HomeMy WebLinkAboutOrdinance 10431
ORDINANCE NO. l/ ~ I
AN ORDINANCE DETERMINING THE NECESSITY- FOR AND ORDERING AND
P1~VIDING FOR THE IMPROVEMENT OF, CAREY ROAD, UNIT I, FROM
WILBAI~ER STREET TO U. S. HIGHWAY 287, AND WILBARGER STREET,
UNIT II, FROM CAREY ROAD TO THE WEST PROPERTY LINE OF BLOCK 5,
VILLAGE CREEK INDUSTRIAL PARK ADDITION, AS HEREINAFTER SET FORTH;
ORDERING AND APPROVING ESTIMATE OF CO5TS; MAKING REVISIONS FOR THE
LEVY OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS
THEREOF FOR APART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING
THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE
WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT
THIS ORDINANCE AND ALL SUBSEQ[JENT PROCEEDINGS RELATING ZO SAID
STREET IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE
1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY
SECRETARY 'ICJ ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY
FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS
OF THIS CITY; AND PROVIDING AN EFFECTIVE IY~TE.
WHEREAS, the Director of Transportation and Public Works for the City of
Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed
the improvement of, Carey Road, Unit I, and Wilbarger Street, Unit II, which
is hereby designated Project No. 29-036959-00 (said improvements being
hereinafter referred to as the "Project");
WHEREAS, the Project shall entail the improvement of the street, avenue,
alley, highway, boulevard, drive, public place, square or any portions
thereof (hereinafter referred to singly and collectively as the "highway"),
and shall be accomplished by filling, grading, raising, paving, repaving,
repairing, constructing, reconstructing, realigning, widening, narrowing or
straightening said highway, or the curbs, gutters or sidewalks and any
appurtenances or incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an
estimate of the costs of the Project; NOW, 'THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE"CITY OF FORT WORTH, TEXAS, THAT:
I.
There exists a public necessity for the Project, and it is hereby ordered
that Plans and Specifications be prepared for the improvement of the Project
and that the Project be carried out and constructed according to the Plans
and Specifications, and any changes or amendments thereto.
~.
-~
0
ti -
II.
The estimated cost of the Project to the City of Fort Worth based on the
estimate of the City Engineer is $ 91b,320.56. The estimated cost of the
Project shall be paid partly by the City of Fort Worth and partly by
assessments to the property abutting the Project and the owners thereof.
The assessments to the property abutting the Project and the owners thereof
shall be levied in accordance with the requirements of TEX. REV. CIV.
STAT. ANN., Article 1105b (hereinafter referred to as "Article 1105b"), and
the City Charter of Fort Worth, Texas, and shall not be more than all the
costs of constructing, reconstructing, repairing, and realigning curbs,
gutters and sidewalks and nine-tenths (9/lOths) of the cost of the remaining
improvements comprising the Project. In any event, said assessments shall
not exceed the special benefits to the abutting property and its owners, as
enhanced by the Project. The City of Fort Worth shall pay the balance of
the cost of the Project not assessed against the property abutting the
Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by
the City of Fort Worth of the Project after its completion. Said
assessments shall be due and payable on or before 30 days after the
acceptance by the City of Fort Worth of the Project, except that, if the
abutting owner so elects, by complying with the terms hereinafter set forth,
said assessments may be paid in installments. Said assessments may be paid
in five (5) equal, consecutive annual installments, the first installment to
be due and payable no later than thirty (30) days after the acceptance by
the City of Fort Worth of the Project, and each subsequent installment to be
due and payable on an annual basis on each consecutive anniversary date of
the acceptance of the Project; in the alternative, said assessments may be
paid in forty-nine (49) equal consecutive monthly installments, the first
installment to be due and payable no later than thirty (30) days after the
acceptance by the City of Fort Worth of the Project. Any owner electing to
pay the assessment in installments, as provided for herein, as a condition
precedent to such election, must execute a promissory note and mechanic's
and materialmen's lien contract evidencing the owner's intent to pay the
assessment in accordance with the terms of one of the alternatives
hereinabove set forth. In any case in which the owner elects to pay the
assessment in installments under either of the alternatives specified, the
assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum. Should any installment not be
paid on its due date, the City of Fort Worth shall have the option to
accelerate the entire unpaid balance of the assessment and declare the same
to be immediately due and payable; this and other terms governing any
default in the payment of any installment shall be set forth in the
mechanic's and materialman's lien contract and shall be uniform among all
owners executing the contract.
