall have all pipes entering or exiting the structure plugged with lean concrete. Manhole top or cone section shall be removed to the top of the full barrel diameter section, or to point not less than 18 inches below final grade. The structure shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be either clean 03/12/09 SC-21 am .. PART D - SPECIAL CONDITIONS washed sand of clean, suitable excavated material approved by the Engineer. Surface restoration shall be compatible with surrounding service surface. Payment for work involved in backfilling, plugging of pipe(s) and all other appurtenances required, shall be included in the appropriate bid item - Abandon Existing Sewer Manhole. .. H. REMOVAL OF MANHOLES: Manholes to be removed shall have all pipes entering or exiting the structure disconnected. The complete manhole, including top or cone section, all full barrel •• diameter section, and base section shall be removed. The excavation shall then be backfilled and compacted in accordance with backfill method as specified in Section E2-2.9 Backfill. Backfill material may be with Type C Backfill or Type B Backfill, as approved by the Engineer. Surface restoration shall be compatible with surrounding surface. I. CUTTING AND PLUGGING EXISTING MAINS: At various locations on this project, it may be .. required to cut, plug, and block existing water mains/services or sanitary sewer mains/services in order to abandon these lines. Cutting and plugging existing mains and/or services shall be considered as incidental and all costs incurred will be considered to be included in the linear foot bid price of the pipe, unless separate trenching is required. J. REMOVAL OF EXISTING PIPE: Where removal of the existing pipe is required, it shall be the Contractor's responsibility to properly dispose of all removed pipe. All removed valves, fire NO hydrants and meter boxes shall be delivered to Water Department Field Operation, Storage Yard. .. C. PAYMENT: Payment for all work and material involved in salvaging, abandoning and/or removing existing facilities shall be included in the linear foot bid price of the pipe, except as follows: separate payment will be made for removal of all fire hydrants, gate valves, 16 inch ... and larger, and sanitary sewer manholes, regardless of location. Payment will be made for salvaging, abandoning and/or removing all other existing facilities .. when said facility is not being replaced in the same trench (i.e., when removal requires a separate trench). L. ABANDONMENT OF EXISTING SEWER LINES: Where plans call for abandonment of existing sewer mains after the construction of a new sewer main, the Contractor shall be responsible for TV inspection of 100% of the existing sewer main to be abandoned to make a final determination that all existing service connections have been relocated to the new main. Once this determination has been made, the existing main will be abandoned as indicated" above in Item I. .. 03/12/09 SC-22 .. PART D - SPECIAL CONDITIONS D- 30 DETECTABLE WARNING TAPES Detectable underground utility warning tapes which can be located from the surface by a pipe am detector shall be installed directly above non-metallic water and sanitary sewer pipe. The detectable tape shall be "Detect Tape" manufactured by Allen Systems, Inc. or approved equal, and shall consist of a minimum thickness 0.35 mils solid aluminum foil encased in a protective inert plastic jacket that is impervious to all known alkalis, acids, chemical reagents and solvents "" found in the soil. The minimum overall thickness of the tape shall be 5.5 mils, and the width shall not be less than two inches with a minimum unit weight of 2% pounds/1 inch/100'. The tape shall be color coded and imprinted with the message as follows: Type of Utility Color Code Legends •• Water Safety Blue Caution! Buried Water Line Below Sewer Safety Green Caution! Buried Sewer Line Below am Installation of detectable tapes shall be per manufacturer's recommendations and shall be as close to the grade as is practical for optimum protection and detectability. Allow a minimum of 18 inches between the tape and the pipe. Payment for work such as backfill, bedding, blocking, detectable •' tapes, and all other associated appurtenances required shall be included in the unit price bid for the appropriate bid item(s). M. D- 31 PIPE CLEANING Joints shall be wiped and then inspected for proper installation by the inspectors. Each joint shall be swept daily and kept clean during installation. A temporary night plug shall be installed on all ow exposed pipe ends during any period of work stoppage. D- 32 DISPOSAL OF SPOIUFILL MATERIAL Prior to the disposing of any spoil/fill material, the Contractor shall advise the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the Contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites o" have been determined by the Administrator to meet the requirements of the Flood Plain Ordinances of the City of Fort Worth (Ordinance No. 10056). All disposal sites must be approved by the Administrator to ensure that filling is not occurring within a floodplain without a permit. A ow floodplain permit can be issued upon approval of necessary Engineering studies. No fill permit is required if disposal sites are not in a floodplain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary Engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site .. without a fill permit or a letter from the administrator approving the disposal site, Contractor shall remove the spoil/fill material at his expense and dispose of such materials in accordance with the Ordinances of the City and this section. D- 33 MECHANICS AND MATERIALMEN'S LIEN The Contractor shall be required to execute a release of mechanics and material men's liens upon -� receipt of payment. D- 34 SUBSTITUTIONS 03112109 SC-23 I_ r PART D - SPECIAL CONDITIONS The specifications for materials set out the minimum standard of quality, which the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material, which has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approvable, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed for use, the Engineer's •• approval thereof must be obtained before the Contractor procures the proposed substitute. Where the term "or equal", or "or approved equal" is not used in the specifications, this does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of proving that the proposed substitution is, in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of this sub -section as related to _ "substitutions" shall be applicable to all sections of these specifications. D- 35 PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER _ A. GENERAL: Prior to the reconstruction, ALL sections of existing sanitary sewer lines to be abandoned, removed (except where being replaced in the same location), or rehabilitated (pipe enlargement, cured -in -place pipe, fold and form pipe, slip -line, etc.), shall be cleaned, and a television inspection performed to identify any active sewer service taps, other sewer laterals and their location. Work shall consist of furnishing all labor, material, and equipment necessary for the cleaning and inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. HIGH VELOCITY JET (HYDROCLEANING) EQUIPMENT: The high -velocity sewer line No cleaning equipment shall be constructed for easy and safe operation. The equipment shall also have a selection of two or more high -velocity nozzles. The nozzles shall be capable of producing a scouring action from 15 to 45 degrees in all size lines designated to be cleaned. Equipment shall also include a high -velocity gun for washing and scouring manhole. walls and floor. The gun shall be capable of producing flows from a fine spray to a solid stream. The equipment shall carry its own water tank, auxiliary engines, pumps, and hydraulically driven hose reel. Hydraulically Propelled Equipment shall be of a movable dam type and be constructed in such a way that a portion of the dam may be collapsed at any time during the cleaning_ operation to protect against flooding of the sewer. The movable dam shall be equal in diameter around the outer periphery to ensure removal of grease. If sewer cleaning balls or other equipment, which cannot be collapsed, is used, special precautions to prevent ` flooding of the sewers and public or private property shall be taken. The flow of sewage present in the sewer tines shall be utilized to provide necessary fluid for hydraulic cleaning devices whenever possible. 2. CLEANING PROCEDURES: The designated sewer manholes shall be cleaned using high - velocity jet equipment. The equipment shall be capable of removing dirt, grease, rocks, sand, and other materials and obstructions from the sewer lines and manholes. If cleaning of an entire section cannot be successfully performed from one manhole, the equipment shall be set up on the other manhole and cleaning again attempted. If, again, successful cleaning cannot be performed or equipment fails to traverse the entire manhole section, it will be assumed that a major blockage exists, and the cleaning effort shall be abandoned. 03112109 SC-24 bw PART D - SPECIAL CONDITIONS When additional quantities of water from fire hydrants are necessary to avoid delay in normal working procedures, the water shall be conserved and not used unnecessarily. No fire hydrant shall be obstructed in case of a fire in the area served by the hydrant. Before using any water from the City Water Distribution System, the Contractor shall apply for and receive permission from the Water Department. The Contractor shall be responsible for the water meter and related charges for the setup, including the water usage bill. All -� expenses shall be considered incidental to cleaning. 3. DEBRIS REMOVAL AND DISPOSAL: All sludge, dirt, sand, rock, grease, and other solid .. or semisolid material resulting from the cleaning operation shall be removed at the downstream manhole of the section being cleaned_ Passing material from manhole section to manhole section, which could cause line stoppages, accumulations of sand in wet wells, or damage pumping equipment, shall not be permitted. 4. All solids or semisolid resulting from the cleaning operations shall be removed from the site and disposed of at a site designated by the Engineer. All materials shall be removed from the site no less often than at the end of each workday and disposed of at no additional cost to the City. 5. UNDER NO CIRCUMSTANCE SHALL SEWAGE OR SOLIDS REMOVED THEREFROM BE DUMPED ONTO STREETS OR INTO DITCHES, CATCH BASINS, STORM DRAINS OR SANITARY SEWER MANHOLES. 6. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the •• camera shall be suitable to allow a clear picture of the entire periphery of the pipe. The camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. r B. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection videotapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy �,„ 03112109 SC-25 a.. PART D - SPECIAL CONDITIONS of the distance meter shall be checked by use of a walking meter, roll -a -tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost of retrieving the Television camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service taps observed during inspection. In addition, other points of significance such as locations of unusual conditions, roots, storm sewer connections, broken pipe, presence of scale and corrosion, and other discernible features will be recorded, and a copy of such records will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard -size photographs of the `w television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. '" 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television inspection and may be retained a maximum of 30 calendar days. .. Equipment shall be provided to the City by the Contractor for review of the tapes. The Engineer will return tapes to the Contractor upon completion of review. Tapes shall not be .. erased without the permission of the Engineer. If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re -televise and provide a good tape of the line at no additional cost to the City. If a good tape cannot be provided of such quality that .. can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. THE TAPES SHALL BE SUBMITTED TO THE ENGINEER PRIOR TO CONSTRUCTION FOR REVIEW AND DETERMINATION OF SAGS. Upon completion of review of the tapes by the Engineer, the Contractor will be notified as to which sections of the sanitary sewer are to be corrected. The Engineer will return tapes to the Contractor upon completion of review. .. All costs associated with this work shall be incidental to unit prices bid for items under Television Inspection of the Proposal. r, C. PAYMENT OF CLEANING AND PRE -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWERS: The cost for Pre -Construction Cleaning and Television Inspection of sanitary sewers shall be per linear foot of sewer actually televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily 03/12109 SC-26 PART D - SPECIAL CONDITIONS evaluated as to existing sewer conditions and for providing appropriate means for review of the tapes by the Engineer including collection and removal, transportation and disposal of sand and debris from the sewers to a legal dump site. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The primary purpose of cleaning is for television inspection and rehabilitation; when a portion of a line is not or cannot be televised or rehabilitated, the cleaning of that portion of line shall be incidental and no payment shall be made. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor, and the costs must be included in the bid price for TV Inspections. The cost of retrieving the TV Camera, under all circumstances, when it becomes lodged during inspection, shall be incidental to TV Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. D- 36 VACUUM TESTING OF SANITARY SEWER MANHOLES D. GENERAL: This item shall govern the vacuum testing of all newly constructed sanitary sewer manholes. B. EXECUTION: 1. TEST PROCEDURE: Manholes shall be vacuum tested prior to any interior grouting with .w all connections in place_ Lift holes shall be plugged, and all drop -connections and gas sealing connections shall be installed prior to testing. The sewer lines entering the manhole shall be plugged and braced to prevent the plugs from being drawn into the manhole. The plugs shall be installed in the lines beyond the drop -connections, gas sealing connections, etc. The test head shall be placed inside the frame at the top of the manhole and inflated in- accordance with the manufacturer's recommendations. A vacuum of ten inches of mercury (10"Hg) shall be drawn and the_ vacuum pump will be turned off. With the valve closed, the level of vacuum shall be read after the required test time. The required test time shall be determined from the Table below in accordance with ASTM C1244-93: Table 1 MINIMUM TIME REQUIRED FOR VACUUM DROP OF 1" Hg (10"Hg - 9"Hg) (SEC) _ Depth of MH. 48-Inch Dia. 60-Inch Dia. (FT.) Manhole Manhole 0 to 16' 40 sec. 52 sec. 18' 45 sec. 59 sec. 20' 50 sec. 65 sec. 0311?109 SC-27 PART D - SPECIAL CONDITIONS em 22' 55 sec. 72 sec. 24' 59 sec. 78 sec. 26' 64 sec. 85 sec. 28' 69 sec. 91 sec. 30' 74 sec. 98 sec. For Each 5 sec. 6 sec. Additional 2' ACCEPTANCE: The manhole shall be considered acceptable, if the drop in the level of vacuum is less than one -inch of mercury (1" Hg) after the required test time. Any manhole, which fails to pass the initial test, must be repaired by either pressure grouting through the manhole wall or digging to expose the exterior wall of the manhole in order to locate the leak and seal it with an epoxy sealant. The manhole shall be retested as described above until it has successfully passed the test. Following completion of a successful test, the manhole shall be restored to its normal condition, all temporary plugs shall be removed, all braces, equipment, and debris shall be removed and disposed of in a manner satisfactory to the Engineer. C. PAYMENT: Payment for vacuum testing of sanitary sewer manholes shall be paid at the contract price per each vacuum test. This price shall include all material, labor, equipment, and all incidentals, including all bypass pumping, required to complete the test as specified herein. D- 37 BYPASS PUMPING The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated and/or replaced. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. Provisions shall be made at driveways and street crossings to permit safe vehicular travel without interrupting flow in the bypass system. Under no circumstances will the Contractor be permitted to discharge sewage into the trenches. Payment shall be incidental to rehabilitation or replacement of the sewer line. D- 38 POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY SEWER A. GENERAL: After construction, ALL sections of sanitary sewer lines shall have a television inspection performed by an independent sub -Contractor hired by the prime Contractor. Work shall consist of furnishing all labor, material, and equipment necessary for inspection of the sewer lines by means of closed circuit television. Satisfactory precautions shall be taken to protect the sewer lines from damage that might be inflicted by the improper use of cleaning equipment. B. TELEVISION INSPECTION EQUIPMENT: The television camera used for the inspection shall be one specifically designed and constructed for such inspection. Lighting for the camera shall be operative in 100% humidity conditions. The camera, television monitor, and other components of the video system shall be capable of producing picture quality to the 03112109 SC-28 Em NO ow No wo ow wo W, .. PART D - SPECIAL CONDITIONS satisfaction of the Engineer; and if unsatisfactory, equipment shall be removed and no payment will be made for an unsatisfactory inspection. -- C. EXECUTION: 1. TELEVISION INSPECTION: The camera shall be moved through the line in either .o direction at a moderate rate, stopping when necessary to permit proper documentation of any sewer service taps. In no case will the television camera be pulled at a speed greater than 30 feet per minute. Manual winches, power winches, TV cable, and powered rewinds „w or other devices that do not obstruct the camera view or interfere with proper documentation shall be used to move the camera through the sewer line. No more than 2000 linear feet of pipe will be televised at one time for review by the Engineer. When manually operated winches are used to pull the television camera through the line, telephones or other suitable means of communications shall be set up between the two manholes of the section being inspected to ensure good communications between members of the crew. The importance of accurate distance measurements is emphasized. All television inspection video tapes shall have a footage counter. Measurement for location of sewer service taps shall be above ground by means of meter device. Marking on the cable, or the like, which would require interpolation for depth of manhole, will not be allowed. Accuracy of the distance meter shall be checked by use of a walking meter, roll -a -tape, or other suitable device, and the accuracy shall be satisfactory to the Engineer. The City makes no guarantee that all of the sanitary sewers to be entered are clear for the passage of a camera. The methods used for securing passage of the camera are to be at the option of the Contractor. The cost or retrieving the Television camera, under all w circumstances, when it becomes lodged during inspection, shall be incidental to Television inspection. Sanitary sewer mains must be laced with enough water to fill all low pints. The television inspection must be done immediately following the lacing of the main with no water flow. If sewer is active, flow must be restricted to provide a clear image of sewer being inspected. 2. DOCUMENTATION: Television Inspection Logs: Printed location records shall be kept by the Contractor and will clearly show the location in relation to an adjacent manhole of each sewer service tap observed during inspection. All television logs shall be referenced to .. stationing as shown on the plans. A copy of these television logs will be supplied to the City. 3. PHOTOGRAPHS: Instant developing, 35 mm, or other standard -size photographs of the television picture of problems shall be taken by the Contractor upon request of the Engineer, as long as such photographing does not interfere with the Contractor's operations. 4. VIDEOTAPE RECORDINGS: The purpose of tape recording shall be to supply a visual and audio record of problem areas of the lines that may be replayed. Video tape recording playback shall be at the same speed that it was recorded. The television tapes shall be furnished to the City for review immediately upon completion of the television 'inspection 03112109 SC-29 am PART D - SPECIAL CONDITIONS and may be retained a maximum of 30 calendar days. Equipment shall be provided to the City by the Contractor for review of the tapes. Tapes will be returned to the Contractor upon completion of review by the Engineer. Tapes shall not be erased without the permission of the Engineer. ow If the tapes are of such poor quality that the Engineer is unable to evaluate the condition of the sewer line or to locate service connections, the Contractor shall be required to re- •• televise and provide a qood tape of the line at no additional cost to the Citv. If a good tape cannot be provided of such quality that can be reviewed by the Engineer, no payment for televising this portion shall be made. Also, no payment shall be made for portions of lines not televised or portions where manholes cannot be negotiated with the television camera. D. PAYMENT OF POST -CONSTRUCTION TELEVISION INSPECTION OF SANITARY _ SEWERS: The cost for post -construction Television Inspection of sanitary sewers shall be per linear foot of sewer televised. The Contractor shall provide the Engineer with tapes of a quality that the particular piece of sewer can be readily evaluated as to sewer conditions and for providing appropriate means for review of the tapes by the Engineer. Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be Im measured as the total length of new pipe installed. All costs associated with this work shall be included in the appropriate bid item - Post -Construction Television Inspection. The item shall also include all costs of installing and maintaining any bypass pumping required to provide reliable, regular sewer service to the area residents. All bypass pumping shall be incidental to the project. .. D- 39 SAMPLES AND QUALITY CONTROL TESTING A. The Contractor shall furnish, at its own expense, certifications by a private laboratory for all too materials proposed to be used on the project, including a mix design for any asphaltic and/or Portland cement concrete to be used, and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall .m provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto. B. Tests of the design concrete mix shall be made by the contractor's laboratory at least nine_ days prior to the placing of concrete using the same aggregate, cement, and mortar which are to be used later in the concrete. The Contractor shall provide a certified copy of the test results to the City. C. Quality control testing of in -place material on this project will be performed by the city at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City. The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. D. Not less than 24 hours notice shall be provided to the City by the Contractor for operations requiring testing. The Contractor shall provide access and trench safety system (if required) •• for the site to be tested, and any work effort involved is deemed to be included in the unit price for the item being tested. 03112109 SC-30 am PART D - SPECIAL CONDITIONS E. The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site. The ticket shall specify the name of the pit supplying the fill material. D- 40 TEMPORARY EROSION, SEDIMENT, AND WATER POLLUTION CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE) A. DESCRIPTION: This item shall consist of temporary soil erosion sediment and water pollution control measures deemed necessary by the Engineer for the duration of the contract. These control measures shall at no time be used as a substitute for the permanent control measures unless otherwise directed by the Engineer and they shall not include measures taken by the CONTRACTOR to control conditions created by his construction operations. The temporary measures shall include dikes, dams, berms, sediment basins, fiber mats, jute netting, temporary seeding, straw mulch, asphalt mulch, plastic liners, rubble liners, baled -hay retards, dikes, slope drains and other devices. B. CONSTRUCTION REQUIREMENTS: The Engineer has the authority to define erodible earth and the authority to limit the surface area of erodible -earth material exposed by preparing right- of-way, clearing and grubbing, the surface area of erodible -earth material exposed by excavation, borrow and to direct the CONTRACTOR to provide temporary pollution -control measures to prevent contamination of adjacent streams, other water courses, lakes, ponds or other areas of water impoundment. Such work may involve the construction of temporary _ berms, dikes, dams, sediment basins, slope drains and use of temporary mulches, mats, seeding, or other control devices or methods directed by the Engineer as necessary to control soil erosion. Temporary pollution -control measures shall be used to prevent or correct erosion that may develop during construction prior to installation of permanent pollution control features, but are not associated with permanent control features on the project. The Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and borrow to be proportional to the CONTRACTOR'S capability and progress in keeping the finish grading, mulching, seeding, and other such permanent pollution -control measures current in accordance with the accepted schedule. Should seasonal conditions make such limitations unrealistic, temporary soil -erosion -control measures shall be performed as directed by the Engineer. 2. Waste or disposal areas and construction roads shall be located and constructed in a manner that will minimize the amount of sediment entering streams. 3. Frequent fordings of live streams will not be permitted; therefore, temporary bridges or _ other structures shall be used wherever an appreciable number of stream crossings are necessary. Unless otherwise approved in writing by the Engineer, mechanized equipment shall not be operated in live streams. 4. When work areas or material sources are located in or adjacent to live streams, such areas shall be separated from the stream by a dike or other barrier to keep sediment from entering a flowing stream. Care shall be taken during the construction and removal of such barriers to minimize the muddying of a stream. 5. All waterways shall be cleared as soon as practicable of false work, piling, debris or other -- obstructions placed during construction operations that are not a part of the finished work. 03112109 SC-31 PART D - SPECIAL CONDITIONS 6. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and reservoirs with fuels, oils, bitumen, calcium chloride or other harmful materials. He shall conduct and schedule his operations so as to avoid or minimize siltation of streams, lakes and reservoirs and to avoid interference with movement of migratory fish. C. MEASUREMENT AND PAYMENT: All work, materials and equipment necessary to provide temporary erosion control shall be considered subsidiary to the contract and no extra pay will •• be given for this work. D- 41 INGRESS AND EGRESS/OBSTRUCTION OF ACCESS TO DRIVES The Contractor shall provide ingress and egress to the property being crossed by this construction and adjacent property when construction is not in progress and at night. Drives shall be left accessible at night, on weekends, and during holidays. The Contractor shall conduct his activities to minimize obstruction of access to drives and property during the progress of construction. Notification shall be made to an owner prior to his driveway being removed and/or rebuilt. D- 42 PROTECTION OF TREES, PLANTS AND SOIL All property along and adjacent to the Contractors' operations including lawns, yards, shrubs, trees, etc., shall be preserved or restored after completion of the work, to a condition equal to or better than prior to start of work. Any trees or other landscape features scarred or damaged by the Contractor's operations shall be restored or replaced at the Contractor's expense. Trimming or pruning to facilitate the work will be permitted only by experienced workmen in an approved manner (No trimming or pruning without the property owners' consent). Pruned limbs of 1" diameter or larger shall be thoroughly treated .. as soon as possible with a tree wound dressing. By ordinance, the Contractor must obtain a permit from the City Forester before any work _ (trimming, removal, or root pruning) can be done on trees or shrubs growing on public property including street Rights -of -Ways and designated alleys. This permit can be obtained by calling the Forestry Office at 817-392-5738. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. No separate payment will be made for any of the work involved for this item and all costs incurred .. will be considered a subsidiary cost of the project. D- 43 SITE RESTORATION The contractor shall be responsible for restoring the site to original grade and condition after completion of his operations subject to approval of the Engineer. The basis for approval by the Engineer will be grade restoration to plus minus one -tenth (0.1) of a foot. 03112109 SC-32 ow PART D - SPECIAL CONDITIONS D- 44 CITY OF FORT WORTH STANDARD PRODUCT LIST Proposed products submitted in the bid documents must appear in the latest "City of Fort Worth Standard Product List, for the bid to be considered responsive. Products and processes listed in the "City of Fort Worth Standard Product List shall be considered to meet City of Fort Worth minimum technical requirements. D- 45 TOPSOIL, SODDING, SEEDING & HYDROMULCHING .. This item shall be performed in accordance with the City of Fort Worth Parks and Community Services Department Specifications for Topsoil, Sodding and Seeding. 1. TOPSOIL DESCRIPTION: This item will consist of furnishing and placing a minimum of six (6) inches of topsoil, free from rock and foreign material, in all parkways and medians to the lines and .. grades as established by the Engineer. CONSTRUCTION METHODS: Topsoil will be secured from borrow sources as required to supplement material secured from street excavation. All excavated materials from streets which is suitable for topsoil will be used in the .parkways and medians before any topsoil is obtained from a borrow source. Topsoil material secured from street excavation shall be stockpiled at locations approved by the Engineer, and at completion of grading and paving operations, topsoil shall be placed on parkway areas so as to provide a minimum six (6) inches of compacted depth of topsoil parkways_ 2. SODDING DESCRIPTION: Sodding will consist of furnishing and planting Bermuda, Buffalo or St. Augustine grass in the areas between the curbs and walks, on terraces, in median strips, on embankments or cut slopes, or in such areas as designated on the Drawings and in accordance with the requirements of this Specification. Recommended Buffalo grass varieties .. for sodding are Prairie and 609. MATERIALS: Sod shall consist of live and growing Bermuda, Buffalo or St. Augustine grass secured from sources where the soil is fertile. Sod to be placed during the dormant state of these grasses shall be alive and acceptable_ Bermuda and Buffalo grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a two (2) inch minimum .. thickness of native soil attached to the roots. St. Augustine grass sod shall have a healthy, virile root system of dense, thickly matted roots throughout a one (1) inch minimum thickness of native soil attached to the roots. The sod shall be free from obnoxious weeds or other grasses and shall not contain any matter deleterious to its growth or which might affect its subsistence or hardiness when transplanted. Sod to be placed between curb and walk and on terraces shall be the same type grass as adjacent grass or existing lawn. Care shall be taken at all times to retain native soil on the roots of the sod during the process of excavating, hauling, and planting. Sod material shall be kept moist from the time it is dug until planted. When so directed by the Engineer, the sod existing at the source shall be 03112109 SC-33 .0 PART D - SPECIAL CONDITIONS watered to the extent required prior to excavating. Sod material shall be planted within three days after it is excavated. CONSTRUCTION METHODS: After the designated areas have been completed to the lines, .. grades, and cross -sections shown on the Drawings and as provided for in other items of the contract, sodding of the type specified shall be performed in accordance with the requirements hereinafter described. Sodding shall be either "spot" or "block". either Bermuda, Buffalo or St. Augustine grass. a. Spot Sodding Furrows parallel to the curb line or sidewalk lines, twelve (12) inches on centers or to the dimensions shown on the Drawings, shall be opened on areas to be sodded. In all furrows, sod approximately three (3) inches square shall be placed on twelve (12) inch centers at proper depth so that the top of the sod shall not be more than one-half (1/2) inch below the finished grade. Holes of equivalent depth and spacing may be used instead of furrows. The soil shall be firm around each block and then the entire sodded area shall be carefully rolled with a heavy, hand roller developing fifteen (15) to twenty-five (25) pounds per square inch compression. Hand tamping may be required on terraces. b. Block Sodding. ow ow At locations on the Drawings or where directed, sod blocks shall be carefully placed on the .. prepared areas. The sod shall be so placed that the entire designated area shall be covered, and any voids left in the block sodding shall be filled with additional sod and tamped. The entire sodded area shall be rolled and tamped to form a thoroughly compact .. solid mass. Surfaces of block sod, which, in the opinion of the Engineer, may slide due to the height or slope of the surface or nature of the soil, shall, upon direction of the Engineer, be pegged with wooden pegs driven through the sod block to the firm earth, sufficiently _ close to hold the block sod firmly in place. When necessary, the sodded areas shall be smoothed after planting has been completed and shaped to conform to the cross-section previously provided and existing at the time sodding operations were begun. Any excess dirt from planting operations shall be spread uniformly over the adjacent areas or disposed of as directed by the Engineer so that the completed surface will present a sightly appearance. •- The sodded areas shall be thoroughly watered immediately after they are planted and shall be subsequently watered at such times and in a manner and quantity directed by the Engineer until completion and final acceptance of the project by the City of Fort Worth. 3. SEEDING DESCRIPTION: "Seeding" will consist of preparing ground, providing and planting seed or a mixture of seed of the kind specified along and across such areas as may be designated on _ the Drawings and in accordance with these Specifications. MATERIALS: on 03/12109 SC-34 PART D - SPECIAL CONDITIONS a. General. All seed used must carry a Texas Testing Seed label showing purity and germination, name, type of seed, and that the seed meets all requirements of the Texas Seed Law. Seed furnished shall be of the previous season's crop and the date of analysis shown on each tag shall be within nine (9) months of time of delivery to the project. Each variety of seed shall be furnished and delivered in separate bags or containers. A sample of each variety of seed shall be furnished for analysis and testing when directed by the .. Engineer. The specified seed shall equal or exceed the following percentages of Purity and germination: Common Name Purity Germination Common Bermuda Grass 95% 90% Annual Rye Grass 95% 95% Tall Fescue 95% 90% Western Wheatgrass 95% 90% Buffalo Grass Varieties Top Gun 95% 90% Cody 95% 90% Table 120.2.(2)a. URBAN AREA WARM -SEASON SEEDING RATE (lbs.); Pure Live Seed (PLS) Mixture for Clay or Tiqht Soils Mixture for Sandy Soils Dates (Eastern Sections) (Western Sections) (All Sections) Feb 1 Bermudagrass 40 Buffalograss 80 Bermudagrass 60 to Buffalograss 60 Bermudagrass 20 Buffalograss 40 May 1 Total: 100 Total: 100 Total: 100 Table, 120.2.(2)b ,.. TEMPORARY COOL -SEASON SEEDING RATE; (lb.) Pure Live Seed (PLS) Dates (All Sections) Aug 15 Tall Fescue 50 to Western Wheatgrass 50 May 1 Annual Rye 50 Total: 100 CONSTRUCTION METHODS: After the designated areas have been completed to the lines, grades, and cross -sections shown on the Drawings and as provided for in other items of this Contract, seeding of the type specified shall be performed in accordance with the requirements hereinafter described. a. Watering. Seeded areas shall be watered as directed by the Engineer so as to prevent washing of the slopes or dislodgment of the seed. 03/12(09 SC-35 PART D - SPECIAL CONDITIONS b. Finishing. Where applicable, the shoulders, slopes, and ditches shall be smoothed after seed bed preparation has been completed and shaped to conform to the cross-section previously provided and existing at the time planting operations were begun. BROADCAST SEEDING: The seed or seed mixture in the quantity specified shall be uniformly distributed over the areas shown on the Drawings and where directed. If the sowing of seed is by hand, rather than by mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer shall be distributed at the same time provided the specified uniform rate of application for both is obtained. "Finishing" as specified in Section D- 45, Construction Methods, is not applicable since no seed bed preparation is required. DISCED SEEDING: Soil over the area shown on the Drawings as directed to be seeded shall be loosened to a minimum depth of three (3) inches and all particles in the seed bed shall be .. reduced to less than one (1) inch in diameter or they shall be removed. The area shall then be finished to line and grade as specified under "Finishing" in Section DA5, Construction Methods. The seed, or seed mixture, specified shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand rather than by mechanical methods, seed shall be raked or harrowed into the soil to a depth of approximately one -eight (1/8) inch. The planted area shall be rolled with a corrugated roller of the "Cultipacker" type. All rolling of the slope areas shall be on the contour. ASPHALT MULCH SEEDING: The soil over the area shown on the Drawings, or as directed to be seeded, shall be loosened to the minimum depth of three (3) inches and all particles in the seed bed shall be reduced to less than one (1) inch in diameter, or they shall be removed. The .. area shall then be finished to line and grade as specified under "Finishing" in Section D-45, Construction Methods. Water shall then be applied to the cultivated area of the seed bed until a minimum depth of six (6) inches is thoroughly moistened. After the watering, when the ground has become sufficiently dry to be loose and pliable, the .. seed, or seed mixture specified, shall then be planted at the rate required and the application shall be made uniformly. If the sowing of seed is by hand, rather than mechanical methods, the seed shall be sown in two directions at right angles to each other. Seed and fertilizer may be distributed at the same time, provided the specified uniform rate of application for both is - obtained. After planting, the seed shall be raked or harrowed into the soil to a depth of approximately one -quarter (1/4) inch. The planted surface area and giving a smooth surface without ruts or tracks. In between the time compacting is completed and the asphalt is applied, the planted area shall be watered sufficiently to assure uniform moisture from the surface to a minimum of six (6) inches in depth. .. The application of asphalt shall follow the last watering as rapidly as possible. Asphalt shall be of the type and grade as shown on the Drawings and shall conform to the requirements of the item 300, "Asphalts, Oils and Emulsions". If the type of asphalt to be used is not shown on the Drawings, or if Drawings are not included, then MS-2 shall be used. Applications of the asphalt shall be at a rate of three -tenths (0.3) gallons per square yard. It shall be applied to _ the area in such a manner so that a complete film is obtained and the finished surface shall be comparatively smooth. Fm 03112109 SC-36 PART D - SPECIAL CONDITIONS RE -SEEDING OF AREAS PLANTED WITH COOL SEASONS SPECIES: Areas where temporary cool season species have been planted may be replanted beginning February 1 with warm season species as listed in Table 120.2(2)a. The re -seeding will be achieved in the following manner. The cool season species shall be mowed down to a height of one (1) inch to insure that slit -seeding equipment will be able to cut through the turf and achieve adequate soil penetration. * Slit -seeding, is achieved through the use of an implement which cuts a furrow (slit) in the soil and places the seed in the slit which is then pressed close with a cult packer wheel. 4. HYDROMULCH SEEDING: If hydro mulch seeding is provided, seed mix shall have 95% purity of Bermuda grass and have a germination rate of 90%. Contractor shall ensure that the grass establishes. 5. CONSTRUCTION WITHIN PARK AREAS TURF RESTORATION OF PARK AREAS: FERTILIZER DESCRIPTION: "Fertilizer" will consist of providing and distributing fertilizer over such areas as are designated on the Drawings and in accordance with these Specifications. MATERIALS: All fertilizer used shall be delivered in bags or containers clearly labeled showing the analysis. The fertilizer is subject to testing by the City of Fort Worth in accordance with the *• Texas Fertilizer Law. A pelleted or granulated fertilizer shall be used with an analysis of 16-20- 0 or 16-5-8 or having the analysis shown on the Drawings. The figures in the analysis represent the percent of nitrogen, phosphoric acid, and potash nutrients respectively as determined by the methods of the Association of Official Agricultural Chemists. In the event it is necessary to substitute a fertilizer of a different analysis, it shall be a pelleted or granulated fertilizer with a lower concentration. Total amount of nutrients furnished and applied per acre shall equal or exceed that specified for each nutrient. CONSTRUCTION METHODS: When an item for fertilizer is included in the Drawings and proposal, pelleted or granulated fertilizer shall be applied uniformly over the area specified to be fertilized and in the manner directed for the particular item of work. Fertilizer shall be dry and in good physical condition. Fertilizer that is powdered to caked will be rejected. Distribution of fertilizer as a particular item of work shall meet the approval of the Engineer. Unless otherwise indicated on the Drawings, fertilizer shall be applied uniformly at the average -� rate of three hundred (300) pounds per acre for all types of "Sodding" and four hundred (400) pounds per acre for all types of "Seeding". _. MEASUREMENT: Topsoil secured from borrow sources will be measured by the square yard in place on the project site. Measurement will be made only on topsoils secured from borrow sources. Acceptable material for "Seeding" will be measured by the linear foot, complete in place. 03112109 SC-37 PART D - SPECIAL CONDITIONS Acceptable material for "Sodding" will be measured by the linear foot, complete in place. Acceptable material for "Fertilizer' shall be subsidiary to the price of sodding or seeding. PAYMENT: All work performed as ordered and measured shall be subsidiary to the contract unless and otherwise noted in the plans and bid documents to be paid for at the unit price bid for each item of work. Its price shall be full compensation for excavating (except as noted below), loading, hauling, placing and furnishing all labor, equipment, tools, supplies, and incidentals necessary to complete work. All labor, equipment, tools and incidentals necessary to supply, transport, stockpile and place topsoil or salvage topsoil as specified shall be included in "Seeding" or "Sodding" bid items and will not be paid for directly. .. "Spot sodding" or "block sodding" as the case may be, will be paid for at the contract unit price per square yard, complete in place, as provided in the proposal and contract. The contract unit price shall be the total compensation for furnishing and placing all sod; for all rolling and .� tamping; for all watering; for disposal of all surplus materials; and for all materials, labor, equipment, tools and incidentals necessary to complete the work, all in accordance with the Drawings and these Specifications. The work performed and materials furnished and measured as provided under "Measurement" shall be paid for at the unit price for "Seeding", or "Sodding", of the type specified, as the case may be, which price shall each be full compensation for furnishing all materials and for performing all operations necessary to complete the work accepted as follows: as Fertilizer material and application will not be measured or paid for directly, but is considered subsidiary to Sodding and Seeding. D- 46 CONFINED SPACE ENTRY PROGRAM It shall be the responsibility of the contractor to implement and maintain a variable "CONFINED SPACE ENTRY PROGRAM" which must meet OSHA requirements for all its employees and subcontractors at all times during construction. All active sewer manholes, regardless of depth, are defined by OSHA, as "permit required confined spaces". Contractors shall submit an acceptable "CONFINED SPACE ENTRY PROGRAM" for all applicable manholes and maintain an — active file for these manholes. The cost of complying with this program shall be subsidiary to the pay items involving work in confined spaces. tw 03112109 S C-38 PART D - SPECIAL CONDITIONS D- 47 SUBSTANTIAL COMPLETION INSPECTION/FINAL INSPECTION 7. Prior to the final inspection being conducted for the project, the contractor shall contact the city inspector in writing when the entire project or a designated portion of the project is substantially complete. 8. The inspector along with appropriate City staff and the City's consultant shall make an .■ inspection of the substantially completed work and prepare and submit to the contractor a list of items needing to be completed or corrected. 9. The contractor shall take immediate steps to rectify the listed deficiencies and notify the owner in writing when all the items have been completed or corrected. ■ 10. Payment for substantial completion inspection as well as final inspection shall be subsidiary to the project price. Contractor shall still be required to address all other deficiencies, which are discovered at the time of final inspection. 11. Final inspection shall be in conformance with general condition item "C5-5.18 Final Inspection" of PART C - GENERAL CONDITIONS. D- 48 EXCAVATION NEAR TREES (WHERE IDENTIFIED ON THE PLANS) 1. The Contractor shall be responsible for taking measures to minimize damage to tree limbs, tree trunks, and tree roots at each work site. All such measures shall be considered as incidental work included in the Contract Unit Price bid for applicable pipe or structure installation except for short tunneling/tree augering. 2. Any and all trees located within the equipment operating area at each work site shall, at the direction of the Engineer, be protected by erecting a "snow fence" along the drip line or edge of the tree root system between tree and the construction area. 3. Contractor shall inspect each work site in advance and arrange to have any tree limbs pruned that might be damaged by equipment operations. The Engineer shall be notified at least 24 hours prior to any tree trimming work. No trimming work will be permitted within private property without written permission of the Owner. 4. Nothing shall be stored over the tree root system within the drip line area of any tree. 5. Before excavation (off the roadway) within the drip line area of any tree, the earth shall be �• sawcut for a minimum depth of 2 feet. 6. At designated locations shown on the drawings, the "short tunnel" method using Class 51 .. D.I. pipe shall be utilized. 7. Except in areas where clearing is allowed, all trees up to 8" in diameter damaged during _ construction shall be removed and replaced with the same type and diameter tree at the contractor's expense. 8. Contractor shall employ a qualified landscaper for all the work required for tree care to ensure utilization of the best agricultural practices and procedures. 03/12(09 SC-39 PART D - SPECIAL CONDITIONS 9. Short tunneling shall consist of power augering or hand excavation. The tunnel diameter shall not be larger than 1-1/2 times the outside pipe diameter. Voids remaining after pipe installation shall be pressure grouted. D- 49 CONCRETE ENCASEMENT OF SEWER PIPE Concrete encasement of sewers shall be paid for at the Contract Unit Price per linear foot of concrete encasement as measured in place along the centerline of the pipe for each pipe diameter indicated. The Contract Unit Price shall include all costs associated with installation and reinforcement of the concrete encasement. D- 50 CLAY DAM Clay dam construction shall be performed in accordance with the Wastewater Clay Dam Construction, figure in the Drawings in these Specifications, at locations indicated on the Drawings or as directed by the City. Clay dams shall be keyed into undisturbed soil to make an impervious barrier to reduce groundwater percolation through the pipeline trench. Construction material shall consist of compacted bentonite clay or 2.27 concrete. Payment for work such as forming, placing .. and finishing shall be subsidiary to the price bid for pipe installation. D- 51 EXPLORATORY EXCAVATION (D-HOLE) The Contractor shall be responsible for verifying the locations of all existing utilities prior to construction, in accordance with item D-6. At locations identified on the drawings, contractor shall conduct an exploratory excavation (D-Hole), to locate and verify the location and elevation of the existing underground utility where it may be in potential conflict with a proposed facility alignment. The exploratory excavation shall be conducted prior to construction of the entire project only at _ locations denoted on the plans or as directed by the engineer. Contractor shall submit a report of findings (including surveyed elevations of existing conflicting utilities) to the City prior to the start of construction of the entire project. If the contractor determines an existing utility is in conflict with the proposed facility, the contractor shall contact the engineer immediately for appropriate design modifications. The contractor shall make the necessary repairs at the exploratory excavation (D-Hole) to obtain a .. safe and proper driving surface to ensure the safety of the general public and to meet the approval of the City inspector. The contractor shall be liable for any and all damages incurred due to the exploratory excavation (D-Hole). -r Payment shall not be made for verification of existing utilities per item D-6. Payment for exploratory excavation (D-Hole), at locations identified on the plans or as directed by the Engineer, shall include full compensation for all materials, excavation, surface restoration, field surveys, and all incidentals necessary to complete the work, shall be the unit price bid. No payment shall be made for exploratory excavation(s) conducted after construction has begun. D- 52 INSTALLATION OF WATER FACILITIES 52.1 Polyvinyl Chloride (PVC) Water Pipe POLYVINYL Chloride Plastic Water Pipe and fittings on this Project shall be in accordance with the material standard contained in the General Contract Documents. Payment for work such as backfill, bedding, blocking, detectable tapes and all other associated appurtenant .. required, shall be included in the linear foot price bid of the appropriate BID ITEM(S). a 03112109 SC-40 i PART D - SPECIAL CONDITIONS .. 52.2 Blocking Concrete blocking on this Project will necessarily be required as shown on the Plans and shall be installed in accordance with the General Contract Documents. All valves shall have concrete blocking provided for supporting. No separate payment will be made for any of the work involved for the item and all costs incurred will be considered to be included in the linear foot bid price of the pipe or the bid price of the valve. 52.3 Type of Casing Pipe 1, WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 .. Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as follows: For the inside and outside of casing pipe, coal -tar protective coating in accordance with the requirements of Sec. 2.2 and related sections in AWWA C-203. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. Stainless Steel Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company or an approved equal shall be used on all non - concrete pipes when installed in casing. Installation shall be as recommended by the Manufacturer. 