Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 4928
s ORDINANCE 140. ORDINANCE ACCEPTING IMPROV'DbENTS ON A PORTION OF DERN ROA AND PORTIONS OF SUNDRY OTHER STR-KEETS, AVENUES AND PUBLIC PLACES , p ,�� :RECORD IN THF CITY OF FORT WORTH, TECAS; IL�CLARING THE' COA�'RACT WITH criTsTTnN rnT�TPa�nt FnR THE CONSTHUCTIOF OF SAID ►T Y SECRYIMPROVEMENTS F[TLLY COMPLI-TED AND PERFM MED; DIRECTING THE ISSUAN E ERECUTION AND DELIVERY OF CERTIFICATES IN E'PIDE'NCE OF SPECIAL AS - WORTMMTS LEVIM AFTER GIVING EFFECT TO SUNT MY CREDITS HRI?LPIN AUTHOR . AND ALLOWED AGAINST SOME OF SAID ASSESSMEITS; DIRECTING THE CITY SECR_IMARY TO ENGROSS AND ENROLL THIS OPDI?DANCE BY COPYING THr CAP- TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AND EFFw'CTIVE DATE. WASthe City of Fort Worth, Texas, has heretofore entered into a contract with GLADE CONSTR�TCTION COMPANY for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit: 1. Deen Road: From 28th Street to Terminal Road, known and designated as Unit No. 1. 2, Bigham Boulevard: From Camp Bowie Boulevard to Calmont Avenue known and designated as Unit No. 2. 3. Virginia Place: From Camp Bowie Boulevard to West Fourth Street known and designated as Unit No. 5. 4. McCart Street: From Biddiaon Street to Drew Street, known and designated as Unit No. 6. WHMEAS, by sundry proceedings heretofore passed by the City Council of the City of Port Worth, Teras, including Ordinance No. 4715 a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHMZAS, the City Council of the City of Port Worth, Texas, has, upon re— view, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 4715 , and WHMEAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THMEFORE, BE IT ORDkIN34D BY TFC' CITY COUNCIL OF TIE CITY OF FMT WCHTH, TIUS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with re— ference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro— perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certifi— cates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: When each of the certificates has been duly executed as hereinabove provid- ed, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED A'3D APPROVED TEAS )��.: day of � �, 19. • APPROVED AS TO FORM An, LEGALITY: � l City Attorney UNIT NO. 1 OF 6 SHEET NO. 1 OF ENGINEER'S FINAL ROLLS OR STATEMENT FOR PAVING ON DEEN ROAD: from 28th St. to Terminal Road Apparent Apparent Credits Cost ASSESSMENT RATE PER FRONT FOOT FOR CURB & GUTTER $ 1.74 50145.87 18.711.72 ASSESSMENT RATE PER FRONT FOOT FGR IMPROVEMENTS EXCLUSIVE OF CURB & GUTTER $ —0— —0— —0-- TOTAL Af,',0UNT ASSESSED AGAINST ABUTTING PROPERTY OWNER $ 23,857.59 "0i5-87 18.711.72 TOTAL ESTIMATED AMOUNT OF CITY'S PART 69 ,455.15 TOTAL CONTRACT CQSP- OF IMPROVEMENTS 88166.97 ENGINEERIS FINAL ROIL UNIT NO. 1 OB 6 PAVING ASSESSMENT SHNST NO. 2 07 11 WIDTH PUT UNIT DESCRIPTION: DEEN ROAD: from 28th to Terminal Road CONTRACTOR CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPS 7Y FRONT EXCLUSIVE OF AND OWNERS FE.0 CB. & GUT.PZB GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- .'14 1C�REDI'15 ASSESSMENT AMOUNT' 1 $1. 4 AMOUNT AMOUNT Dlr•73-101 E. F. Crites E 501 of J.M. Moody 150 -0- 261.00 261.00 5' C & G ® 1.74 8.70 252.30 PI 0. Box 7362 is 1,2&3 Block 1 D1-73-102 R. P. Miney 4 1 " 50 -0- 87.00 87.00 None -0- 87.00 ® 3965 Steelton Beaumont, Texas H D1-73-103 R. P. Mincy 5 1 " 50 -O- 87.00 87.00 50' Curb only .54 27.00 60.00 _ • . 3965 Steelton Beaumont, Texas D1-73-104 G. M. Connell 6 1 " 50 -0- 87.00 87.00 None -0- 87.00 P. o. Box 7426 D1-73-105 Oscar Brown 7 1 " 50 -0- 87.00 87.00 None -0- 87.00 2813 Deen Road Dl-73-106 Ben W. Baker S 40' of " 40 -0- 69.00 69.00 None -0- 69.00 3613 Norton Dr. Lot 8,Blk 1 D1-73-107 Diamond Hill Bapt, Lot 9 & " 60 -0- 104.40 104.40 501 Curb & Gutter ® 1.747-87.00 17.40 Church N.101 of 2814 Oscar Lot 8 1 9 ENGINEER'S FINAL ROLL UNIT N0. 1 OF 6 PAVING ASSESSMENT SH1b;T N0.3 o7 11 WIDTH FEET UNIT DESCRIPTION: DEEN R OADt from 28th to Terminal. Road ® CONTRACTOR CONTRACT DATA: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER, CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT N0. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PZE GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- IOO�4 J�7 TS ASSESSMENT AMOUNT AMOUNT AMOUNT D1-73-108 Hill Top Baptist 1 12 J. M. Mood 50 -0- 87.00 87.00 None -0- 87.00 Church 24-U Sansbury D1-73-109 Gladys Jennings Lot 243 & " 125 -0- 217.50 217.50 151 C & G @ 1.74 26.10 1+ 2905 Dean Road S 25t of 351 Curb only @ .54 18.90 Lot 4,Blk 45.00 172.50 D1-73-110 Albin Walker N 25t of Lo " 125 -0- 217.50 217.50 501 C & G @ 1.74 87.00 130.50 2911 Dean Road 4 & all of Lots 5&6 Block 12 D1-73-111 H. L. Winter 1 13 " 50 -0- 87.00 87.00 51 C & G @ 1.74 8.70 78.30 3001 Debn Road D1-73-112 James Edwin Williams 2 13 " 50 -0- 87.00 87.00 501 Curb only @ .54 27.00 60.00 3003 Dean Road D1-73-113 Joe Sewell 3 13 " 50 -0- 87.00 87.00 50t Curb only @ .54 27.00 60.00 3005 Dean Road D1-73-114 Annie Bessie Ramey 4 13 " 50 -0- 87.00 87.00 501 Curb only @ .54 27.00 60.00 3007 Dean Road D1-73-115 H. L. Sudduth 5 13 " 50 -0- 87.00 87.00 501 Curb only @ .54 27.00 60.00 3009 Dean Road ENGINEZR'S FINAL ROLL UNIT NO.1 OF 6 PAVING ASSESSMENT SHEET NO.4 OF ]1 WIDTH FEET UNIT DESCRIPTION: DEEN ROAD: from 28th St. to Terminal Road , CONTRACTOR CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER , • CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P9H GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF 0 9°,% PE.� ASSESSMENT 1 AMOUNT AMOUNT D1-73-116 Charlene Lancaster 6 13 J.M. Moody 50 -0- 87.00 87.00 161 C & G @ 1.74 27.84 59.16 Noel 2412 Chestnut D1-73-3-17 Rae Foster & Dollie 1 24 " 50 -0- 87.00 87.00 501 Curb only @ .54 27.00 60.00 ` Foster • 3051 Deen Road ` D1-73-118 Rebecca J. Davis 2 24 " 50 -0- 87.00 87.00 50' Curb only @ .54 27.00 60.00 3053 Deen Road D1-73-119 A. H. Woods 3&4 24 " 100 -0- 174.00 174.00 None -0- 174.00 7408 College Circle South D1-73-120 W. C. Blevins 5 24 " 50 -0- 87.00 87.00 None -0- 87.00 3061 Deen Road D1--73-121 W. C. Blevino 6 24 " 50 -0- 87.00 87.00 None -0- 87.00 3061 Deen Road D1-73-122 Preston T. Gault 1 25 " 50 -0- 87.00 87.00 None -0- 87.00 3101 Deen Road D1-73-123 Mabel Mitcham 2 25 " 50 -0- 87.00 87.00 None -0- 87.00 • Bridges 3103 Deen Road i F PAVING ASSESSMENT ENGINENR'S FINAL ROLL UNIT 110. 