Loading...
HomeMy WebLinkAboutContract 26071 t i AMENDMENT NO. 2 STATE OF TEXAS § d COUNTY OF TEXAS § CITY SECRETARY CONTRACT NOr� WHEREAS, the City of Fort Worth ("City") and Freese and Nichols, Inc. ("Engineer") made and entered into City of Fort Worth City Secretary Contract No. 24784, ("Contract") which was authorized by the City Council by M&C C-17306 on the 11th day of March, 1999; and WHEREAS, the Contract involves engineering services for the following project: The City of Fort Worth 36-Inch Waterline from Fossil Hill Estate to Harmon Road (Northside III). WHEREAS, it has become necessary to amend the Contract to include an increased scope of work and revised maximum fee; NOW, THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the contract: 1. Article I of the Contract is amended to include the additional engineering services as specified in proposals from the Engineer dated January 26, 2000, February 23, 2000, and March 13, 2000, copies of which are attached hereto and incorporated herein. The cost to the City for the additional services to be performed by Engineer total $53,174.91. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services under the Contract, as amended, so that the total fee to be paid by City for all work and services shall not exceed the sum of$378,074.91. CA U l'a VV�IIIC'�UU �'utU�e 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the,,,/,)//'-,Ltday of 2000 in Fort Worth, Tarrant County, Texas. ATTEST: CITY OF FORT".WORTH: a,X- P Gloria Pearson U 9J a/-06 Mike Groomer City Secretary Assistant City Manager APPROVAL RECOMMENDED: ENGINEER: Freese and Nichols, Inc. A. Douglas Rademaker, P.E. Director, Department of Engineering Michael L. Nichols, P.E. Vice President APPROVED AS TO FORM AND LEGALITY: Gary Steinberger Assistant City Attorney C - i9 ) Ci _ Contract Authorization Date CGU dl N^UeISUWIALII Simon W.Freese,P.E. 1900-1990 Marvin C.Nichols,P.E. 1896-1969 FREESE-NICHOLS MEMORANDUM TO: Anthony Wilkins FROM: Mike Brownlee SUBJECT: North Beach Street N. S. III Pump Station Expansion Water Department Project No. PW77-060770140490 Department of Engineering Project N0. 2923 Proposed Construction Phase Scope of Services DATE: January 26,2000 Per your request we are submitting our proposed scope of services during the construction phase of the North Beach Street N.S.III Pump Station Expansion. Our proposed scope includes inspection of work performed for the new pump station expansion,including all site work,yard piping,meter vaults, and related electrical and instrumentation. We will coordinate the work directly with the Department of Engineering(D.O.E.). Our fee does not include inspection of the 36-inch pipeline from future North Beach Street to the pump station site or modifications to the existing 21-inch waterline. Our understanding is that this will be inspected directly by the City. Based on the duration and type of construction we propose the following scope of services: • Approximately 16-hours per week of regular on-site inspection including specialty observation during shut-downs, tie-ins, electrical, instrumentation and start-up activities. Our proposal is based on 14 weeks of construction activity. • Preparation of inspection reports containing observations made during each site visit including construction activities,discussions with the Contractor and recommended follow- up activities. 