HomeMy WebLinkAboutOrdinance 10486ORDINANCE NO ~ U
AN ORDINANCE DETERMINING THE NECESSITX FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEMENT OF BRYANT IRVIN ROAD NORTH, FROM
CAMP BOWIE BOULEVARD TO FIFTY-FOUR FEET SOUTH_O_F___ CALMONT AVENUE,
AS HEREINAFTER SET FORTH, APPROVING PROJECT PLANS AND
SPECIFICATIONS, ORDERING AND APPROVING ESTIMATE OF COSTS,
LETTING CONTRACT TO J. L. BER~TRAM CONSTRUCTION AND ENGINEERING,
INC.IN THE AMOUNT OF $288,278.10, FOR THE MAKING AND
CONSTRUCTION OF SUCH IMPROVEMENTS, MAKING APPROPRIATIONS FOR THE
PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED, MAKING
PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST ABUTTING
PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS
OF SUCH IMPROVEMENTS, DIRECTING THE CITY SECRETARY TO FILE A
NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK
OF TARRANT COUNTY, TEXAS, DECLARING THAT THIS ORDINANCE AND ALL
SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENTS ARE
AND SHALL BE IN ACCORDANCE WITH ARTICLE iI05b OF VERNON'S TEXAS
CIVIL STATUTES, AND DIRECTING THE CITY SECRETARY TO ENGROSS
AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE
MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE
ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY;
AND PROVIDING AN EFFECTIVE DATE
WHEREAS, the Director of Transportation and Public Works far the City of
Fort Worth, Texas (hereinafter referred to as the "Director"}, has
proposed the improvement of BRYANT IRVIN ROAD NORTH FROM CAMP BOWIE
BOULEVARD TO FIFTY-FOUR FEET SOUTH OF CALMONT AVENUE, which is hereby
designated Project No 67-023188-00, (said improvements being
hereinafter referred to as the "Project"),
WHEREAS, the Project shall entail the improvement of the street, avenue,
alley, highway, boulevard, drive, public place, square or any portions
thereof (hereinafter referred to singly and collectively as the "highway"}, and
shall be accomplished by filling, grading, raising, paving, repaving,
repairing, constructing, reconstructing, realigning, widening, narrowing or
straightening said highway, or the curbs, gutter or sidewalks and any
appurtenances or incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate
of the costs of the Project,
WHEREAS, the City of Fort Worth has advertised and received bids, in
accordance with TEX REV CIV STAT ANN Articles i105b and 2368a,
and other applicable laws, such that a contract may be awarded for the
construction of the Project, NOW, THEREFORE
c
BE IT ORDAINED BY THE CITX COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT'
I
There exist a public necessity far the Project, and it is hereby ordered
that Plans and Specifications be prepared for the improvement of the Project
and that the Project be carried out and constructed according to the
Plans and Specifications, and any changes or amendments thereto
II
The estimated cost of the Project based on the estimate of the City Engineer
is $302,692.01. The estimated cost of the Project shall be paid partly by
the City of Fort Worth and partly by assessments to the property abutting
the Project and the owners thereof The assessments to the property abutting
the Project and the owners thereof shall be levied in accordance
with the requirements of TEX REV CIV STAT ANN., Article 1105b
(hereinafter referred to as "Article 1105b"), and the City Charter of Fort
Worth, Texas, and shall not be more than all the costs of constructing,
reconstructing, repairing, and realigning curbs, gutters and sidewalks and
nine-tenths (9/lpths} of the cost of the remaining improvements Comprising
the Project In any event, said assessments shall not exceed the special
benefits to the abutting property and its owners, as enhanced by the Project
The City of Fort Worth shall pay the balance of the cost of the Project not
assessed against the property abutting the Project and the owners thereof
The amounts assessed against the abutting properties and the owners
thereof shall constitute a first and prior lien upon such properties and a
personal liability of the owners thereof and shall be payable upon the
acceptance by the City of Fort Worth of the Project after its completion
Said assessments shall be due and payable on or before 30 days after the
acceptance by the City of Fort Worth of the Project, except that, if the
abutting owner so elects, by complying with the terms hereinafter set
forth, said assessments may be paid in installments Said assessments
may be paid in five (5) equal, consecutive annual installments, the first
installment to be due and payable no later than thirty (30) days after the
acceptance by the City of Fort Worth of the Project, and each subsequent
installment to be due and payable on an annual basis on each consecutive
anniversary date of the acceptance of the Project, in the
alternative, said assessments may be paid in forty-nine (49) equal
consecutive monthly installments, the first installment to be due and payable
no later than thirty {30) days after the acceptance by the City of Fort Worth
of the Project Any owner electing to pay the assessment in installments,
as provided for herein, as a condition precedent to such election, must
execute a promissory note and mechanic's and materialmen's lien contract
evidencing the owner's intent to pay the assessment in accordance with
the terms of one of the alternatives hereinabove set forth In any case
in which the owner elects to pay the assessment in installments under either
of the alternatives specified, the assessment shall bear interest from the
date of acceptance of the Project at the rate of eight percent (8 a) per annum
Should any installment not be paid on its due date, the City of Fort Worth
shall have the option to accelerate the entire unpaid balance of the
assessment and declare the same to be immediately due and payable; this and
other terms governing any default in the payment of any installment shall
be set forth in the mechanic's and materialman's lien contract and shall be
uniform among all owners executing the contract
~+?