1 OB SH"T NOS OB 11 � a WIDTH PUT UNIT DESCRIPTION% DEEN R OAD: from 28th St. to Terminal Road CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER L CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE Of AND OWNERS FEET CB. & GUT.PEE GUTTER COST AWUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OB $ -0- 1 74 RE 7 TS ASSESSMENT AMOUNT AMOUNT AMOUNT D1.-73-124 James M. Ricker 3 25 J.M. Moody 50 -0- 87.00 87.00 50' Curb only ® .54 27.00 6o•oo 3105 Deen Road D1,73-125 Stephen Edward 4 25 " 50 -A- 87.00 87.00 None -0- 87.00 Williamson 3107 Deen Road Dl-73-126 C. L. Letsinger 5 25 " 50 -0- 87.00 87.00 None -0- 87.00 3111 Deen Road D1-73-127 C. L. Letsinger 6 25 " 50 -0- 87.00 87.00 501 Curb only ® .54 27.0 6o•oo 3111 Deen Road D1-73-128 J. 0. Fritz 12 1 Diamond 60 -0- 104.40 104"0 38: C & G ® 1.74 66.12 38.28 3151 Deen Road Hill D1-73-129 Howard T. Griffin 13 1 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3153 Deen Road Dl-73-130 J. R. Ross -14 1 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3155 DeenRoad D1--73-131 James H. Morris 15 1 Diamond 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3157 Deen Road Hill Highland D1-73-132 Bernie L. Elkins 16 1 " 60 -0- 104.40 104.40 601 C & G a 1.74 104.40 -0- 3159 Dean Road ENGINEERIS FINAL ROLL UNIT NO. 1 OB 6 PAVING ASSESSMENT S HALT NO. 6 OF 11 WIDTH FEET UNIT DESCRIPTION% DEEN ROAD: from 28th St. to Terminal Road r.•uCONTRACTOR CONTRACT DATES August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEW CB. & GUT.PJO GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- jT.T 7 1 7 4 jREV' E•V' ASSESSMENT AMOUNT I' AMOUNT AMOUNT D1-73-133 Lora May Pebworth 17 1 iamond Hill 60 -0- 104.40 104.40 601 C ® G ® 1.74 104.40 -0- 3161 Dean Road Highland D1-73-134 Charles C. Dollar 18 1 " 60 -0- 104.40 104.40 601 C & G 0 1.74 104.40 -0- 3201 Deen Road d • D1,73-135 William C. Souther- 19 1 " 60 -0-- 104.40 104.40 60' C & G ® 1.74 104.40 -0- land ® 3203 Dean Road D1-73-136 Claude L. Hodges 20 1 " 60 -0- 104.40 104.40 60' C & G @ 1.74 104.40 -0- 3205 Doren Road D1-73-137 J. C. Hahn 21 1 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3207 Dean Road D1-73-138 L. C. Reed 22 1 " 60 -0- 104.40 104.40 601 C & G o 1.74 104.40 -0- 3209 Dean Road 1)1-73-139 Humble Oil & Refining Lot 7 & S. Diamond Hill 80 -0- 139.20 139.20 None -0- 139.20 Company 201 of Lot Highland c/o Milton Simon 8, Blk. 4 2nd Filing 2411 Cont'l Life Bldg, D7t73-140 Dave Bloxom Lots 9 thru 538 -0- 936.12 936.12 1201 C & G ® 1.74 208.80 727.32 • 5513 W. Rosedale 17 & N. 401 of Lot 8 Blook 4 PAVING ASSESSMENT ENGINEER13 FINAL ROLL UNIT NO.I OB 6 SHEET N0.7 OF 11 WIDTH FEET UNIT DESCRIPTION: DEEN ROAD: from 28th St. to Terminal Road CONTRACTOR CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FFM CB. & GUT.Pa GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- OOTREDITS ASSESSMENT AMOUNT 1.74 1.74 AMOUNT AMOUNT D1-73-141 United Gas Pipe Line Part of lota Diamond 30 -0- 52.20 52.20 None -0- 52.20 Co. 11&12 4 Hill P.O. Box 1407 Highland Shreveport, La. D1-73-142 Deen Road Baptist Tract 2-0 Gilmore 97 -0- 168.78 168.78 None -0- 168.78 Church Survey, 3327 Deen Road D1--73-143 Maxx Smith Clark Tract 2-B " 348.5 -O- 606.39 606.39 None -0- 606.39 4309 Cedar Springs Dallas, Texas D1-73-W Andy, E. Patterson Tract 2-A " 56 -0- 97.44 97.44 None -0- 97.44 2503 Leming D1-73-145 Milton S. Simon Tract 2 " ].111,.1 -O- 1990.73 1990.73 None -0- 1,9gO.73 2411 Cont'l Life Bldg D1-73-146 James Bogus 12 Sabine P1. 122.18 -0- 212.59 212.59 122.181 C & G @ 1.74 212.59 -0- P. 0. Box 7426 D1--73-147 Ward Lockhart 13 3 " 120 -0- 208.80 208.80 120? C & G ® 1.74 208.80 -0- 2325 N. F. 36th D1-73-148 Emmett L. Cooper 12 3 " 120 -0- 208.80 208.80 120? C & G @ 1.74 208.80 -0- 2324. Neches # ENGINEER'S FINAL ROLL UNIT NO. 1 OF 6 PAVING ASSESSMENT SHEET N0.8 OF 11- WIDTH 1WIDTH FEET UNIT DIESCRIPTION: DEEN ROAD: from 28th St. to Terminal Road CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT,, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO, PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FLET CB. & GUT.P32 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- 1.74 RED IT4S ASSESSMENT AMOUNT 1.7 AMOUNT AMOUNT D1-73-149 F. & M. Realty Co. 7 5 Sabine Place 120 -0- 208.80 208.80 1201 C & G ® 1.74 208.80 -0- c/o T. J. Bettes 1200 W. Leeway D1-73-150 John W. Witt 8 5 " 120 -0- 208.80 208.80 201 Sidelot ® 1.74 34.80 174.00 2328 N. E. 37th D1-73-151 B. B. McCloud 10 7 " 120 -0- 208.80 208.80 20f Sidelot ® 1.74 34.80 174.00 2329 N. E. 37th D1-73-152 Lloyd B. Conditt 11 7 " 120 -0- 208.80 208980 201 Sidelot ® 1.74 34.80 174.00 4545 E. Belknap D1-73-153 Juanita Jewell 12 8 " 120 -0- 208.80 208.80 201 Sidelot @ 1.74 34.80 174.00 F'orsbach 2337 Repper D1-73-154 Julius C. William 13 8 " 120 -0- 208.80 208.80 201 Sidelot ® 1.74 34.80 174.00 344 Brothers D1-73-155 Cecil Crper 14 11 " 120 -0- 208.80 208.80 201 Sidelot ® 1.74 34.80 174.00 2345 Brothers D1-73-156 Edmond R. Warner 15 11 " 120 208.80 208.80 1201 Curb & Gutter ® 1.74-208.80 -0- 2348 Beaumont D1,73-157 Herman S. Hanzlicek 6 34 " 120 -0- 208.80 208.80 1201 C & G ® 1.74 208.80 -0- 2349 Beaumont PAVING ASSESSMENT ENGINEER'S FINAL ROLL UNIT NO. 1 OF 6 SST NO.9 OF 11 WIDTH FEET UNIT DESCRIPTION: DEEN ROAD: from 28th St. to Terminal Road CONTRACTOR CONTRACT DATE: August 279 1962 TYPE OF IMPROVEMENTS RECOAB TRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO, PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PER GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0 REDITS ASSESSMENT AMOUNT 4 I3454 AMOUNT AMOUNT Dl-73-158 H. S. DeSpain 5 34 Sabine P1. 