0 Photographs of construction progress taken on a weekly basis. • Review pay requests with the Contractor and meet with the City on a monthly basis to discuss the estimate and recommend approval. + Manage project and coordinate any change orders and field orders during the construction phase with D.O.E. • Maintain a set of up-to-date "As-Built"drawings during the course of construction. • Review shop drawings and maintain files with project submittals for record purposes. A copy of all submittals will be forwarded to`D.O.E. Each submittal q (-_COO ED FREESE AND NICHOLS•4055 INTERNATIONAL PLAZA,SUITE 200•FORT WORTH,TEXASA k�j TELEPHONE:817-735-7300• METRO:817-429-1900•FAX:817-735-7491 �' ,�, e�J11/1d e Lo J Ca r� D:\PROJEPTS �yv + 21� cpd January 28, 2000 Page 2 tracked during construction to monitor the status of the submittal. We propose that our current contract be amended in an amount"not-to-exceed"$37,145.00 for work performed during the construction phase of the North Beach Street N. S. III Pump Station Expansion. A detailed breakdown of the fee is attached to this memorandum. If we can be of any assistance or answer any questions regarding the proposed construction phase budget,please contact us at your convenience. EDp ticv PMEY FREESE AND NICHOLS 4055 INTERNATIONAL PLAZA,SUITE 200•FORT WORTH,TEXAS 761094895 TELEPHONE:817-735-73009 METRO:817429-19009 FAX:817-735-7491 D:\PROJECTS\Ftw99425\inspection.wpd f «N O q q d N cco Q M r l7 N h A Q~ N N U pp p pp W N�O 81A N z N M g q z a » x W IT JO O O ~ N 3 N O O N o h Uy W U MF- a ei fq q U » N n m w r � N N � N N M O W o W M Vi N �f f M y n U w f7 O m2N a � y a w a ON♦Nht° r (A N r q N O If Q o m N !- W y q m m F U o W 6 a N� C w » z IL w y � z F z ° U) ` v a am Q IL W C°v p S y O C t C y FE0w 210 � ° u! a ' °$ ° o F h @� � �OE n� b a op� al ' a a a a r°.m r° U mmi 8 < 00080 $� o- �v CITY OF FORT WORTH NORTH BEACH STREET PUMP STA T)CW BUDGET FOR SERVICES TABLE 28 BASIS FOR MANHOURS AND EXPENSES FOR EACH TASK JANUARY 2T,2000 MANHOURS PER TASK EXPENSES PFR TASK TASK I OF UNIT LUMP SUM TOTAL COST UNIT TOTAL NO. DESCRIPTION DEPT. PER UNIT UMTS TYPE HOURS HOURS PER UNIT TYPE COST —=COMTRILICTION PHASE Ohd i ation RR 16 141WEEKS I Cs a I CST wp a 20.00 20.00 mkow(1 0.33 9 0 Mil• 1.274.00 onthsPC;Show 1 .. 6. 6 Hour 64. mMs. :K. o Pm 0 0 CS CST WP postop I oll"ry 0.00 7 • TER o.oG months tier 6.00 Mau w unu els PIC 0 PM 0 PE I MJP 0 ARC CS CST 0 ON .. .. Months 0.00 —I PC Strbon .-.. 3.001 1 Hour —"'p �!'rar� lily. T.VFACILROC OES GROUPOFCRT WORTHS GENREPBUDGET BEACH STREET PS.WB2 p •V,.��.� � 4 26Jsr�00 CRY OF FORT WORTH NORTH BEACH STREET PUMP STATION BUDGET FOR SERVICES TABI!28 BASIS FOR MANHOURS AND EXPENSES FOR EACH TASK JANUARY 7/,2000 MANHOURS PER TASK EXPENSES PER TASK TASK HOURS NG.OF UNIT LUMP SUM TOTAL CO3 UNIT TOTAL NO. DESCRIPTION DEPT. PERUNIT UNITS TWE HOURS HOURS PER UNIT TYPE COST SEWN a I EACH GC ST ARC a s -210 Mile 68.25 RentalQ f Meals Tf0.00 n 0. —00— I PC Stamm W S Hour Costs sww s tsa 4 t - 0 0 WP 0 ARC 0 Expenses SURVEYOR 0.00 mileage 0.33 Go Milo Meals 35.00 1 n Talephom SO.. bon Manage sd bons - -. 4 0 Expenses posw I usirvery 000 0.00 4ibon S. 4.Hour .00 fin " �pD T:VFACILMES GROUPWORT WORT)K CS RENREPBUDOF.T BEACH STREET PS.WB2 IkI� ^1 RIP �pM 28Jon00 QIY OF FORT WORTH NORTH BRACH 8TREET PUMP STATION BUDGET I=SEFVVI"S TABLE W FARO{FDR MAAOMUWAAGE W&MEs FOR EACH TASK .IAMUARY V.2000 KANHOURSPFRIASK PER TASK TASK HOU" NO.Of UNIT LUMP SUM TOTAL COST UNIT TOTAL NO. DESCRIPTION DEPT. PER UNIT UNITS TYPE HOURS HOURS PER UNIT TYPE COST EE ARC 0 if no" I PW 040 akw"soft8. 