Loading...
HomeMy WebLinkAboutResolution 4557-12-2015 resolution NO. 4557-12-2015 AUTHORIZING THE EXECUTION OF AN INTERLOCAL AGREEMENT WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN THE TOTAL AMOUNT OF $10,000.00 FOR MATERIALS TESTING AND INSPECTION SERVICES TO BE PROVIDED BY THE STATE WHEREAS, the City of Fort Worth ("City") entered into a Local Project Advance Funding Agreement (City Secretary No. 43466) with the Texas Department of Transportation ("State") to provide funding for construction of the Dirks Road Phase 2 Project (City Project Number 00768); and WHEREAS, the terms of the said funding require inspections and testing of various off- site fabricated materials by the State to insure the quality of materials and workmanship incorporated into the construction of Dirks Road Phase 2; and WHEREAS, the State desires that the City provide compensation for inspection oversight for said materials through the Interlocal Agreement recommended herein; and WHEREAS, the State and City intend for this agreement to be for one year, in the amount of $10,000.00. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: The City Manager or his designee is authorized to execute an Interlocal Agreement with the Texas Department of Transportation in the total amount of $10,000.00 for the purpose of funding State inspections of off-site fabricated materials (Structural steel bridge components, pre-cast concrete stressed and non-stressed products) related to the Dirks Road / Altamesa Boulevard Phase II Project. Adopted this 15th day of December, 2015. ATTEST: -> � 8 00 0000,�� o O ° B c°y � � �y� � Y• 0 Mary Yaysir, �ity Secretary �? �0000 00 ORT WORT i i t CONSTRUCTION MAYOR AND COUNCIL COMMUNICATION MAP ALTAMESA BOULEVARD PHASE 2 i LOOP820 183 mr,mrr,��?rrn STDALE MERCEDES 777-1 Ft rl 1m �' O MIDGE � r��� i m TOBIE tAYNE r 1 :a? Z Ztu > r O v ♦ m r��n� Sn»,nn �'d CASTLE� k V ERNDN ,o ^�r OA 1 h- �- Z � "�p,6RANDE _ d I , m� l h%LTpN n� M r♦ ` r { op ULE0 mruux r, e II 11 It rALTAMES ALT MESA• z „ � � n,r, jI� o� - pW �O a KIN S Benbrook Lake e i DOL ,i0�a�iiF�mr'MbF7mpar���” t Yc ORS p�� li''aroa�aat �, � �FJTCH �N �'� • � '� t i I " CO,LU BUS, x l � � � C w n ✓X / �� � . �? ' arm✓ r = ;� ✓,I ", �� ;' r � ,r'L sy %mxmmwrx. �p�2Y nn:xn!mnuu r • ��f �// m rev y q� ,r/i. ✓� � �� a ,�W - AMES w IZO . iHERS�N �- gLTAM ES B •UD " r ,i 0 CLEF R E i D 500 1,000 m` Ft 0 2,000 4,000 DETAIL. OF PROJECT LOC�4►TION �,,., . �" Copyright 2014 City of Fort Worth. Unau lhor¢e d re pro duction is a violation of app kable laws. City Projct# 00768 This product is to r info rma tional purposes and may not have been prepared for or be su Bable for legal,engineering,or s rveying pu rp y e oses. h e It does not represent an on-the-g rou nd survey and repre sents only the approximate re la live Iota lio n of pmp arty boun dar'ie s. DO E# 6793 Th e City of Fort Worth assumes no re sp on s ibil ty for the accuracy ofsaid dal a. City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/15/2015 - Ordinance No. 22012-12-2015, 220'13-12-2015 & Resolution No. 4557-12-2015 DATE: Tuesday, December 15, 2015 REFERENCE NO.: C-27570 LOG NAME: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS SUBJECT: Adopt Resolution Authorizing an Interlocal Agreement with the Texas Department of Transportation in the Amount of$10,000.00 to Provide Material Inspection and Testing Services Related to the Construction of Altamesa Boulevard f/k/a Dirks Road from Granbury Road to the Chisholm Trail Parkway, Altamesa Boulevard Phase 2, Authorize Execution of Change Order No. 4 to City Secretary Contract No. 45378 with Austin Bridge & Road, LP, for Construction of Altamesa Boulevard Phase 2 in the Amount of$181,000.60 for Additional Work Related to the Fort Worth and Western Railroad Bridge, Authorize Settlement of Claims in the Amount of$690,443.36 with Austin Bridge & Road, LP, and Authorize Execution of Release Agreement, Adopt Ordinance Allocating $3,350,000.00 of Impact Fee Funds to the Altamesa Boulevard Phase 2 Project, Thereby Increasing the Total Project Cost to $27,317,082.74 and Adopt Appropriation Ordinance, Project No. C00768 (COUNCIL DISTRICT 6) RECOMMENDATION: It is recommended that the City Council: 1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Transportation Impact Fund in the amount