120 -0- 208.80 208.80 1201 C & G @ 1,74 208.80 2352 Jasper D1-73-159 Federal Housing 12 33 " 110.01 -0- 191.57 191.57 110.011 C & G @1 1.74 191,57 -0-- Administration 711 W. 7th D1-73-160 Sabine Baptist Church 13,34,915, " 262.43 -0-- 456.63 456.63 None -0- 456.63 4017 Deen Road 16 & 17 Block 33 D1-73-161 Stauffer Chemical Tract 4-A Baker 680.9 -0-- 1184,77 3184.77 None -0- 1184,77 Company Survey P. 0. Box 1656 D1-73-162 International Mineral Tract 4-A " 1632,1 -0- 2839.85 2839.85 None -0- 2839.85 & Chemical Corp. P. 0, Box 1656 D1-73-163 Stauffer Chemical Co. Tract 12-C Gilmore 1241.5 -0- 2160,21 2160.21 621 C & G 9 1,74 107.88 2052.33 99.Box 1656 Survey D1-73-164 Southwestern Tract 10 " 179 311.46 311.46 181 Curb only @ ,54 9.72 301.74 Petroleum Company P.O. Box 789 D1-73-165 Sterling Holloway Tract 10-A " 770 -0- 1339.80 1339.80 None -0-- 1339.80 Cont'l Life Bldg. s PAVING ASSESSMENT ENGINEER'S FINAL ROLL UNIT NO.1 OF 6 SHEET NO.1007 11 WIDTH PUT UNIT DESCRIPTION: DEEN ROAD: from 28th to Terminal Road CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P10 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- ASSESSMENT AMOUNT i�T74 �1i74 AMOUNT AMOUNT D1-73-166 United Gas Pipe Co. 6 1 1 larren's 50 -0- 87.00 87.00 None -0- 87.00 P.O. Box 1407 Diamond Shreveport, La. Hill DI 73-167 Lester R. Payne Tract 11-1 Gilmore 60 -0- 104.40 104.40 None -0- 104.40 6812 Yolanda Dr. Survey D1-73-168 William L. Rucker Tract 11-B " 50 -0- 87.00 87.00 None -0- 87.00 3216 Deen Rd. D1-73-169 James Oliver Fritz Tract 11-C " 50 -0- 87.00 87.00 None -0- 87.00 3151 Deen Rd. D1-73-170 James Oliver Fritz Tract 11-D " 55 -0- 95.70 95.70 None -0- 95.70 3151 Deen Rd. D1-73-171 Leon P. Toal Tract 11-E " 50 -0- 87.00 87.00 None -0- 87.00 3210 Deen Rd. D1-73-172 Tremarco-Corporation 14 1 Karren's 135 -0-- 234.90 234.90 None -0- 234.90 P.O. Box 2100 Diamond Houston, Texas Hill Dl-73-173 Leon C. Reed 10 3 " -0- 224.1.6 224.46 1001 Curb only ® .54 54.E 2500 Leming 291 Sidelot ® 1.74 , 0.46 104.46 120.00 D1-73-174 Frank D. Harston 11 3 " -0- 217.50 217.50 251 Sidelot ® 1.74 43.50 174.00 2501 Vera Cruz D1-73-175 Robert F. Olufs 10 1) -0- 217.50 217.50 25' Sidelot 0 1.74 43.50 174.00 2500 Vera Cruz ENGINEERIS FINAL ROLL UNIT N0. 1 OF 6 PAVING ASSESSMENT SHAT N03107 11 WIDTH PUT UNIT DESCRIPTION: DEEN ROAD: from 28th St. to Terminal Road CONTRACTOR CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT N0. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.Pj0 GUTTER COST AWUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- OOTCREDITS ASSESSMENT AMOUNT 1.74 $ 1.74 AMOUNT AMOUNT D1-73-176 Nettie Morgan 11 4 Karrents 125 -0- 217.50 217.50 25t Sidelot @ 1.74 43.50 174.00 501 N.E. 31st Diamond Hill D1-73-177 Ira L. Clark 10 5 " 125 -0- 217.50 217.50 25' Sidelot @ 1.74 43.50 174.00 500 N. E. 31st f D1-73-178 Henry B. Powell 11 5 217.50 217.50 251 Sidelot @ 1.74 43.50 174.00 830 Shelby Drive D1t73-179 Texas Electric Serv.0 . Tract ]-/+-1 522.00 522.00 3001 C & G Q 1.74 522.00 -0- Electric Bldg. D1-73-180 Texas Electric Serv.Cc Tract 12-C 120 -0-- 208.00 208.80 1201 C & G @ 1.74 208.80 -0- Electric Bldg. Karrents D1-73-181 Herman D. Eaton H 7 3rd Filing .; 200.10 200.10 151 Sidelot @ 1.74 26.10 501 Dewey 8t Curb only @ .54 4.32 30.42 169.68 Dl-73-182 Diamond Hill Church W 1501 of Lct " 145.5 253.17 253.17 145.51 C & G @ 1.74 253.17 -0- f Christ.2916 Deen Rd 2 Blk 8 D1t73-183 Barney Holland Oil Co Tract 13 Gilmore 785.3 -0- 1366.42 1366.42 None -0- 1366.42 809 N. Main Survey OTAIS 13,711.52 -0- # 23,857.5 3,857.59 $ 5,14.5.87 $18,711.72 UNIT NO. 2 OF 6 SHEET NO. 1 OF 8 ENGINEER'S FINAL ROLLS OR STATEMENT FOR PAVING ON BIGHAM BLVD. FROM CAMP' BOWIE TO CALMONT C`re� dits -Coatent ASSESSMENT RATE PER FRONT FOOT FOR CURB & GUTTER $ 1.74 9♦067_11 2-61©_21 ASSESSMENT RATE PER FRONT FOOT FOR IMPROVEMENTS EXCLUSIVE OF CURB & GUTTER $ -0- -0- -0- TOTAL AMOUNT ASSESSED AGAINST ABUTTING PROPERTY OWNER $ 11,677.32 9806 ,,11 210610_21 TOTAL ESTIMATED AMOUNT OF CITY'S PART 19-03Ar_61 TOTAL CONTRACT COST OF IMPROVEMENTS 210795-82 _ PAVING ASSESSMENT �GINEERIS FINAL ROLL UNIT N0, 2 OF 6 SHUT'T NO. 2 OF 8 WIDTH FEET UNIT DESCRIPTION: BIGHAM BLVD. FROM CAMP BOWIE TO CALMONT CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PZH GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PERLIN. BEFORE OF $ -0- 1T74 1D74 ASSESSMENTAMOUNT AMOUNT AMOUNT B2-73-101 Raymond Nichols & -R 1 Z Boaz 216,5 -0- 376.71 376.71 None -0- 3 6.71 David Benson Country Place 6502 Cale Bowie B2-73-102 V. C. Davey 1-AR 1 " 125 217.50 217.50 1001 Curb only ® .54 54.00 3300 Bigham 25t Sidelot 0 1.74 43.50 97.5© 220.00 B2-73-103 Minor Wallace 8 19 " 100 - 174.00 174.00 1001 Curb only 9 .54 54.00 in.00 3260 Bighain B2-73-104 T. H. Daniel F 19 " 100 -0- 174.00 174.00 100' Curb only ® .54 54.00 120.00 3248 Bigham B2-73-105 William McCoy Cherry 6-B 19 50 -0- 87.00 87.00 501 Curb only @ .54 27.00 60.00 3244, Bigham B2-73-106 J. W. Joyce 6-A 19 190 -0- 87.00 87.00 501 Curb only ® .54 27.00 60.00 3240 Bigham B2-73-107 Loyd McFalls 5-C 19 " 1 - 174.00 174.00 100t Curb ono ® .54 54.00 X0.00 3232 Bigham. B2-73-108 W. H. Arnold 4-C 19 " 50 87,00 87.00 501 Curb only ® .54 27.00 60,00 3228 Bigham • B2-73-109 Elvin L. Anderson ,4,-D 19 " 50 87.00 87.00 50t Curb only @ .54 27.00 60.00 3224 Bigham B2-73-110 Elvin L. Anderson 3-C 19 " 100 174.00 174.00 None -0- 3224 Bighan EdGINEERIS FINAL ROLL UNIT NO.2 OB 6 PAYING ASSESSMENT SH2ST NO. 3 07 S WIDTH FEET UNIT DESCRIPTION: BIGHAM BLVD. FROM CAIS' BOWIE TO CALMONT CONTRACTOR CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER ® CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATS PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMFROYEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PZS GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF A 4 JR 1D TS ASSESSMENT MOUNT AMOUNT AMOUNT B2-73-111 E. J. Gouldy & 2-D 19 Z Boaz 50 -0- 87.00 87.00 501 Curb only ® .54 27.00 60.00 C. E. Joyce Country Pla e 3212 Bigham B2-73-112 Hershel G. Srygley 2-0 19 " 50 -0- 87.00 87.00 501 Curb