Developer and Project Information Cover Sheet:
Developer Company Name: Hillwood Alliance Services, LLC
Address, State,Zip Code: 13600 Heritage Parkway, Suite 200, Fort Worth, TX, 76177
Phone&Email: 817-224-6000, russell.laughlin @hillwood.com
Authorized Signatory, Title: Russell Laughlin,Vice President,Properties Division
Project Name and Brief Alliance Center North Phase 3
Description:
Project Location: N.Beach St&Eagle Parkway
Plat Case Number: FP-15-053 & Plat Name: N Beach Street&Eagel Parkway
FP-15-052
Mapsco: Council District: 7 City Project Number: 02657
CFA Number: 2015-105 DOE Number: 7519
To be completed by staff
b,
�
Received by: '" ��°"" W...° A Date:
t,
r
Cityf'f fort poi th,Texas
Standard Community Facilities Agreement ') FICIA RECORD
CFA Official Release Date: 07.30.2015 ,
Page 1 of 12
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. q�d—� W1�
WHEREAS, Hillwood Alliance Services LLC ("Developer"), desires to make certain
specific improvements as described below and on the exhibits attached hereto ("Improvements")
related to a project generally described as Alliance Center North Phase 3 ("Project") within the
City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas m n •.,a„ • ---
Standard Community Facilities Agreement (WICU1 U. RECORD
CFA Official Release Date: 07.30.2015
Page 2 of 12 F 11�1111 s C ETPA,RY
611?71-3� TX
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ,I a, Sewer (A-1) , Paving (B) 1,0, Storm Drain (B-1) _, Street Lights &
Signs (C) Viz.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section II, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City:established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 3 of 12
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will,be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 4 of 12
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in Part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 5 of 12
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 6 of 12
the end of two (2) years from the date of this Agreement (and any extension
period)the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date:07.30.2015
Page 7 of 12
Cost Summary Sheet
Project Name:Alliance Center North Phasej3
CFA No.: 2015-105 DOE No.: 7519
An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 8 of 12
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction �� �
2.Sewer Construction
Water and Sewer Construction Total $ 61,577.50
B. TPW Construction
1.Street
2.Storm Drain
3.Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total $ 1,662,798.10
Total Construction Cost(excluding the fees): $ 1,724,375.60
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,231.55
D. Water/Sewer Material Testing Fee(2%) $ 1,231.55
Sub-Total for Water Construction Fees $ 2,463.10
E. TPW Inspection Fee(4%) $ 65,256.32
F. TPW Material Testing(2%) $ 32,628.16
G. Street Light Inspsection Cost $ 1,255.60
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost ' N�'�t�� �7° '', �� ��,%
Sub-Total for TPW Construction Fees $ 99,140.09
Total Construction Fees: $ 101,603.19
Choice
Financial Guarantee O tions choose one Amount Mark one
Bond=100% hi
$ 1,724,375.60 X
Completion Agreement=100%/Holds Plat $ 1,724 375 60 � y''r�f 1 I'M�Iy(
n1'
Cash Escrow Water/Sanita Sewer=125% $ 76,971.88
Cash Escrow Paving/Storm Drain=125%
$ 2,078,497 63rhr `°f;
Letter of Credit=125%w/2 r expiration period $ 2 155,4 50a v 'a,, tir ;
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH Date: `
Recommended by:
Jesus J. Chapa "�`
Assistant City Manager �-
Wendy Chi-Babulal, EMBA, P.E.
City of Fort Worth,Texas
Standard Community Facilities Agreement OFFICIAL R 0011 D
CFA Official Release Date: 07.30.2015 (,A" If�SWC iE Irf R Y
Page 9 of 12
Development Engineering Manager DEVELOPER
Water Department Hillwood Alliance Services,LLC
N e L.' 71 La
ca Dou -Wiersig, P.E. Title: Senior Laughlin
Dire o Vice President Division
Transportation& Public Works Department
Date: _*)Oemler 2015
Approved as to Form &Legality:
ATTEST: (Only if required by Developer)
i
Douglas W. Black
Assistant City Attorney Signature
Name: LDPi
M&C No. A _
Date:
ATTEST:
e.
s—
Mary J. 'a r
s
City Secret ry ,
OFFICIAL, Ei ORD
City of Fort Worth,Texas
Standard Community Facilities Agreement OK T Ein R AR
CFA Official Release Date: 07.30.2015
Page 10 of 12
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 - Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
ON Exhibit B: Paving Improvements
Paving Cost Estimate
Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 11 of 12
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 02657
None
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 07.30.2015
Page 12 of 12
1
377
14
TEX"
EAGLE
PKWY =
U
W
~
mU
AGLEZ
PKWY 114
Texas
170
Texas
SITE
287
377
LL .................................. ....................................................................---.......