of$3,350,000.00; 2. Authorize the transfer of funds in the amount of$3,350,000.00 ($1,400,000.00 from Unspecified Service Area W and $1,950,000.00 from Unspecified Service Area Y) to the Alta Mesa Boulevard Phase 2 Project in the Transportation Impact Fund and adopt the attached ordinance increasing appropriations in the Alta Mesa Boulevard Phase 2 Project of the Transportation Impact Fund in the amount of $3,350,000.00 for the construction of Alta Mesa Boulevard Phase 2 Project and decreasing fund balance in the Unspecified Centers of the Fund by the same amounts; 3. Adopt the attached resolution authorizing the execution of an Interlocal Agreement with the Texas Department of Transportation in the amount of$10,000.00 to provide materials inspection and testing services for various structural elements fabricated off-site for the construction of Altamesa Boulevard Phase 2; 4. Authorize the execution of Change Order No. 4 to City Secretary Contract No. 45378, with Austin Bridge & Road, LP, in the amount of$181,000.60 for the Altamesa Boulevard Phase 2 Project, thereby increasing the contract amount to $11,407,506.76; and 5. Authorize the settlement of claims related to delays as settled at mediation between the City of Fort Worth and Austin Bridge & Road, LP, in the amount of$690,443.36 and authorize the execution of Releases and Agreements necessary to complete the settlement. DISCUSSION: Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 1 of 4 This project provides for the construction of Altamesa Boulevard Phase 2, as a six-lane divided principal arterial under two separate phases. Phase 1 was completed in 2007 and extended from Bryant Irvin Road to Chisholm Trail Parkway (SH 121). Phase 2 is currently under construction and extends from Chisholm Trail Parkway (SH 121) to Granbury Road. Phase 2 includes a new railroad bridge structure, retaining wall, sidewalk, water main adjustments, traffic signal modifications and street lights. Material Testing: On October 22, 2013, M&C C-26513 authorized an Interlocal Agreement with Texas Department of Transportation (TxDOT) in the amount of$5,004.00 for inspections and testing required to insure the quality of materials and workmanship incorporated into the construction of the project. The subject Interlocal Agreement provides additional inspections and testing associated with Phase 2, including the cost for staff from the Construction Division of the TxDOT to provide services for various structural elements fabricated off-site (i.e., structural steel bridge components, pre-cast concrete stressed/non-stressed products and miscellaneous fabricated products). Change Order: The subject change order is necessary to replace existing FWWRR Rail and Railroad TIES within the work zone to accommodate replacement of the existing bridge. In addition, elevated levels of arsenic, lead and selenium were detected within the railroad right-of-way during construction, which required additional testing as requested by Texas Commission on Environmental Quality (TCEQ). Groundwater and Contaminated Soils: Two primary issues occurred during the early stages of construction which resulted in significant delays for the construction contractor. Unusually high groundwater levels were encountered during excavation for the bridge components resulting in a project delay while the City and its Engineer formulated revised groundwater management strategies which the contractor then implemented. Contaminated soils were also encountered within the construction site, which required suspension of certain work tasks to allow time to test, analyze and prepare a response plan. These items compromised the project critical path and eventually prevented the contractor from continuing construction of the bridge structure. The City and Contractor engaged in a mediation process to arrive at a settlement for the expenses associated with these unanticipated delays. A Mediation Agreement was reached to settle the claim for$690,443.36 subject to City Council approval. This settlement will add 165 days to the contract completion date. Appropriation of Impact Fees: The attached ordinances will provide $3,350,000.00 of impact fees associated with capacity improvements for this project or approximately 12 percent of the total project costs. M&C C-26676 