HomeMy WebLinkAboutContract 45721-FP4 Department of TPW Const.Services
DOE# ,Date
Project Man ger'
Risk Management S.Canady tT WORTH® CITY SECRE w
D.O.E. Brotherton CONTRAf'T UO, 4,,r,0a --r--P4
CFA Westerman/Scanned ❑
The Proceeding people have been Contacted concerning the request ATION AND PUBLIC WORKS
for final payment&have released this project for such payment. PROJECT COMPLETION
Clearance Conducted By Etta Bacy C f:2A -VPA1V1VC-D �2Q�IS" D.O.E.N9: 7199
Regarding contract 217199 for CENTRE STATION DRIVE as required by the C LJ4f q5-72i
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Prices: $44,759.00
Amount of Approved Change Orders: Ns 1
Revised Contract Amount: $44,759.00
Total Cost Work Completed: $44,759.00
Less Deductions:
Liquidated Damages: Days®$210.00/Day
Pavement Deficiencies:
Total Deduction Amount: $0.00
Total Cost Work Completed: $44,759.00
Less Previous Payments:
Final Payment Due $44,759.00
Recommended for Acceptance Date
Asst. Pikector, TPW - Infrastructure Design and Construction
4, �
1I Aa
i
c Accep Date
Di ctor,
TRANS O TATION AND PUBLIC WORKS DEPARTMENT
Asst. City Manager Date
Comments: FUND ACCT:P265-6051502247-83/P275-7051302247-83
PaGs 590/ EMA.�LE.D OFFICIAL RECORD
P,275-_5�� 0 7
NOV 2 0 2015 CITY SECRETARY
�T. WORTH,TX
hdtlaL "
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name CENTRE STATION DRIVE
Contract Limits
Project Type TRAFFIC SIGNS
City Project Numbers 2247
DOE Number 7199
Estimate Number 1 Payment Number 1 For Period Ending 8/31/2015
CD
City Secretary Contract Number 117199 Contract Time INED
Contract Date 6/30/2014 Days Charged to Date 171
Project Manager Ehia Contract is 100.00 Complete
Contractor WRIGHT CONSTRUCTION COMPANY,INC.
601 W.WAIL ST.
GRAPEVINE, TX 76051-
Inspectors RODGERS / KLENK
Friday,September 04,2015 Page 1 of 4
M—
City Project Numbers 2247 DOE Number 7199
Contract Name CENTRE STATION DRIVE Estimate Number 1
Contract Limits Payment Number I
Project Type TRAFFIC SIGNS For Period Ending 8/31/2015
Project Funding
UNIT C2-TRAFFIC SIGNALS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 12"SLD PVMT MARKING PAINT(V) 92 LF $8.00 $736.00 92 $736.00
2 24"SLD PVMT MARKING PAINT(W) 24 LF $16.00 $384.00 24 $384.00
3 LANE LEGEND ARROW 3 EA $247.00 $74I.00 3 $741.00
4 LANE LEGEND ONLY 3 EA $288.00 $864.00 3 $864.00
5 3-SECT SIGNAL HEAD ASSEMBLY 4 EA $1,351.00 $5,404.00 4 $5,404.00
6 5-SECT SIGNAL I1F.AD ASSEMBLY 2 EA $1,955.00 $3,910.00 2 $3,910.00
7 PED SIGNAL HEAD ASSEMBLY 8 EA $661.00 $5,288.00 8 $5,288.00
8 ACCESSIBLE PED SIGNAL 8 EA $1,357.00 $10,856.00 8 $10,856.00
9 INSTALL RADAR PRESENCE DETECT SYSTEM I E $6,210.00 $6,210.00 1 $6,210.00
10 INSTALL EMERGENCY VEHICLE PREEMPTION I LS $776.00 $776.00 1 $776.00
SYSTEM
I 1 20/C 14 AWG MULTI-CONDUCTOR CABLE 230 LF $6.00 $1,380.00 230 $1,380.00
12 INSTALL MAST ARM 16'-36' 1 EA $3,542.00 $3,542.00 1 $3,542.00
13 FURNISH/INSTALL ALUM SIGN MAST ARM 2 EA $449.00 $898.00 2 $898.00
MOUNT
14 INSTALL ALUM SIGN MAST ARM MOUNT 4 EA $495.00 $1,980.00 4 $1,980.00