2. SEWER: Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and incidental work shall be included in the unit price bid per foot. .r 52.4 Tie -Ins The Contractor shall be responsible for making tie-ins to the existing water mains. It shall be the responsibility of the Contractor to verify the exact location and elevation of the existing line tie-ins. And any differences in locations and elevation of existing line tie-ins between the contract drawings and what may be encountered in the field shall be considered as incidental to construction. The cost of making tie-ins to existing water or sanitary sewer mains shall be included in the linear foot bid price of the pipe. 52.5 Connection of Existing Mains The Contractor shall determine the exact location, elevation, configuration and angulation of existing water or sanitary sewer lines prior to manufacturing of the connecting piece. Any differences in locations, elevation, configuration, and or angulation of existing lines between the contract drawings and what may be encountered in the said work shall be considered as incidental to construction. Where it is required to shut down existing mains in order to make proposed connections, such down time shall be coordinated with the 03/12/09 S C-41 i PART D - SPECIAL CONDITIONS 03112109 Engineer, and all efforts shall be made to keep this down time to a minimum. In case of shutting down an existing main, the Contractor shall notify the City Project Manager, Construction Services, Phone 817-392-8306, at least 48-hours prior to the required shut down time. The Contractor's attention is directed to Paragraph C5-5.15 INTERRUPTION OF SERVICE, Page C5-5(5), PART C - GENERAL CONDITIONS OF THE WATER DEPARTMENT GENERAL CONTRACT DOCUMENTS AND GENERAL SPECIFICATIONS. The Contractor shall notify the customer both personally and in writing .• as to the location, time, and schedule of the service interruption. The cost of removing any existing concrete blocking shall be included in the cost of connection. Unless bid separately all cost incurred shall be included in the linear foot price bid for the appropriate pipe size. 52.6 Valve Cut -Ins It may be necessary to cut -in gate valves to isolate the water main from which the extension and/or replacement is to be connected. This may require closing valves in other lines and putting consumers out of service for that period of time necessary to cut in the .. new valve; the work must be expedited to the utmost and all such cut -ins must be coordinated with the engineer in charge of inspection. All consumers shall be individually advised prior to the shut out and advised of the approximate length of time they may be without service. Payment for work such as backfill, bedding, fittings, blocking and all other associated .o appurtenants required, shall be included in the price of the appropriate bid items. 52.7 Water Services .. The relocation, replacement, or reconnection of water services will be required as shown on the plans, and/or as described in these Special Contract Documents in addition to those located in the field and identified by the Engineer. Im All service's shall be constructed by the contractor utilizing approved factory manufactured tap saddles (when required) and corporation stops, type K copper water tubing, curb stops with lock wings, meter boxes, and if required approved manufactured .. service branches. All materials used shall be as specified in the Material Standards (E1-17 & E1-18) contained in the General Contract Documents. All water services to be replaced shall be installed at a minimum depth of 36 inches below final grade. All existing 3/4-inch water service lines which are to be replaced shall be replaced with 1- inch Type K copper, 1-inch diameter tap saddle when required, and 1-inch corporation from the main line to the meter box. All services which are to be replaced or relocated shall be installed with the service main tap and service line being in line with the service meter unless otherwise directed by the Engineer. A minimum of 24 hours advance notice shall be given when service interruption will be required as specified in Section C5-5.15 INTERRUPTION OF SERVICE. SC-42 PART D - SPECIAL CONDITIONS All water service meters shall be removed, lagged, and collected by the contractor for pickup by the Water Department for reconditioning or replacement. After installation of the water service in the proposed location and receipt of a meter from the project inspector the •• contractor shall install the meter. The meter box shall be reset as necessary to be flush with existing ground or as otherwise directed by the Engineer. All such work on the outlet side of the service meter shall be performed by a licensed plumber. 1. WATER SERVICE REPLACEMENTS: Water service replacement or relocation is required when the existing service is lead or is too shallow to avoid breakage during street reconstruction. The contractor shall replace the existing service line with Type K copper from the main to the meter, curb stop with lock wings, and corporation stop. Payment for all work and materials such as backfill, fittings, type K copper tubing, curb stop with lock wings, service line adjustment, and any relocation of up to 12-inches from center line existing meter location to center line proposed meter location shall be included in the Linear Foot price bid for Copper Service Line from Main to five (5) feet behind Meter. Any vertical adjustment of customer service line within the 5 foot area shall be subsidiary to the service installation. Payment for all work and materials such as tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. .. 1. WATER SERVICE RECONNECTION: Water service reconnection is required when the existing service is copper and at adequate depth to avoid breakage during street reconstruction. The contractor shall adjust the existing water service line as required for reconnection and furnish a new tap with corporation stop. The contractor will be paid for one (1) Service Tap to Main for each service reconnected plus for any copper service line used in excess of five (5) feet from Main to five (5) feet behind the Meter. 2. WATER SERVICE METER AND METER BOX RELOCATIONS: When the replacement and relocation of a water service and meter box is required and the location of the meter and meter box is moved more than twelve (12) inches, as measured from the center line of the existing meter to location to the center line of the proposed meter location, separate payment will be allowed for the relocation of service meter and meter box. Centerline is defined by a line extended from the service tap through the meter. Only relocations made WIN perpendicular to this centerline will be paid for separately. Relocations made along the centerline will be paid of in feet of copper service line. .. When relocation of service meter and meter box is required, payment for all work and materials such as backfill, fittings, five (5) feet of type K copper service and all materials, labor, and equipment used by and for the licensed plumber shall be included in the price bid for the service meter relocation. All other costs will be included in other appropriate bid item(s). 03/12109 This item will also be used to pay for all service meter and meter box relocations as required by the Engineer when the service line is not being replaced. Adjustment of only the meter box and customer service line within 5 feet distance behind the meter will not justify separate payment at any time. Locations with multiple service branches will be paid for as one service meter and meter box relocation. SC-43 PART D - SPECIAL CONDITIONS 4. NEW SERVICE: When new services are required the contractor shall install tap saddle (when required), corporation stop, type K copper service line, curb stop with lock wings, and meter box. Reinforced plastic meter boxes with cast iron lid shall be provided for all 2 inch water meters or smaller. The reinforced plastic water meter boxes shall comply with section El-18A — Reinforced Plastic Water Meter Boxes. Payment for all work and materials such as backfill, fittings, type K copper tubing, and curb stop with lock wings shall be included in the Linear Foot price bid for Service Line from Main to Meter five (5) feet behind the meter. Payment for all work and materials such as tap saddle, corporation stops, and fittings shall be included in the price bid for Service Taps to Mains. Payment for all work and materials such as furnishing and setting new meter box shall be included in the price bid for furnish and set meter box. «. 1. MULTIPLE SERVICE BRANCHES: When multiple service branches are required the contractor shall furnish approved factory manufactured branches. on Payment for multiple service branches will include furnishing and installing the multiple service branch only and all other cost will be included in other appropriate bid item(s). ow 2. MULTIPLE STREET SERVICE LINES TO SINGLE SERVICE METER: Any multiple service lines with taps servicing a single service meter encountered during construction shall be replaced with one service line that is applicable for the size of the existing service No meter and approved by the Engineer. Payment shall be made at the unit bid price in the appropriate bid item(s). .. 52.8 2-Inch Temporary Service Line A. The 2-inch temporary service main and 3/4-inch service lines shall be installed to provide .. temporary water service to all buildings that will necessarily be required to have severed water service during said work. The contractor shall be responsible for coordinating the schedule of the temporary service connections and permanent service reconnections with _ the building owners and the Engineer in order that the work be performed in an expeditious manner. Severed water service must be reconnected within 2 hours of discontinuance of service. A 2-inch tapping saddle and 2-inch corporation stop or 2-inch gate valve with an appropriate fire hydrant adapter fitting shall be required at the temporary service point of connection to the City water supply. The 2-inch temporary service main and 3/4-inch service lines shall be installed in accordance to the attached figures 1, 2 and 3. 2" temporary service line shall be cleaned and sterilized by using chlorine gas or chlorinated lime (HTH) prior to installation. The out -of -service meters shall be removed, tagged and collected by the Contractor for delivery to the Water Department Meter Shop for reconditioning or replacement. Upon restoring permanent service, the Contractor shall re -install the meters at the correct location. The meter box shall be reset as necessary to be flush with the existing ground or as otherwise directed by the Engineer. -� 03112109 SC-44 PART D - SPECIAL CONDITIONS wo The temporary service layout shall have a minimum available flow rate of 5 GPM at a dynamic pressure of 35 PSI per service tap. This criteria shall be used by the Contractor to determine the length of temporary service allowed, number of service taps and number of feed points. When the temporary service is required for more than one location the 2-inch temporary service pipes, 3/4-inch service lines and the 2-inch meter shall be moved to the next successive project location. „ Payment for work such as fittings, 3/4-inch service lines, asphalt, barricades, all service connections, removal of temporary services and all other associated appurtenants required, shall be included in the appropriate bid item. B. In order to accurately measure the amount of water used during construction, the Contractor will install a fire hydrant meter for all temporary service lines. Water used during construction for flushing new' mains that cannot be metered from a hydrant will be estimated as accurately as possible. At the pre -construction conference the contractor will advise the inspector of the number of meters that will be needed along with the locations where they will be used. The inspector will deliver the hydrant meters to the locations. After installation, the contractor will take full responsibility for the meters until such time as the contractor returns those meters to the inspector. Any damage to the meters will be the sole responsibility of the contractor. The Water Department Meter Shop will evaluate the •• condition of the meters upon return and if repairs are needed the contractor will receive an invoice for those repairs. The issued meter is for this specific project and location only. Any water that the contractor may need for personal use will require a separate hydrant w meter obtained by the Contractor, at its cost, from the Water Department. 52.9 Purging and Sterilization of Water Lines Before being placed into service all newly constructed water lines shall be purged and sterilized in accordance with E2-24 of the General Contract Documents and Specifications except as modified herein. The City will provide all water for INITIAL cleaning and sterilization of water lines. All materials for construction of the project, including .. appropriately sized "pipe cleaning pigs", chlorine gas or chlorinated lime (HTH) shall be furnished by the Contractor. Chlorinated lime (HTH) shall be used in sufficient quantities to provide a chlorine residual of fifty (50) PPM. The residual of free chlorine shall be measured after 24 hours and shall not be less than 10 parts per million of free chlorine. Chlorinated water shall be disposed of in the sanitary sewer system. Should a sanitary sewer not be available, chlorinated water shall be "de -chlorinated" prior to disposal_ The line may not be placed in service until two successive sets of samples, taken 24 hours apart, have met the established standards of purity. 03112109 Purging and sterilization of the water lines shall be considered as incidental to the project and all costs incurred will be considered to be included in the linear foot bid price of the pipe. 52.10 Work Near Pressure Plane Boundaries Contractor shall take note that the water line to be replaced under this contract may cross or may be in close proximity to an existing pressure plane boundary. Care shall be taken to ensure all "pressure plane" valves installed are installed closed and no cross connections are made between pressure planes SC-45 .r PART D - SPECIAL CONDITIONS No 52.11 Water Sample Station GENERAL: All water sampling station installations will be per attached Figure 34 or as required in large " water meter vaults as per Figure 33 unless otherwise directed by the Engineer. The appropriate water sampling station will be furnished to the Contractor free of charge, .. however, the Contractor will be required to pick up this item at the Field Operations Warehouse. PAYMENT FOR FIGURE 34 INSTALLATIONS: Payment for all work and materials necessary for the installation of the 3/4-inch type K copper service line will be shall be included in the price bid for copper Service Line from Main to Meter. Payment for all work and materials necessary for the installation tap saddle (if required), corporation stops, and fittings shall be included in the price bid for Service Taps to Main. as Payment for all work and materials necessary for the installation of the sampling station, concrete support block, curb stop, fittings, and an incidental 5-feet of type K copper service line which are required to provide a complete and functional water sampling station shall be ON included in the price bid for Water Sample Stations. PAYMENT FOR FIGURE 33 INSTALLATIONS: Payment for all work and materials .. necessary for the installation tap saddle, gate valve, and fittings shall be included in the price bid for Service Taps to Main. .. Payment for all work and materials necessary for the installation of the sampling station, modification to the vault, fittings, and all type K copper service line which are required to provide a complete and functional water sampling station shall be included in the price bid 1, for Water Sample Stations. 52.12 Ductile Iron and Gray Iron Fittings No Reference Part E2 Construction Specifications, Section E2-7 Installing Cast Iron Pipe, fittings, and Specials, Sub section E2-7.11 Cast Iron Fittings: E2-7.11 DUCTILE -IRON AND GRAY -IRON FITTINGS: All ductile -iron and gray -iron ` fittings shall be furnished with cement mortar lining as stated in Section E1-7. The price bid per ton of fittings shall be payment in full for all fittings, joint accessories, polyethylene wrapping, horizontal concrete blocking, vertical tie -down concrete blocking, and concrete cradle necessary for construction as designed. All ductile -iron and gray -iron fittings, valves and specials shall be wrapped with .. polyethylene wrapping conforming to Material Specification E1-13 and Construction Specification E2-13. Wrapping shall precede horizontal concrete blocking, vertical tie -down concrete blocking, and concrete cradle. Payment for the polyethylene wrapping, horizontal concrete blocking, vertical tie -down concrete blocking, and concrete cradle shall be included in bid items for vales and fittings and no other payments will be allowed. i!V 03112109 S C-46 r M PART D - SPECIAL CONDITIONS D- 53 SPRINKLING FOR DUST CONTROL All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control" shall .. apply. However, no direct payment will be made for this item and it shall be considered to this contract. D- 54 DEWATERING The Contractor shall be responsible for determining the method of dewatering operation for the water or sewage flows from the existing mains and ground water. The Contractor shall be responsible for damage of any nature resulting from the dewatering operations. The DISCHARGE from any dewatering operation shall be conducted as approved by the Engineer. Ground water shall not be discharged into sanitary sewers_ Dewatering shall be considered as incidental to a construction and all costs incurred will be considered to be included in the project price. D- 55 TRENCH EXCAVATION ON DEEP TRENCHES Contractor to prevent any water flowing into open trench during construction. Contractor shall not leave excavated trench open overnight. Contractor shall fill any trench the same day of excavation. No extra payment shall be allowed for this special condition. 'r D- 56 TREE PRUNING A. REFERENCES: National Arborist Association's "Pruning Standards for Shade Trees". a. B. ROOT PRUNING EQUIPMENT a 1. Vibratory Knife 2. Vermeer V-1550RC Root Pruner "' C. NATURAL RESOURCES PROTECTION FENCE r 3. Steel "T" = Bar stakes, 6 feet long. 4. Smooth Horse -Wire: 14-1/2 gauge (medium gauge) or 12 gauge (heavy gauge). 5. Surveyor's Plastic Flagging: "Tundra" weight, International fluorescent orange or red color. .. 6. Combination Fence: Commercially manufactured combination soil separator fabric on wire mesh backing as shown on the Drawings. ,! D. ROOT PRUNING 7. Survey and stake location of root pruning trenches as shown on drawings. am 8. Using the approved specified equipment, make a cut a minimum of 36 inches deep in order to minimize damage to the undisturbed root zone. 0312109 SC-47 :,0 PART D - SPECIAL CONDITIONS 9. Backfill and compact the trench immediately after trenching. 10. Place a 3-foot wide by 4-inch deep cover of mulch over the trench as required by the Engineer. 11. Within 24 hours, prune flush with ground and backfill any exposed roots due to construction activity. Cover with wood chips of mulch in order to equalize soil temperature and minimize water loss due to evaporation. " 12. Limit any grading work within conservation areas to 3-inch maximum cut or fill, with no roots over 1-inch diameter being cut unless cut by hand or cut by specified methods, .. equipment and protection. E. MULCHING: Apply 2-inches to 4-inches of wood chips from trimming or clearing operation .w on areas designated by the Engineer. F. Tree Pruning shall be considered subsidiary to the project contract price. ,w D- 57 TREE REMOVAL Trees to be removed shall be removed using applicable methods, including stump and root ball .m removal, loading, hauling and dumping. Extra caution shall be taken to not disrupt existing utilities both overhead and buried. The Contractor shall immediately repair or replace any damage to utilities and private property including, but not limited to, water and sewer services, pavement, .m fences, walls, sprinkler system piping, etc., at no cost to the Owner. All costs for tree removal, including temporary service costs, shall be considered subsidiary to the project contract price and no additional payment will be allowed. 1W D- 58 TEST HOLES The matter of subsurface exploration to ascertain the nature of the soils, including the amount of ow rock, if any, through which this pipeline installation is to be made is the responsibility of any and all prospective bidders, and any bidder on this project shall submit his bid under this condition. Whether prospective bidders perform this subsurface exploration jointly or independently, and ow whether they make such determination by the use of test holes or other means, shall be left to the discretion of such prospective bidders. ow If test borings have been made and are provided for bidder's information, at the locations shown on the logs of borings in the appendix of this specification, it is expressly declared that neither the City nor the Engineer guarantees the accuracy for the information or that the material encountered Im in excavations is the same, either in character, location, or elevation, as shown on the boring logs. It shall be the responsibility of the bidder to make such subsurface investigations, as he deems necessary to determine the nature of the material to be excavated. The Contractor assumes all responsibility for interpretation of these records and for making and maintaining the required as excavation and of doing other work affected by the geology of the site. The cost of all rock removal and other associated appurtenances, if required, shall be included in the linear foot bid price of the pipe. 03112109 SC-48 10 Im PART D - SPECIAL CONDITIONS D- 59 PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION AND NOTIFICATION OF TEMPORARY WATER SERVICE INTERRUPTION DURING CONSTRUCTION .. Prior to beginning construction on any block in the project, the contractor shall, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: The notification notice or flyer shall be posted seven (7) days prior to beginning any construction activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead and shall include the following information: Name of Project, City Project No (CPN)., Scope of Project (i.e. type of construction activity), actual construction duration within the block, the name of the contractor's foreman and his phone number, the name of the City's inspector and .. his phone number and the City's after-hours phone number. A sample of the 'pre -construction notification' flyer is attached. MW The contractor shall submit a schedule showing the construction start and finish time for each block of the project to the inspector. In addition, a copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed. The contractor will not be allowed to begin •• construction on any block until the flyer is delivered to all residents of the block. In the event it becomes necessary to temporarily shut down water service to residents or ,., businesses during construction, the contractor shall prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. The notice shall be prepared as follows: The notification or flyer shall be posted twenty-four (24) prior to the temporary interruption. The flyer shall be prepared on the contractor's letterhead and shall include the following information: Name of the project, City Project Number, the date of the interruption of service, the period the interruption will take place, the name of the contractor's foreman and his phone number and the name of the City's inspector and his phone number. A sample of the temporary water service interruption notification is attached. A copy of the temporary interruption notification shall be delivered to the inspector for his review prior to being distributed. The contractor shall not be permitted to proceed with interruption of .• water service until the flyer has been delivered to all affected residents and businesses. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector.. All work involved with the notification flyers shall be considered subsidiary to the contract price and no additional compensation shall be made. D- 60 TRAFFIC BUTTONS The removal and replacement of traffic buttons is the responsibility of the contractor and shall be .. considered a subsidiary item. In the event that the contractor prefers for the Signals, Signs and Markings Division (SSMD) of the Transportation/Public Works Department to install the markings, the contractor shall contact SSMD at (817) 392-8770 and shall reimburse SSMD for all costs incurred, both labor and material. No additional compensation shall be made to the contractor for this reimbursement. .. 0311M SC-49 .. PART D - SPECIAL CONDITIONS D- 61 SANITARY SEWER SERVICE CLEANOUTS Whenever a sanitary sewer service line is installed or replaced, the Contractor shall install a two- way service cleanout as shown in the attached detail. Cleanouts are to be installed out of high traffic areas such as driveways, streets, sidewalks, etc. whenever possible. When it is not possible, the cleanout stack and cap shall be cast iron. Payment for all work and materials necessary for the installation of the two-way service cleanout which are required to provide a complete and functional sanitary sewer cleanout shall be included in the price bid for Sanitary Sewer Service Cleanouts. D- 62 TEMPORARY PAVEMENT REPAIR The Contractor shall provide a temporary pavement repair immediately after trench backfill and compaction using a minimum of 2-inches of hot mix asphalt over a minimum of 6-inches of compacted flex base. The existing asphalt shall be saw cut to provide a uniform edge and the entire width and length of the temporary repair shall be rolled with a steel asphalt roller to provide smooth rideability on the street as well as provide a smooth transition between the existing pavement and the temporary repair. Cost of saw cutting shall be subsidiary to the temporary pavement repair pay item. The contractor shall be responsible for maintaining the temporary pavement until the paving contractor has mobilized. The paving contractor shall assume maintenance responsibility upon such mobilization. No additional compensation shall be made for maintaining the temporary pavement. D- 63 CONSTRUCTION STAKES The City, through its Surveyor or agent, will provide to the Contractor construction stakes or other customary method of markings as may be found consistent with professional practice, establishing line and grades for roadway and utility construction, and centerlines and benchmarks for bridgework. These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of stakes shall be set for all utility construction (water, sanitary sewer, drainage etc.), and one set of excavation/or stabilization stakes, and one set of stakes for curb and gutter/or paving. It shall be the sole responsibility of the Contractor to preserve, maintain, transfer, etc., all stakes furnished until completion of the construction phase of the project for which they were furnished. If the City or its agent determines that a sufficient number of stakes or markings provided by the City, have been lost, destroyed, or disturbed, to prevent the proper prosecution and control of the work contracted for in the Contract Documents, it shall be the Contractor's responsibility, at the Contractor's sole expense, to have such stakes replaced by an individual registered by the Texas Board of Professional Land Surveyor as a Registered Land Surveyor. No claims for delay due to lack of replacement of construction stakes will be accepted, and time will continue to be charged in accordance with the Contract Documents. D- 64 EASEMENTS AND PERMITS The performance of this contract requires certain temporary construction, right -of -entry agreements, and/or permits to perform work on private property. The City has attempted to obtain the temporary construction and/or right -of -entry agreements for properties where construction activity is necessary on City owned facilities, such as sewer lines or 03112109 S C-50 me fm r um ■. 1W no N. PART D - SPECIAL CONDITIONS "" manholes. For locations where the City was unable to obtain the easement or right -of -entry, it shall be the Contractor's responsibility to obtain the agreement prior to beginning work on subject property. This shall be subsidiary to the contract. The agreements, which the City has obtained, .. are available to the Contractor for review by contacting the consultant who distributes the plans for the project. Also, it shall be the responsibility of the Contractor to obtain written permission from property owners to perform such work as cleanout repair and sewer service replacement on .. private property. Contractor shall adhere to all requirements of Paragraph C6-6.10 of the General Contract Documents. The Contractor's attention is directed to the agreement terms along with any special conditions that may have been imposed on these agreements, by the property owners. y The easements and/or private property shall be cleaned up after use and restored to its original condition or better. In event additional work room is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the .. use of additional property required. No additional payment will be allowed for this item. The City has obtained the necessary documentation for railroad and/or highway permits required for construction of this project. The Contractor shall be responsible for thoroughly reviewing, understanding and complying with all provisions of such permits, including obtaining the requisite insurance, and shall pay any and all costs associated with or required by the permit(s). It is the Contractor's responsibility to provide the required flagmen and/or provide payment to the appropriate railroad/agency for all flagmen during construction in railroad/agency right-of-way. For railroad permits, any and all railroad insurance costs and any other incidental costs necessary to .. meet the conditions associated with permit(s) compliance, including payment for flagmen, shall be included in the lump sum pay bid item for "Associated Costs for Construction within Railroad / Agency Right-of-way". No additional compensation shall be allowed on this pay item. D- 65 PRE -CONSTRUCTION NEIGHBORHOOD MEETING After the pre -construction conference has been held but before construction is allowed to begin on -� this project a public meeting will be held at a location to be determined by the Engineer. The contractor, inspector, and project manager shall meet with all affected residents and present the projected schedule, including construction start date, and answer any construction related questions. Every effort will be made to. schedule the neighborhood meeting within the two weeks following the pre -construction conference but in no case will construction be allowed to begin until this meeting is held. D- 66 WAGE RATES Compliance with and Enforcement of Prevailing Wage Laws Duty to pay Prevailing Waqe Rates. •• The contractor shall comply with all requirements of Chapter 2258, Texas Government Code (Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents. Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. 03112109 SC-51 PART D - SPECIAL CONDITIONS This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether •- good cause exists to believe that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to paragraph (c) above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. .. Records to be Maintained. The contractor and each subcontractor shall, for a period of three (3) years following the date of IM acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall .. pertain to this inspection. Pay Estimates. %W With each partial payment estimate or payroll period, whichever is less, the contractor shall submit an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. Postinq of Waqe Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project .n at all times. Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs (a) through (g) above. (Wage rates are attached at the end of this section.) T (Attached) 03/12/09 SC-52 PART D - SPECIAL CONDITIONS D- 67 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE A. It is the intent of the City of Fort Worth to comply with the requirements of the Asbestos National Emissions Standards for Hazardous Air Pollutants (NESHAP) found at 40 CFR Part 61, Subpart M. This specification will establish procedures to be used by all Excavators in the removal and disposal of asbestos cement pipe (ACP) in compliance with Aw NESHAP. Nothing in this specification shall be construed to void any provision of a contract or other law, ordinance, regulation or policy whose requirements are more stringent. •. B. ACP is defined under NESHAP as a Category II, non -friable material in its intact state but which may become friable upon removal, demolition and/or disposal. Consequently, if the removal/ disposal process renders the ACP friable, it is regulated under the disposal requirements of 40 CFR 61.150. A NESHAP notification must be filed with the Texas Department of Health. The notification must be filed at least ten days prior to removal of the material. If it remains in its non - friable state, as defined by the NESHAP, it can be disposed as a conventional construction waste. The Environmental Protection Agency (EPA) defines friable as material, when dry, which may be crumbled, pulverized or reduced to powder by hand pressures. C. The Generator of the hazardous material is responsible for the identification and proper handling, transportation, and disposal of the material. Therefore, it is the policy of the City of Fort Worth that the Excavator is the Generator regardless of whether the pipe is friable or not. D. It is the intent of the City of Fort Worth that all ACP shall be removed in such careful and .. prudent manner that it remains intact and does not become friable. The Excavator is responsible to employ those means, methods, techniques and sequences to ensure this result. E. Compliance with all aspects of worker safety and health regulations including but not limited to the OSHA Asbestos Standard is the responsibility of the Excavator. The City of _ Fort Worth assumes no responsibility for compliance programs, which are the responsibility of the Excavator. (Copy of forms attached) F. The removal and disposal of ACP shall be subsidiary to the cost of installing the new pipe unless otherwise stated or indicated on the project plans or contract documents. no D-68 STORM WATER POLLUTION PREVENTION (FOR DISTURBED AREAS GREATER THAN 1 ACRE) PERMIT: As defined by Texas Commission on Environmental Quality (TCEQ) regulations, a Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required for all construction activities that result in the disturbance of one to five acres (Small Construction Activity) or five or more acres of total land (Large Construction Activity). The contractor is defined as an "operator" by state regulations and is required to obtain a permit. Information concerning the 03112109 SC-53 .v PART D - SPECIAL CONDITIONS permit can be obtained through the Internet at http://www.tnrcc.state.tx.us/permitting/water perm/wwperm/construct.html. Soil stabilization and structural practices have been selected and designed in accordance with North Central Texas Council of Governments Best Management Practices and Erosion Control Manual for Construction Activities (BMP Manual). This manual can be obtained through the Internet at www.dfwstormwater.com/runoff.html. Not all of the structural controls discussed in the BMP Manual will necessarily apply to this project. Best Management Practices are construction management techniques that, if properly utilized, can minimize the need for physical controls and possible reduce costs. The methods of control shall result in minimum sediment retention of not less than 70%. am NOTICE OF INTENT (NOI): If the project will result in a total land disturbance equal to or greater than 5 acres, the contractor shall sign at the pre -construction meeting a TCEQ Notice of Intent (NOI) form prepared by the engineer. It serves as a notification to the TCEQ of construction sm activity as well as a commitment that the contractor understands the requirements of the permit for storm water discharges from construction activities and that measures will be taken to implement and maintain storm water pollution prevention at the site. The NOI shall be submitted to the TCEQ sm at least 48 hours prior to the contractor moving on site and shall include the required $100 application fee. The NOI shall be mailed to: No Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 No Atistin, TX 78711-3087 A copy of the NOI shall be sent to: •. City of Fort Worth Department of Environmental Management 5000 MLK Freeway No Fort Worth, TX 76119 NOTICE OF TERMINATION (NOT): For all sites that qualify as Large Construction Activity, the contractor shall sign, prior to final payment, a TCEQ Notice of Termination (NOT) form prepared .. by the engineer. It serves as a notice that the site is no longer subject to the requirement of the permit. The NOT should be mailed to: Texas Commission on Environmental Quality Storm Water & General Permits Team; MC-228 P.O. Box 13087 Austin, TX 78711-3087 STORM WATER POLLUTION PREVENTION PLAN (SWPPP): A document consisting of an erosion control and toxic waste management plan and a narrative defining site parameters and techniques to be employed to reduce the release of sediment and pollution from the construction site. Copies of the project SWPPP's are available for viewing at the office of the Consultant disbursing the plans for the project. The selected Contractor shall be provided with three copies of the SWPPP after award of contract, along with unbounded copies of all forms to be submitted to the Texas Commission on Environmental Quality. 03112109 SC-54 w PART D - SPECIAL CONDITIONS -� LARGE CONSTRUCTION ACTIVITY — DISTURBED AREA EQUAL TO OR GREATER THAN 5 ACRES: A Notice of Intent (NO[) form shall be completed and submitted to the TCEQ including payment of the TCEQ required fee. A SWPPP that meets all TCEQ requirements prepared by the .. Engineer shall be prepared and implemented at least 48 hours before the commencement of construction activities. The SWPPP shall be incorporated into in the contract documents. The contractor shall submit a schedule for implementation of the SWPPP. Deviations from the plan must be submitted to the engineer for approval. The SWPPP is not warranted to meet all the conditions of the permit since the actual construction activities may vary from those anticipated during the preparation of the SWPPP. Modifications may be required to fully conform to the w requirements of the Permit. The contractor must keep a copy of the most current SWPPP at the construction site. Any alterations to the SWPPP proposed by the contractor must be prepared and submitted by the contractor to the engineer for review and approval. A Notice of Termination (NOT) form shall be submitted within 30 days after final stabilization has been achieved on all portions of the site that is the responsibility of the permittee, or, when another permitted operator assumes control over all areas of the site that have not been finally stabilized. SMALL CONSTRUCTION ACTIVITY - DISTURBED AREA EQUAL TO OR GREATER THAN ONE ACRE BUT LESS THAN FIVE ACRES: Submission of a NOI form is not required. However, a TCEQ Site Notice form must be completed and posted at the site. A copy of the completed Site • Notice must be sent to the City of Fort Worth Department of Environmental Management at the address listed above. A SWPPP, prepared as described above, shall be implemented at least 48 hours before the commencement of construction activities. The SWPPP must include descriptions ,. of control measures necessary to prevent and control soil erosion, sedimentation and water pollution and will be included in the contract documents. The control measures shall be installed and maintained throughout the construction to assure effective and continuous water pollution .. control_ The controls may include, but not be limited to, silt fences, straw bale dikes, rock berms, diversion dikes, interceptor swales, sediment traps and basins, pipe slope drain, inlet protection, stabilized construction entrances, seeding, sodding, mulching, soil retention blankets, or other structural or non-structural storm water pollution controls. The method of control shall result in a " minimum sediment retention of 70% as defined by the NCTCOG TMP Manual." Deviations from the proposed control measures must be submitted to the engineer for approval. "' PAYMENT FOR SWPPP IMPLEMENTATION: Payment shall be made per lump sum as shown on the proposal as full compensation for all items contained in the project SWPPP. .. D-69 COORDINATION WITH THE CITY'S REPRESENTATIVE FOR OPERATIONS OF EXISTING WATER SYSTEMS It is the Contractor's responsibility to coordinate any event that will require connecting to or the operation of an existing City water line system with the City's representative. The Contractor may obtain a hydrant water meter from the Water Department for use during the life of named project. In the event the Contractor requires that a water valve on an existing live system be turned off and on to accommodate the construction of the project, the Contractor must coordinate this activity through the appropriate City representative. The Contractor shall not operate water line valves of existing water system. Failure to comply will render the Contractor in violation of Texas Penal Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor will be prosecuted to the full extent of the law. In addition, the Contractor will assume all liabilities and responsibilities as a result of these actions. 03/12109 SC-55 PART D - SPECIAL CONDITIONS D-70 ADDITIONAL SUBMITTALS FOR CONTRACT AWARD The City reserves the right to require any pre -qualified contractor who is the apparent low bidder(s) for a project to submit such additional information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully .. complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information if requested may be "" grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. No D-71 EARLY WARNING SYSTEM FOR CONSTRUCTION Time is of the essence in the completion of this contract. In order to insure that the contractor is "' responsive when notified of unsatisfactory performance and/or of failure to maintain the contract schedule, the following process shall be applicable: The work progress on all construction projects will be closely monitored. On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by •• 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken: 1. A letter will be mailed to the contractor by certified mail, return receipt requested demanding that, within 10 days from the date that the letter is received, it provide sufficient equipment, materials and labor to ensure completion of the work within the contract time. In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contract time. 2. The Project Manager and the Directors of Water Department, and Department of Transportation and Public Works will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed. 3. Any notice that may, in the City's sole discretion, be required to be provided to interested individuals will distributed by the Water Department's Public Information .. Officer. 4. Upon receipt of the contractor's response, the appropriate City departments and .n directors will be notified. The Water Department's Public Information Officer will, if necessary, then forward updated notices to the interested individuals. 5. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract, the bonding company will be notified appropriately. 03112109 SC-56 w PART D - SPECIAL CONDITIONS w D-72 AIR POLLUTION WATCH DAYS The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through OCTOBER 31, with 6:00 a.m. - 10:00 a.m. being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE FORMATION.. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National no Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. On designated Air Pollution Watch Days, the Contractor shall bear the responsibility lobe of being aware that such days have been designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour, or if equipment is new and certified by EPA ow as- "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between om the hours of 7:00 a.m. - 6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather day and added onto the allowable weather days of a given month. we D-73 FEE FOR STREET USE PERMITS AND RE -INSPECTIONS A fee for street use permits is in effect. In addition, a separate fee for re -inspections for parkway '� construction, such as driveways, sidewalks, etc., will be required. The fees are as follows: 1. The street permit fee is $50.00 per permit with payment due at the time of permit application. 2. A re -inspection fee of $25.00 will be assessed when work for which an inspection called for is incomplete. Payment is due prior to the City performing re -inspection. Payment by the contractor for all street use permits and re -inspections shall be considered .+ subsidiary to the contract cost and no additional compensation shall be made. w END OF PART D - SPECIAL CONDITIONS 03112109 SC-57 PART D - SPECIAL CONDITIONS (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction - No %0 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON WATER AND / OR SEWER LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> r. OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> .. AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 03112109 SC-58 OWN PART D - SPECIAL CONDITIONS No zk": no FoxTWORTH _..._ DOE MO. xxxx Project Marne: NOTICE OF TEMPORARY WATER SERVICE • INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, 0311zws SC-59 ,CONTRACTOR PART D - SPECIAL CONDITIONS y u T A H P A N E S H A P V I 0 e fi 4 n TEXAS DEPARTMENT OF HEALTH NOTE: CIRCLE ITEMS THAT ARE AMENDED t) Abatement Contractor: Address; "City: Office Phone Number ( t Site Supervisor-, Site Supervisor: Trained On -Site NESHAP Individual: Demolition Contractor: Address: 2) Project Consultant or Operator. Mailing Address: City: State: Tip: DEMOLITION 1 RENOVATION t� NOTIFICATION FORM T D H NOTIFICATION# TDH License Number State: Zip: Job Site Phone Number. TDH License Number_ TQH License Number. Certification Dale: Office Phone Number[ City: 1e: Tip: TDH License Number_ Office Phone Number: [ i 3) Facllin' Ors Attention: Meging Address: City State: Zip: Ovmer Phone Number "Note: The invoice for the notifi cation lea will be sent to the owner of the bultding and the billing address for the invoice will be obtained from the Information that Is provided in this section- 4) Description or Facility Name: Physical Address: County City: Zip: Facility Phone Number( i Facility Contact Person: Description of AneafRoom Number: Prior Use: Future Use: Age of BuildinWFacisity: Sine: Number of Floors: School (K -12): G YES 0 NO 5) Type of Work, n Demolition :3 Renovation (Abatement) G Annual Consolidated Work will be during. U pay ❑ Evening Mot -' PhW4d Project Description of work schodulm 6) Is this a Public Building? M YES ❑ NO Federal Facility? Z YES _ NO Industrial Site? Q YES tJ NO NESHAP-Only Facility? ❑ YES ❑ NO Is I3uitcift/Facllity Occupied? D YES a NO T) Notification Type CHECK ONLY ONE ❑ Original (10 Worsting Days) Cancellation Amendment ❑ EmergencylOrdered If this is an amendment, which amendment number is this? (Enclose copy of original andlrr last amendment) if an emergency, who did you talk with at T0H7 Emergencyg: + Date and Hoof of Emergency (HHlM 01313 YY): Description of the sudden, unexpected event and explmta ion of now the event caused unsafe conditions or Would cause equipment damage (computers. machinery, etc D B) Description of procedures to be followed In the event that unexpected asbestos is found or previously noon -friable y asbestos material becomes crumbled. pulverized, at reduced to powder, t S 9) was an Asbestos survey performed? Ll YES C' NO Date: I I TDH Inspector License No: t3 Analytical Method: © PLM ❑ TEM ❑ Assumed TDH Laboratory License No: N (For TAHPA (public budding) projects: an assumption must be made by a TDH Licensed Inspector) 10) Description of planned demolition or renovation vvork, type of material, and metfiod(s) to be used, IF 11) Description of work practices and engineering controls to be usod to prevent emissions of asbestos at the demo6tiordrmwadon: III OY12109 S C-60 No ow aw no ft. .o no a. No F PART D - SPECIAL CONDITIONS No MW 12) ALL appiieabto items in the following table must be completed: IF NO ASBESTOS PRESENT CHECK HERE - Approximate amount of Check unit of measurement Asbestos -Containing Building Material Asbestos Type Pipes Surface Area Ln Ln SO SO Cu Cu Ft Lt Ft M Ft M RACM to be removed r RACM NOT removed Interior Category I non -friable removed No Exte. for Category I non -friable removed Category I non-fris ble NOT removed Interior Category 11 non -friable removed .o Exterior Cateaory 11 non -friable removed Catemry 11 non -friable NOT removed no RACM Off -Facility Component 13) Waste Transporter Name: TDH License Number Address: City: State: Zip: .. Contact Person: Pima Number: ( > 14) Waste Disposal Site Name: Address: City. Stale: 70: .w Telephone:~ TNRCC Permit Number: 15) For structurally unsound facilities, attach a copy of demolition order and identify Governmental Otficial below. Name: Registration No: Title. Date of order (MMO YY) ! 1 Date order tD begin (MWDDfYY) f ! 16) Scheduled Dates of Asbestos Abatement (tdM/130 "f) Start I I Complete: 1 f 17) Scheduled Dates DemditionA;Zenovstion (MkVDDIYY) Slart: _ _ _ i ... _ I . Complete: t I " Note: If the start date on this nautic"on can riot b0 mot, time TDH Regional or Local Program office Must he contacted by phone prior to the start date. Failure to do so Is a violation to accofftrico to TAHPA. Section 295.61. I hereby certify #let all information I have provided is correct; complete, -and true to the best of my knowledge_ I acknowledge that I am responsible for all aspects of the notification fort, including, but not limiting, content and submission dates. The maximum penalty is S10,000 per day per violation. ( 1 .. (Signature of Buildino Owner/ Operates (Printed Mama) (Date) (Telephone) or Delegated GonstdlanttContractor) 1 �ax Number) MAIL TO- ASBESTOS NOTIFICATION SECTION .. TOXIC SUBSTANCES CONTROL DIVISION TEXAS DEPARTMENT OF HEALTH *Faxes are not accapted` PO BOX 143538 'Faxes are not accaptcd• AUSTIN. TX 78714-3530 _ PH: 512-834-OW, 1400-572-5548 Form APEI#5, dated 07129102, Replacss TDH form dated 07I f"1. For assistance in completing form, caN f-800.572-5546 03112/09 SC-61 03112109 PART n _ .qPECIAL CONDITIONS SC-62 p I mm PART D - SPECIAL CONDITIONS it ,. i• 0 ow r I wo C1assifications Air Tool Operator Asphalt Raker Asphalt S.hoveier Asphalt Distributcr Operator Asphalt Pavin Machine Operator $at song Plant?Veigher Broom or Sweeper Operator Bulldozer Operator Carpenter Rough" Concrete Finisher- Paving Concrete Finisher -Structures Concrete Paving Curbing Mach. Oper. Concrete Paving Finishing Mach_ Oper. Concrete Paving 9osnt Sealer Oper. Concrete Paving Saw Oper. Concrete Paving Spreader Oper. Concrete Rubber Crane, Clamshe€l, Backhoe, Derrick, Dragtine, Shovel Electrican Flagger Forms Builder- Structures Forts Setter- Paving & Curbs Foundation Drill Operator, Crzvler Mounted Foundation Drill Operator. Truck Mounted Front End Loader Laborer- Common Laborer- Utility Mechanic Milling Machine Operator, Fine Grade Mixer Operator Motor Grader Operator (Fine Grade) Mcior Grader Operator, Rough Oiler Painter, Structures Pavement Marking Machine Opel.. Pipe Laver Roker. Steel Wheel Plant Mix Pavements RQffier, Steel Wheel Other Flatwheel or Tamping Roller, Pneumatic, Set,` -Propelled Scraper ReinforcinA Steel Setter (Paving) Reinforcing Steel Setter (Structure) Source is AGC of Texas (Hwy, Hwy, Utilities Industrial Branch) www.access gpogovtdavisbaront 03112109 Hourly Rates s i a -De $13-W $8.80 $13.99 $12_78 $14.15 Sg.88 $13-22 $12.80 $12,215 $1327 $12.00 $13_63 $12-50 $13.58 $14.50 $10.61 $14.12 $18.12 $,8,43 $11..n $11_R3 $13.87 $18-30 $12.82 $g.18 $1€L85 $1d.9i $11.83 $11 M $15-M $14-50 $13� 17 $10.D4 $11-D4 $11 28 $10-92 $11.07 SC-63 (Scraper Operator (Servicer Slip Form Machine Operator readerBox Onrratorctor operator. awler T�rpe or operator, Pneumatic �Traveling lktixer0 rator Truck Driver- S'Axle {t-ight) Truck Driver- Sint$e Axle {Heavy} I'Truck Driver- Tandem Axle Semi -Trailer Truck Driver-Lowboy;Float nick Driver- Transit Mix r!Yagon Drill, Boring Machine. Post Hole Driller lWelder Work Zone Barricade Servicer Hdy Rts S11.42 31F.32 $12 33 $10.92 S 12-60 $12.91 $12.02 310.91 $11.47 $11.75 $14.93 $12.08 514.DG $13.57 S1D.D9 so Part DA — Additional Special Conditions no I -A PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS ............OMITTED DA-2 PIPELINE REHABILITATION CURED -IN -PLACE PIPE..................................OMITTED DA-3 PIPE ENLARGEMENT SYSTEM...................................................................................4 .. DA-4 FOLD AND FORM PIPE..................................................................................OMITTED DA-5 SLIPLINING.................................................................................................................12 DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT.......................................................19 DA 7 TYPE OF CASING PIPE..............................................................................................22 DA-8 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR..............................................23 DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION ......... DA-10 MANHOLE REHABILITATION .OMITTED ....................................................................... DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION ....................OMITTED DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM .....OMITTED DA-13 INTERIOR MANHOLE COATING - QUADEX SYSTEM ..................................OMITTED DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM......................................28 DA 15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM.........:..........................31 DA-16 INTERIOR MANHOLE COATING; PERMACAST SYSTEM WITH EPDXY LINER ........ .........................................................................................................................OMITTED DA-17 INTERIOR MANHOLE COATING -STRONG -SEAL -SYSTEM .........................OMITTED ` DA-18 RIGID FIBERGLASS MANHOLE LINERS .........................OMITTED DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION....................................OMITTED DA-20 PRESSURE GROUTING.................................................................................OMITTED DA-21 VACUUM TESTING OF REHABILITATED MANHOLES.................................OMITTED DA-22 FIBERGLASS MANHOLES.............................................................................OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES ......... OMITTED DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER............................................34 DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS....................................................34 DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE.............................................35 DA-27 GRADED CRUSHED STONES....................................................................................35 DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE...............................................OMITTED DA-29 BUTT JOINTS - MILLED.............................................................................................35 DA-30 2" H.MJLC. SURFACE COURSE (TYPE "D" MIXI.....................................................36 DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER ................................OMITTED DA-32 NEW 7" CONCRETE VALLEY GUTTER.........................................................OMITTED ,. DA-33 NEW 4" STANDARD WHEELCHAIR RAMP ...................................................OMITTED DA-34 8" PAVEMENT PULVERIZATION...................................................................OMITTED DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUTI ..........................37 DA-36 RAISED PAVEMENT MARKERS....................................................................OMITTED DA-37 DA-38 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING .....OMITTED LOADING. TRANSPORTATION. AND DISPOSAL OF CONTAMINATED SOIL............. .............................................................................. .......................................... OMITTED DA-39 I ROCK RIPRAP - GROUT - FILTER FABRIC ..................................................OMITTED ' DA-40 CONCRETE RIPRAP.......... :........................................... ................................OMITTED . DA-41 COP� CYLINDER PIPE AND FITTINGS ...............................................OMITTED DA-42 _.. ,... . CflN AETE PIPE FITTINGS AND Si E�GM ................................................OMITTED DA-43 UNCLASSIFIED STREET EXCAVATION........................................................OMITTED DA-44 6" PERFORATED PIPE SUBDRAIN...............................................................OMITTED DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS.....................................................38 DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION ....................................OMITTED _ 10123108 ASC-1 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-47 PAVEMENT REPAIR IN PARKING AREA..................................................................39 DA-48 EASEMENTS AND PERMITS......................................................................................39 DA-49 HIGHWAY REQUIREMENTS......................................................................................39 DA-50 CONCRETE ENCASEMENT.......................................................................................39 DA-51 CONNECTION TO EXISTING STRUCTURES.............................................................40 DA52 TURBO METER WITH VAULT AND BYPASS INSTALLATION ......................OMITTED DA-53 OPEN FIRE LINE INSTALLATIONS................................................................OMITTED DA-S4 WATER SAWLE STA''iON.................................................................... ......OMITTED DA-55 CURB ON qQpqftETE PAVEMENT...............................................................OMITTED DA56 SHOP DRAWINGS..........................................................................................OMITTED DA-57 COST BREAKDOWN......................................................................................OMITTED DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY ......................OMITTED DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP........................................................OMITTED DA-60 ASPHALT DRIVEWAY REPAIR..................................................................................40 DA-61 TOP SOIL....................................................................................................................40 DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT ......OMITTED DA-63 BID QUANTITIES............................................................................................OMITTED DA-64 WORK IN HIGHWAY RIGHT OF WAY........................................................................41 DA-65 CRUSHED LIMESTONE (FLEX-BASEI................................ .......OMITTED DA-66 OPTION TO RENEW.......................................................................................OMITTED DA-67 NON-EXCLUSIVE CONTRACT.......................................................................OMITTED DA-68 CONCRETE VALLEY GUTTER.......................................................................OMITTED DA-69 TRAFFIC BUTTONS........................................................................................OMITTED DA-70 PAVEMENT STRIPING....................................................................................OMITTED DA-71 H.M.A.C. TESTING PROCEDURES................................................................OMITTED DA-72 SPECIFICATION REFERENCES................................................................................41 DA-73 RELOCATION OF SPRINKLER SYSTEM BACK -FLOW PREVENTER/CONTROL VALVE AND BOX............................................................................................OMITTED DA-74 RESILIENT -SEATED GATE VALVES.............................................................OMITTED DA-75 EMERGENCY SITUATION. JOB MOVE-IN.....................................................OMITTED DA-76 1 %" & 2" COPPER SERVICES......................................................................OMITTED DA-77 SCOPE OF WORK (UTIL. CUT)......................................................................OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY (UTIL. CUTI...........................................OMITTED DA-79 CONTRACT TIME (UTIL. CUT).......................................................................OMITTED DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) .....................OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT)........................................OMITTED DA-82 LIQUIDATED DAMAGES (UTIL. CUT)............................................................OMITTED DA-83 PAVING REPAIR EDGES (UTIL. CUT)...........................................................OMITTED DA-84 TRENCH BACKFILL (UTIL. CUT)........................................................:..........OMITTED DA-85 CLEAN-UP (UTIL. CUT)..................................................................................OMITTED DA-86 PROPERTY ACCESS (UTIL. CUT).................................................................OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUTI..............................................................OMITTED DA-88 STANDARD BASE REPAIR FOR UNIT 1(UTIL. CUTI ....................................OMITTED DA-89 CONCRETE BASE REPAIR FOR UNIT 11 & UNIT III (UTIL. CUT) ..................OMITTED DA-90 2" TO 9" H.M.A.C. PAVEMENT (UTIL. CUTI..................................................OMITTED DA-91 ADJUST WATER VALVE BOXES. MANHOLES. AND VAULTS (UTIL. CUTn OMITTED DA-92 MAINTENANCE BOND (UTIL. CUT)...............................................................OMITTED DA-93 BRICK PAVEMENT (UTIL. CUT).....................................................................OMITTED 10123108 ASC-2 mg .. sm .. am we .. W_ .o w ow wo w L� wo :;. am PART DA - ADDITIONAL SPECIAL CONDITIONS DA-94 LIME STABILIZED SUBGRADE (UTIL. CUTI................................. ........OMITTED DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUTl...........................................OMITTED DA-96 REPAIR OF STORM DRAINI STRUCTURES (UTIL. CUT) .............................OMITTED DA-97 "QUICK -SET" CONCRETE (UTIL. CUT).........................................................OMITTED DA-98 UTILITY ADJUSTMENT (UTIL. CUTn..............................................................OMITTED DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUTI ......... ............................................................................................................ OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUTI.............. .......... OMITTED DA-101 CONCRETE CURB AND GUTTER (UTIL. CUT)...........................................OMITTED DA-102 PAYMENT (UTIL. CUTI...............................................................................OMITTED DA-103 DEHOLES (MISC. EXT.)..............................................................................OMITTED DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.)...........................................OMITTED DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) ...............................OMITTED DA-106 BID QUANTITIES (MISC. EXT.1................................................. .........OMITTED DA-107 LIFE OF CONTRACT (MISC. EXT.1.............................................................OMITTED DA-108 FLOWABLE FILL (MISC. EXT.)..................................................................OMITTED DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.) ..............................................OMITTED DA-110 DETERMINATION AND ONITIATION OF WORK (MISC. REPL.).................OMITTED DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.) .................................OMITTED DA-112 MOVE IN CHARGES (MISC. REPL.)...........................................................OMITTED DA-113 PROJECT SIGNS (MISC. REPL.)................................................................OMITTED DA-114 LIQUIDATED DAMAGES (MISC. REPL.1....................................................OMITTED DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.).................................OMITTED DA-116 FIELD OFFICE.............................................................................................OMITTED DA-117 TRAFFIC CONTROL PLAN.....................................................................................43 DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS..OMITTED DA-119 CATHODIC PROTECTION SYSTEM.......................................................................43 10123108 ASC-3 s. PART DA - ADDITIONAL SPECIAL CONDITIONS DA-1 AWARD OF CONTRACT FOR PROJECTS WITH MULTIPLE UNITS - OMITTED DA-2 PIPELINE REHABILITATION CURED -IN -PLACE PIPE - OMITTED DA-3 PIPE ENLARGEMENT SYSTEM A. GENERAL: 1. Description: This specification includes requirements to rehabilitate existing sanitary sewers by the pipe enlargement system, herein called Pipe Bursting or .. Pipe Crushing (Pipe Bursting/Crushing). This system includes splitting or bursting the existing pipe to install a new polyethylene pipe and reconnect existing sewer service connections. 2. Methods: This section specifies the approved system method or process to include all labor, materials, tools, equipment and incidentals necessary to provide for the complete rehabilitation of deteriorated gravity sewer lines by the Pipe .. Bursting/Crushing systems. Approved methods include: the PIM Corporation (PIM System), Piscata Way, New Jersey; McLat Construction (McConnell System for Pipe Crushing), Houston, Texas; and Trenchless Replacement Systems, (TRS 00 System), Calgary, Canada. Refer to Part D - SPECIAL CONDITIONS D-34 SIBSTITUTIONS for information regarding pre -approval procedures for alternative processes. 3. Definition: The Pipe Bursting/Crushing system is defined as the reconstruction of gravity sewer pipe by installing an approved pipe material, by means of one of the pre -approved methods set forth in Section A.2 of this specification. The process involves the use of a static, hydraulic or pneumatic hammer "moling" device, suitably sized to break out the old pipe or using modified boring "knife" with a .. flared plug that implodes and crushes the existing sewer pipe. Forward progress of the "mole" or the "knife" may be aided by the use of hydraulic equipment or other apparatus, as specified in the approved methods. The replacement pipe is either pulled or pushed into the bore. The method allows for replacement of pipe sizes from 8" through 21" and/or upsizing in varying increments up to 21". This specification is based on the precedent that the Pipe Bursting/Crushing system used has been pre -approved by the Fort Worth Water Department. 4. Quality Assurance: The Contractor shall be certified by the particular Pipe Bursting/Crushing system manufacturer that such firm is a licensed installer of their system. No other Pipe Bursting/Crushing system other than those listed in Section A.2. of these specifications is acceptable. a. Personnel directly involved with installing the new pipe shall receive training .. in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. 10123108 ASC-4 No PART DA - ADDITIONAL SPECIAL CONDITIONS b. Personnel directly involved with installing the new pipe shall receive training in the proper methods for joint fusing, handling, and installing the polyethylene pipe. Training shall be performed by a qualified representative as determined by the pipe manufacturer. 5. Submittals: Submit for review and acceptance, the following Contractor's Work - Plan and Drawings to the City: a. Shop drawings, catalog data, and manufacturer's technical data showing .. complete information on material composition, physical properties, and dimensions of new pipe and fittings. Include manufacturer's recommendation for handling, storage, and repair of pipe and fittings if damaged. b. Location and number of insertion or access pits shall be planned by Contractor and submitted in writing prior to excavation for approval by the s City. C. Method of construction and restoration of existing sewer service connections. This shall include: 1) Detail drawings and written description of the entire construction procedure to install pipe, bypass sewage flow and reconnection of sewer service connections. �• 2) Working drawings for information only showing sewage flow bypass, and maintenance of traffic. Contractor shall provide for continuous sewerage flow. Dewatering shall be the Contractor's responsibility. 3) Certification of workmen training for installing pipe. 4) Television inspection reports and video tapes made after new pipe installation. 'W 6. Delivery, Storage, and Handling: a. Transport, handle, and store pipe and fittings as recommended by manufacturer. b. If new pipe and fittings become damaged before or during installation, it shall be repaired as recommended by the manufacturer or replaced as required by the Project Manager at the Contractor's expense, before proceeding further. C. Deliver, store and handle other materials as required to prevent damage. B. MATERIALS: '" 10123108 ASC-5 PART DA - ADDITIONAL SPECIAL CONDITIONS 1. Polyethylene Piping Material: The pipe and fitting material shall be high density, extra molecular weight (EHMW) polyethylene pipe material conforming to ASTM D1248, Type 111, Class C. Category 5, Grade P34, and have a PPI (Plastic Pipe Institute) recommended designation of PE3408 and cell classification 345434C per ASTM D3350. The molecular weight category shall be extra high (250,000 to 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. .. a. The interior of the pipe shall be a light reflective color to facilitate closed circuit television inspection. _ b. The pipe material shall be listed by the Plastic Pipe Institute (PPI) in PPI TR-4. The pipe material shall have as hydrostatic design basis of 1600 psi at 73 F and 800 psi at 140 F. C. The manufacturer's certification shall state that the pipe was manufactured from one specific resin and shall state the resin used and its source. All pipe shall be made of virgin material. No rework, except that obtained from the manufacturer's own production of the same formulation, shall be used. d. Pipe supplied under this specification shall have a nominal Ductile Iron Pipe Size inside diameter. The Standard Dimension Ratio (SDR) and minimum pressure rating of the wipe shall be SDR 17 - 100 psi. Pipe with a lower SDR ratio and higher pressure rating may be used in lieu of the minimum specified. 2. Tests: The Contractor shall be required to send submittals to the City of Fort Worth on the production material. a. The pipe manufacturer shall provide certification that samples of the production product meets these specifications. The certification will state that production product has been tested in accordance with ASTM D2837, and validated in accordance with the latest revision of PPI TR-3. b. The pipe manufacturer shall provide certification that stress regression testing has been performed on the specific product. Certification shall include a stress life curve per ASTM D2837 and testing shall have been performed in accordance with ASTM D2837. C. Rejection: Polyethylene plastic pipe and fittings may be rejected for failure to meet any of the requirements of this specification. C. SEWER SERVICE CONNECTIONS: Sewer Service Connections: Sewer service connections shall be connected to the new pipe by mechanical or fusion methods. Once the saddle is secured, a hole shall be drilled in the pipe the full inside diameter of saddle outlet. 2. Pipe Saddles: Mechanical saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D1248, Class C, have stainless steel straps 10123108 ASC-6 MW PART DA - ADDITIONAL SPECIAL CONDITIONS and fasteners, neoprene gasket and backup plate. Mechanical saddles shall be Strap -on -Saddle Type as manufactured by Driscopipe or Tapping Saddle manufactured by DuPont, or approved equal. Fusion saddles shall be electrofusion branch saddles as manufactured by Central Plastics Company, or approved equal. 3. Connection to Existing Service: Connections to the existing sewer service connections pipe shall be made using flexible couplings. All flexible couplings shall conform to ASTM C425 and shall be as manufactured by Femco Joint Sealer Co., DFW Plastics, Inc. or approved equal. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these .. specifications. The Contractor shall, upon request, permit the Engineer to take elevations on both the existing and new portions of the service connection pole to determine final grade and invert elevations. Elevation changes greater than 0.10 feet from the house lateral piping and shall be reconnected as directed by the Engineer. .. 4. Service Interruptions: Service interruptions to homes shall not exceed 18 hours. D. PREPARATION: 1. Bypassing Sewage: a. The Contractor shall bypass the sewage around the section or sections of sewer to be rehabilitated. The bypass shall be made by plugging existing upstream manhole and pumping the sewage into a downstream manhole or adjacent system or other method as may be approved by the Engineer. The pump and bypass lines shall be of adequate capacity and size to handle the flow without sewage backup occurring to facilities connected to the sewer. b. The Contractor shall be responsible for continuity of sanitary sewer service _ to each facility connected to the section of sewer during the execution of the work. If sewage backup occurs and enters buildings, the Contractor shall be responsible for clean-up, repair, property damage costs and claims. 2. Line Obstructions: If pre -installation (TV) inspection reveals an obstruction in the existing sewer (heavy solids, dropped joints, protruding service taps or collapsed pipe) which will prevent completion of the pipe bursting/crushing process, and cannot be removed by conventional sewer cleaning equipment, then an obstruction removal shall be made by the Contractor, with the approval of the Engineer. 3. Sags in Sewer Line: ALL SAGS AND GRADE PROBLEMS IN EXISTING SEWER LINES SHALL BE CORRECTED AS PART OF THIS CONTRACT. If the pre - construction television inspection reveals a sag in the sewer line, the Contractor 10123108 ASC-7 PART DA - ADDITIONAL SPECIAL CONDITIONS shall be responsible for bringing the proposed sewer pipe to an acceptable grade without a sag. A sag is defined as any sewer line segment more than 3 feet in length which ponds water in the absence of sewage flow. The contractor shall take the necessary measures to eliminate the sag by the method of. pipe replacement, digging a sag elimination pit and bringing the bottom of the pipe trench to a uniform grade in line with the existing pipe invert or by other measures that shall be acceptable to the Engineer and the City. •- a. Identification of Sags: Sags shall be identified by television inspection in the absence of sewage flow. If available, the Contractor shall be furnished television tapes from the City identifying the sag location. Flow shall be blocked at an upstream manhole and diverted to another sewer line or downstream manhole below the segment of pipe to be inspected. TV inspection shall be performed in accordance with television inspection of sanitary sewer lines. Video tapes shall be submitted to the City for review. b. Correction of Sags: Sags shall be corrected by open cut and by adding additional bedding material to bring the sag back to grade where access is available. For pipe enlargement methods, all sags identified on the pre - construction video tapes shall be corrected prior to commencing with pipe enlargement. In instances where sags are located under existing structures, the existing .. sewer line may be relocated using open cut or boring methods. The City shall specifically review potential relocation's and evaluate the constructability, economics and engineering feasibility prior to construction .. work. C. Measurement and Payment: Measurement and payment to correct sags shall be per linear foot of pipe construction to correct the sag. For pipe bursting methods, open -cut or bore construction, the applicable bid prices in the proposal section shall apply. Television Inspection: Inspection of the pipelines shall be performed by experienced personnel trained in locating breaks, obstacles and service connections by closed circuit color television. Television inspection shall be in accordance with the specifications contained herewith for "Pre- and Post - Construction Television Inspection of Sanitary Sewer Lines", Part D Special Conditions D-35 and D-38, respectively. — ENLARGEMENT SYSTEM AND PIPE INSTALLATION: Site Organization: a. Insertion or access pits shall be located such that their total number shall be minimized and the length of replacement pipe installed in a single pull shall be maximized. b. Existing manholes shall be utilized wherever practical. Manhole inverts and bottoms may be removed to permit access for installation equipment. ASC-8 PART DA - ADDITIONAL SPECIAL CONDITIONS C. Equipment used to perform the work shall be located away from buildings so as not to create a noise impact. Provide silencers or other devises to no reduce machine noise as needed to meet requirements. d. The actual pipe enlargement procedure shall commence prior to 11:00 AM in order to afford the contractor ample time to complete all related work within the allotted workday, which is defined as the hours between 7:00 AM and 6:00 PM, so as not to impose on the peace and comfort of persons in -� the immediate vicinity. No actual pipebursting work shall be started after 11:00 AM; all actual pipebursting activity shall cease at 6:00 PM. Other activities other than the actual pipebursting may continue after 6:00 PM. 2. Finished Pipe: The installed replacement pipe shall be continuous over the entire length of each pipe segment from manhole to manhole and shall be free from visual defects such as foreign inclusions, concentrated ridges, discoloration, pitting, varying wall thickness, pipe separation, other deformities. Replacement pipe with gashes, nicks, abrasions, or any such physical damage which may have occurred during storage and/or, handling, which are larger/deeper than 10% of the wall thickness shall not be used and shall be removed from the construction site. The replacement pipe passing through or terminating in a manhole shall be carefully cut out in a shape and manner approved by the Engineer. The invert and benches shall be streamlined and improved for smooth flow. The installed pipe shall meet the leakage requirements of the pressure test specified later. -- 3. Pipe Jointing: a. Sections of polyethylene replacement pipe shall be assembled and joined _. on the job site above the ground. Jointing shall be accomplished by the heating and butt -fusion system in strict conformance with the manufacturer's printed instructions. b. The butt -fusion system for pipe jointing shall be carried out in the field by operators with prior experience in fusing polyethylene pipe with similar equipment using proper jigs and tools per standard procedures outlined by the pipe manufacturer. These joints shall have a smooth, uniform, double rolled back bead made while applying the proper melt, pressure, and alignment. It shall be the sole responsibility of the Contractor to provide an acceptable butt -fusion joint. All joints shall be made available for inspection by the Engineer before insertion. The replacement pipe shall be joined on the site in appropriate working lengths near the insertion pit. The maximum length of continuous replacement pipe which shall be assembled above ground and pulled on the job site at any one time shall be 600 linear feet. C. For situations where the replacement pipe is not pulled all the way to the manhole or if it is impossible to pull the missle all the way through, the following shall apply: At the direction of the Engineer, a 12"-18" full circle steel clamp shall be utilized to connect segments of the HDPE pipe. am iw"P&M-i ASC-9 PART DA - ADDITIONAL SPECIAL CONDITIONS 10123108 4. New Pipe Installation: a. Thread winch cable or chain and associated lines through sewer section to be rehabilitated. Keep lines away from pedestrian and vehicular traffic. ~! b. Existing manholes may be used for launch and receiving access. Remove manhole invert and bottom as required. Pull winch chain through sewer section and attach --to cutter and machine head. Lower into launching manhole, apply winch tension pulling the cutter and head into the sewer until the rear of the machine is flush with the manhole wall. Attach steel starter pipe and advance assembly until the rear of the steel starter pipe is flush with the manhole wall. Lower hydraulic jack into the manhole and align. Insert new pipe by simultaneous operation of the jack and winching the cutter and head forward. 5. Anchoring New Pipe and Sealing Manholes: a. After the new pipe has been installed in the entire length of the sewer section, anchor the pipe, at manholes. The new pipe shall protrude in the manholes for enough distance to allow sealing and trimming. b. Sealing the new pipe at manholes shall not begin for a minimum of ten (10) hours after installation. Provide a flexible gasket connector in the manhole — wall at the end of the new pipe, centered in the existing manhole wall, Grout flexible connector in the manhole, filling all voids the full thickness of the manhole wall. C. Restore manhole bottom and invert. 6. Field Testing: a. Low Pressure Air Test of Replacement Pipe: After a manhole -to -manhole section of sanitary sewer main has been pipe burst/crushed and prior to any service lines being connected to the replacement pipe, the pipe shall be plugged at each manhole with pneumatic plugs. The design of the plugs shall be such that they will hold against the test pressure without requiring external blocking or bracing. One of the plugs shall have three air hose connections; one for the inflation of the plug, one for reading the air pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting from any ground water that may be over the pipe. At least two minutes shall elapse to allow the pressure to stabilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting from any ground water that may be over the pipe, shall not be less than the time shown for a given pipe diameter in the following table: ASC-10 " PART DA - ADDITIONAL SPECIAL CONDITIONS Carrier Pipe Diameter (inches) 8 10 12 15 Minimum Elapsed Time (minutes) 4 5 6 7 b. Post -Construction Television Inspection of New Pipe: Refer to Special Condition for Post -Construction Television Inspection of Sanitary Sewer. F. MEASUREMENT AND PAYMENT: 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed in the various diameters of sewers measured along the -� centerline of the sewer from centerline to centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. s 2. Service Reconnections: Installation of sewer service connections will be measured for payment by each actually reconnected to the installed pipe. Payment will be made for the quantities measured at the unit price per each listed. Payment shall include required excavation and backfill, saddles, flexible connections, and all other incidentals necessary to successfully reconnect sewer service lines to the rehabilitated sewer. Payment shall not include pavement replacement, which if required, shall be paid separately. 3. Sewer Cleaning by Bucket Machine: Heavy cleaning requiring more than hydraulic '6 jet cleaning shall be performed by bucket machines. The payment for such cleaning shall be included in the bid item for Pre -Construction Television Inspection of Sanitary Sewer Lines. 4. By-pass Pumping: The Contractor shall provide diversion for the flow of sewage around the section or sections of pipe designated for rehabilitation. The pumps .. and by-pass lines shall be of adequate capacity and size to handle all flows. All costs for by-pass pumping required during installation of the pipe shall be subsidiary to pipe enlargement. 5. Subsidiary Work: Any damage to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or _ replacement of fences, sprinkler system piping and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method will be incidental to pipe installation. DA-4 FOLD AND FORM PIPE - OMITTED 10123108 ASC-11 011*1 Idd 10123108 PART DA - ADDITIONAL SPECIAL CONDITIONS .IPLINING NERAL: This section includes requirements to rehabilitate existing sanitary sewers by plining with polyethylene pipe. 4TERIALS Polyethylene Slipline Pipe:. a. The properties of the material shall be determined in accordance with ASTM D638. ASTM D638 shall be used to determine that the thermal butt - fusion joints are stronger than the materials joined. b. The malt index of the polyethylene resin shall be determined in accordance with ASTM D1238, Condition E, and shall be equal to, or between 0.05 g/10 min. and 1.00 g/10 min. C. The density of the base polyethylene resin shall be determined in accordance with ASTM .D1505 and be equal to, or between, 0.941 g/cc and 0.955 g/cc. d. The material shall be tested in accordance with ASTM D1693, Condition C. e. Polyethylene pipe and fittings may be rejected for failure to meet any of the requirements of this specification. f. The sewer liner pipe and fittings shall be made of a polyethylene pipe compound that meets the requirements for Type 111, Class C, Grade P-34, Category 5, polyethylene material as defined in ASTM D1248 or ASTM D3350, and having a PPI rating of PE3408, and cell classification 345434D or E per ASTM D3350. A higher numbered cell classification limit which gives a desirable higher primary property, per ASTM 3350, may also be accepted by the Engineer at no additional cost to the City. The molecular weight category shall be extra high (250,000 to 1,500,000) as per the Gel Permeation Chromatography determination procedure with a typical value of 330,000. g. Before beginning work, the Contractor shall submit for approval, the vendors specific technical data with the complete information on resin, physical properties of pipe and pipe dimensions pertinent to this job. A certificate of "Compliance With Specification" shall be furnished for all materials to be supplied. The manufacturer's certificate shall state the pipe was manufactured from one specific resin and shall state the resins used and its source. All pipe shall be made of virgin material. No rework except that obtained from the manufacturer's own production of the same formulation shall be used. The City will run tests on field samples per applicable ASTM specifications at an independent laboratory for verification of the required physical properties and characteristics. The number of samples taken shall be at ASC-12 .. M LJ .. M ■r .. PART DA - ADDITIONAL SPECIAL CONDITIONS the City's discretion. All samples shall be provided by the Contractor at no charge to the City. The City shall pay all charges for all testing of the liner material if they are found to meet specification. All retesting of materials not initially meeting these specifications shall be at the Contractor's expense. h. All polyethylene sliplining pipe shall conform to the sizes and Standard Dimension Ratio (SDR) requirements shown on the drawings. Lengths: Standard lengths shall be used whenever possible, (40 foot sections). Where construction difficulties prevent the use of standard pipe sizes, other pipe sizes may be specified. j. Pipes shall be joined to one another and to polyethylene fittings by thermal butt -fusion in accordance with ASTM D2657 and ASTM D3350. Butt -fusion joining and site location, joining shall be performed within or outside the excavation. Joints between pipe sections shall be smooth on the inside and internal projection beads shall not be greater than 3/16 inch. k. The tensile strength at yield of the butt -fusion joints shall not be less that of the pipe. 2. Sewer Service Connections: Mechanical and fusion -bonded saddles shall be made of polyethylene pipe compound that meets the requirements of ASTM D- 2448, Type IV, Class C. Mechanical saddles shall have stainless steel straps and fasteners and neoprene gaskets. Mechanical saddles shall be Strap -on -Saddle Type as manufactured by Drisco Pipe or Tapping Saddle as manufactured by DuPont, or approved equal. Fusion saddles shall be electrofusion branch saddles .� as manufactured by Central Plastics Company, or approved equal. Saddles for use on PVC pipe shall be molded fittings as recommended by the PVC am pipe manufacturer, and shall conform to the requirements of ASTM D3034, SDR 35. C. EXECUTION 1. Cleaning and Television Inspection of Sanitary Sewers: Cleaning and television inspection of sanitary sewers to be sliplined shall be completed per the requirements of Special Condition for pre -construction television inspection. All material encountered in the existing sewers shall be removed and disposed of by the Contractor. All video tapes shall be delivered to the City's representatives for evaluation prior to any sliplining operations. 2. Obstruction Removal: The Engineer shall determine where obstruction removal -s (due to dropped joints, collapsed pipe, roots, rocks, obstructions in the pipe which cannot be removed by the cleaning equipment or other reasons) will be required. The Contractor shall locate the insertion pits at these obstruction locations .. whenever possible, and no additional payment will be authorized to the Contractor. When obstruction removal is required at locations other than insertion pits, an 10123108 ASC-13 r PART DA - ADDITIONAL SPECIAL CONDITIONS 10123108 payment for the obstruction excavation at the appropriate Contract unit price will be authorized. 3. Sewer Cleaning by Bucket Machine and Root Cutting: Heavy cleaning requiring more than hydraulic jet cleaning shall be performed by bucket machines or root cutting, as required. No additional payment for such cleaning and/or root cutting shall be made. 4. Insertion or Access Pits: The location and number of insertion or access pits shall be planned by the Contractor and submitted in writing for approval by the Engineer r, prior to excavation. The pits shall be located such that their total number shall be minimized, and the footage of liner pipe installed in a single pull shall be maximized. Before excavation is begun, it will be the responsibility of the Contractor to check with the various utility companies and determine the location of the utilities in the vicinity of the work area. Damage done to utilities and the resulting repair, temporary service cost, etc., shall be bome by the Contractor. �- All excavations shall be properly sheeted/shored in accordance with OSHA specifications for trench safety systems. Any damage resulting from improperly shored excavations shall be corrected to the satisfaction of the Engineer with no compensation to the Contractor. All open excavations shall be kept secure at all times by the use of barricades with appropriate lights and signs, construction tape, covering with steel plates, etc., or as directed by the Engineer. The cost for bypass pumping if required around an insertion pit, from a manhole upstream to a manhole downstream, shall be included in the Unit Price Bid for sliplining. an Excavation for insertion pits shall not be paid for separately, but shall be included in the Unit Price Bid for sliplining. 5. Insertion of Polyethylene Liner Pipe into Carrier Pipe: The existing sewer will remain in operation during the sliplining process whenever possible. Obstructions -• such as roots, large joint offsets, rocks or other debris, etc., that would prevent passage or damage to the other pipe sections must be removed or repaired prior to installing the new pipe. After completing the insertion pit excavation, the top of the existing sanitary sewer line shall be removed, where required, down to the spring line. A power winch cable shall then be connected to the end of the liner by use of a suitable pulling head, equal to the outside diameter of the liner. The pulling head shall be adequately secured to the liner and then attached to the power winch cable so that the liner can be satisfactorily fed and pulled through the sanitary sewer main. Proper bumpers shall be provided in the insertion pit in order to prevent the ragged edges of the existing pipe from scarring the outside of the liner as it is pulled into the existing sewer. ASC-14 .. PART DA - ADDITIONAL SPECIAL CONDITIONS Precautions shall be taken not to damage the liner or break or separate any of the butt -fused joints. Sufficient time (a minimum of 24 hours) shall be allowed for the liner to return to its normal length assuming the over -elongation is due to a higher temperature at the time of installation) based upon the average temperature in the sewer. The length of the liner pulled in any one segment shall be limited to prevent any backup of service lines which may result due to restricted flow through the annular space. Maximum Allowable Pulling Force. In order to ensure the integrity of the polyethylene liner, the pulling force exerted on the liner shall be limited to that indicated on the following table for the appropriate outside diameter of the polyethylene liner. POLYETHYLENE LINE OUTSIDE DIAMETER (INCHES). 5.375 7.125 8.625 10.750 14.000 18.000 21.000 24.000 MAXIMUM PULLING FORCE (TONS) 3.5 4.0 7.5 10.5 12.0 21.5 35.0 52.0 The Contractor shall use a suitable pulling head so that the pulling head and liner will separate from each other when the pulling force exerted on the liner reaches the amount indicated above. The pulling head design (including calculations) shall be approved by the Engineer prior to its use. As an alternative, the Contractor may be permitted to use a measuring device (spring, gauge, etc.) connected to the pulling cable which shall register the pulling force being exerted on the liner. The pulling force shall not exceed those values indicated above for the applicable outside diameter of the polyethylene liner. The measuring device shall be approved by the Engineer prior to its use. The Contractor may be allowed to push the liner subject to the Engineer's approval. Care shall be taken to avoid any buckling of the liner by limiting the stroke of the backhoe. Any portion of the liner damaged during this insertion process shall be cut out and the liner rejected. In certain cases, the Contractor may be permitted to use a combination of pulling and pushing to enhance the insertion of the liner. A liner that is permitted to be pushed shall not have an open end which can allow sand or other debris to be pushed into the liner. A pipe manufacturer's representative shall be onsite to assist the Contractor for the first full day of slipline pipe installation. .. 101223108 ASC-15 10123108 PART DA - ADDITIONAL SPECIAL CONDITIONS 6. Use of Clamps and Encasement for Polyethylene Pipe: Where excavations for the insertion of the liner are made between two manholes, the ends of the liner will be cut smooth, square to the axis of the liner, so that it can be joined in a workman- like manner. The liner shall be joined with a JCM Industries Type 108 or equal, all stainless steel (including bolts and lugs), full circle, Universal Clamp Coupling with a 1/4-inch minimum thickness grid type gasket. Clamps shall be selected to fit the outside diameter of the liner pipe. Minimum clamp widths shall be selected from the following table: OUTSIDE DIAMETER MINIMUM OF LINER PIPE WIDTH OF CLAMP (Inches) (Inches) 5.375 12 7.125 15 8.625 18 10.750 or Greater 30 In all excavations where the liner is not within the existing sanitary sewer line (carrier pipe) cement stabiliized.sand bedding shall be installed. Visual inspection is required for approval of bedding before backfill is completed. 7. Testing of the Liner. Testing will be required after the liner has been installed in the existing sanitary sewer main. The first is a low pressure air test of the liner before it has been sealed in place at the manholes and before any service reconnections have been made to the liner. The purpose of this test is to check the integrity of the joints that have been made and to verify that the liner has not been damaged by inserting it into the sanitary sewer. a. Low Pressure Air Test Procedure: After a manhole -to -manhole section of sanitary sewer main has been sliplined and prior to any service lines being connected to the new liner, the liner shall be plugged at each manhole with pneumatic plugs. The design of the plugs shall be such that they will hold against the test pressure without requiring external blocking or bracing. One of the plugs shall have three (3) air hose connections; one for the inflation of the plug, one for reading the air -pressure in the sealed line, and one for introducing air into the sealed line. Low pressure air shall then be introduced into the sealed line until the internal air pressure reaches 4.0 psig greater than the average back pressure resulting from any groundwater that may be over the pipe. At least two (2) minutes shall elapse to allow the pressure to stabilize. The time required for the internal pressure to decrease from 3.5 to 2.5 psig greater than the average back pressure resulting from any ground water that may be over the pipe, shall not be less than the time shown for a given pipe diameter in the following table: CARRIER PIPE MINIMUM ASCA 6 PART DA - ADDITIONAL SPECIAL CONDITIONS w OUTSIDE DIAMETER ELAPSED TIME (Inches) (Minutes) 5.375 3 w 7.125 4 8.625 5 10.750 6 14.000 7 18.000 8 Lines over 18 inches shall be approved for payment by Visual and T.V. Inspection in accordance with Special Condition D-38. 8. Sealing Liner in Manholes: After the pipe has reached equilibrium the annular space between the liner and the existing sanitary sewer main must be sealed at each manhole with a chemical seal and nonshrink grout. Oakum soaked in Scotchseal 5600 or equal shall be placed in a band to form an effective water -tight gasket in the annular space between the liner and the existing pipes in the manholes. The width of the band shall be a minimum of 12" or one-half the diameter of the pipe, whichever is greater. It shall be finished off with a non -shrink grout placed around the annular space from inside the manhole and shall not be less than 6" wide. The chosen method, including chemicals and materials, must be approved by the Engineer. The Contractor shall cut the liner so that it extends 4" into the manhole. The Contractor shall make a smooth, vertical cut and slope K the area over the top of the exposed liner using non -shrink grout. The Contractor shall also use cementitious grout to form a smooth transition with a reshaped invert and a raised manhole bench such that neither the shape edges of the liner pipe, nor the concrete bench, nor the channeled invert shall exist to catch debris r and create a stoppage. The invert of the manhole shall also be reworked (smoothed and built-up) to match the flow line of the new liner. The liner pipe shall be allowed to normalize to ambient temperatures, as well as recover from any imposed stretch, a minimum of 24 hours in the case of polyethylene, before being cut to fit between manholes and proceeding with -- reshaping and/or smoothing the manhole invert. 9. Sewer Service Connections: a. Sewer service connections shall be connected to the new pipe by mechanical or fusion methods. Once the saddle is secured, a hole shall be drilled in the pipe, the full inside diameter of the saddle outlet. b. Connections to the existing sewer service connection pipe shall be made _ using flexible Femco sewer connectors, or approved equal. Backfill at service connections shall be cement stabilized sand (2 sacks per cubic yard) to a point 12 inches above the service lateral to trench intersection and shall be in accordance with these Specifications. 10123108 AS C-17 PART DA - ADDITIONAL SPECIAL CONDITIONS C. The Contractor shall upon request, permit the Engineer to take elevations on both the existing and new portions of the service connections pipe to determine final grade and invert elevations. Elevation changes greater than 0.10 feet from the house lateral piping shall be reconnected as directed by the Engineer. d. Service interruptions to homes shall not exceed 18 hours. MEASUREMENT AND PAYMENT 1. Pipe Installation: Pipe installation will be measured for payment by the linear foot of pipe actually installed in the various diameters of sewers measured along the centerline of the sewer from centerline of manholes. Payment will be made for the quantities measured at the unit price per linear foot for the various sewer diameters listed. 2. Service Reconnections: a. Installation of sewer service connections will be measured for payment by each actually reconnected to the installed pipe. Payment will be made for .w the quantities measured at the unit price per each listed. b. Payment includes all required excavation and backfill, surface restoration, saddles, flexible couplers, up to 5' of service line, and all appurtenant work. C. Payment for additional service line (over 5' at each service reconnection) will be paid for at the appropriate Contract Unit Price. Payment includes all required additional excavation, backfill, surface restoration, and all appurtenant work. 3. Television Inspection and Cleaning: Television inspection shall include necessary cleaning (hydraulic jet or mechanical cleaner) to provide video image required for line analysis. The quantity of TV inspection shall be measured as the total length of pipe actually cleaned and televised. This contract requires the Contractor to TV inspect the sewer lines twice, once before and once after construction. Pre - Cleaning and Television Inspection shall be paid at the Contract Unit Price for all pipe successfully cleaned and television inspected. The amount paid to the Contractor for Post Construction Television Inspection shall be the Unit cost times the length of pipe lined. 4. Obstructions: Obstructions such as roots, large offset joints, rocks, or other debris, that would prevent passage or cause damage to pipe and must be removed or repaired before installing the pipe will be paid for at the Contract Unit Price per obstruction removal. Payment shall include all excavation and backfill costs, pipe replacement, surface restoration and appurtenant work required to _ complete each obstruction removal. Obstruction located within ten feet of each other shall be included in only one obstruction removal. Trench Safety System, if ASC-18 ` sm PART DA - ADDITIONAL SPECIAL CONDITIONS required, shall be paid for at the Contract Unit Price. Contractor will not be paid for obstruction removal located at insertion pits. aw 5. Subsidiary Work: Any damage resulting to utilities and property, resulting repairs, temporary service costs, etc. shall be borne by Contractor. Repair and/or replacement fences, sprinkler system piping, and other such restoration work resulting from Contractor activities shall be considered subsidiary to the cost of the project and no additional payment will be allowed. 6. Testing: All cost for testing the replacement pipe by a pressure method will be incidental to the installation. DA-6 PIPE INSTALLED BY OTHER THAN OPEN CUT A. GENERAL: 1. Furnish materials and necessary accessories, with strengths, thickness, coatings, and fittings indicated, specified and/or necessary to complete the work. 2. All excavation shall provide an open area conforming to the outside diameter of the casing and/or carrier conduit. The excavation shall be to an alignment and grade which will allow the carrier conduit to be installed to proper line and grade as "' shown on the Plans and as established in the Specifications. 3. Work shall be performed in accordance with the requirements of the City of Fort Worth Water Department, the Texas Department of Transportation, or railroad company, as applicable. .r B. MATERIALS: 1. Casing Pipe: Casing pipe shall be steel conforming to ANSI B36.10 and the „m following: a. Field Strength: 35,000 psi minimum. no b. Wall thickness: 0.312 in. minimum (0.5 for railroad crossings). k IN C. Diameter: As shown on the drawings (minimum size requirements). d. Joints: Continuous circumferential weld in accordance with AWS D1.1. 2. Carrier Pipe in Casing: Carrier pipe shall be as shown on drawings and as specified in the General Contract Documents. 3. Sewer Pipe without Casing Pipe: Shall be minimum Class 51 ductile iron pipe, or as designated on the plans. .. 4. Grout: Grout shall be Portland Cement grout of min. 2000 psi compressive strength at 28 days. Proportioned not less than 1 cu. ft. of cement to 3 cu. ft. of fine sand with sufficient water added to provide a free flowing thick slurry. 10123108 AS C-19 ,. PART DA - ADDITIONAL SPECIAL CONDITIONS EXECUTION 1. Where sewer pipe is required to be installed under railroad embankments or under highways, streets or other facilities in other than open cut, construction shall be performed in such a manner so as to not interfere with the operation of the railroad, street, highway, or other facility, and so as not to weaken or damage any embankment or structure. During construction operations, barricades and lights to safeguard traffic and pedestrians shall be furnished and maintained, until such time as the backfill has been completed and then shall be removed from the site. 2. 3. Pits and Trenches: a. If the grade of the pipe at the end is below the ground surface, suitable pits or trenches shall be excavated for the purpose of conducting the jacking or tunneling operations and for placing end joints of the pipe. Wherever end trenches are cut in the sides of the embankment or beyond it, such work shall be sheeted securely and braced in a manner to prevent earth from caving in. b. The location of the pit shall meet the approval of the Engineer. C. The pits of trenches excavated to facilitate these operations shall be backfilled immediately after the casing and carrier pipe installation has been completed. Boring and Jacking Steel Casing Pipe: Steel casing pipe shall be installed by boring hole with the earth auger and simultaneously jacking pipe into place_ a. The boring shall proceed from a pit provided for the boring equipment and workmen. The holes are to be bored mechanically. The boring shall be done using a pilot hole. By this method an approximate 2-inch hole shall be bored the entire length of the crossing and shall be checked for line and grade on the opposite end of the bore from the work pit. This pilot hole shall serve as the centerline of the larger diameter hole to be bored. Other methods of maintaining line and grade on the casing may be approved if acceptable to the Engineer. Excavated material shall be placed near the top of the working pit and disposed of as required. The use of water or other fluids in connection with the boring operation will be permitted only to the extent required to lubricate cuttings. Jetting or sluicing will not be permitted. b. In unconsolidated soil formations, a gel -forming colloidal drilling fluid consisting of at least 10 percent of high grade carefully processed bentonite may be used to consolidate cuttings of the bit, seal the walls of the hole, and furnish lubrication for subsequent removal of cuttings and installation of the pipe immediately thereafter. ASC-20 .. .. so PART DA - ADDITIONAL SPECIAL CONDITIONS C. Allowable variation from the line and grade shall be as specified under paragraph A.2. All voids between bore and outside of casing shall be pressure grouted. 