which awarded the construction contract for Phase 2, indicated that impact fees will be necessary to provide full project funding and that Staff will seek City Council approval for this additional funding prior to final completion of the project. This additional funding is necessary to cover Phase 2 change orders, FWWRR charges, final utility relocations, project management and contingencies and other project costs as outlined in the following table. This funding is not being used for the mediated settlement. The construction start date for Phase 2 was April 2014 and the anticipated completion date is now June 2016. The total project budget for Altamesa Boulevard Phase 1 and 2 is shown below: [DESIGN - PHASE 1 and 2 _ AMOUNT _ Design Contract �_$ 2,096,726.00 _ Project Management, Design Coordination $ 1,160,480.00 xDOT Design Review [$ 83,492.00 (FWWR Right-of-Way Agreement $ 3,500,000.00 Right-of-Way and Easement Acquisition $ 850,054.00 Coordination Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 2 of 4 DESIGN PHASE BUDGET 1$ 7,690,752.00 'CONSTRUCTION AMOUNT Constructio_n_C_ontract-Phase 1 $ 2,948,026.66 Construction Contract-Phase 2 $10,742,244.51 Change Order No. 1 (M&C C-27227 3.17.15) $ 404,0_4_4.61__ Change Order No. 2 (Administrative 6.17.15) $ 48,699.04 Change Order No. 3 (Administrative 9.22.15) J$ 31,518.00 Change Order No. 4 (Pending) $ 181,000.60___ xDOT Construction Oversight $ 97,635.00 _ xDOT Material Inspection -1St Interlocal $ 5,004.00 A reement (City Secretary Contract No. 45333 ) xDOT Material Inspecton -2nd Interlocal $ 10,000.00 Agreement (Pending) ime Impact Analysis Settlement with ABR $ 690,443.36 FWWR Construction Services Reimbursement [$--269,831.00 FWWR Additional Construction Services $ 250,000.00 Reimbursement (Pending) ime Impact Analysis for Utility Relocations $ 450,000.00 (Pending) Utility Relocation Costs $ 158,804.32 Inspection, Survey, Material Testing, Project $ 3,339,079.64 Management, Contingencies �OTAL CONSTRUCTION BUDGET $19,626,330.74 OTAL PROJECT BUDGET $27,317,082.74 The funding sources for the project are as follows: PROJECT FUNDING SOURCE AMOUNT 1TxDOT, LPAFA, Phase 2 $ 6,509,000.00 Tarrant County, Phase 1 _ $2,007,444.42 City Funding, 2007 CO (39001) _ $14,952,193.32 City Funding, 1998 Bond $498,445.00 (39409) Requested Impact Fee Funding, $1,400,000.00 Service Area W Requested Impact Fee Funding, $1,950,000.00 Service Area Y TOTAL PROJECT FUNDING —1$27,317,082.74 M/WBE OFFICE -Austin Bridge & Road, LP, is in compliance with the City's DBE Program by committing Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 3 of 4 to an additional 10 percent DBE participation on Change Order No. 4. The City's DBE goal on this change order or extra work is 10 percent. Authorizations provided with this Mayor and Council Communication will result in no additional annual operating impacts to the Transportation and Public Works Department's operating budget beyond those previously identified. FISCAL INFORMATION /CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations, and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated in this action, within the 2007 Critical Capital Fund and the Impact Fee Fund. FUND IDENTIFIERS (FIDs): TO Fund Department Accouni Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) 1 39008 0060419 4413001 UN9925 UN2300 $1,400,000.06 1 39008 0060419 5740010 UN9925 UN2300 1,400,000.00 1)39008, 0060419 4413001 UN9927 UN2300 $1,950,000.00 1 39008 0060419 5740010 UN9927 UN2300 $1,950,000.00 2 39008 0200431 4413001 C00768 CO2383 $3,350,000.00 2 39008 0200431 5740010 C00768 CO2383 $3,350,000.00 FROM Fund Department Accouni Project Program Activity Budget Reference # Amount ID ID Year Chartfield 2 2 39008 0060419 4413001 UN9925 UN2300 $1,400,000.00 39008 0060419 5740010 UN9925 UN2300 $1,400,000.00 2)39008 0060419 4413001 UN9927 UN2300 $1,950,000.00 2 39008 0060419 5740010 UN9927 UN2300 ($1,950,000.00 3 39001 0200431 5740010 C00768 CO2383 $10,000.00 39001 0200431 5740010 C00768 CO2383 $181,000.60 5 39001 0200431 5740010 C00768 CO2383 $690,443.36 CERTIFICATIONS: Submitted for City Manager's Office by_ Jay Chapa (5804) Originating Department Head: Douglas Wiersig (6157) Additional Information Contact: Leon Wilson (8883) Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 4 of 4