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
-2-
i'
III .
~,.
Notice shall be given and a hearing shall be held prior to making or levying
any assessment against any property abutting the Project or its owners, as
required by Article 1105b, Section 9. The notice of the hearing required
under said statute shall be published in a newspaper of the City of Fort
Worth at least three (3) times, the first publication to be made at least
twenty-one (21) days before the hearing date. Written notice shall be
personally given to all persons or entities claiming or owning an interest
in the property abutting the Project and shall be mailed at least fourteen
(14) days before the hearing in the manner specified by Article 1105b,
Section 9. Said hearing shall be held before the City Council of Fort
Worth, Texas, on the 19th day of DECEMBER , 1989 at 10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings
taken and had in accordance with and under the terms of Article 1105b and
the Charter of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County
Clerk of Tarrant County, Texas, a notice of the authorization and approval
of the Project and the pendency of the assessment proceedings authorized
hereunder.
VI .
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Books of the City Council and
by filing the complete ordinance in the appropriate ordinance records of
this city.
VII.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.
PASSED AND APPROVED THIS
19~.
APPROVID AS 'Ib FORM AND LEGALITY:
City Attorney
Date:
DAY OF `_/Y~~i77Z'~cfiLJ
-3-
:.~ -
CAREY ROAD, UNIT I
WILBARGER STREET UNIT II
PROJECT N0. 29-036959-00
~ ~ io~31
UCIC?~R 1989
CAREY ROAD, UNIT I:
The following Community Facilities Agreement provide the Developer's Cost
Contribution for street improvements to adjacent property.
Community Facilities Agreement N0. 1501 (JAGEE OORP.)
VILLAGE CREEK INDUSTRIAL PARY.
BIDCKS 1 & 2R
C.F.A. Amount of Contribution..........$ 279,128.00
Less ~dilbarger Street Contribution..........$ 173,444.80
Carey Road Contribution..........$ 105,683.20
PROTECT N0. 029-036959-00, CAREY FAD UNIT I, FRfJM S~ILBARGER STREET ~ U S HWY 28'1, try be
improved by instructing a seven-inch thick reinforced concrete pavement with a seven-inch
high attached concrete curb on a six-inch lime stabilized subgrade sfl that the finished
roadway will vary forty-eight to sixty-feet wide on a variable Right-0f ~~ay. Drainage
appurtenances and street lights will be installed where necessary.