4. Installation of Carrier Pipe in Casing: low a. Sanitary sewer pipe located within the encasement pipe shall be supported by "skids" or "bands" to prevent the pipe and bells from snagging on the inside of the casing, and to keep the installed line from resting on the bells. IFIR b. All skids shall be treated with a wood preservative. Skids should extend for the full length of the pipe with the exception of the bell area and spigot area .m necessary for assembly unless otherwise specified. C. The Contractor shall prevent over -belling the pipe while installing it through ,,w the casing. A method of restricting the movement between the assembled bell and spigot where applicable shall be provided. d. At all boredAm , jacked, or ,tunneled installations, the annular space between the carrier pipe and casing shall be filled with grout. Care must be taken that not too much water is forced into the casing so as not to float the pipe. The backfill material will not be required unless specified on the plans and "" specified by the Engineer. e. Closure of the casing after the pipe has been installed shall be plugged at the ends of the casing as shown on the drawings or as required by the Engineer. MW 5. Boring and Jacking Ductile Iron Pipe without Casing Pipe: a. As indicated on drawings and as required and directed by the Engineer sewer shall be constructed of bore and jacked ductile iron pipe. b. When a casing pipe is not designated on the drawings, the contractor shall provide a casing pipe if necessary to achieve line and grade. Casing pipe shall be provided at no additional cost and shall be subsidiary to the cost bid for installation By Other than Open Cut. c. Bore and jack in accordance with paragraph C.3. above. d. Short length of sewer consisting of a single pipe section may be installed by jacking without a bore hole if permitted by the Engineer and in soft soil layer. All voids outside of installed pipe shall be pressure grouted. 6. Tunneling: Where the characteristics of the soil, the size of the proposed pipe, or the use of monolithic sewer would make the use of tunneling more satisfactory than jacking or boring, or when shown on the plans, a tunneling method may be .. used, with the approval of the Engineer or railroad/highway officials. 10123108 ASC-21 M PART DA - ADDITIONAL SPECIAL CONDITIONS a. When tunneling is permitted, the lining of the tunnel shall be of sufficient " strength of support the overburden. The Contractor shall submit the proposed liner method to the Engineer for approval. The tunnel liner design shall bear the seal of a licensed professional engineer in the State of Texas. Approval by the Engineer shall not relieve the Contractor of the responsibility for the adequacy of the liner method. b. The space between the tunnel liner and the limits of excavation shall be pressure grouted or mudAacked. ON C. Access holes for placing concrete shall be space at maximum intervals of 10 feet. D. MEASUREMENT AND PAYMENT: Installation of pipe by other than open cut will be measured by the linear foot of pipe, complete in place. Such measurement will be made between the ends of the pipe along the central axis as installed. The work performed and materials furnished as prescribed by this item will be paid for at the Contract Unit Price bid per linear foot for Pipe Installed by Other Than Open Cut of the type, size, and class of pipe specified as shown on plans. The furnishing of all materials, pipe, liner materials required for installation, for all preparation, hauling and installing of same, and for all labor, tools, equipment and incidentals necessary to complete the work, including excavation, backfilling and disposal of surplus material shall be included in the Contract Unit Price as shown in the Bid Proposal. Payment shall not include pavement replacement, which if required, shall be paid separately. DA-7 TYPE OF CASING PIPE a 1. WATER: The casing pipe for open cut and bored or tunneled section shall be AWWA C-200 Fabricated Electrically Welded Steel Water Pipe, and shall conform to the provisions of E1-15, E1-5 and E1-9 in Material Specifications of General Contract Documents and Specifications for Water Department Projects. The steel casing pipe shall be supplied as .. follows: A. For the inside and outside of casing pipe, coal -tar protective coating in accordance with ` the requirements of Sec. 2.2 and related sections in AWWA C-203. B. Touch-up after field welds shall provide coating equal to those specified above. C. Minimum thickness for casing pipe used shall be 0.375 inch. .. Casing Spacers (centering style) such as manufactured by Cascade Waterworks Manufacturing Company, Advanced Products and Systems, Inc., or an approved equal shall be used on all non - concrete pipes when installed in casing. Installation shall be as recommended by the .. manufacturer. 2. SEWER: 10123108 ASC-22 W. .. PART DA - ADDITIONAL SPECIAL CONDITIONS Boring used on this project shall be in accordance with the material standard E1-15 and Construction standard E2-15 as per Fig. 110 of the General Contract Documents. "' 3. PAYMENT: Payment for all materials, labor, equipment, excavation, concrete grout, backfill, and "' incidental work shall be included in the unit price bid per foot. DA-8 SERVICE LINE POINT REPAIR / CLEANOUT REPAIR A. GENERAL: The work covered by this item consists of furnishing all labor, material, equipment, supervision, etc. necessary to construct a point repair on the portion of a service line located within a utility easement, street right-of-way or on private property. Point repairs on Drivate Droperty shall onlv be addressed after the Contractor has received written Dermission from the property owner to do the work. A blank Right -of -Entry Agreement form to be completed by the Contractor and the individual property owners is included at the end of this section. The Contractor shall keep a record copy of all Right - of -Entry forms obtained and have it on hand at all times during construction. The street addresses and approximate location of service line repairs are shown in Table _ and the Field Survey Forms in Attachment . It shall be the Contractors responsibility to accurately field locate the exact point of repair. B. MATERIALS: The pipe replacement material shall be gasketed joint, gravity PVC sewer pipe (ASTM D- 3034, SDR 26) and have a minimum cell classification of 12454 A or B as defined in ASTM D-1784. Installation shall be in strict compliance with the manufacturer, •� recommendations and the Uni-Bell Plastic Pipe Association. The method of jointing the ends of the replaced pipe with the existing pipe shall be water tight. .W C. EXECUTION: 1. After the location of the point repair is determined, the Contractor shall excavate and remove the damaged pipe and replace with new pipe. The minimum length of pipe replaced shall be three (3) feet. All work shall be Derformed by a licensed Dlumber. Determine whether additional lengths of line beyond `minimum length" criteria need replacement. Report need for additional replacement to City and obtain approval before proceeding. 2. The Contractor shall excavate, shape the bottom of the trench and place the MW required pipe bedding so that the grade of the replaced pipe matches the existing service line grade. 10123108 3. Numerous service line point repairs along with lateral line point repairs and obstruction removals are located in areas which in many instances will require the removal of existing landscaping, structures, sidewalks, driveways, etc. Items removed or disturbed shall replaced or restored to original conditions or better. ASC-23 PART DA - ADDITIONAL SPECIAL CONDITIONS 4. Removal of Debris: Excess excavated material and debris are to be removed from the work site daily. Cost of hauling excess excavation and debris is to be included in the price bid for "Service Line Point Repair". 5. Roof and Yard Drains: At the locations indicated in Table of the Attachments. The Contractor shall disconnect roof and yard drains from the sanitary sewer service line. For yard drains, the Contractor shall excavate and remove the drain from the yard and plug the line at the property line. For roof drains, the Contractor shall remove the downspout from the drain line and plug the line to prevent inflow. In addition, the Contractor shall install an elbow fitting at the bottom of the downspout to direct runoff, away from the building, and a concrete splash pad to prevent erosion. 6. Disconnected Service Lines: At the locations indicated in Table_ of Attachments to the Special Contract Documents, the Contractor shall remove the service line no longer in use by excavating at the property line and plugging the service line. 7. Abandonment of Point Repair. If a pipe is exposed and found in good condition, not requiring a point repair, notify City Engineer who will record abandonment of point repair. Backfill the excavation, replace pavement or sidewalk and repair and seed or sod unpaved areas. 8. Cleanout Repair: The Contractor shall make appropriate repairs to cleanouts as indicated in Table and as shown on the PLANS. All cleanout repair work shall be performed by a licensed slumber. a. C. General This special condition describes the repair of sanitary sewer cleanouts located on private property as designated on the Ill Elimination Repair plans. Repair of the cleanouts shall consist of replacing defective cleanout caps or installing new caps where none exist, such that inflow is eliminated. There will be no repairs made to the existing cleanouts that require excavation, other than what is required to expose the top of the cleanout so that the new caps can be installed. Materials Replacement cleanout caps shall be Specialty & Mfg. Company, or equal stainless steel clamps. Excavation Dal -Caps as manufactured by Dallas . The rubber caps are held down by 1) The Contractor shall submit shop drawings on all materials and equipment to be installed. 10123108 ASC-24 r w w w w No r Im PART DA - ADDITIONAL SPECIAL CONDITIONS 2) The Contractor is responsible for obtaining right of entry from the property owners prior to performing any work. Property owners should be notified 48 hours in advance of any work on their property. MW 3) The Contractor shall restore any disturbed surface to its original or better condition at no separate pay. D. MEASUREMENT AND PAYMENT: 1. Payment for service line point repair shall be on a unit price basis for each repair performed on all sizes of service lines for the respective depths. The minimum length of service line point repair shall be three (3) feet. No separate pay if the work is done within the limits of a service line reconnect as defined in Special Condition, D-28, Sanitary Sewer Services'. 2. Measurements for extra length repair is on a linear foot basis for repairs in excess of the minimum 3 foot replacement length. .. 3. All pipe fittings, adapters, .,concrete collars, bedding, and removal and replacements of grass sodding required shall be considered incidental to service line point repair. "3. If no pay item is included for any work required to properly complete a service line point repair as specified, the cost to perform said work, including any required removal and replacement of materials, shall be considered incidental to the service line point repair. 5. Depth of Bury is to be measured from Natural Ground Level to the Flow Line of the -w Sanitary Sewer Service Line at the Point of Replacement. The minimum trench width shall be 3'-0". ow 6. All excavation, backfill, removal and replacement of grass sodding and landscaping, plugs, fittings, and splash pads shall be considered incidental to removal of yard drains, disconnecting roof drains and plugging disconnected service lines. 7. No separate payment will be made for the Contractor to obtain written permission .. to enter private property. 8. Payment will be made for Abandonment of Point Repairs at the Contract Unit Price for Excavation and Backfill Abandoned Point Repairs. 9. Payment shall be made at the Contract Unit Price for each sanitary sewer cleanout successfully repaired. Payment shall be full compensation for all materials, equipment, and labor required to perform the work. DA-9 PROTECTIVE MANHOLE COATING FOR CORROSION PROTECTION A. GENERAL: 10123108 ASC-25 PART DA - ADDITIONAL SPECIAL CONDITIONS No Scope: This section governs all work, materials and testing required for the application of interior protective coating. Structures designated to received interior coating are listed on the construction drawings. The structures are to be coated, including interior wall, top and bench surfaces. Protective coating for corrosion protection shall meet the requirements of this Specification (and items DA-14 and DA-15) and the Manufacturers recommendations and specifications. 2. Description: The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of protective coating of structures in accordance with manufacturer's recommendations. 3. Manufacturer's Recommendations: Materials and procedures utilized for the lining process shall be in strict accordance with manufacturer's recommendations. 4. Corrosion Protection: Corrosion protection may be required on all structures where high turbulence or high H2S content is expected. B. MATERIALS: 1. Scope: This section governs the materials required for completion of protective coating of designated structures. 2. Protective Coating: The protective coating shall be a proprietary two component, 100 percent solids, rigid polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc, or a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. 3. Specialty Cement (If required for leveling or filling): The specialty cement -based coating material shall be either Quadex QM-1s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification: The protective coating material sprayed onto the surface of the structure shall be a urethane or epoxy resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the minimum physical properties as follows: Property Standard Long Term Value Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psi 5. Mixing and Handling: Mixing and Handling of specialty cement material and protective coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All 10123108 ASC-26 r ow s Uft No %a No r. PART DA - ADDITIONAL SPECIAL CONDITIONS equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. C. EXECUTION: 1. General: Protective coating shall not be installed until the structure is complete and in place. 2. Preliminary Repairs: a. All foreign materials shall be removed from the interior of the structure IM using high pressure water spray (3500 psi to 4000 psi at spray tip). b. All unsealed lifting holes, unsealed step holes, and voids larger than approximately one-half (1/2) inch in thickness shall be filled with patching compound as recommended by the material supplier for this application. C. After all repairs have been completed, remove all loose material. no 3. Protective Coating: MW a. The protective coating shall be applied to the structure from the bottom of the frame to the bench, down to the top of the trough. The top of the structure shall also be coated. *J MW b. The protective coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and matter. 2) Place covers over the invert to prevent extraneous material from entering the sewers. 3) If required for filling or leveling, apply specialty cement product to provide a smooth surface for the coasting material. 4) Spray the urethane or epoxy onto the structure wall and bench/trough to a minimum uniform thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. After the walls are coated, the wooden bench covers shall be removed. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. w 10l23/08 ASC-27 PART DA - ADDITIONAL SPECIAL CONDITIONS 6) No applications shall be made to frozen surfaces or if freezing is expected to occur inside the structure within 24 hours after application. 4. Testing of Rehabilitated Manholes: Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with the Section D-36 - VACUUM TESTING OF SANITARY SEWER MANHOLES. D. MEASUREMENT AND PAYMENT: Payment shall be based on the Contract Unit Price Bid per vertical foot, measured from the bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment and material testing required to complete the work. Pressure grouting, if necessary to stop active infiltration prior to application of the protective coating, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a particular structure, if required by the Engineer, shall be paid for separately, as specified in Section DA-10, MANHOLE REHABILITATION. DA-10 MANHOLE REHABILITATION -OMITTED DA-11 SURFACE PREPARATION FOR MANHOLE REHABILITATION - OMITTED DA-12 INTERIOR MANHOLE COATING - MICROSILICATE MORTAR SYSTEM - OMITTED .. DA-13 INTERIOR MANHOLE COATING - QUADEX SYSTEM - OMITTED DA-14 INTERIOR MANHOLE COATING - SPRAY WALL SYSTEM n GENERAL ow This section governs all work, materials and testing required for the application of interior manhole coating. Manholes designated for interior coating are listed on the Manhole Rehabilitation Schedule. Interior manhole coating shall meet the requirements of this Section or of Section DA-12, DA-13, DA-15, DA-16 or DA-17. - 2. Description NAM The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. No 3. Manufacturer's Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in accordance with manufacturer's recommendations. 4. Manholes Im ASC-28 PART DA - ADDITIONAL SPECIAL CONDITIONS .. Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) inch specialty cement -based coating material (Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. B. MATERIALS ME.- .. This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating The interior coating shall be a proprietary two component, 100 percent solids, rigid aw polyurethane system designated as Spray Wall as manufactured by Sprayroq, Inc. . no 3. Specialty Cement The specialty cement -based coating material shall be either Quadex QM-1s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification The interior manhole coating material sprayed onto the surface of the manhole shall be a urethane resin system formulated for the application to a sanitary sewer environment. The spray system shall exhibit the physical properties as follows: Properfi/ Standard Lonq Term Value Tensile Strength ASTM D-638 5,000 psi Flexural Stress ASTM D-790 10,000 psi Flexural Modulus ASTM D-790 550,000 psi 5. Mixing and Handling "' Mixing and handling of specialty cement material and interior coating material, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard aw to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Only personnel thoroughly familiar with the handling of the coating material shall perform the spray coating operations and coating installations. C. EXECUTION 10123108 ASC-29 am PART DA - ADDITIONAL SPECIAL CONDITIONS 1. General Manhole coating shall not be installed until sealing of manhole frame and grade adjustments, or partial manhole replacement when required for the manhole per the No Manhole Rehabilitation Schedule, is complete. 2. Temperature Normal interior coating operation shall be performed at temperatures of 40°F or greater. No application shall be made when freezing is expected within 24 hours. 3. Interior Manhole Coating a. The interior coating shall be applied to the manhole from the bottom of the r frame to the bench, down to the top of the trough. b. The interior coating shall be installed in accordance with the manufacturer's recommendations and the following procedure. 1) The surface shall be thoroughly cleaned of all foreign materials and matter. Cleaning shall be accomplished by using high pressure water spray (minimum 3500 psi at spray tip), cleaning with muriatic acid, degreaser, or other solvents as needed in order to remove any film or residue on the surface. 2) Place covers over the invert to prevent extraneous material from entering the sewers. 3) Apply a minimum of one-half (1/2) inch specialty cement product (Quadex QM-1 s or Reliner MSP) smooth surface for the urethane coating material. 4) Spray the urethane onto the manhole wall and bench/trough with a minimum thickness of 125 mils (0.125 inches). Thickness to be verifiable through the use of methods acceptable to the Engineer. 5) Coat trough area with specialty cement product (Quadex QM-1s or Reliner MSP). 1. Testing of Rehabilitated Manholes a. Testing of rehabilitated manholes for watertightness shall be performed by ... the Contractor after operations are complete in accordance with Section DA- 21. D. MEASUREMENT AND PAYMENT Payment shall be based on the Contract Unit Price per vertical foot, measured from the .o bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for furnishing all labor, supervision, materials, equipment 10123108 ASC-30 .. PART DA - ADDITIONAL SPECIAL CONDITIONS and material testing required to complete the work. Grouting, if necessary, shall be included in the above unit price. Grouting of the pipe seals, bench and trough, and lower portion of a particular manhole, if required by Manhole Rehabilitation Work Schedule or required to be done by the Engineer, shall be paid for separately at the Contract Unit Price. DA-15 INTERIOR MANHOLE COATING - RAVEN LINING SYSTEM A. GENERAL -- 1. Scope This section governs all work, materials and testing required for the application of .. interior manhole coating. Manholes designated for interior coating are listed of the Manhole Rehabilitation Schedule, listed in Section I. Interior manhole coating shall meet the requirements of this Section, or of Section DA-12, DA-13, DA 14, DA-16 or DA-17. UW 2. Description The Contractor shall be responsible for the furnishing of all labor, supervision, materials, equipment, and testing required for the completion of interior coating of manholes in accordance with the Contract Documents. "- 3. Manufacturers Recommendations Materials, mixture ratios, and procedures utilized for the coating process shall be in so accordance with manufacturer's recommendations. 4. Manholes Manholes to be coated are of brick, block, or concrete construction. All manholes shall have a minimum of one-half (1/2) specialty cement -based coating material .. (Quadex QM-1s or Reliner MSP) sprayed or trowelled on coating over the original interior surface. B. MATERIALS 10123✓08 1. Scope This section governs the materials required for completion of interior coating of manholes. 2. Interior Coating Raven Ultra High -Build epoxy Coating, a two-part epoxy resin system using 100% solids based epoxy binder with fibrous and flake fillers, is manufactured by Raven Lining systems and designated as Raven 405. 3. Specialty Cement ASC-31 .r PART DA - ADDITIONAL SPECIAL CONDITIONS The specialty cement -based coating material shall be either Quadex QM-1 s as manufactured by Quadex, Inc. or Reliner MSP as manufactured by Standard Cement Materials. 4. Material Identification Contractors will completely identify the types of grout, mortar, sealant, and/or root �- control chemicals proposed and provide case histories of successful use or defend the choice of grouting materials based on chemical and physical properties, ease of application, and expected performance. These grouting materials shall be compatible with Raven 405 interior coating. The contractor shall be responsible for getting approval from Raven Lining systems and/or the grout manufacturers for the use of these grouting materials. 5. Mixing and Handling Mixing and handling of interior coating, which may be toxic under certain conditions shall be in accordance with the recommendations of the manufacturer and in such a manner as to minimize hazard to personnel. It is the responsibility of the Contractor to provide appropriate protective measures to ensure that materials are under control at all times and are not available to unauthorized personnel or animals. All equipment shall be subject to the approval of the Engineer. Coating shall be performed only by certified applicators approved by the manufacturers. C. EXECUTION 1. General Manhole coating shall not be performed until sealing of manhole from frame and grade adjustments, partial manhole replacement, manhole grouting or sewer replacement/repairs are complete. 2. Temperatures 3. Normal interior coating operation shall be performed at temperatures of 40OF or greater. No application shall be made when freezing is expected within 24 hours. Interior Manhole Coating a. Manholes scheduled for interior coating are shown on the Manhole Rehabilitation Schedule. The interior coating shall be applied to the manhole from the bottom of the manhole frame to the benchArough, including the �- benc h/trough. b. The interior coating shall be installed in accordance with the manufacturer's ■m recommendations and the following procedure. 1) The surface preparation shall comply with the requirements of .. Section DA-11, SURFACE PREPARATION FOR MANHOLE RESTORATION. ASC-32 M .. PART DA - ADDITIONAL SPECIAL CONDITIONS 2) Apply a minimum of one-half (1/2) inch specialty cement -based product (Quadex QM-1s or Reliner MSP) smooth surface for the urethane coating material. 3) The surface prior to application may be damp but shall not have noticeable free water droplets seeping or running water. Material shall be spray applied per manufacturer's recommendations with a minimum thickness of 125 mils (0.125 inch). 4) After the walls are coated, the wooden bench covers shall be removed and the bench sprayed to the same average and minimum thickness as required for the walls. 5) The final application shall have a minimum of three (3) hours cure time or be set hard to the touch, before being subjected to active flow. 6) No applications shall be made to frozen surfaces or if freezing is expected to occur in side the manhole within 24 hours after application. 4. Testing of Rehabilitated Manholes a. After the epoxy liner has set (hard to touch), all visible pinholes shall be repaired. Repairs shall be made by lightly abrading the surface and brushing the lining material over the area. All blisters and evidence of uneven cover shall be repaired according to the manufacturer's recommendations. Spot check of coating thickness may be made by Owner's Representative, and the contractor shall repair these areas as required, at no additional cost to the Owner. b. Testing of rehabilitated manholes for watertightness shall be performed by the Contractor after operations are complete in accordance with Section DA- 21 —VACUUM TESTING OF REHABILITATED MANHOLES. MW D. MEASUREMENT AND PAYMENT Payment shall be based on the Contract Unit Price per vertical foot, measured from the -- bottom of the frame to the top of the bench. The Contract Unit Price shall be payment in full for performing the work and for fumishing all labor, supervision, materials, equipment all testing necessary to complete the work. Payment for grouting of pipe seals, bench and trough and manhole walls shall be based on the Contract Unit Price for each manhole actually grouted. DA-16 INTERIOR MANHOLE COATING: PERMACAST SYSTEM WITH EPDXY LINER - OMITTED 10123108 ASC-33 PART DA - ADDITIONAL SPECIAL CONDITIONS DA-18 RIGID FIBERGLASS MANHOLE LINERS - OMITTED DA-19 PVC LINED CONCRETE WALL RECONSTRUCTION - OMITTED DA-20 PRESSURE GROUTING -OMITTED DA-21 VACUUM TESTING OF REHABILITATED MANHOLES - OMITTED DA-22 FIBERGLASS MANHOLES - OMITTED DA-23 LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES - OMITTED DA-24 REPLACEMENT OF CONCRETE CURB AND GUTTER These provisions require the contractor to remove all failed existing curb and gutter, as designated by the Construction Engineer, and replace with standard concrete curb and gutter, laydown curb and gutter, or in like kind, as governed by the standard City Specifications, Item No. 104 "Removing Old Concrete", Item No. 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S4. Pay limits for laydown curb -and gutter are shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall saw cut the curb and gutter and pavement prior to removal. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9" out from the gutter lip, with same day haul -off of the removed material to a suitable dump site. The street void shall be filled with H.M.A.C. "Type D" mix as per specification No. 300 "Asphalts, Oils and Emulsions", Item No. 304 "Prime Coat and Item No. 312 "Hot Mix Asphaltic Concrete" and compacted to standard City densities and top soil as per specification item No. 116 "Top Soil", if needed, shall be added and leveled to grade behind the curb. Existing improvements within the parkway such as water meters, sprinkler system, etc. damaged during construction shall be replaced with same or better at no cost to the City. Backfill for curb and gutter shall be completed within fourteen (14) calendar days from the day of demolition to date of completion. If the contractor fails to complete the work within fourteen (14) calendar days, a $100 dollar liquidated damage will be assessed per block per day. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-25 REPLACEMENT OF 6" CONCRETE DRIVEWAYS This item shall include the removal and replacement of existing concrete driveways, due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul -off of the removed material to a suitable dump site. For specifications governing this item see Item No. 104 "Removing Old Concrete", Item No. 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the work. 10123108 ASC-34 a FAW S0 rr PART DA - ADDITIONAL SPECIAL CONDITIONS DA-26 REPLACEMENT OF H.M.A.C. PAVEMENT AND BASE The contractor shall remove all existing deformed H.M.A.C. pavement and/or bad base material that shows surface deterioration and/or complete failure. The Engineer will identify these areas upon which time the contractor will begin work. The failed area shall be saw cut, or other similar means, out of the existing pavement in square or rectangular fashion. The side faces shall be cut MW vertically and all failed and loose material excavated. As a part of the excavation process, all unsatisfactory base material shall be removed, if required, to a depth sufficient to obtain stable sub -base. The total depth of excavation could range from a couple of inches to include the surface -base -some sub -base removal for which the Engineer will select the necessary depth. The remaining good material shall be leveled and uniformly made ready to accept the fill material. All excavated material shall be hauled off site, the same day as excavated, to a suitable dump site. After satisfactory completion of removal as outlined above, the contractor shall place the permanent pavement patch, with "Type D" surface mix. This item will always be used even if no base improvements are required. The proposed H.M.A.C, repair shall match the existing pavement section or the depth of the failed material, whichever is greater. However, the patch thickness shall be a minimum of 2 inches. Generally the existing H.M.A.C. pavement thickness will not exceed 6". Before the patch layers are applied, any loose material, mud and/or water shall be removed. A liquid asphalt tack coat shall be applied to all exposed surfaces. Placement of the surface mix lifts shall not exceed 3 inches with vibrator compactions to follow each lift. Compactions of the mix shall be to standard densities of the City of Fort Worth, made in ow preparation to accept the recycling process. All applicable provisions of Standard Specification Item Nos. 300 "Asphalts, Oils, and Emulsions", 304 "Prime Coat", and 312 "Hot -Mix Asphaltic Concrete" shall govern work. The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. DA-27 GRADED CRUSHED STONES This item shall be used to repair the failed base material in areas exceed 8" deep as directed by the Engineer. The material shall be graded crushed stones. For specifications governing this item see Item No. 208 "Flexible Base". The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and 00 incidentals necessary to complete the work. aw DA-28 WEDGE MILLING 2" TO 0" DEPTH 5.0' WIDE - OMITTED DA-29 BUTT JOINTS - MILLED A. Description: This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay shall maintain constant depth at the point the new overlay is terminated and the new "� 10123108 ASC-35 PART DA - ADDITIONAL SPECIAL CONDITIONS surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of Pay Item No. 9 - Wedge Milling. The configuration of the butt joints is described in more detail below. General details of butt joint locations - along with wedge milling in general - are shown in plan form at the back of this document. B. Construction Details Prior to the milling of the butt joints, the Contractor shall consult with the Construction Engineer for proper location of these joints and verify that the selected limits of the projects' street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book. The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20 feet long and milled out across the full width of the street section to a tapered depth of 2". This milled area shall be tapered within the 20 feet to a depth from.0" to 2" at a line adjacent to the beginning and ending points or intermediate transverse items. This butt joint - when overlayed - will consist of a asphalt section that will transition the new overlay to match the existing pavement elevation. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. .. C. Measurement and Payment Butt joints as prescribed above, will be measured by the unit of each butt joint milled. The _ disposal of excess material involved will not be measured for payment. Each butt joint -milled, measured as above, complete4n place -in accordance with these specifications, will be paid for at the unit price shown in the proposal for "Butt Joints". The unit price bid per each shall be full compensation for all milling, including material haul -off, tools, labor, equipment and incidentals necessary to complete the required work. DA-30 2" H.M.A.C. SURFACE COURSE (TYPE "D" MIX) All applicable provisions of Standard Specifications, Item Nos. 312 "Hot -Mix Asphaltic Concrete", 300 "Asphalts, Oils and Emulsions", 304 "Prime Coat", and 313 "Central Plant Recycling -Asphalt Concrete" shall apply to the construction methods for this portion of the project. M Standard Specification 312.5 (1) shall be revised as follows: The prime coat, tack coat, or the asphaltic mixture shall not be placed unless the air temperature is fifty (50) degrees Fahrenheit and rising, the temperature being taken in the shade and away from artificial heat. Asphaltic material shall also not be placed when the wind conditions are unsuitable in the opinion of the Engineer. 10123108 ASC-36 • No PART DA - ADDITIONAL SPECIAL CONDITIONS The contractor shall furnish batch design of the proposed hot mix asphaltic concrete for City approval 48 hours prior to placing the H.M.A.C. overlay. The City will provide laboratory control as necessary. .. The unit price bid per square yard of H.M.A.C. complete and in place, shall be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. DA-31 REPLACEMENT OF 7" CONCRETE VALLEY GUTTER - OMITTED MW DA-32 NEW 7" CONCRETE VALLEY GUTTER - OMITTED DA-33 NEW 4" STANDARD WHEELCHAIR RAMP - OMITTED DA-34 8" PAVEMENT PULVERIZATION - OMITTED .. DA-35 REINFORCED CONCRETE PAVEMENT OR BASE (UTILITY CUT) The following specifications are for the furnishing and placing of reinforced concrete pavement or base as shown on detail and as directed by the Engineer. A- GENERAL: Reinforced concrete pavement or vase shall conform to Specification Item No. 314 herein except for finishing and curing. '! B. FINISHING: The reinforced concrete shall be brought to a uniform surface by working with a wooden float. The surface shall be flush with the adjacent pavement and shall have a finish similar to the surrounding pavement. The surface shall be even and shall provide a smooth ride. .., C. CURING: The reinforced concrete pavement surfaces shall be sprayed uniformly with a membrane curing compound conforming to, the requirements of ASTM C-309, Type 2, white -pigmented compound, which shall not produce permanent discoloration of the concrete. Concrete shall be allowed to cure for seven days or test cylinders reach 3000 psi before removal of barricades. D. EXECUTION: Included in this item will be the removal of the existing reinforced concrete pavement. The existing pavement shall be sawed so as to maintain an even, straight pavement cut. The existing reinforcing steel at sawed line and construction joints shall be lapped 18 inches with the new reinforced concrete pavement. The existing steel shall be thoroughly cleaned before lapping. The following work method will be performed on each utility cut: 1. Place safety signs, barricades and/or other warning devices where necessary and as required. "- 101239108 ASC-37 PART DA - ADDITIONAL SPECIAL CONDITIONS 2. Replace pavement to nearest joint. 3. Mark out the damaged area with keel, chalk line or paint being sure to include all areas requiring repair. 4. Saw cut along marked lines a minimum of two (2) inches deep. 5. Remove existing concrete. 6. Form joints and place reinforcing steel and Dowel Bars (as required) according to standard specifications. 7. Place and finish concrete. 8. Clean up job site, removing all debris. 9. Maintain traffic control devices to protect the area until the concrete has cured seven days or concrete reaches 3000 psi compressive strength. E. PAYMENT: Payment shall be made at the unit price per linear foot as shown on the proposal and shall be full compensation for furnishing all labor, materials, equipment tools and incidentals necessary to complete the work. DA-36 RAISED PAVEMENT MARKERS - OMITTED DA-37 POTENTIALLY PETROLEUM CONTAMINATED MATERIAL HANDLING - OMITTED DA-38 LOADING, TRANSPORTATION, AND DISPOSAL OF CONTAMINATED SOIL - OMITTED DA-39 ROCK RIPRAP - GROUT - FILTER FABRIC - OMITTED DA-40 CONCRETE RIPRAP - OMITTED DA-41 CONCRETE CYLINDER PIPE AND FITTINGS - OMITTED DA-42 CONCRETE PIPE FITTINGS AND SPECIALS - OMITTED DA-43 UNCLASSIFIED STREET EXCAVATION - OMITTED DA-44 6" PERFORATED PIPE SUBDRAIN - OMITTED DA-45 REPLACEMENT OF 4" CONCRETE SIDEWALKS This item shall include the removal and replacement of existing concrete sidewalk due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with 10123108 ASC-88 No No VM s No ow Im WM ww w .a .o PART DA - ADDITIONAL SPECIAL CONDITIONS same day haul -off of the removed material to a suitable dumpsite. For specifications governing this item see Item No. 104 'Removing Old Concrete% and Item No. 504 `Concrete Sidewalk and Driveways'. The unit price bid per square yard shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the removal and replacement work. DA-46 RECOMMENDED SEQUENCE OF CONSTRUCTION - OMITTED .. DA-47 PAVEMENT REPAIR IN PARKING AREA The unit price bid under appropriate BID ITEM(S) of the Proposal shall cover all cost for providing pavement repair equal to or superior in composition, thickness, etc., to existing pavement. All required paving cuts shall be made with a concrete saw in a true and straight line on both sides of the trench, a minimum of twelve (12) inches outside the trench walls. The trench shall be ... backfilled and the top nine (9) inches shall be filled with crushed limestone base material, compacted and level with the finished adjacent surface. This finished grade shall be maintained in a serviceable condition until the paving has been replaced. DA-48 EASEMENTS AND PERMITS Easements and permits, both temporary and permanent, have been secured for this project at this time and made a part thereto. Any easements and/or permits, both temporary and permanent, that have not been obtained by the time of publication shall be secured before construction starts. No work is to be done in areas requiring easements and/or permits until the ow necessary easements are obtained. The Contractor's attention is directed to the easement description and permit requirements, as contained herein, along with any special conditions that may have been imposed on these easements and permits. !1 Where the pipeline crosses privately owned property, the easements and construction areas are shown on the plans. The easements shall be cleaned up after use and restored to their original .• conditions or better. In the event additional work room or access is required by the Contractor, it shall be the Contractor's responsibility to obtain written permission from the property owners involved for the use of additional property required. No additional payment .. will be allowed for this item. DA-49 HIGHWAY REQUIREMENTS The Texas Department of Transportation requirements pertaining to the construction of this project are enclosed herein and made part of these specifications. DA-50 CONCRETE ENCASEMENT Concrete encasement shall be Class E (1500 psi) concrete and for sewer line encasements shall conform to Fig. 113; for water line encasements it shall conform to Fig. 20 of the General Contract Documents. Requirements for such encasement are specified in Sections E1-20 and E2-20 of the General Contract Documents. 10123108 AS C-3 9 PART DA - ADDITIONAL SPECIAL CONDITIONS Payment for work such as forming, placing, and finishing including all labor, tools, equipment and material necessary to complete the work shall be included in the linear foot price bid for Concrete Encasement. DA-51 CONNECTION TO EXISTING STRUCTURES All connections between proposed and existing facilities, shall consist of a watertight seal. Concrete used in the connection shall be Class A (3000 psi) concrete and meet the requirements of Section E1-20 and E2-20 of the General Contract Documents. Prior to concrete placement, a gasket, RAM-Nek or approved equal shall be installed around penetrating pipe. .. Payment for such work as connecting to existing facilities including all labor, tools, equipment, and material necessary to complete the work shall be included in the linear foot price of the appropriate pipe BID ITEM. DA-52 TURBO METER WITH VAULT AND BYPASS INSTALLATION - OMITTED DA-53 OPEN FIRE LINE INSTALLATIONS - OMITTED DA-54 WATER SAMPLE STATION - OMITTED DA-55 CURB ON CONCRETE PAVEMENT - OMITTED DA-56 SHOP DRAWINGS -OMITTED DA-57 COST BREAKDOWN - OMITTED DA-58 STANDARD STREET SPECIFICATIONS H.M.A.C. OVERLAY - OMITTED DA-59 H.M.A.C. MORE THAN 9 INCHES DEEP - OMITTED DA-60 ASPHALT DRIVEWAY REPAIR At locations where H.M.A.C. driveways are encountered, such driveways shall be completely replaced for the full extent of utility cut with H.M.A.C. equal to or better than the existing driveway. .. DA-61 TOP SOIL Where directed by the Engineer, top soil shall be applied in accordance with the City of Fort Worth Transportation and Public Works Department's Standard Specifications for Street and Storm Drain Construction, Item 116, except as follows: All labor, equipment, tools and incidentals shall be included in the square yard bid price for the top soil. DA-62 WATER METER AND METER BOX RELOCATION AND ADJUSTMENT - OMITTED am DA-63 BID QUANTITIES - OMITTED 10123108 ASC-40 .. PART DA - ADDITIONAL SPECIAL CONDITIONS DA-64 WORK IN HIGHWAY RIGHT OF WAY When the Engineer directs the Contractor to perform work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (Tex -Dot), the Contractor shall obtain approval from the Texas Department of Transportation prior to commencing any work therein. All work performed in the Tex -Dot right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation and Item E2-29.1 "Construction Within Highway Right -of -Way" of the General Contract Documents and Specifications, effective July 1, 1978, as amended. DA-65 CRUSHED LIMESTONE (FLEX -BASE) - OMITTED .. DA-66 OPTION TO RENEW - OMITTED DA-67 NON-EXCLUSIVE CONTRACT -OMITTED DA-68 CONCRETE VALLEY GUTTER - OMITTED DA-69 TRAFFIC BUTTONS - OMITTED DA-70 PAVEMENT STRIPING -OMITTED .. DA-71 H.M.A.C. TESTING PROCEDURES - OMITTED DA-72 SPECIFICATION REFERENCES ow When reference is made in these specifications to a particular ASTM, AWWA, ANSI or other specification, it shall be understood that the latest revision of such specification, prior to the date of these general specifications or revisions thereof, shall apply. DA-73 RELOCATION OF SPRINKLER SYSTEM BACK -FLOW PREVENTER/CONTROL •• VALVE AND BOX - OMITTED DA-74 RESILIENT -SEATED GATE VALVES - OMITTED DA-75 EMERGENCY SITUATION, JOB MOVE -IN - OMITTED .. DA-76 1 %" & 2" COPPER SERVICES - OMITTED qW DA-77 SCOPE OF WORK (UTIL. CUT) - OMITTED DA-78 CONTRACTOR'S RESPONSIBILTY (UTIL. CUT) - OMITTED DA-79 CONTRACT TIME (UTIL. CUT) - OMITTED DA-80 REQUIRED CREW PERSONNEL & EQUIPMENT (UTIL. CUT) - OMITTED DA-81 TIME ALLOWED FOR UTILITY CUTS (UTIL. CUT) - OMITTED 10123108 ASC-41 PART DA - ADDITIONAL SPECIAL CONDITIONS 4 DA-82 LIQUIDATED DAMAGES (UTIL. CUT) - OMITTED •• DA-83 PAVING REPAIR EDGES (UTIL. CUT) - OMITTED DA-84 TRENCH BACKFILL (UTIL. CUT) - OMITTED DA-85 CLEAN-UP (UTIL. CUT) - OMITTED .. DA-86 PROPERTY ACCESS (UTIL. CUT) -OMITTED DA-87 SUBMISSION OF BIDS (UTIL. CUT) - OMITTED DA-88 STANDARD BASE REPAIR FOR UNIT I (UTIL. CUT) - OMITTED DA-89 CONCRETE BASE REPAIR FOR UNIT II & UNIT III (UTIL. CUT) - OMITTED DA-90 2" TO 9" H.M.A.C. PAVEMENT (UTIL. CUT) - OMITTED DA-91 ADJUST WATER VALVE BOXES, -MANHOLES, AND VAULTS (UTIL. CUT) - OMITTED DA-92 MAINTENANCE BOND (UTIL. CUT) - OMITTED DA-93 BRICK PAVEMENT (UTIL. CUT) - OMITTED DA-94 LIME STABILIZED SUBGRADE (UTIL. CUT) - OMITTED DA-95 CEMENT STABILIZED SUBGRADE (UTIL. CUT) - OMITTED DA-96 REPAIR OF STORM DRAIN\ STRUCTURES (UTIL. CUT) - OMITTED DA-97 "QUICK -SET' CONCRETE (UTIL. CUT) - OMITTED DA-98 UTILITY ADJUSTMENT (UTIL. CUT) - OMITTED DA-99 STANDARD CONCRETE SIDEWALK AND WHEELCHAIR RAMPS (UTIL. CUT) - OMITTED DA-100 LIMITS OF CONCRETE PAVEMENT REPAIR (UTIL. CUT) -OMITTED DA-101 CONCRETE CURB AND GUTTER (UTIL. CUT) - OMITTED DA-102 PAYMENT (UTIL. CUT) - OMITTED DA-103 DEHOLES (MISC. EXT.) - OMITTED DA-104 CONSTRUCTION LIMITATIONS (MISC. EXT.) - OMITTED DA-105 PRESSURE CLEANING AND TESTING (MISC. EXT.) - OMITTED .. 10123108 ASC-42 .. .v PART DA - ADDITIONAL SPECIAL CONDITIONS DA-106 BID QUANTITIES (MISC. EXT.) -OMITTED DA-107 LIFE OF CONTRACT (MISC. EXT.) - OMITTED DA-108 FLOWABLE FILL (MISC. EXT.) - OMITTED DA-109 BRICK PAVEMENT REPAIR (MISC. REPL.) - OMITTED DA-110 DETERMINATION AND INITIATION OF WORK (MISC. REPL.) -OMITTED DA-111 WORK ORDER COMPLETION TIME (MISC. REPL.) -OMITTED DA-112 MOVE IN CHARGES (MISC. REPL.) - OMITTED DA-113 PROJECT SIGNS (MISC. REPL.) -OMITTED DA-114 LIQUIDATED DAMAGES (MISC. REPL.) -OMITTED DA-115 TRENCH SAFETY SYSTEM DESIGN (MISC. REPL.) -OMITTED DA-116 FIELD OFFICE -OMITTED DA-117 TRAFFIC CONTROL PLAN Traffic control shall be in accordance with item D-8 of the Special Conditions with the exception of the Contractor providing the traffic control plan. A traffic control plan has been prepared and is included in the project plans. All other requirements of D-8 shall apply. DA-118 COORDINATION OF WORK WITH CONTRACTOR FOR OTHER UNITS - OMITTED DA —119 CATHODIC PROTECTION SYSTEM Within a week of commencing the installation of the Cathodic protection -system, the contractor -- shall furnish a letter from the Corrosion Protection System Manufacturer certifying, that the Contractor's superintendent on the project has physically demonstrated the understanding to the field installation procedure of the system and that the initial installation has been verifed and •• found to meet the manufacturer's specifications. Before the Final inspection of the project, the contractor shall have a NACE (National Association of Corrosion Engineers) certified representative of the manufacturer conduct a `Commissioning Survey'. Based on this survey, a certification from the Manufacturer shall be furnished by the Contractor to the City certifying that the system was found to be installed correctly and operating effectively as per the intent of the specifications. 10123108 AS C-43 M Water Department Standard Details FORT WORTH - SANITARY SEWER DETAILS `r FIGURE I TITLE SAN-001 _.......- Standard Type "A" Access Manhole — Plan View SAN-002 ` Standard Type "A" Access Manhole SAN-003 Standard 4' Diameter Manhole SAN-004 Shallow Manhole SAN-005 Standard 4' Diameter Drop Access Manhole •. SAN-006 I Junction Manhole Bottom SAN-007 ..... - __......-.._._... Offset Manhole to Sewer Main Larger Than 24" - OMITTED - - -- ...._.....- -- . - ---- _...---..` SAN-008 Bored Crossing Detail MW SAN 009 Manhole Frame, Cover, Grade Rings and Concrete Collar SAN-010 i Hydraulic Slide SAN-011 Two Way Service Cleanout _ SAN-012 ` Chimney Service SAN-013 's Tvpical Anchor Block for Elevated Crossing - OMITTED SAN-014 Concrete Cradle SAN-015 . Drilled Pier - OMITTED _._......_.___. __ ............ SAN-016 ! Pier Head Detail for Pipe up to 18" Diameter - OMITTED - ..._. _-------....._....__......_. SAN-017 . Pier Head Detail for Pipe over 18" Diameter - OMITTED SAN=018 apical Tunnel Section SAN-019 ------------ I Clay Dam SAN-020 Concrete Encasement ._._.........._....... SAN-021 __-- Wastewater Access Device SAN-022 Sanitary Sewer Marker Pole STR-028 Permanent Asphalt Pavement Trench Repair STR-029 Permanent Asphalt Pavement Trench Repair With Existing Concrete Base WTR-029 Water and Sanitary Sewer Embedment And Backfill Details =, m ow m ow ow I o M =, • ;�': :_/ :r.l 8—#4 BARS (TYP.) _ 2" TYP. Lu LA Of O O= z EnMb Z 4000 PSI CONCRETE ' ENCASEMENT NOTES: 1. THIS STRUCTURE TO BE USED ONLY WHERE PIPE SIZE IS 39" OR LARGER. 2. 2'x3' OPENING IN THE PIPE TO BE FABRICATED AT PIPE PLANT AND NOT IN THE FIELD, EXCEPT WHEN CONSTRUCTION IS ON EXISTING SYSTEM. E1-14 MATERIAL mv E2-14 CONSTRUCTION FORTWORTH CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 STANDARD TYPE "A" ACCESS MANHOLE j PLAN VIEW SAN-001 low MANHOLE FRAME, COVER GRADE RINGS AND CONCRETE "a COLLAR PER SAN-009 WITH "SEWER" CAST IN LID. CONCRETE — SEE STANDARD 4' DIA. M.H. DETAIL SAN-003 Axi/ 1 30" LEAR OPEIING PLY INTERIOR RROSI ON OTECTION AS QUIRED. r 5'-0" Dlk (MIN.) 2'— 0- APPLY 2 COATS j (2'x3' OPENING)_ /Z OF BITUMASTIC COATING 00 00 4—#4 BARS SEE DETAIL SAN-001 FOR -4 THE INSTALLATION OF STEEL BARS AND ADDITIONAL INFORMATION, 4—#4 BARS 8" MIN. MIN. POUR AGAINST WOODEN FORMS 4000 PSI CONCRETE ENCASEMENT SZ 00 EI-14 MATERIAL E2-14 CONSTRUCTION FORT WORTH NOTE: 1. THIS STRUCTURE TO BE USED ONLY WHERE PIPE SIZE IS 39" OR LARGER. CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 STANDARD TYPE "A" ACCESS MANHOLE . SAN-002 no mw no so me REFER TO AN-009 MANHOLE FRAME, COVE GRADE RINGS AND CONCRETE COLLAR PER SAN-009 WITH "SEWER" CAST IN LID. i x 04 - �` \ TRENCH WIDTH CONC. CRADLE APPLY INTERIOR 2 COATS OF TO EXTEND TO BITUMASTIC CORRO'31ON PIPE BELL COATING PROTECTION AS REQUIRED. 0—RING GASKETS ASTM C-76, CLASS III Ccb JOINTS (TYP.) RCP PRECAST MANHOLE Cl� I JOINTS RECOATED SECTIONS OR EQUAL. AFTER SECTIONS *VARIES WITH PUT TOGETHER (REF. E2-114) PIPE DIA. SECTION A —A A = A GROUT, — --------- • ............. z 00 USE 4000 PSI CONCRETE EI-14 MATERIAL E2-14 CONSTRUCTION FORT WORTH' 4' DIA. FOR SEWER PIPE UP TO 21" DIA. 5' DIA. FOR SEWER PIPE 24" TO 36" DIA. CITY OF FORT WORTH, TEXAS STANDARD 4'DIAMETER MANHOLE SECTION B—B DATE: FEB. 2009 SAN-003 no FINISH GRADE MANHOLE FRAME, COVER, GRADE RINGS AND CONCRETE 15" BELOW FINISH RIM COLLAR PER SAN-009 WITH "SEWER" CAST IN LID, ELEVATION FOR STREET RECONSTRUCTION 30 FLAT SLAB TOP MIN. 6" THICK, DESIGNED TO MEET 49" OR EXCEED H-20 LOADING APPLY 2 COATS = MONOLITHIC CONCRETE OF BITUMASTIC GROUT •,;';� (4,000 PSI) OR ASTM COATING. 1 6'�,:;r:' C478 PRECAST MANHOLE SECTIONS. MIN. 6' .:� �. J�•.' 4'-0" SECTION A -A O—RING GASKET JOINT (TYP.) r � I PRECAST I JOINT DETAIL A t A 48" R.G. E1-12 MATERIAL E2-12 CONSTRUCTION ORT WORT I CITY OF FORT WORTH, TEXAS SHALLOW MANHOLE DATE: FEB. 2009 SAN-004 .. .. .o w ow USE SDR-26 PIPE TO FIRST JOINT rr BEHIND LIMIT OF EXCAVATION CONCRETE COLLAR �III� ...V-2" z III — I LIMITS OF I I III w EXCAVATION Ld yJ J —II11m 11— 5 _I I I--Q md IIII�!> md a IF as .r E1-14 MATERIAL No E2-14 CONSTRUCTION ORT WORTH MANHOLE FRAME, COVER, GRADE RINGS AND CONCRETE COLLAR PER SAN-009 WITH "SEWER" CAST IN LID. I- _30" CLEAR f OPENING ` APPLY INTERIOR CORROSION PROTECTION AS REQUIRED. j 2",. 3�,///_OF APPLY 2 COATS SDR-26 BITUMASTIC TEE COATING j INSTALL NUTS AWAY FROM M.H. WALL ON CONCRETE - SEE w % M.J. FITTING STANDARD 4' DIA. COR-TEN BOLTS / SAN-0031L ow z - 4'-0" O - m m — IF REQUIRED, PROVIDE i STUB EXTENSION AT END j Q % OF P.E. IN M.H. WALL i SLOPE 1"/1' TYP.� i' VERTICAL TO -'i POINT OF PIPE GROUTED INVERT— USE 4000 PSI J CONCRETE CITY OF FORT WORTH, TEXAS STANDARD 4' DIAMETER DROP ACCESS MANHOLE 1O 4' DIA. FOR SEWER PIPE UP TO 21" DIA. 5' DIA. FOR SEWER PIPE 24" TO 36" DIA. DATE: FEB. 2009 SAN-0OS I .r s sw w wo no m no NOTES: A. STANDARD PIPE FITTINGS SHALL BE USED TO FORM INVERTS OF JUNCTION MANHOLES WHEN POSSIBLE, WITH INSTALLATION AS FOLLOWS: 1. PIPE FITTING. 