HomeMy WebLinkAboutOrdinance 10356
ORDINANCE NO.
1 ~51~
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PFd'JVIDING FOR THE IMPROVEMENT OF WABASH AVENUE, AS HEREINAFTER SET
FORTH; APPROVING PROJECT PLANS AND SPECIFICATIONS; ORDERING AND
APPROVING ESTIMATE OF COSTS; LETTING CONTRACT 'IC) JAME5 W.
JACKSON, INC., FOR THE MAKING AND CONSTRUCTION OF SUCH
IMP120VEMENTS; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE
INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF
ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR
A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY
SECRETARY 'IC) FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE
COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS
ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET
IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF
VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO
ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAP'iE
IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE
ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the
Worth, Texas
improvement
67-024326-00,
Director of Transportation and Public Works for the City of Fort
(hereinafter referred to as the "Director"), has proposed the
of WABASH AVENUE, which is hereby designated Projects ido.
(said improvements being hereinafter referred to as the "Project");
WHEREAS, the Project shall entail the improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
WHEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
BE IT ORDAINED BY THE CITY OOUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
There exist a public necessity for the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or amendments thereto.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$ 36,789.22. The estimated cost of the Project shall be paid partly by the
City of Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to the property abutting the
Project and the owners thereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/lOths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort V~orth of the Project after its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8g) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
`.
contract and shall be uniform among all owners executing the contract.
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III .
Bids having been requested by appropriate advertisement, as required by Articles
1105b and 2368a and the lowest bid of JAMES W. JACKSON, INC., having been found
to be the lowest and best bid for them ing an constructson of said Project,
the contract therefore is hereby awarded to JAMES W. JACKSON, INC., at and for
the amount of $ 35,037.35.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the 5th day of September, 1989,_
at 7:00 P.M
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
Q~n
PASS D AND APPRUVID THIS U L~,Y OF ~u ~ r
19 ~Q
APPROVED AS 'IC) FORM AND LEGALITY:
City Attorney
Date:
~~1
Tt. ~ W ~ ' .Z .t
~ ,
~ --
~ ~ :.~`-
' .~~ ~ ,
- o
~J ~ Z- ~ • 1 ~ '~Jp¢O 1 1
_ V~1 ~ mss. r
F^
i` l i 0 7 8 Q ~~_ '~,~ f
I = J -~_ '
~` ~~ a 5 ~ a ~ ~ ~~.
,: A'
} ~ 1/ _ ~_
J
_:.~ - ~ .~
~ ~ R ,~
~ T 3A2
V'' B ~ TR
P ~ - ~ `MOTEL
t SiTE-
A~! ~ ~/
C 4' ~ z
38 P
~.° nr srrr w-Ric•oR ~
~" ' Q'~
5 R-3 5 R -2 Ve 311.4 ~
SR_I ~ 3A-!~
_ i~ ~~ 2
t 8 +sa4 ~i ~
9 G P < . cou~~ O Q
20 Q B s~ ~ 2g@ G ~
22 i 6 C ~ = ca+~son e ~ i 3A-
~ ~ Q _ 2 4
ABASH AVII~CTE
i7DLLTNSWpKrH STREET ~ 285' NORTH
PRQ7I~7L'!' N0. 67-024326-00
JUNE 1989
PR0.TECT N0. 067-024326-00, WABASH AVENUE, FROM COLLINSWORTH STREET Zl~ APPROXIMATELY 285
FEET NOnTH, to be improved by constructing a seven-inch thick reinforced concrete pavement
~'` with a seven-inch high attached concrete curb on a six-inch lime stabilized subgrade so that
the finished raodway will be thirty feet wide on a fifty foot rightrof way. Driveway
approaches will be constructed where specified on the plans.
OWI~R & LEGAL DESCRIPTION 7ANING FRIJrPTAGE RATE AMOUNT ASSESSMENT
BDGINNING AT OOLLINSWORTH ST. MICHAEL HUGHES ESTATE
~~IEST SIDE
000001370979
JAMES N PATTERSON JR, ETAL
~ JERRY W PRICER & 00, INC I 56.OO'PAVF3~SFNT 40.33 2258.48
809 SCARLET SAGE CT 40.00'CURB 3.35 134.00
FORT WOK14i TX 76112 $2392.48
BIX 2 LOT 6-P
000001370960
MARK VINCENT FREDERICK, ETAL
$ PETE FREDERICK I 220.00'PAVII~iENT 40.33 8872.60
P 0 BOX 121324
FORT W~'!4i TX 76121 $8872.60
BLK 2 LL7T 6-N
ADJUSTMENT: **
-1-
WABASH:
A Cannunity Facilities Agreement (short form) provided the Developers
Contributions towards the street improvement.
The amount of $ 13,198.17 was prepaid by Joe R Dugger, Sud Properties
Venture, for Carlson's Subdivision. Block 1, Lot 2.
LDGEND:
* Inlet credit
** Curb Gutter, Driveway approaches & sidewalk were constructed in
1983 less than 10 years old, qualifies for 100 credit.
-2-
WAEiASH AVFN[JE
A. Property Owners by Assessment
B. Developer contribution by Community
Facilities Agreement
C. Fort Worth City
C-1 Street Construction $ 10,574.10
C-2 Engr.Inspection / Admin. $ 1,751.87
(5$ of bid $ 35,037.35)
D. TOrTAL ESTIMATID PROJECT QOST
$ 11,265.08
$ 13,198.17
$ 12,325.97
$ 36,789.22
-3-
VASTER FILE•11 / ~,, ~.r.-.-yr~.~
ACt" ' JNtiN~!
