HomeMy WebLinkAboutOrdinance 10366
ORDINANCE NO. ~<~~Y~
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEMENT OF PEN5ACOLA STREET, _F_R_OM OLD
BENBROOK ROAD TO U.S. HIGHWAY 377, ASSET FORTH; APPROVING PROJECT
.. .. PE - r ILA ~ ~ G AND APPROVING ESTIr~ATE OF
COSTS; LETTING CONTRACT TO JAMES W. JACKSON ,INC. IN THE AMOUNT
OF $ 58,772.50 ., FOR THE MAKING AND CONSTRUCTION OF SUCH
IMPROVEMENTS; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE
INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF
ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR
A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY
SECRETARY T'0 FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE
COUNTY CLERK OF TARRAN'T COUNTY, TEXAS; DECLARING THAT THIS
ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET
IMPROVFI~IENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1I05b OF
VERNON'S TEXAS CIVIL STATUTES; AND DIRECTIPJG THE CITY SECRETARY TO
ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME
IN THE MINUTE BOOKS OF TEiE CITY COUNCIL AND BY FILING THE COMPLETE
ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Director of Transportation and Public Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of PENSACOLA AVENUE , FROM OLD BENBROOK ROAD TO U.S. HIGHWAY 377,
which is hereby designated Project No. 67-040168-00, (said improvements being
hereinafter_ referred to as the "Project"); ___._
VJf-~REAS, the Project shall entail the improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the '"highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains o_r culverts;
'vVI-iEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
'v~1riEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT, ANN., Articles 1105b and' 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
-1-
.~
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
There exist a public necessity far the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or amendments thereto.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$ 61,711.13. The estimated cost of the Project shall be paid partly by the
City of Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to ti7e property abutting the
Project and the o~mers t'nereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/lOths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the a'utting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort Worth of the Project of ter its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
-2-
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III.
Bids having been requested by appropriate advertisement, as required 'oy Articles
1105b and 2368a and the lovrast bid of JAD'IES W. JACKSON, INC., having been found
to be the lowest and best bid for the making and construction of said Project,
the contract therefore is hereby awarded to JAMES W. JACKSON, INC., at and for
the amount of $ 58,772.50. ~~~+~
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of_ the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the 17th day of October, 1989,
at 10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with aril under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of_ the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
-3-
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage. ))~
PA AND APPROVED THIS ____~~L~. DAY OF _--- - -- `
19~---.
APPROVED AS ~ FORM AND LEGALITY:
City Attorney -~ ____
Date:
-4-
~,~ ,.'
Z2 s ' , 7 D.4vElvppRT - -
S
°~ ~ ~ a S •~
,s ~'' , ~ ~
~~~ ,s _ I
1
°b~ ~
o. S u-,~1,=i~,~,o~, -
~~ r : • - -
~ GASTON
rs 22 ,~ L ~ ~ Z~ ; ~ ~ ;1~T~
v7 • ~~ 'Q ' ~ 4 i S ~ ~ -
1
J' ~~ 1R ~ ~' 1
.3 '4 Cpl 3 ~ I ~ 1 i ~
_ ~ ~~
0
vP ~~ v~ a ~ r~
'~.,e ~ Z
>~ ~s ~
Q I r, , s• u
st tt to n u n ; ,~
w~ 2 3 ~. '~
.,
~~ ~~~ h ~;e ~ s~ a e n s e ~~A~ ~ 9~ ; o
/ ~h /°7 l~ ~ r -~-.~ i ~ 2 ~ J V y e
Q x
W r- i Q
J ~ 20
Q ~~ ~ f
• 2, ty ~ ~ ~ rr ~ K is to . za tt - tr I t
alN~, q - to , t
4 ~
'~ ST ar ' EWIkG
~1
^ ~ z ~ 4 ~1 ; `~e ? ~ e 9':,o a ,t s w
f • ~ 1 - ~l /
PENSACOLA AVENCJE
(OLD BENBROOK ROAD TO HWY-377)
PROJECT NOo 67-040168-00
JUNE 1989
ar DJECT N0. 67-040168-00, F` PENSP,COLA AVf~1[JE, FROf'd OLD BENBROOK ROAD 'IU U.S. 377, is to be
~y unproved by constructing a six-inch thick reinforced concrete pavement with a seven-inch high
attached concrete curb on a six-inch thick lime stabilized subgrade so that the finished road-
way will be thirty feet wide on a fifty foot right-of-way.