only ® .54 27.00 b0.00 3208 Bigham t B2-73-U3 Ted Gouley 1-C 19 " 110 -0- 191.40 191.40 101 Curb & Gutter ® l.74r17.40 3200 Bigg 101 Sidelot ® 1.74 17.40 34.80 156.60 B2-73-114 Ft, Worth Indepen- 1 thru " 800 -0- 4392.00 1,392.00 8001 Curb & Gutter 9 dent School District 8 20 1.74 1,392.00 -�- 3210 W. Lancaster B2-73-115 Ft. Worth Indepen- 1 thru " S00 -0- 4392.00 1,392.00 8001 Curb & Gutter 9, dent School District 8 21 1.74 1,392.E -�- 3210 W. Lancaster B2-73-116 Texas Water Co. E. 1001 Myrtle B. 100 -0- 174.00 174.00 None -0- 174.00 2806 Race St. of Lot 1 Andrews Sub Block 1 B2-73-117 L. A. Smith 2-0 & 1 " 100 -0- 174.00 174..00 None -0- 174.00 6/,28 Garland 2-D B2-73-118 John B. Barber 3-E 1 " 100 -0- 174.00 374.00 161 C & G t 1.74 27.84 4120 Curzon 841 Curb only 0 .54 45.36 73.20 100.80 ENGINEER'S FINAL ROLL UNIT NO. 2 OF 6 PAVING ASSESSMENT SMUT NO. 4 OF B WIDTH FEET UNIT DIESCRIPTION: BIGHAM BLVD. FROM CAMP BOWIE TO CALMONT CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT 90. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P16 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- OOT REDITS ASSESSMENT AMOUNT 1 1.74 1.74 AMOUNT AMOUNT B2-73-119 Texas Water Co. S. 551 Myrtle B. 55 -0- 95.70 95.70 None -0- 95.70 2806 Race f Lot 4 Andrews Block 1 B2-73-120 Ben W. Welch 4-B 1 " 60 -0- 104.40 104.40 None -0- 104.40 1905 Dakar Rd. E. B2-73-121 C. G. Russell J 1 " 120 -0- 208.80 208.80 100' Curb only ® .54 54.00 6501 Malvey 201 Sidelot ® 1.74 24.80 88.80 120.00 B2-73-12.2 Rosa Parsons E 1 " 125 -0- 217.50 217,50 1001 Curb only @ .54 54.00 6502 Malvey 251 Sidelot @ 1.74 43.50 97.50 120.00 B2-73-123 G. M. Bigham 8-D 1 " 100 -0- 174.00 174.00 None -0- 174.00 3105 Stadium B2-73-124 Willard T. Bartlett 15 4 " 125 -0- 217.50 217.50 1251 C & G @ 1.74 217.50 -0- 6457 Calmont B2-73-125 Cecil Gill 14 4 Ridglea 110.4 -0- 192.10 192.10 110.41 C & G Q 1.74 192.10 -0- 6452 Malvey North B2-73-126 Joseph B. Collins 16 5 " 120.2 -0- 209.15 209.15 120.21 C & G 9 1.74 209.15 -0-- 6457 Malvey B2-73-127 Mrs. Ola Myers 15 5 " 120 -0- 208.80 208.80 3201 C & G 9 1.74 208.80 -0- 6456 Darwood Ave. PAYING ASSESSMENT ENGINEER'S FINAL ROLL UNIT N0. 2 OF 6 SHUT NO. 5 Op 8 WIDTH FEET UNIT DESCRIPTION: BIGHAM BLVD. FROM CAMP BOWIE TO CALMONT CONTRACTOR CONTRACT DATA: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.Pa GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- OOTRE I TS ASSESSMENT AMOUNT 1.74 AMOUNT AMOUNT B2-73-128 Robert M. Crumbie 17 12 Ridglea 110.4 -0- 192.10 192.10 110.41 C & G ® 1.74 192.10 -0- 3715 Camp Bowie North B2-73-1.29 Johnnie Parrett 16 12 " 115 -0- 200.10 200.10 115' C & G @ 1.74 200.10 -0- 6460 Locke B2-73-130 Mrs. Augusta Corley 1 23 " 120 -0- 208.80 208.80 1201 C & G 0 1.74 208.80 -0- Gill 6457 Locke B2-73-131 J. H. Morrill 20 23 " 95 -0- 165.30 165.30 951 C & G Q 1.74 165.30 -0- 3005 Bigham B2-73-132 Riley Gill 19 23 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3009 Bigham B2-73-133 Robert C. Cleeve 18 23 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 301.3 Bigham B2-73-134 A. J. Poplin 17 23 60 -0- 104.40 104.40 601 C & G @ 1.74 104.40 -0- 3017 Bigham B2-73-135 James L. Shanahan 16 23 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3021 Bigham ' B2-73-136 James L. Shanahan 15 23 " 60 -0- 1401+0 104.40 601 C & G 8, 1.74 104.40 -0- 3021 Bigham ENGINEER'S FINAL ROLL UNIT NO.2 OF 6 PAVING ASSESSMENT SHEET NO.6 OF $ WIDTH FEET UNIT DESCRIPTION: BIGHAM BLVD. FROM CAMP BOWIE TO CALMONT CONTRACTOR CONTRACT DATA: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT,PZ1 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF ASSESSMENT AMOUNT AMOUNT 1•�4 1 1 71+ AMOUNT AMOUNT B2-73-137 Edgar R. Rheaume 14 23 Ridglea 60 -0- 104.40 104.40 60' C & G 0 1.74 1©4.4© -0- 3029 Bigham North 82-73-138 John K. Kimbro 13 23 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -°0- 3033 Bigham B2-73-139 Harold Raines Jameso2 12 23 " 97.4 -0- 169.0 169.45 97./.1 C & G ® 1.74 169.48 -0- 6464 Curzon B2-73-140 Joe E. Kuykendall 30 23- " 46 -0- 80.0/,. 80.04 461 C & G ® 1.74 80.04 -0- 6457 Curzon B2-73-141 J. M. McManus, Jr. 29 23-h 60 -0- 104.40 104.40 601 C & B ® 1.74 104.40 -0- 3105 Bigham B2-73-142 Jack Smith 28 23-k 60 -0- 104.40 104.1,0 601 C & G ® 1.74 104.40 -0- 3109 Bigham B2-73-143 Eugene Creeoh 27 23 " 60 -0- 104.40 104.40 601 C & G 0 1.74 104.40 -0- 3113 Bighan B2-73- Harry Maazze 26 23 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3117 Bigham B2-73-145 John W. Burt 25 23 " 60 -0- 104.40 104.40 601 C & G 0 1.74 104.40 -0- 3121 Bigham B2-73-146 Edward Rex Collins- 24 23 " 60 -0- 104.40 104.40 60' C & G ® 1.74 104.40 -0- worth 3125 Bigham ENGINEBR'S FINAL ROLL UNIT NO. 2 OB 6 PAVING ASSESSMENT SHEET NO. 707 8 WIDTH FEET UNIT DESCRIPTION: BIGHAM BLVD. FROM CAMP BOWIE TO CALMONT CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB. & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P12 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ $$per ASSESSMENT AMOUNT $ 1.74 .745 AMOUNT AMOUNT B2-73-147 T. R. Boley 23 23 Ridglea 60 -0- 104.40 104.40 60' C & G 0 1.74 104.40 -0- 3129 Bigham North B2-73-148 Floyd E. Wilson 22 23 " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -r0- 3133 Bigham B2-73-149 Oliver Le Watson 21 23 ° 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3137 Bigham B2-73=15C Jessie A. Thayer 20 23 " 60 -0- 104.40 104.40 601 C & G 0 1.74 104.40 -0- 3141 Bigham B2-73-151 Joseph Ce Howard 19 23-A " 60 -0- 104.40 104.40 601 C & G ® 1.74 104.40 -0- 3149 Bigham B2-73-1512 Joseph C. Howard 18 23-A " 60 -0- 104.40 704.40 601 C & G @ 1.74 104.40 -0- 311+9 Bigham B2-73-15 Edwin We Bedford 17 23-A " 75 -0- 130.50 130.50 751 C & G ® 1.74 130.50 -0- 6464 Garland B2-73-15 William T. Hall 10 28-A " 75 -0- 130.50 130.50 751 C & G 0 1.74 130.50 -0- 6471 Garland 82-73-15 Marvin P. Hughes 9 28-4 " 65 -0- 113.10 713.10 651 C & G 0 1.74 113.10 -0- 3209 Bigham 10GINEER'S FINAL ROLL UNIT NO. 2 07 6 PAVING ASSESSMENT SHEET NO 0 07 8 WIDTH D'E'FT UNIT DESCRIPTION: BIGHAM