Loading...
HomeMy WebLinkAboutContract 40243-A14 9 r a AMENDMENT NO. 14 TO AGREEMENT OF Y�RZ�10 ' FOR ARCHITECTURAL DESIGN SERVICES RENOVATE and EXPAND the GENERAL TERMINAL BUILDING at MEACHAM INTERNATIONAL AIRPORT ti la�� L 99 V � E OF TEXAS § § CITY SECRETARY CONTRACT NO. 243-141 COUNTY OF TARRANT § WHEREAS, The City of Fort Worth ("City") and Hahnfeld Associates, Architects and Planners, Inc. made and entered into City Secretary Contract No. 40243 (The Contract) which was authorized by the City Council by M&C C-24215, the 11th day of May, 2010; and Amendment Nos. 1, 2, 3, 4, 6, 7,11, 12 and 13 were administratively executed in the amount of $129,910.00 for additional topographic surveys, cost estimates, underground utilities survey, utility easement, new tenant lease space, new FBO revisions and new FBO tenant finishout design services; and Amendment No. 5 was approved by M&C C-24980 on June 14, 2011 to complete the design and provide construction administration services in the additional amount of $985,732.50 plus up to $63,680.00 in reimbursable expenses; and Amendment No. 8 was approved by M&C C-26111 on February 19, 2013 to redesign the Project's approved site and revise completed drawings in the additional amount of $85,505.00 plus up to $2,365.00 in reimbursable expenses; and Amendment No.9 was approved by M&C C-26504 on October 15, 2013 for additional redesign fees to accommodate a new FBO within the terminal building in the additional amount of $317,917.00 without additional reimbursable expenses; and Amendment No. 10 was approved by M&C C- 26712 on March 18, 2014 for additional redesign fees to accommodate a new FBO within the terminal building in the additional amount of$120,473.00 without additional reimbursable; WHEREAS, further amendment is necessary to incorporate additional requested architectural and civil engineering design services and changes in the construction drawings to accommodate a new FBO tenant finishout requested revisions; NOW THEREFORE, City and Hahnfeld Associates, Architects and Planners, Inc. d/b/a Hahnfeld Hoffer Stanford Architects Planner Interiors ("Architect"), collectively (the "Parties") acting by and through their duly authorized representatives, enter into the following agreement: 1. Article 1.1, SECTION I —SERVICES OF THE ARCHITECT, a paragraph is added to read as follows: "Provide additional design services to further modify the Project's currently approved architectural and civil engineering plans in order to incorporate the new FBO tenant finishout requested revisions. The Total cost of these additional services is $46,750.00 without additional reimbursable expense fees. The scope of services are described more fully in the following Hahnfeld Hoffer Stanford's letter, Attachment "A" dated July 7, 2015 subject: Amendment Proposal for Additional Services — Design Services for FBO Finishout Reimbursement Plan, Meacham Airport Terminal Building Renovation — Phase 2 including this letter's attachment noted as Exhibit"A". Attachment"A" is attached hereto, and made a part of this Agreement." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect to complete the Projects as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES as addressed in City Secretary Contract No. 40243 and Amendment Nos. 1 through 13 and hereof shall be $1,892,347.50, hereinafter referred to as the 'total fee', plus up to $79,245.00 in reimbursable expenses." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY Amendment No. 14 Page 1 of 2 General Aviation Terminal Building at Meacham International Airport FT. WORTH, TX July 2015 EXECUTED this the!7:Way of 015, in Fort Worth, Tarrant County, Texas. Hahnfeld Associates,Architects and Planners, Inc. APPROVED: d/b/a Hah rAIA cts nners Interiors By: By: Ichael J. H Fernando Costa Principal Assistant City Manager' APPROVAL REC RECORDED �° ��% 0 � � 0 By: By: 8� tPd!