In addition, the City Attorney shall have the authority to
authorize terms of payment different than those specified herein when the
Director has previously determined that an extreme financial hardship exists
III
Bids having been requested by appropriate advertisement, as required by
Articles 1105b and 2368a and the lowest bid of, 3. L. BERTRAM CONSTRUCTION AND
ENGINEERING. INC., having been found to be the lowest and best bid for the
making and construction of said Project, the contract therefore is hereby
awarded to J. L. BERTRAM CONSTRUCTION AND ENGINEERING INC at and for the
amount of $288,278.10.
To provide for the gayment of said contract and the indebtedness
incurred thereby, there is hereby appropriated out of available funds
and current revenues of the City, an amount sufficient to pay the indebtedness
so incurred
Notice shall be given and a hearing shall be held prior to making or levying
any assessment against any property abutting the Project or its owners, as
required by Article 1105b, Section 9 The notice of the hearing required
under said statute shall be published in a newspaper of the City of Fort
Worth at least three (3) times, the first publication to be made at least
twenty-one (21) days before the hearing date Written notice shall be
personally given to all persons or entities claiming or owning an interest
in the property abutting the Project and shall be mailed at least fourteen
(14) days before the hearing in the manner specified by Article 1105b,
Section 9 Said hearing shall be held before the City Council of Fort
Worth, Texas, on the 30th day of January, 1990, at 10 00 A.M.
IV
The improvements provided for herein shall be made and constructed,
notice given, hearing held and assessments made and levied and all
proceedings taken and had in accordance with and under the terms of Article
1105b and the Charter of the City of Fort Worth, Texas
V
The City Secretary is directed to prepare, sign and file with the County
Clerk of Tarrant County, Texas, a notice of the authorization and approval
of the Project and the pendency of the assessment proceedings authorized
hereunder
VI
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Books of the City Council and
by filing the complete ordinance in the appropriate ordinance records of this
city
3 + I r
~J t + •
VII
This ordinance shall take effect and be in full force and effect from and
after the date of its passage
PASS AND APPROVED THIS ~~ DAY OF
19
APPRO ED AS TO F M AND LEGALITY'
City Attorney
Date'
1'
.~
e ~.
I U '.~ 1 6 ~ 12~1f,10 ~ ,6 '7 ~
~' ~ EAST FOURTH ST
11 12 1 ~ i i3 i i2
~ i! ~ 2 12 2 !i i 2 a •s2ii~so f~
so a a ii a so ~ ~
s ~ 3450
s s , s s~ s o so ~ s s~ s s ' s s u s s ~~
~ s
]v~i s ~60~ i ~ 6ALVEZ ANE ~
IW 7 2 i 2 a s 5 6 7 a. N i 2 a 4 s 6 i~
~ s a .6 ~ i P 5 s s ~ N
12 ii so sa s ~
A
z~
Y B,
.. s
~~
•LAMNMOOD AVE ~ TR 3A TR ?9 ~~~~ ~AMNMOOGO~iVE-'r~~~~
TR ,~~~ ~ w, N TR 3 TR 2 1 5 ~
3D , e w e •^ TR 3C TR 2A 1 2 a 4 6 1 Z a. 6 E 3
i
60,o I TR !M TR a8 Tp S
N N:N •N PI'II ^ ~ ~T IiT ~O
TR 3G TR aE2 i2 !i 10 ~ 8 7
FISHER AVE ` TR 3D TR 3E
TR 3F1 TR aEi
iR TR 3F TR 3E3 :~
RPN~ i ~z A' 1659 ' ~ '
1P~~~IN _ 2 s ~,
~ ~ 2 s S 8 a 6 31
Q TR 1A1 T iC
S
-~- 13u TR i TR ici c ~: P 6~ ~ m
„ o TR 1A t
~ ww~~~~"~e T6i iC2 LL 60
I ~ TR !8 TR iC3 d ~ 81 t ~ '
A~a~ ~
_-_~+- ---~_ i _ p ~~(~ 12 iilio s 6 7
- ~ i 6 R1) I
~~j ENNIS AVE
LAWNWOOD AVENUE
PARADISE STREET TO S. JUDKINS STREET
PROJECT N0. 67-040177-00
EXHIBIT A
JANUARY 1990
1
12 S7j10 i B 7 5'
6'
I
~~ip~~~
REVISED FEBRUARY 1990
,E
:r~
PROJECT 1i0. 67-040177-OO,LAWNWOOD AVENIIE, UNIT II, FROM PARADISE STREET TO S. JQDRINS
STREET, to be improved by constructing six-inch thick reinforced concrete pavement With
a seven-inch high attached concrete curb on a six-inch-thick liege stabilised aubgrade, so
that the finished roadway vill be thirp feet wide on a sixty foot Right-Of-Way.