BLVD. FROM CAMP BOWIE TO CALMONT CONTRACTOR CONTRACT DATE; TYP& OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PXB GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- OOT 4 C��ITS ASSESSMENT AMOUNT 1.74 $ 74 AMOUNT AMOUNT B2-73-156 William S. Griffin 8 28-A Ridglea 80 -0- 139.20 139.20 801 Curb & Gutter @ 1.74=139.20 -0- 3313 Bigham North B2-73-157 Kenneth Ambrose 7 28-A " 11+2.2 -0- 247.43 247.43 142.2 C & G @ 1.74 247.43 -0- Hardee, 2068 Harold Salina, Kansas B2-73-158 Douglas Benson Kelty 10 33-A " 165 -•0- 287.10 287.10 165' C & G @ 1.74 287.10 -0- 3221 Bigham B2-73-159 Don C. Cherry 9 33-A " 152.8 -0- 265.87 265.87 152.8 C & G @ 1.74 265.87 -0- 6482 Greenway Rd. B2-73-160 May Hittson 12 33 " 95 -0- 165.30 165.30 95' C & G @ 1.74 165.30 3301 Bigham B2-73-161 Wilber Vinton Brad- 11 33 " 146.3 -0- 254.56 254.56 146.3' C & G @ 1.74 254.56 -0- shaw, 6490 Camp Bowi TOTALS 6,711.,1 up677.32 ,677.32 9,067.11 2,610.21 UNIT NO. 5 OF 6 SHEET NO. 1 OF 2 ENGINEER'S FINAL ROLLS OR STATEMENT FOR PAVING ON VIRGINIA PLACE: from Camp Bowie Blvd. to 4th Street Apparent Apparent Credits Cost ASSESSMENT RATE PER FRONT FOOT FOR CURB & GUTTER $ 1.74 6i191�$E�_ 10927.52_ ASSESSMENT RATE PER FRONT FOOT FOR IMPROVEMENTS EXCLUSIVE OF CURB & GUTTER $ —0— TOTAL AMOUNT ASSESSED AGAINST ABUTTING PROPERTY OWNER $ 10p019.38 '. 1821-52 TOTAL ESTIMATED AMOUNT OF CITY'S PART i st nra_ti� TOTAL CONTRACT COST OF IMPROVEMENTS 21^90.1.17 PAVING ASSESSMENT :ffGINEER'S FINAL ROLL UNIT NO. 5 OF 6 SHE9T NO.2 OF 9 WIDTH FEET UNIT DESCRIPTION. VIRGINIA PLACE: From Camp Bowie Blvd. to 4th St. CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT ATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT MCCLUSIVE OF AND OWNERS PEST CB. & GUT.P10 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- X174 X174 ASSESSMENT AMOUNT . • AMOUNT AMOUNT V5-73-101 Lula V. Chaddock 21 3 Bunting 43.3 -0- 75.34 75.34 43.31 C & G @ 1.74 75.34 -0- 3545 Winifred Dr. V5-73-102 G. G. Bass, Jr. 20 3 " 50 -0- 57.00 87.00 501 C & G @ 1.74 87.00 -0- 1424 Virginia Place V5-73-103 George H. Jones 19 3 " 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 3420 Virginia Place ° V5-73-104 0. F. Clark 18 3 " 50 -0- 87.00 87.00 50t C & G @ 1.74 87.00 -0- 1416 Virginia Place V5-73-105 Mrs. Lenora Johnson 17 3 " 50 -0- 87.00 87.00 50t C & G @ 1.74 87.00 -0- 706 Dan Waggoner Bldg V5-73-106 Fannie Grizzell 16 3 " 50 -0- 87.00 87.00 50t C & G @ 1.74 87.00 Buckner 1401 Virginia Place V5-73.-107 Isabelle Appling 15 3 " 50 -0- 87.00 87.00 50t C & G 0 1.74 87.00 1401 Virginia Place Y5-73-108 Y. Be Yates 14 3 " 50 -0- 87.00 87.00 50+ C & G @ 1.74 87.00 - 1400 -Virginia Place V5-73-109 M. L. Burton " 50 -0- 87.00 87.00 50t C & G @ 1.74 87.00 1324 Virginia Place ENGINEERIS FINAL ROLL UNIT NO. 5 OF 6 PAVING ASSESSMENT SST NO.3 OF 9 WIDTH FEET UNIT DESCRIPTION: VIRGINIA PLACE: from Camp Bowie to I+th Place CONTRACTOR CONTRACT DATA: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT N0. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P10 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- O�T REDITS ASSESSME AMOUNT 1.74 NT 1.74 AMOUNT AMOUNT V5-73-110 M. D. Waller 12 3 BuntinT 50 -0- 87.00 87.00 50t C & G @ 1.74 87.00 -0- 1320 Virginia Place V5-73-7.71 W. W. Craig 11 3 it 50 -0- 87.00 87.00 50t C & G ® 1.74 87.00 -0- 1316 Virginia Place V5-73-112 Mary Lee Poindexter 10 3 ' 50 -0- 87.00 87.00 50t C & G ® 1.74 87,00 -0- 1312 Virginia Place 195-73-113 Katherine Tighe 9 & S " 66 2/3 -0- 115.99 115.99 66 2/3' C & G ® 1.74 115.99 -0- 1308 Virginia Place 16 2/3' of 8 Blk, 3 V5-73-114 Louis G. James S 331 of " 66 2/3 -0- 115.99 115.99 66 2/3t C & G @ 1.74 115.99 -0- 301 Hgrwood Lot 7 & N. Dallas, Texas 33f of Lot B,Blk 3 V5-73-115 Cleda Marie Winn 5.43.1 of " 60.17 101+,70 104,70 60.171 C & G @ 1.71+ 104.70 -0- 1222 Virginia Place Lot 6 & N. 16 2/3 of Lot 7,Blk 3 V5-73-116 Virgil H. Scrogga 5 & S.* of " 82.17 -0- 31+2.94 71+2.98 82.171 C & G ® 1.74 142.98 -0- 1216 Virginia Place Lot 4 & N. 6 2/3' of Lot 6,Blk 3 ENGINEERI3FIN�' ROLL UNIT NO. 5 OF 6 PAVING ASSESSMENT SHEST NO.4 OF 9 WIDTH FEET UNIT DESCRIPTION; VIRGINIA PLACE: from Camp Bowie to 4th Place CONTRACTOR CONTRACT DATES TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER A CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT N0. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVA OF AND OWNERS FEET CB. & GUT.PXR GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF a i(iT REiI ASSESSMENT AMOUNT • AMOUNT AMOUNT V5-73-117 Henry J. Greve of Lot 3 Bunting 87.5 -0- 152.25 152.25 87.51 C & G @ 1.74 152.25 -0- 1210 Virginia Place & N. 37--t o Lot 4,Blk 3 V5-73-118 Cora Daggett JenningE S.351 of " 60 -0- 104.40 104.40 601 C & G 0 le74 104.40 -0- 1204 Virginia Place Lot 2 & N. 251 of Lot Block 3 V5-73-119 R. H. King Estate 1 & N. 151 " 65 113.10 113.10 651 C & G @ 1.74 113.10 -0- 1200 Virginia Place of Lot 2, Block 3 V5-73-120 L. L. McCombs 34 11 Kart 150 261.00 261.00 1001 Curb only @ .54 54.00 4000 Clarke 501 Sidelot @ 1.74 87.00 141.00 120.00 V5-73-121 Leyton G. Gambill 13 11 " 135234.90 234.90 161 C & G @ 1.74 27.84 4001 Bunting 841 Curb only @ .54 45.36 351 Sidelot @ 1.74 60.90 134.10 100.80 V5-73-122 Andrew Scott Thomson E 151 of 130 226.20 226.20 301 Sidelot @ 1.74 52.20 174.00 Estate L.i4 8 4000 Bunting V5-73-123 A. E. Dines 13 8 120 208.80 208.80 201 Sidelot @ 1.74 34.80 1000 Virginia Place 111 C & G @ 1.74 19.14 891 Curb only @ .54 A:8ao6 _ 102.00 106.80 ENGINEER'S FINAL ROLL UNIT N0. 