HomeMy WebLinkAboutContract 52517-A4CSC No. 52517-A4 AMENDMENT No . 4 TO CITY SECRETARY CONTRACT No. 52517 WHEREAS, the City of Fort Worth (CITY) and CDM Smith Inc., (ENGINEER) made and entered into City Secretary Contract No. 52517, (the CONTRACT) which was authorized by M&C C-29181 on the 25th day of June, 2019 in the amount of $192,600.00; and WHEREAS, the CONTRACT was subsequently revised by Amendment No.1 in the amount of $97,448.00 authorized administratively on May 29, 2020, Amendment No.2 in the amount of $141,740.00 authorized by M&C 21-0540 on August 3, 2021, and Amendment No.3 in the amount of $99,500.00 authorized administratively on November 2, 2022; and WHEREAS, the CONTRACT involves engineering services for the following project: Westside Water Treatment Plant Plate Settler Expansion; WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $904,827.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,436,115.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [Westside WTP Plate Settler Exp.] Page 1 of 2 [CPN 102052] EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated Assistant City Manager. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: Feb 21, 2024 APPROVAL RECOMMENDED: Chfistovher HaKder Christopher Harder (Feb 19, 2024 07:57 CST) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER CDM Smith, Inc. Stacy L. Barna Client Services Leader DATE: 2/12/2024 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Scott Taylor PE 2/14/24 Scott Taylor, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C : 24-0077 4999r— 01 /23/2024 Date- Douglas Black (Feb 21, 202414:57 CST) 2023-1104571 Douglas W. Black Form 12 95 : Senior Assistant City Attorney F FORr Ila o,0000000�Lo� v � o pd l.a ATTEST: Rio oo oc° � aa��b11p46444p� Jannette S. Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Prof Services Agreement Amendment Template Revision Date: November 23, 2021 [Westside WTP Plate Settler Exp.] Page 2 of 2 [CPN 102052] Smith 801 Cherry Street Unit 33, Suite 1820 Fort Worth, Texas 76102 (817)332-8727 December 12, 2023 Mr. Scott Taylor Fort Worth Water Department 1000 Throckmorton Fort Worth, Texas 76102 Subject: Westside Water Treatment Plant Plate Settler Expansion Project (City Project 102052) City Secretary Contract No. 52517 Request for Amendment #4 Dear Mr. Taylor: CDM Smith was requested to complete a re-rerating of the existing Westside Water Treatment Plant from 18 MGD to 21 MGD. Additionally, CDM Smith was requested to complete design and construction phase services for expansion to 24 MGD. We request an amendment to our current contract for performing these additional services. The attached scope of work provides a more detailed explanation for these additional services. Also attached is our fee proposal table developed for the additional scope of work. The requested fee for base services is $ 904,827. This fee is broken down as follows: • CDM Smith, Inc. $ 614,031 • Gupta & Associates, Inc. $290,796 A summary of the total contract amount is provided below: • Original Agreement Amount $ 192,600 • Amendment 1 $ 97,448 • Amendment 2 $ 141,740 • Amendment 3 $ 99,500 • Proposed Amendment 4 $904,827 • Revised Agreement Amount $ 1,436,115 04 WATER+ ENVIRONMENT +TRANSPORTATION+ ENERGY+ FACILITIES , Smith Mr. Scott Taylor December 12, 2023 Page 2 Please review and if acceptable prepare an amendment for this work. Please contact me if you have any questions or comments. Sincerely, ql��— Jessica Veach Client Service Leader CDM Smith Inc. Cc: Tony Sholola, FWWD David Vallejo, CDM Smith 10 LETTER-Westside WTP Plate Settlers Project - Amendment No. 3 Request Letter SCOPE OF SERVICES FOR WESTSIDE WATER TREATMENT PLANT PLATE SETTLER EXPANSION PROJECT 102052 AMENDMENT NO.4 - PLANT RE -RATING AND EXPANSION BACKGROUND CDM Smith (ENGINEER) contracted with the City of Fort Worth (CITY) for the Westside Water Treatment Plant (WSWTP) Plate Settler Expansion Project. The initial scope of work included development of design for adding additional plate settlers to the three sedimentation basins and the WSWTP to expand their capacity from the existing 15 MGD capacity to 18 MGD. Amendment No.1 to the contract was executed to provide additional design for the addition of Filter No. 5 and any coordination of changes related to the membrane addition procured by the CITY directly. Amendment No. 1 also included design services for the following items: • Replace the existing raw water transit time meter and flow control valve with magnetic flow meter for better accuracy, • Provide an additional membrane feed pump with variable frequency drive, and • Relocate the potable water sample point following the clearwell storage tank. Amendment No.2 provided for an on -site resident project representative, supported as needed by senior technical staff, for the original 56 week (13 month) contractual construction period. Amendment No. 3 provided for additional engineering services during construction, project management, and on -site RPR for an additional 48 weeks through the projected construction completion date of November 2023. This proposal for Amendment No. 4 requests authorization for additional scope of work and engineering fee to complete the following work items: 1. Submit a formal request to the Texas Commission on Environmental Quality (TCEQ), on behalf of the CITY, for an increase in the approved WSWTP rated capacity from its currently designed capacity of 18 MGD to 20 MGD. 2. Perform design and construction phase services for expanding the WSWTP capacity from its re -rated capacity of 20 MGD (completed in work item #1 above) to an increased overall plant production capacity of approximately 24 MGD. It is anticipated that the above plant expansion will require the below additions/modifications to the existing WSWTP unit operations and processes. Table 1 attached provides details on the assumed preliminary design