OWNER i LEGAL DESCRIPTION
-------------------------
BEGIpIiIIiG AT PARADISE ST
SOUTHSIDE
000002467607
DON E HUBBARD
b850 MANHATTAN
FORT WORTH, TX 76112
BLR 58 LOT 1
VACANT LOT
ZONING lRONTAGE RATE
------ -------- -----
RIVERSIDE ADDITION
B 50.00' PAVEMENT 36.59
50.00' CURB 2.33
AMOONT ASSESSMENT
1,829.50
116.50
1,946.00
Assessment set by City Council 1015.00
BEGINNING AT JUDKINS
--------------------
NORTHSIDE
000002467445
CURTIS DIXON
2805 LAWNWOOD
FORT WORTH, TX 76111
BLK 54 LOT 12
*, VACANT LOT
B S0.00' PAVEMENT
34.00' CURB
36.59 1,829.50
2.33 79.22
1908.72
Assessment set by City Council
985.00
-1-
~~
The Assessment Paving Policy as revised Jul? 28, 1987 (MSC G-7160), provides
that property soned sad used as oae or two-family residential property in target
areas will sot be assessed for street reconstruction. Oader this policy, the
owners of the followiaq improved property soned sad used as one and two-family
residences will not be assessed.
RIVERSIDE ADDITION
Block 54 Lots 7, 8, 9, 10, 11
Block 58 Lots 2, 3, 4, 5, 6,
Block 59 Lots 1, 2, 3, 4, 5, 6
8H!lPER i BILLINGSLEY SOBDIVISION
Lots A, B
-2-
tv .
r'
L~WOOD avE~oE
008? DISTRIBOTI011:
(A) COST TO PROPERTY OWNERS ................................5 2,000000
(B) COST TO FORT WORTH CITY ................................5 90,527,16
STREET CONSTRUCTION ................5 86,121.10
ENGR. INSP./ADMIN ..................S 4,406.06
(S$ OF BID S 88,121.10)
(C) TOTAL ESTIMATED PROJECT COST....., ......................5 92,527.16
LEO'EIiD
s Curb Inlet Credit
-3-
.~ _ _~: II (~ 1) lI ~) ~1~ l//7// ~'~'~1 ~) 11 ~M) ~1 ~/ /J/~ ~/T1~1-~11
MASrER citE•3 ~~,~//®~ ~~~ ~./®/~1VU IV~i1VlV ~®U I/ W~ILIIiU (1~1(i~i~.WlV~ii~y U (L
ACCOUNTINq• Z e1%/
7RAN9P0 TNTlf3T1lPUSUC WORK ;,REFERENCE
~vUMBER SUBJECT AWARD OF CONTRACT FOR THE PAGE
~
,~
~
~ C-12085 ASSESSMENT PAVING OF BRYANT IRVIN ROAD i or _4
rArr.>r A Mlre
s
r
rr
, NORTH FROM CAMP RnwrE BOULEVARD TO
- --
` FIFTY-FOUR FEET SOUTH OF CALMONT AVENUE
J (J L. BERTRAM CONSTRUCTION & ENGINEERING
INC.,, AND J.D. VICKERS, INC.)