OWNER/ DEVELOPER: ENGINEER:
ALLIANCE HILLWOOD ALLIANCE PROTON
NORTH CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE
NOT TO SCALE PHAS E 3 1360 FORT WORTH,PARKWAY,
EXAS 76177E 200 SUITE 7
PHONE: (817) 224-6000 KENE:8 7- 62-33
DATE:OCTOBER 2015 PHONE:817-562-3350
LEGEND TRACT2
EAGLE INCOME PROPERTIES,LP
DOC.N0.2009.143323
PROPOSED WATER LINE R.P.R.D.C.T.
....................................
EXIST WATER LINE
_v-
PROPOSED GATE VALVE
PROPOSED REDUCER 811 WL
NOTE:ALL PROPOSED WATER LINES ARE 8"
UNLESS OTHERWISE NOTED
li
LOT
2&
BLOCK En NORTH
TRACT 2
x EAGLE INCOME PROPERTIES,LP
fw DOC.NO.2009-143323
RP.P.D.C.T.
10" WL
AL LOT M=DRTH
LmCE
CALVIN PETERSON&
PETERSON FMIILYTRUST
DOC NO.2008-94SM 5
VOL.W po'257
R.P.RD C
811 WL
12"WL
10"WL 10"WL
............. .......
EX 16
12" WL \7
AIL INVESTMENT.LP.
DDC.N0.1998-117441
PARCEL W.3
ILPJLD.C.7.
EXHIBIT A WATER
........... ........... -----------------------------------------------------------------------------------------------------------------------
1pl� OWNER/ DEVELOPER: 11111 PELOTON
p ALLIANCE HILLWOOD ALLIANCE 11 Il�l LAND SOLUTIONS
0 NORTH 300' CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE
13600 HERITAGE PARKWAY,SUITE 200 SUITE 185
PHASE 3 7 KELLER,TX 76244
FORT WORTH,TEXAS 7617 PHONE:817-5
PHONE: (817) 224-6000
GRAPHIC SCALE DATE:OCTOBER,2015
TRACT 2
LEGEND EAGLE INCOME PROPERTIES,LP
DOC.N0.2009.143323
R.P.R.O.C.T.
----�- PROPOSED SEWER LINES
__a---- EXIST SEWER LINES
r.
('' 1
f
?it, t1
t i
_ 1
1n.
ji
�t 1
�+ t
n I
ALLWIPCE CENTER NORTH 0f
1
n� t
rt t
f
TRACT2
EAGLE INCOME PROPERTIES,lP
Lill DOC.N0.2009.143323
,
f RP.RD.C.T.
i
. {
0
3 8" SS i
{ U
Q i
I EIf l
LIJ
ca
CALNNPETERSONB
PETERSON FAMILY TRUST
'y1 DOC NO.2008-94534,5
I 1 VOL.384 PG.257
[ R.P.R.D.C.T.
Ito
7� I
i I{
j AIUA ICE L�1 ER NORTH ��I i
1
I�� 1
EAGLE PARKWAY °
...............
AIL INVESTMENT,LP.
DOC.N0.i998-117441
PARCELN0.3
' RP.R_OCT.
I
9,
EXHIBIT Al - WASTEWATER
------------------ --- - ------- ---- -- --
OWNER/ DEVELOPER: I;!�I PELOTON
ALLIANCE
HILLWOOD ALLIANCE U LAND SOLUTIONS
NORTH 300 CENTER NORTH SERVICES, L.P.
5751 KROGER DRIVE
13600 HERITAGE PARKWAY,SUITE 200 SUITE 7
PHASE 1 FORT WORTH,TEXAS 76177 KENE:8 7- 62-33
GRAPHIC SCALE DATE:SEPTEMBER,2013
PHONE: (817) 224-6000 PHONE:817-562-3350
LEGEND
r I
TRACT 2 x
. EAGLE INCOME PROPERTIES,
�� PROPOSED CONCRETE PAVEMENT DO0.RP.RD.CT.23
SIDEWALK BY DEVELOPER
28' B-B / 130' ROW °r
LDT?R BLOCK,
ALLDUiCE ARTER NORTH
i;
1�
r!
