Loading...
HomeMy WebLinkAboutContract 46700 Developer and Project Information Cover Sheet: Developer Company Name: Scannell Properties#206,LLC Address, State,Zip Code: 1765 Duke Street Phone : 703-302-1892 E-Mail:joelsaa,scannellproperties.com Authorized Signatory/Title: Joel Scannell/Managing Director Project Name and Brief Description: Railhead#3 Project Location: 300 Railhead Rd. Plat Case No.: FP98-40 Plat Name: Railhead Fort Worth Ph1 Mapsco: F48-L Council District: 2 City Project No : 02574 CFA: 2015-32 DOE: 7458 To be completed by_staff Received by: Date: ✓/1 1 m m L m 0 3 y L� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX i COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary �[ 7 COUNTY OF TARRANT § Contract No. I 1p I ©� WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Railhead #3 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE,For and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer acknowledges that 4te said acceptance process requires the Developer's contractor(s) to s bWIgh4L RECORD 2 CITY SECRETARY FT.WORTH,TX affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X , Sewer(A-1) X , Paving(B) X_, Storm Drain(B-1) X , Street Lights & Signs (C)_2L E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section 11, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: Railhead#3 CFA.No.:2015-032 DOE No.: 7458 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $16,075 2.Sewer Construction $5,350.00 Water and Sewer Construction Total $ 21,425.00 B. TPW Construction 1.Street $ 116,525.33 2.Storm Drain $ 412,005.50 3.Street Lights Installed by Developer $ 40,200.00 TPW Construction Cost Total $ 568,730.83 Total Construction Cost(excluding the fees): $ 590,155.83 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 428.50 D. Water/Sewer Material Testing Fee(2%) $ 428.50 Sub-Total for Water Construction Fees $ 857.00 E. TPW Inspection Fee(4%) $ 21,141.23 F. TPW Material Testing(2%) $ 10,570.62 G. Street Light Inspsection Cost $ 1,608.00 H. Street Signs Installation Cost Sub-Total for TPW Construction Fees $ 33,319.85 Total Construction Fees: $ 34,176.85 Financial Guarantee Options Choose one Amount Mark'choice Bond=100% $ 590,155.83 x Completion Agreement=100%/Holds Plat $ 590,155.83 Cash Escrow Water/Sanitary Sewer=125% $ 26,781.25 Cash Escrow Paving/Storm Drain=125% $ 710,913.54 Letter of Credit=125%w/2yr expiration period $ 737,694.79 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary,with the corporate seal of the City affixed,and said Developer has executed this instrument in quadruplicate,at Fort Worth,Texas this day of 20 CITY OF FORT WORTH-Recommended by: Water Department Transportation&Public Works Department '� 4 a-9--1z 4 U. t ` Wendy Chi-Babulal, BA,P.E. Dougla4W.Wiersig,P.E. Development Engineering Manager Director Approved as to Form&Legality: Approved by City Manager's Office 96�� cw .' Douglas W. Black Fernando Costa Assistant City Attorney Assistant City Manager M&C No.AlAr Date: ATTEST: Vol 000 �v J.K ys 0 City Secretary V o� a � O' AS s.. � ATTEST: OPER: Scannell Properties#206,LLC Signaftl '�/�(� ,L ignature: (Print)Name.