:`:
R1IANSP.ORTAtfON~PUBI.IG W Ka ~~®~
N~LEIt ADMINIS7RA77C~ ~
~i~y ®f 1F®~°~ ~~~°th, ~Ce.~~~
DATE REFERENCE SUBJECT AWARD OF CONTRACT TO JAMES W. PAGE
NUMBER JACKSON INC. FOR THE ASSESSMENT 3
8/8/89 **C-11.792 ,~ L I 1 °f
' WORTH STREET TO 285 FEET NORTH
RECOMMENDATION
It is recommended that the City Council
1. approve the following bond fund transfers
From To
94-009905-00 67-024326-00
Special Wabash,
Assessments Collinsworth-
Unspecified 285' North
67-024901-00 67-024326-00
Assessment Wabash,
Paving Collinsworth-
Unspecified 285' North
Amount Reason
$11,265.08 To move property
owner's share
of cost from
Revolving Fund
to Project Account.
$10,574.10 To provide funds
for the City's
share of
construction cost.
2. authorize the City P1anager to execute a contract with James W. Jackson,
Inc., in the amount of $35,03.7.35 based on their low bid for the
construction of Wabash Avenue from Collinsworth Street to 285' north,
3. declare the necessity for and order the improvements to Wabash Avenue
from Collinsworth Street to 285' north,
4. authorize the assessment of a portion of the cost of the improvements
against the owners of the abutting property,
5. approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
6. establish September 5, 1989, as the date of the benefit hearing,
7. authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
Vernon's Texas Civil Statutes, and
8. adopt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 7 above, and other applicable requirements
of Article 1105b, Vernon's Texas Civil Statutes.
nrcriiccTnni
Mr. Joe K. Dugger, the developer of Carlson's Subdivision, Block 1, Lot 2,
has executed a short form Community Facilities Agreement for the construction
of Wabash Avenue frorn Collinsworth Street to 285' north. The developer will
^~"-~ a
DATE REFERENCE sus~ECT AWARD-OF CONTRACT TO JAMES W. PAGE
NUMBER JACKSON, INC., FOR THE ASSESSMENT 2„ 3
8-8x89 **C-11792 PAVING OF WABASH AVENUE FROM CO_LLINS- °f
WORTH STREET TO 285 FEET NORTH ~~ u; ~,.
prepay $13,198.17 f or his share of the cost for street improvements adjacent
to Lot 2, Block ~, Garlson's Subdivision. A carwash has recently been
completed at the corner of Collinsworth and Wabash. Wabash Avenue is in poor
condition, never having been built to City standards.
This project is located in Council District No. 3.
PROJECT DESCRIPTION
Street Limits Width/Feet Row/Width/Feet
Wabash Avenue Collinsworth Street 30 50
to 285' North
PROPOSED IP1PROUEP1ENTS
It is proposed to improve 6Jabash Avenue by constructing a seven-inch thick
reinforced concrete pavement with a seven-inch high attached concrete curb on
a six-inch thick lime stabilized subgrade so that the finished roadway will
be thirty feet wide on a fifty foot right-of-way. Six-inch thick concrete
driveway approaches will be constructed where showm on the plans.
RECEIPT OF BIDS.
Bids for the project were received on May 25, 1989, after being advertised on
May 4 and May 11, 1989, with 30 working days allotted to complete the
project.
Bidder- Amount
James W. Jackson, Inc. $35,037.35
Walt Williams Const., Inc. $38,475.50
Centerline Constructors, Inc. $38,518.54
Harrod Paving Co. $40,392.77
Howard Cement Construction $42,971.15
Thomas Const „ Inc. $56,596.50
Austin Paving Co. $61,288.45
The low bidder is in compliance with the City's MBE/WBE policy.
ENGINEER'S ESTIMATE OF COST FOR STREET IMPROVEMENTS•
Based on standard City policy and the low bid prices, the following
assessment rates have been established for Wabash Avenue.
s .~
;~
.~
7 Inch Thick Reinforced Concrete Pavement $40.33/L.F.
7 Inch High Attached Concrete Curb $ 3.35/L.F.
Fs ~~~
i.'TL'~
DATE REFERENCE
NUMBER SUBJECT AWARD OF CONTRACT TO JAMES W. PAGE
8/8/89 **C 11792 JACKSO N, INC., FOR THE ASSESSMENT 3 or 3
WORTH STREET TO 285 FEET NORTH
The total cost for street improvements to Wabash Avenue is distributed as
follows
Property Owner's Share of the Cost $24,463.25
City's Share of the Cost 12,325.97
Total 36,789.22
FINANCING
Sufficient funds are available for transfer from Street Improvement Fund 67
Project No. 024901, Unspecified-Misc ,
ellaneous Assess Paving. Upon approval
and completion of Recommendation No . 1, sufficient funds will be available in
Street Improvement Fund 67, Project 024326-00, Wabash, Collinsworth - 285'
north, to finance this contract.
Expenditures will be made from Index Code 630335.
Sufficient funds are available in Street Improvements Fund 67, Project No.
095105-00, Engineering Salaries, to finance engineering inspection and
administrative costs.
DAI f/6
APPROVED BY
CITY COUNCI!
~uG 8 1989
~~
Cfty S~otetaty of the
City of Fort Worth. Tio~c~
SUBMITTED FOR THE
CITY MANAGER'S
OFFICE BY Davi d Ivor