2. POUR MANHOLE FLOOR TO SPRING LINE OF FITTING, 3. BREAK OUT TOP OF FITTING TO SPRING LINE. 4. POUR REMAINDER OF MANHOLE INVERT TO PROVIDE VERTICAL INVERT WALL UP TO 3/4 POINT OF THE LARGER PIPE INVOLVED, AS DETAILED. S. STEEL TROWEL FINISH INVERT OF MANHOLE, B. WHEN SPECIAL SITUATIONS PROHIBIT USE OF STANDARD PIPE FITTINGS AS ABOVE OUTLINED, THE INVERT SHALL BE FORMED OF CONCRETE AND STEEL TROWEL FINISHED TO PROVIDE SIMILAR FUNCTIONAL CHARACTERISTICS TO THOSE AFFORDED BY THE ABOVE INSTALLATION. INVERTS THUS FORMED SHALL BE CONSTRUCTED TO THE ENGINEER'S SATISFACTION. E1-14 MATERIAL no E2-14 CONSTRUCTION FoRr WORTH PLAN VIEW SECTION A -A O WHEN PIPE SIZES DIFFER, 0 MATCH THE PIPE CROWNS. CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 JUNCTION MANHOLE BOTTOM SAN-006 .. I I I=1 11=1 I El 11=1 11=1 11=1 11=1 11=1 I B I M I M 11=110 11=1 I El I I —I � I= ,m =III -III J I 1-1 11=1 11=1 11=1 11=1 I t=1 11=1 11-1 I I-III=1 I I -I 11=1 11=1 11-11 VARIABLE DIAMETER BORE TO BE LARGE ENOUGH o TO PERMIT DESIGN TYPE PIPE TO BE PULLED OR m w S JACKED THROUGH. < wf } J w m as O No —111—III—III—III—III—III—III—III—III—III—III—III—III—III—III-111—I .. III=1 I I=1 I I=1 I I=1 I I=1 I I=1 I I_III-III-III-t I I -III -III -III -III -III -I 1I- .r so TYPICAL BORED SECTION LONGITUDINAL VIEW PRESSURE GROUT AS NEEDED I—III—III=1 I I -III —I 1 I —III -I I I -I I I I I=1 I I -I � -I I I -I I I=1 i 1=1 I I-III-1( .I 11=1 I I j 11=1 I I-1 11-111=I I II-1 I l y -I 11=1 I I I I I=111-111-1 I I-1 I I-1 11= w w,i � a 0 a m w w C LLJLLJ LLJ Ld J � m � mQa as o of o > >, I —I i I —I i I-1 i—III—III—I 11=1 1-1 I I 11=1 11=1 I I=1 I I=1 I FI I I-1 I I-1 I I-1 I I I E1 I I,, ; ,I 11-1 I I-1 11-1 11-L=1 11- -11 B I 1=1 11=1 I I-1 11=1 I I-1 11=1 11= TYPICAL BORE WITH PIPE INSTALLED LONGITUDINAL VIEW CASING S (REFER Ti PRODUCT PERIMETER OF THE BORE DIP CARRIER PIP TYPICAL END VIEW NOTE: 1. COMPRESSION TYPE JOINTS TO BE USED IF POSSIBLE. 2. IF COMPRESSION TYPE JOINT IS NOT AVAILABLE, M.J. TYPE SHALL BE USED AND JOINTS BOLTED BEFORE PULLING PIPE INTO PLACE. E1-15 MATERIAL m E2-15 CONSTRUCTION f ^'2ESSURE GROUT AROUND CASING JD CARRIER PIPE. GROUT SHALL PROPORTIONED AS 1 CU. FT. CEMENT, 3.5 CU. FT. OF CLEAN VE SAND WITH SUFFICIENT WATER )DED TO PROVIDE A FREE .OWING THICK SLURRY. CASING PIPE SEWER LINES SHALL BE SECURED BY CASING SPACERS AS MANUFACTURED BY CASCADE WATERWORKS MANUFACTURING CO., ADVANCE PRODUCTS & SYSTEMS, OR APPROVED EQUAL. ORT�VOUH CITY OF FORT WORTH, TEXAS BORED CROSSING DETAIL DATE: FEB_ 2009 i SAN-008 8. so A w COLLAR CONFIGURATION COLLAR CONFIGURATION FOR PAVED AREA I FOR UNPAVED AREA 4'-8" MANHOLE FRAME AND 32" DIA. COVER EQUAL TO McKINLEY IRON ' �! I WORKS No. A32M w/� PICK BARS. (REFER TO j.l; :• j • '.' \v:. 3" TYP. STD. PRODUCT LIST) 4000 PSI CONCRETE • �� � \ / •..� . N, A co I q- 8—#4 REBARS TYP. 2" x 8" x 30" I.D. CONCRETE PRECAST 32" MIN, Y4" CHAMFER (TYP.) GRADE RINGS PER ASTM C478. / Z I 1 GROUND PVMT. �.... _ 4 30" CLEAR�� OPENING O _ CONCRETE COLLAR RAM I NEK HEIGHT VARIES s E1-14, E1-20, E1-21 MATERIAL .w E2-14, E2-20, E2-21 CONSTRUCTION aCT10 4 1_ A O REBAR SHALL BE PLACED 3" MIN. FROM TOP AND BOTTOM OF CONCRETE COLLAR. O WHERE MANHOLES ARE IN THE STREET, INSTALL 2 MORE GRADE RINGS BETWEEN CASTING AND TOP OF PAVEMENT. CITY OF FORT WORTH, TEXAS MANHOLE FRAME, COVER, GRADE RINGS AND CONCRETE COLLAR O3 32" HINGED LIDS ARE REQUIRED FOR SEWER PIPES 24" OR LARGER AND RAISED MANHOLE STRUCTURES. (REFER TO STD. PRODUCTS LIST). ® HINGED LIDS INSTALLED IN STREETS SHALL OPEN AGAINST THE FLOW OF TRAFFIC. DATE: FEB. 2009 SAN-009 mw aw no No 8� 4—#3 DOWELS SPACED EVENLY A v B B V. SECTION 13-13 A PLAN MEW x j� NOTE: DROP TROUGH WILL BE POURED moNOLITHICALLY WITH CAST IN PLACE BENCH, OR DOWELED AND GROUTED —� j 1 O"R TO PRECAST BENCH. Y2 I-D- 1 O"R 12" MIN. cli #3 DOWEL SECTION A —A FORT WORTH CITY OF FORT WORTH, TEXAS HYDRAULIC SLIDE DATE: FEB- 2009 SAN-010 so PROPERTY LINE "CITY OF FORT WORTH STANDARD CLEANOUT w/ 6„ 4" CONCRETE 1 CAST IRON CAP rq3 BARS COLLAR _ 12 COLD JOINT REQUIRED 1 STANDARD PARKWAY Y4"/FT. 4" ;III_III—III— La\, r II=III=III=III=_III=I \?J. 14 L I I=I I I- 7� � EXIST. OR PROP. 4' SIDEWALK FOR NEW DOUBLE BAND STAINLESS 12" I DEVELOPMENT STEEL COUPLING I - CAP RISER 2' BELOW GRADE. ) BACKFILL CLEANOUT STACK WITH CONCRETE COLLAR (CAST IRON) NATIVE TOPSOIL COMPACTED TO (PLAN VIEW) 95% STANDARD PROCTOR DENSITY •.�+�'.';---��-- 4" STACK (IRON OR PVC) CONCRETE TWO WAY SWEEP TEE ANCHOR r •.'�•F�.. CLEANOUT TEE SFISTING OR WER SERVICE PROPOSED _i SDR-35 OR SDR-26 SERVICE. 1 SLOPE -VARIES, 2Z MIN. L FERNCO FLEXIBLE COUPLING REQUIRED 6 MIN. � 6 IF EXISTING SERVICE f 1' MIN. 6" IS PRESENT, I - OTHERWISE PLUG. MIN. SEWER MAIN PAID FOR AS CLEANOUT PRODUCT INFORMATION •• From Stonley Roberts & Assoc„ Inlormotion Subject To Chonge. Q_FSCRIPTION WEIGHT PART NO. Cost Iron Loterol Cleonout 18 Ibs ATL-424 W/ SS Bolts and Coupling h" SS gBOLTS J U 0 RING � I 7.5" I I CAST IRON CLEANOUT PROPERTY LINE 01 ORT WORTH r r r r SIDEWALK STREET i— CURB CLEANOUT NOTES 1. THE SWEEP TEE AND PIPE FITTINGS INSTALLED SHALL BE SDR-35 OR SDR-26 PVC MATERIAL. 2. CONNECTIONS TO THE EXISTING SERVICE SHALL BE MADE USING RUBBER SLEEVE COUPLINGS WITH STAINLESS STEEL DOUBLE BAND REPAIR SLEEVES. THE SLEEVES SHALL BE TIGHTENED TO THE TOROUE RECOMMENDED BY THE MANUFACTURER. 3. SLOPE OF THE SANITARY SEWER SERVICE SHALL BE A MINIMUM OF 2 PERCENT, 4. PIPE AND FITTINGS SHALL BE SDR-35 OR SDR-26 PVC WHEN NOT IN HIGH TRAFFIC AREAS. 5. CONCRETE USED AROUND CLEANOUT ASSEMBLY SHALL BE 5 SACK, 3,000 PSI MIX. DRIVEWAY PROPERTY LINE SIDEWALK CAST IRON CUCLEANOUT �\ RB DRIVEWAY APPROACH STREET pou-nmusimeme :•• CITY OF FORT WORTH, TEXAS TWO WAY SERVICE CLEANOUT DATE: FEB. 2009 SAN-011 u ow 'w z � J OIF w CLEANOUT PER olW DETAIL SAN-011 � UJ 2" MIN. GRADE w FINISH GRADE FOR 4" SERVICE FINISH GRADE 11=III=III-III=� Y J t`_�J II -III -III-III-III - I -1 I I-III=111�I I I_ ' ; , • -< j._ �I 11=1 I 1=1 I iLl I ITI I I: 77 SEWER PIPE PLUG-� �'�. ;�,+ FLOW ELEVATION TO - ----� BE DETERMINED BY ENGINEER STACK 15' MIN. ��:.":'. ';: •. EXIST. SERVICE LINE L 6" MIN. AT BOTTOM ONLY 45' BEND -1 I I- :'.• :.:;•1 , t:.:_l i 1- TYPE "C" OR "B" BACKFILL W SANITARY SEWER LINE fH STANDARD EMBEDMENT R DETAIL WTR-030 NOTE: TEE AND STACK TO BE COMPATIBLE TO MAIN LINE MATERIAL OR AS DIRECTED BY ENGINEER. SECTION A —A PLAN CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 CHIMNEY SERVICE SAN-012 k ow mw no no no EXISTING SURFACE BACKFILL AS APPROPRIATE � I I I I I=1 I I=1 I I '•;:`. •'°�' �;<= : �I I I III =111=III=III= II-111=111= -III :��=a.° ••� =III= III- ..,. .I. III- :.v�l �f� •�;x=a:..., II-1 III "• .�•Y.,`�,.;,�.v,'• —I (I- II— o• -•�.• 11= � III ..�� .R. _ •!'.—III. —III _ .t .:f _-.:. :.y;., ;=�. � � ,.. - :ti� • ;.��:�=1 11= � 11= l l ,, 1 1 1 i l f-III ;III 7371 I ;III i t-1 � 0 0 6" MIN. DIMENSION. MAXIMUM FOR PAY PURPOSES SHALL BE 6" WHEN BID PER CUBIC YARD. O 6" MIN. DIMENSION. MAXIMUM FOR PAY PURPOSES SHALL BE 6" ON MAINS 24" AND SMALLER, 9" ON MAINS 30" AND LARGER, OWHEN BID PER CUBIC YARD. 3 CLASS 'E' (1500 PSI) CONCRETE E1-20 MATERIAL E2-20 CONSTRUCTION FORT%ORTH CITY OF FORT WORTH, TEXAS CONCRETE CRADLE DATE: FEB. 2009 SAN-014 TUNNEL LINER (AS INDICATED IN SPECIAL PLANS & DOCUMENTS) M a o a o w _ _ a w w a J w J m z m ir 7, Q 3 o w j w < Vn z < Z Fi CUT AWAY LONGITUDINAL SECTION NOTE: FURNISH & INSTALL GROUT IN KA II0 OF 1 CUBIC FOOT OF CEMENT AND 3.5 CUBIC FEET OF CLEAN FINE SAND WITH SUFFICIENT WATER ADDED TO PROVIDE A FREE FLOWING THICK SLURRY. E1-15 MATERIAL E2-15 CONSTRUCTION FORT WORTH I ANNULAR SPACE GROUTED INNEL LINER FILL BETWEEN LINER AND SEWER PIPE WITH GROUT SEWER PIPE k INSTALL SKIDS AS NECESSARY. SKIDS SHALL MEET THE APPROVAL OF THE ENGINEER. END VIEW CITY OF FORT WORTH, TEXAS TYPICAL TUNNEL SECTION DATE: FEB. 2009 SAN-018 i = 2 -i 200' MIN. SPACING PER COMPACTED BENTONITE — - �3 CITY OF FORT WORTH CLAY OR 2:27 CONCRETE TREE ORDINANCE. I Y— — — — — — PIPE EXISTING GROUND I I—III=1 I I—III-1 I �, 4' OR TO BOTTOM OF — PAVEMENT BASE OR TOP SOIL MINIMUM TRENCH WIDTH PIPE > PIPE DIA. + 1' DIA_ _TRENCH WIDTH 1 TYPICALT SECTION Fob!l i W0rm CITY OF FORT WORTH, TEXAS CLAY DAM I I —I 11—I i t—III—I I �11111� 111=111 ;,L1- UNDISTURBED SOIL DATE: FEB. 2009 SAN-019 EXISTING SURFACE BACKFILL AS APPROPRIATE I=III .I I I � =11 I=1 f l=1 I I- ;:° ``U" ,'•,.:;- =: � :>:}'r I I=1 I I=1 11= Mob IIIIII ••�y.�.'•.'y'•.. I II 1I- ,II '6�� '.• •a• II —III • y _ :: . �;:�', —I 1I- � --III •�..� ':=:�'` .` � �• .'-_•` ��';'•�. ��� —I I- � I 11=11,,III=-III-111,;,III,,III,;,II,,;,lll,, 11-1 1O 6" MIN. DIMENSION. 6" MAX. FOR PAY PURPOSES WHEN BID PER CUBIC YARD. O 6" MIN. DIMENSION. MAX. FOR PAY PURPOSES SHALL BE 6" ON MAINS 24" AND SMALLER, 9" ON MAINS 30" AND LARGER WHEN BID PER CUBIC YARD. O4" MIN. DIMENSION. 4" MAX. FOR PAY PURPOSES WHEN BID PER CUBIC YARD. ® CLASS 'E' (1500 PSI) CONCRETE. E1-7 MATERIAL no E2-7 CONSTRUCTION FORT WORTH CITY OF FORT WORTH, TEXAS CONCRETE ENCASEMENT DATE: FEB. 2009 SAN-020 No RISER PIPE PLUG 15" SDR no CUT AS REQ. FOR- 35 PVC -- 6, 8, 10, & 12 CROSS LINK HIGH DETl�(L 'B' INCH PIPE ALONG WATER TIGHT DENSITY POLYTHELENE N.T.S. CUTTING GROOVE. ADAPTER (PVC -'--'- ACCESS FITTING i TO PVC FOR PVC; CLAY TO PVC FOR CLAY) DETAIL 'A' DETAIL 'A' N.T.S. , J I f= ,l'3 ,rPIPE ASSEMBLY SPECIFIED —_ __ _ 1=111—I ON PLANM-,-- I I=I I I I I I=I I I —I I =1 I I=1 I I=1 r' I I=1 I I=1 I I=1 I I=1 I I=111=III=III=1 I I=1 11= SECTION A —A CAST IRON M.H. FRAME AND COVER PAVEMENT DETAIL 'B' -WATER TIGHT PLUG EXISTING GROUND am wo so so to r mo ma -i i-i i ii-i i-A ;. := <:;•. . 1 n I:.i. >.; -i -'[--,--'—'TWO CONCRETE GRADE Y RINGS (MINIMUM) AND r70- A NON -SHRINK GROUT w io N EQUAL TO PIPE EMBEDMENT UNDISTURULU SOIL - RT WORTH CITY OF FORT WORTH, TEXAS WASTEWATER ACCESS DEVICE 15" P.V.C. PIPE ASTM D 3034 (SDR-35) UNDISTURBED SOIL SAND AND STABILIZED SOIL COMPACTED TO 95% STD. PROCTOR DENSITY AND PLACED IN 6-INCH LIFTS BEGINNING AT THE WASTEWATER ACCESS DEVICE WORKING OUTWARD TO THE EXCAVATION WALLS CROSS LINK HIGH DENSITY POLYETHELENE ACCESS FITTING COMPACTED -CRUSHED STONE, FINE GRADATION DATE: FEB. 2009 SAN-021 no i r 4 MIN ASS ASS k%W P P .�r UE UE am..raiwa E E V" TW TW 4m L L ow I E I E n SAf?H 0 R N oRN ��w N E N E uw% Mt 0-rTflliY W.M = FoRT WC% FoRr Wo hr•wr�,w rr Mrc Y iws+m fsrww�saro�aar SZL f IN CASE IN CASE ne OF EINBROENCY OF EMERGENCY PLEASE CALL PIEASfi CALL (817)-392.4477 (817)-392.4477 FOR LNE LOCATION FOR UNE LOCATION PLEASE CALL PLIASE CALL j (817)-392.8296 (817)-392-8296 I! un4tw an�wn L +mv16xi r.a-au NOTES: 1. MARKERS SHALL NOT BE USED FOR 12" AND SMALLER DIAMETER SEWER LINES. -111-III-1 -III=III-I11= 2. PLACEMENT SHALL BE AT EACH El I El I F: I I I=I I I I I I=I RIGHT-OF-WAY CROSSINGS AND I -I I I=I -I I El I I -I I F MAJOR UTILITY CROSSINGS AS -III-IIII= III =III III= DIRECTED BY THE ENGINEER. I -I I I -I -__ -I i =1 I I=1 I I=1 � I -III -III -I -III=III-III-III-III= 1=lll�i�llll��lll-1;� FORT WORTH CITY OF FORT WORTH, TEXAS SANITARY SEWER MARKER POLE DATE: FEB. 2009 SAN- 022 EXISTING TRENCH REPAIR LIMITS � _ CURB & EXISTING HMAC NEW HMAC GUTTER PAVEMENT (SEE NOTE 1) - i µ: I . a. r r .9.'. ''b:' .:c. ;b, O:. d • a�. —:�;:?.'A.:.1i,."'..r.r•n.b•.�' .I .ioIaI ::� II ....'f , 1 ._(•:.:.'.�YI: "'�'I':�;.�'..�'...'Ir; 6.� t-:'. �,�'._•�.-,�:,-A� ,. .�,.•r./tr�:•,.'a:i4..+r;:,•!f*•s2�:°s.i`2i`.47.�ti.:..:. , ��•4, r.rNr1A5.. 'a{.',•,.::`,'A.. v:'!xj�.1':�e'i.r _' •:N•.".t.'•1:'..1:s..1I.,.:x. '"CN'eRTE xl , ... I ......... i . .::1."112" ,;pLtt_�_.•..._�I...,.-_P''•.•.;RI.Ir •—I?M—`a1E%.•..,i. COAT .... �rEXISTING i_" .� i I•.-o.�..I'..IiL..o...W,:-:e('.:,�...,:I ..i;__i••.E.•- SUBGRADE .`_... .•1I .�('mab1: '_y1-.. ,.:.s::I -.y.:I.'i.i. .-.• _� y• •t-i '' .� .. ..,.:....... ; L;s BACKFILL MATERIAL (IF ANY) PER DETAIL WTR-034 PIPE*`• i :.. . (SEE NOTE 3) al i:=: �,• _.i.l DITCH WALL .: �...",r �::4�<i": `'::ny+�l�')::,.; i:�.1..a fir' • , NQTES: 1. ALL EXISTING ASPHALT COURSE SHALL BE REPLACED TO THE ORIGINAL DEPTH. PLACE A MINIMUM OF 2" HMAC SURFACE COURSE (TYPE "D" MIX) TO MATCH EXISTING GRADE AS SHOWN. 2. PLACE A MIN. OF 8" 2:27 CONCRETE AS SHOWN. 3. FLOWABLE FILL MAY BE REQUIRED TO BACKFILL ALL TRENCHES IN DOWNTOWN STREETS AND IS OPTIONAL IN OTHER AREAS. IF FLOWABLE FILL IS REQUIRED, A SEPERATE PAY ITEM WILL BE PROVIDED FOR SUCH. 4. ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH THE CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION, FoRTWORTH CITY OF FORT WORTH, TEXAS DATE: 10-2007 PERMANENT ASPHALT PAVEMENT TRENCH REPAIR STR-028 1 t s 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EXISTING TRENCH REPAIR LIMITS CURB & EXISTING HMAC NEW HMAC GUTTER SEE DETAIL PAVEMENT (SEE NOTE 4) STR-035 I! ,- -- is ,.:.. ,� ii ,� : 5" MIN.':.:,:'• 77 ., .iw� •,.�,•�--: , . ' t�. • , -.•ter, •:'.�9..: . ......III .�: • ..•,-•*•-• ,:.. '# ., • � y ..'.'� . r• . r4-fir-`"• :.,��., • ;".�j`', ..I...'-r1 .—.: .• —.;.G�. ._.. .':'. . :. i �,„..._...Ii.l.. ....�.1 :..:..:.L...I.' . �.:_�i I..Ii `�' .I -..:I;.l i::,_�� I ���—:�� ,,. ��.', IIr.�.d_ a�:'...V' �. I i I '_.iiILII �tRy'C�i.1 .�1.f i", .�-..-.! +.Ji:./ ,kr.:. r�:&TO7 ;w...-.. A..r�w:.tu.yd..r.•: 'i..`�,,y# !;S`•..,. !;Y.,EFw,i,:cl}.✓V• A�`�9':�11�.l:',a.::1},$s"�,..a.w i ,•i 6,. ..�•'I••�` � NN �'• s.L*.i .4l:112" TACK COAT CEEXISTING ,, ,1 EXISTI;I.N.G SUBGRADEBOTH WAYS WITH MIN. 2BARS "' CLASS 'A' REINFORCED � W _- �l CONCRETE BASE CONCRETE (IF ANY) LONGITUDINAL IN DITCH " - L._.:— =.x:' aBASE PIPE "... ;;,, Imo_ BACKFILL MATERIAL ! PER DETAIL WTR-034 r, ...1 _I (SEE NOTE 6) DITCH WALL 1..:...: NOTES: 1. CONCRETE BASE SHALL,BE REPLACED TO ORIGINAL THICKNESS OR TO A MINIMUM THICKNESS OF 5", WHICHEVER IS GREATER. 2. IF STEEL EXISTS IN CONCRETE BASE TO BE CUT, THE STEEL SHALL BE CUT AND SALVAGE AS POSSIBLE. A MINIMUM LAP SPLICE DISTANCE OF 12" SHALL BE PROVIDED. 3. REINFORCED CONCRETE BASE WILL BE REPLACED OVER TRENCH, AS SHOWN, IN THE EVENT NON —REINFORCED CONCRETE BASE IS REMOVED. 4. ALL EXISTING ASPHALT COURSE SHALL BE REPLACED TO THE ORIGINAL DEPTH. PLACE A MINIMUM OF 2" HMAC SURFACE COURSE (TYPE "D" MIX) TO MATCH EXISTING GRADE AS SHOWN. 5. 2:27 CONCRETE MAY BE DELETED IF HALF THE SPECIFIED THICKNESS OF 2:27 IS ADDED TO THE CLASS "A" CONCRETE. 6. FLOWABLE FILL MAY BE REQUIRED TO BACKFILL ALL TRENCHES IN DOWNTOWN STREETS AND IS OPTIONAL IN OTHER AREAS. IF FLOWABLE FILL IS REQUIRED, A SEPERATE PAY ITEM WILL BE PROVIDED FOR SUCH. 7. ALL CONSTRUCTION MUST BE IN ACCORDANCE WITH THE CITY OF FORT WORTH STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION. FoRTWORTH CITY OF FORT WORTH, TEXAS DATE: 10-2007 PERMANENT ASPHALT PAVEMENT TRENCH REPAIR WITH EXISTING CONCRETE BASE STR-029 ow ■t —III—IIIII- IA II—III—IIII� .III—lII=1I -III—III=1 Ld TYPE "C" BACKFILL SEE SPEC. E1-2.4 MINIMUM 6" INITIAL BACKFILL COVER .' ;." `,'y ;;-.-''t,':: !—! G.C.D. SAND MATERIAL EMBEDMENT & INITIAL BACKFILL -I I `� -III SEE SPEC. E1-2.3 G.C.D. • MINIMUM 6"1(- _I � -III .,;',''� • t !-I EMBEDMENT IIIIIIII III WATER: I I!I!I I IlIII (III IIIIII I IIIIII SIZES UP TO AND INCLUDING 12" I=tII-III �� I I-1 I I=111� I 11—I I > TYPE "C" BACKFILL -III- SEE SPEC. E1-2.4 MINIMUM 6" INITIAL 111 -I h' '; Yi " .I I -I G.C.D. BACKFILL COVER: I —I I ; _r _ 11= CRUSHED STONE OR SAND WATER — 6" MATERIAL INITIAL BACKFILL SAN. SEWER — 12"I- �IIIII E1E2.3 G.CO1-2.4(b) OR CRUSHED STONE MINIMUM 6" I I I '` III SEE SPEC. E1 —2.3 EMBEDMENT -III=I G.C.D. NOTE: SPECIFICATION WATER: SIZES 16" AND LARGER REFERENCES ARE FOR WATER AND SANITARY SANITARY SEWER: ALL SIZES SEWER ONLY. I SAND GRADATION MATERIAL SPECIFICATIONS • LESS THAN 10� PASSING //200 SIEVE THE EMBEDMENT AND BACKFILL DETAILS PROVIDED ON THIS SHEET SHALL REPLACE APPROPRIATE PROVISIONS OF E1-2.4(b) • P.I. = 10 OR LESS AND E1-2.3 OF THE GENERAL CONTRACT DOCUMENTS AND SPECIFICATIONS FOR WATER DEPARTMENT PROJECTS (G.C.D.) ALL OTHER PROVISIONS OF THESE ITEMS SHALL APPLY. I CRUSHED STONE GRADATION i SIEVE SIZE RETAINED 1" 0-10 I Y2" 40-75 _Y8" 55-90 #4 90-100 #8 95-100 I CITY OF FORT WORTH, TEXAS DATE: FEB. 2009 FORTWORTH WATER AND SANITARY SEWER EMBEDMENT AND BACKFILL DETAILS ! WTR-029 I 00 me .r ." wo Contractor's Compliance with Workers Compensation Laws am no w Ov no no no no P, as CONTRACTORS COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Article 8308-3.23 of Vernon's Annotated Civil Statutes, Contractor certifies that it provides worker's compensation insurance coverage for all of it's employees employed on City of Fort Worth Project Number D , o , E , ("0-3q STATE OF TEXAS § n tlCt�Sr r Gti, AL. i CONTRACTO Y — T Mark Pappas, Vice -President of Conatser Management Group, Inc, G.P. Title COUNTY OF TARRANT § B FORE PE, the. undersigned authority, on this day personally appeared n �►cr R v ., -� , known to me to be the person whose name is subscribed to the f �goQgtrument, and acknowledged to me that he/she executed the same as the act and deed 70 k Ao, Ca N gr A4 r . —rx P for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this s�� day of , 20 d 1. JAMIE L BROWN NOTARY PUBLIC SJ}4jlOF��• State OfTexas ✓T I Comm, Exp. 08-27-2012 NotAey Public in and for the State of Texas aw no no CERTIFICATE OF INSURANCE NOTICE The blank spaces in the Certificate of Insurance; Performance, Payment, and Maintenance Bonds; and i Contract are not to be filled on by the Bidder at the time of submitting his proposal. These forms are included herein to familiarize the Bidder with such forms which the successful Bidder will be required to execute. no CERTIFICATE OF INSURANCE TO: CITY OF FORT WORTH Date_ NAME OF PROJECT: Sanitary Sewer Svstem Rehabilitation Contract LVM (58) Part 2 PROJECT NUMBER: Sewer P254-703170106087 DOE # 6039 Citv Proiect #01060 IS TO CERTIFY THAT: Conatser Construction TX, LP is, at the date of this certificate, Insured by this Company with respect to the business operations hereinafter described, for the type of insurance and accordance with provisions of the standard policies used by this Company, and further hereinafter described. Exceptions to standard policy noted on reverse side hereof. TYPE ()F L� �FM�r _ Policy Effective Expires Limits of Liability Worker's Compensation Comprehensive General Bodily Injury: Liability Insurance (Public Ea. Occurrence: $ „ Liability) Property Damage: Ea. Occurrence: $_ -- Blasting Ea. Occurrence: $ j Collapse of Building or structures adjacent to Ea. Occurrence: $ excavations Damage to Underground Utilities Ea. Occurrence: $ Builder's Risk Comprehensive Bodily Injury: Automobile Liability Ea. Person: $ _ Ea. Occurrence: $ Property Damage: i Ea. Occurrence: $ • Bodily Injury: Contractual Liability Ea. Occurrence: $ Property Damage: >w Ea. Occurrence: $ Other Locations covered: All operations for the Citv of Fort Worth Description of operations covered: Sanitary Sewer Svstem Rehabilitation Contract LVIII (58) Part 2 The above policies either in the body thereof or by appropriate endorsement provided that they may not be changed or canceled by the insurer in less than five (5) days after the insured has received written notice of such changer cancellation. Where applicable local laws or regulations require more than five (5) days actual notice of change or cancellation to be assured, the above policies contain such special requirements, either in the body thereof or by appropriate endorsement thereto attached. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy. I jAgenev Insurance Co. Fort Worth Agent Address j I I 1 Title nI 110 00 4A 00 400 r 40 ri.A Ar ,/ 1 wo p ark F o$ �1V ortl�i (Ot� Of F 0-0 MW Bond No: 022023714 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, (1) Conatser Construction TX. LP, as Principal herein, and (2) Liberty Mutual Insurance Comvanv , a corporation organized under the laws of the State of (3) MA . and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the sum of TWO MILLION, FIVE HUNDRED SEVENTY FOUR THOUSAND, EIGHT HUNDRED TWENTY FIVE DOLLARS AND NO CENTS ($2,574,825.00) for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREA� ER 1622 p�rbs entered into a certain written contract with the Obligee dated the day of , 20_ a copy of which is attached hereto and made a part hereof for all purposes, for the construction of. Sanitary Sewer System Rehabilitation Contract LVIII (58) Part 2 NOW, THEREFORE, the condition of this obligation is such, if the said Principal shall faithfully perform the work in accordance with the plans, specifications, and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of such statute, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this day of C.20^ r ATTEST: (Principal) Secretary (SEAL) �1 ess as to Principal + ATTEST: Secretary (S E A L) Conatser Constru n TX, LP PRINCIP By: m e.Mark appas Title: Vice President of Conatser Management Group,Inc., GP Address: P.O. Box 15448 Fort Worth. TX 76119 Liberty Mutual Insurance Company SURETY By: -2� Name: Glenna S . Davis Attorney in Fact Address: 175 Berkeley Stteet Boston, MA 02117 C41J-111 Witness as�D Surety Telephone Number: 972.233.9588 + NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of + Power of Attorney shall be attached to Bond by the Attorney -in -Fact. The date of bond shall not be prior to date of Contract. r r Bond No: 022023714 t PAYMENT BOND THE STATE OF TEXAS § COUNTY OF TARRANT § KNOW ALL BY THESE PRESENTS: That we, (1), CONATSER CONSTRUCTION TX, LP as Principal herein, and (2) Liberty Mutual Insurance Companv a corporation organized and existing under the laws of the State of (3) MA as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of TWO MILLION. FIVE HUNDRED SEVENTY FOUR THOUSAND, EIGHT HUNDRED TWENTY FIVE DOLLARS AND NO CENTS ($2.574,825.00) for the payment whereof, the said Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS, the Principal has entered into a certain written contract with the Obligee _ dated the day of SEP 29 20. which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length, for the following project: Sanitary Sewer System Rehabilitation Contract LVIII (58) Part 2 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253, Texas Government Code, as amended) supplying labor or materials in the prosecution of the work under the contract, then this obligation shall be void; otherwise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute, to the same extent as if it were copied at length herein. -- IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have executed this instrument. SIGNED and SEALED this day of SEP 29 2009 , 20_. .. No i ATTEST: (Principal) Secretary (SEAL) /- '01— 4� 11-1 ecrf i s as to Principal .o ATTEST: Secretary as (SEAL) r/ no Witness 46 Surety Conatser Construc;�� TX, LP PR;INCIPALI By: Na e: Mark Pappas Vice President of Conatser Title: Management Groun. Inc., GP Address: P. 0. Box 15448 Fort Worth, TX 76119 Liberty Mutual Insurance Company SURETY By: Name: Glenna S. Davis Attorney in Fact Address: 175 Berkeley Street Boston, MA 02117 Telephone Number: 972.233.9588 NOTE: (1) Correct name of Principal (Contractor). (2) Correct name of Surety. (3) State of incorporation of Surety Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attomey-i n- Fact. The date of bond shall not be prior to date of Contract. Bond No: 022023714 MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OF TARRANT § NO KNOW ALL BY THESE PRESENTS: That CONATSER CONSTRUCTION TX. LP. ("Contractor"), as principal, and, Libertv �- Mutual Insurance Company a corporation organized under the laws of the State of MA , ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of -- Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of TWO MILLION. FIVE HUNDRED SEVENTY FOUR THOUSAND, EIGHT HUNDRED TWENTY FIVE DOLLARS AND NO CENTS ($2.574.825.00), lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors, said Contractor and Surety do hereby bind themselves, their heirs, executors, administrators, assigns and successors, jointly and severally. This obligation is conditioned, however, that: WHEREAS, said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the of SEP 29 2009 20_, a copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: Sanitary Sewer Svstem Rehabilitation Contract LVIII (58) Part 2 the same being referred to herein and in said contract as the Work and being designated as project number(s) SEWER P254-703170106087 and said contract, including all of the specifications, we conditions, addenda, change orders and written instruments referred to therein as Contract Documents being incorporated herein and being made a part hereof; and, WHEREAS, in said Contract, Contractor binds itself to use such materials and to so construct the work that it will remain in good repair and condition for and during a period of after the date of the final acceptance of the work by the City; and WHEREAS, said Contractor binds itself to maintain said work in good repair and condition for said term of Two (2) vears; and WHEREAS, said Contractor binds itself to repair or reconstruct the Work in whole or in part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary; and, WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided. NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repair or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void, and have no force or effect. Otherwise, this Bond shall be and remain in full force and effect, and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is exteiml,t ca)counterparts, each of •• which shall be deemed an original, this _ day of , A.D. 20 ATTEST: Conatser ConstructJon TX, LP (S EA L) Contractor B Secretary ame�/ Mark ZiPas Vice President of Conatser Title: Management Grou _ Tnc . _ GP ATTEST: Libertv Mutual Insurance Comnanv (S E A L) Surety By:, Secretary Name: Glenna S. Davis Title: Attorney -in -Fact 175 Berkeley Street Boston, MA 02117 Address THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 2589764 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the 'Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint too GREG A. WILKERSON, GLENNA S. DAVIS, CATHY VINSON, CAROLYN MAPLES, JOHN R. WILSON, ALL OF THE CITY OF FORT WORTH, STATE OF TEXAS .............. ...... ............ ....:.:......................... ............. :.....:........................................... ....................................................... .............................. :..:............................ :..................... ....................................... each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding TWENTY FIVE MILLION AND 00/100** ***************** DOLLARS ($ 25,000,000.00***** ) each, and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. That this power is made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in -fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be N as binding as if signed by the president and attested by the secretary. d By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attomeys-in-fact: .O pp1 C Pursuant to Article XIII, Section 5 of the By -Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized to appoint such attomeys-in-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and p deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. i3! 7 That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. > IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of —W Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 12th day of June _2009 N C •� �O ro COMMONWEALTH OF PENNSYLVANIA ss 'n N COUNTY OF MONTGOMERY aw tm LIBERTY MUTUAL INSURANCE COMPANY BY Garnet W. Elliott, Assistant Secretary ` 3 d n0 C On this 12th day of June 2009 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above ai Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. - IN TESTIMONY c) first above writte i3 ci CERTIFICATE subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year COMMONWEA1,THOF PFNNSYI.YANtA Notarml5aaa Temss Pastat4a, Notary PAI t Ply—th Tvp., Mont.. y County My Cowlission E pies March 28, 2013 41." s, P�yrnm Asso *—or NoYdles By Ter6sa Pastella, Notary Public I, the undersigned, Assistant cretary of Liberty Mutual Insurance Company, do hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys -in -fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. SAP 29 ZC' 1 IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this day of By sM : David M. Carey, Assiant Secretary ca V N N M C 7 C to C O VH N CW 0CL a; o� 3W of a� 20 to w0 O C O >.a (D0 rN E N �cr) cc V O HT 0 Liberty �Allutual. Important Notice TO OBTAIN INFORMATION ABOUT THIS BOND OR TO MAKE A COMPLAINT: You may contact the Texas Department of Insurance to obtain information on 40 companies, coverages, rights or complaints at: 800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 •• Your notice of claim against the attached bond may be given to the Surety Company that issued the bond by sending it to the following address: i .. Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the claim office by telephone at: 610-832-8240 Premium or Claim Disputes If you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. This notice is for information purposes only and does not become a part of or a condition of the attached document. It is given to comply with Section 2253.048, Government Code, and Section 53.202, Property Code, Effective September 1, 2001 Part H — TWDB (Contracts and Documents) .. ..9 ED-004e (8-19-02) Texas Water Development Board Supplemental Contract Conditions (ED-004e) CWS" Tier 3, & DWS" Instructions on use Applicability These Supplemental Conditions contain provisions that are worded to comply with certain statutes and regulations which specifically relate to the Clean Water State Revolving Fund (CWSRF) and Drinking Water State Revolving Fund (DWSRF) program projects receiving funds directly made available by the Federal capitalization grants. Provisions which are applicable to the project's funding source or dollar value of the contract are so noted within with the provision. Construction projects which have Colonia Wastewater Treatment Assistance Program (CWTAP) funding do not use these conditions but instead use the EPA Supplemental Conditions and TWDB Special .. Conditions ED-004C. Construction projects which are financed by CWSRF Tier 2 (projects receiving state funds) instead use TWDB Supplemental Conditions ED-004E. Projects with State Loan funding use Supplemental Conditions ED-004G. Optional provisions that are good business practices are available in ED-004H. Application of Conditions The conditions and forms listed under Instructions to Bidders are to be included in the instructions to bidders for construction services. The provisions listed under Construction Contract Supplemental Conditions should be included with the other general and special conditions that are typically included in s the construction contract documents by the design engineer. Modifications to Provisions The Applicant may need to modify parts of these provisions to better fit the other provisions of the construction contract. The Applicant and the consulting engineer should carefully study these provisions before incorporating them into the construction contract documents. In particular, Water Districts and other types of districts should be aware of statutes relating to their creation and operation which may affect the application of these conditions. The Recipient (Owner) is to determine and incorporate the affirmative action goals for the project into supplemental condition No. 12. Condition number 15 (Archeological Discoveries and Cultural Resources) and 16 (Endangered Species) may be superseded or modified by project specific conditions established during the application process. These documents may confer certain duties and responsibilities on the consulting engineer that are beyond, or short of, what the Applicant intends to delegate. The Applicant should ensure that the ,., contractual agreement with the engineer provides for the appropriate services. Otherwise the Applicant should revise the wording in these special conditions to agree with actually delegated functions. Good Business Practices MW There are other contract provisions that the Owner and Designer need to include as a matter of good business practices. It is recommended that provisions addressing the following matters be included in the MW construction contract. Contract Provisions that satisfy these are available from TWDB upon request. WRD-708C Revised 9/7/2005 Appendix F 23 a/ - • Specifying the time frame for accomplishing the Construction of the project, and the consequences of " not completing on time, including liquidation damages. • Specifying the type and dollar value of and documentation of insurance the contractor is to carry. As a minimum the contractor should carry liability and builder's risk insurance • Identifying the responsibility of the contractor - Responsibility and warranty of work. • Price reduction for defective pricing of negotiated costs. • Differing site conditions - notice and claims regarding site conditions differing from indicated conditions. • Covenants against contingent fees - Prohibit contingent fees for securing business. • Gratuities - Prohibitions against offering and accepting gratuities • Audit and access records • Suspension of work - Conditions under which owner may suspend work. • Termination - Conditions under which owner may terminate • Remedies - How disputes will be remedied. Other Requirements There may be other local government requirements and applicable Federal and State statutes and regulations which are not accommodated by these conditions. It is the Loan/Grant Recipient's responsibility to ensure that the project and all contract provisions are consistent with the relevant statutes and regulations. Advertisements for Bids The official advertisement for bids that is published in newspapers should include certain information including: • A clear description of what is being procured. • How to obtain P&S, and necessary forms and information. _ • The date and time by which bids are to be received. (deadline) • The address where bids are to be provided. • Acknowledgement of any special requirements such as mandatory pre -bid conference and Affirmative Action requirements. • Right to reject any and all bids. Bid proposal The Bid proposal form should account for the following. • If lump sum bid, account for Property Consumed in Contracts to Improve Real Property; Tax Code 151.056. • Distinguish Eligible and Ineligible items. • Accommodate Trench Safety requirements with separate per unit pay item for trench excavation safety protection Health and Safety Code Chapter 756. • Include space for Contractor to acknowledge receipt of each Addendum issued during the bidding process. Bidding Process: The Plans and Specifications should include an explanation of how the bids will be processed. The explanation should include the following components. T • Whether a Pre -bid Conference, will be held, whether it is optional or mandatory, and where and when it will be held. • Specify the criteria and process for determining responsiveness and responsibleness of the bidder • Specify the method of determining the successful bidder and award (IE. Award to the lowest responsive responsible bidder, accounting for any multiple parts to bids.) • Allow for withdrawal of a bid due to a material mistake. WRD-708C Revised 9/7/2005 Appendix F 24 • Identify the time frame that the bids may be held by the Owner before awarding a contract. (IE. Typically for 60 or 90 days.) • Acknowledge right of the Owner to reject any and all bids. All proposed modifications to these conditions should be brought to the attention of and discussed with the appropriate TWDB area engineer. The TWDB engineer can also answer any questions regarding these conditions. The questions and proposed modifications can be sent to the following address. Texas Water Development Board Office of Project Finance & Construction Assistance P. O. Box 13231, Capitol Station Austin, Texas 78711-3231 (512) 463-7853 FAX (512) 475-2086 WRD-708C Revised 9/7/2005 Appendix F 25 Texas Water Development Board SUPPLEMENTAL CONTRACT CONDITIONS For Projects Funded through the Clean Water State Revolving Loan Program (Tier 3) and W Drinking Water State Revolving Loan Program ww 40 i WRD-708C Revised 9/7/2005 Appendix F 26 TWDB SUPPLEMENTAL CONDITIONS CWSRF Tier 3, and DWSRF no Table of Contents Instructions to Bidders Conditions: 1. Minority and Women -Owned Businesses Enterprise Goals 2. Contin2ent Award of Contract 3. Equal Employment Opportunity and Affirmative Action 4. Debannent and Suspension Certification 5. Bid Guarantee Forms to be submitted with bids (attached) • Bidder's Certifications regarding Equal Employment Opportunity and Non -Segregated Facilities (WRD-255) • MWBE Affirmative Steps Certification and Goals (WRD-217) no Construction Contract Supplemental Conditions Conditions: 1. Supersession 2. Privitv of Contract 3. Definitions 4. Laws to be Observed 5. Review by Owner. and TWDB 6. Performance and Pavment Bonds 7. Proaress Pavments and Pavment Schedule 8. Worlanan's Compensation Insurance Coverage 9. Chances 10. Prevailing Waee Rates 11. Contract Work Hours Requirements (29 CFR 5. 1, & 5.6) 12. Equal Employment Opportunity and Affirmative Action (41 CFR 60-1.4, 1.7, 1.8, 4.2, and 4.3) 13. Debarment and Suspension (40 CFR 32, Appendix B) 14. Minoritv and Women -Owned Business Enterprise 15. Archeological Discoveries and Cultural Resources 16. Endangered Species 17. Hazardous Materials 18. Proiect Sign 19.Operation and Maintenance Manuals and Training 20. As -built Dimensions and Drawings _ Forms to be submitted with executed contracts: • Contractor's Act of Assurance (ED-103) • Contractor's Resolution on Authorized Representative (ED-104) • MWBE Affirmative Steps Solicitation Report (WRD-216) • MWBE Self -Certification (WRD-218) Forms to be submitted during construction: • MWBE Certification and Participation Summary (WRD-373) WRD-708C Revised 9/7/2005 Appendix F 27 EPA AND TWDB SUPPLEMENTAL CONDITIONS Instructions to Bidders - 1. MINORITY AND WOMEN -OWNED BUINESS ENTERPRISE GOALS -.This contract is subject to the EPA established Minority Business Enterprise (MBE) / Women's Business Enterprise (WBE) "fair -- share" goals: MBE: CONSTRUCTION 10.3%; SUPPLIES 5%; SERVICES 11.5%; EQUIPMENT 5%. WBE: CONSTRUCTION 5.9%; SUPPLIES 7.6%; SERVICES 14.5%; EQUIPMENT 7.6%. TWDB document Guidance for Utilization of Small, Minority and Women Owned Businesses, SRF-52v3 describes the requirements of this program. The prime contractor must submit the PRIME CONTRACTOR AFFIRMATIVE STEPS CERTIFICATION and GOALS (WRD-217) with the bid, to demonstrate the Prime Contractor's _ understanding and commitment to taking affirmative steps. The contractor must provide the Owner with the information required for Loan Grant Participation Summary, TWDB document SRF-373 and provide sufficient documentation (TWDB WRD-216) that a ` "good faith effort" was made in offering fair opportunity for participation by qualified SMWBE firms. This information must be submitted prior to the contract award so the information can be approved and presented to the TWDB for funding of this contract. -- 2. CONTINGENT AWARD OF CONTRACT This contract is contingent upon release of funds from the Water Development Board. Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by a loan or grant from the Texas Water Development Board, and a grant from the United States Environmental Protection Agency (U.S. EPA.) Neither the State of Texas, or U.S. EPA nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. 3. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION - This provision applies only to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. — The Bidder's EEO/NSF Certifications regarding Equal Employment Opportunity and Non -Segregated Facilities (WRD-255) must be submitted with the bid. 4. DEBARMENT AND SUSPENSION CERTIFICATION - This provision applies only to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects which receive funds made directly available by Federal funding. This contract is subject to the provisions the federal Debarment and Suspension requirements of 40 CFR Part 32, including but not limited to Appendix B as follows: Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion --Lower Tier Covered Transactions Instructions for Certification 4.1. By signing and submitting this proposal, the prospective lower tier participant is providing the certification set out below. WRD-708C Revised 9/7/2005 Appendix F 28 ,r. 4.2. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. 4.3. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous when submitted or had become erroneous by reason of changed circumstances. 4.4. The terms covered transaction, debarred, suspended, ineligible, lower tier covered transaction, participant, person, primary covered transaction, principal, proposal, and voluntarily excluded, as used in this clause, have the meaning set out in the Definitions and Coverage sections of rules implementing Executive Order 12549. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. 4.5. The prospective lower tier participant agrees by submitting this proposal that, should the proposed _ covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. 4.6. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transaction," without modification,_ in all lower tier covered transactions and in all solicitations .. for lower tier covered transactions. 4.7. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that it is not proposed for debarment under 48 CFR part 9, subpart 9.4, debarred, suspended, ineligible, or voluntarily excluded from covered transactions, unless it knows that the certification is erroneous. A participant may decide the method and frequency by which it determines the eligibility of its principals. Each participant may, but is not required to, check the List of Parties Excluded from Federal Procurement and Nonprocurement Programs. 4.8. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of a participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. 4.9. Except for transactions authorized under paragraph 5 of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is proposed for debarment under 48 CFR part 9, subpart 9.4, suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. Certification Regarding Debarment, Suspension, Ineligibility and _. Voluntary Exclusion --Lower Tier Covered Transactions (1) The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any Federal department or agency. (2) Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. r 5. BID GUARANTEE Each bidder shall furnish a bid guarantee equivalent to five percent of the bid price. (Water Code 17.183). If a bid bond is provided, the contractor shall utilize a surety company which is authorized to do business in Texas in accordance with Art. 7.19-1. Bond of Surety Company; Chapter 7 of the Insurance Code. MW Forms to be submitted with Bid: WRD-708C Revised 9/7/2005 Appendix F 29 • Bidder's EEO/NSF Certifications regarding Equal Employment Opportunity and Non -Segregated Facilities (WRD-255) • Prime Contractor Affirmative Steps Certification and Goals (WRD-217) Construction Contract Supplemental Conditions Conditions: 1. The SUPERSESSION Owner and the contractor agree that the TWDB Supplemental Conditions apply to that work eligible for Texas Water Development Board assistance to be performed under this contract and these clauses supersede any conflicting provisions of this contract. 2. PRIVITY OF CONTRACT Funding for this project is expected to be provided in part by the Texas Water Development Board. Neither the State of Texas, nor any of its departments, agencies or employees is, or will be, a party to this contract or any lower tier contract. This contract is subject to applicable provisions 31 TAC Chapter 363 in effect on the date of the assistance award for this project. 3. DEFINITIONS " (a) The term Owner means the local entity contracting for the construction services. (b) The term "TWDB" means the Executive Administrator of the Texas Water Development Board, or other person who may be at the time acting in the capacity or authorized to perform the functions of such Administrator, or the authorized representative thereof. 4. LAWS TO BE OBSERVED — In the execution of the Contract, the Contractor must comply with all applicable Local, State and Federal laws, including but not limited to laws concerned with labor, safety, minimum wages, and the environment. The Contractor shall make himself familiar with and at all times shall observe and comply with all Federal, — State, and Local laws, ordinances and regulations which in any manner affect the conduct of the work, and shall indemnify and save harmless the Owner, Texas Water Development Board, and their representatives against any claim arising from violation of any such law, ordinance or regulation by himself or by his subcontractor or his employees. 5. REVIEW BY OWNER, and TWDB (a) The Owner, authorized representatives and agents of the Owner, and TWDB shall, at all times have — access to and be permitted to observe and review all work, materials, equipment, payrolls, personnel records, employment conditions, material invoices, and other relevant data and records pertaining to this Contract, provided, however that all instructions and approval with respect to the work will be given to the Contractor only by the Owner through authorized representatives or agents. (b) Any such inspection or review by the TWDB shall not subject the State of Texas to any action for damages. 6. PERFORMANCE AND PAYMENT BONDS Each contractor awarded a construction contract furnish performance and payment bonds: (a) the performance bond shall include without limitation guarantees that work done under the contract will be completed and performed according to approved plans and specifications and in accordance with sound construction principles and practices; and (b) the performance and payment bonds shall be in a penal sum of not less than 100 percent of the contract price and remain in effect for one year beyond the date of approval by the engineer of the political subdivision. (c) The contractor shall utilize a surety company which is authorized to do business in Texas in accordance with Art. 7.19-1. Bond of Surety Company; Chapter 7 of the Insurance Code. WRD-708C Revised 9/7/2005 Appendix F 30 7. PROGRESS PAYMENTS AND PAYMENT SCHEDULE (a) The Contractor shall submit for approval immediately after execution of the Agreement, a carefully prepared Progress Schedule, showing the proposed dates of starting and completing each of the various sections of the -work, the anticipated monthly payments to become due the Contractor, and the accumulated percent of progress each month. (b) The following paragraph applies only to contracts awarded on a lump sum contract price: COST BREAKDOWN - The Contractor shall submit to the Owner a detailed breakdown of his estimated cost of all work to be accomplished under the contract, so arranged and itemized as to meet the approval of the Owner or funding agencies. This breakdown shall be submitted promptly after execution of the agreement and before any payment is made to the Contractor for the work performed under the Contract. After approval by the Owner the unit prices established in the breakdown shall be used in estimating the amount of partial payments to be made to the Contractor. (c) Progress Payments (1) The Contractor shall prepare his requisition for progress payment as of the last day of the month and .. submit it, with the required number of copies, to the Engineer for his review. Except as provided in Paragraph (3) of this subsection, the amount of the payment due the Contractor shall be determined by adding to the total value of work completed to date, the value of materials properly stored on the site and deducting (1) five percent (5%) of the total amount, as a retainage and (2) the amount of all previous payments. The total value of work completed to date shall be based on the actual or estimated quantities of work completed and on the unit prices contained in the agreement (or cost breakdown approved pursuant to section 6.b relating to lump sum bids) and adjusted by approved change orders. The value of materials properly stored on the site shall be based upon the estimated quantities of such materials and the invoice prices. Copies of all invoices shall be available for _ inspection by the Engineer. (2) The Contractor shall be responsible for the care and protection of all materials and work upon which _ payments have been made until final acceptance of such work and materials by the Owner. Such payments shall not constitute a waiver of the right of the Owner to require the fulfillment of all terms of the Contract and the delivery of all improvements embraced in this Contract complete and satisfactory to the Owner in all details. (3) This clause applies to contracts when the Owner is a Municipal Utility District, or Water Control and Improvement District. The retainage shall be ten percent of the amount otherwise due until at Ieast fifty percent of the work has been completed. After the project is fifty percent completed, the District may reduce the retainage from ten percent to no less than five percent. (4) The five percent (5%) retainage of the progress payments due to the Contractor may not be reduced until the building of the project is substantially complete and a reduction in the retainage has been authorized by the TWDB. (5) The following clause applies only to contracts where the total price at the time of execution is $400,000 or greater and the retainage is greater than 5% and the Owner is not legally exempted from the condition (i.e certain types of water districts). The Owner shall deposit the retainage in an interest -bearing account, and the interest earned on such retainage funds shall be paid to the Contractor after completion of the contract and final acceptance of the project by the Owner. (d) Withholding Payments. The Owner may withhold from any payment otherwise due the Contractor so 00 much as may be necessary to protect the Owner and if so elects may also withhold any amounts due from the Contractor to any subcontractors or material dealers, for work performed or material furnished by WRD-708C Revised 9/7/2005 Appendix F 31 No them. The foregoing provisions shall be construed solely for the benefit of the Owner and will not require the Owner to determine or adjust any claims or disputes between the Contractor and his subcontractors or Material dealers, or to withhold any moneys for their protection unless the Owner elects to do so. The failure or refusal of the Owner to withhold any moneys from the Contractor shall in no way impair the obligations of any surety or sureties under any bond or bonds furnished under this Contract. (c) Payments Subject to Submission of Certificates. Each payment to the Contractor by the Owner shall be made subject to submission by the Contractor of all written certifications required of him and his subcontractors by Section 3 hereof (relating to labor standards) and other general and special conditions elsewhere in this contract. (e) Final Payment. (1) Upon satisfactory completion of the work performed under this contract, as a condition before final payment under this contract or as a termination settlement under this contract the contractor shall _ execute and deliver to the Owner a release of all claims against the Owner arising under, or by virtue of, this contract, except claims which are specifically exempted by the contractor to be set forth therein. Unless otherwise provided in this contract, by State law or otherwise expressly agreed to by the parties to this contract, final payment under this contract or settlement upon termination of this contract shall not constitute a waiver of the Owner's claims against the contractor or his sureties under this contract or applicable performance and payment bonds. (2) After final inspection and acceptance by the Owner of all work under the Contract, the Contractor shall prepare his requisition for final payment which shall be based upon the carefully measured or computed quantity of each item of work at the applicable unit prices stipulated in the Agreement or cost breakdown (if lump sum), as adjusted by approved change orders. The total amount of the final -- payment due the Contractor under this contract shall be the amount computed as described above less all previous payments. (3) The retainage and its interest earnings, if any, shall not be paid to the Contractor until the TWDB has authorized a reduction in, or release of, retainage on the contract work. (4) Withholding of any amount due the Owner, under general and/or special conditions regarding "Liquidated Damages," shall be deducted from the final payment due the Contractor. 8. WORKMAN'S COMPENSATION INSURANCE COVERAGE (a) The contractor shall certify in writing that the contractor provides workers' compensation insurance coverage for each employee of the contractor employed on the public project. (b) Each subcontractor on the public project shall provide such a certificate relating to coverage of the " subcontractor's employees to the general contractor, who shall provide the subcontractor's certificate to the governmental entity. (c) A contractor who has a contract that requires workers' compensation insurance coverage may provide the coverage through a group plan or other method satisfactory to the governing body of the governmental entity. (d) The employment of a maintenance employee by an employer who is not engaging in building or i construction as the employer's primary business does not constitute engaging in building or construction. (e) In this section: (1) "Building or construction" includes: (A) erecting or preparing to erect a structure, including a building, bridge, roadway, public utility facility, or related appurtenance; (B) remodeling, extending, repairing, or demolishing a structure; or (C) otherwise improving real property or an appurtenance to real property through similar activities. (2) "Governmental entity" means this state or a political subdivision of this state. The term includes a municipality. WRD-708C Revised 9/7/2005 Appendix F 32 9. CHANGES (a) The Owner may at any time, without notice to any surety, by written order, make any change in the work within the general scope of the contract, including but not limited to changes: (1) In the specifications (including drawings and designs); (2) In the time, method or manner of performance of the work; (3) In the Owner -furnished facilities, equipment, materials, services or site, or (4) Directing acceleration in the performance of the work. .. (5) The original contract price may not be increased under this section by more than 25 percent. The original contract price may not be decreased under this section by more than 25 percent without the consent of the contractor. (Local Government Code 271.060) _ (b) A change order shall also be any other written order (including direction, instruction, interpretation or determination) from the Owner which causes any change, provided the contractor gives the Owner written notice stating the date, circumstances and source of the order and that the contractor regards the order as a change order. (c) Except as provided in this clause, no order, statement or conduct of the Owner shall be treated as a change under this clause or entitle the contractor to an equitable adjustment. (d) If any change under this clause causes an increase or decrease in the contractor's cost or the time required to perform any part of the work under this contract, whether or not changed by any order, the Owner shall make an equitable adjustment and modify the contract in writing. Except for claims based on defective specifications, no claim for any change under paragraph (a)(2) above shall be allowed for any costs incurred more than 20 days before the contractor gives written notice as required in paragraph (a)(2). In the case of defective specifications for which the Owner is responsible, the equitable adjustment shall include any increased cost the contractor reasonably incurred in attempting to comply with those defective specifications. .. (e) If the contractor intends to assert a claim for an equitable adjustment under this clause, the contractor must, within 30 days after receipt of a written change order under paragraph (a)( 1) or the furnishing of a written notice under paragraph (a)(2), submit a written statement to the Owner setting forth the general nature and monetary extent of such claim The Owner may extend the 30-day period. The contractor may include the statement of claim in the notice under paragraph (2) of this changes clause. (f) No claim by the contractor for an equitable adjustment shall be allowed if made after final payment under this contract. (g) Changes that involve an increase in price will be supported by documentation of the costs components in a format acceptable to the Owner. 