041NER & LEGAL DESCRIPTION ZONING
IIwINNING AT WII.BARGER STREET
EAST SIDE:
000003845400
MRS IRIS M FARKAS
3501 BELLAIRE DR NO #36 BLDG C
FORT 4JORTH TX 76109
TRACT 12E2 ABST 395 B
FRONTAGE
J. tiJ. LIANIEL SURVEY
204.00'PAVEMIIIT
204.00'CURB
204.00'LIGHTS
204.00'DRAINAGE
RATE APIOUNT ASSESSMETTT
50.71
2.64
1.97
12.08
APPRAISAL
VACANT LOT
000001761196
T~IERCHANTS FAST
MCITOR LINES
BOY 2050
DALLAS TX 75221
BLK 1 LL7T 1-A
A'lERCHATTTS ADDITION
1344.00'PAVEN[ENT
J 1312.00'CURB
1344.00'LIGHTS
1344.00' DRAITIAGE
50.71
2.64
1.97
12.08
APPRAISAL
10344.84
538.56
401.88
2464.32
T3749.60
10812.00
68154.24
3463.68
2647.68
16235.52
90501..12
71232.00
10812.-00
A1ITUSTED; * , VACATTT LDT 71232.00
CAREY FAD, UNIT I:
COST DISTRIBUTIOP~:
A. PROPERTY Oti~NER BY ASSESSMENT ..................$ 82,044.00
A-1 Street Improvements........$ 79,582.68
A-2 Street Lights ..............$ 2,461.32
B. DEVELOPER ~ONTRIBUTIOPI .........................5105,683.20
B-1 Street Improvement .........5102,594.24
B-2 Street Lig hts ...............$ 3,088.96
B-3 To be pre-paid ..............$105,683.20
C. FORT ~•JORTH CITY.... ............................5119,216.32
C-1 Street Improvements.........$ 84,920.49
C-2 Street Lights ... ...........$ 6,391.87
C-3 Engr Insp / Admin...........$ 27,903.96
(10$ of $279,039.56)
D. 1UTAL ESTIMATED PROJECT COST ...................$306,943.52
-3-
~7DCT NO. 29-036959-00 WILBARGER STREET UNIT II, FROM CAREY ROAD TU THE WEST PROPERTY LINE OF
~CK 5, VILLAGE CREEK INDUSTRIAL PARK ADDTTION, to be improved by constructing a 7-inch thick
enforced concrete pavement with a 7-inch high attached concrete curb on a 6-inch thick lime
mobilized subgrade so that the roadway will be 48 to 60-feet wide on a variable right-of-way.
-inch thick and 5 feet wide concrete sidewalks will be constructed on the north side of the
met and 6-inch thick concrete driveway approaches will be constructed where shown on the
ins. Drainage appurtenances and street lights will be installed where necessary.
~r~R & I~.GAL DESCRIPTION ZONING
________~M~_~
~-'i:I'fi SIDE
uU001348523
.;.:,,L,IE MAYS
y.33 jlIL.BARGER
_ WORTH TX 76119
~ 3 L~7T 14
VACAr~'T LOT
FROrTTAGE
RATE
HOP4E ACRES ADDITION
B 100.00'PAVFMENT
100.00'CURB
100.00'LIGHTS
100.00' DRAIrIAGE
500.00 SF SDj~,LK
50.71
2.64
3.75
16.20
2.60
APPRAISAL
ASSESSMErTT
5071.00
264.00
375.00
1620.00
1300.00
8630.00
5300.00
WILdCES SUB-DIVISION
X003529487
TED SAVINGS ASSN
~0 SO WEST FR1iT1' STE 200 B
ASTON TX 77027
~~ I,OT B
100.00'PAVEMENT
100.00'CURB
100.00'LIGHTS
100.00'DRAINAGE
500.00 SF SDr~ lAL,K
50.71 5071.00
2.64 264.00
3.75 375.00
16.20 1620.00
2.60 1300.00
8630.00
APPRAISAL 5300.00
VACArTT IIJT
X003529479
.yTED SAVINGS Assn
~0 SO WEST FRI7Y STE 200
ASTON TX 77027
~~ LOT Al
~: L]STED: * - VACANT IIJT
5300.00
WIL.KES SUB-DIVISION
B 100.00'PAVfSiIIQT 50.71 5071.00
84.00'CURB 2.64 221.76
100.00'LIGHTS 3.75 375.00
100.00'DRAIidAGE 16.20 1620.00