criteria for the listed modifications as well as the assumed expanded capacity of the affected processes. Westside WTP Plate Settler Expansion Project (102052) 1 Scope of Work — Amendment No. 4 11/08/2023 a. Ozonation i. Two ozone sidestream venturi injection (SVI) pumps will be added, one serving each flash reactor and ozone contact basin. ii. Ozone is not fused at the WSWTP for disinfection purposes, so no additional generation capacity will be added. At a higher plant production flow of 24 MGD, the doses delivered to the water is anticipated to change as show on Table 1 and those dosages are assumed to be sufficient for pre -oxidation and taste & odor control. The existing ozone contact basins and ozone dissolution flash reactors were designed for a capacity of 19.5 MGD each, so no additional trains/units are needed for this expansion. The two additional sidestream injection pumps will provide needed capacity and redundancy for the SVI pumps. b. Sedimentation i. Additional sedimentation capacity will be required to achieve a plant production capacity of 24 MGD. Two alternate options are included in this scope of work to provide the added capacity as shown on Table 1 and described below. 1. Settling plate re -rating will be pursued with TCEQ from the current loading rate of 0.35 gallons per minute per square foot (gpm/sf) to an increased loading rate of 0.40 gpm/sf. 2. If settling plate re -rating efforts are not successful, additional plate modules will be added as part of the Amendment No. 4 work as shown on Table 1. Since these design efforts may not be required, this scope of work is included as Additional Services. c. Granular Media Filtration i. One granular media filter will be added to provide a filtration capacity as shown in Table 1. The existing Filter Box No. 6 will be used for the additional filter. Under this Amendment #4, new filter underdrains, granular filtration media, and filter gallery piping will be added to enable use of Filter No. 6. The added items will match the features of the existing filters. d. Ultrafiltration Membranes i. One membrane skid will be added to the membrane filtration system at the Rack No. 6 location. This membrane skid will be of the type and capacity shown on Table 1 and will increase the net production capacity of the membrane system to approximately 24 MGD. It is assumed that the additional membrane skid will be pre -procured by the CITY directly from Pall Corporation to match the existing system and will be assigned to the construction contractor for installation. ii. One membrane feed pump (Feed Pump No. 5) and variable frequency drive (VFD) will be added at one of the two empty slots reserved for future pumps at the existing Membrane Feed Pump Station to allow use Westside WTP Plate Settler Expansion Project (102052) 2 Scope of Work — Amendment No. 4 11/08/2023 of the added Rack No. 6. The added feed pump will be a horizontal split - case centrifugal pump of the same type and design characteristics as those of the existing pumps. iii. One strainer (Strainer No. 5) will be added at one of the strainer empty slots reserved for future strainers at the Pipe Gallery level of the Membrane Facility, downstream from the Membrane Feed Pump Station. e. High -Service Pump Station i. Two high -service pumps will be added (High -Service Pump #s 3 and 6) to fill the two empty pump slots, as shown on Table 1. Pump #3 will be added to supplement the existing WS-3 pressure plane pumps (Pump #s 1 and 2). Pump #6 will be added to supplement the existing WS4 pressure plane pumps (Pump #s 4 and 5). Addition of these pumps will be needed to provide firm pumping capacity in line with the additional expanded plant flow. f. Chemical Feed System i. Sodium Hypochlorite 1. A third 7,000-gallon sodium hypochlorite storage tank will be added at the Chemical Feed Room to provide a storage volume that is in compliance with TCEQ's rules (15 days of storage), as shown on Table 1. It is assumed that the third tank will be installed in the available area adjacent to the east of the existing tanks. Modifications will be made to the sodium hypochlorite containment area to enclose the new tank, including extending the containment wall and access stairs. 2. WSWTP personnel has reported that the existing sodium hypochlorite feed pumps experience suction problems that prevent using approximately the bottom 4 feet of chemical in the existing tanks. ENGINEER will investigate this issue to determine if there are suction piping, including valves, and/or metering pump issues and if so, the above piping and/or valves will be replaced. If there is no issue with the suction piping, the feed pump support pedestal will be lowered. ii. Sodium Hydroxide (Caustic) 1. The WSWTP has an existing 5,000-gallon caustic storage tank at the outdoor Chemical Storage Area. The plant currently uses a 50% caustic solution and for this solution concentration, the existing chemical tank provides enough storage to comply with TCEQ's regulations. However, use of a 50% solution requires use of a chemical recirculation pump to avoid crystallization of the solution at temperatures below approximately 55 deg. F. Under the work of Amendment #4, a new larger tank with a capacity of 7,000 gallons, as shown on Table 1, will be provided. This tank will allow use of 25% caustic solution if the CITY desired to Westside WTP Plate Settler Expansion Project (102052) 3 Scope of Work — Am ndment No. 4 11/08/2023 implement this change in the future and stop using a recirculation PUMP. SCOPE OF WORK - BASE SERVICES The scope of work presented below describes the additional base services included in this Amendment No. 4. Work Item #1 - WSWTP Re -rate to 20 MGD Task 1 - Project Management ENGINEER will provide additional project management related to the technical tasks added by Amendment #4, Work Item #1. These services will include additional administration