Loading...
HomeMy WebLinkAboutContract 46800 Developer and Project Information Cover Sheet: Developer Company Name: Live Oak 40 Development, LLC Address, State,Zip Code: 5137 Davis Blvd,North Richland Hills, TX 76180 Phone 817-281-3509 E-Mail terry@sandlin.com Authorized Signatory/Title Terry Sandlin Project Name and Brief Description: Live Oak Creek Phase 2, Sections 1 &2 Project Location: Sec.1: North of White Settlement Rd. East of Haywire Ranch Rd. Sec.2: North of White Settlement Rd. West of Haywire Ranch Rd. Plat Case No.:FP:14-035,36 Plat Name: Live Oak Creek Mapsco: 57 R&Q Council District: 3 City Project No:02333 CFA:2015-021 DOE.: 7275 To be completed by staff. Received by: Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX t COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 4600 WHEREAS, the undersigned Developer ("Developer") desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Live Oak Creek Phase 2 Sections 1 & 2 ("Project") within the City of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the Improvements and the Project. NOW,THEREFORE, For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with rrnn the work performed by said contractors. C) rn B. Developer shall provide financial security in conformance with paragraph 6, C m Section II, of the Policy and recognizes that there shall be no reduction in the 0 C-- collateral until the Project has been completed and the C' has u C13 accepted the Improvements. Developer acknowledge OMCtAL RECORD acceptance process requires the Developer's contractor( )CUUNNEMRY 2 FT.WORTH,TX affidavit of bills paid signed by its contractor and consent of surety signed by its surety to ensure the contractor has paid any sub-contractors and suppliers in full. Additionally, the contractor must also provide in writing that the contractor has been paid in full by Developer for all the services provided under their contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City- approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits are made a part hereof: Water (A) X Sewer(A-1) X_, Paving (B)X , Storm Drain(B-1) X , Street Lights & Signs (Q-2L E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public streets and/or to perform water/waste water construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the Improvements, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the Improvements valid for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of 3 Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give at least 48 hours' advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. v. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide, at its expense, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements contemplated herein. I. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the 4 community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, 5 damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its 6 agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two (2) years from the date of this Agreement (and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) 7 Cost Summary Sheet Project Name: Live Oak Creek Phase 2, Sections 1 &2 CFA No.:2015-021 DOE No.: 7275 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $132,600 2.Sewer Construction $166,573.00 Water and Sewer Construction Total $ 299,173.00 B. TPW Construction 1.Street $ 287,452.50 2.Storm Drain $ 77,405.00 3.Street Lights