Loading...
HomeMy WebLinkAboutContract 47259 CITY SECWTAW CMRACT NO.L L" Developer and Project Information Cover Sheet: Developer Company Name: Hillwood Alliance Services, LLC Address, State,Zip Code: 13600 Heritage Parkway, Suite 200, Fort Worth, TX, 76177 Phone&Email: 817-224-6000, russell.laughlin @hillwood.com Authorized Signatory, Title: Russell Laughlin,Vice President,Properties Division Project Name and Brief Alliance Center North Phase 3 Description: Project Location: N.Beach St&Eagle Parkway Plat Case Number: FP-15-053 & Plat Name: N Beach Street&Eagel Parkway FP-15-052 Mapsco: Council District: 7 City Project Number: 02657 CFA Number: 2015-105 DOE Number: 7519 To be completed by staff b, � Received by: '" ��°"" W...° A Date: t, r Cityf'f fort poi th,Texas Standard Community Facilities Agreement ') FICIA RECORD CFA Official Release Date: 07.30.2015 , Page 1 of 12 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. q�d—� W1� WHEREAS, Hillwood Alliance Services LLC ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Alliance Center North Phase 3 ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS, any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas m n •.,a„ • --- Standard Community Facilities Agreement (WICU1 U. RECORD CFA Official Release Date: 07.30.2015 Page 2 of 12 F 11�1111 s C ETPA,RY 611?71-3� TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ,I a, Sewer (A-1) , Paving (B) 1,0, Storm Drain (B-1) _, Street Lights & Signs (C) Viz. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II, paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City:established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the City of Fort Worth, Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 12 maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will,be evidenced on the Certificate of Insurance (ACORD or other state- approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available; to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces, to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 4 of 12 I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with, the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further, Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 5 of 12 construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent (2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period, the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 6 of 12 the end of two (2) years from the date of this Agreement (and any extension period)the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLANK) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 7 of 12 Cost Summary Sheet Project Name:Alliance Center North Phasej3 CFA No.: 2015-105 DOE No.: 7519 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 8 of 12 Items Developer's Cost A. Water and Sewer Construction 1. Water Construction �� � 2.Sewer Construction Water and Sewer Construction Total $ 61,577.50 B. TPW Construction 1.Street 2.Storm Drain 3.Street Lights Installed by Developer 4. Signals TPW Construction Cost Total $ 1,662,798.10 Total Construction Cost(excluding the fees): $ 1,724,375.60 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 1,231.55 D. Water/Sewer Material Testing Fee(2%) $ 