support services, reporting, and invoicing associated with completion of the added technical tasks. Task 2 - Basis of Design Memorandum No changes in scope of work Task 3 - TCEQ Coordination Task 3.1 BODM Submittal - No changes in the scope of work. Task 3.2 CT Study (Updated) ENGINEER originally completed an updated CT study for the originally planned WSWTP expansion to 18 MGD. Under this Amendment No. 4, ENGINEER will revise this study to include expansion to a capacity of 20 MGD and submit a draft copy to the CITY for review and hold a workshop meeting to obtain City comments. It is assumed that comments on the revised draft study will be discussed at the same meeting with the CITY that is held to discuss comments on the Task 3.4 initial draft Technical Memorandum (TM). The final revised study will be submitted to TCEQ for review and approval. ENGINEER will coordinate with TCEQ during the preparation of the study and answer any questions they may have. Work Products: a) Draft and final revised CT Study for 20-MGD capacity (electronic, .pdf format). b) Summary notes from meetings/phone calls held with TCEQ (.pdf format). Task 3.3 Membrane System Expansion Approval - No changes in the scope of work. Task 3.4 WTP Capacity Expansion to 20 MGD This additional task includes gathering design documentation and necessary technical support Westside WTP Plate Settler Expansion Project (102052) 4 Scope of Work — Am ndment No. 4 11/08/2023 information and preparation of an engineering technical memorandum (TM) to request TCEQ's approval for increasing the WSWTP's rated capacity from the current design of 18 MGD to 20 MGD. In the TM, the ENGINEER will document the capacity of each of the plant's unit operations and processes to demonstrate that the overall WSWTP rated capacity can be increased to the requested 20 MGD. ENGINEER will also update the CT Study originally completed for a plant capacity of 18 MGD to include a 20-MGD capacity (see Task 3.2 above). ENGINEER will complete and submit to the CITY for review an initial draft TM and hold a workshop meeting to gather comments. ENGINEER will update the draft TM, submit it to TCEQ for review, and facilitate up to two (2) meetings with TCEQ to discuss and respond to review comments. It is assumed that all these meetings will be virtual. ENGINEER will address TCEQ's comments, prepare a final TM, and submit to TCEQ for ruling on the requested capacity expansion. Work Products: a) Draft TM for CITY's review (.pdf format). b) Draft and final TM for TCEQ's review in both electronic and hard copies as required by TCEQ, with a copy to the CITY. c) Meeting summaries from draft TM review workshop meeting with CITY. d) Meeting summaries/notes from meetings and calls with TCEQ. Task 4 - Final Design and Final Construction Documents No changes in scope of work Task 5 - Bid Phase Services No changes in scope of work Task 6 - Construction Phase Services No changes in scope of work Work Item #2 - WSWTP Expansion to 24 MGD Task 1 - Project Management ENGINEER will provide additional project management related to the technical tasks added by Amendment #4, Work Item #2. These services will extend the work described in Task 1 of the Agreement to completion of Work Item #2, but with the following amended assumptions and deliverables applicable to the present amendment work: Assumptions: a) Monthly project progress reports, schedule updates, and MWBE reports will be prepared for the project duration assumed in the attached Schedule. b) 4 meetings with city staff during design (2 progress meetings and 2 review meetings) Work Products: Westside WTP Plate Settler Expansion Project (102052) 5 Scope of Work — Amendment No. 4 11/08/2023 a) Meeting summaries with action items b) Monthly invoices c) Monthly progress reports d) Baseline design schedule e) Monthly schedule updates, if applicable, with schedule narrative describing any current or anticipated schedule changes f) Monthly M/ WBE Report Form and Final Summary Payment Report Form Task 2 - Preliminary Design ENGINEER will develop a Preliminary Design Report (PDR) to document the plant improvements necessary for expanding the WSWTP from 20 MGD (completed in Work Item #1 above) to 24 MGD. The PDR shall be submitted to CITY per the approved Project Schedule. The purpose of the PDR is for the ENGINEER to • Develop the basis of design for improvements, • Develop a budgetary -level cost opinion for the improvements to ensure the scope is in line with available funding, and • Obtain the CITY's endorsement of the proposed concepts. ENGINEER will develop the PDR as follows. 2.1. Preliminary Design Report The PDR will provide a high-level description of the existing plant facilities and a detailed description of the improvements necessary for expanding the plant to 24 MGD. The PDR will include the previously described facilities and equipment that are being added and will provide their basis of design criteria. The PDR will provide preliminary designs of the added facilities and equipment in the form of layouts and drawings at design level of 15% to 30%. Other facilities that do not require modifications will not be covered in this document. 