500.00 SF SIX~LK 2.60 1300.00
8587.76
APPRAISAL 5300.00
5300.00
5300.00
_~_
a LEGAL DESCRIPTION ZONING FROr7TAGE RATE At'9QUNT ASSESSP'IENT
HOME ACRES ADDITION
.. = SIDE
.349295
G FREEMAN ,IV
~~ VESTA FARLEY E 290.00'PAVII~TT 50.71 14705.90
_=~H TX 76119 290.00'CURB 2.64 765.60
6 IIJT A,B,C & 13 290.00'LIGHTS 3.75 1067.50
290.00'DRAINAGE 16.20 4698.00
1450.00 SF SDY~ 2.60 3770.00
25027.00
APPRAISAL 15370.00
15370.00
A,B,C, ARE VACANT, IQr 13 has a mobile hrn~e
HOME ACRES ADDITION
X349449
L WRIGHT
-_~ 850 E 200.00'PAVQ4II~'I' 50.71 10142.00
-'VG CITY TX 76951 200.00'CURB 2.64 526.00
o I1JT 14 & 15 200.00'LIGHTS 3.75 750.00
200.00'DRAINAGE 16.20 3240.00
241.20 SF DR APPR 2.75 663.30
850.00 SF SL7L~,L.K 2.60 2210.00
15323.30
APPRAISAL 10600.00
10600.00
~: *, BUSINESS
HOPiE ACRES ADDITION
_ •- 149465
_
MITCHELL
-ZBARGER E 100.00'PAVII~IENT 50.71 5071.00
~'H TX 76119 100.00'CURB 2.64 264.00
- . L~7I' 16R i00.00'LIGHTS 3.75 375.00
100.00'DRAINAGE 16.20 1620.00
241..20 SF DR APPR 2.75 663.30
350.00 SF SI7L~,LK 2.60 910.00
7993.30
APPRAISAL 5300.00
5300.00
~: * , Buslr~ESs
HOME ACRES ADDITION
49473 ~---~_r. _~ .~~ ~~
MITCHELL
- =.BARGER E 100.00'PAVfMII~T 50.71 5071.00
~~Ei TX 76119 84.00'CURB 2.64 221.76
Lf.IT 17A 100.00'LIGHTS 3.75 375.00
100.00'DRAINAGE 16.20 1620.00
241.20 SF DR APPR 2.75 663.30
350.00 SF SDV~,LK 2.60 910.00
-"
~ 8861006
r~:
, BUSINESS
APPRAISAL 5300.00 5300.00
-5-
:T~]ER & LEGAL DESCRIPTION ZONING FRONTAGE RATE
HOME ACRES ADDITION
~RTfi SIDE
00001349643
~~EST W THOMAs
~~2a BAYLOR
-' WORTH TX 76119
=K 7 IIJTS A,$,C,13
BUS, lOT 13 VACANT
E 300.00'PAVEMENT
300.00'CURB
300.00'LIGHTS
300.00'DRAINAGE
669.35 SF DR APPR
1085.00 SF SDY~ILK
50.71 15213.00
2.64 792.00
3.75 1125.00
16.20 4860.00
2.75 1840.71
2.60 2821.00
23830.71
APPRAISAL 19080.00
HOME ACRES ADDITION
_00001349856
~ARENCE JOHNSOf1
"_13 HILLS)AL.E E
:" WORTH TX 76119
7 LfJT 14
VACANT IIJT
X0005808677
~'EDOM
~aTIST CHURCH
:~9 ~~ILBARGER ST
'" WORTH TX 76119
33 & 33A
BUSTED:#, CHURCH BUILDING
100.00'PAVEMEtTT 50.71
100.00'CURB 2.64
100.00'LIGHTS 3.75
100.00'DRAINAGE 16.20
500.00 SF SIXlAL.K 2.60
APPRAISAL
ASSABRAP~IER G J , ASST 7
359.00'ADJUSTID:
E 155.00' PAVII4FNI'
204.00' PAVII4ErTI'
155.00'CURB
204.00'CURB
155.00'LIGHTS
204.00'LIGHTS
194.70 SF DR APPR
775.00 SF SI7WAI~C
1020.00 SF SDG~,I,IC
50.71
25.36
2.64
1.32
3.75
1.88
2.75
2.60
1.30
5071.00
264.00
375.00
1620.00
1300.00
8630.00
5300.00
7860.05
5173.44
409.20
269.28
581.25
383.52
535.43
2015.00
1326_00
18553.17
APPRAISAL 19027.00
ASSESSf~'iENT
19080.00
5300.00
18553.17
-6-
YJILBARGER STREET, UPJIT II:
The Assessment Paving Policy as revised July 28, 1987 (M&C G-7160),
provides that property zoned and used as one or two family
residential property in target areas will not be assessed for street
reconstruction. Under this policy, the owners of the following
improved property zoned and used as one and two family residences will
not be assessed.