15 FURNISH AND INSTALL RADAR PRESENCE 520 LF $3.00 $1,560.00 520 $1,560.00
CABLE
16 FURNISH AND INSTALL EMERGENCY 230 LF $1.00 $230.00 230 $230.00
VEHICLE PREEMPTION CABLE
Sub-Total of Previous Unit $44,759.00 $44,759.00
Friday,September 04,2015 Page 2 of 4
City Project Numbers 2247 DOE Number 7199
Contract Name CENTRE STATION DRIVE Estimate Number I
Contract Limits Payment Number I
Project Type TRAFFIC SIGNS For Period Ending 8/31/2015
Project Funding
Contract Information Summary
Original Contract Amount $44,759.00
Chantte Orders
Total Contract Price $44,759.00
Date 4/////< Total Cost of Work Completed 54.4,759.00
Co a or ''n^ ` Less %Retained $0.00
uq
Date , Net Earned $44,759.00
Inspection Superviso Earned This Period $44,759.00
o e Retainage This Period $0.00
Z > Less Liquidated Damages
Project Mana
Days @ /Day $0.00
Date �j` LessPavement Deficiency $0.00
Asst. re odPPW-Infrastructure Design and ConT on Less Penalty $0.00
Date 7 Less Previous Payment $0.00
r� Director cling partment Plus Material on Hand Less 15% $0.00
1lBalance Due This Payment $44,759.00
Friday,September 04,2015 Page 3 of 4
City Project Numbers 2247 DOE Number 7199
Contract Name CENTRE STATION DRIVE Estimate Number 1
Contract Limits Payment Number 1
Project Type TRAFFIC SIGNS For Period Ending 8/312015
Project Funding
Project Manager Ehia City Secretary Contract Number 117199
Inspectors RODGERS / KLENK Contract Date 6/302014
Contractor WRIGITr CONSTRUCTION COMPANY,INC. Contract Time 180 CD
601 W.WALL ST. Days Charged to Date 171 CD
GRAPEVINE, TX 76051- Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $44,759.00
Less %Retained $0.00
Net Earned $44,759.00
Earned This Period $44,759.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00 {
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
i
Balance Due This Payment $44,759.00
Friday,September 04,2015 Page 4 of 4
Document G706A
Contractor's Affidavit of Release of Liens
PROJECT: (Name and address) ARCHITECT'S PROJECT NUMBER: OWNER:❑
CentrePort City Project: 02247
Centre Station Drive CFA: 2014-003
ARCHITECT:❑
Lot 2, Block 104
Fort Worth, Texas CONTRACT FOR:
TO OWNER: (Alame and address) Water, Sewer, Paving, Storm Drain,
CONTRACTOR:Z
Street Lights, Traffic Signals to serve
CentrePort Venture, LP Centre Station Drive SURETY:❑
Two Seaport Lane
Boston, MA 02210-2021 CONTRACT DATED:
June 17, 2014 OTHER:❑
STATE OF: TEXAS
COUNTY OF: TARRANT
The undersigned hereby certifies that to the best of the undersigned's knowledge, information and belief, except as listed
below, the Releases or Waivers of Lien attached hereto include the Contractor, all Subcontractors, all suppliers of materials
and equipment, and all performers of Work, labor or services who have or may have liens or encumbrances or the right to
assert liens or encumbrances against any property of the Owner arising in any manner out of the performance of the
Contract references above.
EXCEPTIONS.
NONE
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address)