0. 00obo I PC CAD ta0on00 coon 0.00 PIC .. R,O&M) I 2 0 CS 0 zgr 0.5 5 EACH 1 Month 0,00 0.33 • 50,00 0.00 boon 200.00 OR oon s e2 TRIP I PE CST 4 4 WP 0 •a 0.331 40 ila .50 n .001p— •ala .00n .00 T*tephons .. - ..- 1 50.00 no 0.00 PC boon I 1 0.001 S our 64,00 vMJ IfJIL UL Il"il5l`:VIIdV n; �;a pU c,•L':; (�� �p c �.. .i;....................... � o T:iQFACIUTIES GROUPWORT WORTH%CS GENREPBUDGET BEACH STREET PS.WB2 28.lan W Sent by: FREESE & NICHOLS 2149202565 02/29/00 2:18PM Job 861 Page 215 91102 ENGINEERING SERVICES HANGE AUTHORIZATION FREESE-NICHOLS Client: City of Fort Worth F&N Project No.: FTW 99425 1000 Throckmorton Fort Worth, Tx Contract Change No.: 1 76102 Date: 2/23/00 Project Description: North Side III 24-inch waterline, DOE Project No. 2923, Water Dept No.PW77 60770140490 Description of Services Added/Deleted: Revise horizontal and vertical alignment of 24-inch line in Beach Street. Line to be located 20 feet east of proposed west Beach Street 120 foot ROW. Revise the three easement legal descriptions to reflect the new horizontal alignment. Provide mylars to Carter & Burgess for Hillwood participation. The change in alignment was made at the City request in order to facilitate Right of Way acquisition, after 90 % complete plans had been approved with revisions for the bid process. All as requested by memorandum from Anthony Wilkins. Deliverables: Revised Plan and Profile sheets, three revised legal descriptions. Compensation shall be adjusted as follows: Original Contract $324,900 Revised Legal Descriptions (ANA) ---------------------------- 2,970 Project Manager Time 4hrs @$123 - 492 Engineering Time- (Brownlee)60 hrs @ $751 hr ------ ---- 4,500 Engineering Time- (Hastert 16 hrs @ $106/hr---------------1,696 Cad Tech Time (Myal) 32 hrs @ $66/hr-- --- 2,112 Cad Tech Overtime 21 hrs@$99/hr----------------------------2,079 Computer Charges 53hrs @$12/hr--- -- ----- ----- - 636 PAylars for Carter & Burgess, plotting charges, ------------ 500 Subtotal $14,985 Revised Total Contract $339,885 Schedule shell be adjusted as follows: Plans are to be ready for bidding beginning February 24, 2.000 A/I provisions, terms, and conditions of the agreement for services which are not expressly amended by this executed authorization remain in full force and effect. Changes/n compensation provisions will be incorporated in invoices for services Services pending authorization. Ll Services underway per verbal authorization by Anthony Wilkins on February 18, 2.000. FREESE D�HOLS, C.: BY T1 LE: Project Manager DATE: 2128100 ', ( I,i "I�SCJD N'T111BUTION: PM, RFP, TTW, WA �� U ntr fd WEU err % f Ex 1707 N.MARXET STREET,SUITE 500 LB 51 •DALLAS.TEXAS 75202-2001 •TELEPHONE-214-920.2500• FAX:214.920-2565 D:,FTw9942bicnnll.wl „•H,e;•,;.r rMENGINEERING SERVICES FREE5E-r�rcr�o�s CONTRACT CHANGE AUTHORIZATION Client: City of Fort Worth F&N Project No.: FTW99424 1000 ThrockmOrton Fort Worth, Tx Contract Change No.: 2 76102 Date: 3/13/00 Project Description: Hicks Road 36-inch Waterline, D.O.E. Project No. 2731, Water Dept. No. PW77-060770140440 Description of Services Added/Deleted: Revise Kenneth and Mary Leporis tract legal description and plat to reflect sale of approximately 1 acre to Samuel Leporis and prepare a new legal description and plat for the Samuel Leporis tract. Deliverables: 2 copies