Loading...
HomeMy WebLinkAboutContract 47324 " 'R � � . 9 Developer and Project Information Cover Sheet: Developer Company Name: Centcrgy,West 7`h LP Address, State,Zip Code: 8235 Douglas Avenue Ste 900,Dallas TX 75225 Phone&Email: 214-368-7200,wmiller@centergyretail.com Authorized Signatory,Title: West Miller,Principal Project Name and Brief Left Bank-Traffic Signal Improvements Description: Project Location: Harrold Street betwccn West 7th Street and Dakota St Plat Case Number: Plat Name: <Plat Name> Mapsco: <Mapsco> Council District: 9 City Project Number: 02558 CFA Number: 2015-113 DOE Number: 7439 To be completed by staff Received by: Date: City of Fort Worth,Texas �a � � Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 1 of 11 STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. � " � WHEREAS, Centergy, West Vh L,P., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Left Bank - Traffic Signal Improvements ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 2 of 11 to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractors) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ❑j, Sewer(A-1) E,Paving(B) ❑;, Storm Drain(B-1) El, Street Lights & Signs (C) FA. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s),Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date: 07.30.2015 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits,actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers; agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers,servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City,its officers, agents and employees from and against any and all claims,suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify,and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) - the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. (REMAINDER OF PAGE INTENTIONALLY LEFT BLAND City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 7 of 11 Cost Summary Sheet Project Name: Left Bank-Traffic Signal CFA No.: 2015-113 DOE No.: 7439 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ - 2.Sewer Construction $ - Water and Sewer Construction Total $ - B. TPW Construction 1.Street $ 2.Storm Drain $ - 3.Street Lights Installed by Developer $ - 4. Signals $ 182,818.00 TPW Construction Cost Total $ 182,818.00 Total Construction Cost(excluding the fees): $ 182,818.00 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ - D. Water/Sewer Material Testing Fee(2%) $ Sub-Total for Water Construction Fees $ E. TPW Inspection Fee(4%) $ F. TPW Material Testing(2%) $ G. Street Light Inspsection Cost $ H. Signals Inspection Cost $ 7,312.72 H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 7,312.72 Total Construction Fees: $ 7,312'72 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 182,818.00 Completion Agreement=100%/Holds Plat $ 182,818.00 Cash Escrow Water/Sanitary Sewer=125% $ - Cash Escrow Paving/Storm Drain=125% $ 228,522.50 Letter of Credit=125%w12 r expiration period $ 228,522.50 x City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Centergy,West 7"'LP Jesus