RECOMMENDATION
It is recommended that the City Council. .,
1 approY2~the following fund transfers
F-~tOM T0~ AMOUNT REASON
94-009905-00 67-023188-00 $ 32,567.78 To move property
Special Assessments Bryant Irvin owners' share of
Unspecified Road North cost from Revolving
Fund to Project
Account.
94-009905-00 67-017049-00 $ 69,620.50 To provide funds
Special Assessments Bryant Irvin for the Water Main
Unspecified Road North Replacement.
45-60-90-20 53-017049-00 $ 7,000.00 To provide funds
Water and Sewer Bryant Irvin for inspection and
Operating Road North survey.
2, authorize the City Manager to execute a'contract with J.D. Vickers,
Inc., in the amount of $69,620.50 based on the low bid for the water
main replacement in Bryant Irvin Road North,
3. authorize the City Manager to execute a contract with J.L .Bertram
Construction & Engineering, Inc., in the amount of $288,278.10 and 36
work ing days for the paving of Bryant Irvin Road North from Camp Bowie
Boulevard to fifty-four feet south of Calmont Avenue,
4, declare the necessity for and order the improvements to Bryant Irvin
Road North from Camp Bowie Boulevard to fifty-four feet south of Calmont
Avenue,
5. authorize the assessment of ;~ portion of the cost of the improvements to
Bryant Irvin Road North against the owners of the abutting property,
6, approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
7 establish January 30, 1990, a:> the date of the benefit hearing,
'f'
DOTE I NUMBER `E I SUBJECT AWARD OF CONTRACT FOR THE PnGE
1-2-9U C-12085 I ASSESSMENT PAVING OF BRYANT IRVIN ROAD- 2. ~,r4
----- --- NORTH FROM CAMP BOWIE BOULEVARD TO
FIFTY=FOUR FEET SOUTH OF CALMONT AVENUE
(J L BERTRAM CONSTRUCTION & ENGINEERING
.~ ,~ U
INC AND J D VICKERS, INC )
8 authorize the preparation of assessment rolls and notification~of
property owners in accordance with the provisions of Article 11U5b of
Verrioi~' s Annotated Ci vi 1 Statutes, and
9 adopt an ordinance reflecting the City Council's authorization and
approval of Recommendations 3 through 8 above, and other applicable
requirements of Article 1105b, Vernon's Annotated Civil Statutes
DISCUSSION
Tfie 198ci-88 Capital Improvement
funds for the improvement of Bryant
from Camp Bowie Boulevard to I-30
Calmont .Street is the frontage
Highways and Public Transportation
will reconstruct the fifty-four
.Avenue as part of its project
Program approved in March, 1986, included
Irvin Road North (formerly Guilford Road)
road for I-30 The State Department of
is in the process of improving I=30 and
feet of Bryant Irvin Road south of Calmont
Bryant Irvin. Road North is located in Council. District No 7
PROJECT DESCRIPTION
STREET, LIMITS WIDTH/FEET ROW WIDTH./FEET
Bryan ruin Camp~wie Boulevard
Road North to Fifty-Four Feet
South of Calmont Avenue
PROPOSED IMPROVEMENTS
.t
It is proposed to improve this segment of Bryant Irvin Road North by
constructing a seven-incf~ thick reinforced .concrete pavement with a
seven-in.ch high attached concrete curb over a six-inch thick lime stabilized
subgrade so that the finished roadway will be forty-four feet wide on a sixty
foot right-of-way Six-inch thick concrete driveway approaches and four-inch
thick concrete sidewalks will be constructed where shown on the plans
RECEIPT OF BIDS
Bids for the project were received on November 2, 1989, after being
advertised on October 12 and 19, 1989, with sixty working days allotted for
the base bid, forty=eight days alloted for Alternate No 1, and thirty-six
days allotted for Alternate No 2 Bids received were as follows
;~ _ _ ~5,
~.
,..
DATE REFERENCE SUBJECT PAGE ~
NUMBER AWARD OF CONTRACT FOR THE
~-~-9n r.- »nR~ ASSESSMENT PAVING OF BRYANT IRVIN ROAD ~_ 0,4
FIFTY-FOUR FEET SOUTH OF CALMONT AVENUE
{J.L. BERTRAM°CONSTRUCTION & ENGINEERING
INC., AND J.D. VLCKERS, INC.)
BIDDER
WATER-~IVTT I
J.D. Vickers, Inc. r
Circle C. Construction Co.
Steed, Inc.