5 OB 6 PAVING ASSESSMENT SHUT NO. 5 OF 9 WIDTH FEET UNIT DESCRIPTION: VIRGINIA PLACE: from Camp Bowie to 4th Place CONTRACTOR CONTRACT DATES TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER • CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PXB GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF ASSESSMENT AMOUNT 11't4 .74 AMOUNT AMOUNT V5-73-124 S. A. Beall 14 5 McCart 130 -0- 226.20 226.20 61 C & G ® 1.74 10.44 4000 Mattison 30t Sidelot ® 1.74 52.20 62.64 163.56 V573-125 W. Neblett Brown 13 5 " 120 -0- 208.80 208.80 100' Curb only ® .54 54.00 4001 Modlin 20 t Sidelot ® 1.74 34.80 88.80 120.00 V5-73-126 J. 0. Jordan 14 2 " 130 -0- 226.20 226.20 1001 Curb only ® .54 54.00 4000 Modlin 301 Sidelot ® 1.74 52.20 106.20 120.00 V5-73-127 L. P. Hightower 13 2 " 128 -0- 222.72 222.72 100' Curb only @ .54 54.00 4001 W. 7th 281 Sidelot ® 1.74 48.72 102.72 120.00 V5-73-128 Charles D. Brown 8 18 Trinity 135 -0- 234.90 234.90 351 Sidelot ® 1.74 60.90 174.00 620 Chicago Heights V5-73-129 Haley A. Rowley 9 18 " 135 -0- 234.90 234.90 351 Sidelot ® 1.74 60.90 174.00 4001 W. 6th V5-73-130 J. B. Jaynes, Jr. 7 7 Country 135 -0- 234.90 234.90 351 Sidelot ® 1.74 60.90 174.00 4000 W. 6th Club Hts. V5-73-131 Corda Mae Cunningham8 7 " 135 -0- 234.90 234.90 351 Sidelot @ 1.74 60.90 174.00 4001 W. 5th V5-73-132 Mrs. Evan M. Mayo 7 6 " 118 -0- 205.32 205.32 loot Curb only ® .54 54.00 2309 Western 181 Sidelot ® 1.74 31.32 85.32 120.00 V5-73-133 M. R. Johnson Estate 5 ,11 Monticello 125 -0- 217.50 217.50 1001 Curb only ® .54 54.40 1201 4th 25t Sidelot 9 1.74 43.50 Rosdburg, Texas 97.50 120.00 j1GINEERI S FINAL ROLL UNIT NO. 5 OB 6 PAVING ASSESSMENT SHEET NO. 6 OF 9 WIDTH 7ZET UNIT DESCRIPTION: VIRGINIA PLACEt from Camp Bowie to 4th Place CONTRACTOR CONTRACT DATE% TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMKZNTRATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.Pj2 GUTTER COST ADJUSTMENT CREDITS AMOUNT.' FRONT FOOT PER LIN. BEFORE OF $ -0-. OOTREDITS ASSESSMENT AMOUNT 1.74 1,74 AMOUNT AMOUNT V5-73-134 0. B. Ring 1 10 Monticello 125 -0- 217.50 217.50 1001 Curb only @ .54 54.00 2230 Warner Rd, 25t Sidelot @ 1.74 43.50 97.50 120,00 V5-73-135 Ruth A. Worford 1 5 Country 118 -0- 205,32 205.32 181 Sidelot @ 1.74 31.32 174.00 3928 W. 5th Club Hts. V5-73-136 MTs. N. L. Clark 16 8 " 135 -0- 234.90 234.90 35t Sidelot @ 1.74 60.90 174.00 3929 W. 5th V5-73-137 E. Homer Boyer 1 8 " 135 -0- 234.90 234.90 35t Sidelot @ 1.74 60,90 174.00 3930 W. 6th V5-73-138 Walter W. Ward 16 17 Trinity 135 -0- 234.90 234.90 35t Sidelot @ 1,74 60,90 174.00 3929 W. 6th Hts. V5-73-139 E. C. Hayes 1 17 Country 135 -0- 234.90 234.90 1001 Curb only @ ,54 54.00 3930 W, 7th Club Hts. 351 Side Lot @ 1.74 60.90 714.90 120,00 V5-73-140 W. G. Marlar 1 1 McCart 122.8 -0- 213,67 213.67 122.81 C & G 0 1.74 213.67 -0- P.O. Box 885 Lubbock, Texas V5-73-141 William S. Loughry 18 1 " 150 -0- 261.00 261.00 loot Curb only @ .54 54.00 3932 Modlin 501 Sidelot @ 1.74 87,00 7.41.04 ENGINEER'S FINAL ROIL UNIT NO. 5 OF 6 PAVING ASSESSMENT SHEET NO.7 OF 9 WIDTH FEET UNIT DESCRIPTION: VIRGINIA PLACES from Camp Bowie to 4th Place CONTRACTOR CONTRACT DATES TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT N0. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PER GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF OOT ¢REDITS ASSESSMENT AMOUNT 1.74 $ 1.74 AMOUNT AMOUNT V5-73-142 Herbert A. Thaxton 1 6 MhCart 120 -0- 208.80 208,80 1001 Curb only @ .54 54.00 3931 Modlin 201 Sidelot @ 1.74o 88.80 120.00 V5-73-143 E. W. Kiene 18 6 " 130 -0- 226.20 226.20 1001 Curb only @ .54 54.00 3932 Mattison 301 Sidelot @ 1.74 52.20 106.20 120.00 V5-73-144 Allen Hatley 1 7 " 120 -0- 208.80 208.80 61 Curb & Gutter @ 1.74-10.44 3933 Mattison 201 Sidelot @ 1.74 45.24 163.56 V5-73-145 A. Scott Thomson 18 7 " 130 -0- 226.20 226.20 301 Sidelot @ 1.74 52.20 174.00 Estate 4000 Bunting V5-73-146 R. C. Bright 1 12 " 135 -0- 234.90 234.90 61 C & G @ 1.74 10,44 3933 Bunting 941 Curb only @ .54 50,76 35' Sidelot @ 1.74 60.90 122.10 112.80 V5-73-147 Winn® Gates Jenkins 18 12 " 150 -0- 261.00 261,00 501 Sidelot @ 1.74 87.00 3932 Clark 1001 Curb only @ .54 54.00 141.00 120.00 V5-73-148 B111 B. Willis 38 2 Bunting 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 • 0. 609 N. Bailey V5-73-149 Lee Cornelieua 37 2 " 50 -0- 87.00 87.00 501 C & G 0 1.74 87.00 -0-- 1205 Virginia ENGINEPR'S FINAL ROLL UNIT N0. 5 OB 6 PAVING ASSESSMENT SHEET NO.8 OF 9 WIDTH PEET UNIT DESCRIPTION: VIRGINIA PLACES from Camp Bowie Blvd. to 4th St, CONTRACTOR CONTRACT DATE: TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PEH GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF -0- 9!74 jPT*T ASSESSMENT AMOUNT AMOUNT 7 AMOUNT AMOUNT V5-73-150 Joe F. Orr 36 2 Bunting 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1209 Virginia Place V5-73-151 Earl L. Phillips 35 2 " 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1213 Virginia Place •V5-73-152 W. T. Runyon 34 2 " 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1217 Virginia Place V5-73-153 Odell C. Atwood 33 2 " 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1221 Virginia Place V5-73-151+ Steve D. Ford 32 2 " 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1301 Virginia Place V5-73-155 Alson E. Peck 31 2 " 50 --0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1305 Virginia Place V5-73-156 Richard A. Earl 30 & N " 75 -0- 130.50 130.50 751 C & G @ 1.74 130.50 1311 Virginia Place of 29 2 V5-73-157 Willis F. Lee 28 & S j " 75 -0- 130.50 130.50 751 C & G @ 1.74 130.50 1317 Virginia Place of 29 2 V5-73-158 Gertrude M. Orgain 27 2 " 50 -0- 87.00 87.00 501 C & G @ 1.74 87.00 -0- 1321 Virginia Place ENGINEER'S FINAL ROLL UNIT N0. 