Installed by Developer $ 66,264.00 TPW Construction Cost Total $ 431,121.50 Total Construction Cost(excluding the fees): $ 730,294.50 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 5,983.46 D. Water/Sewer Material Testing Fee(2%) $ 5,983.46 Sub-Total for Water Construction Fees $ 11,966.92 E. TPW Inspection Fee(4%) $ 14,594.30 F. TPW Material Testing(2%) $ 7,297.15 G. Street Light Inspsection Cost $ 2,650.56 H. Street Signs Installation Cost $ 980.00 Sub-Total for TPW Construction Fees $ 25,522.01 Total Construction Fees: $ 37,488.93 Financial Guarantee Options Choose one Amount Mark choice Bond=100% $ 730,294.50 Completion Agreement=100%/Holds Plat $ 730,294.50 Cash Escrow Water/Sanitary Sewer=125% $ 373,966.25 Cash Escrow Paving/Storm Drain=125% $ 538,901.88 Letter of Credit=125%w/2yr expiration period $ 912,868.13 x 8 IN TESTIMONY WHEREOF,the City of Fort Worth has caused this instrument to be executed in quadruplicate in its name and on its behalf by its Assistant City Manager,attested by its City Secretary,with the corporate seal of the City affixed,andsa'd Developer has execu d this instrument in quadruplicate,at Fort Worth,Texas this th day of 20�_. CITY OF FORT WORTH-.Recommended by: Water Department Transportation&Public Works Department AWe hi-Ba lal,EMBA,P.E. Douglas . Wiersig,P.E. velopment Engineering Manager Director Approved as to Form&Legality: Approved by City Manager's Office Douglas W. Black Fernando Costa .... Assistant City Attorney Assistant City Manager M&C No. AIA, Date: ATTEST: 0 ° ° OM EiM&C RE-QUIRED 0 ° Mary J.Kayser 000 City Secretary ,'°°°°°°S ATTEST: DEVELOPER: Live Oak 40 Development,LLC 1 Signature Signature. (Print)Name: Print Name: Teary Sandlin Title:Manager OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX 9 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Location Map ® Exhibit A: Water Improvements ® Water Estimate ® Exhibit A-1: Sewer Improvements ® Sewer Estimate ® Exhibit B: Paving Improvements ® Paving Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Estimate (Remainder of Page Intentionally Left Blank) 10 PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE LIVE OAK CREEK,PHASE 2 SECTIONS 1 &2 SUBJECT TRACTS �i rR0 � z b m N VICINITY MAP(N.T.S.) 0,0,E, NO. 7275 CITY PROJECT NO. 02333 39 WATER PROJECT NO. P265-6001502333-00 Srm® � 16301 Dumm Drive,Sub 2008 SEWER PROJECT N O. P275-7001302333-00 Addison,Texas 75001 Tel:972-248-7676 FILE NO. W-2333 Fax 972-248-1414 October 1, 2014 — SHEET 1 FINAL PLAT — SECTION 1 LIVE OAK CREEK BLOCK F, LOTS 12-21 AND BLOCK MM, LOTS 1-10 20 RESIDENTIAL LOTS 3.656 ACRES OUT OF THE JOHN T. ALLEN SURVEY, ABST. No. 67 TARRANT COUNTY, TEXAS REF. CASE Nos.: PP-005-098 FP-14-036 FINAL PLAT — SECTION 2 LIVE OAK CREEK BLOCK K. LOTS 17-18 AND 19A; BLOCK Q, LOTS 7-13; BLOCK T. LOTS 1-9; BLOCK W. LOTS 1-2 AND 1A 20 RESIDENTIAL LOTS AND 2 OPEN SPACE LOTS 6.050 ACRES OUT OF THE JOHN T. ALLEN SURVEY, ABST. No. 67, AND THE C.E.P.I. MFG. CO. SURVEY, ABST. No. 382 TARRANT COUNTY, TEXAS REF. CASE Nos.: PP-005-098 FP-14-035 LIVE OAK DEVELOPMENT 40, LLC OWNERAEVELOPER 5137 Davis Blvd. (817) 281-3509 North Richland Hills, Texas 76180 JBI PARTNERS, INC. ' SURVEYOR ZgNGINEER 16301 Quorum Drive, Suite 200 B (972) 248-7676 Addison, Texas 75001 TBPE No. F-438 TBPLS No. 10076000 D.O.E. NO. 7275 6BID CITY PROJECT NO. 02333 IIXM RMS1ERn qac FIRMF438 WATER PROJECT NO. P265-6001502333-00 16301 Quwn fte,Supe 