TR"PRO
IJII ' EAGIOOCC NO.PROPERTIES,LP
OOC..Rpm8-743323
R.P.RO.C.T.
i
:
:
� Iw
i IW
w
IQ
C -m
28' B-B/ 130' ROW -=j i0 --
i Z CALVIN PETERSON 6
PETERSON FAI4R.Y TRUST
DOCNO.2 _84B34,5
VOL 384 PG.257
I C 1.eLOCK 1 R.P.R.D.C.T.
ALLIANCE CENTER NORTH
f
i
f
I
29' B-B / 110' ROW
1' —
.� ._._... Tom...----
PAR A
I
{; AIL INVESTM.ENf LP. =_......_...__..__...; ;
I DDC-NO.tBS�n54at
PARCEL N0.3
. RPRD.C.T.
9
EXHIBIT B - PAVING
= � ..-.. ALLIANCE -- ...- ------
OWNER/ DEVELOPER: PELOTON
Ii!�I �
HILLWOOD ALLIANCE -Will ill LAND SOLUTIONS
0 NORTH 300' CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE
13600 HERITAGE PARKWAY,SUITE 200 SUITE 7
PHASE 3 FORT WORTH,TEXAS 76177 KENE:8 7X62-33
GRAPHIC SCALE DATE:OCTOBER 2015 PHONE: (817) 224-6000 PHONE:817-562-3350 �
TRACT 2
LEGEND
EAGLE NO 2 PROPERTIES,3 LP
R.P.2009.1.
PROPOSED STORM DRAIN INLET
-- -- EXIST STORM DRAIN INLET 21" RCP
PROPOSED STORM DRAIN MANHOLE l
-� PROPOSED STORM DRAIN HEADWALL
21" RCPJ
21 RCP 1r.
66"RCP1.
i' 21" RCP
LOT 2R,BLOCK t f
ALL110E CENTER NORTH
5'
•' t
21 RCP + �'
72"RCP
ri
TRACT2
! I EAGLE INCOME PROPERTIES,LP
DOC.N0.2009.743323
R.P.RA.C.T.
24"RCP �
21" RCP
III
a I t
IDO
mp
r O CALVIN PETERSON&
z PETERSON FAMILY TRUST
DOC NO.2008-94834,5
VOL.384 PG.257
L0E t.BLOCK 1
ALLWlCE CENTER NORTH
I
t 60" RCP 1
I.
i 21" RCP
21"RCP
21" RCP 21" RCP 21 RCP A � 72" RCP
21 RCP 21'
—
E
a _ ,
21" RCP 33" RCP 36" RCP 36" RCP --- --
I; A0.KVESTMENT LP.
DOC.NO.799&71'7441
PARCELNO.3
RP.R.D.C.T.
EXHIBIT B1 - STORM DRAINAGE
-------------------------------------------------------------------------------- ------
E
OWNER/ DEVELOPER: pELOTON
HILLWOOD ALLIANCE
UI LA.o
o NORTH 300'
CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE
SUITE 15
+
PHASE 3 1360 FORT WORTH,PARKWAY,
EXAS 76177E 200 KELLER,TX7 6244
GRAPHIC SCALE DATE:OCTOBER,2015 PHONE: (817) 224-6000 PHONE:817-562-3350
LEGEND TRACT 2
EAGLE INCOME PROPERTIES,LP
DOC.NO.2009-143323
® PROPOSED STREET LIGHTS R.P.R.D.C.T.
EXIST STREET LIGHTS
I1
i f
r
1 g'
LOT2R,BLOCK 1
ALLIMCE CENTERNORTH
t
g
g l�
5 f
TRACT 2
EAGLE INCOME PROPERTIES,LP
I DOC.NO.2009-143323
RRR.D.C.T.
LLJ
f
W
� I
m
f0
I Z CALVIN PETERSON&
PETERSON FAMILYTR UST
DOC NO.200&94834,5
LOT 1 BLOCK
VOL.. PG.257
R
1 ALLIANCE CENT ER NCRTH 1 _ PRD.C.T,
3 I E
I
• FIIr'
AIL LNVE$TLtENT LP.
DOC.N0.199E1T 441
PARCEL NO.3
RPA D.C.T.
i
I
EXHIBIT C - STREET LIGHTS
------------------- --------------------------•-------.._..---------------------......._----
I ALLIANCE OWNER/ DEVELOPER: (;!I( PELOTON
o NORTH 300 HILLWOOD ALLIANCE U LAND SOLUTIONS
CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE
TE 15
Sul
13600 HERITAGE PARKWAY,SUITE 200 KEGLER,TX7 6244
PHASE 3 FORT WORTH,TEXAS 76177
GRAPHIC SCALE DATE:OCTOBER,2015 PHONE: (817) 224-6000 PHONE:817-562-3350
LEGEND TRAPRO
EAGLE INCOME PROPERTIES,LP
DOC.NO.2009-
RP.R.D.C.T.