& "_ _ / L• Print Name:Robert J.Scannell Title:Manager OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ❑ Location Map 0 Exhibit A: Water Improvements Water Estimate �?]C Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements Paving Estimate [� Exhibit B-1: Storm Drain Improvements Storm Drain Estimate [� Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 0 75 150 300 450 GRAPHIC SCALE IN FEET mow p / 0 � RP REMOVE EXISTING PLUG do / CONNECT TO EXISTING 8" W.L. O INSTALL- 1-8" VALVE / 1-3" IRR. WATER SERVICE SADDLE TAP 1-2" IRR. METER BOX 1 / INSTALL KFLOW PREVEN TOR REFER TO PC ATE SITE UTILIT 1-2" DOM. WATER SERVICE, PLAN FOR CONTINUATION — REMOVE: SADDLE TAP 1-8" PLUG 1-2" DOMESTIC METER BOX INSTALL REFER TO PRIVATE SITE UTILITY, 1-8"X6" REDUCER l PLAN FOR CONTINUATION 1-6" VALVE /l � 1—F.H. PER CITY OF FORT / WORTH SIDS. RAILHEAD #3 + Ct CONNECT TO EXISTING 12 W.L� %*: . • *dI INSTALL. ............................... 1-12"X8" TAPPING SLEEVE �JAVIER.D. JARAMILLO� t -_ 1-8" VALVE A 91007 al�`FSSjC..... �s Q i`®ONAL O =THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY JAVIER D. JARAMILLO, P.E. 91007 ON 05/11/2015. ALTERATION OF A SEALED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE RESPONSIBLE ENGINEER IS AN OFFENSE UNDER THE TEXAS ENGINEERING PRACTICE ACT. RAILHEAD ®3 WATER 8350 N. CENTRAL EXPWY. SUITE 1000 IMPROVEMENTS Pacheco Ko c h D LAS. TX 75206 972235.3031 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY I CHECKED BY SCALE DATE JOB HUABER TARRANT COUNTY, TEXAS AMS JDJ 1".150' 05/05/2015 1977-14.455 PAGE 1 OF 5 0 75 150 300 450 �® / RO GRAPHIC SCALE IN FEETfo N SS I O` B CONNECT TO EX. 8" SEWER STUB OUT INSTALL• / 1-WWAC AT PROPERTY LINE INSTALL: FL 8"=688.30 (SE) FLOWABLE FILL IN CONTRACTOR SHALL FIELD VERIFY PRIOR TO INSTALL — EXISTING 8" W.W. REFER TO PRIVATE SITE UTILITY PLAN FOR CONTINUATION STUBOUT AND PLUG RAILHEAD #3 i 41 tp / - ............................... IJAVIER D. JARAMILLO/ ...............................I/ O II 91007 s`Nwa E+ir i THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY JAVIER D. JARAMILLO, P.E. 91007 ON 05/11/2015. ALTERATION OF A SEALED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE RESPONSIBLE ENGINEER IS AN OFFENSE UNDER THE TEXAS ENGINEERING PRACTICE ACT. RAILHEAD *3 SANITARY SEWER 8350 N. CENTRAL EXPWY. SUITE 1000 IMPROVEMENTS Pacheco Koch DALLAS, TX 75206 972235.3031 1X REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY CHECKED BY SCALE DATE JOB NUABER TARRANT COUNTY, TEXAS AMS JDJ 1"=150, 05/05/2015 1977-14.455 PAGE 2 OF 5 RAILHEAD #3 SANITARY SEWER IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 28-Apr-15 Parts Description Spec# Qty Unit