NO. 4557-12-2015
AUTHORIZING THE EXECUTION OF AN INTERLOCAL AGREEMENT
WITH THE TEXAS DEPARTMENT OF TRANSPORTATION IN THE TOTAL
AMOUNT OF $10,000.00 FOR MATERIALS TESTING AND INSPECTION
SERVICES TO BE PROVIDED BY THE STATE
WHEREAS, the City of Fort Worth ("City") entered into a Local Project Advance
Funding Agreement (City Secretary No. 43466) with the Texas Department of Transportation
("State") to provide funding for construction of the Dirks Road Phase 2 Project (City Project
Number 00768); and
WHEREAS, the terms of the said funding require inspections and testing of various off-
site fabricated materials by the State to insure the quality of materials and workmanship
incorporated into the construction of Dirks Road Phase 2; and
WHEREAS, the State desires that the City provide compensation for inspection oversight
for said materials through the Interlocal Agreement recommended herein; and
WHEREAS, the State and City intend for this agreement to be for one year, in the amount
of $10,000.00.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS:
The City Manager or his designee is authorized to execute an Interlocal Agreement with
the Texas Department of Transportation in the total amount of $10,000.00 for the purpose of
funding State inspections of off-site fabricated materials (Structural steel bridge components,
pre-cast concrete stressed and non-stressed products) related to the Dirks Road / Altamesa
Boulevard Phase II Project.
Adopted this 15th day of December, 2015.
ATTEST: -> � 8 00 0000,��
o O
°
B c°y �
� �y� �
Y•
0
Mary Yaysir, �ity Secretary �? �0000 00
ORT WORT
i
i
t
CONSTRUCTION MAYOR AND COUNCIL COMMUNICATION MAP
ALTAMESA BOULEVARD PHASE 2 i
LOOP820 183 mr,mrr,��?rrn STDALE
MERCEDES 777-1 Ft
rl
1m �'
O MIDGE
� r���
i
m
TOBIE tAYNE
r 1
:a?
Z Ztu > r O
v ♦ m r��n� Sn»,nn �'d
CASTLE� k
V ERNDN ,o
^�r OA
1
h-
�-
Z
� "�p,6RANDE
_
d I ,
m�
l
h%LTpN
n� M
r♦ `
r
{
op ULE0
mruux
r, e II
11 It
rALTAMES
ALT MESA• z
„ � � n,r, jI�
o� - pW
�O
a
KIN S
Benbrook
Lake e i DOL ,i0�a�iiF�mr'MbF7mpar���”
t Yc ORS p�� li''aroa�aat
�, �
�FJTCH �N �'� • � '� t i I
" CO,LU BUS,
x
l � �
� C
w
n
✓X /
�� � . �? ' arm✓
r = ;� ✓,I ", �� ;' r � ,r'L sy %mxmmwrx. �p�2Y nn:xn!mnuu
r
• ��f �// m
rev y q� ,r/i. ✓� � �� a ,�W
-
AMES
w
IZO
. iHERS�N
�- gLTAM ES B •UD
"
r
,i
0 CLEF R
E
i
D 500 1,000
m`
Ft
0 2,000 4,000
DETAIL.
OF PROJECT LOC�4►TION �,,., . �"
Copyright 2014 City of Fort Worth. Unau lhor¢e d re pro duction is a violation of app kable laws. City Projct# 00768
This product is to r info rma tional purposes and may not have been prepared for or be su Bable for legal,engineering,or s rveying pu rp y e
oses. h e
It does not represent an on-the-g rou nd survey and repre sents only the approximate re la live Iota lio n of pmp arty boun dar'ie s. DO E# 6793
Th e City of Fort Worth assumes no re sp on s ibil ty for the accuracy ofsaid dal a.