_Wayne Corum, Interim 6rrector, Mary J. ao Property Management Department City Secreta G000000 0, O rFXAS APPROVED ASTQ FORM LEGALITY: M&C C- No M&C Reguired Contract Authorization By: Grant Jordan Date: Assistant City Attorney OFFICIAL RECORD Amendment No. 14 CITY SECRETARY Page 2 of 2 General Aviation Terminal Building at Meacham International Airport FT. WORTH, TX July 2015 ,e4,K7,Da my,0 200'. #1 �(Illworth 16101 Hahmeld 817.921 5928 Office Hoffer 817.302.0692�,-ix 0 Sta, ford July 7,2015 Mr.Alfonso Meza Architectural Services Facilities Management Group Transportation and Public Works Department City of Fort Worth 401 West 13th Street Fort Worth,Texas 76102 RE: Amendment Proposal for Additional Services-Design Services for FBO Finishout Reimbursement Plan Meacham Airport Terminal Building Renovation -Phase 2 Dear Mr. Meza: As requested by the City of Fort Worth Aviation Department,I am sending you this proposal for the design of the Meacham Airport Terminal Building Renovation project to include design services for the FBO finish- out.These proposed design services have been selected from a master list generated by Hahnfeld Hoffer Stanford dated 7/7/2015, (attached) to include the most critical construction activities necessary to meet the contractor's schedule. The remaining items can be addressed in a future Design Amendment when additional information is available from the FBO operator,American Aero, and the FBO finishout Design Architect,Schenklel Shultz Architects. DESIGN FEES INCLUDED IN THIS PROPOSAL Our proposal includes the necessary design costs to issue design documents necessary for pricing and construction as soon as possible, and the management costs to coordinate the project with the FBO Interiors Architect Schenkel Shultz, and American Aero.We have divided the fee into each of the design tasks for a better understanding of the costs associated with each construction task. ITEM AA1 The redesign of the FBO ramp side entry vestibule to include a new window opening and adjustment in vestibule wall thickness.This includes modifying existing drawings,and relocating utilities contained within the wall enclosure. This task was requested by the FBO Architect, Schenkel Shultz. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $6,900.00 $1,000.00 ITEM AA 2 The redesign of the Terminal side for the removal of the interior connecting corridor between the Meacham Terminal Building Lobby and the Entry Lobby of the FBO.This includes the redesign of the tenant spaces adjoin the corridor, redesign of the interior glazing systems,and ceilings. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $6,000.00 NA *COLLABORATION *IF 1 *TRANSFORMATION Meacham Terminal Building Renovation July 7, 2015 Professional Services Proposal Page 2 of 3 ITEM AA3 Completion of design documentation of the parking shade canopies in the FBO parking lot.This includes preparation of bid documents for securing a vendor contract, coordination of disciplines,and field supervision of the installation.Design will be based on preliminary concepts prepared by FBO Architect,Schenkel Shultz.This includes all (4)of the proposed canopies. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $7,000.00 $2,500.00 ITEM AA5 The redesign of the roof drain risers near column G/7 to column G/6.This includes re-routing of storm drain laterals in the ceiling of the Lower Level. This task was requested by the FBO Architect, Schenkel Shultz. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: NA $1,600.00 ITEM AA9 The incorporation of illuminated signs proposed by the FBO, American Aero, into the construction documents of the shell building. This includes 2 illuminated signs on the exterior building wall. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $3,500.00 $1,500.00 ITEM AA11 The completion of preliminary design documents for the Ground Service Equipment Building on the ramp area. Preliminary drawings prepared by Schenkel Schultz will be completed and issued as construction documents, ready for bidding and construction by the contractor. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $8,500.00 $1,500.00 ITEM AA15 The design and coordination with the contractor to locate and install vehicle ground loop activated swing arm gates for the entry to the FBO reserved lot. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $750.00 $600.00 Meacham Terminal Building Renovation July 7, 2015 Professional Services Proposal Page 3 of 3 ITEM AA16 The design and location drawings for illuminated signs to the FBO reserved parking lot, the driveway to the FBO hangers 15N, 14N, and the design and coordination of the entry drive monument sign on behalf of the FBO,American Aero. Hahnfeld Hoffer Stanford Lump Sum Fee: Campos Engineering Inc. Lump Sum Fee: $4,800.00 $600.00 Total fee for the above quotations is$46,750.00(Forty Six Thousand Seven Hundred Fifty dollars and no cents), including the fees from Hahnfeld Hoffer Stanford and the consultants. FEES NOT INCLUDED IN THIS PROPOSAL • Travel outside of the City of Fort Worth • Attendance in regular meetings of the Interiors Architect with the FBO Operator,American Aero. • Attendance in regular meetings of the FBO Contractor, Balfour Beatty, and the FBO Operator, American Aero. • Additional printing and distribution beyond the usual distribution of drawings in PDF files emailed to all parties. • Distribution of CAD files beyond 1 copy each of the files issued at the completion of documentation. • Additional renderings or revisions of previous renderings for Owner or the FBO operator. REIMBURSABLE EXPENSES We anticipate no additional reimbursable costs beyond the base contract allowances. Our Proposal includes the attached exhibit from Campos Engineering, and the master schedule of proposed design tasks,and is attached hereto and part of Exhibit A. If you have any questions regarding this Design Amendment Fee Proposal, please give me a call.Thank you. Sincerely, HAHNFELD HOFFER STANFORD architects planners interiors Eric A.Claycamp,Al ,LEED A BD+C Associate Principal/Project Manager Cc: Eric Hahnfeld-Hahnfeld Hoffer Stanford Jeff Kloska-City of Fort Worth Aviation Attachments: Exhibit A CAMPOS EXHIBIT A 1 ENGINEERING, Inc. Consulting Englneers July 6, 2015 Via E-mail: eclaycamp@hahnfeld.com Hahnfeld Hoffer Stanford 200 Bailey Avenue, Suite 200 Fort Worth, Texas 76107 Attention: Eric A. Claycamp, AIA, LEED AP BD+C Associate Principal/Project Manager RE: Meacham Airport Terminal Renovation Proposal l Contract No. S15-1269.00 FBO Finish-out Reimbursement Plan Add Services Campos submits herewith this proposallcontract for additional engineering services in association with the following work scope increase: SCOPE OF WORK As requested below is our proposal for the MEP design of the Meacham Airport Terminal Building Renovation project to include design services for the FBO finish-out. These proposed design services have been selected from a master list generated by Hahnfeld Hoffer Stanford dated 6/17/2015, (attached) to include the most critical construction activities necessary to meet the contractor's schedule. The remaining items may be addressed at a later time, and when additional information is available from the FBO operator, American Aero, and the FBO finishout Design Architect, Schenklel Shultz Architects. Our proposal includes the necessary design costs to issue design documents necessary for pricing and construction as soon as possible, and the management costs to coordinate the project with the FBO Interiors Architect Schenkel Shultz. We have divided the fee into each of the design tasks for a better understanding of the costs associated with each construction task. 1. The redesign of the FBO ramp side entry vestibule to include a new window opening and adjustment in vestibule wall thickness. This includes modifying existing drawings, and relocating utilities contained within the wall enclosure. This task was requested by the FBO Architect, Schenkel Shultz. Campos Engineering Inc. Lump Sum Fee: $1,000 2. Completion of design documentation of the parking shade canopies in the FBO parking lot. This includes preparation of bid documents for securing a vendor contract, coordination of disciplines, and field supervision of the installation. Design will be based on preliminary concepts prepared by FBO Architect, Schenkel Shultz. This includes all (4) of the proposed canopies. Campos Engineering Inc. Lump Sum Fee: $2,500 1331 River Bend Drive • Dallas,Texas 75247 . Tel:214.696.6291 . Fax 214.361-6298 Hahnfeld Hoffer Stanford Attention: Eric A.Claycamp CEI Proposal No.S15-1269.00 July 6,2015 Page 2 of 3 3. The redesign of the roof drain risers near column G/7 to column G/6. This includes re- routing of storm drain laterals in the ceiling of the Lower Level. This task was requested by the FBO Architect, Schenkel Shultz. Campos Engineering Inc. Lump Sum Fee: $1,600 4. The incorporation of illuminated signs proposed by the FBO, American Aero, into the construction documents of the shell building. This includes 2 illuminated signs on the exterior building wall. Campos Engineering Inc. Lump Sum Fee: $1,500 5. The completion of preliminary design documents for the Ground Service Equipment Building on the ramp area. Preliminary drawings prepared by Schenkel Schultz will be completed and issued as construction documents, ready for bidding and construction by the contractor. Campos Engineering Inc. Lump Sum Fee: $1,500 6. The design and coordination with the contractor to locate and install vehicle ground loop activated swing arm gates for the entry to the FBO reserved lot. Campos Engineering Inc. Lump Sum Fee: $600 7. The design and location drawings for illuminated signs to the FBO reserved parking lot, the driveway to the FBO hangers 15N, 14N, and the design and coordination of the entry drive monument sign on behalf of the FBO, American Aero. Campos Engineering Inc. Lump Sum Fee: $600 WORK CLARIFICATIONS 1. Attendance in regular meetings of the Interiors Architect with the FBO Operator, American Aero is not included. 2. Attendance in regular meetings of the FBO Contractor, Balfour Beatty, and the FBO Operator, American Aero is not included. Campos Engineering, Inc. Proposal No. S15-1269.00 Hahnfeld Hoffer Stanford Attention: Eric A.Claycamp CEI Proposal No.S15-1269.00 July 6,2015 Page 3 of 3 We will perform these additional services for a lump sum fee of Nine Thousand Three Hundred Dollars ($9,300). This agreement, if executed, will constitute an amendment to our Basic Services Agreement. Please indicate your acceptance by singing and returning one copy of this Letter Agreement. Respectfully submitted, Campos Engineering, Inc. ACCEPTED: J. Michael McKee By: Associate Principal Eric A. Claycamp, AIA, LEED AP BD+C Associate Principal Date: Campos Engineering,Inc. Proposal No. S15-1269.00 Q 00 v 0 0 N LII \ ri 0 2 O C C C C C C C . C a) w (J aJ aJ a) a) a) E E E E E E E u E Y C C C C C C C d C E E E E E E E E N E D_ Q Q Q Q a a Q Z a O to N tN N m H CO N m N to H m y Yi Oa H '^ O 'n O '^ O `^ O `^ O '^ O '^ CL O 4t CLO p O p O p 0 p 0 p 0 p 0 p O C p 0 u c a o c '> v WC E D_ W Q o 0 (V z 3 Q z z i z rZ W W W V c _ Z z O ,ID O m 0 0 0 z g 3 !uj 2I 0 0 0 0 0 0 Oo. M O vL 9 to O � n LA z � 10 ID z � E 01 H N yL r-i z -i . Wa w CL U C7 O 00O O .O IIn p aC O O W Ow aCl0 lD '� W twi. T 00 W WTIn O T O C) O O OT'D m Fn {A{ nI 06' �v o 0 0 0 0 0 O ? O = � O O O v c no Q1 O lA ' 00 ' 00 O O a O ' LLAw M v ' Ln 0 t o N Lf 00 Cn e-I o 6 M - O >7 e-i' O rq N .7` LL. M ll1 l7 r'7 'a M Ln > mM N p u� O LA O -1Llicc Q Q) ey G N C Q) (7 lO L.L LLA 0= v VVV? V) VL6 V) V) f{ v v N 7 1 u C O O N y w O V p (0 Q V > O 4U o 0 0 0 0 0 0 0 0 0 0 O urni o C 000 0 C c 0 C Lr 00 N C�' O O O 00 0 N N U @ C 70 ca ti T V 00 C C O E m NO U a � u C t 0 Q- LL h O m Q o c �t 3 m Y c V o c ar u u a a I as Q c to m Y v `o .>_ U v m m ,mo E - C +.. v LL p` 3 m e c c n 3 7 O io d m c` ca V) 7 O a Q > � O c 0 O m .� 7 a c � m O c c _ V1 m C. '.+ i 1 t (3- 0 O a v C t = 0 •10 co io m W v c Y E M c a s p O ami o `O Co �i .c O u u m v a -M W o d Q c Ona p o m U > v o a N 2 ar � o Q Q cy �, E 3 m m (D n v o CL c c v n en CA O a) L 00 rc c `^ p co m V c p o E o a c ° w o o n v 7 01 u d c c 3 c > to C '� C U C VI N m In W N -0 Ca N a! C 'CS — m m v oa o m - m m O m p E c m m c m 0 7 V O al .m O aJ m a) J J O C C O. ccd 7 D C 7 J 3 E a) d J N >O E m N C "O C > col0 U — 'O V Y `O ,� E G O d E Y C M -0 > A (6 aJ X 7 . — — 7 fO U C Q C v p 0G 1' a U Q' x (,'J 1' C a a W (7 m D_' Q Q Q G D_ C a a (0 a Q p E — L- c 2 s Q m 0O0 WO z V to N W C a !O (d (a HQN QM V Ln 1a0 ah co 01 0 .--I .NQ-I .m-1 �a�•1 .'QQn-� Q� .Qh-1 Q�Q r�-I F o d p V Q Q Q Q Q Q Q a a Q Q In ccW W W 0 p J W LL z a