HO"'IE ACRES ADDITION
Block 3, IAt 11B, 12, 13, 15
LEGIIID:
* Inlet Credit
# Triangular lot (155 ft @ regular rate, & 204 ft @ half rate = 359 ft.
-~-
~~ILBARGER STREET., UNIT II:
The following Co~nunity Facilities Agreement provide the Developer's Cost
Contribution for street i~rovements to adjacent property.
Co~nunity Facilities Agreement t~1O. 1501 (JAGEE CORP.)
VILL~IGE CREEK INDUSTRIAL PARK ADDITION
BIDCKS 1, 3R & 5
C.F.A. Amount of
.
Contribution..........$ 279,128.00
.............$ 105,683.20
Less Carey Road
SJilbarger Street
" ............$ 173,444.80
_8
WZLBARGER STREET, UNIT II:
COST DISTRIBUTION:
A. PROPERTY OG•JNER BY ASSESSr•~NT ..................$ 95,403.17
A-1 Street Improvements........$ 86,339.87
A-2 Street Lights ..............$ 9,063.30
B. DEVELOPER OONTRIBUTION BY CFA ..................$173,444.80
B-1 Street Improvement .........$164,815.44
B-2 Street Lights ...............$ 8,629.36
B-3 To be pre-paid ..............$173,444.80
C. FOP,I' WORTH CITY ................................5340,529.07
C-1 Street Improvements.........$269,049.83
C-2 Street Lights ...............$ 16,081.33
C-3 Engr Insp f Admin...........$ 55,397.91
(10$ of $553,979.13)
D. TOTAL ESTIMATED PROJECT OOST ...................$609,377.04
_o_
PRU7ECT NO. 29-036959-00 SUMMARX
(Carey Fd~ad Unit I, Wilbarger Unit III
Property Owners by Assessment
A.
A-1 Street Improvements .............$ 165,922.55
A-2 Street Lights ...................$ 11,524.62
B.
Developers Contribution by CFA
B-1 Street Improvements .............$ 267,409.68
B-2 Street Lights ...................$ 11,718.32
Fort Worth City
C.
C-1 Street Improvements .............$ 353,970.32
C-2 Street Lights ...................$ 22,473.20
C-3 Engr Insp/Admin.... ..... ..$ 83,301.87
(10~ of Estimate $833,018.69?~
TC)TA,L ESTIMATED PROJECT COST
D.
-10-
$ 177,447.17
$ 279,128.00
$ 459,745.39
$ 916,320.56
MASER FILL+)
11000Ui1TiNa•2 ~IUL ly/ ® U IUL U IL~LI(~ ~®IL1V U Ic~tl~ /Ll~ ~®U a lV U U l4~ ILl4/ ~ l4~ (S~lL~ll~l4/ ~ (L® U IL
lW1NBPORTATIOJ1IpUpLIC IYORICle\J~
NAYER
1J-~V • l
~~
~a 1~P:T'Fi'2A'f~Op • REFERENCE SUBJECT AUTHORIZATION OF PROJECT AND PAGE
NUMBER ESTABLISHMENT OF BENEFIT HEARING 4
11-7-89 G-8310 DATE FOR THE ASSESSMENT PAVING '°'
REY ROAD UNIT I, IA AND
WILBARGER STREET (UNIT II)
RECOMMENDATION
It is recommended that the City Council
1. Approve the following inter-fund transfers
From To Amount Reason
94-009905-00 29-036959-00 $177,447.17 To provide funds
Special Carey Road for the property
Assessments Unit I and owners' share of
Unspecified Wilbarger Street, the street con-
Unit II struction.