2008 SEWER PROJECT NO. P275-7001302333-00 Ad&m,Tom 75001 Tel:972.248-7676 FILE NO. W-2333 Fax 972.24&1414 October 1, 2014 — SHEET 2 LOT 24 BLOCK K PRIVATE OPEN SPACE W.K.GANDY SURVEY F.W.SCHODEVERUNC SURVEY 0.535 98 ACRES A-1890 A-13 _. SANITARY SEWER EASEMENT J. 7,ALLEN SURVEY A-67 7-1 (BY)SEPARATE INSTRUMENT) DRAINAGE DRAINAGE EASEMENT 3- FUTURE PHASE EASEMENT BY SEPARATE (BY INSTRUMENT) SEPARATE ACCESS EASEMENT g INSTRUMENT) (BY SEPARATE W°I LIVE OAK CREEK INSTRUMENT) " PHASE 2.SECTION 20'PIPELINE DOE 7275 EASEMENT TOENERGY TRANSFER FUEL,L.P. DOC.NO. 02D6237894 W/J HAYWIRE I LP DERRINGER DRIVE DOC.NUMBER D206260523 Is 7 a o " a r t � fig: on e a !LI OA CRE K R m u m ti 1e O PHA�E 1, EC N 1 0 loop s ° 7 6 y z ffi o. i s ABIN T A, LID 128884 a x t WATER V 1y 16 OLINGER DRIVE 11 4 CISCO COURT EASEMENT zam o± (BY SEPARATE o Wo Sfj W ° tx 3 Td 10 n tx INSTRUMENT) v 10 n 1z a 13 14 C y x p y u T Op 1e 0o a n s ! Ix ° H v ° 7 6 S LOT 2 BLOCK LL 11 a r PRIVATE OPEN SPACE 3 1f t 2.280 ACRES 10 1 r a ! y e 7 v 10 z o I O u v W u n 1 � a q 16 LIVE OAK CREEK ri 11 14 1a a I n 10 v e I.e 7 s s PHASE 1, e 10 ! c33 SECTION 1 ! a CABINET A. l y HATHAWAY DRIVE x O SLIDE 12888 O 7 v t ° W/J HAYWIRE 1 U e e to u u 12 n m ° ° ° s DOC.NUMBER IVE AK RE ! a Al 0206260623 7 n ra SE 71 1 z ° 17 1e 1. zo V 14 n CA INET A. 1 3� SL 1 88 ri ao a �c S n 2. _ LIVE OAK CREEK YARMOUTH LANE Sr PHASE 2,SECTION 1 DOE 7275 ° r t '.i" tx 13 u 1s 1e n to n m .'off a 23 ? _ , ��cc9c��'�j,,,,"���P`4• •• 6 ! x50 X07 7 7 ° ° x 1 Toy`2 g aoa c = WATER 6e `bb 'K 06vA7[oPLu av ° O 2 SEWER .wo geuu6c[ /., 1 EASEMENT ,?. 91, 12 a—El DRUMMONO LANE g x O (BY y� a SEPARATE _ s e 7 � INSTRUMENT LIV OAI CR EK ) fib '►,+10 0'y�' 11 12 to 1+ PHA E 1, e p ¢ 101s K SAN CAB 112 < 888 22 12 w SCALE: 1'=400' PLAT MAP PLANS FOR THE CONSTRUCTION OF WATER, dEB "'+�wOrtM SEWER, PAVING, STREET LIGHTING, & TlEXASRMSHRM»1r> FIRM F-438 DRAINAGE IMPROVEMENTS TO SERVE 16301 QUDRKII D149.SWIe 20DB LIVE OAK CREEK,PH 2 SECTIONS 1&2 Add m,Texas 75001 (D.O.E N0.7275) Tet 972.248.7676 Fac 972-248.1414 October 31, 2014 - SHEET 3 LOT 24 BLOCK K PRIVATE OPEN SPACE W.K.GANDY SURVEY F.W.SCHODEVERLING SURVEY 0.535 ACRES x-1890 A-1390 — J. T.ALLEN SURVEY SANITARY SEWER EASEMENT A-67 71 (BY SEPARATE INSTRUMENT) DRAINAGE DRAINAGE EASEMENT u EASEMENT BY SEPARATE (BY IN _ SEPARATE ACCESS EASEMENT CONNECT TO EX. INSTRUMENT) w B•WATER (BY SEPARATE �a LIVE OAK CREEK DOE/545J INSTRUNENT) PHASE 2.SECTION , IR 20'PIPELINE DOE 7275 P274-700130054183 EASEMENT TO ENERGY 2 (B SEP RA 7 TRANSFER b I STRU ENT) 5 4 ] NEL,L.P. DOC.NO. D206237894 — DERRI GER DRIVE e 7 CONNECT TO EX. n < 8•WATER 4 a xF� t o R ° DOE M 5453 �� mti to O PHA E I. 'ECiI 1 1oO s ° 7 s P261-600150054183 p a ABIN T A. LIOECC�12888 a 4 a WATER R u OLINGER DRIVE 11 CISCO COURT EASEMENT 4 m p+ s t4 CONNECT TO E%. \ BY SEPARATE Wa 8•WATER tx a Z 0 J to tt tz INSTRUMENT) CONNECT TO EX. DOE WTR S/ 45J 11 +x t] I zI to u s DCE 9•WRIER 13 P274-700130054183 0o u r QI Ol 1! /5457 a TR 0 4 a a t 0 17 tom P264-600150054183 12 e I u t s ° ° 7 , — s 2 BLOCK LL n T I q - I a r PRIVATE OPEN ' SPACE ? t \ 2.280 ACRES to tr 9I tt , I ° 12 1] 14 a is u t2 to LIVE OAK CREEK y p is u I 1t 10 4 e e 7 e r PHASE 1, e 10 4 C° a 3 SECTION 1 _ 4 CABINET A. O T L , I HATHAWAY DRIVE ] 2 tO SLIDE 12888 9 e EX.8•WATER W/J HAYWIRE I LP r ° s DDC.NUMBER IVE AK RE 4 a Ll +° a :a D208250623 CONNECT TO EX.7 ]] SE TI 1 z 8•WATER ar