J. Chapa Name: West Miller � Assistant City Manager Title: Principal Date: —�— Date: et Recommended by: ATTEST: (Only if required by Developer) Wendy Chi-Babulal, EMBA, P.E. Development Engineering Manager S gnature Water Department Name: t 1 a A�— ro�"PYp��� SAMANTHA NEIMER t J U My Aug st Expires 22 2J igDougl Wi , P.E. Director Transportation&Public Works Department Approved as to Form &Legality: ATTEST: r " 1V F Douglas W. Black J. Kayser Assistant City Attorney City Secretary M&C No. 4 x Date: .,.d�.,... O FIMA City of Fort Worth,TexasN1 CFA Official Release Date: 07 0.2015 ant �F.,r �` �� u'r` „W Page 9 of 11 Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement M Location Map El Exhibit A:Water Improvments ❑', Water Cost Estimate ❑ Exhibit A-1: Sewer Improvements j Sewer Cost Estimate ❑ Exhibit B: Paving Improvements Paving Cost Estimate ❑; Exhibit B-1: Storm Drain Improvements ❑; Storm Drain Cost Estimate FA Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No.02558 None City of Fort Worth,Texas Standard Community Facilities Agreement CFA Official Release Date:07.30.2015 Page 11 of It t�yoE oR 35W 199 z 121 '9 c'r� u, AlRRORT FWY o O R t�E WHITE SETTLEMERT RD J WHITE SETTLEMER RD. EP PROJECT HARRo LOCATION ST W 7TH S ,' w N ST a� 30 �q9 h JO W L NCA TER AVE 3 z p PENN nVANIA VE E l/A THE ST � O i 35W 30 _..- W ROSEDALE ST to ul to Not to Scale TRAFFIC SIGNAL BURY IMPROWENTS 5310 Harvest Hill Road,Suite 100 TO SERVE LEFT BANK VICINITY MAP Dallas,Texas 75230 CENTERGY RETAIL,LLC Tat(972)991-0011 Fax(972)991-0278 8235 Douglas Avenue,Suite 900 TBPE#F-1048 TBPLS It F-10107502 Dallas,Texas 75225 Copyright®2015 Contact-West Miller,214 368.7200(Ofc),214.616.3050(Mbl) DATE.November 2,2015 SCALE:AS SHOWN DRAWN BY.JRN FILE.VICINITY MAP.DWG PROJECT No.0104157-30004 Fb10415T3W04\7thP Harm -Fat4 h\ENGINEERINGICFNIs eft Bank-ltafFic Sgml Imp,o mems\G VKniilyI pdw9m &tli bympatt on Sep23.15151A LEGEND SIGNS jf1IAST OUNT QUANTITY METRO(STREET NAME x BLOCK#) ARM R9-3a;NO PEDESTRIAN CROSSING SYMBOL) GAL POLE W3.3(ADVANCE TRAFFIC CONTROL SIGN) GROUND 1 INSTALL PEDESTRIAN BUTTONS 8 R10-3e SIGN ASSEMBLY UNIT AT POLE:i AT T1-T5 0 50 100 150 200 1"=100' otr pity INSTALL 8" WHITE R38 VAR (180') INSTALL 24" WHITE o STOP BAR (251) INSTALL 24"WHITE STOP BAR(48') D INSTALL 4" INSTALL 24" WHITE � U INSTALL 4" DOUBLE YELLOW DBL YELLOW CROSSWALK TIE0") 111111111 - TIE INTO EXISTING .. s INSTALL 24" WHITE A TIE INTO EXISTING CROSSWALK t INSTALL 8" YELLOW INSTALL B" — A - WHITE--(150') INSTALL 24" WHITE � STOP BAR (48') A ONLY R3.5L plr atr R3.8 VAR BURY TRAFFIC SIGNAL EXHIBIT C-2 IMPROVMENTS TRAFFIC SIGNAL 5310 Harvest Hill Road,Suite 100 TO SERVE LEFT BANK IMPROVEMENTS: Dallas,Texas 75230 CENTERGY RETAIL,LLC T.[.