94-009905-00 67-040165--00 $179,093.50 To provide funds
Special Carey Road, for the property
Assessments Unit IA owners' share of
Unspecified the street con-
struction.
2. Declare the necessity for and order the improvements to Carey Road, Unit
I, from Wilbarger Street to US Highway 287, Wilbarger Street, Unit II,
from Carey Road to west property line of Block 5 in Village Creek
Industrial Park Addition, and Carey Road, Unit IA, from Wilbarger Street
to Berry Street,
3. Authorize the assessment of a portion of the cost of the Carey Road
(Units I and IA) and Wilbarger Street (Unit II) improvements against the
owners of the abutting property,
4. Approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
5. Establish December 19, 1989, as the date of the benefit hearing,
6. Authorize the preparation of assessment rolls and notification of pro-
perty owners in accordance with the provisions of Article 1105b of
Vernon's Annotated Texas Statutes, and
7. Adopt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 6 and other applicable requirements of
Article 1105b, Vernon's Annotated Texas Statutes.
DATE REFERENCE SUBJECT AUTHORIZATION OF PROJECT AND PAGE .y
NUMBER ESTABLISHMENT OF BENEFIT HEARING 2 ct 4
11-7-89 G-8310 DATE FOR THE ASSESSMENT PAVING
OF CAREY ROAD (UNIT I, IA), AND
WILBARGER STREET (UNIT II} ~ ~ ~ " p~ ~~~ ~~~~
nTCrIiCCTf1N
The 1986-88 Capital Improvement Program approved in March, 1986, included
funds for the improvement of Carey Road from E. Berry Street to US Highway
287. The section of Carey from Wilbarger to US 287 and Wilbarger Street from
Carey Road to the west property line of Block 5 in the Village Creek
Industrial Park Addition are included in a Community Facilities Agreement
with the owner of 50% of the adjacent land.
The streets are in the Stop Six target area, and CDBG funds will provide 30~
of the construction cost for Carey Road Units I and IA.
The projects are located in Council District No. 5.
PROJECT DESCRIPTION
Street
Carey Road, Unit I
Carey Road, Unit IA
Wilbarger Street,
Unit II
PROPOSED IMPROVEMENTS
Limits
Wilbarger Street
to US Highway 287
E. Berry Street to
Wilbarger Street
Carey Road to west
property line of
Block 5, Village
Creek Industrial
Park Addition
Width/Feet
48 to 60
40 to 48
48 to 60
Row Width/Feet
Variable
Variable
Variable
Carey Road (Unit I), from Wilbarger Street to US Highway 287, is proposed to
be improved by constructing a seven-inch thick reinforced concrete pavement
with a seven-inch high attached concrete curb on a six-inch lime stabilized
subgrade so that the finished roadway will vary from forty-eight to sixty-
feet on a variable right-of-way. Drainage appurtenances and street lights
will be installed where necessary.
Carey Road (Unit IA), from Wilbarger Street to Berry Street, is proposed to
be improved by constructing a seven-inch reinforced concrete pavement with a
seven-inch high attached concrete curb on a six-inch lime stabilized sub-
grade. The finished roadway will be 40 to 48 feet wide with a variable right-
of-way. Six-inch thick concrete driveway approaches will be constructed where
specified on plans.
Wilbarger Street (Unit II), from Carey Road to the west property line of
Block 5, Village Creek Industrial Park Addition, is proposed to be improved
by constructing a 7-inch reinforced concrete pavement with a 7-inch high
attached concrete curb on a 6-inch thick lime stabilized subgrade so that the
~, atR ri
. : h,j
Y3 ^~ ~ ~
o~+ v
DATE REFERENCE sue~ECT AUTHORIZATION OF PROJECT AND PAGE
NUMBER ESTABLISHMENT OF BENEFIT HEARING 3 ct 4
11-7-89 G-8310 DATE FOR THE ASSESSMENT PAVING
OF CAREY ROAD (UNIT I, IA), AND
WILBARGER STREET (UNIT II)
roadway will be 48 to 60 feet wide on a variable right-of-way. Four inch
thick, 5 foot wide concrete sidewalks will be constructed on the north side
of the street, and 6-inch thick concrete driveway approaches will be con-
structed where shown on the plans. Drainage appurtenances and street lights
will be installed where necessary.