PROPOSED STREET NAME SIGNS
EXIST STREET NAME SIGNS
i r
f
i l
1
LOT 2R BL-1
P1.LWtCE CENSER NORTN
1
7 I
jTRACr2
EAGLE INCOME PROPERTIES,j-
DOC.N0.2009-143323
R.P.R.D.C.T.
3 � I
Lu
{: m
I m 1
I �
ZCALVIN PETERSON 8
PETERSON FAMILY TRUST
DOC NO.2OW94834,5
VOL.384 PG.257
ALLNN ECeE RNORTH R.P.RD.QT.
I
I fi
1
c ( i
G t
•
Art
AIL V%!,lW LP.
DOC.N0.1998-117411
9
RPRD.C.T.
1
EXHIBIT C1 - STREET NAME SIGNS
o ALLIANCE NE E -------
OWNER/DEVELOPER: dill P E LOTO N
o NORTH 300, HILLWOOD ALLIANCE li I LAND SOLUTION.
CENTER NORTH SERVICES, L.P. 5751 KRO ER DRIVE
13600 HERITAGE PARKWAY,SUITE 200 SUITE 76244 1
PHASE 3 FORT WORTH,TEXAS 76177 KEL
GRAPHIC SCALE DATE:OCTOBER 2015 PHONE: (817) 224-6000 PHONE:817-562-3350
PELOTON
LAND SOLUTIONS
I
5751 KROGER DR.SI'L.185 I KELLER.TX 76244 f&11.562.9350
ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM 23
1 3110.0101 Site Clearing 1 $5,500.00 $5,500.00
2 3123.0101 Unclassified Excavation by Plan 3,390 $5.50 $18,645.00
3 3124.0101 Embankment by Plan 9,519 $4.50 $42,835.50
4 3125.0101 SWPPP >1 acre 1 $15,500.001 $15,500.00
Total Earthwork Improvements $82,480.50
5 3213.0105 10"Cone Pvmt 3,375 19,854 $45.00 $893,430.00
6 3211.0502 8"Lime Treatment 4,028 23,696 $3.00 $71,088.00
7 3211.0400 Hydrated Lime 82 484.71 $165.00 $79,977.15
8 3212.0503 6"Asphalt Base Type B 2,510 2,553 $32.00 $81,696.00
9 3211.0400 Hydrated Lime 40.83 $165.00 $6,736.95
10 3216.0101 6"Cone Curb and Gutter 213 $30.00 $6,390.00
11 19999.0001 Construct Concrete Header 79 240 $20.00 $4,800.00
12 3213.0301 4"Cone Sidewalk 3,400 20,048 $3.00 $60,144.00
13 9999.0002 Brick Pavers(Median) 229 $72.00 $16,488.00
14 3213.0503 Barrier Free Ramp,Type M-1 3 $1,200.00 $3,600.00
15 9999.0003 Install'End of Road'Barricade 51 234 $25.00 $5,850.00
16 3305.0107 Manhole Adjustment,Minor 1 7 $800.00 $5,600.00
17 3305.0111 Valve Box Adjustment 1 3 $300.00 $900.00
18 2605.3031 4"CONDT PVC SCH 40(T) 582 $16.00 $9,312.00
19 9999.0004 6"CONDT PVC SCH 40(T) 582 $20.00 $11,640.00
20 3292.0400 Seeding,H dromulch 3,021 16,786 $2.00 $33,572.00
21 9999.0005 Traffic Control 1 $5,500.00 $5,500.00
Total Paving Improvements $1,296,724.10
22 3217.0001 4"SLD Pvmt Marking HAS W) 4,204 $2.00 $8,408.00
23 3217.0003 4"BRK Pvmt Marking HAS(W) 2,553 $2.00 $5,106.00
24 3217.0201 8"SLD Pvmt Marking HAS(W) 1,436 $4.00 $5,744.00
25 3217.0301 12"SLD Pvmt Marking RAE(W) 731 $6.00 $4,386.00
26 3217.0501 24"SLD Pvmt Marking HAE(W) 153 $8.00 $1,224.00
27 3217.2102 REFL Raised Marker TY I-C 64 $4.00 $256.00
28 3217.2104 REFL Raised MarkerTYD-C-R 204 $5.00 $1,020.00
29 3217.1002 Lane Legend Arrow 9 $300.00 $2,700.00
30 3217.1006 Lane Legend Bike 11 $300.00 $3,300.00
31 9999.0006 Install Custom Sign Ground Mount-ACN 13 $1,400.00 $18,200.00
