Loading...
HomeMy WebLinkAboutOrdinance 10487ORDINANCE NO 1~~ AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND PROVIDING FOR THE IMPROVEMENT OF LAWNWOOD AVENUE, UNIT II, FROM PARADISE STREET TO SOUTH JUDKINS STREET AS HEREINAFTER SET FORTH, APPROVING PROJECT PLANS AND SPECIFICATIONS, ORDERING AND APPROVING ESTIMATE OF COSTS, LETTING CONTRACT TO WALT WILLIAMS CONSTRUCTION, INC.,IN THE AMOUNT OF 588,121.10, FOR THE MAKING AND CONSTRUCTION OF SUCH. IMPROVEMENTS, MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED, MAKING PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS OF SUCH IMPROVEMENTS, DIRECTING THE CITX SECRETARY-TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS, DECLARING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET iMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXA5 CIVIL STATUTES, AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BX "COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING'THE~COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE ` WHEREAS, the Director of Transportation and Public Works for the City of Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed the improvement of LAWNWOOD AVENUE UNIT II FROM PARADISE STREET TO SOUTH JUDKINS STREET, which is hereby designated Project No 67-040177-00, (said improvements being hereinafter referred to as the "Project"); WHEREAS, the Project shall entail the improvement of the street, avenue, alley, highway, boulevard, drive, public place, square or any portions thereof {hereinafter referred to singly and collectively as the "highway'°), and shall be accomplished by filling, grading, raising, paving, repaving, repairing, constructing, reconstructing, realigning, widening, narrowing or straightening said highway, or the curbs, gutter or sidewalks and any appurtenances or incidentals thereto, including drains or culverts, WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of the costs of the Project, WHEREAS, the City of Fort Worth has advertised and received bids, in accordance with TEX REV CIV STAT ANN Articles 1105b and 2368a, and other applicable laws, such that a contract may be awarded for the construction of the Project, NOW, THEREFORE -, ., BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT I There exist a public necessity for the Project, and it is hereby ordered that Plans and Specifications be prepared for the improvement of the Project and that the Project be carried out and constructed according to the Plans and Specifications, and any changes or amendments thereto Iz The estimated cost of the Project based on the estimate of the City Engineer is $92,527.16. The estimated cost of the Project shall be paid partly by the City of Fort Worth and partly by assessments to the property abutting the Project and the owners thereof The assessments to the property abutting the Project and the owners thereof shall be levied in accordance with the requirements of TEX REV CIV STAT ANN Article 1105b (hereinafter referred to as '°Article 1105b"), and the City Charter of Fort Worth, Texas, and shall not be more than all the costs of constructing, reconstructing, repairing, and realigning curbs, gutters and sidewalks and nine-tenths (9/lOths) of the cost of the remaining improvements comprising the Project In any event, said assessments shall not exceed the special benefits to the abutting property and its owners, as enhanced by the Project The City of Fort Worth shall pay the balance of the cost of the Project not assessed against the property abutting the Project and the owners thereof The amounts assessed against the abutting properties and the owners thereof shall constitute a first and prior lien upon such properties and a personal liability of the owners thereof and shall be payable upon the acceptance by the City of Fort Worth of the Project after its completion Said assessments shall be due and payable on or before 30 days after the acceptance by the City of Fort Worth of the Froject, except that, if the abutting owner so elects, by complying with the terms hereinafter set forth, said assessments may be paid in installments Said assessments may be paid in five (5) equal, consecutive annual installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project, and each subsequent installment to be due and payable on an annual basis on each consecutive anniversary date of the acceptance of the Project, in the alternative, said assessments may be paid in forty-nine (49) equal consecutive monthly installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of~the Project Any owner electing to pay the assessment in installments, as provided for herein, as a condition precedent to such election, must execute a promissory note and mechanic's and materialmen's lien contract evidencing the owner's intent to pay the assessment in accordance with the terms of one of the alternatives hereinabove set forth In any case in which the owner elects to pay the assessment in installments under either of the alternatives specified, the assessment