(972)991-0011 Fax(972)991-0278 8235 Douglas Avenue,Suite 900 SIGNING AND TBPE#F-1048 TBPLS#F-10107502 Dallas,Texas 75225 Copyright®2015 Contact-West Miller,214.368.7200(015c),214.616.3060(Mbl) PAVEMENT MARKINGS DATE:September 23,2015 SCALE:AS SHOWN DRAWN BY:GJ FILEExHlelr c-3-rR4FFlC SIGNAL IMPROVEMENTS.Dwc PROJECT No.0104157-30004 Ca\10C151190W415igrwl Dasgn�£.NiWt G3-TreRC apnel lmgowments.dvg modficdby gN^e On Sep 28,1512.53 PM 0 N N � e 0 0 c M M V C W rat O I`ly� O � a F � O N M M S ° � F a z a Z o E x z U x W W ° N � o 3 F". W ¢ w w w w w ¢ w w w w ¢ ¢ w w ¢ ¢ F z � w a a d a F W W O a Q z v U w w W F oo y ¢ O to J a/ Q U U U U Y C 3 C Eu w U U U U R ¢ w 5 a b Q > y ',� z z z c A A A 1 a a o 0 0 0 o O O O O o a a a y m U U U U � In In In Q -1 H F.. W V F W N 0 N N_ � F O O O 5 w F x o ry o W ,y Z F" � ry F F F d z A z .7 E» OR' c�a � O ° o� F W x W z O w Q Z W W W W W W W W W W H z w w a a, Cz7 w w F- F > A s o x o e Cl. F T ? 3 5 E G v -8 45 w x E E E O C Y N C O O O ¢ �' q oa U U U U U �, 3 `2 ,ao �ab c Ln r2 a°i a°i v a v .pp .pp U o 'pp M <'t n a iv ¢� .�, ,�9 w U oN z z O z U �3 Z0 00 O N M b W F 0 N N r ` ON N N N vt N N M N 5 W e- >C ° r, o Q >„ Z F � a Z A Z oa w a ,o Q ° 0 x ° � F W x 5 z O F W w F z o � a d Lz7 b a � � U U w w W9 a F � z h z vi ; z b a° a° P. cu o v pm, v -yap -o via C1 o�J C❑q7 Wpp W y W H F F R S c � � �u �u �o ❑ o o � c ¢ d a o W "r 004243 DAP-WD PROPOSAL Page 1 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Infonnation Bidder's Proposal Bidlist Item Specification Unit of Bid Unit Price No. Bid Value Description Section No. Measure Quantity TRAFFIC SIGNAL IMPROVEMENTS 1 0241.0100 Remove Sidewalk 0241 13 SF 300 $2.00 $600.00 2 2605.0111 Furnish/Install Flee Sery Pedestal 26 05 00 EA 2 $6,500.00 $13,000.00 3 2605.3015 2"CONDT PVC SCH 80(T) 26 05 33 LF 35 $12.00 $420.00 4 2605.3016 2"CONDT PVC SCH 80(B) 26 05 33 LF 104 $15.00 $1,560.00 5 2605.3025 3"CONDT PVC SCH 80(T) 260533 LF 375 $15.00 $5,625.00 6 2605.3026 3"CONDT PVC SCH 80(B) 260533 LF 465 $18.00 $8,370.00 7 3213.0301 4"Cone Sidewalk 32 1320 SF 180 $8.00 $1,440.00 8 3213.0505 Barrier Free Ralnp,Type M-3 32 1320 EA 1 $400.00 $400.00 9 3217.0002 4"SLD Pvmt Marking HAS(1) 32 1723 LF 270 $2.00 $540.00 10 3217.0201 8"SLD Pvmt Marking HAS(W) 32 1723 LF 330 $2.00 $660.00 11 3217.0202 8"SLD Pvmt Marking HAS(1) 32 1723 LF 105 $2.00 $210.00 12 3217.0501 24"SLD Pvmt Marking HAE(W) 32 1723 LF 303 $2.00 $606.00 13 3217.1002 Lane Legend Arrow 32 1723 EA 4 $200.00 $800.00 14 3217.1006 Lane Legend Bike 32 1723 EA 2 $200.00 $400.00 15 3217.4301 Remove 4"Pvmt Marking 32 1723 LF 370 $1.00 $370.00 16 3217.4303 Remove 8"Pvmt Marking 32 1723 LF 130 $1.00 $130.00 17 3217.4402 Remove Lane Legend Arrow 32 1723 EA 3 $150.00 $450.00 18 3217.4404 Remove Lane Legend Only 32 1723 EA 1 $150.00 $150.00 19 3217.4406 Remove Lane Legend Bike 32 1723 EA 2 $150.00 $300.00 20 3441.1001 3-Sect Signal Head Assmbly 3441 10 EA 5 $950.00 $4,750.00 21 3441.1002 4-Sect Signal Head Assmbly 3441 10 EA 1 $1,050.00 $1,050.00 22 3441.1003 5-Sect Signal Head Assmbly 344110 EA 1 $1,250.00 $1,250.00 23 3441.1011 Ped Signal Head Assmbly 3441 10 EA 4 $750.00 $3,000.00 24 3441.1021 2"Ped Push BTN Station W/Sign 3441 ]0 EA 4 $50.00 $200.00 25 3441.1031 Audible Pedestrian Pushbutton Station 34 41 10 EA 4 $1,650.00 $6,600.00 26 3441.1209 Furnish/Install BBU System EXT Mounted 34 4l 10 FA 1 $7,250.00 $7,250.00 27 3441.1221 Furnish/Install Model 712 Preemption Detector 3441 10 EA 3 $1,785.00 $5,355.00 28 3441.1224 Furnish/Install Preemption Cable 3441 10 LF 360 $2.15 $774.00 29 3441.1234 Furnish/Install Radar Cable 3441 10 LF 375 $2.65 $993.75 30 3441.1315 20/C 14 AWG Multi-Conductor Cable 3441 10 LF 385 $6.00 $2,310.