32 9999.0007 Install Custom Sign on Shared Pole-ACN 1 $800.00 $800.00
btal Pavement Markings&Signage Improvements $51,144.00
33 3341.0201 21"RCP,Class III 352 $48.001 $16,896.00
34 3341.0305 33"RCP,Class lII 645 $78.00 $50,310.00
35 3341.0309 36"RCP,Class I11 768 $90.00 $69,120.00
36 3305.0112 Concrete Collar 1 $500.00 $500.00
37 3349.5001 10'Curb Inlet 8 $2,200.00 $17,600.00
38 3349.0001 4'Storm Junction Box 2 $3,500.00 $7,000.00
39 13305.0109 Trench Safety 1 1,765 $1.00 $1,765.00
Total Storm Drain Improvements $163,191.00
40 2605.3011 2"CONDT PVC SCH 40(T) 660 $12.00 $7,920.00
41 2605.3021 3"CONDT PVC SCH 40(T) 430 $14.00 $6,020.00
42 3441.1502 Ground Box,Small,w/Lid Apron 7 $750.00 $5,250.00
43 3441.3302 Rdwy Illum Foundation TY 3,5,6,and 8 2 $1,500.00 $3,000.00
44 3441.3003 Rdwy Illum Assmbly TY 18,18A,19,and D-40 2 $3,000.00 $6,000.00
45 3441.3201 LED Lighting Fixture 4 $800.00 $3,200.00
Total Street Light Improvements $31,390.00
46 3311.0241 8"Water Pie 70 $40.00 $2,800.00
47 3311.0341 10"Water Pie 123 $46.00 $5,658.00
48 3311.0461 12"PVC Water Pie 305 $52.00 $15,860.00
49 3311.0462 12"PVC Water Pipe,CSS Backfill 20 $62.00 $1,240.00
50 0241.1118 4"-12"Pressure Plug $800.00 $5, 00.00
5
1
51 3312.4108 12"x 10"Tapping Sleeve&Valve 1 $4,500.00 $4,500.00
52 3312.4114 16"x 12"Tapping Sleeve&Valve 2 $5,500.00 $11,000.00
53 3312.0117 Connection to Existing 4"-12"Water Main 4 $1,000.00 $4,000.00
54 3311.0001 Ductile Iron Water Fittings w/Restraint 1.76 $3,500.00 $6,160.00
55 9999.0008 Concrete Blocking,Type B 2.55 $150.00 $382.50
56 3305.0109 Trench Safety 518 $1.00 $518.00
Total Water Improvements $57,718.50
57 3331.4115 8"Sewer Pie 51 a,:)V.Vvi $2,550.00
58 3331.3302 8"2-way Cleanout 1 $850.001 $850.00
59 3305.0109 Trench Safety 51 $4.00 $204.00
60 3301.0002 Post-CCTV Inspection 51 $5.00 $255.00
Total Sewer Improvements $3,859.00
61 0241.1100 Remove Asphalt Pvmt 550 $6.00 $3,300.00
62 9999.0009 Remove Gravel Drive 866 $4.00 $3,464.00
63 0241.1300 Remove Conc Curb&Gutter 796 $10.00 $7,960.00
64 9999.0010 Remove Ex Median Island 1 $3,500.00 $3,500.00
65 9999.0011 Remove'End of Road Barricade' 88 $5.00 $440.00
66 3217.4301 Remove 4"Pvmt Marking 6,183 $1.00 $6,183.00
67 3217.4303 Remove 8"Pvmt Marking 4,190 $1.25 $5,237.50
68 3217.4306 Remove 24"Pvmt Marking 12 $2.00 $24.00
69 3217.4402 Remove Lane Legend Arrow 2 $100.00 $200.00
70 3217.4404 Remove Lane Legend Only 2 $100.00 $200.00
71 9999.0012 Remove Alum Sign Ground Mount 5 $200.00 $1,000.00
72 0241.3017 Remove 30"Storm Line 68 $20.00 $1,360.00
73 10241.4203 Remove 6'Drop Inlet 1 $1,000.00 $1,000.00
74 10241.4401 Remove Headwall/SET 4 $1,000.001 $4,000.00
Total Misc Improvements $37,868.50
Total Improvements $1,724,375.60