Larry H. Jackson, Const., Tnc. ~_
Tri-Tech Const., Inc.
Improvements, Inc.
AMOUNT
$69,620.50
76,167.00
76,946.00
79,605.00
84,051.00
STREET UNIT II BASE BID ALT. N0. 1 ALT. N0. 2
(60 DAYS) (48 DAYS) (36 DAYS)
J.L. Bertram Const & Eng., Inc. $285
,878.10 $287,078.10 $288,278.10
Walt Williams Const., Inc. .
294,161.15 296,711.15 ~~5
Centerline Constructors, I nc. 307,212.85 No Bid No Bid
Austin Paving Co. 328,693.73 336,193.73 338,693.73
Harrod Paving Co. 330,836.60 336,836.60 342,836.60
Larry H. Jackson, Const., Inc. 356,456.00 358,956.00 361,456.00
Bryant Irvin Road North is heavily traveled between Camp Bowie Boulevard and
I-30, and 42% of the land abutting the road is commercial property.
Staff's evaluation of the three low bids indicates that it would be in the
City's best interest to accept Alternate No. 2 in the amount of $288,278.10
and 36 working days as submitted by J.L. Bertram Construction and
Engineering, Inc. This recommendation is based on traffic volumes using this
roadway, the percentage of commercial development fronting the street,
liquidated damages as specified in the contract ($210.00/per day) and the
small premium which would be paid in utilizing Alternate No. 2 versus the
number of working days which would be saved ($100.00/per day).
The low bidders are i~n compliance with the City's DBE Policy.
ENGINEER'S ESTIMATE OF COST
Based on standard City policy and the low bid prices, the following
assessment rates have been established
7 inch ,~th,ick,~concrete pavement $54.51/L.F.
7 irich,`th.ck~`concrete curb $ 2.78/L.F.
6 inch thick ~r'ei~forced concrete $ 3.21/S.F.
driveway approaches
4 inch thick reinforced concrete $ 1.71/S.F.
sidewalks ~:
distributed as follows
The total cost "for street improvements to Bryant Irvin Road North is
Property owner's share of cost $ 32,567.78 (11%)
City's share of cost ~ $270,124.23 (89%)
Total Estimated Cost - $~~~r
DATE REFERENCE
NUMBER SUBJECT AWARD OF CONTRACT FOR THE ~"' "PAGE y'°~~
2-90 G-12085 ASSESSMENT PAVING OF BRYANT IRVIN ROAD 4 of4
~
-QOM-~AM~---~ 9Jd-I-E-
--
~
FIFTY-FOUR FEET SOUTH OF CALMONT
AVENUE
(J .L BEf2TRAM CONSTRUCTION & ENGINEERING
INC AND J D. VICKERS, INC )
FINANCING.
Sufficient funds are availabl e for transfer as follows:
FUND RROJECT PROJECT NAME AMOUNT
~- 0~=U0 Special- ssessments $10~1$S; 28
Unspecified
45 60-90-20 Water and Sewer $, 7,QQ0.00
Operating
Total $109,188.28
Upon approval and completion of Recommendation No. 1, funds W11 be available
'
as follows
FUND PROJECT
-
- PROJECT NAME AMOUNT
bT
0~3T81~=~0 ~ ry a n r v i r~ $ 3~,3bT7 8
Road North
67 017049-QO Bryant Irvin $ 69,620.50
Road North
53 017049-00 Bryant Irvin $ 7,000.00
Road North
Total $109,188.28
Funds for the City's share of the street paving cost are available in Street
Improvements Fund 67, .Project No. 023188-00, Bryant Irvin Road North
Expenditures will be made from Index Codes 630335 for street improvements,
630335 for water replacement, 620294 for water inspection. and 620336 for
water survey
Sufficient funds are avai lable in Street Improvement Fund 67, Project
No. 095106-00, Engineering Salaries, to finance engineering ins ection and
administrative costs APPROV~D BY
CITY COUNCIL
WWW d
JqN 2 1990
SUBMITTED FOR THE
CITY MANAGER'S
OFFICE BV
W~ ~ ~ ~ dlil W
Wood
DISPOSITION BY COUNCIL.
PROCESSED BY
_
. ^ APPROVED
ORIGINATING ^ OTHER (DESC )
DEPARTMENT HEAD• (''1!'~ SOCZptalp Q a thB
TY SECRETARY
FOR ADDITIONAL INFORMATION
CONTACT Martha Lunday x8063 Ado ted O +
dinanC@ Noe