W n CA INET A. DOE A 5453 SLI Ez1 8s n WTR/P"4_,..130(054183 _ a LIVE OAK CREEK 4 YARMOUTH LANE z / PHASE 2,SECTION 1 ] 2 ] DOE 7275 2 t 1e 111 12 0 14 11 L 17 to tf 20 ° T 10 4 22 4 T ,ayA; xa 30'%50' nit`' � Loi T z a at 1® to 19 WATER& SEWER pglYAh�N WA e O I to F u to tr 10 b EASEMENT EAMMEK1 DRUMMOND LANE "s,,bYi4"1y 12.78°ACRES r r SEPARATE ° b �q'b•y°}Si•a LI OA CR EK INSTRUMENT) 12 a 14 PHA ON CONNECT 70 EX o4t7p2z,� to is KO AN C I8•WATER 12888 DOE M 5453 �7i"pl} •• / h 20 WTR/ s 4 a 2 1' P264-600150054183 •� I b tr n 1R to is u u SCALE: 1'=400' LEGEND PROP. WATERLINE WATER . EXHIBIT A EXIST. WATER LINE PLANS FOR THE CONSTRUCTION OF WATER, �``"`� SEWER, PAVING, STREET LIGHTING, & TEMSR aSUNMENIMM ,FRMfz-436 DRAINAGE IMPROVEMENTS TO SERVE 163o10uorum We,Sum 200B LIVE OAK CREEK,PH 2 SECTIONS 1 812 Addbon,Tum 750D1 (0.01 N0.7275) Tet 972-247676 Fm1c972-248-1414 PROPOSED WATER LINES ARE 80 UNLESS OTHERWISE INDICATED. October 31, 2014 — SHEET 4 CFA COST ESTIMATE UNIT PRICE BID Project Item Information Bidders Proposal Bidlist Item Description Specificati Unit ofBid Unit Price Bid Value No. on Section Measure Quanti UMI.-WATT IMPROVEMVNT$ 33I1.0001 Ductile Iron Water Fittings w/ 33 11 11 TON 0.90 $ 3,500.00 $ 3,150.00 Restraint 3311.0261 8"PVC Water Pipe 33 11 12 LF 2,038 $ 32.00 $ 65 216.00 3311.0262 8"PVC Water Pipe,CSS Backfill 33 11 12 LF 79 $ 48.00 $ 3,792.00 3311.0461 12"PVC Water Pipe 33 11 12 LF - $ 31.50 $ 3312.0001 Fire H drant 33 1240 EA 2 $ 3,750.00 $ 7 500.00 3312.2003 1"Water Service(copper) 33 12 10 EA 39 $ 950.00 $ 37 050.00 3312.2103 1 1/2"Water Service 33 12 10 EA $ 1,350.00 $ 3312.3002 6"Gate Valve 33 1220 EA 2 $ 875.00 $ 1,750.00 3312.3003 8"Gate Valve 33 1220 EA 7 $ 1075.00 $ 7 525.00 3312.3005 12"Gate Valve 33 1220 EA - $ 1,900.00 Is 3312.0117 Remove Plug&Connect to 33 1225 EA 6 $ 750.00 $ 41500.00 Existing 4"to 12"Main 9999.0000 4"Irrigation Casing LF I - $ 13.00 $ 9999.0001 6"Irrigation Casing LF I - $ 17.50 $ 3305.0109 Trench Safety 3305 10 ILF 2,117 1 $ 2,11700 UNIT 1:WATER IMPROVEMENTS BID SUMMARY is 132,600.00 END OF SECTION UNE OAK PHASE 2 SECTIONS 1 and 2 CITY OF FORT WORTH DOE 7275 LOT 24 BLOCK K PRIVATE OPEN SPACE W.K.GRDY SURVEY F.W.SCHODEVERLING SURVEY 0.535 ACRES A-1890 A-1398 J. T.ALLEN SURVEY SANITARY SEWER EASEMENT A-67 7-1 (BY SEPARATE INSTRUMENT) DRAINAGEDRAINAGE EASEMENT EASEMENTENT BY SEPARATE (BY INSTRUM ) SEPARATEtAC(.CES�S EASEMENT INSTRUMENT) SEPARATE LIVE OAK CREEK TRUMENT) `� PHASE 2.SECTION BY 20'PIPELINEUFMT DOE 7275 EASEMENT TO ENERGY SEP RAM UT TRANSFERSTRU NT) y a FUEL.L.P. 7 DOC.NO.D2062"7894 E R DRIVE U OA CR K� O PHA E 1, -EC 1 too° ° ° 70 ABIN T A- LID 2888 ° ] r WATER 'R .EBJ7RI`� 1 11 . t- ZISCO-EOUBL EASEIENT GONNEC7 TO T �� SEPARATE wOo $ I EX.12�55 LINE I lr a t0 n 12 INSTRUMENT) DOE p5453 11 1r 1] la t. _• S PRO P271 15 4570013 JOD5418 oO I 13 r O° 1° n s . a r 1 4 is 12 I e I 14 1 I2 ° ] 7 ° ! LOT 2 4 BLOCK LL 11 �z_ �N LAN �- ] a PRIVATE OPEN SPACE 12 1 ' \� \ 2.280 ACRES le II- 1 xI ] y e 7 ] r O 11 12 13 \ \ ° I 0 11 qq1. a ] 12 is 1°I u 1r n 10 ° s e 7 s +s 1° LIVE PHASECREEK 1. SECTION 1 CABINET A. O L y �A'TNAWA]LOR11� �_ ] r O SLIDE 12888 K 7 8 1 W/J HAYWIRE 1 LP 1a tr t+ 10 ° ° 7 e s �' DOC.NUMBER \ IVE AK RE a p� D206260623 \ 7 I u ra SE N 1 x 6 ! t7 to 1e xa at a° n CA INET A, t 3� SLI E 1 86 xe PHASE 2,SECTION LIVE OAK CREEK aury ru i.uE— —,� ZQ + 1 `. z DOE 7275 ] ] x 1 \ 1n 11 u u 14 11 1e n 