2.2. Opinion of Probable Construction Cost (OPCC) Following receipt of feedback on the PDR, ENGINEER will develop an opinion of probable construction cost (OPCC) for the work associated with Work Item #2. This OPCC will be a Class 4 estimate as defined by the Association for the Advancement of Cost Engineering International (AACEI) standards. Assumptions: • No geotechnical borings or field investigations are expected for this work. • No water distribution system hydraulic analysis of the WS-3 and WS-4 pressure planes will be completed under this amendment's work. It is assumed that the design criteria of the two new added pumps will respectively match the design Westside WTP Plate Settler Expansion Project (102052) 6 Scope of Work — Am ndment No. 4 11/08/2023 criteria of the existing WS-3 and WS-4 pumps, respectively, as shown on Table 1. If the design criteria of the new pumps need to differ from those of the existing ones, it is assumed that updated WS-3 and WS-4 pressure plane system head curves will be provided by the CITY for pump selection. • Since the plant structures and buildings were originally designed for a plant capacity of 35 MGD, it is not anticipated that improvements to the HVAC systems will be necessary and such improvements are not included in the scope of Amendment #4. However, for verification purposes, a review of the HVAC system capacity at the electrical room that contains the membrane feed pump VFDs is included. • The scope of work assumes that improvements will be of the type specifically defined above in the Amendment #No. 4 Background section. The scope does not include evaluation and potential implementation of other alternative equipment or improvements. • One (1) electronic (.PDF) copy and 5 hard copies of the PDR will be delivered. PDR shall be letter sized and comb -bound with a clear plastic cover. Drawings will be 1/2 size fold outs bound in the report. • ENGINEER shall prepare the meeting minutes of the PDR Review meeting and revise the report, if needed. • ENGINEER shall not proceed with Design activities without obtaining written approval by the CITY of the PDR. Deliverables: • Preliminary Design Report (PDR) • OPCC Task 3 - TCEQ Coordination ENGINEER will coordinate with the Texas Commission on Environmental Quality (TCEQ) related to obtaining approvals for the Amendment #4, Work Item #2 WSWTP expansion to 24 MGD and below described exceptions to their Rules and Regulations. 3.1. PDR Submittal ENGINEER will submit the PDR to TCEQ with letter documenting the expansion plans for the WSWTP for their preliminary review. The design drawings and specifications to be prepared as part of Task 4 will be submitted later for construction approval along with an updated copy of the PDR. 3.2. CT Study • ENGINEER will prepare an updated CT study for the WSWTP incorporating all items related to the plant expansion to 24 MGD. This study will be submitted to TCEQ for review and approval. ENGINEER will coordinate directly with TCEQ Westside WTP Plate Settler Expansion Project (102052) % Scope of Work — Am ndment No. 4 11/08/2023 during the preparation of the study and answer any questions they might have. 3.3 Membrane System Expansion Approval • If the added membrane skid differs from the last added Membrane Skid No. 5, ENGINEER will coordinate with the membrane filter manufacturer (Pall Corporation) to obtain operating parameters of the modified system and identify alterations from previously submitted information to TCEQ. The parameters and operations to be confirmed include number of membrane units and modules installed; square footage of modules; pre-treatment train processes; membrane backwash cycle procedure; membrane enhanced filtrate maintenance wash procedure; minimum membrane chemical CIP frequency and duration; and filtrate flux rate. • If the added membrane skid differs from the last added Membrane Skid No. 5, ENGINEER will also confirm membrane rack and module characteristics and properties related to direct integrity testing (DIT) calculations. This information will be submitted to TCEQ for approval. 3.4. Re -rating of Existing Settling Plates 0 Under this additional task, ENGINEER will coordinate with TCEQ to obtain approval to increase the currently allowed plate loading rate of 0.35 gpm/sf to a higher rate of 0.4 gpm/ sf. As part of this work, ENGINEER will complete the following items: o Prepare a full-scale pilot testing protocol for testing the plates of one existing settling basin for TCEQ's review and approval. o Upon protocol approval by TCEQ, ENGINEER will coordinate with the CITY completion of the testing. It is assumed that plant personnel will perform the testing and collect the necessary data. o ENGINEER will compile the data collected by plant personnel and will prepare a report summarizing the testing results for CITY's review. ENGINEER will capture the CITY's comments and issue a revised report for submittal to TCEQ for review and approval. 3.5. WSWTP 24-MGD Expansion Approval ENGINEER will assemble and submit to TCEQ a 100% level set of drawings and specifications along with the updated PDR for their review and approval for construction. ENGINEER will coordinate directly with TCEQ upon receiving their comments to respond and negotiate approval. Assumptions: • CITY will perform full-scale settling plate testing per the protocol approved by TCEQ, including necessary equipment and instrument calibration and data Westside WTP Plate Settler Expansion Project (102052) 8 Scope of Work — Am ndment No. 4 11/08/2023 collection. • It is anticipated that TCEQ will take at least 60 calendar days to review the above - described submittals. ENGINEER will contact and coordinate with TCEQ prior to initiating the Existing Settling Plate Re -Rating task to determine the feasibility of re -rating the settling plates to a rate of 0.4 gpm/sf. If success of re -rating the plate settler system does not seem probable ENGINEER will provide services to add two (2) parallel plate modules to each sedimentation basin, as indicated on Table 1, to the work described in Tasks 1, 2, 3.5, 4, 5, and 6 of this Amendment #4. It is assumed that the additional plate settler modules will be pre -procured by the CITY directly from MRI - Meurer Research to match the existing system and will be assigned to the construction contractor for installation. In the event that TCEQ were not amenable to approving the requested settling plate re -rate to a loading rate of 0.4 gpm/sf after completing the necessary full-scale pilot testing, additional plate modules will need to be added to make up for the difference between