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 0042 43 Bid Pmposal_DAP-Trdfic Signal Impmements.xlsx 00 42 43 DAP-BID PROPOSAL Pngc 2 of 2 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist item Specification Unit of Bid No. Description Section No. Measure Quantity Unit Price Bid Value 31 3441.1322 31C 14 A WG Multi-Conductor Cable 3441 10 LF 1110 $2.50 $2,775.00 32 3441.1408 NO 6 Insulated Elec Condr 3441 10 LF 405 $1.50 $607.50 33 3441.1409 NO 8 Insulated Elec Condr 34 41 10 LF 260 $1.25 $325.00 34 3441.1413 NO 6 Bare Elec Condr SLD 3441 10 LF 220 $1.50 $330.00 35 3441.1414 NO 8 Bare Flee Condr 3441 10 LF 360 $1.25 $450.00 36 3441.1503 Ground Box Type D,w/Apron 3441 10 EA 7 $850.00 $5,950.00 37 3441.1606 Install 10'-14'Ped Pole Assmbly 3441 10 EA 2 $1,000.001 $2,000.00 38 13441.1611 Furnish/Install Type 41 Signal Pole 3441 10 EA 1 $2,585.00 $2,585.00 39 3441.1612 Furnish/Install Type 42 Signal Pole 3441 10 EA 1 $3,275.00 $3,275.00 40 3441.1613 Furnish/Install Type 43 Signal Pole 3441 10 EA 1 $3,831.00 $3,831.00 41 3441.1623 Furnish/Install Mast Arm 16'-36' 3441 10 EA 2 $1,830.00 $3,660.00 42 3441.1624 Furnishfinstall Mast Arm 40'-48' 3441 10 EA 1 $2,650.00 $2,650.00 43 3441.1701 TY I Signal Foundation 3441 10 EA 2 $1,050.00 $2,100.00 44 3441.1703 TY 3 Signal Foundation 3441 10 EA 2 $2,850.00 $5,700.00 45 3441.1704 TY 4 Signal Foundation 3441 10 FA 1 $4,200.00 $4,200.00 46 3441.1712 Signal Cabinet/BBU Foundation 3441 10 EA 1 $2,500.00 $2,500.00 47 3441.1724 Install Controller&Cabinet,Ground MNT 3441 10 FA 1 $3,500.001 $3,500.00 48 3441.4005 Install Alum Sign Mast Arm Mount 34 41 30 EA 5 $750.00 $3,750.00 49 3441.4006 Install Alum Sign Ground Mount 34 41 30 EA 2 $450.00 $900.00 50 3441.4007 Install Alum Sign Ex Pole Mount 34 41 30 EA 2 $350.00 $700.00 51 3441.4108 Remove Sign Panel and Post 34 41 30 EA 1 $150.00 $150.00 52 9999.0001 Furnish/Install ATC Cabinet 352i EA 1 $17,175.00 $17,175.00 53 9999.0002 Furnish ATC 2070-1,Dx Controller EA 1 $4,915.75 $4,915.75 54 9999.0003 2-Channel Vector Card EA 2 $4,350.00 $8,700.00 55 9999.0004 Furnish/Install ATB2-TYP2-138W-NW-NL-7PIN EA 2 $1,150.00 $2,300.00 Luminaires or approved equivalent) 56 9999.0005 Provide lteris Vantage Vector Detection System EA 3 $7,575.00 $22,725.00 57 9999.0006 Traffic Control(Subsid Items:6"Chain Link Fence,Temp. 3471 13 MO 1 $5,500.00 $5,500.00 HMAC and Water Filled Barriers TOTAL TRAFFIC SIGNAL IMPROVEMENTS $182,818.00 Bid Summary TRAFFIC SIGNAL IMPROVEMENTS $182,818.00 Total Construction Bid $182,818.00 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 237 ;.calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version April 2,2014 00 42 43_Bid Proposal_DAP-TmtTc Signal Imprevemenlsslss