10. PREVAILING WAGE RATES This Contract is subject to Government Code Chapter 2258 concerning payment of Prevailing Wage Rates. The Owner will determine what are the general prevailing rates in accordance with the statute. The applicable provisions include, but are not limited to the following: § 2258.021. Right to be Paid Prevailing Wage Rates (a) A worker employed on a public work by or on behalf of the state or a political subdivision of the state shall be paid: (1) not less than the general prevailing rate of per diem wages for work of a similar character in the locality in which the work is performed; and (2) not less than the general prevailing rate of per diem wages for legal holiday and overtime work. (b) Subsection (a) does not apply to maintenance work. (c) A worker is employed on a public work for the purposes of this section if the worker is employed by a contractor or subcontractor in the execution of a contract for the public work with the state, a political subdivision of the state, or any officer or public body of the state or a political subdivision of the state. Added by Acts 1995, 74th Leg., ch. 76, § 5.49(a), eff. Sept. 1, 1995. Amended by Acts 1997, 75th Leg., ch. 165, § 18.01, eff. Sept. 1, 1997. § 2258.023. Prevailing Wage Rates to be Paid by Contractor and Subcontractor; Penalty (a) The contractor who is awarded a contract by a public body or a subcontractor of the contractor shall pay not less than the rates determined under Section 2258.022 to a worker employed by it in the execution of the contract. WRD-708C Revised 9/7/2005 Appendix F 33 (b) A contractor or subcontractor who violates this section shall pay to the state or a political subdivision of the state on whose behalf the contract is made, $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in -the contract. A public body ' awarding a contract shall specify this penalty in the contract. (c) A contractor or subcontractor does not violate this section if a public body awarding a contract does not determine the prevailing wage rates and specify the rates in the contract as provided by Section 2258.022. (d) The public body shall use any money collected under this section to offset the costs incurred in the administration of this chapter. (e) A municipality is entitled to collect a penalty under this section only if the municipality has a population of more than 10,000. Added by Acts 1995, 74th Leg., ch. 76, § 5.49(a), eff. Sept. 1, 1995. _ § 2258.024. Records (a) A contractor and subcontractor shall keep a record showing: (1) the name and occupation of each worker employed by the contractor or subcontractor in the construction of the public work; and (2) the actual per diem wages paid to each worker. (b) The record shall be open at all reasonable hours to inspection by the officers and agents of the public body. " Added by Acts 1995, 74th Leg., ch. 76, § 5.49(a), eff. Sept. 1, 1995. § 2258.025. Payment Greater Than Prevailing Rate Not Prohibited This chapter does not prohibit the payment to'a worker employed on a public work an amount greater than the general prevailing rate of per diem wages. Added by Acts 1995, 74th Leg., ch. 76, § 5.49(a), eff. Sept. 1, 1995. 11. CONTRACT WORK HOURS REQUIRMENTS (29 CFR 5.1, & 5.6) - This provision only applies to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects which receive funds made directly available by Federal funding. This contract is subject to Title 29 Code of Federal regulations Part 5 concerning Contract Work Hours, including but not limited to the following. Sec. 5.5 Contract provisions and related matters. (a) omitted. (b) Contract Work Hours and Safety Standards Act. The Agency Head shall cause or require the contracting officer to insert the following clauses set forth in paragraphs (b)(1), (2), (3), and (4) of this section in full in any contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by Sec. 5.5(a) or 4.6 of part 4 of this title. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. (1) Overtime requirements. No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. (2) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (b)(1) of this section the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (b)(1) of this section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (b)(1) of this section. (3) Withholding for unpaid wages and liquidated damages. The (write in the name of the Federal agency or the loan or grant Owner) shall upon its own action or upon written request of an WRD-708C Revised 9/7/2005 Appendix F 34 authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (b)(2) of this section. (4) Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (b)(1) through (4) of this section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (b)(1) through (4) of this section. (c) In addition to the clauses contained in paragraph (b), in any contract subject only to the Contract Work Hours and Safety Standards Act and not to any of the other statutes cited in Sec. 5.1, the Agency Head shall cause or require the contracting officer to insert a clause requiring that the contractor or + subcontractor shall maintain payrolls and basic payroll records during the course of the work and shall preserve them for a period of three years from the completion of the contract for all laborers and mechanics, including guards and watchmen, working on the contract. Such records shall contain the name and address of each such employee, social security number, correct classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. Further, the Agency Head shall cause or require the contracting officer to insert in any such contract a clause providing that the records to be maintained under this paragraph shall be made available by the contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the (write the name of agency) and the Department of Labor, and the contractor or subcontractor will permit such representatives to interview employees during working hours on the job. CJ 12. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION - This provision only applies to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects which receive funds made directly available by Federal funding and the contract agreement is for more than $10,000. During the performance of this contract, the Contractor agrees as follows: (a) The Contractor will not discriminate against any employee or applicant for employment because of race, color, religion, sex, age, handicap, or national origin. The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, sex, age, handicap, or national origin. Such action shall include, but not be limited to the following: Employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided ` setting forth the provisions of this nondiscrimination clause. (b) The Contractor will, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive considerations for employment without regard to race, color, religion, sex, age, handicap, or national origin. _ (c) The Contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. (d) The Contractor will comply with all provisions of Executive Order 11246 of September 24, 1965, .. the Age Discrimination in Employment Act of 1967,29 U.S.C.A. 621 (1985), Executive Order 12250 WRD-708C Revised 9/7/2005 Appendix F 35 of November 2, 1980, the Rehabilitation Act of 1973, 29 U.S.C.A. 701 et seq. (1985), and of the rules, regulations, and relevant orders of the Secretary of Labor. (e) The Contractor will furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant thereto, and will permit access to his books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation to ascertain compliance with such rules, regulations, and orders. (f) In the event of the Contractor's noncompliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, this contract may be canceled, terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in i Executive Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as otherwise provided by law. (g) The Contractor will include the portion of the sentence immediately preceding paragraph (a) and the provisions of paragraphs (a) through (g) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontractor or vendor. The Contractor will take such action.with respect to any subcontract or purchase order as the administering agency may direct as a means of enforcing such provisions, including sanctions for noncompliance: PROVIDED, HOWEVER, That in the event a Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency the Contractor may request the United States to enter into such litigation to protect the interest of the United States. (h) The Contractor will comply with Executive Order 11246 based on its implementation of the — Equal Opportunity Clause, specific affirmative action obligations required by the Standard Federal Equal Employment Opportunity Construction Contract Specifications, as set forth in 41 CFR Part 60-4 and its efforts to meet the goals established for the geographical area where the Contract is to be _ performed. The hours of minority and female employment and training must be substantially uniform throughout the length of the Contract, and in each trade, and the Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of ` minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's goals shall be a violation of the Contract, the Executive Order, and the regulations in 41 CFR Part 60-4. The goals are expressed as percentages of the total hours of employment and training of minority and female utilization the Contractor should a reasonably be able to achieve in each construction trade in which it has employees in the covered area. Goals are published periodically in the Federal Register in notice form, and such notices may be obtained from any office of federal contract compliance programs office or from federal procurement contracting officers (512) 229-5835. The Contractor is expected to make substantially uniform progress toward its goal in each craft during the period specified. Whenever the Contractor, or any subcontractor at any tier, subcontracts a portion of the work involving any construction trade, it shall physically include in each subcontract in excess of $10,000 the provisions of these specifications and the notice which contains the applicable goals set for minority and female participation and which is set forth in the solicitations from which this contract resulted. 13. DEBARMENT AND SUSPENSION - This provision applies only to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects which receive funds made directly available by Federal funding. _ WRD-708C Revised 9/7/2005 Appendix F 36 This contract is subject to the Title 40 Code of Federal Regulations Part 32 concerning Debarment and Suspension. The contractor will comply with the assurances provided with the bid that led to this contract. 14. MINORITY AND WOMEN -OWNED BUSINESSES ENTERPRISES - This provision only applies to Clean Water State Revolving Fund Program projects and Drinking Water Financial Assistance Program projects. (a) The Contractor shall, if awarding sub -agreements, to the extent appropriate for the goals listed in the instructions to bidders make a good faith effort to use minority and women business when possible as sources of supplies, construction, equipment and services by taking the following steps: .. (1) Including qualified small, minority, and women's businesses on solicitation lists; (2) Assuring that small, minority, and women's businesses are solicited whenever they are potential .. sources; (3) Dividing total requirements, when economically feasible, into small tasks or quantities to permit maximum participation of small, minority, and women's businesses; (4) Establishing delivery schedules, where the requirements of the work permit, which will encourage participation by small, minority, and women's businesses; and (5) Using the services and assistance of the Small Business Administration and the Office of Minority Business Enterprise of the U.S. Department of Commerce, as appropriate. (b) The Contractor shall submit to the Owner information on utilization of minority and women business enterprises within 30 days of entering into an agreement with a minority or women business enterprise. The information shall include reporting called for in Texas Water Development Board's Guidance for Utilization of Small, Minority & Women -Owned Businesses, SRF-052v3 in procurement. _ (c) The Contractor shall maintain a documentation file on all efforts to obtain Minority and Women -Owned Business Participation. 15. ARCHEOLOGICAL DISCOVERIES AND CULTURAL RESOURCES No activity which may affect properties listed or properties eligible for listing in the National Register of Historic Places, or eligible for designation as a State Archeological Landmark is authorized until the Owner has complied with the provisions of the National Historic Preservation Act and the Antiquities Code of Texas. The Owner has previously coordinated with the appropriate agencies and impacts to known cultural or archeological deposits have been avoided or mitigated. However, the Contractor may encounter unanticipated cultural or archeological deposits during construction. If archeological sites or historic structures which may qualify for designation as a State Archeological Landmark according to the criteria in 13 TAC 41.6 - 41.10, or that may be eligible for listing on the National Register of Historic Places in accordance with 36 CFR Part 800, are discovered after construction operations are begun, the Contractor shall immediately cease operations in that particular area and notify the Owner, the TWDB, and the Texas Antiquities Committee, P.O. Box 12276, Capitol Station, Austin, Texas 78711-2276. _ The Contractor shall take reasonable steps to protect and preserve the discoveries until they have been inspected by the Owner's representative and the TWDB. The Owner will promptly coordinate with the State Historic Preservation Officer and any other appropriate agencies to obtain any necessary approvals or permits to enable the work to continue. The Contractor shall not resume work in the area of the discovery until authorized to do so by the Owner. 16. ENDANGERED SPECIES No activity is authorized that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of WRD-708C Revised 9/7/2005 Appendix F 37 Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. If a threatened or endangered species is encountered during construction, the Contractor shall immediately cease work in the area of the encounter and notify the Owner, who will immediately implement actions in accordance with the ESA and applicable State statutes. These actions shall include reporting the encounter to the TWDB, the U. S. Fish and Wildlife Service, and the Texas Parks and Wildlife Department, obtaining any necessary approvals or permits to enable the work to continue, or implement other mitigation actions. The Contractor shall not resume construction in the area of the encounter until authorized to do so by the Owner. 17. HAZARDOUS MATERIALS Materials utilized in the project shall be free of any hazardous materials, except as may be specifically provided for in the specifications. If the Contractor encounters existing material on sites owned or controlled by the Owner or in material sources that are suspected by visual observation or smell to contain hazardous materials, the Contractor shall immediately notify the Engineer and the Owner. The Owner will be responsible for the testing for and removal or disposition of hazardous materials on sites owned or controlled by the Owner. The Owner may suspend the work, wholly or in part during the testing, removal or disposition of hazardous materials on sites owned or controlled by the Owner. 18. PROJECT SIGN A project IDENTIFICATION SIGN will be provided to the contractor. The contractor shall erect the sign in a prominent location at the construction project site or along a major thoroughfare within the community as directed by the Owner. -� 19. OPERATION AND MAINTENANCE MANUALS AND TRAINING (a) The Contractor shall obtain installation, operation, and maintenance manuals from manufacturers and suppliers for equipment furnished under the contract. The Contractor shall submit three copies of each complete manual to the Engineer within 90 days after approval of shop drawings, product data, and samples, and not later than the date of shipment of each item of equipment to the project site or storage location. (b) The Owner shall require the Engineer to promptly review each manual submitted, noting necessary corrections and revisions. If the Engineer rejects the manual, the Contractor shall correct and resubmit the manual until it is acceptable to Engineer as being in conformance with design concept of project and for compliance with information given in the Contract Documents. Owner may assess Contractor a charge for reviews of same items in excess of three (3) times. Such procedure shall not be considered cause for delay. Acceptance of manuals by Engineer does not relieve Contractor of any requirements of terns of Contract. (c) The Contractor shall provide the services of trained, qualified technicians to check final equipment installation, to assist as required in placing same in operation, and to instruct operating personnel in the proper manner of performing routine operation and maintenance of the equipment. (d) Operations and maintenance manuals specified hereinafter are in addition to any operation, maintenance, or installation instructions required by the Contractor to install, test, and start-up the equipment. (e) Each manual to be bound in a folder and labeled to identify the contents and project to which it applies. The manual shall contain the following applicable items: (1) A listing of the manufacturer's identification, including order number, model, serial number, and location of parts and service centers. (2) A list of recommended stock of parts, including part number and quantity. VIM-708C Revised 9/7/2005 Appendix F 38 s F:J .o (3) Complete replacement parts list. (4) Performance data and rating tables. (5) Specific instructions for installation, operation, adjustment, and maintenance. (6) Exploded view drawings for major equipment items. (7) Lubrication requirements. (8) Complete equipment wiring diagrams and control schematics with terminal identification. 20. AS -BUILT DIMENSIONS AND DRAWINGS (a) Contractor shall make appropriate daily measurements of facilities constructed and keep accurate records of location (horizontal and vertical) of all facilities. (b) Upon completion of each facility, the Contractor shall furnish Owner with one set of direct prints, marked with red pencil, to show as -built dimensions and locations of all work constructed. As a minimum, the final drawings shall include the following: (1) Horizontal and vertical locations of work. (2) Changes in equipment and dimensions due to substitutions. (3) "Nameplate" data on all installed equipment. (4) Deletions, additions, and changes to scope of work. (5) Any other changes made. Forms to be submitted with executed contracts: • Contractor's Act of Assurance (ED-103) • Contractor's Resolution on Authorized Representative (ED-104) • Affirmative Steps Solicitation Report (WRD-216) • SMWBE Self -Certification (WRD-218) Form to be submitted during construction: • Loan/Grant Participation Summary (SRF-373) WRD-708C Revised 9/7/2005 Appendix F 39 .. .o an ED-101 01 /03100 SITE CERTIFICATE This is to certify that the City of Fort Worth, Tarrant County, Texas has now acquired, taken bona fide options on, or initiated formal condemnation proceedings against all property (sites, easements, rights -of -way, or specific use permits) necessary for construction, operation and maintenance of (water) (wastewater) facilities described as Sanitary Sewer Rehabilitation Contract 58 - Part 2 o' DOE No. 6039 CWSRF Loan No. 72104 in accordance with plans and specifications approved by the Texas Water Development Board. Any deeds or documents required to be recorded to protect the title(s) held by the City of Fort Worth have been recorded or filed for record wherever necessary. In the event of conflicts with existing underground utilities, or to preserve unknown cultural or so historic resources, the City of Fort Worth has the right of eminent domain and will take condemnation action, if necessary, to acquire any sites, easements or rights -of -way which may be required to change the location of any of the facilities described above; and upon acquisition of the rights -of -way and recording of documents, will submit another site certificate to that effect. aw EXECUTED this day of (Signature) Assistant City Attorney, City of Fort Worth (Title) ,2009 Note: This certificate MUST BE EXECUTED BY AN ATTORNEY OR AN ABSTRACTOR r, qualified to evaluate the Applicant's interest in the site and make such a determination. .. Contractor's Act Of Assurance (ED-103) STATE OF TEXAS COUNTY OF & rra ,, A BEFORE MEA.,,� bre,,,,a Notary Public duly commissioned and qualified in and for the County of Ta r-rij-s,-,4 in the State of Texas came and appeared K—p - &.� -TX , as represented by &41, L PA a S , the corporation's X I'C< -pmS t , who declares he/she is authorized to represent��%- d.0A.4,r,, •,iL.TX, LF pursuant to provisions of a resolution adopted by said corporation on the 1 day of �,w4rjg.", 20 09 (a duly certified copy of such resolution is attached to and is hereby made a part of this document). parnc7c , as the representative ofl oa hkr/ TX LP declares that Iona- wl- �nas JjAlg,�assures the Texas Water Development Board that it will construct project at , Texas, in accordance with sound construction practice, all laws of the State of Texas, and the rules of the Texas Water Development Board. r 5�" GIVEN UNDER MY HAND and seal of office this r 200—�L A.D. jwk:';'p"'`B<; . JAMIE L BROWN NOTARY PUBLIC !"';• y . State of Texas Comm. Exp. 06-27-2012 My Commission expires day of — L 6L- Printed Name 0(1 -21- aOV , ED-103 01/03/01 WRD-708C Revised 9/7/2005 Appendix F 47 Contractor's Resolution (ED-104) ON AUTHORIZED REPRESENTATIVE no Pr PAgd Duct 1 TX . LP Name or Dames r no I hereby certify that it was RESOLVED by a quorum of the directors of the o Aa fr c,,A►1, t"uc-�-1 J , meeting name of corporation on the day of t f • , 20�n that 8 5 and be, and hereby is, authorized to act on behalf of Co hk4Xr 0Ljj4-rc htr .. —1-)( r L_P , as its name of corporation representative, in all business transactions conducted in the State of Texas, and; That all above resolution was unanimously ratified by the Board of Directors at said meeting and that the resolution has not been rescinded or amended and is now in full forces and effect; and; In authentication of the adoption of this resolution, I subscribe my name and affix the seal of the corporation this 1 ' (seal) ED-104 5/019/02 day of , 20LI 1. - Secretary WRD-708C Revised 9/7/2005 Appendix F 49 SRF-404 (5/13/91) SRF Number Certification Regarding Debarment, Suspension, and other Responsibility Matters (SRF-404) The prospective participant certifies to the best of its knowledge and belief that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not within a three year period preceding this proposal been convicted of or had a civil judgement rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of. Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (c) Are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and (d) Have not within a three-year period preceding this _application/proposal had one or more public transactions (Federal, State, or local) terminated for cause or default. I understand that a false statement on this certification may be grounds for rejection of this proposal or termination of the award. In addition, under 18 USC Sec. 1001, a false statement may result in a fine of up to $10,000 or imprisonment for up to 5 years, or both. / VI*CC_—&31JeYJ Typed Da6nj & Title U Authorized Representative �. /jgnareeo1246' �zed Representative Date I am unable to certify to the above statements. My explanation is attached. so WRD-708C Revised 9/7/2005 Appendix F 51 no WRD-25s 09/12/01 BIDDER'S CERTIFICATIONS Project Name Project Number Contract For The following certifications must be completed by the bidder for each contract. A. EQUAL EMPLOYMENT OPPORTUNITY- ( ) I have developed and have on file at my each establishment affirmative action programs pursuant to 41 CFR Part 60-2. ( ) I have participated in previous contract(s) or subcontract(s) subject to the equal opportunity clause under Executive Orders 11246 and 11375. I have filed all reports due under the requirements contained in 41 CFR 60- .. 1.7. bd I have not participated in previous contracts(s) subject to the equal opportunity clause under Executive rders 11246 and 11375. ( ) I will obtain a similar certification from any proposed subcontractor(s), when appropriate. B. NONSEGREGATED FACILITIES I certify that I do not and will not maintain any facilities provided for my employees in a segregated manner, permit my employees to perform their services at any location under my control where segregated facilities are maintained; and that I will obtain a similar certification prior to the award of any federally assisted subcontract exceeding $10,000 which is not exempt from the equal opportunity clause as required by 41 CFR 60-1.8. 1 understand that a false statement on this certification may be grounds for rejection of this bid proposal or termination of the contract award. . /V� IA -A K. PAfI y.P• Typed N & *�fid le- of Bidder's thorized Representative Signatu' Authorized Representative Date - ��exI;Kkv"A W // I Name & Address of Bidder 59 .4 WRD-259 3/20/02 VENDOR COMPLIANCE WITH RECIPROCITY ON NON-RESIDENT BIDDERS Government Code 2252.002 provides that, in order to be awarded a contract as low bidder, a non-resident bidder must bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to "r underbid a non-resident bidder in order to obtain a comparable contract in the state in which the non- resident's principal place of business is located. A non-resident bidder is a contractor whose corporate offices or principal place of business is outside of the state of Texas. This requirement does not apply to a contract involving Federal funds. The appropriate blanks in Section A must be filled out by all out-of-state or non-resident bidders in order for your bid to meet specifications. The failure of out-of-state or non- resident contractors to do so will automatically disqualify that bidder. Resident bidders must check the blank in Section B. A. Non-resident vendors in (give state), our principal place of business, are required to be percent lower than resident bidders by state law. A copy of the statute is attached. Non-resident vendors in (give state), our principal place of business, are not required to underbid resident bidders. B. Our principal place of business or corporate offices are in the State of Texas: Company City State Zip 1)aa - By: (please rind �y \ Signature ICie - ki— Title: (please print) THIS FORM MUST BE RETURNED WITH THE BID 60 .. Texas Water Development Board SMWBE Guidance (SRF-052 v.5) Rev. 07/21 /06 SMWBE STATE REVOLVING FUND PROGRAM GUIDANCE DOCUMENT FOR THE UTILIZATION OF SMALL, MINORITY & WOMEN -OWNED BUSINESSES IN PROCUREMENT 11 Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 TABLE OF CONTENTS 'I I. GENERAL INFORMATION A. Background B. EPA Policy C. Applicability D. Guidance Document E. Benefits F. TWDB Role G. Flowchart of Procurement Process II. DEFINITIONS III. FAIR SHARE POLICY A. Fair Share Policy B. Fair Share Goals IV. GOOD FAITH EFFORT A. General B. Six Affirmative Steps C. Professional Service/Other Contracts D. Contractor Selection E. Documentation Financial Application Phase Subsequent Phases SMWBE Forms Tips for Achieving a Good Faith Effort in Procurement V. AFFIRMATIVE STEPS OUTREACH PROGRAM A. Affirmative Step One: Compile Solicitation Lists B. Affirmative Step Two: Solicit Contractors C. Affirmative Step Three: Reduce Contract Size D. Affirmative Step Four: Establish Delivery Schedules E. Affirmative Step Five: Use Government Sources to Identify F. Affirmative Step Six: Monitor Prime Contractor's GFE VI. AUTHORITY A. Federal Laws, Executive Orders and Federal Regulations B. State Laws C. TWDB Rules WK Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 J. GENERAL INFORMATION A. Background - The Texas Water Development Board (TWDB) receives grants from the Environmental Protection Agency (EPA) to provide low -interest loans to eligible political subdivisions. As a direct result of the United States Supreme Court's decision in Adarand Constructors, Inc. v. Pena 115 S. Ct. 2097 (1995), the EPA established new policies governing Small, Minority and Women -Owned Business Enterprises (SMWBE). These new policies are included in the Grants and Operating Agreements between the EPA and TWDB, and apply to all recipients of financial assistance. B. EPA Policy - EPA's policy (policy) requires recipients of its financial assistance to establish Fair Share Goals (goals) for awarding contracts and procuring goods and services from SMWBE's in the construction, supplies, equipment, and services procurement categories. The policy is meant to ensure that SMWBE's have the �. opportunity to participate in the procurement process, for all phases of the project. It is important to note that although the policy includes small (SBE) and rural area (SBRA) business enterprises, EPA is only statutorily required to collect data and enforce fair share goal objectives for Minority and Women -Owned business enterprises. TWDB will continue to collect information on SBE and SBRA participation, but those contract awards will not count towards the MBE and WBE goals. 4 C. Applicability - EPA's policy applies to all procurements made after May 8, 1998, for the Texas Water Development Board (TWDB) Drinking Water State Revolving Fund program (DWSRF), Tier III Clean Water State Revolving Fund program (CWSRF) and Colonial Wastewater Treatment Assistance Program (CWTAP). TWDB programs not affected by this policy are: Water Quality Enhancement (WOE), Water Supply Account (WSA), State Participation, Agricultural Loans and Grants, Tier II Clean Water State Revolving Fund program (CWSRF) and Economically Distressed Areas Program (EDAP). D. Guidance Document - The intent of the SMWBE guidance document is to assist applicants and contractors comply with EPA's policy regarding SMWBE's. It is based, in part, on publications, training manuals and other guidance documents developed ,by EPA to implement their policies published in 40 CFR Parts 30, 31, and 35. The guide also ensures consistency with the Supreme Court's decision in Adarand Constructors, Inc. v. Pena 115 S. Ct. 2097 (1995). E. Benefits - The Affirmative Steps Outreach Program is designed to benefit both recipients of EPA funds and the business community. Applicants can receive lower interest rates on loans in comparison to those available on the open -market, as well as having access to a greater pool of potential contractors to bid on their projects. This increased competition could have the affect of lowering overall project costs, thus, lessening the repayment burden on the Applicant. F. TWDB Role - The TWDB strives to provide all the necessary technical assistance needed to both applicants and prime contractors throughout all phases of the project. This can include reviewing draft newspaper advertisements, Request for Qualifications (RFQ), and Information for Bids (IFB) to ensure SMWBE components are included; and scheduling pre -application, project management, pre -bid and pre -construction conferences upon request. 40 Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 G. Flowchart of SMWBE Document Review (Note: CVVfAP funding does not have IUP, but must comply with EPA's Fair Share Policy) J'a j APPLICANT Ranked on the Intended Use Plan (IUP) by the TWDB APPLICANT Receives Letter of Invitation ® to Submit Loan Application APPLICANT APPLICANT Schedules Pre -Application _ .._ Decides to Continue with Meeting with TWDB Staff The Application Process APPLICANT May Procure Financial Advisor, Bond Counsel, & Consultant Engineer in accordance with EPA's Good Faith Effort Policy (See TWDB Guidance SRF-052) SMWBE COORDINATOR - 3. E-Mails Review Engineer Deficiencies Checklist & any Corrected Forms Deficiencies 4. Contacts Applicant (as necessary) SMWBE COORDINATOR 1. Reviews Corrected Forms & Other Documentation — 2. Contacts Applicant With Any Final Deficiencies to Correct APPLICANT Submits Financial Assistance Application to TWDB SMWBE COORDINATOR 1. Reviews WRD-215, and 216,217,218,SRF-373 2. Enters Data into SMWBE Tracking System 3. Determines Acceptability No Deficiencies SMWBE COORDINATOR 1. E-Mails Review Engineer with final approval 2. Forwards SMWBE Packet to Records Management w Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 .r 11. DEFINITIONS For the purpose of this guide, the following definitions shall apply: ♦ Applicant - Eligible political subdivision or privately -owned water system applying for financial assistance from the TWDB. ♦ Construction - Any contract or agreement to provide the building, erection, alteration, remodeling, improvement or extension of a TWDB-funded project. ♦ Equipment - Tangible, nonexpendable personal property having a useful life of more than one year, and an acquisition cost of $5,000 or more per unit. ♦ Grantee - Direct recipients of EPA funds through cooperative grant. ♦ Minority Business Enterprise (MBE) - A business concern which, 1) is certified as socially and we economically disadvantaged by the Small Business Administration (SBA), or; 2) is certified as a minority business enterprise by a State or Federal agency, or; 3) is independent and at least 51 percent -owned and controlled by minority group member(s), or; 4) is a Historically Black College or University (HBCU's). '+ (Minority individuals include Black Americans, Hispanic Americans, Native Americans, Asian Pacific Americans, or other groups whose members have been determined to be disadvantaged by the Small Business Act or by the Secretary of Commerce under Executive Order 11625, §5.) ♦ Prime Contractors - A business concern that enters into written agreements directly with the Applicant for construction, supplies, equipment and services. ♦ Recipients - Eligible political subdivisions or privately -owned water systems, who receive financial assistance from the TWDB, and/or prime contractors procured by political subdivisions or privately - owned water systems receiving financial assistance from the TWDB. ♦ Services - A contractor's time and effort (incl. consultants), which do not involve the delivery of a specific end -item, other than documents (i.e. reports, design drawings, specifications, etc.). .,, ♦ Small Business Enterprise (SBE) - A small business concern, including any affiliate that is independently owned and operated, but not dominant in the field in which they operate. Must also be officially qualified as an SBE by the Small Business Administration (SBA), which uses a numerical definition called "Size Standard" that is almost always stated in either number of employees or average annual receipts. (See Table 1) ♦ Small Business in a Rural Area (SERA) - A small business concern that is located and conducts its principal operations in a rural area/non-metropolitan county (as defined by the SBA). ♦ Subcontractors - A business concern that enters into written agreements directly with the Prime Contractor for construction, supplies, equipment and services. ♦ Supplies - All tangible personal property other than equipment. ♦ Women Business Enterprise (WBE) - A business concern which, 1) is certified as economically and socially disadvantaged by the SBA, and; (2) (a) is at least 51 percent owned by one or more women, or in the case of a publicly -owned businesses, at least 51 percent of the stock is owned by one or more women, and; (b) whose daily business operations are managed and directed by one or more of the women owners. .. Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 III. FAIR SHARE POLICY A. Fair Share Policy - It is EPA's policy that recipients of EPA financial assistance through grants, cooperative agreements and loans put forth a good faith effort to identify, solicit and if possible, award a fair share of contracts/procurements to small, minority and women -owned businesses. This policy applies to all contracts/procurements for construction, supplies, equipment and services. In accordance with these guidelines, the TWDB has established and presently administers the SMWBE program, to promote SMWBE participation for all applicable program projects. B. Fair Share Goals - The goals shown below were developed using data from the 1997 United States Economic Census, which determined the availability of small, minority and women - owned businesses throughout the State. The goals are applied to individual project contracts and procurements, which then determines the maximum potential procurement opportunities (in dollars) that are available to be awarded to MBE's and WBE's in each of the applicable procurement categories. It is important to note that the goals are not achievement standards or quotas, nor is achieving the goals mandatory. However, applicants and prime contractors (including minority and women -owned businesses) are required to adequately demonstrate that a good faith effort was made to achieve the goals using EPA's six affirmative steps. The fair share goals are negotiated by individual states, and are then presented to EPA for approval. The current EPA -approved fair share goals for the State of Texas are as follows: ' Procurement MBE Goal ' - y", 1(VBE Goal . Category = Percentage (%) : ` *'. Percentage"(°foj 3 Construction 34% 8% f S Supplies 18% 29% Equipment 13% 13% ..........__... ..... .._..__...._.................._ -.. ....... _.... -_.......... Services 22% 26% .-1 Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07121 /06 at IV. GOOD FAITH EFFORT A. General - To ensure compliance with the EPA's Good Faith Effort Policy and Affirmative Steps Outreach Program, the TWDB recommends that all applicants review their own procurement policies and procedures to see if/how SMWBE's are addressed. For applicants that may have outdated or unwritten procurement procedures, the six affirmative steps outlined below, provide an excellent starting point for updating and/or developing written procurement procedures to address SMWBE's. B. Six Affirmative Steps (1) Include qualified SMWBE's on solicitation lists; (2) Solicit potential SMWBE's, whenever they are potential sources; (3) Reduce contract size/quantities, when economically feasible, to permit maximum participation of SBE's SMWBE's; (4) Establish delivery schedules to encourage participation by SMWBE's; (5) Use the services and assistance of the SBA, the Minority Business Development Agency, the U.S. Department of Commerce, as appropriate; (6) Require Prime Contractor's to follow steps 1-5 when awarding subcontracts or sub -agreements. C. Professional Service/Other Contracts - As part of the application phase, applicants typically enter into prime contracts for professional services such as Financial Advisor, Bond Counsel, and Consultant Engineer. In addition to following the Six Affirmative Steps, the Applicant must also procure professional services in accordance with Title 10, Chapter 2254 of the Texas Government Code (Professional Services Procurement Act) and Title 40 Code of Federal Regulations, Part 31 (Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments). D. Contractor Selection - Recipients are responsible for establishing their own criteria for awarding contracts and for reviewing RFQ's, IFB's, and other bid documents to determine their validity and acceptability. Although the TWDB does not oversee this aspect of the process, it does recommend that adequate documentation be maintained to show the openness of the selection process and the method used to select the proposal/bid to ensure compliance with EPA's policy. E. Documentation ♦ Financial Application Phase - As part of the financial application package, applicants must submit documentation certifying an understanding of EPA's good faith effort policy, including the fair share goals and six affirmative steps. This information is documented on TWDB form WRD-215, APPLICANT AFFIRMATIVE STEPS CERTIFICATION and GOALS. Note: It is not uncommon for applicants to procure the services of Financial Advisor, Bond Counsel, and Consultant Engineer during the financial application phase. However, they must have been procured in accordance with EPA's good faith effort policy to be funded with federal loan proceeds. ♦ Subsequent Proiect Phases - Once the TWDB approves the loan commitment, applicants may proceed with the planning, design, and construction phases of the project, as directed by the TWDB review/project engineer. For each new procurement or contract award, the applicant (in the procurements of prime contractors) and the prime contractors (in the procurement of subcontractors) must demonstrate their understanding and adherence to EPA's good faith effort policy for all project costs to be funded with federal loan proceeds. Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 Texas Water Development Board Small, Minority, Women -Owned Business Enterprise Program Tips for Achieving a Good Faith Effort in Procurement To assist entities identify, include, and utilize qualified Small, Minority, and Women -Owned Business Enterprises (SMWBE), applicants and prime contractors are encouraged to refer to the following list of resources made available on a local, statewide, and national level. 1 Resources for identNying' SMWBE's: ♦ Texas Building and Procurement Commission's (TBPC) Centralized Master Bidders List (CMBL) & Historically Underutilized Business (HUB) Search - The CMBL & HUB Search is a statewide database managed by the TBPC. This database contains contact information on all vendors registered to do business with the State, including TBPC-certified HUB vendors. The CMBL & HUB search is an online system available to the public free of charge. htti)://www.tbpc.state.tx.us/cmbVcmblhub-htmi Texas Department of Transportation - Disadvantaged Business Enterprise Directory httr)://www.dot.state.tx.us/business/tucr)info.htm ♦ The City of Houston Minority, Women -Owned, and Disadvantaged Business Directory http://houston.mwdbe.com/FrontEndNendorSearchPublic.asp?TN=Houston Diversity ♦ The City of Austin - Minority Vendor List http://www.ci.austin.tx.us/i)urchase/t)u vendor intro.htm ♦ Small Business Administration's -Dynamic Small Business Search - SBA-DSBA is an Internet -based system that allows applicants and prime contractors to search for small, minority and women -owned businesses in their area. http://dsbs.sba.gov/dsbs/dsi) dsbs.cfm ♦ Other Minority & Women Business Organizations that you can contact directly to obtain a list of qualified vendors for your procurement opportunity: American Indian Chamber of Commerce of Texas Website: www.aicct.com Contact: Diana Woodward Email: doodward()aicct,com Phone: 817-429-2323 Fax: 817-451-3575 Central & South Texas Minority Business Council Website: www.cstmbc.orq Contact: Name: Jennifer Mort Email: jennifer@sdtmbc.com, eva@cstmbc.com Phone: 210-525-7925, 512-386-8766 Dallas/Fort Worth Minority Business Development Council Website: www.dfwmbdc.com Contact: Andrew Nash Email: business@dfwmbc.com Phone: 214-630-0747 Texas Association of Historically Underutilized Businesses Website: www.texashubs.orq Contact: Roy Mata Email: rmata@tgsaustin.com, info@texashubs.org Phone: 512-220-4293 Fax: 512-288-9121 Women's Business Council — Southwest Website: www.wbcsouthwest.ora Contact: Emilia Menthe, Erica Williams Email: ementhe@wbcsouthwest.org, ewilliams@wbcsouthwest.org Phone: 817-299-0566 Women Contractors Association Website: http://www.womencontractors.orq/ Contact: Josena Arquieta Email: jarquieta@womencontractors.org Phone: 713-807-9977 Fax: 214-637-2241 Fax: 713-807-9917 Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 Options for announcing your solicitation: ♦ Direct Communication - Contacting potential bidders by direct communication can include but are not limited to correspondence by letter, facsimile, telephone, or email. Applicants and prime contractors are required to provide copies of outreach letters, mailing lists, telephone, fax, and email tracking logs. ♦ Small Business Administration's (SBA) Sub -Net - Sub -Net is an Internet -based system that allows applicants and prime contractors to post their procurement opportunities online_ Access to the database is free to government agencies and contractors, and is an excellent resource for soliciting SMWBE's for your project. The Sub -Net database can be accessed at: http://web.sba.aov/subnet ♦ Newspaper Advertisements - The posting of applicable project procurement opportunities should be done in accordance with the notice requirements of state law on competitive bidding, where applicable. There are specific laws governing each type of entity. For example, two important provisions of state law governing municipalities require: 1. The notice should be published once a week for two consecutive weeks in a newspaper published in the municipality. If no newspaper is published in the municipality, the notice must be posted at the city hall for 14 days before the date set to publicly open the bids and read them aloud; }2. The date of the first publication should be/BEFORE the 14th day of the date set to publicly open the bids. *** Please consult your legal counsel for specific laws governing your entity. *** Pertinent language that needs to appear within the text of the solicitation includes: A. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). B. Any contract or contracts awarded under this Invitation for Bid (IFB) or Request for Qualifications (RFQ) are expected to be funded in part by a loan from the TWDB. Neither the State of Texas nor any of its departments, agencies, or employees are or will be a party to this IFB, RFQ, or any resulting contract. .. C. This contract is subject to the Environmental Protection Agency's (EPA) "fair share policy", which includes EPA -approved "fair share goals" for Minority Business Enterprise (MBE) & Women Business Enterprise (WBE) firms in the Construction, Supplies, Equipment, and Services procurement categories. EPA's policy requires that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to SMWBE's. Although EPA's policy does not mandate that the fair share goals be achieved, it does require applicants and prime contractors to demonstrate us of the six affirmative steps. The current fair share goals for the State of Texas are as follows: CATEGORY MBE WBE CONSTRUCTION 34.0% 8.0% SUPPLIES 18.0% 29.0% EQUIPMENT 13.0% 13.0% SERVICES 22.0% 26.0% D. Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex, age, handicap or national origin. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended by Executive Order 11375, and as supplemented in Department of Labor regulations 41 CFR Part 60. Small, minority, and women -owned business enterprises are encouraged to respond. A complete version of TWDB document, "SMWBE State Revolving Fund Program Guidance Document for the Utilization of Small, Minority, and Women -Owned Business Enterprises in Procurement' is available online at: http://www.twdb.state_tx.us/publications/forms manuals/SRF052.rtf Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 V. AFFIRMATIVE STEPS OUTREACH PROGRAM I T A. Affirmative Step One: Include qualified SMWBE's on solicitation lists .- See "Tips for Achieving a Good Faith Effort in Procurement" on previous page. B. Affirmative Step Two: Solicit potential SMWBE's, whenever they are potential sources ♦ DIRECT COMMUNICATION - Use of direct communication as a means to solicit potential contractors can include contact by certified letter, facsimile, e-mail and by telephone. Direct communication implies that a contractor solicitation list has been established; this list must be provided as backup documentation to the WRD-216 form when submitted. ♦ INDIRECT COMMUNICATION - Use of indirect communication as a means to solicit potential contractors can include advertising in one or more local, regional or statewide newspapers, trade association publications, minority media outlets, Internet or other website listings, and/or by notifying women and minority business organizations and chambers of commerce of these procurement opportunities. Newspaper advertisements must run in accordance with applicable r purchasing guidelines and must include a statement encouraging the participation of minorities, women and small businesses submitting an RFQ and/or bid. C. Affirmative Step Three: Reduce contract size/quantities, when economically feasible, to permit maximum participation of SBE's SMWBE's Reducing contract size increases the opportunity for SMWBE participation by dividing the work into smaller increments that may be more favorable to smaller businesses. An optimum time to consider reducing contract size is during the project design phase. Methods for reducing contract size could include, but are not limited to: reviewing the project for opportunities to stage work; dividing multiple -site work; dividing work by task; limiting "brand name requirements"; and soliciting multiple bid items. D. Affirmative Step Four: Establish Delivery Schedules to Encourage Participation Delivery schedules can sometimes determine whether a firm will be able to participate in the procurement process. Short delivery schedules often favor larger firms that have more staff and more available resources to complete big projects in a short period of time. Advanced planning and adequate project management can allow for reasonable delivery schedules, lengthening response time to receive bids and/or proposals, and can even increase competition, which can lead to reduced cost to the applicant. - E. Affirmative Step Five: Use the services and assistance of the SBA, the Minority Business Development Agency, and the U.S. Department of Commerce, as appropriate The SBA and the Department of Commerce (DOC) Minority Business Development Agency (MBDA) both manage outreach programs to assist SMWBE's business increase their procurement opportunities. The SBA assists small businesses in the development of business plans, financing, and education; applicants are encouraged to educate contractors on the services available to them through these government organizations. See Affirmative Step One for web links to those agencies. F. Affirmative Step Six: Require all Prime contractors to follow steps 1-5 when awarding subcontracts/sub-agreements Prime Contractors are required to follow steps 1-5 when awarding subcontracts/sub- agreements. They are also required to include the applicable "fair share objectives" in all project bid documents when soliciting for subcontracting opportunities. Including this information in the bid document/RFP ensures the potential bidder's awareness of the requirement and notification to comply. Any contract or subcontract awarded without regard to the "fair share objectives" can be considered ineligible for loan funding by the TWDB. u Eli Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 M. .,:A thority A. Federal Laws, Executive Orders and Federal Regulations 1. Public Law 95-507 - The Amendments to the Small Business Act. a.) Establishes the Office of Small and Disadvantaged Business Utilization in every Agency having procurement powers. b.) Establishes the 8(a) program. c.) Establishes Preferential Procurement Goals for participation by small businesses, small disadvantaged firms, 8(a) and small women- owned concerns in Federal contracting programs. The goals are forwarded to the Small Business Administration on an annual fiscal year basis for approval or negotiation. 2. Public Law 100-533 - Women's Business Ownership Act of 1988. Increases the advocacy Role of Federal Agencies to further promote and advance WBE utilization in Federal contracting and subcontracting activities. 