the TCEQ-approved re -rated capacity and the required expanded settling capacity (approximately 26 MGD). Services for these efforts are not included in this Scope of Services and if they became necessary, they would need to be completed as Additional Services to be negotiated separately. Deliverables • Transmittal Letter to TCEQ with PDR and response to TCEQ Comments • Updated CT Study for 24 MGD • Membrane Calculations for TCEQ, if applicable • ENGINEER's sealed and signed 100% set of drawings and specifications and updated PDR for TCEQ construction approval. Task 4 - Final Design and Final Construction Documents Upon approval of the PDR, ENGINEER will develop the WSWTP 24-MGD Expansion (Amendment #4, Work Item #2) design documents (plans and specifications) for submittal to TCEQ for approval and for bidding of the work to general construction contractors. ENGINEER will prepare construction documents as follows: Draft final (90% level) plans and specifications will be submitted to CITY per the approved Project Schedule. Plans are anticipated to include the drawings indicated in the attached Drawing List. The ENGINEER will submit a final design estimate of probable construction cost with the 90% design package. This estimate will be Class 5. • Following a 90% construction document review meeting with the CITY, the ENGINEER will capture comments and prepare and submit 100% level construction documents to the CITY per the approved Project Schedule for final approval. Westside WTP Plate Settler Expansion Project (102052) 9 Scope of Work — Am ndment No. 4 11/08/2023 • The 100% set of construction documents will be submitted to TCEQ for review and approval. ENGINEER will submit a final set of bid documents for bidding the work. This set will be stamped, dated, and signed by the ENGINEER registered in State of Texas. Assumptions: • CITY will procure additional membrane equipment for installation by construction contractor at the WSWTP to expand capacity from 20 MGD to 24 MGD. ENGINEER will provide the CITY with a specification for the additional membrane skid for the CITY to use in their procurement. • Drawings will be developed through use of the existing WSWTP CADD drawings. These drawings are of 2 dimension -type (21)). It is assumed that development of new BIM 3D models and drawings will not be necessary. • 1 electronic set (.PDF file) and 5 sets of 1/2 size drawings and 5 specifications will be delivered for the 90% Design package. • 1 electronic set (.PDF file) will be delivered for the 100% Design package to be submitted to TCEQ. • 1 electronic set (.PDF file) and 5 sets of 1/2 size drawings and 5 specifications will be delivered for the final Bid Documents package. ENGINEER will follow the CITY's requirements for electronic file submittal at 90% and 100% design levels and for the Bid Documents. Deliverables • 90% construction plans and specifications. • 100% construction plans and specifications. • Bid Documents • Detailed opinion of probable construction cost (OPCC) • Original cover mylar for the signatures of authorized CITY officials. Task 5 - Bid Phase Services ENGINEER will support the bid phase of the work added by Amendment No. 4, Work Item #2. The services described in Task 5 of the Agreement will be similarly provided for the work of Amendment No. 4, Work Item #2. Task 6 - Construction Phase Services ENGINEER will support the construction phase of the work added by Amendment #4, Work Item #2 as follows. Westside WTP Plate Settler Expansion Project (102052) 10 Scope of Work — Amendment No. 4 11/08/2023 6.1 Construction Support • The ENGINEER will attend the preconstruction conference and up to eighteen (18) monthly construction meetings. • The ENGINEER will visit the project site following each monthly construction meeting to observe general progress at a high level. ENGINEER's visit will not include detailed inspections or verifications of the work. • The ENGINEER will review submittals and shop drawings sent by the construction contractor as required by the Specifications. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and issue field orders and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final" project walk through and assist with preparation of final punch list. 6.2 Record Drawings • The ENGINEER will prepare Record Drawings from information provided by the CITY depicting any changes made to the Final Drawings (Conformed -to -Bid Documents) during construction for the WSWTP 24-MGD Expansion. The following information shall be provided by the CITY: o As -Built Survey o Red -Line Markups from Contractor o Red -Line Markups from City Inspector o Copies of Approved Change Orders o Approved Substitutions • The ENGINEER will modify the Final Drawings (Conformed -to -Bid Documents) electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. • The following disclaimer shall be included with the Record Drawing stamp: o "These Record Drawings were prepared using information provided by others and represent the "as constructed" conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liability for undocumented changes and certifies only that the documented changes are accurately depicted on these drawings." • Record Drawings shall be submitted in the format required by the CITY. Files will be uploaded to the project's Record Drawings folder at the electronic Westside WTP Plate Settler Expansion Project (102052) 11 Scope of Work — Amendment No. 4 11/08/2023 storage location required by the CITY. ENGINEER will prepare Record Drawings for the WSWTP to include the scope originally specified in the Agreement plus the modifications made to expand the plant to 24 MGD under Amendment #4, Work Item #2.Only drawings that have changed will be modified and Record Drawing seals and stamps provided. The updated Record Drawings will be produced in AutoCAD. The Record Drawings will be delivered to the City in