1. Contractor's Release or Waiver of Liens, conditional Wright Construction Co., Inc.
upon receipt of final payment. 601 W Wall St., Grapevine, X 76051
2. Separate Releases or Waivers of Liens from
Subcontractors and equipment suppliers, to the extent BY:
required by the Owner, accompanied by a list thereof. (Sigr)6tur of authorize representative)
Gary A. Oostveen, Controller
(Printed name and title)
Gary A. Oostveen, Controller, personally appeared before
me, the undersigned notary public, and provided satisfactory
evidence of identification to be the person who signed this
document in my presence and swore or affirmed to me that
the contents of this document are truthful and accurate to the
best of his/her knowledge and belief-
INA CHRISTINE GOOLSBY y SS
;�P••40�n'
Notary Public
/✓/// '�
=_- = Date:
STATE OF TEXAS A
..- My Comm.Exp•May 14,2017 Notary Public:
My Commission expires:5,� ,/�e/
CAUTION You should sign an Original Document.on which this lex;appears in RFD An Original Document assures that changes will not be obscured
TORGO SOFTWARE mvw TorgoSortware com 01996.2012 ALL RIGHTS RESERVED
Contractor's Affidavit of Payment of Debts and Claims
Document G706
TO OWNER: (Name and address) ARCHITECT'S PROJECT NUMBER: OVVNER:❑
CentrePort Venture, LP City Project: 02247
Two Seaport Lane CFA: 2014-003 ARCHITECT:❑
Boston, MA 02210-2.021
CONTRACT FOR:
CONTRACTOR:d
Water, Seaver, Paving, Storm Drain,
PP.OJEC T: (Name and address) Street Lights, Traffic Signals to serve
CentrePort Centre Station Drive SURETY:❑
Centre Station Drive
Lot 2, Block 104 CONTRACT DATED:
Fort Worth, Texas OTHER:❑
June 17, 2014
STATE OF: TEXAS
COUNTY OF: TARRANT
The undersigned hereby certifies that, except as listed below, payment has been made in full and all obligations have
otherwise been satisfied for all materials and equipment furnished, for all work, labor, and services performed, and for all
known indebtedness and claims against the Contractor for damages arising in any manner in connection with the
performance of the Contract referenced above for which the Owner's property might in any way be held responsible or
encumbered.
EXCEPTIONS:
None
SUPPORTING DOCUMENTS ATTACHED HERETO: CONTRACTOR: (Name and address)
1. Consent of Surety to Final Payment. Whenever Surety is Wright Construction Co., Inc.
involved, Consent of Surety is required.
601 W. Wall St., Grapevine,
6051
Indicate Attachment: ®yes ❑ no
BY: 1�
The following supporting documents should be attached (Sig' �ura of EhAh orizeff representative)
hereto if required by the Owner:
1. Contractor's Release or Waiver of Liens, conditional Gary A. Oostveen, Controller
upon receipt of final payment. (Printed name and title)
Gary A. Oostveen, Controller, personally appeared before
2. Separate Releases or Waivers of Liens from me, the undersigned notary public, and provided satisfactory
Subcontractors and equipment suppliers, to the extent evidence of identification to be the person who signed this
required by the Owner, accompanied by a list thereof. document in my presence and swore or affirmed to me that
the contents of this document are truthful and accurate to the
3. Contractor's Affidavit of Release of Liens. best of his/her knowledge and belief.
ZINA CHRISTINE GOOLSBY Date:
Notary Public
`+ +' STATE OF TEXAS Notary Public:
My Comm.Up.May14,2017 F
My Commission expires:
CAUTION You should sign an Onginal Documera,cn v,hlch this text appears in RED An Original Document assureg that changes will not be obscured
TORGO SOFTWARE Nvww 7orgoSodware com ®195&2012 ALL RIGHTS RESERVED
�DMDr� Merchants Bonding Company
2100 FLEUR DRIVE•DES MOINES, IOWA 50321-1158
` (515)243-8171 •(515)243-3854 FAX
OWNER
ARCHITECT
' p CONTRACTOR
CONSENT OF SURETY SURETY
TO FINAL PAYMENT OTHER
Bond No. TXC605350
Printed in cooperation with The American Institute of Architects(ALA)by\-lerchnts Bordin;Coinpany(Mutual),Nlerchants Bonding Company
(Nfutual)vouches that the Ian�uage ui this document conforms exactly to the Ian-uage used in AIA Document G707, 1994 Edition.
TO OWNER: ARCHITECT'S P?OJECT NO.:
(blame and address)
CentrePort Venture,LP
City of Fort North CONTRACT FOR:
PROJECT: CONTRACT DATED: June 30,2015
(Name and address)
CentrePort
In accordance with the provisions of the Contract bet,tiveen the Owner and the Contractor as indicated above, the
gtser!name and address of&"ty)
Merchants Bonding Company (Mutttal)
2100 Fleur Drive
Des Moines, Iowa 50321-1158
SURETY,
on bond of
flnserf name and address of Contractor)
Wright Construction Co.,Inc.,601 W.Wall St.,Grapevine,Texas 76051
, CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety of any of its obligations to
(Insert name and address of Owner)
CentrePort Venture,LP
City of Fort Worth
OWNER,
as set forth in said Surety's bond.