1,231.55 Sub-Total for Water Construction Fees $ 2,463.10 E. TPW Inspection Fee(4%) $ 65,256.32 F. TPW Material Testing(2%) $ 32,628.16 G. Street Light Inspsection Cost $ 1,255.60 H. Signals Inspection Cost $ - H. Street Signs Installation Cost ' N�'�t�� �7° '', �� ��,% Sub-Total for TPW Construction Fees $ 99,140.09 Total Construction Fees: $ 101,603.19 Choice Financial Guarantee O tions choose one Amount Mark one Bond=100% hi $ 1,724,375.60 X Completion Agreement=100%/Holds Plat $ 1,724 375 60 � y''r�f 1 I'M�Iy( n1' Cash Escrow Water/Sanita Sewer=125% $ 76,971.88 Cash Escrow Paving/Storm Drain=125% $ 2,078,497 63rhr `°f; Letter of Credit=125%w/2 r expiration period $ 2 155,4 50a v 'a,, tir ; ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH Date: ` Recommended by: Jesus J. Chapa "�` Assistant City Manager �- Wendy Chi-Babulal, EMBA, P.E. City of Fort Worth,Texas Standard Community Facilities Agreement OFFICIAL R 0011 D CFA Official Release Date: 07.30.2015 (,A" If�SWC iE Irf R Y Page 9 of 12 Development Engineering Manager DEVELOPER Water Department Hillwood Alliance Services,LLC N e L.' 71 La ca Dou -Wiersig, P.E. Title: Senior Laughlin Dire o Vice President Division Transportation& Public Works Department Date: _*)Oemler 2015 Approved as to Form &Legality: ATTEST: (Only if required by Developer) i Douglas W. Black Assistant City Attorney Signature Name: LDPi M&C No. A _ Date: ATTEST: e. s— Mary J. 'a r s City Secret ry , OFFICIAL, Ei ORD City of Fort Worth,Texas Standard Community Facilities Agreement OK T Ein R AR CFA Official Release Date: 07.30.2015 Page 10 of 12 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 - Changes to Standard Community Facilities Agreement Location Map Exhibit A: Water Improvments Water Cost Estimate Exhibit A-1: Sewer Improvements Sewer Cost Estimate ON Exhibit B: Paving Improvements Paving Cost Estimate Exhibit B-1: Storm Drain Improvements Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 11 of 12 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 02657 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 12 of 12 1 377 14 TEX" EAGLE PKWY = U W ~ mU AGLEZ PKWY 114 Texas 170 Texas SITE 287 377 LL .................................. ....................................................................---....... OWNER/ DEVELOPER: ENGINEER: ALLIANCE HILLWOOD ALLIANCE PROTON NORTH CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE NOT TO SCALE PHAS E 3 1360 FORT WORTH,PARKWAY, EXAS 76177E 200 SUITE 7 PHONE: (817) 224-6000 KENE:8 7- 62-33 DATE:OCTOBER 2015 PHONE:817-562-3350 LEGEND TRACT2 EAGLE INCOME PROPERTIES,LP DOC.N0.2009.143323 PROPOSED WATER LINE R.P.R.D.C.T. .................................... EXIST WATER LINE _v- PROPOSED GATE VALVE PROPOSED REDUCER 811 WL NOTE:ALL PROPOSED WATER LINES ARE 8" UNLESS OTHERWISE NOTED li LOT 2& BLOCK En NORTH TRACT 2 x EAGLE INCOME PROPERTIES,LP fw DOC.NO.2009-143323 RP.P.D.C.T. 10" WL AL LOT M=DRTH LmCE CALVIN PETERSON& PETERSON FMIILYTRUST DOC NO.2008-94SM 5 VOL.W po'257 R.P.RD C 811 WL 12"WL 10"WL 10"WL ............. ....... EX 16 12" WL \7 AIL INVESTMENT.LP. DDC.N0.1998-117441 PARCEL W.3 ILPJLD.C.7. EXHIBIT A WATER ........... ........... ----------------------------------------------------------------------------------------------------------------------- 