electronic and hard copy format. Assumptions: • 58 Submittals/Shop Drawings (including re -submittals) and 15 O&M Manuals. (including re -submittals) are assumed. • 15 RFI's are assumed. • 5 change documents, including Field Orders, Work Change Directives, and Change Orders are assumed • No Substitution Request evaluations. • No Resident Project Representative (RPR) will be provided. Deliverables: • Responses to Contractor's Request for Information • Field Order and Work Change Directive documents • Review of Change Orders • Review of submittals / shop drawings • Final Punch List items • Record Drawings COMPENSATION The total requested amount of this proposed Amendment No. 4's Base Services is as follows: • $38,440 for Work Item #1 (WSWTP Re -rate to 20 MGD) per attached Fee Development Spreadsheet. • $866,387 for all other Base Services work associated with the project, including Work Item #2 (WSWTP Expansion to 24 MGD) per attached Fee Development Spreadsheet. The Labor Rate Schedule shall be the below updated schedule that includes 2024 and 2025 hourly billing rates. Westside WTP Plate Settler Expansion Project (102052) 12 Scope of Work — Amendment No. 4 11/08/2023 Labor Category Officer/Principal Senior Technical Specialist Project Manager Senior Engineer (Level 7/ 8) Project Engineer (Level 5/6) Engineer (Level 3/4) Graduate Engineer (Level 1/2) CADD Designer/Drafter Senior Administration Contract Administration Clerical Administration SCHEDULE 2024 Rate ($/hour) $310 $280 $260 $260 $200 $170 $160 $150 $140 $140 $110 2025 Rate ($/hour) $320 $290 $270 $270 $210 $180 $160 $150 $140 $140 $110 The above services are anticipated to be completed following the below schedule. This schedule assumes that CDM Smith will receive an executed amendment from the City of Worth by January 5, 2023. • Work Item #1 (WSWTP Re -rate to 20 MGD) o Delivery of draft revised CT Study and draft TM requesting an increased plant capacity to 20 MGD from TCEQ to CITY for their review: February 9, 2024. o After receiving review comments on deliverables from the CITY, the ENGINEER anticipates to issue revised deliverables within 15 calendar days. o Reviews by TCEQ are anticipated to take 60 calendar days. After their reviews, the ENGINEER anticipates to address their comments and reach a resolution within approximately 45 calendar days from receiving TCEQ's comment. • Work Item #2 (WSWTP Expansion to 24 MGD) o See attached Schedule END OF SCOPE OF WORK Westside WTP Plate Settler Expansion Project (102052) 13 Scope of Work — Am ndment No. 4 11/08/2023 Westside WTP Re -Rate and Expansion of 24 MGD Engineering Fee 11-9-23 CDM Smith Gupta 8, Assoclates Task Description Principal Project Manager S,.Tech.Spec Sr.Engr.7/8 Project Eng, 5/6 Engineer 3/4 CADD Clerical Admin Contract Admin. Total Hours Labor Total ODC CDM Smith Total Total Hours Labor Total ODC Gupta Total Total Base Services I 1 I I I I Work Item #1: 20 MGD Plant Re -Rate 4 21 6 69 0 85 0 2 3 190 $ 3SA40 $ - $ 38,440 $ 38,440 Task 1- Project Management 1 4 3 8 $ 1,648 $ 1,648 $ 1,648 Task 3- TCEQ Coordination Tasks 3 17 6 69 85 2/ 1. $ 36,792 $ 36,792 $ 36,792 Work Item#2: 24 MGD Plant Expansion 47 517 167 680 9S 766 349 44 40 2639 $ 574,162 $ 1,429 $ 575,591 1719 $ 277,360 $ 13,436 $ 290,796 $ 966,387 Task 1- Project Management 35 232.5 29 45.5 4 72 1 8 40 467 $ 114,415 $ 440 $ 114,855 66 $ 14,972 $ 749 $ 15,721 $ 130,576 Task 2- Preliminary Design 4 41 82 162 11 155 69 0 524 $ 113,348 $ 989 $ 114,337 230 $ 40,920 $ 2,018 $ 42,938 $ 157,275 Task 3- TCEQ Coordination 28 10 85 58 1 2 0 194 $ 39,550 $ 39,550 $ 39,550 Task 4- Final Design and Construction Documents: $ - $ - 90%Design 4 55 46 176 50 214 156 20 0 721 $ 147,153 $ 147,153 880 $ 131,523 $ 4,870 $ 136,393 $ 283,546 1001ADesign 1 10.5 0 42 6 42 40 6 0 147.5 $ 28,655 $ 28,655 135 $ 21,890 $ 2,396 $ 24,286 $ 52,941 Task 5 - Bid Phase ices 3 18 0 45 6 6 8 0 86 $ 19,204 $ 19,204 55 $ 9,141 $ 457 $ 9,598 $ 28,802 Task 6- Construction Phase ServServices 0 132 0 124.5 24 180 76 0 0 5365 $ 111,838 $ 111,838 352 $ 58,914 $ 2,946 $ 61,860 $ 173,698 Total Base Services 51 539 173 749 95 799 349 46 43 2829 $ 612,602 $ 1,429 $ 614,031 1718 $ 277,360 $ 13,436 $ 290,796 $ 904,827 Westside WTP Plate Settler Project Expansion Amendment #4 - 24-MGD Expansion Schedule ID Task Name (Start (Finish 1 Notice to Proceed Fri 1/5/24 Fri 1/5/24 2 Preliminary Design Mon 1/8/24 Fri 4/19/24 3 Re -rate Settling Plates to 24 MGD Mon 1/8/24 Fri 9/13/24 4 Final Design and Constr.Docs Mon 4/22/24 Fri 11/8/24 5 90% Design Mon 4/22/24 Fri 7/19/24 6 100% Design Mon 7/22/24 Fri 8/16/24 7 TCEQ Review/Comment Resolution Mon 8/19/24 Fri 11/8/24 8 Bid Phase Mon 9/9/24 Fri 11/29/24 9 Construction Mon 12/2/24 Wed 5/13/26 Task Project Summary Manual Task Start -only C Deadline i Project: Schedule_11-03-23 Split Inactive Task Duration -only Finish -only ] Progress Date: Fri 11/3/23 Milestone ♦ Inactive Milestone Manual Summary Rollup External Tasks Manual Progress Summary r r Inactive Summary s Manual Summary r External Milestone Page 1 BASE SERVICES Count Drawing Owner Discipline GENERAL 1 Cover Sheet CDM Smith Process Mech. 2 G-1 Sheet Index CDM Smith Process Mech. 3 G-2 General Legend CDM Smith Process Mech. 4 G-3 Plant Schematic CDM Smith Process Mech. 5 G-4 Plant Process Design Criteria CDM Smith Process Mech. 6 G-5 Hydraulic Profile I CDM Smith Process Mech. 7 G-6 Hydraulic Profile II CDM Smith Process Mech. 8 G-7 Hydraulic Profile III CDM Smith Process Mech. CIVIL 9 C-1 Civil Legend CDM Smith Process Mech. 10 C-2 Temporary Facilities And Construction Staging Plan CDM Smith Process Mech. 11 C-3 Site Plan and Sheet Key CDM Smith Process Mech. MECHANICAL 12 M-1 Instrumentation Legend CDM Smith Process Mech./I&C 13 M-2 Mechanical Legend CDM Smith Process Mech. 14 M-4 Filtration Process, Mechanical and Instrumentation Diagram I CDM Smith Process Mech./I&C 15 M-5 Filtration