IN WITNESS WHEREOF,the Surety has hereunto set its hand on this date: August 26,2015
(Insert in writing the month followed by the numeric date and year.)
Merchants Bonding Company (Mutual)
(SLrely)
Attest: `
(S (Signature of awho' re sentotiwj
Kathy Sells Attorney-In-Fact
CON 0405(02/01) (Pnntednameandtitle)
�iILERCHN TTS
BONDING COMPANY,, Bond No TXC605350
POWER OF ATTORNEY
Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,
INC.,both being corporations of the State of Iowa(herein collectively called the"Companies')do hereby make,constitute and appoint,
individually,
Casey Hege; Dustin Parker; Kathy Sells; Martin Day
their true and lawful Attorney(s)-in-Fact,to make,execute,seal and deliver on behalf of the Companies,as Surety,bonds,undertakings
and other written obligations in the nature thereof.subject to the limitation that any such instrument shall not exceed the amount of:
TWENTY MILLION(S20,000,000.00)DOLLARS
This Power-of-Attorney is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the
Board of Directors of Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchanis
National Bonding,Inc.,on October 24,2011.
"The President,Secretary,Treasurer,or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and
authority to appoint Attorneys-in-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company
thereto,bonds and undertakings,recognizances,contracts of indemnity and other writings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of
Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship
obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given
to the Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and
construction contracts required by the State of Florida Department of Transportation.It is fully understood that consenting to the Stale ofFlorida
Department of Transportation making payment of the Final estimate to the Contractor and/or its assignee,shall not relieve this surety company
of any of its obligations under its bond.
In connection with obligations in favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given
to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner-
Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
In Witness Whereof,the Companies have caused this instrument to be signed and sealed this 15th day of August 2015
BONDINGMERCHANTS UAL)
•••Q\FIG CQ a• MERCHANTS NATIONAL BONDING,(NC.
�ggt0Rq •�0��(�F0Q�9�,c
'. 2073 ',�- •ec
'•yJ �Y• By
63 . \ .
STATE OF IOWA '''•a,,, „a�"' •�•••.
COUNTY OF Dallas ss. President
On this 15th day of August 2015 ,before me appeared Lary Taylor,to me personally known,who being by me sworn did say that
he is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.;and that the seals affixed
to the foregoing instrument are the Corporate seals of the Companies;and that the said instrument was signed and sealed in behalf of the
Companies by authority of their respective Boards of Directors.
1Pa'^<r WENDY WOODY
i � Commission Number 784654
My Commission Expires
owP June 20, 2017
Notary Pubir , •County,Iowa
(Expiration OF notary's commission
does not invalidate this instrument)
I,William Warner,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.,
do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,
which is still in full force and effect and has not been amended or revoked.
In Witness Whereof, I have hereunto set my hand and affixed the seal of the Companies on this 26th day of August 2015
10 14A \1W CoyjA,
_ z; Secretary
x'• 2003 •s ` 1933 =�,
POA 0014 (6/15) ',•,+•�•""""''rr���
ERC Ts
BONDING COMPANY,,,
\,IERCHANTS BONDING COMPANY(M.UTUAL) • MERCHkNITS NATIONAL BONDING. INC.
2100 FLEUR DRIVE - DCS &IOI,NES. IOWA 50321-1153 (800)678-8171 • (51S)213-3854 FAX
IMPORTANT NOVICE
To obtain information or make a complaint:
You may contact your insurance agent at the telephone number provided by your insurance agent.
You may call Merchants Bonding Company (Mutual) toll-free telephone number for information or to make a
complaint at:
1-800-678-8171
You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or
complaints at:
1-800-252-3439
You may write the Texas Department of Insurance at:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: hftp://,Nww.tdi.state.tx.us
E-mail: Cons umerProtection@tdi.texas.gov
PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or-about a claim
you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of
Insurance.
ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part
or condition of the attached document.