shall bear interest from the date of acceptance of the Project at the rate of eight percent (80) per annum Should any installment not be paid on its due date, the City of Fort Worth shall have the option to accelerate the entire unpaid balance of the assessment and declare the same to be immediately due and payable, this and other terms governing any default in the payment of any installment shall be set forth in the mechanic's and materialman's lien contract and shall be uniform among all owners executing the contract In addition, the City Attorney shall have the authority to authorize terms of payment different than those specified herein when the Director has previously determined that an extreme financial hardship exists III Bids having been requested by appropriate advertisement, as required by Articles 1105b and 2368a and the lowest bid of, WALT WILLIAMS CONSTRUCTION, INC., having been found to be the lowest and best bid for the making and construction of said Project, the contract therefore is hereby awarded to WALT WILLIAMS CONSTRUCTION, INC., at and for the amount of $88,121.10 To provide for the payment of said contract and the indebtedness incurred thereby, there is hereby appropriated out of available funds and current revenues of the City, an amount sufficient to pay the indebtedness so incurred Notice shall be given and a hearing shall be held prior to making or levying any assessment against any property abutting the Project or its owners, as required by Article 1105b, Section 9 The notice of the hearing required under said statute shall be published in a newspaper of the City of Fort Worth at least three (3) times, the first publication to be made at least twenty-one (21) days before the hearing date Written notice shall be personally given to all persons or entities claiming or owning an interest in the property abutting the Project and shall be mailed at least fourteen (14) days before the hearing in the manner specified by Article 1105b, Section 9 Said hearing shall be held before the City Council of Fort Worth, Texas, on the 30th day of January, 1990, at 10.00 A.M. IV. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessments made and levied and all proceedings taken and had in accordance with and under the terms of Article 1105b and the Charter of the City of Fort Worth, Texas V The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice of the authorization and approval of the Project and the pendency of the assessment proceedings authorized hereunder , VI The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Books of the City Council and by filing the complete ordinance in the appropriate ordinance records of this city . ~ ~ ., VII This ordinance shall take effect and be in full force and effect from and after the date of its passage PASSED AND APPROVED THIS 19_ APPROVED AS TO FORM AND LEGALITY' City Attorney DAY OF Date k ~± P ~~ `~ q„ pity of 1Fo~°t worth, ~e.~~~ MASTER FILE•1 ~ Y UiJ/ ®~ ~ (1. ({i~ ~®ILTV U ll~ll/ (l~~ ~®~~ ([i1V~~~1/~t.W ~ IL~~ ACCOUNTINQ•7 1/l7~gW e~ KAlEaA DATE NISTRAnaN • 1-2-90 REFERENCE NUMBER C-12086 SUBJECT AWARD OF CONTRACT FOR THE ASSESSMENT PAVING OF LAWNWOOD AVENUE UNIT II FROM PARADISE STREET PAGE 4 ' °`__ ~'~ TO SO. JUDKINS STREET ( ___ WALT WILLIA~1S CONSTRUCTION INC. AND CIRCLE "C" CONSTRUCTION , COP1PANY) RECOh1MENDATION - ... It is reccammended that the City Council 1. Approve the following fund transfers _ FROM TO AP10l1NT REASbN 94-009905-00 67-040177-00 $ 3,854.72 To move property Special Assessments Lawnwood, owners' share of Unspecified Parad ise - cost from Revolving Judkins Fund to Project Account. 67-040901-00 67-040171-00 $ 51,830.05 To provide funds Inner City Streets Lawnwood, for the City's share Unspecified Paradise - of construction Judkins cost. 94-009905-00 67-017114-00 $ 36,432.00 'To provide funds Special Asse'ssmen~s Lawnwood, for the Water Main Unspecified Paradise - Replacement.* Judkins 45-60-90-20 53-017114-00 $ 3,600.00 To provide funds Water and Sewer Lawnwood Avenue for inspection and Operating survey. 76-206081-35 76-206081-34 $ 26,436..33 To provide funds Street Assessment Lawnwood Avenue for street improve- Fund ments. 2. Authorize the City P1anager to execute a contract with Circle "C" Construction Company in the amount of $33,120.00 based on the low bid for the water main replacement Unit I in Lawnwood Avenue from Paradise Street to So. Judkins Street (Unit I), 3. Authorize the City Planager to execute a contract with Walt Williams Construction, Inc., in the amount of $88,121.10 and 27 working days for the paving of Lawnwood Avenue Unit II from Paradise Street to So. Judkins Street (Alternate II), 4. Declare the necessity for and order the improvements to Lawnwood Avenue from Paradise 'Street to So. Judkins Street, S DATE REFERENCE SUBJECT: nnn~~v v~ Lvn~~~rt4~ ~v.iv- ~i~~. PAGE NUMBER ASSESSP1ENT PAVING OF LAWNWOOD 2 4 r 7, 1-2-90 C-12086 AVENUE UNIT II FROP1 PARADISE STREET I -- or _--_- CONSTRUCTION, INC. AND CIRCLE "C" CONSTRUCTION COPIPANY) "` " `' ' 