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 12/15/2015 - Ordinance No. 22012-12-2015, 220'13-12-2015
& Resolution No. 4557-12-2015
DATE: Tuesday, December 15, 2015 REFERENCE NO.: C-27570
LOG NAME: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS
SUBJECT:
Adopt Resolution Authorizing an Interlocal Agreement with the Texas Department of Transportation in the
Amount of$10,000.00 to Provide Material Inspection and Testing Services Related to the Construction of
Altamesa Boulevard f/k/a Dirks Road from Granbury Road to the Chisholm Trail Parkway, Altamesa
Boulevard Phase 2, Authorize Execution of Change Order No. 4 to City Secretary Contract No. 45378 with
Austin Bridge & Road, LP, for Construction of Altamesa Boulevard Phase 2 in the Amount of$181,000.60
for Additional Work Related to the Fort Worth and Western Railroad Bridge, Authorize Settlement of Claims
in the Amount of$690,443.36 with Austin Bridge & Road, LP, and Authorize Execution of Release
Agreement, Adopt Ordinance Allocating $3,350,000.00 of Impact Fee Funds to the Altamesa Boulevard
Phase 2 Project, Thereby Increasing the Total Project Cost to $27,317,082.74 and Adopt Appropriation
Ordinance, Project No. C00768 (COUNCIL DISTRICT 6)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Transportation Impact Fund in the amount of$3,350,000.00;
2. Authorize the transfer of funds in the amount of$3,350,000.00 ($1,400,000.00 from Unspecified
Service Area W and $1,950,000.00 from Unspecified Service Area Y) to the Alta Mesa Boulevard Phase 2
Project in the Transportation Impact Fund and adopt the attached ordinance increasing appropriations in
the Alta Mesa Boulevard Phase 2 Project of the Transportation Impact Fund in the amount of
$3,350,000.00 for the construction of Alta Mesa Boulevard Phase 2 Project and decreasing fund balance
in the Unspecified Centers of the Fund by the same amounts;
3. Adopt the attached resolution authorizing the execution of an Interlocal Agreement with the Texas
Department of Transportation in the amount of$10,000.00 to provide materials inspection and testing
services for various structural elements fabricated off-site for the construction of Altamesa Boulevard
Phase 2;
4. Authorize the execution of Change Order No. 4 to City Secretary Contract No. 45378, with Austin
Bridge & Road, LP, in the amount of$181,000.60 for the Altamesa Boulevard Phase 2 Project, thereby
increasing the contract amount to $11,407,506.76; and
5. Authorize the settlement of claims related to delays as settled at mediation between the City of Fort
Worth and Austin Bridge & Road, LP, in the amount of$690,443.36 and authorize the execution of
Releases and Agreements necessary to complete the settlement.
DISCUSSION:
Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 1 of 4
This project provides for the construction of Altamesa Boulevard Phase 2, as a six-lane divided principal
arterial under two separate phases. Phase 1 was completed in 2007 and extended from Bryant Irvin Road
to Chisholm Trail Parkway (SH 121). Phase 2 is currently under construction and extends from Chisholm
Trail Parkway (SH 121) to Granbury Road. Phase 2 includes a new railroad bridge structure, retaining
wall, sidewalk, water main adjustments, traffic signal modifications and street lights.
Material Testing: On October 22, 2013, M&C C-26513 authorized an Interlocal Agreement with Texas
Department of Transportation (TxDOT) in the amount of$5,004.00 for inspections and testing required to
insure the quality of materials and workmanship incorporated into the construction of the project. The
subject Interlocal Agreement provides additional inspections and testing associated with Phase 2,
including the cost for staff from the Construction Division of the TxDOT to provide services for various
structural elements fabricated off-site (i.e., structural steel bridge components, pre-cast concrete
stressed/non-stressed products and miscellaneous fabricated products).
Change Order: The subject change order is necessary to replace existing FWWRR Rail and Railroad
TIES within the work zone to accommodate replacement of the existing bridge. In addition, elevated
levels of arsenic, lead and selenium were detected within the railroad right-of-way during construction,
which required additional testing as requested by Texas Commission on Environmental Quality (TCEQ).
Groundwater and Contaminated Soils: Two primary issues occurred during the early stages of
construction which resulted in significant delays for the construction contractor. Unusually high
groundwater levels were encountered during excavation for the bridge components resulting in a project
delay while the City and its Engineer formulated revised groundwater management strategies which the
contractor then implemented. Contaminated soils were also encountered within the construction site,
which required suspension of certain work tasks to allow time to test, analyze and prepare a response
plan. These items compromised the project critical path and eventually prevented the contractor from
continuing construction of the bridge structure. The City and Contractor engaged in a mediation process
to arrive at a settlement for the expenses associated with these unanticipated delays. A Mediation
Agreement was reached to settle the claim for$690,443.36 subject to City Council approval. This
settlement will add 165 days to the contract completion date.
Appropriation of Impact Fees: The attached ordinances will provide $3,350,000.00 of impact fees
associated with capacity improvements for this project or approximately 12 percent of the total project
costs. M&C C-26676 which awarded the construction contract for Phase 2, indicated that impact fees will
be necessary to provide full project funding and that Staff will seek City Council approval for this additional
funding prior to final completion of the project. This additional funding is necessary to cover Phase 2
change orders, FWWRR charges, final utility relocations, project management and contingencies and
other project costs as outlined in the following table. This funding is not being used for the mediated
settlement.