Process, Mechanical and Instrumentation Diagram II CDM Smith Process Mech./I&C Ultrafiltration Membranes Process, Mechanical and Instrumentation 16 M-6 Diagram I Pall/CDM Smith Process Mech./I&C Ultrafiltration Membranes Process, Mechanical and Instrumentation 17 M-7 Diagram II Pall/CDM Smith Process Mech./I&C Ultrafiltration Membranes Process, Mechanical and Instrumentation 18 M-8 Diagram III Pall/CDM Smith Process Mech./I&C Clearwell and HSPS Process, Mechanical and Instrumentation 19 M-9 Diagram CDM Smith Process Mech./I&C Ozone Sidestream Injection System Process, Mechanical and 20 M-10 Instrumentation Diagram CDM Smith Process Mech./I&C Sodium Hypochlorite Process, Mechanical and Instrumentation 21 M-11 Diagram CDM Smith Process Mech./I&C Sodium Hydroxide Process, Mechanical and Instrumentation 22 M-12 Diagram CDM Smith Process Mech./I&C 23 MB-1 Ozone Contact Basins Partial Plan at El. 863.50 CDM Smith Process Mech. 24 MB-2 Ozone Contact Basins Partial Plan at El. 872.00 CDM Smith Process Mech. 25 MB-3 Ozone Contact Basin Sections I CDM Smith Process Mech. 26 MB-4 Ozone Contact Basin Sections II and Details CDM Smith Process Mech. 27 MD-1 Filter and Pipe Gallery Upper Level Plans CDM Smith Process Mech. 28 MD-2 Filter Pipe Gallery Operating Level Plan, Section, and Details CDM Smith Process Mech. 29 MD-3 Filter No. 6 Section CDM Smith Process Mech. 30 MD-4 Filter No. 6 Sections and Details CDM Smith Process Mech. 31 MD-5 Filter No. 6 Details CDM Smith Process Mech. 32 MD-6 Membrane Facility Rack No. 6 Expansion Plan - El 847 CDM Smith Process Mech. 33 MD-7 Membrane Facility Rack No. 6 Expansion Plan - El 855 CDM Smith Process Mech. 34 MD-8 Membrane Facility Rack No. 6 Expansion Plan - El 870 CDM Smith Process Mech. 35 MD-9 Membrane Facility Rack No. 6 Expansion Section I CDM Smith Process Mech. Membrane Facility Rack No. 6 Expansion Partial Plan El. 872 and 36 MD-10 Section II CDM Smith Process Mech. 37 ME-1 Chemical Storage Area Partial Plan CDM Smith Process Mech. 38 ME-2 Sodium Hydroxide Storage Sections and Details CDM Smith Process Mech. Page 1 of 3 BASE SERVICES Count Drawing Owner Discipline 39 ME-3 Chemical Feed Room Operating Level Plan CDM Smith Process Mech. 40 ME-4 Chemical Feed Room Sections I CDM Smith Process Mech. 41 ME-5 Chemical Feed Room Sections II and Details CDM Smith Process Mech. 42 ME-6 Chemical Feed System Isometric CDM Smith Process Mech. 43 MF-1 HSPS Operating Level Plan CDM Smith Process Mech. 44 MF-2 HSPS Sections and Details CDM Smith Process Mech. 45 MZ-1 Mechanical Standard Details I CDM Smith Process Mech. 46 MZ-2 Mechanical Standard Details II CDM Smith Process Mech. STRUCTURAL 47 S-1 Structural General Notes I CDM Smith Structural 48 S-2 Structural General Notes II CDM Smith Structural 49 S-3 Structural Standard Details I CDM Smith Structural 50 S-4 Structural Standard Details II CDM Smith Structural 51 SE-1 Chemical Feed Room Structural Plan CDM Smith Structural 52 SE-2 Chemical Feed Room Structural Sections and Details CDM Smith Structural ELECTRICAL 53 E-1 Electrical Legend And Symbols - I GAI Electrical 54 E-2 Electrical Legend And Symbols - II GAI Electrical 55 E-3 Electrical General Notes GAI Electrical 56 E-4 Electrical Overall Site Plan GAI Electrical 57 E-5 Electrical Conduit and Wire Schedule GAI Electrical 58 EB-1 Electrical - Ozone Contact Basins Partial Electric Plan and Schedule GAI Electrical Ozone Contact Basin MCC-OB Electrical One Line Diagram and 59 EB-2 Elevations GAI Electrical 60 EB-3 Ozone Contact Basin Electrical Panel Schedule and Schematics GAI Electrical 61 ED-1 Electrical - Filter Overall Electric Plan and Schedule GAI Electrical Filter/ Membrane Switchboard (Swb-Flt) One -Line Diagram - 62 ED-2 Addition GAI Electrical 63 ED-3 Electrical Switchboard (SWB-FLT), MCC-FLTA One -Line Diagram - I GAI Electrical 64 ED-4 Electrical Room Plan and Details GAI Electrical 65 ED-5 Electrical Power Panel and PLC/RIO Control Panel Elevations GAI Electrical 66 ED-6 Electrical Filter Power Panel HFLT-1A One -Line Diagram GAI Electrical 67 ED-7 Electrical Filter Power Panel HFLT-5 One -Line Diagram GAI Electrical 68 ED-9 Electrical Pipe Gallery Power and Control Plan GAI Electrical Existing Electrical Filter - Power and Instrumentation Modification 69 ED-10 Plan GAI Electrical 70 ED-11 Filter Pipe Gallery Electrical Details GAI Electrical Electrical - Filter Electrical and Instrumentation Interface Diagrams 71 ED-12 And Schematic GAI Electrical 72 ED-13 Filter Electrical Schematic GAI Electrical 73 ED-14 Membrane Feed Pump Electrical Schematic GAI Electrical 74 ED-15 Electrical - Filter Upper -Level Power And Instrumentation Plan GAI Electrical 75 EE-1 Chemical Storage Area Partial Electrical Plan GAI Electrical 76 EE-2 Chemical Feed Room Electrical Plan GAI Electrical 77 EF-1 HSPS Area Electrical Site Plan GAI Electrical 78 EF-2 4160v Motor Control Center MV-HAS & MV-HSB One -Line Diagram GAI Electrical 79 EF-3 Switchgear MVSG-HS Elevation & Details GAI Electrical 80 EF-4 HSPS Power Plan GAI Electrical 81 EF-5 HS Pump Electrical Schematic - I GAI Electrical 82 EF-6 HS Pump Electrical Schematic - II GAI Electrical 83 EF-7 HS Pump Electrical Schematic - III GAI Electrical Page 2 of 3 BASE SERVICES Count Drawing Owner Discipline 84 EF-12 PLC/HS Interface Diagram GAI Electrical 85 EF-13 HSPS Electrical Details GAI Electrical 86 EZ-1 Electrical Standard Details I GAI Electrical 87 EZ-2 Electrical Standard Details II GAI Electrical 88 EZ-3 Electrical Standard Details III GAI Electrical INSTRUMENTATION 89 IZ-1 Instrumentation Details OPTIONAL SERVICES Count Drawing Owner Discipline MECHANICAL 1 M-3 Sedimentation Process, Mechanical and Instrumentation Diagram CDM Smith Process Mech./I&C 2 MC-1 Sedimentation Basins Plate Settlers Plan CDM Smith Process Mech. 3 MC-2 Sedimentation Basins Plate Settlers Sections - I CDM Smith Process Mech. 4 MC-3 Sedimentation Basins Plate Settlers Sections - II CDM Smith Process Mech. Page 3 of 3 City of Fort Worth, Texas Mayor and Council Communication DATE: 01/23/24 M&C FILE NUMBER: M&C 24-0077 LOG NAME: 60WSWTPPSETA4 - CDM SUBJECT (CD 3) Authorize Execution of Amendment No. 4 to an Engineering Agreement with CDM Smith, Inc., in the Amount of $904,827.00, for Westside Water Treatment Plant Plate Settler Expansion Project and Adopt Appropriation Ordinances to Effect a Portion of Water's Contribution to the Fiscal Years 2024-2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 4 to City Secretary Contract No. 52517 in the amount of $904,827.00, an engineering agreement with CDM Smith, Inc. for construction support services for Westside Water Treatment Plant Plate Settler Expansion project for a revised contract amount of $1,436,115.