Loading...
HomeMy WebLinkAboutContract 39313-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. R 2- (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Jacobs Engineering Group, Inc. (Engineer) made and entered into City Secretary Contract No. 39313, (the Contract) which was authorized by the City Council by M&C C-23768 on the 8th day of August 2009; and WHEREAS, the Contract involves engineering services for the following project: Design, Fill and Regrade of Noise Properties (Storm Drainage Improvements) , Project No. 1399 WHEREAS, it has become necessary to execute Amendment No. 2 to said contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 21, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $10, 500.00. 2. Article TI of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by City of Fort Worth,Texas Amendment to Engineering Agreement Paue I of 2 OFFICIAL RECORD CITY SECRETARY - FT. WORTH, TX the City of all work and services shall not exceed the sum of $250, 405.87. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this 2,0 day of 201j.., in Fort Worth, Tarrant County, Texas. AZr -n'C1T1'q 000 00U0 00 Q®��C� 11160 _4 n�d �O Q QY �Dt �0h eS o o° d fi�.�f-City Secretary ��a*o°°°o000000 44i,nj 4 �'a��d APPROVAL RECOMMENDED: APPROVED:EN Kent Penney, Director Fernando Costa Aviation Department Assistant City Manager Jacobs Engineering Group, Inc. Engineer / By. Michael Bauer Operations Manager 777 Main Street Fort Worth,Texas 76102 APPROVED AS TO FORM AND LEGALITY: &V Assistant City Attorney NO M&C REEQ IRED Cityot'Fort Worth,'I'exa. —��- Amendment to Engineering Agreement Page 2 ot'2 i OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX For777 M air.Street Foot Worth,TX 76102 U.S.t1. 1,817,735-6000 Fax 1.817,735-6148 September 21, 2011 Ms. Ruseena Johnson AVIATION DEPARTMENT Fort Worth Meacham International Airport City of Fort Worth 4201 North Main Street, Suite 200 Fort Worth,Texas 76106-2749 Re: Scope or Work and Fee Proposal for Construction Phase Services Storm Drainage Improvements—Meacham International Airport City Contract No. 1399-1 Dear Ruseena: Per your request, we are providing a scope of work and a fee proposal for limited review of RFI's, shop drawings and site visits up to the limit of this contract. This contract is a cost plus contract with rates as shown below. The enclosed fee shows a not to exceed an amount of$10,500.00 unless authorized with hourly billing rates of; Project manager $197.75!Hour Senior Engineer 184.61/Hour Design Engineer 145.79/Hour Clerical 66.62/Hour Cost for reproduction and trip expenses are a reimbursable at cost. Thank you for your consideration. Since y, eterman, P.E. Project Manager Jacobs Engineering Group Inc. JLP/ cc: Bill Weistead,City of Fort Worth Correspondence Jacobs Engineering Group inc Construction Phase Services Storm Drainage Improvements Meacham International Airport City Contract No. 1399-1 September 21,2011 Scope of Work • The scope of work for construction phase services is summarized below. We anticipate that the construction phase services contract for engineering services will be a not to exceed reimbursable agreement. The following work items are estimated assuming a one-hundred-twenty(150) calendar day construction period. I. Construction Phase Services • Site Visits—As requested • Respond to BFI's • Review of shop drawings and submittals The following elements are not included for the Construction Phase Services. • Surveying to verify contractors work • Attend Weekly Construction Meetings • Review/Approve Applications for Payment • Estimate Interim Embankment Quantities • Substantial Completion Inspection and Punch List • Final Inspection • Prepare As-Built Plans These items as well as others,which are deemed necessary,may be added at a later date. FEE PROPOSAL SUMMARY SHEET 9/2112011 Project Storm Drainage Improvements City Project Number 1399-1 Airport: Meacham International Airport Project Manager: Ruseena Johnson Consultant: Jacobs Engineering Inc SALARY RATES Project Senior Design Man= Engineer ENineer EIT CADD Clerical $77.181 72.05 56.90 $46.80 1 $33.351 W.00 Consultants G&A 1.228 Consultants Profi 15. ° Consultants Muldplf 2.5622 LABOR HOURS BY PHASE Project Senior Design Manager Engineer Engineer EIT CADD Clerical Pretinrinary,Design 0.0 0.0 0.0 0.0 0.0 0.0 Final Design 0.0 0.0 0.0 0.0 0.0 0.0 Bidding 0.0 0.0 0.0 0.0 0.0 0.0 Construction 46.0 0.0 2.0 0.0 0.0 13.0 Total Hours 46.0 0.0 2.0 0.0 0.0 13.0 TOTAL PAYROLL.COSTS $10,254.13 TOTAL MISC.EXPENSES $199.90 TOTAL BASIC SERVICES CONTRACT COSTS $10,454.03 TOTAL SUBCONSULTANT Geotechnical $0.00 Survey $0.00 Subcontract Coord. 10.0% $0.00 Total Subcontract Services $0.00 TOTAL ENGINEERING COST $10,454.03 CSJ No 0502MECH Page 1 of 1 9/21/2011 FEE PROPOSAL CONSTRUCTION PHA.' Project Storm Drainage Improvements TxDOT Project No: 0 Airport: Meacham International Airport Project Manager. Ruseena Johnson Consultant: Jacobs Engineering Inc Estimated Personnel Hrs 21.5 weeks LABOR Project Senior Design Anticipated Task Manager Engineer Engineer EIT CADD Clerical Preconst Conf. (1 total) Meetings(3 meetings) 8 Site Visits(Outside of mtgs. 3 total) Pre-activity Meetings(1 total) Final inspection(1 total) Address Submittals(8 @2hr/ea), 16 Coordination with Agent, Contractor 12 2 Testing review(10 @0.1hr) 10 Pay Estimates(6 total) Estimated Hours 46 0 2 0 0 Subtotal Labor $9,096.53 $0,00 $291.58 $0.00 $0.00 $866.( Subtotal labor $10,254.13 MISCELLANEOUS COSTS Reproduction 150.00 Travel(3 trips total) 45.90 Misc.-Mail, etc. 4.00 Total Miscellaneous Costs $199.90 SUBCONSULTANT COSTS Geotech n ica i $0.00 Survey $0.00 Subcontract Coord. 10.Q% $0.00 Total Subconsultant Costs $0.00 TOTAL COSTS THIS PHASE $10,454.03 $10,454.03 CB No.014304 2 of 3 9/2112011