ENGINEER'S ESTIMATE OF COST
Based on the Engineer's cost estimate, the assessment rates have been estab-
lished as follows
Carey Road, Unit I
7 inch thick reinforced concrete pavement $50.71/L.F.
7 inch high concrete curb $ 2.64/L.F.
Street lights $ 1.97/L.F.
Drainage $12.08/L.F.
Carey Road, Unit lA
7 inch thick. reinforced concrete pavement $49.20/L.F.
7 inch high concrete curb $ 2.70/L.F.
6 inch thick concrete driveway approaches $ 2-.75/S.F.
Drainage $48.18/L.F.
Wilbarger Street, Unit II
7 inch thick reinforced concrete pavement $50.71/L.F.
7 inch high concrete curb $ 2'.64/L.F.
6 inch thick concrete driveway approaches $ 75/S.F.
4 inch thick concrete sidewalk $,;~.60/S.F.
Street lights $ 3.75/L.F.
Drainage $16.20/L.F.
The assessment rates result in the following division of cost
'Y S '/',j 1~6r ?.
Carey Road, ~Un:~t~::~z:~-~' `f ~;,,+•=.
Property ~Ow~ne~rs'~~ ~ ' } ~ $187,727.20 (61%)
Fort Worth City $119,216.32 (39%)
•- >;r,T~otal~y_.Project Cost 306,943.52
Carey Road, Unit IA~. ~~~
Property -Ow.ne•r•s--•-~~--~----•- $ 179,093.50 (17%)
Fort Wort:b~.Ci~ty;~.-~:. .r ~° $ 872,506.50 (83%)
~'~µ.~~~~l~bta=1~~P~roject Cost X1,051.600.00
Wilbarger Street, Unit II r
Property Owners $268,847.97 (44%)
Fort Worth City $340,529.07 (56%)
Total Project Cost 609,377.04
:x .,, ~~ z.t~
~ ,
DATE REFERENCE SUBJECT AUTHORIZATION OF PROJECT AND PAGE
NUMBER ESTABLISHMENT OF BENEFIT NEARING 4 4
11-7-89 G-8310 DATE FOR THE ASSESSMENT PAVING °`
OF C REY ROD UNI ,
WILBARGER STREET (UNIT II)
AUTHORIZATION OF PROJECT
In accordance with the provisions of the Article 1105b of Vernon's Annotated
Texas Statutes, it is proposed that City Council approve the estimates of
cost for the proposed project, conduct a benefit hearing and levy assessments
for the project.
FINANCING
Sufficient funds are available as follows for transfers
Fund Project No. Project Name Amount
94 009905-00 Special Assessments $356,540.67
Unspecified
Upon approval and completion of Recommendation No. 1, sufficient funds will
be available as follows
2g 036959-00 Carey Road Unit I, $177,447.17
Wilbarger Street
Unit 2
67 040165-00 Carey Road Unit IA 179,093.50
$356,540.67
8W f/6
APPROVED BY
CITY COUNCIL
Nov ~ asa9
~~
~~~ ~ ~ ~
c~~ ~ ~ ~ ~~
SUBMITTED FOR THE
A6Y GER'S Wi 11 i
m WOOd
I DISPOSITION BY COUNCIL.
^ APPROVED PROCESSED BY
a
FFICE
O
ORIGINATING ~ OTHER (DESCRIBE)
DEPARTMENT HEAD Gary Santerre CITY SECRETARY
FOR ADDITIONAL INFORMATION
CONTACT Lunday 8063
O ~~~
DATE.
Adopted O~rd~nanC~ No4~,-~2-~ (~