SUP 0032 TX(12/13)
FORTWORTH REV:02n010'
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
CONTRACTOR&PROJECT DATA
Nome of Contractor Project Name
Wright Construction Centre Station Drive
DOE Inspector DOE Number
Candace Klenk 7199
Elnspector Project Manager
❑ Water❑ Waste Water❑ Stone Drainageo Pavement Fred Ehia
Initial Contract Amount roject DjQtculty
$ . '��(. Q Simple QQ Routine O Complex
Final Cilittract Amount Date
s 9.0k 9/10/2015
II)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/M RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safe 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Com hint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 428
BONUS POINTS(25 Maximum)(B)�
TOTAL SCORE M) 428
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 4C sum of applicable element score maximums which= 448
Rating(ITS/MS]'100%) 428 / 448 %%
Performance Category Excellent
<20%-Inadequate 20%to<40%=Deficient 40%to<6096=Standard 60%to<80%-Good >_80%—Fzce11ent
Impector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
lj;�—Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor
CONT'RACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
f The City of Fort Worth•1000 Throckmortoa Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax.(817)392-7845
FORTWORTH REV:0207
t,
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
PROJECT INFORMATION _ Date: 9/10/2015
Name of Contractor _ Project Nana
Wri�}►t Construction _ Centre Station Driv
DOE Inspector Project Manager
Candace Klenk _ _ Fred Ehia
DOE Number I Project Difficulty Type of Contract
7199 0 Simple OQ Routine 0 Complex 21 Water❑✓ waste water0 Storm Dralnage2 Pavement
Initial Contract Amount Final Contract Amount
11)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ,ELEMENT RATING
(0-4) I (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector _ 2 Clarity&Sufficiency of Details S
3 Accuracy of Measured Quantities � L"3 A licabiliof Specifications
4 Display Of Professionalism ��_t L_;4 Accuracy of Plan Quantities
�5 Citizen Complaint Resolution _ V !PROJECT MANAGER EVALUATION
6 Performance-Settin u Valve Crews,l abs�Z1__f 1-Knowledge And/Or Problem Resolution
ADMINISTRATION _ _ 2 Availability of Project Mana er
I Change Order Processing Time 3 Communication
2 Tiniliness of Contractor Pa ents 3 4 Resolution of Utili Conflicts _
3 Bid O nin to Pre-Con Meetin Tuneframe
IIn COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor J41
01
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throckmo.r Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fix(817)392-7845
FORT WORTHrr)
TRANSPORTATION AND PUBLIC WORKS
STATEMENT OF CONTRACT TIME
STATEMENT#
FINAL STATEMENT# 1 DOE 1 7119
NAME OF PROJECT: Centre Station Drive Contractor I Wri ht Cont.
YEAR: 2015
PROJECT NO.: FINAL INSPECTION DATE 4*012015
P-2656051502247-83 P275-7051302247-83 I WD CD
CONTRACT TIME 180 I I X
PERIOD FROM: iHW65 TO: I W31FA15 I MID - Month I
WORK ORDER EFFECTIVE: " 08120114 BEG I n MID l n
DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR
CHARGED DAYS CREDITED CHARGED DAYS CREDITED
1 16 Sun 0
2 17 Mon 0
3 18 Tue 0
4 19 Wed 0 i�IA
5 20 Thu 0 NA
6 21 Fri 0 N�►
7 22 Sat 0
8 23 Sun 0
9 24 Mon 0 NA
10 25 Tue 0
11 26 Wed 0 FIA
12 27 Thu 0 NA
13 28 Fri 0 A
14 1 1 29 Sat 0 14A
15 1 30 Sun 0 QUA
31 Mon 0 JWA
NA Wkn&Hal Wea Utl Q
Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS
HOLIDAYS RELOCATE CHARGED
THIS PERIOD 0 0 0 0 0 0
PREVIOUS PERIOD 0 171 171
TOTAL TO DATE 1 0 0 1 0 1 0 1 171 1 171
REMARKS,
Stopped time on 2-4-15. Walked Wrights final on 4-30-15,punchlist was completed 6-10-15.
Signature: Signature: -
(PrintName) L y Candace Klenk
CONTRACTOR I DATE INSPECTOR DATE 913/2015