5 OF 6 PAGING ASSESSMENT SHUT NO. 9 OF 9 WIDTH FEET UNIT DESCRIPTION: VIRGINIA PLACE: from Camp Bowie Blvd. to 4th St. CONTRACTOR CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT, DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO., PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PXR GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ -0- $Opq+ IREDITS ASSESSMENT AMOUNT $$ 4 1.74 AMOUNT AMOUNT V5-73-159 E. A. Belden 26 2 Bunting 50 -0- 87.00 87.00 50' C & G ® 1.74 87.00 -0- 1325 Virginia Plac$ V5-73-160 Mrs. J. A. Whitley 25 2 " 50 -0- 87.00 87.00 50' C & G @ 1.74 87.00 -0- 1401 Virginia Place V5-73-161 John H. Wright 24 2 " 50 -0- 87.00 87.00 50' C & G @ 1.74 87.00 -0- 3640 Potomac ` V6-73-162 Milton J. Nix 23 2 " 50 -0- 87.00 87.00 50' C & G ® 1.74 87.00 -0- 1409 Virginia Place V5-73-163 E. E. Ravey 22 2 " 50 -0- 87.00 87.00 50' C & G @ 1.74 87.00 -0- 1413 Virginia Place V5-73-164 Ila Tippit 21 2 " 50 -0- 87.00 87.00 50' C & G ® 1.74 87.00 -0- 11+17 Virginia Place V5-73-165 John 0. Tucker Jr. 19&.20 2 " 110 -0- 191.40 191.40 110' C & G ® 1.74 191.40 -0- F TOTALS 59758.26 $ -0- 10P019.38 $10,019.3 6..191.86 $39827.52 UNIT NO. 6 OF 6 I SHEET NO. 1 OF 8 ENGINEER'S FINAL ROLLS OR STATEMENT FOR PAVING ON MC CART STREET FROM BIDDISON TO EBIV FINAL FINAL, Credits Cost +. , ASSESSMENT RATE PER FRONT FOOT FOR CURB & GUTTER $ 1.74 4.704*60 4.74g.sg ASSESSMENT RATE PER FRONT FOOT FOR IMPROVEhAENTS EXCLUSIVE OF CURB $ GUTTER $ 0.00 0600 0.00 TOTAL MOUNT ASSESSED AGAINST ABUTTING PROPERTY OWNER $ 9,453.42 4.704,,,6o 4.74g.s? TOTAL ESTIMATED AMOUNT OF CITY'S PART 240864.51 TOTAL CONTRACT COST OF IMPROVEMENTS 229613.33 ENGINEER'S FINAL ROLL UNIT N0.6 OF 6 PAVING ASSESSMENT SH"T NO.2 OF S WIDTH FILET UNIT DESCRIPTION: MC CART' STREET FROM BIDDISON TO DREW CONTRACTOR GLADE CONSTRUCTION CO. CONTRACT DATEi Augast 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT ATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PER GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ IPOOT , CREDITS ASSESSMENT AMOUNT 1• AMOUNT AMOUNT 6-73-101 alpeau Scoggin 35 Homeland 50 0 7.00 7.00 NONE 87.00 929 McCart :16-73-102 .L. Miller 10 35 ++ 50 0 57.00 87.00 " 97.00 921 McCart 6-73-103 B.G. Miller 1 & 12 35 " 100 0 174.00 174.00 " 17+.00 3021 McCart -16-73-101+ lerry T. Subbs 13 35 " 50 0 87.00 87.00 " 87.00 01 W. Gambrell 6-.73-105 Adrian H. Woods 7409 College Cir.S. 14 & S.j of " 75 0 130.50 130.50 " 130.50 5 35 46-73-106 E.L. Leeth 16 & N.j of +' 75 0 130.50 130.50 " 130.50 3901 McCart 15 35 .6-73-107 I.L. Kennedy 9 & 10 26 " 100 0 :LT4.00 174.Oo " 174.00 3819 McCart 1,16-73-108 I.L. Kennedy 11 26 50 0 87.00 87.00 " 87.00 3819 McCart 146-73-.109 Harry Girard 12 26 " 50 0 87.00 87.00 " 87.00 3601 Jeanett 216-73-110 Harry Girard 13 26 " 50 0 87.00 87.00 '+ 97.00 3601 Jeanett ENGINEER1S FINAL ROLL UNIT N0.6 08 6 PAVING ASSESSMENT S "T N0.3 OF 9 WIDTH tel' UNIT DESCRIPTION: MC CART STREET FROM BIDDISON TO DREW CONTRACTOR GLADE CONSTRUCTION CO. CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROP0 Y FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P10 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ IPOOT - ¢REDITS ASSESSMENT AMOUNT -711 AMOUNT AAMOUN'T M6-73-111 B.H. Carroll 14 26 Homeland 50 0 $ 87.00 97.00 NONE $ 97.00 Memorial Baptist Church 3909 McCart M6-73•-112 B.H. Carroll Memorial 15 & 16 26 n 100 A 174.00 17".0 ° 174.00 Baptist Church 3009 McCart M6-73-113 James A. Kilburn 3775 McCart 9 & 10 25 R 100 0 174.00 174.3c If 174.00 M6-73-114 P.M. Tonsing 11 25 n 50 0 87,00 97,00 101 Curb only 0 .54 5•4o 81.60 1059 Glasgow Rd. M6-73-115 David Be Poxom 12 25 n 50 0 97.00 97.00 None 97.00 c/o Dr. O.J. Emery 406 Medical Arts Bldg M6-73. 116 Wendell 0. Pender 4125 Sandage 13 25 " 0 87.00 97.00 11 87.00 M6-73-117 James C. Lankford 14 25 " 0 97.00 97.00 If 87,00 3759 McCart 7 M6-73-•119 Andrew D. Moore 15 25 " 0 97.00 87.00 11 87.00 3751 ReCart ENGINEER'S FINAL ROLL UNIT NO. 6 OB 6 PAVING ASSESSMENT SHAST NO. 407 9 WIDTH FEET UNIT DESCRIPTION: MC CART STREET FROM BIDDISON TO DREW CONTRACTOR GLADE CONSTRUCTION CO. CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROP13TY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET C3. & GUT.P GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ IfOOT 1. CREDITS ASSESSMENT AMOUNT AMOUNT AMOUNT X6-73-•119 Andrew D. Moore 16 25 Homeland 50 0 87.00 87.00 None $ 57.00 3751 McOart M6-73-120 Earnest William Geer A 16 If 100 0 174.00 17L' OC 1001 Cb. & Out. 1.74 174.00 0 2314 W. Biddison M6-73•-121 Orel G. Griffith 11 16 " 50 0 87.00 87.00 ° 87.00 ' 3120 Merida M6-73. 122 J.L. Matthews 3717 McCart 12 16 1' 50 0 57.00 57.00 97,00- M6-73-123 Anton J. Moos 517 E. Drew 13 16 " 50 0 57.00 57.00 11 57.00 M6-73-124 J.L. Horner 33 Chelsea Drive 14,15 16 ° 100 0 174.00 174.0 n 174.00 M6-•73-125 Ralph Bell 16 16 " 50 0 97.00 87.00 n 87.00 3701 McCart M6-73-126 Elizabeth Lucilla 9 15 if 50 0 87.00 97.00 501 Cb. & Gut. 1.74 87.00 0 Housewright 117 Boaz M6-73-127 Stuart J. Williams 3625 McCart 10 15 11 50 0 87.00 97.00 501 Cb. & Gut. 6 1.74 87.00 0 ENGINEERIS FINAL ROLL UNIT NO. 6 OF 6 PAVING ASSESSMENT SHh;ET N0. 503F 8 WIDTH FEET UNIT DESCRIPTION: MC CART STREET FROM BIDDISON TO DREW CONTRACTOR GLADE CONSTRUCTION CO. CONTRACT DATE: August 27, 1962 TYPE OF IMPROVM4ENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPLITY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.P10 GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF OOT REDITS ASSESSMENT AMOUNT -711 ftF A I(j&T M6-73-128 Worth Well Surveys Inc. 11 15 Homeland 50 0 97,00 97.00 501 Cb. & Gat. OL-714 $7.00 0 3621 McCart M6-73-129 Worth Wells Surveys Inc. 3621 McCart 12 15 " 0 0 97.00 97.00 501 Cb. & Gut. ®1.714 87.00 0 M6-73-.130 H. Kenneth Drahn 3636 Stanley Avenue 13 15 " O 97.00 97.00 501 n n 0 1.714 97.00 0 M6-73-131 Anchor Loan Co. 3609 McCart 114 15 " 87.00 87.00 501 " " 01.714 87.00 0 M6-73-132 Westronics Inc. 3605 McCart 15,.16 15 " 1 11.00 1714.00 1001 n " 61.j14 1714.00 0 M6-73-133 Sidney Klemon 3208 Bellaire Drive V. 9 & S.11 of 10 6 " 50 87.00 87.00 501 n n 61.714 97,00 0 M6-73-1314 R.B. Bryson 3575 McCart 10 6 " 50 '37,00 501 n n 01,714 87,00 M6-73-135 Mrs. Grubbs Lots 11,12, Potato Chips 13,114,15, 3565 McCart 16 6 " 300 522.QQ 522,00 3001 Cb. & Gut. 1.714 522.00 0 M6-73,-136 Bessie McMillan 1.5 & S.31 3513 McCart of 6 5 " 53.5 93.09 93.09 53.51 Cb. & Gut. 1.714 93,09 0 ENGINEER'3 FINAL ROLL UNIT NO. 6 OF 6 PAVING ASSESSMENT SHSIT NO.6 OF 8 WIDTH FEET UNIT DESCRIPTION: MC CART STREET FROM BIDDISON TO DREW CONTRACTOR GLADE CONSTRUCTION CO. CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PXB GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BE'F'ORE OF $ $OC i 7 ¢REDI�TS ASSESSMENT AMOUNT $ $ 1• AMOUNT AMOUNT M6-73-137 Ruben Howell Morrie N.146 ' of Homeland 14b-5 0 80.91 80.91 146.5 