1e n m 71 e ° 10 1 \ u .E. �s�' I ° e s . �. p 30'%50' c�'yZ'Ly,+�, LOT 7 7 ] x 1 ? t° 1e 17 WATE `t1SE WEIR R k $ `01�'t PRNATELMN SPA e I QY 1 1°O u 1a 1x EASEMENT E pfNJAGE DBill{L1DN0 LANE O 12—ACRES / \ a a E SEP RATE LI OAI CR EK INSTRUMENT) 12 a 14 \ PNA E 1. e ° 4. `3 10 C ON CONNECT TO CA < EX.4'DIA.MH ° 2 DOE,15453 m PROJIF a a x r 1° ° 17 rc P274-70013D054183 (E) SCALE: 1'=400' LEGENDS PROP. S.S. LINE SANITARY Bi • --0 PROP. S.S. MH EXHIBIT Al — —•— - EXIST. S.S. MH PLANS FOR THE CONSTRUCTION OF NATER, - -a — EXIST. S.S. LINE SEVER, PAVING, STREET LIGHTING, & TIEWRMSTURme GDEERMFIRMr-438 DRAINAGE IMPROVEMENTS M SERVE 18301 Ou0N1m Me,Sub 2008 PROPOSED SANITARY LIVE OAK CREEK,PH 2 SECTIONS 18 2 Addhm,Tem 75001 (D.O.E NO.7275) Tot 972-248-7676 SEWER LINES ARE 8m Fmc972-248-1414 UNLESS OTHERWISE INDICATED. October 31, 2014 — SHEET 5 00 42 43 BID PROPOSAL PAGE 4 OF 17 CFA COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Description Specificati I Unit of Bid Unit Price Bid Value No. F Ion Section I Measure I Quantity UNIT 2: SANTITARY SEWER IMPROVEMENTS 3301.0002 Post-CCTV Inspection 33 0131 LF 1,884 $ 2.00 $ 3,768.00 3301.0101 Manhole Vacuum Testing 33 01 30 EA 7 $ 350.00 $ 2,450.00 3305.3004 12"Sewer Carrier Pipe 33 05 24 LF 163 $ 47.00 $ 7,661.00 3331.4115 8"Sewer Pipe 33 11 10 LF 1,602 $ _ 35.00 $ 56,070.00 3331.4117 8"Sewer Pipe,CSS Backfill 33 1110 LF 119 $ 40.00 $ 4,760.00 3339.1001 4'Manhole(all depths) 33 39 10 EA 7 $ 3,150.00 $ 22,050.00 3339.0106 MH major adjustment-Replace 3305 14 EA 1 $ 775.00 $ 775.00 Cone with 30"min 3331.3102 4"Standard sanitary lateral with 2-33 3150 EA 39 $ 900.00 $ 35,100.00 Wav Cleanout 3331.3314 Locate and adjust existing sanitary 33 3150 EA 2 $ 400.00 $ 800.00 service 3339.0001 Epoxy manhole liner(Internal 33 39 60 VF 39 $ 6,825.00 Corrosion Protection),Complete $ 175.00 in place 3201.0614 Concrete pavement repair, 32 01 29 SY 278 $ 85.00 $ 23,630.00 residential complete in place 9999.0002 Connect to Existing Manhole EA 1 $ 800.00 $ 800.00 3305.0109 Trench Safety 3305 10 LF 1884 $ 1.00 Is 1,884.00 UNIT 2: SANTITARY SEWER IMPROVEMENTS BID SUMMARY is 166,573.00 END OF SECTION LIVE OAK PHASE 2 SECTIONS 1 and 2 CITY OF FORT WORTH DOE 7275 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS LOT 24 BLOCK K PRIVATE OPEN SPACE W.K.GANDY SURVEY F.W.SCHODEVERLING SURVEY 0.535 ACRES A-1690 A-1398 J. T.ALLEN SURVEY SANITARY SEWER EASEMENT A-67 7-1 (BY SEPARATE INSTRUMENT) _ DRAINAGE DRAINAGE EASEMENT $ EASEMENT BY SEPARATE 4i (BY INSTRUMENT) _ SEPARATE ACCESS EASEMENT INSTRUMENT) w (BV SEPARATE LIVE OAK CREE INSTRUMENT) w PHASE 2.SECTION 20'PIPELINE DOE 7275 EASEMENT TO ENERGY 2 (B SEP AT TRANSFER a I 'TRUENT) Yl . a FUEL,L.P. ° 7 e DOC.N0. t z 1 D206237894 o e T O n z u yp�py n 'd 7 J S 1 ° e �D�a U nd 1p e Oe U OA KR 6 6 loo 1, LE7eOmci ID28s° ♦ 3AKIN 7 A. m ? x 1 WATER 00� 4R a II . OUR EASEMENT z?m o± (BY a,,,iJ a I♦ SEPARATE 00 a 12 a 1e 11 lx INSTRUMENT) 1Q o to 11 12 13 la t♦ u T O 16 17 s . 1 : t 1e ' Ix 6 1♦ 1 9 e ) e a LOT 2 BLOCK LL tl a x PRIVATE OPEN SPACE 3 12 1 — 2.280 ACRES to I xl a 6 7 e to 2 ° o 11 c u u u a aIs 1♦ la 12 n to s , 1s 1e LIVE OAK CREEK > O I T e PHASE 1. e 1O ♦ " a SECTION i • CABINET A. l e HATHAWAY DRIVE a x O SLIDE 12888 O7 e t ° W J HAYWIRE I LP e e 1e 1 1♦ a tz n to ° e 7 e a / IVE AK RE a DOC.NUMBER D2062UB0623 7 u za SE TIO 1 z a 17 1e le xo r x. xs CA INET A. I SLI E 1 88 h � LIVE OAK CREEK 4 YARMOUTH LA1 PHASE 2,SECTION 1 a DOE 7275 a 7 1 1. In �12 �13 1♦ 1a to n to a zo 21 I ° s ♦ u zs T t2 30'%Sy 'o$U0.0. O LOT 7 x WATER SEWER NAE eNO EAS y A1RNO EMEN'h T EASEMENT NE xRy 1x. RS SEPARATE O s e 7 INSTRUMEN fib'T64 �4.