5. Authorize the assessment of a portion of the cost of the improvements to Lawnwood Avenue against the owners of the abutting property, 6: Approve the estimate of costs and amounts to be assessed .as stated in the Engineer's Estimate; °° 7. Establish January 30, 1990, as the date of the benefit hearing4, R. Authorize the preparation of assessment rolls and notification of property owners in accordance with the provisions of Article 1105b of Vernon's Annotated Civil Statutes; and 9. Adopt an ordinance reflecting the City Council's authorization and approval of Recommendations 3 through 8 above, and other applicable requirements of Article 1105b, Vernon's Annotated Civil Statutes. *Funds above the amount bid are necessary to cover possible change orders according to City Ordinance No. 10437. DISCUSSION. The 1986-88 Capital Improvement Program approved in March, 1986, included funds for the improvement of Lawnwood Avenue from Paradise Street to So. Judkins Street. Lawnwood Avenue is in the Riverside Target Area, and CDBG funds will provide 30 percent of the construction cost. Lawnwood Avenue is located in Council District No. 8. PROJECT DESCRIPTION STREET LI~1ITS WIDTH/FEET RObJ WIDTH/FEET Lawnwood Paradise Street to 30 60 Avenue So. Judkins Street PROPOSED IMPROVEMENTS It is proposed to improve this segment of Lawnwood Avenue by constructing a six-inch thick reinforced concrete pavement with a seven-inch high attached concrete curb over a six-inch lime stabilized subgrade so that the finished roadway will be thirty feet wide on a sixty foot right-of-way. RECEIPT OF BIDS Bids for the project were received on November 2, 1989, after being advertised on October 12 and 19, 1989, with 45 working days allotted for the Base Bid, 36 days for Alternate No. 1, and 27 days for Alternate No. 2. Bids received were as follows: ~, _ ~ ~ •, r _~ r~ DATE REFERENCE SUBJECT - PAGE NUMBER ~ ASSESSP1ENT PAVING OF LAWNWOOD 3 4 1-2-90 C-12086 AVENUE UNIT II F'ROP1 PARADISE STREET - of ---- CONSTRUCTION, I'NC. AND CIRCLE "C" CONSTRUCTION COMPANY) BIDDER AMOUNT WATER (UNIT I) Circle "C" Construction Co. J.D. Vickers, Inc. Improvements, Inc. P1&D Construction Co. STREET (UNIT II) Walt Williams Const., Inc. J.L. Bertram Const & Eng., Inc. James W. Jackson, Inc. Centerline Constructors, Inc. M&D Construction Co. Austin Paving Co. $33,,,120,00 ,6 .0 34,620.50 35,196.00 BASE BID ALT. N0. 1 ALT. N0. 2 (60 DAYS) (48 DAYS) 36 DAYS) $ 88,121.10 93,311.00 99,327.00 103,087.50 116,838.80 118,181..48 $ 88,121.10 103,811.00 104,327.00 No Bid 121,838.80 121,681.48 $ 88,121.10 109,311.00 109,227.00 No Bid 126,838.80 123,681.48 Staff's evaluation of the three low bids indicates that it would be in the City's best interest to accept Alternate No. 2 in the amount of $88,121.10 and 27 working days as submitted by Walt Williams Construction, Inc., since no premium is involved in accepting this Alternate. The low bidders are in compliance with the City's DBE Policy. •~ ENGINEER'S ESTTP1ATE OF COST• Based on standard City policy and the low bid prices, the following assessment rates have been established 6 inch thick reinforced concrete pavement $36.59/L.F. ' 7 inch thick concrete curb $ 2.33/L.F. The total cost for street improvements to Lawnwood Avenue is distributed as follows Property owners' share~of cost $ 3,854.72 ( 4%) Caty's•~share of cost $ 88,672.44 (96%) Total'-E~stimat~ed Cost $ 92,527.16 FINANCING. ;, Sufficient funds tare available for transfer as follows 5 '~ . t .. ..... ` ~ G Y Z ~ -' ~ 1 i' ~ a w .. DATE REFERENCE NUMBER suB~ECT AWARD OF 'CONTRACT FOR THE ~ PAGE ASSESS~~IENT PAVING OF LAWNWOOD 4 4 1-2-90 C-.12086 AVENUE UNIT II FROP1 PARADISE ST REET ~f __ • TO SO. JUDKINS STREET (WALT WILLIAMS CONSTRUCTION, INC. AND CIRCLE " C" CONSTRUCTION COMPANY) FUND PROJECT PROJECT NAME AMOUNT 94 009905-00 Special Assessments $ 40,286.72 Unspecified 67 040901-00 Inner City Streets $ 57,830.05 Unspecified 45 60-90-20 Water and Sewer $ 3,600.00 Operating 76 206081-35 Street Assessment $ 26,436.33 Fund TOTAL L8,' S . Upon approval and completion of Recommendation No. 1, funds will be available as follows• FUND PROJECT PROJECT NAME AMOUNT 67 040177-00 Lawnwood Avenue $ 61,684.77 Paradise - Judkins 67 017114-00 Lawnwood Avenue $ 36,432.00 53 017114-00 Lawnwood Avenue $ 3,600.00 76 206081-34 Lawnwood Avenue $ 26,436.33 TOTAL $128,153.10 Expenditures will be made from Index Codes 630335 and 400309, 620294 (Inspection)., 620336, (Survey) . Sufficient funds are available in Street Improvement F und 67, Project No. 095106-00, Engineering Sal aries, to finance engineering inspection and administrative costs. APPROVED BY WWW d C ITY COUNCIL JAiV 2 i9~~ SUBMITTED FOR THE CITY MANAGER'S DISPOSITION BY COUNCIL: ~~~ ~'" K"s~r ,,,.PRD,C~SSEB BY 1.~ OFFICE BY___ Wi 11 i am 1~I. Wood ^ APPROVED ORIGINATING ' ^ OTHER (DESCRfBE) = C11y Of k'OTS 'Y of th® iiJoxth. Taxa~ DEPARTMENT HEAD• CITY SECRETARY ~ FOR ADDITIONAL INFORMATION CONTACT Martha Lunda .x8063 a OrQinartfls ~t~^ DATE ~;, .-~ ~~ -- ,