Unit Cost Total Cost Division 2-Sitework Imported Embedment/Backfill, CLSM 3305 10 50 CY $60 $3,000 8"Sewer Service 33 31 50 1 EA $850 $850 WWAC 00 00 00 1 EA $1,500 $1,500 %*• ,.............................:*.r aWAVIER D. JARAMILLC • :........................... . O no:• 91007 9fI,Fs�CEN SS-"��' _ 0 75 150 300 450 GRAPHIC SCALE IN FEET OPO / W&P I\I ' 1O c,S l I / 1 0 A A RAILHEAD #3 W B _s-� et0, "4 .................. O I � SJAVIER D. JARAMILLO� Vi �� •, 91007 'mss , E= G E— N C� °d1s�7.CENS.�, ,o`�NAIE.��G p5-ll-1 AO BARRIER FREE RAMP THE SEAL APPEARING ON THIS DOCUMENT WAS © 8" CONCRETE DRIVEWAY AUTHORIZED BY JAMER D. JARAMILLO, P.E. 91007 ON HEAVY-DUTY PAVEMENT 05/11/2015. ALTERATION OF A SEALED DOCUMENT (FIRELANES-DRIVEWAYS) WITHOUT PROPER NOTIFICATION TO THE RESPONSIBLE 8" THICK REINFORCED CONCRETE PAVEMENT ENGINEER IS AN OFFENSE UNDER THE TEXAS (4,000 PSI) WITH #3 BARS ® 18" O.C.E.W. ENGINEERING PRACTICE ACT. ON COMPACTED SUBGRADE TO 95% OF RAILHEAD •S ASTM D698 DENSITY(STANDARD PROCTOR) PAVING 8350 N. CENTRAL EXPWY. SUITE 1000 IMPROVEMENTS Pacheco Koch DALLAS. TX 75208 972235.3031 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH ,08A*IV BY I CHECKED BY SCALE DATE JOB NVANEN TARRANT COUNTY, TEXAS AMS JDJ 1'-150' 05/05/2015 1977-14.455 PAGE 3 OF 5 RAILHEAD #3 PAVING IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 28-Apr-15 Parts Description Spec# Qty Unit Unit Cost Total Cost Division 2-Sitework Remove Conc Curb&Gutter 02 41 15 270 LF $12.00 $3,240.00 Site Clearing 31 10 00 1 LS $2,000.00 $2,000.00 8"Conc Pvmt 32 13 13 9645 SF $5.07 $48,900.15 4"Conc Sidewalk 32 13 20 5785 SF $4.66 $26,958.10 8"Concrete Driveway 32 13 20 2195 SF $5.07 $11,128.65 Barrier Free Ramp,Type P-1 32 13 20 2 EA $1,250.00 $2,500.00 Topsoil (N/A) 32 91 19 1140 Cy $5.00 $5,700.00 Seeding, Hydromulch (N/A) 32 91 19 27668 SY $0.07 $1,798.42 Temporary Watering of Seeding 000000 6 AC $2,500.00 $14,300.00 subtota 10% •F e� �a16� � ............. i JAVIER.D. JARAMILLO ..... 91007 • ' 6 CEN S EO.���1 0 75 150 300 450 GRAPHIC SCALE IN FEET �dft� F00 ee ' R � *I a /JAVIER ..................... •JARAMILLO/ e� 91007.. Al' � o0'c''�ICENSO � 1 ,llVEXISTING el�i®���~ r r / / �' REMOVEHEADWALL E SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY JAVIER D. JARAMILLO, P.E. 91007 ON CONNECT TO EXISTING 05/11/2015. ALTERATION OF A SEALED DOCUMENT STORM INLET THOUT PROPER NOTIFICATION TO THE RESPONSIBLE 9'X4' BOX CULVERT NGINEER IS AN OFFENSE UNDER THE TEXAS NGINEERING PRACTICE ACT. C o INSTALL: 4' DROP INLET i INSTALL: / 2-7'X4' BOX CULVERT INSTALL: 10' CURB INLET RAILHEAD #3 INSTALL: BOX CULVERT HEADWALL INSTALL: / Q 42' STORM DRAIN INSTALL.- 36" NSTALL:36" STORM GS INSTALL: 30" FLARED HEADWALL INSTALL: INSTALL• 36" FLARED HEADWALL 130" STORM DRAIN Q INSTALL: I 42" FLARED HEADWALL \ ee ........