�2 ♦ LI 0 CR K T) Ix 1314 PHA E 1. e e to C ON g7� 1s�. •. 6 is a � ; •\ I a a • a x 1K zo 1e 17 1e E fo RR• -- a.s sraxp.,ep�[rr♦ (we.) c,a iii a x x�O wr.,ls.a u�a rp N.Rua w) SCALE: 1*=400a ° rSs,♦nao > a�r cR ,sa o<R m n�>-Ral, Qc,o0i R ,r nFelPernu�oemlcTa PAVING �► amm U1313-D@ EXHIBIT B PI SEWER,FOR PAVING,OST EETLIGHTING,ON OF WATER, .rEXAs cFUtMF-438 DRAINAGE IMPROVEMENTS TO SERVE 16301 Own Dare,Slim 2DDB LIVE OAK CREEK,PH 2 SECTIONS 1&2 Adelson,Texe615001 (D.O.E NO.7275) Tel:972-248-7676 Fax 972-248.1414 October 31, 2014 — SHEET 6 00 42 43 BID PROPOSAL PAGE 6 OF 17 CFA COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Specificati Unit of Bid No. DescriptionUnitSection Measure Quantity Unit Price Bid Value UNIT 4«PAWNG IN"OVt+NIMTS 3213.0101 6"Conc Pvmt;Complete In Place 32 13 13 SY 6,165 $ 37.50 $ 231,187.50 3211.0501 6"Lime Treatment;Complete In 32 11 29 SY 6,591 $ 2.50 $ 16,477.50 Place 3211.0400 Lime;Complete In Place 32 1129 TN 99 $ 175.00 $ 17,307.50 #27/SY 3213.0301 4"Conc Sidewalk 32 1320 1 SF 510 $ 4.00 1$ 2,040.00 3213.0501 4'Barrier Free Ramp,Type R-1 32 1320 EA 8 $ 1,450.001$ 11 600.00 241.1000 Remove Existing Concrete 0241 15 SY 99 $ 10.00 $ 990.00 Sidewalk Pavement 3125.0101 SWPPP>1 acre 31 25 00 LS 1 $ 3,500.00 $ 3,500.00 0.0001 Type III Barricade 0.0000 LF 58 $ 35.00 $ 2,030.00 9999.0010 Remove Street barricade 0241 15 LF 116 $ 10.00 $ 1,160.00 9999.0011 Connect to existing concrete street 312500 LF 116 $ 10.00 $ 1,160.00 avement UNIT 4:PAVING IMPROVEMENTS BID SUMMARY IS 287,452.50 END OF SECTION LIVE OAK PHASE 2 SECTIONS 1 and 2 CITY OF FORT WORTH DOE 7275 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS LOT 24 BLOCK K PRIVATE OPEN SPACE W.K.GANDY SURVEY F.W.SCHODEVERLING SURVEY 0.535 ACRES A-1090 A-1398 J. T.ALLEN SURVEY SANITARY SEWER EASEMENT A-67 71 (BY SEPARATE INSTRUMENT) DRAINAGE DRAINAGE EASEMENT EASEMENT BY SEPARATE (BY INSTRUMENT) SEPARATE ACCESS EASEMENT INSTRUMENT) W (BY SEPARATE � LIVE OAK CREEK INSTRUMENT) PHASE 2.SECTION 20'PIPELINEDOE 7275 EASEMENT TO ENERGY tSEP ATTRANSFER a IU ENT) ]FUEL,L.P. 7 a DOC.NO. t z 1 D206237894 a•pv DERRINGER DRIVE e p 9 0 1 I CONNECT TO EXISTING 7 0 42-RCP STORM LINE U 1] u o X-19941 I y W niD 1T > DOE-5453 ] 7 1 0 9 ° 9 r �'^ a s U OAK_CRF K m to O PHA E 1, ECTI N 1 0 1o0 a I a 7 6 y o a U d ABI N T A, LID 12088 9 ] m ? _ z 1 WATER i a a 13 I+7�_ OLI ER DRIVE n a �CISCO COURT EASEMENT - % 14 SEPARATE oo S I e 1z ] to n 1$ INSTRUMENT) I a to 11 12 13 1] 14 ' R 1] 2 a I J 7 4 ]W t O 16 17 a to a BLOCK LL 4 LOT 2 ] , PRIVATE OPEN II I I SPACE ? to u 1 2.280 ACRES 1 9I ] 4 y e 7 a to 9 'o n ] O 12 13 14 < ° to 14I 1] 17 n to 9 e 6 7 6 to +° LIVE PHASECREEK I a 1a 4 a / SECTION f t_ 4 ] CABINET A, L y HATHAWAY DRIVE t O / SLIDE 12888 O7 9 1 a eV41� 12 IG 9 e T y W/J H YWIRE I LP e / ` IVE AK RE 4 ] p� D20626DB23 7 zz ]] 74 SE a ` n to to 7o r a CA INET A, 1 S-I�E:i 8e ` w ] LIVE OAK CREEK 4 YARMOUTH LANE S� 1 PHASE 2,SECTION 1 z DOE 7275 ] ] ] 1 10 In 111 113 114 111111 n to 1, m zl a e7 p CONNECT TO EXISTING , 1D 24'RCP STORM L1NE \ X-19941 o�`�� zz 7] ]I CARL DOE-5453 a 4 / p RF 4 ew 30'X50' � aoa7c 7 ] O / 19 to 17 to WATER h '14b'2 e 1 a 14 SEWER O. =N'T" DRUMMOND