1pl� OWNER/ DEVELOPER: 11111 PELOTON p ALLIANCE HILLWOOD ALLIANCE 11 Il�l LAND SOLUTIONS 0 NORTH 300' CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE 13600 HERITAGE PARKWAY,SUITE 200 SUITE 185 PHASE 3 7 KELLER,TX 76244 FORT WORTH,TEXAS 7617 PHONE:817-5 PHONE: (817) 224-6000 GRAPHIC SCALE DATE:OCTOBER,2015 TRACT 2 LEGEND EAGLE INCOME PROPERTIES,LP DOC.N0.2009.143323 R.P.R.O.C.T. ----�- PROPOSED SEWER LINES __a---- EXIST SEWER LINES r. ('' 1 f ?it, t1 t i _ 1 1n. ji �t 1 �+ t n I ALLWIPCE CENTER NORTH 0f 1 n� t rt t f TRACT2 EAGLE INCOME PROPERTIES,lP Lill DOC.N0.2009.143323 , f RP.RD.C.T. i . { 0 3 8" SS i { U Q i I EIf l LIJ ca CALNNPETERSONB PETERSON FAMILY TRUST 'y1 DOC NO.2008-94534,5 I 1 VOL.384 PG.257 [ R.P.R.D.C.T. Ito 7� I i I{ j AIUA ICE L�1 ER NORTH ��I i 1 I�� 1 EAGLE PARKWAY ° ............... AIL INVESTMENT,LP. DOC.N0.i998-117441 PARCELN0.3 ' RP.R_OCT. I 9, EXHIBIT Al - WASTEWATER ------------------ --- - ------- ---- -- -- OWNER/ DEVELOPER: I;!�I PELOTON ALLIANCE HILLWOOD ALLIANCE U LAND SOLUTIONS NORTH 300 CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE 13600 HERITAGE PARKWAY,SUITE 200 SUITE 7 PHASE 1 FORT WORTH,TEXAS 76177 KENE:8 7- 62-33 GRAPHIC SCALE DATE:SEPTEMBER,2013 PHONE: (817) 224-6000 PHONE:817-562-3350 LEGEND r I TRACT 2 x . EAGLE INCOME PROPERTIES, �� PROPOSED CONCRETE PAVEMENT DO0.RP.RD.CT.23 SIDEWALK BY DEVELOPER 28' B-B / 130' ROW °r LDT?R BLOCK, ALLDUiCE ARTER NORTH i; 1� r! TR"PRO IJII ' EAGIOOCC NO.PROPERTIES,LP OOC..Rpm8-743323 R.P.RO.C.T. i : : � Iw i IW w IQ C -m 28' B-B/ 130' ROW -=j i0 -- i Z CALVIN PETERSON 6 PETERSON FAI4R.Y TRUST DOCNO.2 _84B34,5 VOL 384 PG.257 I C 1.eLOCK 1 R.P.R.D.C.T. ALLIANCE CENTER NORTH f i f I 29' B-B / 110' ROW 1' — .� ._._... Tom...---- PAR A I {; AIL INVESTM.ENf LP. =_......_...__..__...; ; I DDC-NO.tBS�n54at PARCEL N0.3 . RPRD.C.T. 9 EXHIBIT B - PAVING = � ..-.. ALLIANCE -- ...- ------ OWNER/ DEVELOPER: PELOTON Ii!�I � HILLWOOD ALLIANCE -Will ill LAND SOLUTIONS 0 NORTH 300' CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE 13600 HERITAGE PARKWAY,SUITE 200 SUITE 7 PHASE 3 FORT WORTH,TEXAS 76177 KENE:8 7X62-33 GRAPHIC SCALE DATE:OCTOBER 2015 PHONE: (817) 224-6000 PHONE:817-562-3350 � TRACT 2 LEGEND EAGLE NO 2 PROPERTIES,3 LP R.P.2009.1. PROPOSED STORM DRAIN INLET -- -- EXIST STORM DRAIN INLET 21" RCP PROPOSED STORM DRAIN MANHOLE l -� PROPOSED STORM DRAIN HEADWALL 21" RCPJ 21 RCP 1r. 66"RCP1. i' 21" RCP LOT 2R,BLOCK t f ALL110E CENTER NORTH 5' •' t 21 RCP + �' 72"RCP ri TRACT2 ! I EAGLE INCOME PROPERTIES,LP DOC.N0.2009.743323 R.P.RA.C.T. 24"RCP � 21" RCP III a I t IDO mp r O CALVIN PETERSON& z PETERSON FAMILY TRUST DOC NO.2008-94834,5 VOL.384 PG.257 L0E t.BLOCK 1 ALLWlCE CENTER NORTH I t 60" RCP 1 I. i 21" RCP 21"RCP 21" RCP 21" RCP 21 RCP A � 72" RCP 21 RCP 21' — E a _ , 21" RCP 33" RCP 36" RCP 36" RCP --- -- I; A0.KVESTMENT LP. DOC.NO.799&71'7441 PARCELNO.3 RP.R.D.C.T. EXHIBIT B1 - STORM DRAINAGE -------------------------------------------------------------------------------- ------ E OWNER/ DEVELOPER: pELOTON HILLWOOD ALLIANCE UI LA.o o NORTH 300' CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE SUITE 15 + PHASE 3 1360 FORT WORTH,PARKWAY, EXAS 