~J'];R & LEGAL DESCRIPTIOPJ
OLD BECJBROOK ROAD
:JORTH SIDE
000005536243
ti~RREra COURT ~~1
A ~ i N : VERNE GARRI SOPJ
910 HOUSTON
FT 6JORTH TX 76102
RUC 22 L,(7I' 1R
ZONIPJG FRONTAGE RATE
RIDGECREST ADDITION
316.00'ADJUSTED:
C 286 , 00' PAVF~`'IENT 35.85
270.00'CURB 3.11
10253.10
839.70
ii092.80
ADJUSTED: *,** VACANT LOT
000002387301
FRANK W MADDUX
4014 4JHITE SEITLEr1ErJT E
FT WORTH TX 76107
BLK 22 LOT 18
ALIJUSTED: *,** BUSINESS
STATE H~JY 377 IPJTERSECTS
;O`JTIi 3I DE
000002387463
T'n~J~C W MADDOX
4014 WHITE SETTLII~'IENT
FT PJORTH TX 76107
3LK 23-R LOT 13
RIDGEr~REST ADDITION
210.00'ADJUSTED:
180.00'PAVEMENT 35.85
170.00'CURB 3.11
RIDGECREST ADDITtOr3
209.00'AA7USTED:
E 179.00' PAVEr4ENT
174.00'CURB
35.85
3.11
6453.00
528.70
6981.70
6417.15
541.14
6958.29
ADJUSTED:*, ** BUSII~SS
ASSESSP~IE~ JT
11092.80
6981.70
69 58.29
-1-
J
O' ~1ER ~ LEGAL DESCRIPTION ~ ZONFPJG
~' OLD 3L~ dBROOY, }~(JAD
SOUTH SIDE
4. ~-----------
000004433254
FRANx w ~~ES~wzND APT
7?.08 AIRPORT ~'n C
Fr ~aoRTx Tx 76117
BLK 23R LfJT 1
ADJUSTED: *,** APAFrI'MfNTS
FRONTAGE RATE AMOUNT
RI~ECREST ADDITION
328.00' ADJtISTEll
298.00'PAVF~"IEi3I' 35.85 10683.30
244.00'CURB 3.11 758.84
11442.14
-2-
ASSESSE'IENT'
11442.14
I
Y~
PENSACOLA AVENUE
C06T DISTRIBUTION:
A. Property Owner
3. Fort Worth City
Construction
Engr Ins~~ / Admin
(5~ of bid $58,77?.. 50)
$ 22,297.57
$ 2,938.63
C . TOTAL ESTIMATED PFd~7F L [' (;QS'T
LEGE[']D:
* Curb inlet cr~:~~r
tt Credit for 30' Drainage Easement
$ 36,474.93
$ 25,236.20
$ 61,711.13
-3-
~1;
MAarF~ s~t~• s "
.~ ,R
~CCOUNt~NG:z
OytRANSPORTATION~VUBUC WO~V(,/(i ly/ ~ Q
yYATER ADMINISTRATION ~ e1~
DATE REFERENCE
NUMBER
8/22189 **C-11824
RECOMMENDATION.
.r
SUBJECT CONTRACT AWARD FOR ASSESSMENT PACE
PAVING OF PENSACOLA STREET (OLD BEN- 3
BROOK ROAD TO U.S. HIGHWAY 377) TO 1Of
JAMES W. JACKSON, INC.
It is recommended that the City Council
1. approve the following bond fund transfers.
-- FROM
"~ ~ ~~ 94-009905-00
Special Assessments
Unspecified
b7-040901-00
Inner City
Streets
Unspecified
TO
67-040168-00
Pensacola Avenue
from Old Benbrook
Road to U.S.
Highway 377
67-040168-00
Pensacola Avenue
from Old Benbrook
Road to U.S.
Highway 377
AMOUNT REASON
$36,474.93 To move property
owner's share of
cost from Revoly-
ing Fund to Pro-
ject Account.
$22,297.57 To provide funds
for the City's
share of the con-
struction cost.