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water Impact Fee Fund in the amount of $1,044,827.00 from available funds for the purpose of transferring funds from the Water/Wastewater Wholesale Impact Fees and Water/Wastewater Retail Impact Fee projects (City Project Nos. B20004 and B20005) to the Westside Water Treatment Plant Plate Settler Expansion project (City Project 102052); and 3. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Water Impact Fee Fund in the amount of $1,044,827.00 transferred from within the Water Impact Fee Fund to the Westside Water Treatment Plant Plate Settler Expansion project (City Project No. 102052) and; 4. Effect a portion of Water's contribution to the Fiscal Years 2024-2028 Capital Improvement Program. 76141iF.mLe]kF On June 25, 2019, Mayor and Council Communication (M&C C-29181) authorized an engineering agreement with CDM Smith, Inc., (City Secretary Contract No. 52517), in the amount of $192,600.00 for the Westside Water Treatment Plant (WSWTP) Plate Settler Expansion project. The agreement was subsequently revised by Amendment No. 1 in the amount of $97,448.00, administratively authorized May 29, 2020, that provided additional design for the replacement of the raw waterflow meter, the addition of filter No. 5, the addition of membrane feed pump No. 5 and relocating the finished water sample point, Amendment No. 2 in the amount of $141,740.00, authorized August 3, 2021 (M&C 21-0540) that primarily provided construction support services for construction of Part 1 of the project consisting of shop drawings and submittals reviews, change order review, record drawings and update plant operational manual and Amendment No. 3 in the amount of $99,500.00 administratively authorized November 2, 2022 that provided for additional construction services on the project. Amendment No. 4 provides for the following: Preparation of a formal request to the Texas Commission on Environmental Quality (TCEQ) for an increase in the approved WSWTP rated design capacity from 18 MGD to 20 MGD and design and construction phase services for expanding the WSWTP capacity from the re -rated capacity of 20 MGD to 24 MGD. The proposed expansion will require modifications to the existing operations and processes of the treatment plant. In addition to the contract cost, $140,000.00 is required for project management and material testing. This project will have no impact on the Water Department operating budget when complete. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will amend the City of Fort Worth's Fiscal Year 2024-2028 Capital Improvement Program as follows: 60WSWTPPSETA4 -CDM Capital Revised Project FY2024 CIP Budget Change Fund Name Appropriations Authority (Increase/Decrease) FY2024 Name Budget 56003 102052 Westside Water WTP $0.00 This M&C $1,044,827.00 $1,044,827.00 Impact Plate Fee Settlers Funding for the Westside Water Treatment Plant Plate Settler Expansion project is depicted below: Fund Existing Additional Project Total* Appropriations Appropriations Water Impact Fee - Fund 56003 $5,224,002.00 $1,044,827.00 $6,268,829.00 Project Total $5,224,002.00 $1,044,827.00 $6,268,829.00 *Numbers rounded for presentation purposes. Funding is available in the W/WW Wholesale Impact Fees and W/WW Retail Impact Fees projects within the Water Impact Fee Fund for the purpose of funding Westside Water Treatment Plant Plate Settler Expansion project within the Water Impact Fee Fund. CDM Smith, Inc. agrees to maintain its initial M/WBE commitment of 10 percent that it made on the original agreement and extend and maintain that same M/WBE commitment of 10 percent to all prior amendments up to and inclusive of this Amendment No. 4. Therefore CDM Smith, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 3. 196Y9t1MI►1&10LY,/_1%0Is] ►WKS]=I I19M-A0Is] ►A The Director of Finance certifies that funds are currently available in the W/WW Wholesale Impact Fees and W/WW Retail Impact Fees projects within the Water Impact Fee Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the Water Impact Fee Fund for the Westside WTP Plate Settlers project to support the above recommendations and execution of the amendment to the agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for Citv Manaaer's Office by Oriainatina Business Unit Head Dana Burghdoff 8018 Chris Harder 5020 Additional Information Contact: Scott Taylor 7240 60WSWTPPSETA4-CDM FID Table 2 56003 0600430 4413023 B20004 2024 $522,414.00 Water -Wholesale 2 56003 0600430 5900016 B20004 2024 $522,414.00 2 56003 0600430 4413024 B20005 2024 $522,413.00 Water - Retail 2 56003 0600430 5900016 B20005 2024 $522,413.00 3 56003 0600430 4956003 102052 2024 $1,044,827.00 3 56003 0600430 102052 2024 $1,044,827.00 3 56003 0600430 5900016 B20004 B02000 9999 $522,414.00 3 56003 0600430 5900016 B20005 B02000 9999 $522,413.00 3 56003 0600430 4956003 102052 005430 9999 ($1,044,827.00) 2&3) 56003 0600430 5330500 102052 005484 9999 $40,000.00 2&3) 56003 0600430 5310350 102052 005484 9999 $10,000.00 1) 56003 0600430 5330500 102052 005430 9999 $904,827.00 To pay Engineering Company