76177E 200 KELLER,TX7 6244 GRAPHIC SCALE DATE:OCTOBER,2015 PHONE: (817) 224-6000 PHONE:817-562-3350 LEGEND TRACT 2 EAGLE INCOME PROPERTIES,LP DOC.NO.2009-143323 ® PROPOSED STREET LIGHTS R.P.R.D.C.T. EXIST STREET LIGHTS I1 i f r 1 g' LOT2R,BLOCK 1 ALLIMCE CENTERNORTH t g g l� 5 f TRACT 2 EAGLE INCOME PROPERTIES,LP I DOC.NO.2009-143323 RRR.D.C.T. LLJ f W � I m f0 I Z CALVIN PETERSON& PETERSON FAMILYTR UST DOC NO.200&94834,5 LOT 1 BLOCK VOL.. PG.257 R 1 ALLIANCE CENT ER NCRTH 1 _ PRD.C.T, 3 I E I • FIIr' AIL LNVE$TLtENT LP. DOC.N0.199E1T 441 PARCEL NO.3 RPA D.C.T. i I EXHIBIT C - STREET LIGHTS ------------------- --------------------------•-------.._..---------------------......._---- I ALLIANCE OWNER/ DEVELOPER: (;!I( PELOTON o NORTH 300 HILLWOOD ALLIANCE U LAND SOLUTIONS CENTER NORTH SERVICES, L.P. 5751 KROGER DRIVE TE 15 Sul 13600 HERITAGE PARKWAY,SUITE 200 KEGLER,TX7 6244 PHASE 3 FORT WORTH,TEXAS 76177 GRAPHIC SCALE DATE:OCTOBER,2015 PHONE: (817) 224-6000 PHONE:817-562-3350 LEGEND TRAPRO EAGLE INCOME PROPERTIES,LP DOC.NO.2009- RP.R.D.C.T. PROPOSED STREET NAME SIGNS EXIST STREET NAME SIGNS i r f i l 1 LOT 2R BL-1 P1.LWtCE CENSER NORTN 1 7 I jTRACr2 EAGLE INCOME PROPERTIES,j- DOC.N0.2009-143323 R.P.R.D.C.T. 3 � I Lu {: m I m 1 I � ZCALVIN PETERSON 8 PETERSON FAMILY TRUST DOC NO.2OW94834,5 VOL.384 PG.257 ALLNN ECeE RNORTH R.P.RD.QT. I I fi 1 c ( i G t • Art AIL V%!,lW LP. DOC.N0.1998-117411 9 RPRD.C.T. 1 EXHIBIT C1 - STREET NAME SIGNS o ALLIANCE NE E ------- OWNER/DEVELOPER: dill P E LOTO N o NORTH 300, HILLWOOD ALLIANCE li I LAND SOLUTION. CENTER NORTH SERVICES, L.P. 5751 KRO ER DRIVE 13600 HERITAGE PARKWAY,SUITE 200 SUITE 76244 1 PHASE 3 FORT WORTH,TEXAS 76177 KEL GRAPHIC SCALE DATE:OCTOBER 2015 PHONE: (817) 224-6000 PHONE:817-562-3350 PELOTON LAND SOLUTIONS I 5751 KROGER DR.SI'L.185 I KELLER.TX 76244 f&11.562.9350 ITEM TOTAL UNIT PRICE ITEM TOTAL COST ITEM NO. BID ITEM 23 1 3110.0101 Site Clearing 1 $5,500.00 $5,500.00 2 3123.0101 Unclassified Excavation by Plan 3,390 $5.50 $18,645.00 3 3124.0101 Embankment by Plan 9,519 $4.50 $42,835.50 4 3125.0101 SWPPP >1 acre 1 $15,500.001 $15,500.00 Total Earthwork Improvements $82,480.50 5 3213.0105 10"Cone Pvmt 3,375 19,854 $45.00 $893,430.00 6 3211.0502 8"Lime Treatment 4,028 23,696 $3.00 $71,088.00 7 3211.0400 Hydrated Lime 82 484.71 $165.00 $79,977.15 8 3212.0503 6"Asphalt Base Type B 2,510 2,553 $32.00 $81,696.00 9 3211.0400 Hydrated Lime 40.83 $165.00 $6,736.95 10 3216.0101 6"Cone Curb and Gutter 213 $30.00 $6,390.00 11 19999.0001 Construct Concrete Header 79 240 $20.00 $4,800.00 12 3213.0301 4"Cone Sidewalk 3,400 20,048 $3.00 $60,144.00 13 9999.0002 Brick Pavers(Median) 229 $72.00 $16,488.00 14 3213.0503 Barrier Free Ramp,Type M-1 3 $1,200.00 $3,600.00 15 9999.0003 Install'End of Road'Barricade 51 234 $25.00 $5,850.00 16 3305.0107 Manhole Adjustment,Minor 1 7 $800.00 $5,600.00 17 3305.0111 Valve Box Adjustment 1 3 $300.00 $900.00 18 2605.3031 4"CONDT PVC SCH 40(T) 582 $16.00 $9,312.00 19 9999.0004 6"CONDT PVC SCH 40(T) 582 $20.00 $11,640.00 20 3292.0400 Seeding,H dromulch 3,021 16,786 $2.00 $33,572.00 21 9999.0005 Traffic Control 1 $5,500.00 $5,500.00 Total Paving Improvements $1,296,724.10 22 3217.0001 4"SLD Pvmt Marking HAS W) 4,204 $2.00 $8,408.00 