The construction start date for Phase 2 was April 2014 and the anticipated completion date is now June
2016.
The total project budget for Altamesa Boulevard Phase 1 and 2 is shown below:
[DESIGN - PHASE 1 and 2 _ AMOUNT _
Design Contract �_$ 2,096,726.00 _
Project Management, Design Coordination $ 1,160,480.00
xDOT Design Review [$ 83,492.00
(FWWR Right-of-Way Agreement $ 3,500,000.00
Right-of-Way and Easement Acquisition $ 850,054.00
Coordination
Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 2 of 4
DESIGN PHASE BUDGET 1$ 7,690,752.00
'CONSTRUCTION AMOUNT
Constructio_n_C_ontract-Phase 1 $ 2,948,026.66
Construction Contract-Phase 2 $10,742,244.51
Change Order No. 1 (M&C C-27227 3.17.15) $ 404,0_4_4.61__
Change Order No. 2 (Administrative 6.17.15) $ 48,699.04
Change Order No. 3 (Administrative 9.22.15) J$ 31,518.00
Change Order No. 4 (Pending) $ 181,000.60___
xDOT Construction Oversight $ 97,635.00 _
xDOT Material Inspection -1St Interlocal $ 5,004.00
A reement (City Secretary Contract No. 45333
)
xDOT Material Inspecton -2nd Interlocal $ 10,000.00
Agreement (Pending)
ime Impact Analysis Settlement with ABR $ 690,443.36
FWWR Construction Services Reimbursement [$--269,831.00
FWWR Additional Construction Services $ 250,000.00
Reimbursement (Pending)
ime Impact Analysis for Utility Relocations $ 450,000.00
(Pending)
Utility Relocation Costs $ 158,804.32
Inspection, Survey, Material Testing, Project $ 3,339,079.64
Management, Contingencies
�OTAL CONSTRUCTION BUDGET $19,626,330.74
OTAL PROJECT BUDGET $27,317,082.74
The funding sources for the project are as follows:
PROJECT FUNDING SOURCE AMOUNT
1TxDOT, LPAFA, Phase 2 $ 6,509,000.00
Tarrant County, Phase 1 _ $2,007,444.42
City Funding, 2007 CO (39001) _ $14,952,193.32
City Funding, 1998 Bond $498,445.00
(39409)
Requested Impact Fee Funding, $1,400,000.00
Service Area W
Requested Impact Fee Funding, $1,950,000.00
Service Area Y
TOTAL PROJECT FUNDING —1$27,317,082.74
M/WBE OFFICE -Austin Bridge & Road, LP, is in compliance with the City's DBE Program by committing
Logname: 20ALTAMESA PHASE 2 PROJECT AMENDMENTS Page 3 of 4
to an additional 10 percent DBE participation on Change Order No. 4. The City's DBE goal on this change
order or extra work is 10 percent.
Authorizations provided with this Mayor and Council Communication will result in no additional annual
operating impacts to the Transportation and Public Works Department's operating budget beyond those
previously identified.
FISCAL INFORMATION /CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above recommendations,
and adoption of the attached appropriation ordinance, funds will be available in the current capital budget,
as appropriated in this action, within the 2007 Critical Capital Fund and the Impact Fee Fund.
FUND IDENTIFIERS (FIDs):
TO
Fund Department Accouni Project Program Activity Budget Reference # Amount
ID ID Year (Chartfield 2)
1 39008 0060419 4413001 UN9925 UN2300 $1,400,000.06
1 39008 0060419 5740010 UN9925 UN2300 1,400,000.00
1)39008, 0060419 4413001 UN9927 UN2300 $1,950,000.00
1 39008 0060419 5740010 UN9927 UN2300 $1,950,000.00
2 39008 0200431 4413001 C00768 CO2383 $3,350,000.00
2 39008 0200431 5740010 C00768 CO2383 $3,350,000.00
FROM
Fund Department Accouni Project Program Activity Budget Reference # Amount
ID ID Year Chartfield 2
2 39008 0060419 4413001 UN9925 UN2300 $1,400,000.00
39008 0060419 5740010 UN9925 UN2300 $1,400,000.00
2)39008 0060419 4413001 UN9927 UN2300 $1,950,000.00
2 39008 0060419 5740010 UN9927 UN2300 ($1,950,000.00
3 39001 0200431 5740010 C00768 CO2383 $10,000.00
39001 0200431 5740010 C00768 CO2383 $181,000.60
5 39001 0200431 5740010 C00768 CO2383 $690,443.36
CERTIFICATIONS:
Submitted for City Manager's Office by_ Jay Chapa (5804)