LANE O U t] EASEMENT fs S (BY Tqr��.?TS MAX O y a 7 SEPARATE CR EK INSTRUMENT) ti 1] 14 / PHA E 1, e e o$0 �'�* a 1a 1a k LAN CAC a n 12 tze6e 4 ] H A 19 to 17 ra 1a a 1] SCALE: 1'=400' LEGEND o PROP. INLET STORM DRAINAGE .,. EXHIBIT B1 ,� EXIST. INLET PLANS FOR THE CONSTRUCTION OF WATER, PROP. STORM DRAIN SEWER, PAVING, STREET LIGHTING, & TOLAS nNXW,li3�MHRMF-aaa DRAINAGE IMPROVEMENTS _ — EXIST. STORM DRAIN TO SERVE 16301 Dumm Drive,Sub 2008 LIVE OAK CREEK,PH 2 SECTIONS 18 2 M&M,Te19T6 75001 (D.O.E NO.7275) Tel:972.245-7676 IL Fax:972-24&1414 October 31, 2014 — SHEET 7 00 42 43 BID PROPOSAL PAGE 5 OF 17 CFA COST ESTIMATE UNIT PRICE BID Project Item Information Bidders Proposal Bidlist Item Specificati Unit of Bid No. Description on Section Measure ti Unit Price Bid Value 3317.0110 Special Riprap[8"-12"rock 31 3700 SY 95 S 85.00 $ 8,075.00 riprap on grouted 6"bottom;18" D 3341.0201 21"RCP Class III 3341 10 LF 20 $ 55.00 $ 1,100.00 3341.0205 24"RCP Class III 3341 10 LF 130 $ 65.00 S 8,450.00 3341.0309 42"RCP Class III 3341 10 LF 305 $ 115.00 $ 35 075.00 3349.0001 4'Stoop Junction Box(Manhole) 3339 10 EA 1 S 3,750.00 S 3,750.00 3349.0002 5'Storm Junction Box(Manhole) 3339 10 EA 1 $ 4,750.00 S 4,750.00 3349.5001 10'Curb Inlet 33 49 20 EA 2 $ 3,000.00 $ 6,000.00 3349.5002 15'Curb Inlet 33 49 20 EA 1 S 3,500.00 $ 3,500.00 3349.7001 5'x5'Drop Inlet 33 49 20 EA 1 $ 4,750.00 S 4,7W00 9999.0005 FW-0 Headwall 6x4 39 49 40 EA $ 5,610.00 $ 9999.0006 FW-0 Headwall 80 39 49 40 EA - S 6,150.00 $ 241.0800 Remove Drop Inlet 0241 14 EA 21 750 $ 1,500.00 3305.0109 Trench Safety 3305 10 1 LF 1 455 1 $ 455.00 UNIT 3:STORM DRAIN IMPROVEMENTS BID SUMMARY S 77,405.00 END OF SECTION LIVE OAK PHASE 2 SECTIONS 1 and 2 CITY OF FORT WORTH DOE 7275 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS LOT 24 BLOCK K PRIVATE OPEN SPACE W.K.GANDY SURVEY F.W.SCHOOEVERLING SURVEY 0.535 ACRES A-1890 A_139B SANITARY SEWER EASEMENT J. T.ALLEN SURVEY (BEPARATE INSTRUMENT) A-67 Y S DRAINAGE DRAINAGE EASEMENT EASEMENT BY SEPARATE (BY INSTRUMENT) _ SEPARATE ACCESS EASEMENT INSTRUMENT) (BY SEPARATE '� LIVE OAK CREE INSTRUMENT) PHASE 2,SECTION 20'PIPELINE DOE 7275 EASEMENT TO ENERGY = (8 SEP RATT TRANSFER s I STRU ENT) y 4 J FUEL,L.P. ° 7 e DOC.N0. 1 2 1 D206237894 i DERRINGER DRIVE n �a yam+ Oh Y 7 • J 2FF�� 1 O 9 e [ Is LI�E 6 Is e O PHA;E Al: CRTI N 1 0 toe s ° 7 s y rc a u a AKIN T A, LIDEE�t 12888 9 4 J WATER ._9 a DU ER DRIVE b n • CISCO COURT 2 1 EASEMENT z m o (BY r [ 1• 12 SEPARATE oo a 12 J j 10 n INSTRUMENT) 8 s 10 11 12 a IJ u 7 1J o • °O eD 16 11 e . 12 a t• i s e 7 s s LOT 2 JO'U4 BLOCK LL 11 J 2 PRIVATE OPEN SPACE t2 1 2.280 ACRES 10 0 1 , J • s e 7 e to p 11 ' 9 I O Iz t] 14 le t`s�i ty 1J It 11 to [ e e 7 6 to LIVE P OAK CREEK e to • u u I 1. 5 SECTION 1 CABINET A. t y HATHAWAY DRIVE J 2 O SLIDE 12888 O 7 9 1 e e e Is u unUu11 10 ° ° 7 ° s W/J HAYWIRE I LP DOC.NUMBER IVE AK RE J D2062US0623 7 22 zJ SE TI 1 2 s 17 1e is 2e 21 2• n CA INET A. 1 3� wl Ezi ze zs zo _ J � LIVE OAK CREEK 4 YARMOUTH LANE Sr 1 PHASE 2,SECTION 1 J 2 J DOE 7275 • 2 1 10 I11 1 12 113 u 16 M 17 to n zo 31 5} e7Rbs�, v e • „ za l CARLILf e 1 30'%50' U �.nAL,q,22 -• lelDpTPtiG ) ] 2 1 to to 17 1e WATER h "•iy�2e2,ya —N O AN sr•4 1 SEWER g„'!