23 3217.0003 4"BRK Pvmt Marking HAS(W) 2,553 $2.00 $5,106.00 24 3217.0201 8"SLD Pvmt Marking HAS(W) 1,436 $4.00 $5,744.00 25 3217.0301 12"SLD Pvmt Marking RAE(W) 731 $6.00 $4,386.00 26 3217.0501 24"SLD Pvmt Marking HAE(W) 153 $8.00 $1,224.00 27 3217.2102 REFL Raised Marker TY I-C 64 $4.00 $256.00 28 3217.2104 REFL Raised MarkerTYD-C-R 204 $5.00 $1,020.00 29 3217.1002 Lane Legend Arrow 9 $300.00 $2,700.00 30 3217.1006 Lane Legend Bike 11 $300.00 $3,300.00 31 9999.0006 Install Custom Sign Ground Mount-ACN 13 $1,400.00 $18,200.00 32 9999.0007 Install Custom Sign on Shared Pole-ACN 1 $800.00 $800.00 btal Pavement Markings&Signage Improvements $51,144.00 33 3341.0201 21"RCP,Class III 352 $48.001 $16,896.00 34 3341.0305 33"RCP,Class lII 645 $78.00 $50,310.00 35 3341.0309 36"RCP,Class I11 768 $90.00 $69,120.00 36 3305.0112 Concrete Collar 1 $500.00 $500.00 37 3349.5001 10'Curb Inlet 8 $2,200.00 $17,600.00 38 3349.0001 4'Storm Junction Box 2 $3,500.00 $7,000.00 39 13305.0109 Trench Safety 1 1,765 $1.00 $1,765.00 Total Storm Drain Improvements $163,191.00 40 2605.3011 2"CONDT PVC SCH 40(T) 660 $12.00 $7,920.00 41 2605.3021 3"CONDT PVC SCH 40(T) 430 $14.00 $6,020.00 42 3441.1502 Ground Box,Small,w/Lid Apron 7 $750.00 $5,250.00 43 3441.3302 Rdwy Illum Foundation TY 3,5,6,and 8 2 $1,500.00 $3,000.00 44 3441.3003 Rdwy Illum Assmbly TY 18,18A,19,and D-40 2 $3,000.00 $6,000.00 45 3441.3201 LED Lighting Fixture 4 $800.00 $3,200.00 Total Street Light Improvements $31,390.00 46 3311.0241 8"Water Pie 70 $40.00 $2,800.00 47 3311.0341 10"Water Pie 123 $46.00 $5,658.00 48 3311.0461 12"PVC Water Pie 305 $52.00 $15,860.00 49 3311.0462 12"PVC Water Pipe,CSS Backfill 20 $62.00 $1,240.00 50 0241.1118 4"-12"Pressure Plug $800.00 $5, 00.00 5 1 51 3312.4108 12"x 10"Tapping Sleeve&Valve 1 $4,500.00 $4,500.00 52 3312.4114 16"x 12"Tapping Sleeve&Valve 2 $5,500.00 $11,000.00 53 3312.0117 Connection to Existing 4"-12"Water Main 4 $1,000.00 $4,000.00 54 3311.0001 Ductile Iron Water Fittings w/Restraint 1.76 $3,500.00 $6,160.00 55 9999.0008 Concrete Blocking,Type B 2.55 $150.00 $382.50 56 3305.0109 Trench Safety 518 $1.00 $518.00 Total Water Improvements $57,718.50 57 3331.4115 8"Sewer Pie 51 a,:)V.Vvi $2,550.00 58 3331.3302 8"2-way Cleanout 1 $850.001 $850.00 59 3305.0109 Trench Safety 51 $4.00 $204.00 60 3301.0002 Post-CCTV Inspection 51 $5.00 $255.00 Total Sewer Improvements $3,859.00 61 0241.1100 Remove Asphalt Pvmt 550 $6.00 $3,300.00 62 9999.0009 Remove Gravel Drive 866 $4.00 $3,464.00 63 0241.1300 Remove Conc Curb&Gutter 796 $10.00 $7,960.00 64 9999.0010 Remove Ex Median Island 1 $3,500.00 $3,500.00 65 9999.0011 Remove'End of Road Barricade' 88 $5.00 $440.00 66 3217.4301 Remove 4"Pvmt Marking 6,183 $1.00 $6,183.00 67 3217.4303 Remove 8"Pvmt Marking 4,190 $1.25 $5,237.50 68 3217.4306 Remove 24"Pvmt Marking 12 $2.00 $24.00 69 3217.4402 Remove Lane Legend Arrow 2 $100.00 $200.00 70 3217.4404 Remove Lane Legend Only 2 $100.00 $200.00 71 9999.0012 Remove Alum Sign Ground Mount 5 $200.00 $1,000.00 72 0241.3017 Remove 30"Storm Line 68 $20.00 $1,360.00 73 10241.4203 Remove 6'Drop Inlet 1 $1,000.00 $1,000.00 74 10241.4401 Remove Headwall/SET 4 $1,000.001 $4,000.00 Total Misc Improvements $37,868.50 Total Improvements $1,724,375.60