Cb. & Gut. 61.714 80.91 0 1224 W. Bewick 16 5 M6-73-139 Ruben Howell Morris 7 & 9 5 " 100 0 1714.00 1714.00 100, " " (91.714 1714.00 0 12214 W. Bewick 146-73-139 McCart Enterprises Tract 3 Sutherland 600 A 1,01414.00 1,01414.00 600, " " 01.714 1,01414.00 0 P.O. Box 1779 Survey M6--73-1140 Jeco Realty Co. Tract 6 " 1405.3 0 705.22 705.22 405.31 Cb. & Gut. 011.714 705.22 0 6 3590 McCart M6-73-141 Fort Worth Steel Tract 5 " 197.7 0 3144.00 344-w 197.7' " " 41.714 31414.00 0 & Machinery Co. P.O. Box 1039 M6-73-1142 A.L. Davis Tract 7 " 151 0 262.714 262.714 NONE 262.714 Food Stores 3149 N. Cherry M6-73-1143 Louis Bogart Tra^ " 50 0 97.00 97,00 " 87.00 P.O. Box 11395 M6-73•-144 Frank Ewell & 1 1 C'<r a I 0 107.99 107.88 107.88 Jack T. Stovall Sone 2000 W. Berry ENGINEER,S FINAL ROLL UNIT NO. 6 OF 6 PAVING ASSESSMENT SH"T N0.7 OF 8 WIDTH FEET UNIT DESCRIPTION: MC CART STREET FROM BIDDISCN TO DREW CONTRACTOR GLADE CONSTRUCTION CO. CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUDTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT NO, PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPER'.Y FRONT EXCLUSIVE OF AND OWNERS FEET CB. & GUT.PEE GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ OOT REDITSS ASSESSMENT AMOUNT 1 1.741-74 AMOUNT AMOUNT M6-73-145 RaV Moore 2 1 Carroll 55 0 195.70 195-7C NCHE 95.70 2j4 9 Ryan Pl. Cr. Stone M6.73-146 Jack Wren 3 1 55 0 95.70 95-7C 95.70 2005 Thomas Pl. M6-73-147 Myrtle Stepp 3750 McCart 1 4 " 55 0 95.70 95.70 " 95.70 M6-73-148 Art. Gray 2 & N.521 3756 McCart of 3 4 " 107 0 186.18 186.18 521 Curb only 0.54 28.08 158.10 M6-73-149 A.J. Waters 3200 Schieffer 4 & 5.31 & " 71 0 123.54 123.54 711 Curb only 0 .54 38.34 85.20 N. 16, of Lot 5 4 M6-73-150 The First National 6 & S. 39� Bank of Boston of 5 if 94 9 163.56 163.56 94, curb only .54 50.76 112.80 Boston, Massachusetts M6-73-151 auto A. Wilhelms 1 & 2 5 " 110 0 191.40 191.40 1101 Curb only .54 59.40 132.00 3778 McCart 1 M6-73-152 N.A. Goodgion 3 5 " 55 0 95.70 95.70 NONE 95.70 3808 McCart M6-73--153 J.F. Russell 4 5 " 55 0 95.70 95.70 " 95.7-0 3812 McCart ENGINEERIS FINAL ROLL UNIT N0. 6 OF 6 PAYING ASSESSMENT S 'T NO. 9 O 9 r WIDTH FENT UNIT DESCRIPTION: MC CART STREET FROM BIDDISON TO DREW CONTRAC'T'OR GLADE CONSTRUCTION CO. CONTRACT DATE: August 27, 1962 TYPE OF IMPROVEMENTS RECONSTRUCTION & CURB & GUTTER CERT. DESCRIPTION OF PROPERTY ASSESSMENT RATE PER FOOT N0. PROPERTY OWNER LOT BLOCK ADDITION APPARENT IMPROVEMENTS CURB PROPERTY FRONT EXCLUSIVE OF AND OWNERS FW CB. & GU`T.PXR GUTTER COST ADJUSTMENT CREDITS AMOUNT FRONT FOOT PER LIN. BEFORE OF $ 001.7 JU ITS ASSESSMENT AMOUNT 4 1.74 AMOUNT AMOUNT M6-73-154 Southwest Leases Inc. 3516 McCart 5969 5 Carroll 110 0 191.44 191. 4 1101 Cb. & Gut1r. 8 1.74 191.44 0 Stone M6-73-155 Fort Worth Ind.e-pendent Part of Trinity School District Thomas Addition 600 0 1044.00 1044.00 6001 curb only 0 .54 �24.00S 720.00 3210 W. Lancaster McCann Survey 5,433.00 9,453.42 9.453.42 4,704.60 4,74s.82 r. .�•,=nlsa a. ct�a�fe City of Fort WortA, Texas Mayor and Council Communication DATE REFERENCE SUBJECT:Reconstruction of Gravel Base PAGE NUMBER 7/1/63 FP-49 Streets at Six Locations Final ,.iyment for Four L6cationa n A 16f, I ijkilL 5 t,U Final Council action on the project described below is r AiR eSECRETARY Project Description: FT. !NORTH, TEX. Name: Reconstruction of Gravel Base Streets at Si . (Unit 1, Deen Road; Unit 2, Bigham Blvd.; Unit 5, Virginia Place; Unit 6, Mc Cart Street). Contractor: Glade Construction Company Contract Awarded: August 27, 1962 (M&C PW-1234). Work Order effective October 25, 1962. Date of Final Inspection and Approval: March 31, 1963• Working Time Bid: 120 Working Days. Working Time Used: 74 Working Days to date on entireroject (the other units are nearing completion. Project Cost and Financing: Bid Price: $144,251.25 for these four units. Final Contract Cost these Units: $161,477.19 Partial Payments Previously Made: 6 Amount: $145029.47 Final Payment Due: $16,147.72 Payment to be made from Account No.: 94-B7-7. Deviation from Bid Price due to the Following Items: (1) Storm Drain and subdrain on Deen Road at Railroad Crossing to provide surface drainage. + $1.,856 (2) Lime Stabilized Base on Deen Road to Improve existing old gravel base. + 10681 (3) Additional base and surface on Deen Road due to revisions at intersections and variations between estimated and measured quantities. + 3,274 (4) Additional cement used in some areas on Deen Road to stabilize existing base material. + 2,200 (5) Excavation on Deen Road, Bigham Blvd., and Virginia Place to lower crown. + 5,587 (6) Removing and reconstructing more existing curb and gutter than anticipated, due to its poor condition which would have been hazardous to the new street base and surface. + 3,534 (7) 4" Lime Stabilized sub-base to provide a stable sub base for the new pavement. + 2033 (8) Removal and re-installation of walks and driveways required to conform with the new curb and gutter. + 903 (9) Variations between estimated and measured quantities- 4,142 TOTAL $17,226 R DATE REFERENCE SUBJECT: PAGE NUMBER Reconstruction of Gravel Base 7/1/63 FP-49 Streets at Six Locations 2 or V4-a 1 Pay nt for rigur- Paving Test Cores% Attached is s Tabulation of Paving Thickness showing compliance with specifications within acceptable construction tolerance after the correction of the deficiency in surface, an area approximately 6' x 121 . Recommended Council Action% It is reccamnded that an ordinance be adopted accepting Units 1, 2, 5 and 6 of thU project; that final payment in the amount of $16,147.72 be made to Glade 8amtruction Company; and that a bond transfer in thea amount of 4*1ow be made from Project leo. 94-B7-901, UnspecIfis'd. Reconstruction Projects to Project No. 94-B7®7, Reconstruction at 6 IAcations, to provide necessary additional funds for this project. JU%mr LOFFICIAL ARY f�X. SUBMITTED BY: DISPOSITION BY COUNCIL: PROCNE Y4 APPROVED [OTHER (DESCRIBE) "40• am� �sa CITYRY DATE CITY MANAGER