3. Public Law 100-590 - Small Business Administration Reauthorization and Amendment Act of 1988. Enacted on November 3, 1988. It requires Federal agencies with substantial procurement or grant -making authority'to establish rural area business enterprise development plans. The Administrator of the Small Business Administration has identified EPA as a Federal agency having substantial procurement and grant -making authority. EPA has established a Rural Area Business Enterprise Development (RABED) Plan covering both financial assistance and direct procurement. 4. Public Law 101-507 - EPA Appropriation of Act of 1991. The 1991 Appropriations Act signed into law on November 5, 1990. "The Administrator of the Environmental Protection Agency shall, to the fullest extent possible, ensure that at least 8 per centum of Federal funding for prime and subcontracts awarded in support of authorized programs, including grants, loans and contracts for wastewater treatment and leaking underground storage tanks grants, be made available to business concerns or other organizations owned or controlled by socially and economically disadvantaged individuals (within the meaning of Section 8(aK5) and (6) of the Small Business Act (15 U.S.C. 637(a)(5) and (6)), including historically black colleges and universities. For purpose of this section, economically and socially disadvantaged individuals shall be deemed to include women... MW 5. Public Law 102-389 - The 1993 Appropriations Act. Enacted on October 6, 1992 changes the language in the Administrative Provisions of PL. 101-507 by adding the word 'hereafter' to the first sentence of the provision which states, "The Administrator of the Environmental Protection Agency shall, hereafter..." The addition of the word "hereafter" makes the language permanent. 6. OMB Circular A-102. Standards to be used by Federal agencies in establishing procedures for the procurement of supplies, services and construction with Federal assistance funds. 7. Executive Order 11625. Issued on October 13, 1971. The Order clarified the authority of the Secretary of Commerce to implement policy and to assist minority business enterprises. One of the factors was, "...to coordinate the participation of Federal departments and agencies in an increased minority enterprise effort." As a result of this, the Order required the Secretary of Commerce to, "...Promote the mobilization of activities and resources of State and local governments, businesses and trade associations, universities, foundations, professional organizations and volunteer groups toward the growth of minority business enterprises, and facilitate the coordination efforts of these groups with those of Federal departments and agencies." The Order further requires that Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21/06 the Secretary, with the participation of other Federal departments and agencies, as appropriate, to develop comprehensive plans and specific program goals; establish .. regular program monitoring and reporting systems; and evaluate the impact of Federal support in achieving the objectives established by this Order. The Order requires the head of each Federal department or agency to furnish information and reports in a manner W prescribed by the Secretary of Commerce. It further stipulates that within the constraints of law and appropriations, Federal departments and agencies shall foster and promote minority business enterprise. 8. Executive Order 12138. Issued on May 18, 1979. The Order directed all Federal agencies to: (1) facilitate, preserve and strengthen women's business enterprise and to ensure full participation by women in the free enterprise system; (2) take affirmative action in — support of women's business enterprises; and (3) extend Federal financial assistance to any program or activity... each department or agency empowered to, shall issue regulations requiring the recipient of such assistance to take appropriate affirmative action in support of women's business enterprise and to prohibit actions or policies which discriminate against women's business enterprise. Pursuant to Executive Order 12138, the regulation implemented by the agencies shall prescribe sanctions for noncompliance. Sanctions by EPA were set forth in 40 CFR Part 30, Subpart I. In the case of assistance awards to recipients other than State and local governments they are still set forth there. In the case of assistance awards to State and local governments they are set forth in 40 _ CFR Part 31.43. 9. Executive Order 12432 - Minority Business Development. Issued July 14, 1983. The Order directed all Federal agencies to: (1) develop an MBE plan on an annual basis; (2) establish MBE objectives; (3) identify methods for encouraging prime contractors and grantees to utilize MBEs; (4) build upon programs administered by the Small Business Administration and Minority Business Development Agency; (5) furnish an annual report regarding the accomplishments of their MBE programs; and (6) establish programs to deliver management and technical assistance to MBEs. 10.40 CFR Part 30. EPA implements its small business, minority business and women - owned business programs for institutions of higher education, hospitals, and other non- profit organizations in 40 CFR Part 30.44(b). 11.40 CFR Part 31.EPA implements its small business, minority business and women -owned business programs for States, local governments and Indian Tribes through its "Uniform Administrative Requirements for Grants and Cooperative Agreements to State and local Governments", 40 CFR Part 31, in 40 CFR 31.36(b) Procurement standards and Sec. 31.36 (e) Contracting with small and minority firms, women's business enterprise and labor surplus area firms ensuring use of six affirmative steps. 12.40 CFR Part 35, Subpart K. Under the State Revolving Fund Program requirements for the participation of minority and women -owned businesses apply to assistance in an amount equaling the grant. To attain compliance with MBENUBE requirements, the Regional Administrator or designee will negotiate an annual "fair share" objective with the State for MBE/WBE participation on these SRF-funded activities. A fair share objective should be based on the amount of the capitalization grant award or other State established goals. See 40 CFR 35.3145(d). Ref: www.epa.gov/authority.htm .. Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 B. State Laws 1. Texas Water Code - Chapter 15, Subchapter J. SUBCHAPTER J. FINANCIAL ASSISTANCE FOR WATER POLLUTION CONTROL establishes the state water pollution control revolving fund to be administered by the board under this subchapter and rules adopted by the board _ 2. PROFESSIONAL SERVICES PROCUREMENT ACT (CHAPTER 2254. SUBCHAPTER A.) Added by Acts 1993, 73rd Leg., Chi. 268, Sec. 1, eff. Sept. 1, 1993. Sec. 2254.002. Definitions. In this subchapter: (1) "Governmental entity" means: (A) a state agency or department; (B) a district, authority, county, municipality, or other political subdivision of the state; or (C) a publicly owned utility. .. (2) "Professional services" means services: (A) within the scope of the practice, as defined by state law, of: (i) accounting; (ii) architecture; (iii) land surveying; (iv) medicine; (v) optometry; (vi) professional engineering; or (vii) real estate appraising; or (B) provided in connection with the professional employment or practice of a ` person who is licensed as: (i) a certified public accountant; (ii) an architect; (iii) a land surveyor; (iv) a physician, including a surgeon; (v) an optometrist; (vi) a professional engineer; or (vii) a state certified or state licensed real estate appraiser. Added by Acts 1993, 73rd Leg., ch. 268, Sec. 1, eff. Sept. 1, 1993. Amended by..Acts 1997, 75th Leg., ch. 244, Sec. 1, eff. Sept. 1, 1997. Sec. 2254.003. Selection of Provider; Fees. (a) A governmental entity may not select a provider of professional services or a group or association of providers or award a contract for the services on the basis of competitive bids submitted for the contract or for the services, but shall make the selection and award: (1) on the basis of demonstrated competence and qualifications to perform the services; and (2) for a fair and reasonable price. (b) The professional fees under the contract: (1) must be consistent with and not higher than the recommended practices and fees published by the applicable professional associations; and (2) may not exceed any maximum provided by law. Added by Acts 1993, 73rd Leg., ch. 268, Sec. 1, eff. Sept. 1, 1993. Sec. 2254.004. Contract for Professional Services of Architect, Engineer, or Surveyor. (a) In procuring architectural, engineering, or land surveying services, a governmental entity shall: (1) first select the most highly qualified provider of those services on the basis of demonstrated competence and qualifications; and (2) then attempt to negotiate with that provider a contract at a fair & Texas Water Development Board SMWBE Guidance Document (SRF-052v.5) rev. 07/21 /06 reasonable price. (b) If a satisfactory contract cannot be negotiated with the most highly qualified .- provider of architectural, engineering, or land surveying services, the entity shall: (1) formally end negotiations with that provider; (2) select the next most highly qualified provider; and (3) attempt to negotiate a contract with that provider at a fair & reasonable price. (c) The entity shall continue the process described in Subsection (b) to select and negotiate with providers until a contract is entered into. Added by Acts 1993, 73rd Leg., ch. 268, Sec. 1, eff. Sept. 1, 1993. Amended by Acts 1997, 75th Leg., ch. 119, Sec. 1, eff. Sept. 1, 1997. Sec. 2254.005. Void Contract. A contract entered into or an arrangement made in violation of this subchapter is void as against public policy. Added by Acts 1993, 73rd Leg., ch. 268, Sec. 1, eff. Sept. 1, 1993. i 3. Local Government Code A. CHAPTER 252. PURCHASING AND CONTRACTING AUTHORITY OF MUNICIPALITIES B. CHAPTER 2051. GOVERNMENT DOCUMENTS, PUBLICATIONS, AND NOTICES C. CHAPTER 2251. PAYMENT FOR GOODS AND SERVICES D. CHAPTER 262. PURCHASING AND CONTRACTING AUTHORITY OF COUNTIES C. TWDB Rules 1. Chapter 363, Financial Assistance Programs 2. Chapter 371, Drinking Water State Revolving Fund 3. Chapter 375, State Water Pollution Control Fund WRD-215 Revised 07/21/06 TEXAS WATER DEVELOPMENT BOARD APPLICANT/ENTITY AFFIRMATIVE STEPS CERTIFICATION and GOALS WRD-215 - I. PROJECT INFORMATION A. TWDB B. Applicant/Entity C. Loan/Grant D. Program Type Project No. Name Amount (insert'x' for all that apply) Drinking Water SRF (DWSRF) Clean Water SRF (CWSRF) .. Colonia Wastewater (CWTAP) Other II. GOOD FAITH EFFORT (Applicable to all PRIME Contracts Awarded by the Applicant/Entity) I understand that it is my responsi6il7ty to compfy with a/f state and fe&raf regufrtions andguidnnce in the utilization of Smak Minority, Women -owned andSma/f Businesses in RurafAreas, in procurement. I certify that I wiQ make a good faith effort" to afford opportunities for SBE, MBE, 4ABrE andSOM s 6y. 1. Including qualified SBE, MBE, WBE and SBRA's on procurement solicitation lists; 2. Soliciting potential SBE, MBE, WBE and SBRA's; .. 3. Reducing contract size/quantities, when economically feasible, to permit maximum participation by SBE, MBE, WBE and SBRA's; 4. Establishing delivery schedules to encourage participation by SBE, MBE, WBE and SBRA's; 5. Using the services and assistance of the Small Business Administration, Minority Business Development Agency, U.S. Department of Commerce, Texas Marketplace; 6. Requiring all PRIME contractors to follow steps 1-5 of the "good faith effort" in employing SBE, MBE, WBE and SBRA Subcontractors; Signature - Applicant/Entity Representative Title Certification Date III. PROJECT PARTICIPATION ESTIMATES (Demonstrates maximum potential for MBENVBE participation, based on total loan/grant amount) Total Procurement Potential MBE Participation Potential WBE Participation Cost Category Total Goal Extension Goal Extension Construction $ - 34.0% $ - 8.0% $ - Supplies $ - 18.0% $ - 29.0% $ - Equipment $ - 13.0% $ - 13.0% $ - Services $ - 22.0% $ - 26.0% $ - *Other Issuance Costs $ - N/A N/A {not subject to MA -BE poa s! Total Procurement) $- ;:T:USI eQ. ai Ioao1 -ant amount; �. IV. TWDB APPROVAL SIGNATURES IOPFCA Engineer Approval Date SWMBE Coordinator Approval Date 'Other ISSUANCE costs can include: origination fees; bond insurance; land/easement/right-of-way: attorney oeneral fee: navincl agent fee or other non -bid project costs. TEXAS WATER DEVELOPMENT BOARD WRD-216 AFFIRMATIVE STEPS SOLICITATION REPORT Revised 07/21/06 1 WRD-216 1. PROJECT INFORMATION A. TWDB B. Applicant/Entity C. Contract D. Program Type Project No. Name I Amount (insert "X' for all that apply) ---]Drinking Water SRF (DWSRF) 64xo-k. Rckab Project De Clean Water SRF (CWSRF) Description: Con+,-" j-Y (11..( Wpati —.---]Colonia Wastewater (CWTAP) - Prime -------- Solicitation By: Applicant/En.tity,-z. 1 -X: Prime Contractor .... ... .... TWDB Construction Contract NumtS6r- 11. SOLICITATION LIST Column 1 List on this form, or provide a separate list of each business entity solicited for procurement: Full name, street address, city/state/zip, for each Small, Minority, Woman, Rural Area or Other N Column 2 Enter one of the following procurement or contract categories: CONSTRUCTION, SUPPLIES; EQUIPMENT; SERVICES 1d T' R Column 3 SBE, MBE, WBE, SRBA, or OTHER (NOTE! "OTHtR"- Company or firm is Non-SBE, MBE, WBE or SERA) Column 4 Evidence of Good Faith Effort solicitations will include a combination of the following outreach methods. Adequate backup documentation must be attached to this form for each method used. 1. Newspaper Advertisements 5. Internet & Web Postings O irect Contact by Phone, Fax, Mailouts 6. Trade Association Publications N: CD S 3. Meetings or Conferences 7. Other Government Publications 4. Minority Media . . .. ....... A umn Column 1 Column 2, will Name & Address of Procurelneint or', SolicitationType o Methods est-Entities Solicited for Prownernent. Contract Category Business s do S-Ef ArTj . . ..... fie Signatur? - Authonged Representative 111. TYY1JAa9ROVAL SIGNATURES OPFCA Engineer Approval Date Title Date vicc- - Pres (dem SWMSE Cbordin'aitor -A i ppr.qyal Date.:- PRIME CONTRACTOR: PROJECT DESCRIPTION CONATSER CONSTRUCTION TX, LP SANITARY SEWER REHAB, CONTRACT LVIII (58) - Part 2 COLUMNI NAME/ADDRESS OF ENTITIES AEI 1107 Arwine court, Suite #100 Euless, Texas 76040 B2O Environmental, Inc. 3103 Clear Lake Court Arlington, TX 76017 DFW Infrstructure, Inc. 4913 Briar Patch Lane Burleson, TX 76028 Magnum Manhole 3828 Cavalier Dr. Garland, tX 75042 NTP Plumbing 1025 E. Powell Ave. Fort Worth, TX 76104 Ram Tool & SuppIy Company, Inc 2323 Crown Road Dallas, Texas 75229 3/Tag Communications, LLC 709 Northill Dr Richardson, TX 75080 All -Tex Pipe & Supply, Inc. 5205 Elliott Reeder Road Haltom City, TX 76117-5915 LKT & Associates P O Box 668 Melissa, TX 75454-0668 Romar Supply, Inc. 2468 Fabens Road Dallas, TX 75229 Thompson Bearings & Power Trnms P O BOX 222261 Dallas, TX 75062 THT Electric Company dba THT 2999 N. Stemmons Freeway Winston Water Cooler, Ltd. 5014 Mark W Parkway Fort Worth, TX 76106 COLUMN 2 CONTRACT CATEGORY SERVICES SIC: 162306 SERVICES SIC: 162306 SERVICES SIC: 162306 SERVICES SIC: 162306 SERVICES SIC: 162306 SUPPLIER SIC: 179102 SUPPLIER SIC: 321201 SUPPLIER SIC: 321201 SUPPLIER SIC: 321201 COLUMN 3 TYPE OF BUSINESS Provides TV Inpsection and Pipe Cleaning M/WBE CONTRACTOR Provides TV Inpsection and Pipe Cleaning M/WBE CONTRACTOR Provides TV Inpsection and Pipe Cleaning M/WBE CONTRACTOR Provides TV Inpsection and Pipe Cleaning M/WBE CONTRACTOR Provides TV Inpsection and Pipe Cleaning M/WBE CONTRACTOR Supplies Rebar M/WBE CONTRACTOR COLUMN 4 SOLICITATION METHODS Direct by Phone, Fax, Mailouts Direct by Phone, Fax, Mailouts Direct by Phone, Fax, Mailouts Direct by Phone, Fax, Mailouts Direct by Phone, Fax, Mailouts Direct by Phone, Fax, Mailouts Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts M/WBE CONTRACTOR Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts M/WBE CONTRACTOR Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts M/WBE CONTRACTOR SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts SIC: 321201 M/WBE CONTRACTOR SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts SIC: 321201 M/WBE CONTRACTOR SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts SIC: 321201 M/WBE CONTRACTOR SUPPLIER Supplies Pipe, Pipe Fittings and Valves Direct by Phone, Fax, Mailouts SIC: 321201 M/WBE CONTRACTOR FORM WRD-216 Page 1 Conatser Construction TX, LP P. O. Box 15448 Fort Worth, Texas 76119 (817) 534-1743 FAX: (817) 534-4556 July 27, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies SIC 00162306 We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: CONTRACT LVIII (58) — Part 2 SANITARY SEWER SYSTEM REHABILITATION Sewer Project No. P254-703170106087 DOE #: 6039 City Project #: 01060 Project Bid Date: August 6, 2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L. P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 ( Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Opening", no later than 5:00 PM; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have any questions or comments regarding the above, please call (817) 534-1743 or fax (817) 534-4556. Mark Pappas Vice -President Conatser Construction TX, LP P. O. Box 15448 Fort Worth, Texas 76119 (817)534-1743 FAX: (817) 534-4556 July 27, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies SIC 00321201 We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: CONTRACT LVIII (58) — Part 2 SANITARY SEWER SYSTEM REHABILITATION Sewer Project No. P254-703170106087 DOE #: 6039 City Project #: 01060 Project Bid Date: August 6, 2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L. P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 ( Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Opening", no later than 5:00 PM; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have any questions or comments regarding the above, please call (817) 534-1743 or fax (817) 534-4556. Mark Pappas Vice -President Conatser Construction TX, LP P. O. Box 15448 Fort Worth, Texas 76119 (817) 534-1743 FAX: (817) 534-4556 July 27, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies SIC 00179102 We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: CONTRACT LVIII (58) — Part 2 SANITARY SEWER SYSTEM REHABILITATION Sewer Project No. P254-703170106087 DOE #: 6039 City Project #: 01060 Project Bid Date: August 6, 2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX., L. P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file with us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes" of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No. 7278, as amended by City Ordinance No. 7400 ( Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. All bids must be quoted "One Work Day Prior to Bid Opening", no later than 5:00 PM; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have any questions or comments regarding the above, please call (817) 534-1743 or fax (817) 534-4556. Mark Pappas Vice -President DBE DBE ID# FIRM ADDRESS CITY STATE ZIP PHONE FAX LETTER July 27, 2009 00162306 A E 1 1107 Arwine Court, Suite #100 Euless TX 76040 (817) 268-1381 (817) 268-1921 y 00162306 B20 Environmental, Inc. 3103 Clear Lake Court Arlington TX 76017 (817) 467-7006 (817) 465-6149 y 00162306 DFW Intrastructure, Inc. 4913 Briar Patch Lane Burleson TX 76028 18887399070 (817) 332-7244 y 00162306 Magnum Manhole & Underground Co. 3828 Cavalier Drive Garland TX 75042 (214) 687-2293 (972) 276-5318 y 00162306 NTP Plumbing & Utilities Contractor P O BOX 2110 Fort Worth TX 76104 (817) 483-6200 (817) 483-6203 y 00179102 Ram Too] & Supply Company, Inc. 1432 Mac Arthur Dr. Carrollton TX 75007 (817) 759-1993 (817) 759-2799 y 00179102 Rebar Service & Supply Company, Inc. 1390 Gilman Road Kennedale TX 76060 (817) 483-4603 (817) 483-8418 y 00321201 3/TAG Communications, LLC 709 North Hill Drive Richardson TX 75080 12149345692 19722342512 y 00321201 All -Tex Pipe & Supply, Inc. 5205 Elliott Reeder Road Haltom City TX 76117 (817) 831-3821 (917) 831-2173 y 00321201 LKT & Associates P O BOX 668 Melissa TX 75454 (214) 544-0440 (214) 544-3684 y 00321201 Romar Supply, Inc. 2468 Fabens Road Dallas TX 75229 (214) 357-2020 (214) 357-1398 y 00321201 Thompson Bearings & Power Transmission LLC P O BOX 222261 Dallas TX 75062 (972) 812-0878 (972) 812-0877 y 00321201 THT Electric Company, Inc. DBA THT 2999 N. Stemmons Frwy Lewisville TX 75077 (972) 979-3204 (469) 322-2668 y 00321201 Tower Well Resources, LLC P O BOX 1641 Colleyville TX 76034 (817) 849-1577 (817) 485-1677 y 00321201 Winston Water Cooler, LTD. 5014 Mark IV Parkway Fort Worth TX 76106 (817) 624-9090 (817) 624-1747 y 27-Jul-09 Send Log Status AtType PrName Date Comple Fax Set Thompson Bearings & Power Tr... Mon 7/27/2009 3:40 PM Comple Fax Set Magnum Manhole & Undergrou... Mon 7/27/2009 3:30 PM Failed Fax Set 3/TAG Communications, LLC Mon 7/2712009 3:53 PM Comple Fax Set All -Tex Pipe & Supply, Inc. Mon 7/27/2009 3:24 PM Comple Fax Set Ram Tool & Supply Company, Inc Mon 7/27/2009 3:34 PM Comple Fax Set Winston Water Cooler, LTD. Mon 7/27/2009 3:44 PM Comple Fax Set Conatser Construction, Inc. to Mon 7/27/2009 3:26 PM Failed Fax Set Tower Well Resources, LLC Mon 7/27/2009 3:54 PM Comple Fax Set Rebar Service & Supply Company Mon 7/27/2009 3:36 PM Comple Fax Set NTP Plumbing & Utilities Contr Mon 7/27/2009 3:32 PM Comple Fax Set B2O Environmental, Inc. Mon 7/27/2009 3:46 PM Comple Fax Set DFW Intrastructure, Inc. Mon 7/27/2009 3:47 PM Comple Fax Set AEI Mon 7/27/2009 3:21 PM Comple Fax Set THT Electric Company, Inc. D Mon 7/27/2009 3:50 PM Comple Fax Set LKT & Associates Mon 7/27/2009 3:28 PM Comple Fax Set Romar Supply, Inc. Mon 7/27/2009 3:38 PM Page 1 Pa... Company 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Su... Phone Number/Callerld 9728120877 9722765318 9722342512 8178312173 8177592799 8176241747 8175344556 8174851677 8174838418 8174836203 8174656149 8173327244 8172681921 4693222668 2145443684 2143571398 Send Log Page 2 From: Bertha Gianulis To: tnc. to Conbtser Construction Conatser Construction, TX., LP Tel: 817-534-1743 Fax: 817-534-4556 To: Inc. to Conatser Construction Company: Fax Number: 8175344556 Subject Pages including cover page: 2 Date: 7/27/2009 Time: 3:26:48 PM Page 1 of 2 il FAX COVER From : Bertha Gianulis Company: Conatser Construction Fax Number: (817) 534-4556 Time: 3:20:36 PM I Date: 7/27/2009 MESSAGE We are soliciting bids from Certified and Approved MBE and WBE enterprise companies for projects within the City of Fort Worth, Texas. The following letter outlines the details. Thank You for your interest. WinFax PRO Cover Page From: Bertha Gianulis To: Inc. to Conatser Construction Date: 7/27/2009 Time: 3:26:48 PM I Page 2 of 2 CONATSER CONSTRUCTION TN., L.P. P. O. Box 15448 Fort Worth, Texas 76119 (817) 534-1743 (817) 534-4556 July 27, 2009 Attention: Certified and Approved MBE and WBE Enterprise Companies We are soliciting bids from Certified and Approved M.B.E. and W.B.E. Enterprise companies who wish to quote us sub -prices on the following project [s]: CONTRACT LVIII (58) — Part 2 SANITARY SEWER SYSTEM REHABILITATION Sewer Project No. P254-703170106087 DOE #: 6039 City Project #: 01060 Project Bid Date: August 6, 2009 Specifications and Contract Documents for this project [s] may be obtained at the Office of Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas or can be viewed at Conatser Construction TX. L.P. 5327 Wichita Street, Fort Worth, Texas. All Subcontractors must have a Certificate of Insurance on file erith us prior to bid submittal and must be capable of having a Performance, Payment and Maintenance Bond. All Subcontractors will be required to comply with Provision 5159-A of "Vernon's Annotated Civil Statutes' of the State of Texas with respect to the payment of prevailing wage rates and City Ordinance No 7278, as amended by City Ordinance No. 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29) prohibiting discrimination in employment practices. All bids must be quoted "One Work Dav Prior to Bid Or)enirm". no later than 5:00 P.M.; otherwise bids will be considered non -responsive. We appreciate your interest in this project and look forward to working with you in the future. If you have any questions or comments regarding the above, please call me at (817) 534-1743. Our Fax Number is (817) 534-4556. Mark Pappas Vice -President WRD-217 Revised 07/21/06 TEXAS WATER DEVELOPMENT BOARD PRIME CONTRACTOR AFFIRMATIVE STEPS CERTIFICATION and GOALS WRD-217 I. PROJECT INFORMATION A. TWDB B. Applicant/Entity C. Loan/Grant G. Program Type Project No- Amount (insert' "for all that apply) Drinking Water SRF (DWSRF) Clean Water SRF (CWSRF) D. Contract Number E. Prime Contractor F. Contract Amount Colonial Wastewater (CWTAP) IOther II. GOOD FAITH EFFORT (Applicable to all Sub -Agreements Awarded by the Prime Contractor) I understand that it is my responsifit'Gty to compfy with atf state mtd federal regufatimrs andguidance in the utireration of smaA EXCEPTION *inon,t� M'omen-0wntdondSmaff7)usincsstsinftraf.Arta;inpmcurzmea� t. IcertthatIwiffma4agoodfaithefJorr`toafford opporturrities forSM WW, 10BE mtd St84(p's fry. _ _ As the Prime Contractor, 1. Including qualified SBE, MBE, WBE and SBRA's on procurement solicitation lists; I certify that I have reviewed 2. Soliciting potential SBE, MBE, WBE and SBRA's; the contract requirements and 3. Reducing contract size/quantities, when economically feasible, to permit maximum found no available subcontracting opportunities. participation by SBE, MBE, WBE and SBRA's; 1 also certify that I will fulfill 4. Establishing delivery schedules to encourage participation by SBE, MBE, WBE and 100 percent of the contract SBRA's; requirements with my own = 5. Using the services and assistance of the Small Business Administration, Minority Business employees & resources. Development Agency, U.S. Department of Commerce, Texas Marketplace; 6. Submitting documentation to the Texas Water Development Board to verify good faith effort, steps 1-5. (check it applicable) Signature Auth ze Representative Title Certification Date `/I'CQ„ ' Nm. 5 t! Ili/PRQ�/ECT PARTICIPATION ESTIMATES (Demonstrates maximum potential for AABEhvBE participation, based on total contract amount) Total Procurement Potential MSE Participation PotlfiiIFB1EP Cost Category Total Goal :,.Extension' QoaC : a Ex#e)iarll 8.0/. Construction $ 5 34.0/° $' ^--- $ - ._._._.__ 00 Supplies.. $ .� - 18.0% $ Z CD19153— - 29.0% $ I ito.... - ...34 Equipment $ - 13.0% $ - 13.0% $ - Services $ - 22.0% Qr) ° 0 - "Other Issuance Cs ots - .. a .._ _._. $ NIA NIA (not subiect to b1ME oo &'j Total Procurement a sly a�°° - {must e4=:.�f0� ' ual conttrWt amDunti ) ... , t W ... _ IV. TWDB APPROVAL SIGNATURES OPFCA Engineer Approval Date SWMBE Coordinator Approval Date, ` Other ISSUANCE costs can include: orioination fees; bond insurance; land/easement/right-of-wav: attorney general fee; oavinq anent tee or other non -bid oroiect costs. WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement I WRD-21 a I. PROJECT INFORMATION A. TWDB B. Applicant/ C. Contract D. Program Type Project No: Entity Name Amount (insert -x• for all that app y). Drinking Water SRF (DWSRF) I Clean Water SRF (CWSRF) E: Contractor Name and Address � _R -a�dry' : _ _ —! Colonia Wastewater (CWTAP) 32W M8rVij$ br. F— 1 IIw-e -J Other- - ---- --- — II. CERTIFICATION I hereby certi that the a6ow named rsm is in- act a mal4 9bfinori Women -Owned or Smaff Business in a &4Am_ in accordance with the Texas Water (Develovment Board auidance document (Sgi' F-0S21 i Small Business Enterprise (SBE) I Place "X" in the Minority Business Enterprise (MBE) i appropriate category Women -Owned Business Enterprise (WBE) Small Business in a Rural Area (SERA) Signature -, PRIME C. ctor Title Date ignatu APPLIC Nr/ENTITY Representative - Title Date 1 IN III. NOTARIZATION State of: T,< County of SWORN TO AND SUBSCRIBED before me on: qj Sign u Date Printed Name: < iltit..t t !ti IV. TWDB APPROVAL SIGNATURES (Imprint Sea o: JAMIE L BROWN NOTARY PUBLIC * i i State of Texas Comm. Exp. 06-27-2012 _ .---. _._._--- . - - --- --1- - ..._ _ ____-- - My Commission Expires on:!'! _ �1 OPFCA Engineer, Approval Date SMWBE Coordinator. Approval.Date WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement I WRD-218 1. PROJECT INFORMATION A. TWDB B_ Applicant C. Contract D_ Program Type Project No. Entity Name Amount (insert-x• for as that apply) J Drinking Water SRF (DWSRF) E. Contractor Name and Address Clean Water SRF (CWSRF) Colonia Wastewater (CWTAP) Other.. -__--------- --------. IL CERTIFICATION I here that the above named is vr- act a rn �f� 'Women-Oumerf or SmalC Business in a rRu a<Ar�ea in accordance with the Texas Water (Development Boardauidance document ORF OS21 Small Business Enterprise (SBE) I Place "X" in the Minority Business Enterprise (MBE) appropriate category Women -Owned Business Enterprise (WBE) Small Business in a Rural Area (SBRA) Signatur IME 7Con or Title Cate _- - -- -- V fcs, - Pry s_lalehr ` gnatur I-APPIL116ANIIXTITY Representative Title Date:- •• Ill. NOTARIZATION State of T x a 5 (Imprint Seafj County of: -------- -------- : PPrP;;B•.. JAMIE L BROWN i SWORN TO AND SUBSCRIBED before me on: ' =o,'J...., ` `. * i�i } • NOTARY PUBLIC � State of Texas Comm. Exp. 06-2 201 11� ---......._..-.._ . Signal � � Date Printed Name: My Commission Expires on:' b t` ale IV. TWDB APPROVAL SIGNATURES OPFCA Engineer Approval: Date , : SMWBE Coordinator. Approval -Date WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement I WRD-218 I. PROJECT INFORMATION A. TWDB B. Applicant/ C. Contract D. Program Type Project No. Entity Name Amount (insert"X" for all that apply) Drinking Water SRF (DWSRF) E. Contractor Name and Address Clean Water SRF (CWSRF) Th T Colonial Wastewater (CWTAP) t J r i'�� l I ►1e_ -.� i'�5 ne�C_' c; Sit - QQ -^t t�- q C� l�'-t l r / I�CX �t t (o()45; Other IL CERTIFICATION I k�M& thatthe above named srm is in- act a S 4 2 Women owned or Small Business in a 4 crafArea, in accordance with the Texas Water Dewromnent Board auidance document (94?, '-OS21 Small Business Enterprise (SBE) Place "X" in the Minority Business Enterprise (MBE) appropriate V, category Women -Owned Business Enterprise (WBE) Small Business in a Rural Area (SERA) :Signat a )PRIME Co .actor Title Date nature - IPPLIC1iNT/ENTITY Representative Title, Date III. NOTARIZATION .---State of: -- — --- -- - ---- --(Imprint SeaO -- - -- — - County of: SWORN TO AND SUBSCRIBED before me on: JAMIE L BROWN NOTARY PUBLIC State of Texas Comm. Exp. 06-27-2012 Signal Date Printed Name:�Tt /KiC L . IV. TWDB APPROVAL SIGNATURES - OPFCA Engineer Approval Date My Commission Expires on: I&p . 17 _ � SMWBE Coordinator Approval Date r� WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement I WRD-218 I. PROJECT INFORMATION A. TWDB B. ApplicanU C. Contract D. Program Type Project No. Entity Name Amount (inert'( for all that apply) Drinking Water SRF (DWSRF) E. Contractor Name and Address Clean Water SRF (CWSRF) uf1C6�5 t�Ut"Ct° �. QQ Colonia Wastewater (CWTAP) � f�25 .��L �9� <.a Vaf c�J� �-IUu�-�U� a�77 aR Other II. CERTIFICATION I Ageb � that the above named fim is in; act a , Mino ' 'Women -Owned or STgff Business in a liraf� in accordance with the Texas 'Water (DeveCovment Board guidance document (SARI-052). Small Business Enterprise (SBE) Place "X" in the Minority Business Enterprise (MBE) appropriate category Women -Owned Business Enterprise (WBE) Small Business in a Rural Area (SERA) Signature - PRIMElCoaor S' nature - APPLICd'NTIENTITY Representative v _. Ill. NOTARIZATION State of. County of: Title V i- cu Pre s J-e kA Title W" SWORN TO AND SUBSCRIBED before me on: Signatur)arnl-trDate Printed Name RW' .A.A. nr ` Date 19�im-Y Date (Imprint Soo -------- JAMIE BROWN NOTARY PUBLIC State of Texas OFP' Comm. Exp. 06-27-2012 My Commission Expires on: (_�P- — i (— a() `d� IV. TWDB APPROVAL SIGNATURES OPFCA Engineer Approval Date SMWBE Coordinator Approval Date WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement WRO-218 1. PROJECT INFORMATION A. TWDB B. Applicant/ C. Contract D. Program Type Project No. Entity Name Amount (insert'x- for an that apply) Drinking Water SRF (DWSRF) E. Contractor Name and Address Clean Water SRF (CWSRF) Colonia Wastewater (CWTAP) Other 11. CERTIFICATION I figeb certi that t_Fte above named fi m is in- ac a �mag Mino . 'Women -Owned or,,2MgBusiness in a � ra Area in accordance with the Texas' Water(Devefovment Boardaurdance document (SVeF-0521 Small Business Enterprise (SBE) Place "X" in the Minority Business Enterprise (MBE) t/ appropriate category Women -Owned Business Enterprise (WBE) i �. _._.._ ....I Small Business in a Rural Area (SBRA) f. ...... . ws S.igna MIC for Title Date SignatuTIT'( Representative Title Date III. NOTARIZATION State of: County of: SWORN TO AND SUBSCRIBED before me on: Sigv- nat)qUt Date (Lnpnnt Sea) JAMIE L BROUVN j+t i* NOTARY PUBLIC °•.�4o`y; State of Texas Comm. Exp. 06-27-2012 Printed Name:' � Rr„�� My Commission Expires on: T,a� �b d� IV. TWDB APPROVAL SIGNATURES OPFCA Engineer Approval Date SMWBE Coordinator Approval Date WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement I WRD-218 I. PROJECT INFORMATION A. TWDB B. Applicant/ C. Contract D. Program Type Project No. Entity Name Amount (insert W for all that apply) Drinking Water SRF (DWSRF) _ E. Contractor Name and Address Clean Water SRF (CWSRF) Colonia Wastewater (CWTAP) *3(L4 9C'Q.rta,�, 1�irGN� iCYfZ 0 Other 1 II. CERTIFICATION I fi�b cgrti that t—he above named u in- act a ,�_!� 9V(inm 'Women -Owned or b Business in a &ra[Area, in accordance with the Texas Water 0eve(onment Boardouidance document (.S'RF--0521 Small Business Enterprise (SBE) Place "X" in the Minority Business Enterprise (MBE) appropriate category Women -Owned Business Enterprise (WBE) Small Business in a Rural Area (SBRA) Signature- PRIME Contractor / h Title F �( Date Si nature- APPLICANT/ENTITY Representative Title Date III. NOTARIZATION State of: (ImprintSeaq --.... _ �x ass County of: -t-2 rr a SWORN TO AND SUBSCRIBED before me on: ''°"�R;. JAMIE L BROWN 6 ; I II p� r `r r NOTARY PUBLIC `0'tLn. {2[.►' 1 ,+ State of Texas Comm. Exp. 06-27-2012 Signa a Date Printed Name: Drou �, My Commission Expires on: QX4 _ a 1 ao 01,' IV. TWDB APPROVAL SIGNATURES OPFCA Engineer Approval Date SMWBE Coordinator Approval Date WRD-218 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 SMWBE SELF -CERTIFICATION For Utilization of Small, Minority, Women -Owned, & Small Businesses in Rural Areas in Procurement I WRD-218 : ; .. 1. PROJECT INFORMATION A. TWDB B. Applicant/ C. Contract D. Program Type Project No. Entity Name. Amount (Wised W for an that apply) Drinking Water SRF (DWSRF) E. Contractor Name and Address -- Clean Water SRF (CWSRF) Colonia Wastewater (CWTAP) ---� x U632-6 IYJC IS 1(0�(0 Other II. CERTIFICATION I that ttie above named urrt is in- act a SmmaQ �Vtino►ity. 'Women -Owned or ,�mali Business in a �� area m accordance with the Texas Water rDevefonment Board auidance document 6q?,F--0S21 Small Business Enterprise (SBE) Place "X" in the Minority Business Enterprise (MBE) j appropriate category Women -Owned Business Enterprise (WBE) ✓ Small Business in a Rural Area (SBRA) i I Signature - P" .Contr or Title Date Signalure-APPLICANTI _ $(MTY��Representative Title Date Ill. NOTARIZATION State of: (Imprint Sea9 County of: T rrall,+ --- - SWORN TO AND SUBSCRIBED before me on: JAMIE L BROWN { ti.i* NOTARY PUBLIC Statt Texas ...`111.... Comm. Exp. o06-27-2012 Signatu Date Printed Name: " My Commission Expires on:; IV. TWDB APPROVAL SIGNATURES OPFCA Engineer . Approval Date SMWBE Coordinator Approval Date SRF-373 TEXAS WATER DEVELOPMENT BOARD Revised 07/21/06 LOAN/GRANT PARTICIPATION SUMMARY SRF-3.73 ' . I. PROJECT INFORMATION A. TWDB Project B. Applicant/Entity Name C. Contract or D. Program Type (inse'd W for all that apply) Number I j Loan Amount Drinking Water SRF (DWSRF) i Project Description j s _ P :Clean Water SRF (CWSRF) Vs Prime Contractoro k per Ctl .,t�tf '�'.x.�_ �,P�. Colonia Wastewater (CWTAP) .................. .�_.._.._._.._..._.... ; ---- _ Solicitation By: ;Applican�t/Eritity: ! Pfirrie Contras#or ;Other TWDB Construction Contract Number: — I II. LIST OF ACTUAL CONTRACTS I PROCUREMENTS N Column 1 Enter the full name, street address, city/state/zip for each firm awarded a contract for the project T i Column 2 Enter the procurement category: CONSTRUCTION; SUPPLIES; EQUIPMENT; SERVICES U '. Column 3 Enter the type of business: SBE; MBE; WBE; SRBA; or OTHER (OTHER = Non -SSE, MBE. WBE or SBRA) T Column 4 Enter the exact amount of the awardeftontract o Column 5 Enter the exact date the contract was or will be executed Column 6 Enter the certification type (i.e. state; federal; NCTRCA; City of Houston; Self -Certification etc.) Column 1 Column2 Column 3 Column* Column 5 Column 6 Name & Address of. Contracted Procurement . Type of . ..AGfual.ContraOi Contract Type of SMWBE FifmNendor Category. Business'. Awarded ($) EXecution Date GertiftcaYroil I hereby certify Mat aiTof the firms futeda6ove were cvrrt »c edto work on the spec fedprojeci I also certify that I wilrimmeetately notify. the Texas Water 0mlopment Boardifany of the "esmal; minority, wornen-ownedar ruralfums are termmatedfmm the project. Signatu utho,, ee epresentative Title. Date 'T III. TWD APPROVAL S GNATURES OPFCA Engineer Approval Date SMWBE Coordinator Approval Date PRIME CONTRACTOR: CONATSER CONSTRUCTION TX, LP PROJECT DESCRIPTION. SANITARY SEWER REHAB, CONTRACT LVlll (59) - Part 2 COLUMN] COLUMN2 COLUMN3 COLUMN6 COLUMNS COLUMN NAME/ADDRESS OF ENTITIES CONTRACT CATEGORY TYPE OF BUSINESS ACTUAL CONTRACT AWARDED CONTRACT EXECUTION DATE TYPE OF CERTIFICATION Robert Granados Trucking Services and Supplies MBE $386,758.00 September 15, 2009 NCTRCA 5412 Kingslink Circle Fort Worth, Texas 76135 Cowlown Redi-Mix Supplies MBE/WBE $76.700.00 September 15. 2009 NCTRCA P 0 BOX 163267 Fort Worth, Texas 76161 Roadrunner Traffic Supply Supplies MBE/WBE $4.500.00 September 15. 2009 NCTRCA 3200 Marquita Dr. Fort Worth, Texas 76116 Haros Partners, LP Services MBE $16,000.00 September 15, 2009 NCTRCA 5112 Mosson Road Fort Worth, TX 76119 MJ Pipeline Inspection, Inc. Services WEE $11,700.00 September 15, 2009 NCTRCA P 0 BOX 851 Granbury, Texas 76046 Magnum Manhole Company Services WEE $63,000.00 September 15, 2009 NCTRCA 314 S. Kirby St. Garland, Texas 75042 Suncoast Resources, Inc. Supplies WEE $60,000.00 September 15, 2009 NCTRCA 6922 Cavalcade Houston, TX 77028 National Waterworks Supplies Non-MBE(WBE $383,400.00 September 15, 2009 WA P O BOX 940700 Dallas, Texas 75284 JLB Contracting, LLC Supplies Non-MBEIWBE $6,100.00 September 15, 2009 N/A P 0 BOX 24131 Fort Worth, TX 76124 Rinker Materials Supplies Non-MBE(WBE $66,000.00 September 15, 2009 WA P 0 BOX 730197 Dallas, Texas 75373-0197 Conatser Construction TX, LP Supplies/Services Non-MBE(WBE $1,500,667.00 September 15, 2009 N/A P O BOX 15448 Fort Worth, Texas 76119 FORM SRF-373 Page 1 No w Ow APPENDIX A Geotechnical Investigation so M 40 am April 7, 2009 Mr. Peter Lai RJN Group, Inc. 12160 Abrams Road, Suite 400 Dallas, Texas 75243 Re: Geotechnical Investigation Sanitary Sewer Rehabilitation . • Contract 58-Part ii-Phase 2 Fort Worth, Texas Mas-Tek Project No.: E09-0207 Dear Mr. Lai: Phn: (972) 437-4300 Fax: (972) 437-2707 E-Mail: plai(a)rin.com Please find enclosed our report summarizing the results of the geotechnical investigation performed at the above referenced project site. We trust the recommendations derived from this investigation will provide you with the information necessary to complete your proposed project successfully. For your construction materials testing and related quality control requirements, it is recommended that the work be performed by Mas-Tek Engineering & Associates in order to maintain continuity of inspection and testing services for the project under the direction of the geotechnical project engineer. We thank you for the opportunity to provide you with our professional services. If we can be of further assistance, please do not hesitate to contact the undersigned at (972) 709-7384. Sincerely, MAS-TEK ENGINEERING & ASSOCIATES, INC. MW William Cappell Project Engineer .. Mar Principal �p�( E, a o�• MARS li Fs �cr1iseD d ti Geotechnical Consulting & Materials Testing 3228 Halifax, Suite B Dallas, Texas 75247 972 709-7384 .. .r TABLE OF CONTENTS PAGE sm 1.0 INTRODUCTION 1 1.1 PROJECT DESCRIPTION - ---- ---- 1 1.2 PURPOSE AND SCOPE ----- - ------------------------------------1 2.0 FIELD INVESTIGATION— --- ----------------------------1 3.0 LABORATORY TESTING _.._____ 2 4.0 SITE AND SUBSURFACE CONDITIONS --------- ------ ---------- ----------- -------- 2 4.1 GENERAL SITE CONDITIONS ----- ------------------------2 4.2 SITE GEOLOGY---__ -_..___-___ i 4.3 SUBSURFACE CONDITIONS ------ —---------------- ---------------------------------3 4.4 GROUNDWATER CONDITIONS---------------------- 5.0 TRENCH EXCAVATIONS 3 ' 5.1 OPEN CUTS ----- ----------- -- 4 5.2 TRENCH BRACING/BORE PIT SHORING ----- ----------4 .. 5.3 DEWATERING------------------------ ----------------------5 j 5.4 CONSTRUCTION CONSIDERATIONS 5 5.5 BORE CONSIDERATIONS 5 6.0 EARTHWORK GUIDELINES 6 6.1 TRENCH BACKFILL --6 7.0 CONSTRUCTION TESTING ------- -------------------_____�_____�_�__g 8.0 LIMITATIONS --------------_ ------ ------ ---7 FIGURES PLAN OF BORINGS -------- ---1 LOGS OF BORINGS ---- ------------- ---- 2 through 10 LEGEND - KEY TO TERMS OF BORINGS & SYMBOLS-------------------------------------11 SLOPE RATIO FOR OPEN TRENCH CUTS ---------------12 PRESSURE ENVELOPE FOR TRENCH SHORING I k ----------------------------13 ' r MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 GEOTECHNICAL INVESTIGATION SANITARY SEWER REHABILITATION CONTRACT 58 — PART ii — PHASE 2 FORT WORTH, TEXAS 1.0 INTRODUCTION 1.1 PROJECT DESCRIPTION This project consists of a new 18 inch sanitary sewer line within a residential area located near the NE corner of 1-20 / Loop 820 and Hulen Street in Fort Worth, Texas. See Figure 1 for alignment. Microtunnelling is proposed along most of this alignment due to the existing pavements and the invert depth of the proposed sanitary sewer line. i 1.2 PURPOSE AND SCOPE ' I The purposes of this geotechnical investigation were to: 1) explore the subsurface conditions at the site; 2) evaluate the pertinent engineering properties of the subsurface materials; 3) provide recommendations for open cut construction and trench shoring and; 4) provide considerations for proposed microtunneling. This report was prepared in general accordance with our subconsultant agreement dated July 23, 2008. 2.0 FIELD INVESTIGATION The field investigation consisted of drilling seven (7) deep core borings along the proposed alignment. The borings were drilled to depths of 20 to 45 feet below the existing ground surface. The boring locations were located at the approximate locations shown on the Plan of Borings (Figure 1). ! A truck mounted auger drill rig was used to advance these borings and to obtain samples for ` laboratory evaluation. Undisturbed samples of cohesive soils were obtained at intermittent intervals with standard, thin -walled, seamless tube samplers. These samples were extruded in the field, logged, sealed, and packaged to protect them from disturbance and maintain f their in -situ moisture content during transportation to our laboratory. I MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 1 y The limestone was continuously cored to allow evaluation of rock hardness and compressive strength. Rock hardness was also evaluated by cone penetration tests. Upon completion of the test borings, the boreholes were backfilled and plugged with concrete after obtaining groundwater measurements. The results of the boring program are presented on the Logs of Borings, Figures 2 through 10. A key to the descriptive terms and symbols used on the logs is presented on Figure 11. 3.0 LABORATORY TESTING Laboratory tests were performed on representative samples of the soil to aid in classification «. of the soil materials. These tests included Atterberg Limits tests, moisture content tests, and dry unit weight determinations. Hand penetrometer tests were performed on the soil samples to provide indications of the swell potential and the foundation bearing properties of the subsurface strata. Unconfined compressive strength tests and unit weight determinations were performed on rock core samples to provide indications of the rock hardness. The results of our testing program are presented on the Log of Borings (Figures 2 through 10). 4.0 SITE AND SUBSURFACE CONDITIONS 4.1 GENERAL SITE CONDITIONS This project consists of a new 18 inch sanitary sewer line within a residential area located near the NE corner of 1-201 Loop 820 and Hulen Street in Fort Worth, Texas. See Figure 1 for alignment. Microtunnelling is proposed along most of this alignment due to the existing pavements and the invert depth of the proposed sanitary sewer line. 4.2 SITE GEOLOGY As shown on the Dallas sheet of the Geologic Atlas of Texas, the project site is located in an area underlain by the undivided Fort Worth Limestone and Duck Creek Formation. This Formation typically consists of hard limestone strata interbedded with shale and clay seams. no Soils derived from the formation are typically moderately to highly active clays exhibiting moderate to high shrink/swell potential with variations in moisture content. No _ MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 2 4.3 SUBSURFACE CONDITIONS Subsurface conditions encountered in the borings, including descriptions of the various strata and their depths and thicknesses, are presented on the Logs of Boring. Note that depth on all borings refers to the depth from the existing grade or ground surface present at the time of the investigation. Boundaries between the various soil types are approximate. 4.4 GROUNDWATER CONDITIONS ' The borings were advanced using auger -drilling methods. Advancement of the borings using auger -drilling methods allows observation of the initial zones of seepage. Water was encountered in most of the test borings. Water level measurements indicate groundwater levels in most areas at depths ranging from 8 to 18 feet below the existing ground surface at the time of this investigation (March 2009). Shallower groundwater levels should be anticipated after periods of rainfall. Results of the water level measurements are shown on the Logs of Borings (Figure 2 thru 10). It is not possible to accurately predict the magnitude of subsurface water fluctuations that might occur based upon short-term observations. The subsurface water conditions are subject to change with variations in climatic conditions and are functions of subsurface soil conditions, rainfall, and water levels within nearby creeks. 5.0 TRENCH EXCAVATIONS i It is understood that microtunnelling will be performed along most of the alignment and that open cut construction will be performed in some areas.. As indicated on the boring logs, soil conditions will vary significantly. The conditions will vary from jointed clay and calcareous clay to severely fractured weathered limestone to very hard i unweathered limestone_ Short term groundwater was present in the borings at depths ranging from 8 to 18 feet in some areas at the time of this investigation (March 2009). Shallower groundwater levels would be anticipated during or after periods of rainfall. MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 3 For trench excavations less than five feet in depth, and in stable clay soils, trench excavation may be cut near vertical in accordance with OSHA regulations, For excavations ! to anv depth in sand, gravel, soft clay, non -compact fill, submerged soil, or unstable rock (fractured weathered limestone), or where seepage, or sloughing is observed, it will be necessary to employ either sloped excavations or temporary bracing regardless of trench depth. For excavation to depths in excess of five feet, it will be necessary to employ either sloped excavations or temporary bracing, regardless of the soil conditions encountered. General w guidelines for the design of these two alternatives are discussed in the following sections. 5.1 OPEN CUTS ! I Recommended slope ratios for the respective soil conditions are presented graphically on Figure 12. Trench excavation to any depth in unstable soil or in weathered or fractured rock conditions should be cut back in a similar manner as described above. It should be recognized f that free standing slopes will be less stable when influenced by groundwater or saturated by rain. Surcharge loads, such as those resulting from excavation spoil, or equipment, should be placed no closer than two feet from the crest of the slope, or in accordance with OSHA regulations. Vehicle traffic should be maintained at least five feet from the edge of the crest. R Excavation may encounter non -compact fill soils placed during previous construction of j underground utilities. If encountered, these fill soils should be sheeted, shored, and braced, or laid back on slopes no steeper than 1.5 (H): 1(V). 5.2 TRENCH BRACING/BORE PIT SHORING I Where site limitations require excavations to have vertical side walls, an internal bracing system will be necessary. Bracing may consist of timber or steel shoring or manufactured steel trench braces. The lateral pressure distribution to be used in the design of trench bracing may be determined as presented on Figure 13. It should be recognized that pressures are not included from hydrostatic pressures, surcharge loads, or traffic live loads at trench side walls, j dynamic loads, and vibration, which if present, must be included in bracing design. In lieu of a shoring system, a trench shield consisting of a prefabricated rigid steel unit adequate to withstand anticipated lateral pressures may be used. I MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 4 M as 5.3 DEWATERING It should be anticipated that groundwater will be encountered in the excavations. Groundwater levels may be encountered at relatively shallow depths in some areas, particularly after periods of heavy rain (See Sections 4.4 and 5.0). In areas where groundwater is encountered, a system of ditches, sumps and pumping will be required to provide groundwater control. The design of the actual dewatering system required is the contractor's responsibility. This includes the control of tail -water flow through previous backfilled sections. 5.4 CONSTRUCTION CONSIDERATIONS The following guidelines are presented to aid in the development of the excavation plans: Surface areas behind the crest of the excavations should be graded so that surface water does not pond within 15 feet of the crest, nor drain into the excavation. Heavy material stockpiles should not be placed near the crest of slopes per OSHA requirements. Similarly, heavy construction equipment should not pass over or be parked within 5 feet of the crest. The crest of slopes should be continually monitored for evidence of movement or potential problems. Freestanding slopes will become less stable when influenced by groundwater or saturation by rain. 5.5 MICROTUNNELLING It is understood that microtunnelling will be performed along most of the alignment and that invert depths will be within 2' to 5' of the geotechnical boring depths. See Boring Logs. Based on the borings, microtunnelling will generally be performed within very hard gray limestone containing occasional fractures, shale seams and gray calcareous shale layers. In some areas, the crown of the tunnel will be overlain by fractured water -bearing weathered limestone, water bearing calcareous clay and highly expansive jointed shaley clay. See boring logs for specific conditions at each boring location. MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 5 6.0 EARTHWORK GUIDELINES 6.1 TRENCH BACKFILL The excavated soils can be used for trench backfill. Use of rock fragments greater than six (6) inches in any dimension should be prohibited, since attaining uniform moisture and density without voids would be difficult. The backfill should be placed in thin compacted lifts as • specified below. The fill materials should be free of surficial vegetation or debris. ,o Clay and calcareous clay fill soils having a PI over 25 should be placed in 8 inch horizontal loose lifts and compacted to at least 95 percent of the maximum dry density as determined by ASTM D-698 test method. The clay and calcareous clay should be compacted at optimum to +4 above the optimum moisture content. Sand or sandy clay fill soils having a PI of less than 25 should be placed in 8 inch horizontal loose lifts and compacted to at least 95 percent of the maximum dry density as determined by so ASTM D-698 test method. These lower PI soils should be compacted at -2 to +2 of optimum moisture. Broken limestone should be place in loose lifts of 8 inches and should be adequately crushed to where individual rock fragments have a diameter of less than 6 inches. The crushed '! limestone should be compacted at optimum to +4 percentage points above optimum moisture to a minimum of 95% Standard Proctor density (ASTM D-698). The limestone materials should be crushed and compacted using a compactor of sufficient size and weight to crush the rock. For fill depths below 15 feet and 25 feet depths respectively, the compaction level should be increased to 98% and 100% ASTM D698, respectively, where it is desired to reduce post - construction settlements. 