2. authorize the City Manager to execute a contract with James W. Jackson,
Inc. ~in the amount of $58,772.50 based on their low bid for the
construction of Pensacola Avenue from Old Benbrook Road to U.S. Highway
377,
3. declare the necessity for and order the improvements to Pensacola Avenue
from Old Benbrook Road to U.S. Highway 377,
4. authorize the assessment of a portion of the cost of Pensacola Avenue
improvements against the owners of the abutting property,
5. approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
6. establish October 17, 1989, as the date of the benefit hearing,
7. authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
Vernon's Texas Civil Statutes, and
8. adopt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 7 above, and other applicable requirements
of Article 1105b, Vernon's Texas Civil Statutes.
DISCUSSION:
The 1986-88 Capital Improvement Program approved in March, 1986, included
funds for the improvement of Pensacola Avenue from Old Benbrook Road to U.S.
Highway 377. Pensacola Avenue abuts commercial property only.
DATE REFERENCE SUBJECT CONTRACT AWARD FOR ASSESSMENT PAGE
NUMBER PAVING OF PENSACOLA STREET (OLD BEN- =2 3
8/22/89 **C-11824 BROOK ROAD TO U .S . HIGHWAY 377 ) TO --~- °r ~_
JAMES W. JACKSON, INC.
This project is located in Council District No. 3.
PROJECT DESCRIPTION:
STREET
Pensacola Avenue
LIMITS WIDTH/FEET
Old Benbrook Road 30
to U.S. Highway
377
PROPOSED IMPROVEMENTS:
ROW WIDTH/FEET
50
It is proposed to improve Pensacola Avenue by constructing a six-inch thick
reinforced concrete pavement with a seven-inch high attached concrete curb on
a six-inch thick lime stabilized subgrade so that the finished roadway will
be 30 feet wide on a fifty foot right-of-way.
RECEIPT OF BIDS
Bids for the project were received on June 15, 1989, after being advertised
on May 25 and June 1, 1989, with 45 working days allotted to complete the
project.
BIDDER
AMOUNT
James W. Jackson, Inc. $58,772.50
Harrod Paving Company $61,184.00
S. Hakim Concrete Construction $62,498.15
Walt Williams Construction, Inc. $67,076.70
J.L. Bertram Construction & Eng. Inc. $68,798.75
Austin Paving Company $73,544.26
P.C. Construction, Inc. $78,507.50
The low bidder ~is in compliance with the City's MBE/WBE policy.
ENGINEER'S ESTIMATE OF COST FOR STREET IMPROVEMENTS.
Based on standard City policy and the low bid prices, the following
assessment rates have been established for Pensacola Avenue
6" inch thick reinforced concrete pavement $35.85/LF
1" inch high concrete attached curb $ 3.11/LF
~_
. ;a,t'~~
-ta
The total cost for street improvements to Pensacola Avenue is distributed as
follows
s~
u~"
"'971,
F
DATE REFERENCE
NUMBER suB~ECr CONTRACT AWARD FOR ASSESSMENT PAGE
8/22/89 **C-11824 PAVING OF PENSACOLA STREET (OLD BEN- 3 3
-- °` _-
HIGH Y 3 1 T
JAMES W. JACKSON, INC.
Pvoperty owner's share of the cost $36,474.93 (59%)
City's share of the cost $25,236.20 (41%)
Total Estimated Cost 61 711.13
FINANCING
Sufficient funds are available for transfer in Assessments Paving Fund 94,
Project No. 009905-00, Special Assessments Unspecified, and Street
Improvements Fund 67, Project No. 040901-00, Inners City Streets Unspecified.
Upon approval and completion of Recommendation No. 1, sufficient funds will
be available in Street Improvement Fund 67, Project No. 040168-00, Pensacola
Avenue.
Expenditures will be made from Index Code 630335.
Sufficient funds are available in Street Improvements Fund 67, Project
No. 095105-00, Engineering Salaries, to finance engineering, inspection, and
administrative costs.
DAI.j
APPROVED BY
ci~r couNCi~
auG ~2 1989
9~~~~
c~rr s~~to~r ~ ehe
c}c~ oe Fort worth, rya.
SUBMITTED FOR THE
CITY MANAGER'S
OFFICE BY David Ivory
DISPOSITION BY COUNCIL.
~ APPROVED
PROCESSED BY
ORIGINATING
DEPARTMENT HEAD Gary Santerre ^ OTHER (DESCRIBE)
CITY SECRETARY
FOR ADDITIONAL INF„QRM TIQN Ado
CONTACT raf a 7805 ted Ordinance No
y
DATE