�" DRUMMOND LANE O O 4 u 12 EASEMENT 2 , (BY 4 J SEPARATE ab.tb44 U 0 CR K INSTRUMENT) ip ! II u 13 1• PHA to Ito _j C ON t5 M' CA ♦�'nd<6'E ° >Z 11 zo 12888 i Y • 4 J N s e e e 2 1 O IT le le IS U LEGEND SCALE: 1"=400' LUMINAIRE STREET LIGHTING EXHIBIT C p EXISTING PLANS FOR THE CONSTRUCTION OF WATER, 6BI LUMINAIRE SEWER, PAVING, STREET LIGHTING, & DRAINAGE IMPROVEMENTS TO SERVE 1p LIVE OAK CREEK,PH 2 SECTIONS 1812 TEXAS RREIGISUR®F1,1139NI FIRM F-438 (D.O.E N0,7275) 16301 Q mml DOW.S1ib 2008 Adelson,Texas 75001 Tel:972.246.7676 Fa1:972.248-1414 October 31, 2014 — SHEET 8 LOT 24 BLOCK K PRIVATE OPEN SPACE W.N.GANDY SURVEY F.W.SCHODEVERLING SURVEY 0.535 ACRES A-1890 A-1398 SANITARY SEWER EASEMENT J. T.ALLEN SURVEY A-87 7-1 (BY SEPARATE INSTRUMENT) DRAINAGE DRAINAGE EASEMENT EASEMENT BY SEPARATE (BY INSTRUMENT) _ SEPARATE ACCESS EASEMENT INSTRUMENT) (BY SEPARATE "d LIVE OAK CREEK 20'PIPELINE INSTRUMENT) " PHASE 22.SECTION EASEMENTI-EMENT DOE TO ENERGY t (B SEP RAT T TRANSFER 6 I STRU NT) s a FUEL,L.P. 6 7 e DOC.N0. + T a I D205237094 DERRINGER DRIVE ° 6 0 Y e 7 0 11 J12 13 0 17 �e 7 v yam,m n '9j Y ] i 1 O 9 6 m Ra a a U OA CRF�K R O PHA E 1, ECTl N 1 100 6 a 7 6 oma ua ABIN T A, LIDS' 2686 of y 4 a m n 3 x + WATER to rc 15 OLINGER DRIVE 11 6 CISCO COURT EASEMENT u- s z?o o� (BY SEPARATE Qma2 8 a u a i to I+ 1213 INSTRUMENT) u M13 7 13 2 0 o O e ao i n a 4 a x 1 1e 12 a 14 7 6 6 7 e 6 LOT 2 a BLOCK LL t+ 2 PRIVATE OPEN SPACE 3 12 1 rc 2.280 ACRES 10 0 1 x a s e 6 to n a '0 11 2 9 I 0 u n 14 3 o 1a 16 LIVE OAK CREEK u 12 y 16 14 l n 10 a e e 7 6PHASE 1, 6 10 4 ° SECTION 1 e CABINET A, L y HATHAWAY DRIVE a 2 O SLIDE 12888 O7 a 1 ° W J HAYWIRE I LP e e la 1� It 1] 17 11 la 6 a 7 6 s / IVE AK RE 4 ] q� D206260623 7 22 x] SE TI1 2 O a 17 1e to xo a+ 2e n CA INET A, SLI E 1 88 2e Al 2 2e + c ] GT LIVE OAK CREEK • 4 YARMOUTH LANE ._� 1 PHASE 2.SECTION 1 a DOE 7275 x I to Itt 112 jl] �1411111- 11 to 16 m 21 T a 6 7 e 6 t6 o a 6 t a' C'UtlllE .t16= I e y R p 30'%50' LOT ) ] i t t6 to 1a 16 WATER 8 0 SEWER 14b'4 AaVAIE vEM 9A ° O u It EASEMENT y-p ?•+L a E� DRUMMOND LANE /� 7} ',G4" '4y1. t27e6 Ac6[s 2 SEPARATE ''' �6'y6444 a ! LI PHA CR EK t] INSTRUMENT) 14sE a e rc c4�AO 'IY to 1] k0 AN CAC ON �bg 6 xi 1t ae 12888 3 •\ I a a • 21 2 1Y 16 O n 1e ,y 14 13 LEGEND SCALE: 1r=400x `�a STREET SIGNS II1 PROPOSED SIGN BLADE EXHIBIT Cl PLANS FOR THE CONSTRUCTION OF MATER, STOP PROPOSED STOP SIGN SEVER, PAVING, STREET LIGHTING, &'81 DRAINAGE IMPROVEMENTS iloTO SERVE LIVE OAK CREEK,PH 2 SECTIONS 1&2 TEXAS REQ3TFYM ENMEERM FIRM F-438 (D.O.E NO.7275) 16301 Quorum DrW,Sule 200B Ad&W,Tema 75001 Tel:972.248.7676 Fax:972-24&1414 October 31, 2014 — SHEET 9 00 42 43 BID PROPOSAL PAGE t OF t CFA COST ESTIMATE UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Item Description Specificati Unit of Bid Unit Price Bid Value No. on Section I Measure I Quantity UNIT 5s STREET UGHTING INWR.OVEMENTS 3441.3101 Install 150W Metal Halide Cobra EA 7 $ 2,500.00 $ 17,500.00 Lighting Fixture 3441.3301 Foundation TY 4 EA 7 $ 2,500.00 $ 17 500.00 3441.3011 Rdwy Illum Assmby TY 8,11,D- LF 7 $ 2,500.00 $ 17,500.00 25 and D-30 3441.1410 Ground Box,Small,w/Lid Apron LF $ 430.00 $ - 3441.301112"CONDT PVC SCH 40 T)_ 26 05 33 ILF 2221S 15.50 $ 3,441.00 3441.141 1 NO 6 Insulated Alum Elec Condr 3441 10 LF 1 6661$ 15.50 $ 10,323.00 UNIT 5:STREET LIGHTING IMPROVEMENTS BID SUMMARY $ ",264.00 STREET NAME SIGN IMPROVEMENTS Street Name signs EA 4 $245.001$ 980.00 Total $ 980.00 END OF SECTION CITY OF FORT WORTH DOE 7275 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS SAN003-CFA Quantity Matrix,CFA-Lighting