of each legal description and plat Compensation shall be adjusted as follows: PreviousContract 339,885 Revised legal descriptions and plats w/ 10% markup- 1,045 Revised Total Contract 340,930 Schedule shall be adjusted as follows: Revised instruments to be turned in as soon as possible. Aii provisions, terms, and conditions of the agreement for services which are not expressly amended by this executed authorization remain in full force and effect. Changes in compensation provisions wi//be incorporated in invoices for services ❑ Services pending authorization. Services underway per verbal and fax authorization by Anthony Wilkins on February 28, 2000. FREESE D NI OLS, INC.: BY: TITL Proiect Manager DATE: 3/08/2000 I� �I((`` p rG (�((�((��'��(pD}�(��� DISTRIBUTION: PM, ADG, JVC, WA ,0-VF CC'IA"L RE�!E( 00R,D CDS'���f�P)Mly Ya� 11i� II. FT. llld✓'-.�u000P 1701 N.MARKET STREET,SUITE 500 LB 51 •DALLAS,TEXAS 75202-2001 •TELEPHONE:214-920-2500• FAX:214-920-2565 D Aftw99224%contractchange.wpd City of Fort Worth, Texas OVagor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 7/11/00 **C-18101 30AMEND 1 of 2 SUBJECT AMENDMENT NO. 2 TO ENGINEERING AGREEMENT WITH FREESE & NICHOLS, INC. FOR DESIGN OF THE 36-INCH WATER LINE FROM FOSSIL HILL ESTATES TO HARMON ROAD F RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an amendment to City Secretary Contract (No. 24784) with Freese & Nichols, Inc. in the amount of $53,174.91, revising the contract amount to $378,074.91. DISCUSSION: On March 11, 1999 (M&C C-17306), the City Council authorized the City Manager to execute an engineering services agreement with Freese & Nichols, Inc. for design of the 36-inch water line from Fossil Hill Estates to Harmon Road. This agreement was subsequently amended on October 19, 1999, to allow for the design of the 24-inch water line from the Harmon Road Elevated Tank, and for design of the pump station expansion. The scope of work for Amendment No. 2 is as follows: a) Provide for redesign of the water line alignment to 1) accommodate the needs of property owners and to adjust to a change in future street right-of-way width, 2) additional surveying, 3) preparation of three easement documents, and 4) additional printing. The fee for this request is $16,030.00; and b) Construction inspection services provided by Freese and Nichols, Inc. to manage the construction of the recently awarded North Beach Street Pump Station Expansion. The fee for this request is not to exceed $37,144.91. The combined amendment request amount is $53,174.91. Freese & Nichols, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 7% participation on this amendment. This project is located in COUNCIL DISTRICT 2, Mapsco 21Y and Z, and 22N, P, S, and W. City of Fort Worth, Texas "avow and Counn't Communication DATE REFERENCE NUMBER LOG NAME PAGE 7/11/00 **C-18101 30AMEND 2 of 2 SUBJECT AMENDMENT NO. 2 TO ENGINEERING AGREEMENT WITH FREESE & NICHOLS, INC. FOR DESIGN OF THE 36-INCH WATER LINE FROM FOSSIL HILL ESTATES TO HARMON ROAD FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Commercial Paper-Water Fund. MG:k Submitted for City Manager's FUND I ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) APPROVED Mike Groomer 6140 CITY COUNCL Originating Department Read: JUL 11 2000 A.Douglas Rademaker 6157 (from) PW77 1 531200 060770140490 $53,174.91 Additional Information Contact: city Secretary of U• City of fort Worth,?s% A.Douglas Rademaker 6157