— —_ EMERGENCY SPITW—A—Yl RAILHEAD sS STORM DRAIN 8350 N. CENTRAL EXPWY. SUITE 1000 IMPROVEMENTS Pacheco Koch DALLAS. TX 75206 972235.3031 TX REG. ENGINEERING FIRM F-469 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY I CHECKED BY SCALE DATE JOB NUA6ER TARRANT COUNTY. TEXAS AMS JDJ 1"-150' 05/05/2015 1977-14.455 PAGE 4 OF 5 RAILHEAD #3 STORM DRAIN IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 28-Apr-15 Parts Description Spec# Qty Unit Unit Co!Ft Total Cost Division 2-Sitework Remove Headwall/SET 02 41 14 3 EA $200.00 $600.00 Medium Stone Riprap,dry 313700 800 SY $75.00 $60,000.00 Trench Safety 33 05 10 559 LF $0.50 $279.50 Concrete Collar 33 05 17 2 EA $550.00 $1,100.00 Imported Embedment/Backfill,Crushed Rock 33 05 10 115 CY $35.00 $4,025.00 21"RCP,Class 111 33 41 10 20 LF $48.00 $936.00 24"RCP,Class III 33 41 10 8 LF $50.00 $400.00 30" RCP,Class 111 33 41 10 24 LF $75.00 $1,800.00 36" RCP,Class III 33 41 10 41 LF $82.00 $3,362.00 42" RCP,Class III 33 41 10 40 LF $121.00 $4,840.00 7x4 Box Culvert 33 41 10 840 LF $358.00 $300,720.00 9x4 Box Culvert 33 41 10 8 LF $485.00 $3,880.00 Headwall, Box Culvert 33 49 40 1 CY $11,550.00 $11,550.00 30"Flared Headwall, 1 pipe 33 49 40 1 EA $1,600.00 $1,600.00 36"Flared Headwall, 1 pipe 33 49 40 1 EA $1,788.00 $1,788.00 42"Flared Headwall, 1 pipe 33 49 40 1 EA $2,695.00 $2,695.00 10'Curb Inlet 33 49 20 1 EA $2,970.00 $2,970.00 4'Drop Inlet 33 49 20 1 EA $3,960.00 $3,960.00 Pond Emergency Overflow Structure 00 00 00 6 AC $2,500.00 $14,300.00 Sub 1036 tingenm �,..,......................... ;JAVIER D. JARAMILLO" ,..... ,..... 91007 ,� 0 75 150 300 450 GRAPHIC SCALE IN FEET P� \ It f 0 i i RAILHEAD #3 INSTALL: 1-STREET LIGHT PER CITY OF FORT WORTH STANDARDS + / 1 n n INSTALL' 1-STREET LIGHT PER Q CITY OF FORT WORTH STANDARDS 41 -,� �JAVIER.....JARAM.LLOip e8DlFSS�EN : ir G���•.o O THE SEAL APPEARING ON THIS DOCUMENT WAS AUTHORIZED BY JAVIER D. JARAMILLO, P.E. 91007 ON 05/11/2015. ALTERATION OF A SEALED DOCUMENT WITHOUT PROPER NOTIFICATION TO THE RESPONSIBLE ENGINEER IS AN OFFENSE UNDER THE TEXAS ENGINEERING PRACTICE ACT. RAILHEAD •3 STREET LIGHTING Pacheco N. ITRAL EXPWY. SUITE 1000 IMPROVEMENTS Pacheco Koch DALLAS, TX 75208 972.235.3031 TX REG. ENGINEERING FIRM F-489 RAILHEAD FORT WORTH DALLAS . FORT WORTH . HOUSTON TX REG. SURVEYING FIRM LS-100080-00 LOCATED IN THE CITY OF FORT WORTH DRAWN BY I CHECKED BY SCALE DATE JOB NUAeER TARRANT COUNTY, TEXAS AMS JDJ 1.-150' 05/05/2015 1977-14.455 PAGE 5 OF 5 RAILHEAD #3 STREET LIGHTING IMPROVEMENTS Engineer's Opinion of Probable Construction Cost 28-Apr-! m Parts i' .. �i' ,� Spec# Cll y Unit Unit Cost Total Cost Division 2-3kewr6 Hecirical Facilities(N/A) 260500 1 I LS a10,s70m ;10.500.{]0 Conduit Box MA E 26 05 33 2 EA .5450M SM1.00 "CONDT PVC SCH 80(Bl (N/A) 26 05 33 500 LF 42.t]0 521,0w.00 LED L11:.ht+n Fixture(LIGHT SrANOAH,D)iN/A344120 2 EA S3,90O.UG S7,8D0 00 Subtotal E OFr� � o JAVIER' ....JARANIILLO e �34<1 o. C/91 007 .... ...... S��FSc6 NSE� 9Q%®®®VAL-P— ®