7.0 CONSTRUCTION TESTING Field density and moisture content determinations should be made on each lift of fill with a minimum of 1 test per lift per 100 linear feet for roadways and a minimum of 1 test per lift per 150 linear feet of utility trench backfill. Supervision by the field technician and the project i MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 6 engineer is required. Some adjustments in the test frequencies may be required based upon the general fill types and soil conditions at the time of fill placement. Many problems can be avoided or solved in the field if proper inspection and testing services are provided. It is recommended that site preparation, concrete placement, and fill compaction be monitored by a qualified engineering technician. Density tests should be performed to verify compaction and moisture content of any earthwork. Inspection should be performed prior to and during concrete placement operations. Mas-Tek Engineering & Associates, Inc. employs a group of experienced, well -trained technicians for inspection and construction materials testing who would be pleased to assist you on this project. 8.0 LIMITATIONS The professional services which have been performed, the findings obtained, and the recommendations prepared were accomplished in accordance with currently accepted geotechnical engineering principles and practices. The possibility always exists that the subsurface conditions at the site may vary somewhat from those encountered in the boreholes. The number and spacing of test borings were chosen in such a manner as to decrease the possibility of undiscovered abnormalities, while considering the nature of loading, size, type and cost of the project. If there are any unusual conditions differing significantly from those described herein, Mas-Tek Engineering & Associates should be notified to review the effects on the proposed construction. The recommendations given in this report were prepared exclusively for the use of the Client and their consultants and clients. The information supplied herein is applicable only for the design of the previously described development to be constructed at locations indicated at this site and should not be used for any other structures, locations, or for any other purpose. We will retain the samples acquired for this project for a period of 30 days after the submittal date printed on the report. After this period, the samples will be discarded unless otherwise notified by the owner in writing. MAS-TEK ENGINEERING & ASSOCIATES, INC. E09-0207 Page 7 v • ' • A ti ' ti �' 1 ► LIME `ti' r,,,. SHEETtu s r .� 1 EEI SHEEl 1' a '� AOA;t,G 1 SHEET r 1 {"T' tlkNtG4 i ... • •k LStr`EE"t" � � . �� r .. are„ i H .EfT i` r i r.• r.:G SHEET OA- Ir4ZZ _ ZEE t a•J n ` •tC � •t, a 1 - r T PLAN SHEET l2 SHEET it „ • 2",., sSHEE7 Y. Projevt No: — - _ E09-0_207 PLAN OF BORINGS FIGURE NO: rrfwx-Ts.c En�..ea. frog FT. WORTH MICRO TUNNEL — FT. WORTH, TEXAS 1 is As3so�cUates. trMe. LOG OF BORING B-1 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 Date: 03/2312009 Elev.: Location: See Figure 1 Depth to water at completion of boring: 10' Depth to water when checked: prior to coring was: 13' .. Depth to caving when checked: was: ELEVATIOW DEPTH $OIL SYMBOLS SAMPLER. SYMBOLS DESCRIPTION MC L � PI '2W 00 P.EN UNCC(ON SW" ((evil S FIELD TEST DATA Prf „ ASPHALT over sand & gravel base 416 ses" `. W4 6' Brown calcareous CLAY w/ limestone seams -' 2W Moderately hard to hard tan weathered LIMESTONE, w/ clay seams, fractured 1150/1 S'. -seepage at 8' Very hard gray LIMESTONE w/ calcareous shale seams -� & occasional fractures * 14 T1 j 50I0.7S I 150105" 5010" r -low angle fracture `' 96%REC -45° angle fracture 96%ROD -450 angle fracture •`I 6 140 86,7 0.1 �T I -low angle fracture 4 ,sz 4843 z++�« 501025" - ' 5°"°z5 -low angle fracture _ 7€� 65%* REC 65% ROD I , -low angle fracture 6 142 102,4 01*� ` �_so 5W 25" -glow angle fracture_..-__.___ Boring terminated at 28' - a4 I _ 3s Notes: * Low recovery due to mechanical breakage and blockage within core barrel during drilling. FIGURE:2 >Ar1k Slickensided MTE, INC. LOG OF BORING B-2 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 OWN Date: 03/16/2009 Bev.: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: end of day was: Dry +� Depth to caving when checked: was: ELEVATION/ SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION MC LL PL Pt -200 DO P PEN UNCON Strain (feet) 8 FIELD TEST DATA % % % % Pd tsf ksf % NEW ° ASPHALT over gravel base Light brown calcareous CLAY wl calcareous deposits 14 54 20 34 45.. Moderately hard to hard tan weathered LIMESTONE, w/ calcareous clay layers, fractured -s NEW to -10 4111111 -1s 91110 ta. - 20 NOW and -25 - 30 _ 35 .ts Notes: I A4V 50f3" ,W,V 5410,51 Very hard gray LIMESTONE w/ calcareous shale seams & occasional fractures 50f 1" sorc.25' S010.5" 5W.5'• 5W 25" 50/0'• 5*0.25" W0.25 -low angle fracture -low angle fracture 95%REC -low angle fracture 95% ROD MTE, INC. 2 154 7291 FIGURE:3 LOG OF BORING B-2 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Date: 03/1612009 Elev.: Location: See Figure 1 i Depth to water at completion of boring: Dry Depth to water when checked: end of day was: Dry Depth to caving when checked: was: ELEVATIO%U SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION {teeth 8 FIELD TEST DATA _.� ,s�ro.s' -low angle fracture aTa %JD.25' -45' angle fracture at 93% REC 2Y y1� 93% ROD - r. -450 angle fracture -45 50/025" - 50ff ......._.__......... _.._..........__.. _._.............. _..... ....__ _ _._..._..._.... _................ _........... _._.._... .. Boring terminated at 45' _30 r �70 i Notes: Project No.: E09-0207 04C LL PL PI -200 DD PIPER LKCON $tmp % % % % Pd of hd %_ 8 138 1237 2A i ib9 �4,6 FIGURE:4 N[TE, INC. LOG OF BORING B-3 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 Date: 03/20/2009 Elev.: Location: See Figure 1 Depth to water at completion of boring: 17' Depth to water when checked: after 24 hours was: 12' f Depth to caving when checked: was: ELTSOIL SYMBOLS DESCRIPTION LL DEPTH SAMPLER SYMBOLS ' PL PI •200 DD PPC•N u"Cora s,a�, DEPTH � (tsaet� L FIELD TEST DATA 16 % 'q % pa ,i! ksr % ASPHALT over 9" concrete 310 Brown & light brown calcareous CLAY w/ tan limestone 'z 21 'S 13 25 __.._.. Moderately hard to hard tan weathered LIMESTONE, w/ t,77very hard layers & calcareous clay layers, fractured ; sa, s" -some very hard gray limestone layers below 6' so 5a1.25" so T p 5011" ' t s Sao 75- i sa, 5'• - Fl 5010 25' -seepage at 15' -w/ 4" to 6" gray shale layers below 17' Very hard gray LIMESTONE w/ calcareous shale seams & occasional fractures sao, s• wlZi. .m -gyp I F 7 ' 50M 25" - � s 5019, 2 ' 50/0.25•. I -low angle fracture 72%*REC -45° angle fracture 11 162 39.9** e,0 172•/, ROD Notes: * Low recovery due to mechanical breakage and blockage within core barrel during drilling. FIGURE:5 �Ar�Ar Failed along fractured shale seam MTE, INC. LOG OF BORING B-3 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 . Date: 03120/2009 Elev.: Location: See Figure 1 Depth to water at completion of boring: 17' Depth to water when checked: after 24 hours was: 12' Depth to caving when checked: was: ELEVATtOW DEPTH SOIL SYMOOLS SAMPLER SYMBOLS DESCRIPTION t,% x � Pt `2W 00 PPF" ��► smn (feet) 8 FIELD TEST DATA -450 angle fracture 3 t55 761.0 -low angle fracture EYE,—, ,' 40 soro z1" Very hard gray LIMESTONE w/ calcareous shale seams -low angle fracture 4 145 857.5 ' 77%* REC 77 % ROD -low angle fracture -45 -�? D25" -low anqle fracture ._.._--- Boring terminated at 45' s a - sv Notes: Low recovery due to mechanical breakage and blockage within core barrel during drilling. FIGURE:6 *�k Failed along fractured shale seam MTE, INC. LOG OF BORING B-4 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 Date: 03/23/2009 Elev.: Location: See Figure 1 Depth to water at completion of boring: 23.5' Depth to water when checked: after 24 hours was: 18' Depth to caving when checked: was: ELEVATtON1 SOtI SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION MC LL PL Pf -200 DD P PEN UNCON Strain (feet) 8 FIELD TEST DATA % % % % pcf tsf kst % ASPHALT - 25 — r f - - 30 I ' - 35 Light brown sandv CLAY w/ gravel srs Light brown calcareous CLAY w/ tan severely weathered 10 1116" limestone layers, calcareous deposits & calcareous 1716" nodules 51G 7V 16 41 15 26 = y. tllG' 136- 16n, 11W 27V 1W 7W 20 5t1r1^ 50f0.2S' SM,26- 501cr ._...__._.._.__.... . .._......._........... r. Moderately hard to hard tan weathered LIMESTONE, fractured ___.._._...._..-....... _...._........_.._.__.._._......._..._._..__— Tan & gray shalev CLAY w/ limestone seams, jointed 18 54 20 34 Tan severely weathered LIMESTONE, severely fractured -seepage at 19' Very hard gray LIMESTONE w/ shale seams & occasional fractures -low angle fracture 3 160 703,0 -low angle fracture i2 M.0 262 2,3 M�ROD -15" gray calcareous shale layer at 27' -low angle fracture -low angle fracture 25, 1-low angle fracture �r 110`—`135 ——59.02.3� Moderately hard gray calcareous shale w/ very hard limestone layers 45%* REC 45° angle fracture 45% ROO , -450 angle fracture Very hard gray LIMESTONE w/ shale seams 5oro.2s `C10 Boring terminated at 35' Notes: * Low recovery due to mechanical breakage and blockage within core barrel during drilling FIGURE:7 MTE, INC. LOG OF BORING B-5 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 Date: 03/24/2009 Elev.: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: End of day was: Dry Depth to caving when checked: was: ELEVATION/ SOIL SYMBOLS DEPTH I SAMPLER SYMBOLS DESCRIPTION % x % PI '960 PDDD P.P N UN`SON Strain (feet) & FIELD TEST DATA ° ASPHALT ;z 3s ;s Dark brown & light brown sandv CLAY w/ reddish brown '�" clati, & gravel ;zsr6' Brown sandv CLAY w/ limestone fragments ..�g5dr Very hard tan weathered LIMESTONE w/ clay seams, - 5 fractured i F Very hard gray LIMESTONE w/ gray shale layers & ri_.. occasional fractures -450 angle fracture 00%* REC L s 801W ROD -low angle fracture 4 150 3977 29 .. -450 angle fracture t :r' Spr0.5'1 4 149 1592 1,6 -low angle fracture }�W%*REC -low angle fracture I MR-L. 88% ROD — _4 J ..., _.. _ _ _ _.._ ._...5f L419.4_— 1.7 .. Very hard gray LIMESTONE w/ shale seams i -45' angle fracture .. _20-'_ _ 25' - 'LL-_450 angle fracture �- Boring terminated at 20' �� no - 25 i - 30 - 35 Notes: Low recovery due to mechanical breakage and blockage within core barrel during drilling FIGURE:8 _ _ _ MTE, INC. _ LOG OF BORING B-6 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 .,, Date: 03/19/2009 Elev.: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: End of day was: 13' Depth to caving when checked: was: ELEVATION/ SOIL SYMBOLS DEPTH I SAMPLER SYMBOLS DESCRIPTION % PI '200 Do I P,PEN uNcoN sv% !feet) a FIELD TEST DATA Brown sandy CLAY w/ calcareous nodules &gravels 41 f �4/6 Brown sandv CLAY w/ limestone fragments, gravel, & "' reddish brown clay (FILL) - SW n Light brown & gray sandv CLAY w/ numerous limestone 19 -12 1e 33 fragments & layers of broken limestone 12 30 (FILL to 7') 6/6" 15 4.5* 7/6" 916" 6/6" 22 07.2 -10 9/6,. ...... ........... 32/6• Light brown calcareous CLAY w/ numerous limestone fragments am -,Hard tan weathered LIMESTONE, fractured J1" Very hard gray LIMESTONE w/ fractures & shale layers Svc 5^ 851A* REG 1 163 1838,0 85% ROD -low angle fracture 5=,5" -low angle fracture -45' angle fracture 56%* REc 56% ROD 50/0 25- 50'0 _ Boring terminated at 22' 5. 144 Notes; fir Low recovery due to mechanical breakage and blockage within core barrel during drilling _ MTE, INC. 420.3 i.8 FIGURE:9 ... LOG OF BORING B-7 Project: Ft. Worth Microtunnel - Ft. Worth, Texas Project No.: E09-0207 Date: 03/18/2009 Elev.: Location: See Figure 1 Depth to water at completion of boring: Dry Depth to water when checked: End of day was: 10' No Depth to caving when checked: was: ELEVATION/ SOIL SYMBOLS DEPTH SAMPLER SYMBOLS DESCRIPTION *A % P1 "V � P oN U kSON Sa FIELD TEST DATA o Brown very sandv CLAY to clavev SAND 2.2 Brown sandv CLAY w/ limestone fragments Brown & light brown sandv CLAY w/ numerous t3� deposits limestone fragments & calcareous de 9 P 1.r _ _15 ■r � - 20 I - 30 11 47 1e 31 4r6' 13 63.6 5.4i" Tan & gray shalev CLAY w/ hard limestone seams, 12 40 15 26 2' 'ointed 5f)t1 Very hard tan & gray weathered LIMESTONE wl clay 5t11 • seams, severely fractured -low angle fracture- W% ROD Moderately hard gray calcareous SHALE w/ very hard limestone layers & occasional fractures WO 26' -45' angle fracture 5 146 752A saa, 16 112 136 2.3 40% ROD Very hard gray LIMESTONE w/ shale layers & occasional fractures solo 26' -,low angle fracture Boring terminated at 20' Notes: * Low recovery due to mechanical breakage and blockage within core barrel during drilling FIGURE:10 MTE, INC. _ _ r Symbol Description .� Strata symbola — ® Paving Calcareous Clay r KEY TO LOG TERMS & SYMBOLS Symbol Description �- Water table at boring completion Boring continues LIMESTONE, Weathered Limestone CLAY, sandy Shaley Clay LIMESTONE, Severely Weathered .r Calcareous Shale Misc. Symbols L Water table when checked Soil Samplers Roger 7� Standard f� Penetration Test THD Cone T Penetration Test (Tj Rock W Core Thin wall Shelby Tube ad Notes: 1. Exploratory borings were drilled on dates indicated using truck mounted drilling equipment. 2. Water level observations are noted on boring logs. - 3. Results of tests conducted on samples recovered are reported on the boring logs. Abbreviations used are: DD = natural dry density (pcf) LL = liquid limit M MC = natural moisture content M PL = plastic limit (iS) Uncon.= unconfined compression (tsf) PI = plasticity index P.Pen.= hand penetrometer (tsf) -200 = percent passing #200 ;4. Rock Cores Recovery = sum of core sample recovered divided by length of run, expressed as percentage. RQD = (Rock Quality Designation) sum of core sample recovery 4" or greater in length divided by the run, expressed as percentage. FIGURE:11 MTE, INC, f 10 RECOMMENDED SLOPE RATIOS SOIL / ROCK Soft clay soils (hand penetrometer of 0.5 to 0.9 tsf) Submerged soils, and/or fractured rock from which water is seeping Granular soils (sand and gravel) Stiff to hard clay, calcareous clay, shaley clay and sandy clay above existing groundwater level Tan weathered limestone 8r fractured gray limestone above existing groundwater level C Short Term Long Term Bedding (under 8 hours) (over 8 hours) („ Cut H V H V Z (ft.) 1 -'/2 1 2 1 0 1-'/z 1 2 1 0 1-'/2 1 2 1 0 1 1 1 1 ` In accordance with the best interpretation of OSHA regulations, submerged soil is defined as water bearing granular soils, fissured clay soils, or fractured rock (jointed weathered clay -shale, tan fractured weathered limestone, or fractured gray limestone) from which groundwater is seeping. Maximum bedding cut for trench excavations less than 12 feet deep in dry soil and weathered clay -shale which are open less than 8 hours. NOTE: Recommended slope ratios may be subject to reduced stability under the influence of groundwater or saturation by rain. Recommended slope ratios are designed for safety only of temporary excavations and are not designed to prevent limited sloughing during construction. i a#ss4wrAwe sss .nG FORT WORTH MICRO -TUNNEL FT. WORTH, Texas DATE: April 6, 2009 RECOMMENDED SLOPE RATIOS PROJECT NO: E09-0207 2 FIGURE 12 LATERAL EARTH PRESSURES FOR INTERNALLY BRACED EXCAVATIONS (For excavations terminating in stiff to hard clay or limestone) — Ground Surface t r I 'i ly/L Excavation Bottom- -no WHERE: Sh = Lateral Earth Pressure, psf. g = Saturated Unit Weight of Soil; Use 130 pcf for stiff to hard Clay, Weathered Marl Use 140 pcf for Unweathered Gray Limestone H = Height of Excavation (ft.) k = Earth Pressure Coefficient, Use 0.35 for Stiff to Hard Clay, Weathered Marl NOTES: 1) If water is not allowed to drain from behind shoring or bracing, full hydrostatic pressure must be considered. 2) Surcharge loads and traffic live loads, if present, must also be considered. r� FORT WORTH MICRO -TUNNEL LATERAL EARMH FIGURE Mws-TiK FT. WORTH, Texas PRESSURES 13 Engitsearing - �' Assoclatas, Inc' DATE; April 6, 2009 PROJECT NO- E09-0207 wk- W APPENDIX B TXDOT Utility Crossing Permit and Specifications aw s Page 1 of 1 ., Notice of Proposed Installation rol" Utility Line On TxDOT Highway Right of Way DCp.rtmBn[ �+ a nonsporfapon Installation Application Online version 412006 To the Texas Transportation Commission Date 12/12/2008 c/o District Engineer Application No. FTW20081121091733 Texas Department of Transportation Fort Worth District, Texas Formal notice is hereby given that City of Fort Worth w proposes to install a utility facility within the right-of-way of IH0020 in Tarrant County, Texas as follows: (details are shown on page 2) An 18-inch Sanitary Sewer Main is proposed for installation across Interstate 201820 at Westlake Drive between Hulen Street and Granbury Road. A 30-inch steel encasement pipe with a minimum wall thickness of 0.5" shall be bored across the entire TxDOT Right-of-way for a total length of 380' with the 18-inch PVC pipe inserted in the steel encasement. An 8-inch Sanitary Sewer Main and 18-inch Sanitary Sewer Main are proposed to replace an existing 8-inch Sanitary Sewer Main that runs parallel to Interstate 20/820 just inside TxDOT Right -of -Way at this location. The construction of one (1) 5-foot manhole and replacement of one (1) 5-foot mahole and two (2) four foot manholes is proposed for the line parallel to Interstate 201820. The construction of the line parallel to 201820 shall take place more than 10' away from the frontage road and should not affect the flow of traffic. The line will be constructed and maintained on the highway right-of-way as shown on the attached drawing and in accordance with the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all governing laws, including but not limited to the "Federal Clean Water Act," the "National Endangered Species Act," and the "Federal Historic Preservation Act." Upon request by TxDOT, proof of compliance with all governing laws, rules and regulations will be submitted to TxDOT before commencement of construction. no Our firm will use Best Management Practices to minimize erosion and sedimentation resulting from the proposed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions." ti Our firm will ensure that traffic control measures complying with applicable portions of the Texas Manual of Uniform Traffic Control Devices will be installed and maintained for the duration of this installation. ow The location and description of the proposed installation and appurtenances is more fully shown by 5 files containing drawings and other pertinent information uploaded to the website. Construction will begin on or after February 1. 2009 and end on or before December 1. 2009 . I certify that I am authorized to represent the Firm listed below, and that our Firm agrees to the conditions/provisions included in this notice. Utility Installation Owner Cityof Fort Worth By Roert Sauceda Title Address 1000 Throckmorton Street "- Fort Worth, TX 76102 Phone No. 817-392-2387 E-mail address robe rt. sauceda(cDfortworthgov.orq http://apps.dot.state.tx.uslUIRPROAibIPennitNotice.asp?PermitEventNo=O&PermitApNo=F rW200811... 12/12/2008 Page 1 of 1 TxDOT - Fort Worth District CHECKLIST FOR REVIEW OF NOTICES OF PROPOSED INSTALLATION Online version 11/2008 Yes No N/A Are other existing utility lines in the vicinity shown on the plans and have you included vertical elevations and horizontal alignments for these existing utilities based on the department6s survey datum? Are the right of way line and edge of highway pavement clearly shown on plans? For lines to be installed parallel to the highway, have you included the design, proposed location, vertical elevations, and horizontal alignments of the utility facility based on the department4s survey datum, the relationship to existing highway facilities. For installations parallel to the highway, does the installation alignment change? Alignment changes need to be justified and reasonable. For aerial installations, do the plans clearly show and differentiate between existing poles and new poles? For gas crossings, are all encased gas lines showing vent pipes at right of way line and all gas pipes clearly marked with owners signs? For highway crossings, is the location of the crossing clearly shown on the plans? The crossing should be as close to 90 degrees as practical. Are the utility plans legible, drawn to scale, and accurately dimensioned and when printed out are easily read? The following statement is clearly stated on each page of the plans: CONTRACTORS: IT IS YOUR RESPONSIBILITY TO CALL THE TXDOT AREA INSPECTOR 48 HOURS PRIOR TO START OF CONSTRUCTION. (see specs for utility installations for contact numbers) It is understood it is the application owners' responsibility to file the 48 hours job start notice through the on line UIR Electronic program. In the comment box you shall enter the name of the contractor, on site supervisor name and cell number and the date the construction is going to start. Contractor: TBD Construction Start Date: After February 1, 2009 For lines crossing State highways or roads, crossing intersecting streets/county roads, or passing through the protected root area of desirable trees, is it clearly shown in description and on ALL plans that the line will be installed by conventional dry auger boring unless otherwise approved by a TxDOT engineer or Inspector? In addition, casing should be shown under highways and paved city street/county road intersections. http://apps.dot.state.tx.uslUIRPROA ibIPermitCheckl ist.asp?Perm itApNo=FTW20081 l21091733 12/12/2008 No r Approval Form .. .0r Approval Form Online version 11/2005 To Robert Sauceda City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 APPROVAL Date 12/29/2008 Application No. FTW20081121091733 District App. No. 220-SSA59-08 Highway1H 0020 Control Section 000812 Maintenance Section South Tarrant County Tarrant Page 1 of I TxDOT offers no objection to the location on the right-of-way of your proposed utility installation, as described by Notice of Proposed Utility Installation No_ FT V20081121091733 (District Application No. 220-SS-459-08) dated 12/29/2008 and accompanying documentation, except as noted below. Conventional dry bore only unless approved in writing by the Area Engineer or Inspector. - Buzz ON When installing utility lines on controlled access highways, your attention is directed to governing laws, especially to Texas Transportation Code, Title 6, Chapter 203, pertaining to Modernization of State Highways; Controlled Access Highways. Access for serving this installation shall be limited to access via (a) frontage roads where provided, (b) nearby or adjacent public roads or streets, (c) trails along or near the highway right-of-way lines, connecting only to an intersecting roads; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Installation Owner's rights of access to the through -traffic roadways and ramps shall be subject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Installation Owner in making emergency repairs as required for the safety and welfare of the public, the Utility Owners shall have a temporary right of access to and from the through -traffic roadways and ramps as necessary to accomplish the required emergency repairs, provided TxDOT is immediately notified by the Utility Installation Owner when such repairs are initiated and adequate provision is made by the Utility Installation Owner for convenience and safety of highway traffic. The installation shall not damage any part of the highway and adequate provisions must be made to cause minimum .w inconveniences to traffic and adjacent property owners. In the event the Installation Owner fails to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel compliance. .. It is expressly understood that the TxDOT does not purport, hereby, to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the TxDOT may require the Installation Owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. +� If construction has not started within six (6) months of the date of this approval, the approval will automatically expire and you will be required to submit a new application. You are also requested to notify this office prior to commencement of any routine or periodic maintenance which requires pruning of trees within the highway right-of- way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, s type of cuts, painting cuts and clean up. These specifications are intended to preserve our considerable investment in highway planting and beautification, by reducing damage due to trimming. Special Provisions: "" UIR SPECS Notice to be sent to applicants You are required to notify TxDOT 48 hours (2 business days) before you start construction to allow for proper inspection and coordination of work days and traffic control plans. Use the UIR website for the 48-hour notification. DO NOT start construction until you have coordinated the construction start date and inspection with TxDOT. You are also required to keep a copy of this Approval, the Notice of Proposed Installation, and any approved amendments at the job site at all times. �w Texas Department of Transportation By Buzz Kyler Title Project Coordinator District Fort Worth https://apps.dot.state.tx.us/IJIRPRO/I ib/NoticeApproval.asp?ApproverlD=DOT20070622123013 &Perm... 12/29/2008 wo aw s wo ,. no Texas Department of Transportation Specifications for _ utiliw _ Installations no Fort Worth District (revised Jul100) Ow » .. .. w .. W no 00 wo mar MP no i Specifications for Utility Installations Fort Worth District [ TxDOT Directory For Utilities 3,4 [ TxDOT's Mission Statement 5 Safety 5 [ Protection of Highway Facilities 5 [ Use of Explosives 5 [ Protection of Existing Facilities 5, Deviation From Approved Plans 5 [ Staking of Utility Lines in Advance of Construction 5 [ Full -Time Supervision and Inspection 5 [ Notification of Job Start 5 TxDOT Locates 6 [ Stockpiles on TxDOT ROW 6 [ Coordination of Work With Highway Contractor or State Forces 6 [ Work Day Restrictions 6 Inclement Weather 6 Pits 6 Bore and Tunneling: Operations 7 [ Markers 7 [ Above -Ground Appurtenances 8 Back -Fill of Utility Trenches 8 Site Clean -Up 8 [ Repair and Replacement of RiR-Rap and Earth Slopes 8 Special Precautions For Erosion Control 8 Seeding Specifications 9 Aesthetics 10 Required Pruning Practices 10 Pruning Suggestions 11 °-ix-_ 'watt"," W. i :Wev Pnsiblhilml 2 1 nrt W.rtk (Si<n tcq dw no .. (56) ERATH, HOOD S SOMERVELL.COUNTYAREA OFFICES ..r MARC Mc ENDREE AREA ENGINEER 254-965-3511 DAVID BULLARD ASST AREA ENG. /UTILITY COORD. 254-965-3511 I(57) PARKER A PALO PIWO COUNTY AREA OFFICES . p JOHN CORDARY AREA ENGINEER 817-596-9834 VACANT ASST AREA ENG. /UTILITY COORU. 817-596-9834 JOHNSON. COUNTY M AtW, FIN,Cftr_ RALPH GARZA MAINTENANCE SUPERVISOR 817-202-2900 BRYAN ANDERSON UTILITY OBSERVER 817-202-2905 WISE & JACK COUNTY MAINTENANCE RICKY TOMPKINS MAINTENANCE SUPERVISOR 940-626-3400 KEITH PROCHNOW UTILITY OBSERVER (WISE) 940-626-3901 JANA ROBINSON UTILITY OBSERVER (JACK) 940-567-6611 NORTH .TARR,ANTGO1NTY;Mp;NAFiCE GARY PHILLIPS MAINTENANCE SUPERVISOR 817-283-2731 NOTE: UTILITY PERMIT OBSERVER FROM AREA OFFICE w• STACY CLACK 817-313-3873 SOUTH TARRMT CAAA�N;�NA04 RALPH.GARZA MAINTENANCE SUPERVISOR 817-235-3416 no NOTE: UTILITY.PERMIT OBSERVER. FROM AREA OFFICE JIMMY VAUGHAN 817-307-1617 ERATH, HOaa SO.tAERVELL COUNTY tWNTENA►NCE no JAMES PARKER MAINTENANCE SUPERVISOR 2547897-2647 JASON SHEVOKAS UTILITY OBSERVER 254-897-2647 GEORGE MITCHELL DESIGNER.. 254-897-2647 PARKE11 PALO PINTO -COUNTY'- ' wT i+IAI+It ALAN DONALDSON MAINTENANCE SUPERVISOR 817-596-9298 WAYNE FRAIZER UTILITY OBSERVER (PARKER) 817-596-9298 .. BRYAN RIGGS UTILITY OBSERVER (PALO PINTO) 940-325-2414 no r IN CASE OF EMERGENCIES, CONTACT TXDOT DUTY II $17-247 7772. LIGHTS AND TRAFFIC CONTROL DEVICES SHALL ALWAYS BE USED, AND WILL BE IN STRICT ACCORDANCE IMTH THE GUIDELINES OF THE TMUTCD. Sjrrlfir a066vYm'tlmt 4100bti-ImP 4 0 TXDOT'S MISSION STATEMENT The mission of the Texas Department of Transportation is to provide safe, effective and efficient movement of people and goods. SAFETY Please refer to the Texas Manual on Uniform Traffic Control Devices for questions concerning traffic control. While working, on TXDOT right of way hard hats and fluorescent safety vest are required at all tunes. PROTECTION OF HIGHWAY FACILITIES All construction operations relative to installation of the Utility shall be Conducted in such manner as to protect highway facilities from damage at all times. In addition, all work must be done in strict accordance with all applicable regulations of the occupational Safety and Health Administration (OSHA) of the US Department of Labor. USE OF EXPLOSIVES N explosives shall be used within limits of highway right-of-way without written permission. PROTECTION OF EXISTING UTILITIES Prior to beginningactual construction operations the Utility shall notify all other Utility Companies who may have facilities in the area so they can determine if the proposed construction will conflict with or otherwise damage their f facilities. REMEMBER: 1-800-DIG;TESS DEVIATION FROM APPROVED PLANS No changes shall be made to the approved location of utilities without prior authorization of TxDOT. The Utility shall make necessary arrangements with other Utility Owners for moving facilities and/or supporting same during trenching operations. Any poles, anchors, etc. relocated to clear the proposed underground utility line shall be moved toward the highway right-of-way line and location shall be subject to TxDOT approval. Alf utility lines Incorrectly installed shall be removed and laid in proper location at the entire expense of the Utility. STAKING OF UTILITY LINES IN ADVANCE OF CONSTRUCTION Utility lines shall be staked well in advance of construction so that TxDOT can inspect staking to verify that the alignment conforms to requirements set out herein and that there is no conflict with highway facilities. FULL TIME SUPERVISION AND INSPECTION The Utility shall provide competent full-time supervisors or inspectors for all utility installations. NOTIFICATION OF JOB START 48 Hour notification is required for utility installations by contractor and on line through UIR. Please have the following. information ready when you call: • APPROVED PERMIT NO. • STATE HIGHWAY NO. + UTILITY COMPANY • UTlLrrY SUPERVISOR OR INSPECTOR'S NAME and UTILITY CELL NO. • GENERAL CONTRACTOR'S NAME • NAME OF FOREMAN and MOBILE PHONE NO. • STARTDATE ri4 i 'titih' tit-WiRrigin Fort 1Y.urtA Mswii i' r MW No TXDOT LOCATES ..r 48 Hour notification is required for TXDOT tomtes. BE AWAREH TXDOT has a considerable invesWent in traffic signals, Ilghting, and traffic management system, These systems include underground electric and fiber optic lines. If any of the above facilities are within the limits of the utility project, the utility is required to call the .. phone numbers listed below: Signals and lighting: Phone # (817) 370-6671 Traffic Management:. Phone # (817) 370=6745 AERIAL CROSSINGS 72 Hour (3 business days) notification is required for aerial crossings. w Crossings on controlled access highways and/or high volume roadways can only be performed on Sunday, between the hours of 3 a.m. to 7 a.m. with police assistance and traffic control. ,.. Crossings on non -controlled access roadways and/or low volume roadways can be performed anytime during the week, Monday thru Friday, between the hours of 9 a.m. and 4 p.m. with proper traffic control. LANE CLOSURES 72 Hour (3 business days) notification is required for lane closures prior to the alteration of traffic How, If a lane closure is required due to an unforeseen situation and after a utility permit has been approved, it will be necessary to call the TxDOT Utility Permit Office at 817r370-6697.. A traffic control plan must be submitted and approved by TxDOT prior to lane closures. �r Note: An Engineer's seal may be required for lane closures on controlled access highways and high volume roadways. STOCKPILES ON TXDOT ROW Stockpiling will be allowed with permission from TxDOT. Once, permission has been granted, stockpi" can start forty-eight hours prior to construction. The stockpile shall be placed on the right of way line or as close as possible without obstructing the curb, pavement, or line of site. Ali materials must be removed from TxDOT right of way completion of the utility project. COORDINATION OF WORK WITH HIGHWAY no CONTRACTOR OR STATE FORCES All work related to the installation of utilities shall be conducted in such manner as not to interfere in anyway with highway construction or TxDOT maintenance operations. no WORK DAY RESTRICTIONS Except, in cases of emergency, no work will be allowed on Saturdays, Sundays. Federal or State Holidays or at night. 'o EXCEPTIONS MAY BE GRANTED BY TXDOT IF the Utility shows that "off day" work is necessary to avoid service interruptions to the public and the Utility agrees to the following conditions: Obtain TxDOT approval at least.48 hours in advance. The Contractor is required to have sufficient personnel and "' equipment on the job to efficiently execute the work. The utility will have a supervisor or inspector present on the job at all times while the work is in progress. INCLEMENT WEATHER To ensure the safety of the traveling public, as well as the contractor and his crew and TxDOT agents, no work shall be allowed during inclement. weather such as, but not limited to rain, fog, snow and sleet effects visibility and/or traction. �/ titwofnatmlc ri.N' t linty 6 F,0 Worda'111v0 ki PITS All pits shall be excavated and closed within 48 hours. If the utility wishes to leave pits open overnight, relleclive, barricades must be employed. BORE AND TUNNELING OPERATIONS GENERAL REQUIREMENTS Utilities crossing under surfaced roads within the limits of highway right-of-way shall be placed by auger bore or tunnel method, unless otherwise specifically authorized by TxDOT. Bores or tunnels shall be placed at depths below the roadway structure which are sufficient for superimposed live and dead loads and also prevent collapse of supporting soil between hole and roadway. Boring and tunneling operations shall extend outside of the front slope and clear zone of the highway. Bores Where material beneath pavement is sandy or unstable and will be subject to caving, the hole for the casing shall be bored and cased simultaneously and bored material removed through casing. Cutting face of auger or drill shall not project more than six (6) Inches ahead of casing and no water shall be used in connection with drilling. Where material beneath pavement is stable and not subject to caving, and allowed by TxDOT, the hole for the casing may be bored first and casing inserted in the hole immediately after completion of boring. If allowed by TxDOT, water may be used in conjunction with boring. Bore Pit Location Pits excavated for boring or tunneling operations shall be located so that any possible sloughing of sides of pit will not endanger shoulders or pavements and so that barricades can be placed as specified in the TMUTCD. Bore pits should be located at least thirty feet from the edge of the nearest, through traffic lane and not less than twenty feet from the edge of pavement on ramps. On. low traffic roadways and frontage roads, bore pits should not be less than ten feet from the edge of pavement or fivefeetfrom face of curb. Tunneling While hole is being tunneled, casing shall normally be jacked into place as operations progress. Working face of excavation shall not precede advancing end of casing by more than two and one half (2112) feet unless otherwise allowed by TxDOT. Grouting All voids around casing shall be pressure grouted. The grout shall consisting of Portland Cement and washed sand and containing not less than two (2) sacks or Portland Cement per cubic yard of grout. Additional cement shall be added if workability and/or stability cannot be obtained. An air -entraining agent may also be added to the grout mixture to facilitate flow if necessary. Grouting shall be done immediately after casing has been installed in hole in order to avoid any shearing of soil and settlement of over burden above casing. Means shall be provided for proving that voids are filled around 24" diameter and larger casings in the event there is some doubt by TxDOT. TxDOT may require the Utility to install removable plugs at intervals inside the casing. No holes shall be drilled in pavement or shoulders for grouting operations. MARKERS The Utility shall place a readily identifiable and suitable marker at each right-of-way line for highway crossings. Utilities that parallel the right of way shall place a marker every 15M feet, at intersecting streets; and highway drainage. culverts. `sp*-tilirxt Q44S 6-- 3'litin, 1"solu'l ltt / tm-1 !1 �rw w1viel 4.P ow ABOVE -GROUND APPURTENANCES Above -ground appurtenances, such as pedestals, fire hydrants, meters, etc., shall be located at the right-of-way line. BACKFILL OF UTILITY TRENCHES DESCRIPTION This specification shall govern backfill of trenches, which have been opened for the, removal, adjustment, or installation of utility lines within the limits of highway right-of-way. Except when permission is granted, compacted backfill will be used for utility installations. Backfill shall consist of compacted material obtained from suitable soil r excavated from the trench, or from sources outside the highway light -of -way. Material shall be free of rock, lumps, or clods that will not break down under compaction. Backfill material shall be placed in the trench in layers not to exceed 6' in depth and compacted. Water shall be added as required to facilitate compaction. Compaction shall be done with rollers or mechanical tamps. Use of rollers will be allowed only when such use is not believed detrimental to any highway facility. The type of roller used must be acceptable to TxDOT. When .• rollers are used, mechanical tamps shall be used along the sides of trench to compact any backfill that cannot be reached with rollers_ Compacting shall be continued until a backfill density is equal to that of the adjacent, undisturbed material: Where trenches lie within the limits of drainage ditches and Channels, which are in solid rock, TxDOT may require 1' of concrete backfill, struck off flush with the top of rock. » SITE CLEAN UP The Utility is responsible for site clean up at the end of each workday. Roadways adjacent to the utility construction site shall be kept free from debris, construction materials, and mud. At the end of each day, construction equipment and materials shall be moved as far from the roadway as feasible within the safety rules. If mudding of the roadway occurs at any time, the roadway shall be deaned immediately. When the utility installation is complete, the right-of-way shall be reshaped to its original condition and - the area reseeded or re -sodded to reduce erosion. Should settlement or erosion occur within one (1) year of the utility installation, TxDOT may specify prompt replacement at the utility's expense for bringing the construction site to a satisfactory condition. TxDOT will restore sites that are left at an unsatisfactory condition after notification has been sent to the utility. These sites will be restored to original condition, The utility shall fully reimburse all costs incurred by TxDOT for all repairs made by TXDOT These costs include, but are not limited to, matters of traffic safety, right of way contour, .� restoration and repairs to all highway structures: including; but not limited to roads, driveways, terrain, landscaping, fences, etc. REPAIR AND REPLACEMENT OF RiPRAP AND EARTH SLOPES .+ Any existing riprap cut by trenching operations shalt be replaced and surface of new riprap finished to match that of existing riprap. Concrete riprap shall contain not less than three (3) sacks of cement per cubic yard of concrete. Reinforcing steel shall conform to that of existing riprap. M SPECIAL PRECAUTIONS FOR EROSION CONTROL Special precautions should be taken during utility installations to avoid disturbing existing drainage courses. In addition, soil erosion should be held to a minimum and sediment from the construction site should be kept away from the roadway and drain inlets: During construction the roadbed and ditches shall be maintained in such condition to insure proper drainage at all times. Ditches and channels shall be maintained to avoid damage to the roadway. .r To avoid soil erosion; it is advised and encouraged that the Utility Contractor use ail applicable means: (i:e. sift fences, hay bails, rock filter dams, etc.) to detour soil from eroding into roadway, ditches. and adjacent property. YFwrillwiftink for U'li►iir 14.10146)(LN 8 Ffirt Worth$liu�t�. no SEEDING SPECIFICATIONS RURAL AREA WARM -SEASON SEEDING RATE In pounds, Pure Live Seed (PLS.) Mixture for Clay or Tight Soils Mixture for Sandy Soils Dates _ Eastern Section Western Section All Sections Feb 1 Green Sprangietop 0.6 Green SprarOetop 0.6 Green Sprangleton 0.7 To Sideoats Grama (El Reno) 1.8 Sideoats Grama (Haskell or El Row) 1.8 Sideoa4s_Grama (Haskell) 22 May 1 Bermudagrass 0.8 Little Btiiestem 1.1 Bermudagrass 0.9 Little Bluestein 1.1 IndiwQrass (loa*ta or Cheyenne) 1,5 Little Bluestein 1.4 K-R Bluestem 0.7 K-R Bluestein 0.7 Sand bropseed 0.2 Switchgrass 12 Switchgrass (Alamo or Blackwell) 1,2 Total 6.2 Total 6.9 Total 5.4 URBAN AREA WARM -SEASON SEEDING RATE In Pounds, Pure Live Seed (PLS) Mixture for Clay or Tight Soils Mixture for Sandy Soils' Dates Eastern Section Western Section All Sections Feb 1 Green Spranglatop 0.9 Green Sprangtetop 1.1 Green Sprangletop 11 To Bermudagrass 1.2 K-R Bluestem 1.3 K-R Bluestein 1.3 May 1 m Buff6lograss 10;7 Buffalograss 1:5 u�� S.Q Total 11.1 Total 13.1 Total3.9 TEMPORARY COOL -SEASON SEEDING RATE In pounds, Pure Live Seed (PLS) Dates All Sections Feb 1 Tall Fescue To Western Wheatgrass May 1 Wheat (Red, Winter) Total 4.0 5.Q wo 39.0 TEMPORARY COOL -SEASON LEGUME SEEDING RATE In pounds, Pure Live Seed (PLS) Dates All Sections Aug 15 Crimson Clover 7,0 to Nov 30 Total 7.0 TEMPORARY WARM -SEASON SEEDING RATE In pounds, Pure Live Seed (PLS) Dates All Sections May 1 Foxtaii Millet to Nov 30 Total Note: Names in parenthesis () represent "Improved' varieties of the species shown, !iynii:catinu+c Arr i�rflirt tmtullultob.9 z 30.0 30.0 FortVorlb l*.16rt 4M Mh no No AESTHETICS To preserve and protect trees, shrubbery, and other aesthetic features on the highway right-of-way. TxDOT may specify the extent and methods of tree removal, tree trimming, or their replacement. TxDOT may also specify the installation methods of the underground or overhead utility in order to protect and preserve trees and other aesthetic features. REQUIRED PRUNING PRACTICES PRIOR TO CUTTING • Locate utility lines with the leastpossible interference with trees. • Amount of clearance should be determined by the rate of tree growth. • Remove minimum number of branches to .provide adequate clearance. • Maintain adequate clearance for lines, NOT EXCESSIVE CLEARANCE. • ALL pruning shall conform to recognized tree surgery practice. • Preserve natural character of tree. WHERE TO CUT In removing a limb, the cut should be made at a fork where the remaining branch will be at least one third the diameter of the one removed. LIMB REMOVAL 1 in removing branches the cut should be made at a fork with the remaining branch at least one-third the diameter of the .one removed. 2. Undercut 1%3 of the way through the limb, 8 to 12 inches from the main stem. 3. Remove limb .4_to 6 inches out from the first cut. 4- Remove stub with an even cut so that a trace (called a "collar") still protrudes (about % inch). .e 5. All cuts two (2) inches or over shall be painted with an approved tree dressing or paint. ' See pg I I DISPOSAL OF CUTTINGS All pruned wood and brush must be removed from the right of way and disposed of in accordance with the laws .o and regulations ofthe community, county, and state. Disease branches (especially those infected with oak wilt) must be properly disposed of to prevent the further spread of the disease. so r "M MW rdr tuitlh ins[nt;aeu+z, 10 F4#rt Worip Ukriee am PRUNING SUGGESTIONS as% 4� V­ —A -.4 hn PRESFIFIVING SIMME'TRY. UNDESIRABLE TREE MODIVICAYOONS Sveh ues-1-0 .maimlopionce goofs a*4 ciq)kl.qf--ay airs Ohllinsss. DtStRA8kE Uff"SIRABLE QN.OE,SiRAV)_E DESIRABLE C � 6 fsf cof. 'JV undb,4 i.mb from Maj. SI*4%- Refta-t slob $j: Fir.4tiod tv .MINA lic w* AY ymb, r losit Cut OCSYRASLE 09 5j1iA8LE kliftE 31RABLE PROPER LIMB FkEMO%,At (2*6-a. or mo*&) SOrritkA**vtur (oft-umdwifto It ton NVOOh Mwid NOTICE _ PLEASE - READ Please be responsible and notify TXDOT 48 hours aw prior to starting construction, and be prepared to provide the following information. aw 1. Permit and Highway numbers 2. The name of the Utility Company, a contact person's name and phone number. 3. The name of the Construction Company, a contact persons name and phone number. "' 4. A start date 5. Date to be staked, if applicable. Note: A coon of the attached Aooroval (including all attachments) shalt be on the iob site at all times. ow ow owIF CONSTRUCTION IS FOUND TO HAVE COMMENCED WITHOUT 48 HOURS CALL IN NOTICE, THE JOB SHALL BE SHUT DOWN UNTIL PROPER PROCEDURES ARE COMPLETED. ./ ow M APPENDIX C Temporary Right -of -Entry Forms am no • rl no .. Sanitary Sewer Rehabilitation, Contract 58 — Part 2 Parcel # TROE 1 Doe # 6039, Sewer Project # P254-703170106087 Abstract 693 & Overton West, Block E, Lot 2A CITY OF FORT WORTH TEMPORARY RIGHT OF ENTRY STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS COUNTY OF TARRANT § +� That the undersigned, hereinafter referred to as "Grantor", does by these presents grant and convey to the City of Fort Worth, TX, herein after referred to as "Grantee" a temporary right of entry onto property described as Block E, Lot 2A, Overton West Addition and Abstract 693 as shown on the plat recorded in Tarrant County Plat Records a/k/a 4521 S. Hulen St., Fort Worth, Tarrant County, Texas, hereinafter referred to as the "Property", for the purpose of rehabilitation, replacing or constructing a sanitary sewer, sanitary sewer manhole, water, and driveway replacement. Upon execution of this agreement, Grantor will grant Grantee and its contractor's access to the Property for the purpose stated herein, until such time as the project is completed and approved by the Grantee, at which time the above described temporary right of entry becomes void. This Right of Entry shall include the right of Grantee and its employees, agents, representatives, or contractors to access the aforementioned property. we TO HAVE AND TO HOLD the above described right of entry, together with all and singular, the rights and appurtenances thereto, anywise belonging unto the said Grantee, is successors and assigns, for the purposes set forth above. r Grantee shall restore the Property to the condition it was in immediately prior to accessing the Property under this Right of Entry. EXECUTED this the day of , 2007. GRANTOR: (Please Print) (Signature) TEMPORARY RIGHT OF ENTRY Rev. 7/1006 r .. as am 7-1 m sw m no no r 1fl N i I III ►�ESf APO50 i �I LUrT �...: !W I b l OVERf03 8.212'C•1 f I I a,.o., III v0� R. • 11 I P' for i I —41 q :o• ao• ar I{ Lor 3 I I Lor 3 5[�iiar• �• --r ri <a►r.u� �v rw•z �.. EASE�Nr wr a� s,.som II urrin.nn I I� rxe�r_,n�:d 1,9' Ur/L rrr Ed5l-ArVr I I � I — a I I! LUr� -HEAL 'Nr — �I — — — — — — — — — — — _ \— 4" PVC @ 2.00 — Lor s CL I I ] f. co 1 FF=679.44 I' I EXECUr/vE � I FY ACE' /l \ ! I LOr E rro slpwr — I I •+ 6R/CX BU/CO/NGi � l e I I rµMw, o.<ns LiQ� 4r LOr 1-A I I / e o �Kf /wra"df / I � (I WESTCL lFF AL7� T;'DN � cor a .!z rnrw•rd �� LOr T-B II LOT 9 ...r.,nr.. ��. �. Ir s,ir ar ,f .r .� • a.a: I I SEWER PROJECT NO. P254-703170106087 RIGHT OF21ENTRY EXHIBIT DOE *6039, CITY PROJECT No. 01060 FORT WORTH. Tx 76109 MAP NO. 2030-368. MAPSCO NO.89-K LOT 2-A. BLOCK E. OVERTON WEST AOOITION FORTWORTH CITY OF FORT WORTH, TEXAS 1j RJNGROUP, INC. µ OVER `rm /CwME TOWER #, PLAZA 7E #4W WATER DEPARTMENT FORT PWRTH• 7EXA876109 r w w Nd do `1 me APPENDIX D City of Fort Worth Traffic Control Typicals END f ROAD WORK ENO ROAD WORK 1 7/ 16/09 ice'• * �Ei I PETER Z. LAi •. a .............................. 85495 .�e� x dw o"i 3 a 0 o ^ � 00000� a ARROW BOARD IF SPEED LIMIT LL z IS 40 MPH OR GREATER f In o In N °o RIGHT 0 RIGHT LANE 00 LANE CLOSED o o�0 CLOSED f 1 � 0 ul 01 X L D 3 ROAD f o WORK AHEAD 0 x -o a ROAD WORK AHEAD CITY OF FORT WORTH TYPICAL ONE WAY MULTIPLE LANE STREET TRANSPORTATION ONE RIGHT LANE CLOSURE AND Note: PUBLIC WORKS See reverse side for General Notes and Device Spacing PLAN '131R' I aw so we me A wo so oft E m 7/ 16/09 o y' � �� •aE v � v 9 .. ...PETER Z. LAI. ... ... 85493 `e m w <r _ so CITY OF FORT WORTH TRANSPORTATION AND .. PUBLIC WORKS TMUTCD Figure TA-3.4 & 6 bi� 0 0 0 0 � o 0 10 FEET 00 Y MIN. o o cr 0 0 o W 0 tL w LL Z o :3 O 0 CD N o IN o _ x 0 Z Q o 0 o I- 0 w w 0 w W o tL LL o O o lCD O o ROAD I WORK x AHEAD i b14 TYPICAL TWO WAY STREET - SPEED LIMIT 30 MPH OR LESS SHORT TERM STATIONARY - 12 HRS OR LESS - DAYTIME ONLY Note: See reverse side for General Notes and Device Spacing PLAN '2 20 B' No f J i f I J ROAD W WORK END AHEAD ( 1 ROAD WORK X 00 7/ 16/09 0 10 FEET ° '�EOFt��.4� J MIN. .0 P y0P.. •qQ°aE / Y A S�. 0 3 a �.PETER�Z. LAI .d o ... .................., W W ''q.. 85495Q� }s �d�pF �cENS�O or f ba a0 o J o 1 f 0 0 Z. C a X Q — ROAD JL o WORK END U AHEAD 1 I ROAD WORK o U i a f I S 3 _F1s r+ i O O N { � h � M to 1 a i � o CITY OF FORT WORTH TYPICAL T.WO WAY STREET - SPEED IMIT 30 MPH OR LESS TRANSPORTATION INTERMEDIATE TERM OVERNIGHT TO 3 DAYS no AND Note' 1 PUBLIC WORKS See reverse side for Generol Notes and Device Spocinq. PLAN h h 2 2 C C i h i I ' 1 f ROAD WORK END AHEAD x IROAD WORK 7/16/09 ROAD AHEAD V0-0 S. .*y. aE ........... Flogger ...... ttlE 85495 --�nv 0 0 Li w U L, Z 0 o 2 Floggers required whenever - opposing traffic required 0 Flogger Required On to use same lane. o 0 Collector/Residentiol Ln Streets. AdditionefFloggers o Moy Be Required Depending On Floggers shall be in constant Erd Field Conditions. radio contact. No congregroting around z 4 I ONE X LANE < flagger stations. / ROAD Flogger stations must be AHEAD lighted at night. /R�0 AD END x WORK AHEAD I ROAD WORI 0 cli U') CITY OF FORT WORTH TYPICAL TWO WAY STREET TRANSPORTATION LANE CLOSURE AND Not - e: See reverse Side for GenerciNotes and Device Soocin PUBLIC WORKS PLAN "221" r DETOUR cwo 'r z x L.j (A �,� raaa a 01 TVCEI WK ROAD CLOSED � � \ ROAD CLOSED�.rr a77Yls 1" I � n � \ \ . Hill Ia will z a. x SIKET MAMC F- V) DETOLM AHEAD aosEo C, e .. f* .................... .......... .. PETER Z. LAI 7/16/09 4 M 9......................... 5495 . �j d3-- "/ " CENS ...... iv; so CITY OF FORT WORTH FULL STREET CLOSURE DETOUR TRANSPORTATiON AND Note: PUBLIC WORKS PLAN r- See reverse side for Genero[Notes and Device Spocinq ill m <tx--� Y x cNo z A CLOSED j T ROAD F�l JL z x SMIT rrAK ow V, 000JR T. AWAIT L=poro uosco MCI N" VETO,* 0.1 7/16/09 ............... PETER FLA"ll" 85495 ........ .. xt ,4�j CITY OF FORT WORTH FULL STREET CLOSURE DETOUR TRANSPORTATION AND Note: PUBLIC WORKS See reverse side for GeneralNotes and Device Soo-nj PLAN "F-2" no 0111 0 �,T � 4 �4 rc RMD F,5fl � / STREET MAME 4*= C=> 3MVM 1338iS ���- 4 o 00 ■ 11 pw OF 0%1� *.................Z... ................ 7/16/09 .......! PETER .. I V.... 854 -5 0 d1l. w < CITY OF FORT WORTH FULL INTERSECTION CLOSURE DETOUR TRANSPORTATION AND PUBLIC WORKS See reverse side for General Notes and Device Spacinq. M F - 3 # I z a J a W Z i w l06 +L1-10 t V1 D350 1 S'DE WOLK t CLOSED 1 S"WXK CLMDI 1 _ V C W.E. 1 I _ O 7/ 16/09 t �° 4 t11 O!e I P v .............................. .........................: �. TER .. LAi ...... PE85495 co i\elegy 0 Q CITY OF FORT WORTH SIDEWALK CLOSURE DETOUR TRANSPORTATION AND Note; PUBLIC WORKS See reverse side for Gencrol Notes and Device 5pocing. PLAN "P—l" tl Y Y 1 r - N a � J a 1 7/ 16/0917 i s� .* �.�:................................Y �, PETER Z. LA4 s o-�'0�►; 85495 t-ITY OF FORT WORTH SIDEWALK CLOSURE DETOUR TRANSPORTATION AND Note: 1 PUBLIC WORKS See reverse side for GenerolNotes and Device Spocinq. PLAN "P-2" r "GENERAL NOTES" 1. All channelizing devices shall be in accordance with the current edition of the Texas Manual on Uniform Traffic Control Devices. 2. All Traffic Control Devices shall have working visible warning lights as required in accordance with the current edition of TMUTCD. we 3. For Temporary Situations, when it is not feasible to remove and restore pavement markings, channelization must be made dominant by using a very close device spacing. This is especially important in locations of conflicting information, such as where traffic is directed over a double yellow centerline. In such locations, channelizing device spacing of 10 feet is required. 4. For Lonq Term Stationary work, all conflicting pavement markings must be removed and No centerline striping provided where two way traffic is in adjacent lanes. no 5. Contractor shall provide sidewalk closure, crosswalk closure and/or walkway bypass wherever pedestrian movements are affected by construction activities. All sidewalks and crosswalks shall be accessible when contractor is not working unless otherwise approved by the City Traffic Engineer. 6. The use of trailer mounted ARROW DISPLAYS may be required on all lane closures. The contractor shall provide one (1) stand-by unit in good working condition at the job site, ready for use, if his operation requires 24-hour a day closure set-ups and if required. 7. City Traffic Engineer and/or Inspectors may require additional traffic control devices. TYPICAL TRANSITION LENGTHS AND SUGGESTED MAXIMUM SPACING OF DEVICES Minimum Desirable Taper Suggested Maximum Device Suggested Sign Lengths (L) Feet Spacing Spacing (Feet) Posted 10, 11' 12' On a Taper On a Tangent X. Speed Formula` Lane Lane Lane (Feet) (Feet) Dimension MPH Offset Offset Offset I 30 I 150 165 180 30 60-75 120 35 I 40 45 L=WS2 205 225 245 35 60 I 265 295 1 320 40 50 i L=WS 450 495 1 540 45 500 1 550 1 600 50 70-90 160 80-100 240 90-110 320 100-125 400 'L= Taper length in feet W= Width of offset in feet S= Posted speed Note: Buffer Zone will be 25 feet (maximum). LEGEND n o Channelizing devices Trailer mounted arrow display Flagger �� Barricade