HomeMy WebLinkAboutOrdinance 10371_- _ ..-
~~ ~ ~,
ORDINANCE N0.
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEMENT OF LORAINE STREET FROM SCHADT
STREET TO DEEN ROAD,. HEREINAFTER SET FORTH; ORDERING AND
APPROVING ESTIMATE OF COSTS; MAKING REVISIONS FOR THE LEVY OF
ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR
A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY
SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE
COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS
ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET
IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF
VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY
TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF
SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE
COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Director of Transportation and Public Works for the City of
Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed
the improvement of, LORAINE STREET FROM SCHADT STREET TO DEEN ROAD, which
is hereby designated Project No. 67-040155-00, (said improvements being
hereinafter referred to as the "Project");
WHEREAS, the Project shall entail the improvement of the street, avenue,
alley, highway, boulevard, drive, public place, square or any portions
thereof (hereinafter referred to singly and collectively as the "highway"),
and shall be accomplished by filling, grading, raising, paving, repaving,
repairing, constructing, reconstructing, realigning, widening, narrowing or
straightening said highway, or the curbs, gutters or sidewalks and any
appurtenances or incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an
estimate of the costs of the Project; NOW, THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
There exists a public necessity for the Project, and it is hereby ordered
that Plans and Specifications be prepared for the improvement of the Project
and that the Project be carried out and constructed according to the Plans
and Specifications, and any changes or amendments thereto.
,..
.,
~, ~ .
II.
The estimated cost of the Project to the City of Fort Worth based on the
estimate of the City Engineer is S 382,L.800.00. The estimated cost of the
Project shall be paid partly by the City of Fort Worth and partly by
assessments to the property abutting the Project and the owners thereof.
The assessments to the property abutting the Project and the owners thereof
shall be levied in accordance with the requirements of TEX REV. CIV
STAT. ANN Article 1105b (hereinafter referred to as "Article 1105b"), and
the City Charter of Fort Worth, Texas, and shall not be more than all the
costs of constructing, reconstructing, repairing, and realigning curbs,
gutters and sidewalks and nine-tenths (9/lOths) of the cost of the remaining
improvements comprising the Project. In any event, said assessments shall
not exceed the special benefits to the abutting property and its owners, as
enhanced by the Project The City of Fort Worth shall pay the balance of
the cost of the Project not assessed against the property abutting the
Project and the owners thereof
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by
the City of Fort Worth of the Project after its completion Said
assessments shall be due and payable on or before 30 days after the
acceptance by the City of Fort Worth of the Project, except that, if the
abutting owner so elects, by complying with the terms hereinafter set forth,
said assessments may be paid in installments Said assessments may be paid
in five (5) equal, consecutive annual installments, the first installment to
be due and payable no later than thirty (30) days after the acceptance by
the City of Fort Worth of the Project, and each subsequent installment to be
due and payable on an annual basis on each consecutive anniversary date of
the acceptance of the Project, in the alternative, said assessments may be
paid in forty-nine (49) equal consecutive monthly installments, the first
installment to be due and payable no later than thirty (30) days after the
acceptance by the City of Fort Worth of the Project Any owner electing to
pay the assessment in installments, as provided for herein, as a condition
precedent to such election, must execute a promissory note and mechanic's
and materialmen's lien contract evidencing the owner's intent to pay the
assessment in accordance with the terms of one of the alternatives
hereinabove set forth In any case in which the owner elects to pay the
assessment in installments under either of the alternatives specified, the
assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum Should any installment not be
paid on its due date, the City of Fort Worth shall have the option to
accelerate the entire unpaid balance of the assessment and declare the same
to be immediately due and payable; this and other terms governing any
default in the payment of any installment shall be set forth in the
mechanic's and materialman's lien contract and shall be uniform among all
owners executing the contract
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists
.~~~1
.~.~
~~ ,
III.
Notice shall be given and a hearing shall be held prior to making or levying
any assessment against any property abutting the Project or its owners, as
required by Article 1105b, Section 9 The notice of the hearing required
under said statute shall be published in a newspaper of the City of Fort
Worth at least three (3) times, the first publication to be made at least
twenty-one (21) days before the hearing date Written notice shall be
personally given to all persons or entities claiming or owning an interest
in the property abutting the Project and shall be mailed at least fourteen
(14) days before the hearing in the manner specified by Article 1105b,
Section 9 Said hearing shall be held before the City Council of Fort
Worth, Texas, on the 3RD OF OCTOBER, 1989, AT 7:00 P.M..
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings
taken and had in accordance with and under the terms of Article 1105b and
the Charter of the City of Fort Worth, Texas
V
The City Secretary is directed to prepare, sign and file with the County
Clerk of Tarrant County, Texas, a notice of the authorization and approval
of the Project and the pendency of the assessment proceedings authorized
hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Books of the City Council and
by filing the complete ordinance in the appropriate ordinance records of
this city.
VII.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage
PASS AND APPROVED THIS ~ DAY OF ,
19 .
APPROVED AS TO FORM AND LEGALITY
City Attorney
Date•
LORAINE STREET
SCHADT STREET TO DEEN ROAD
PROJECT N0, 67-040155-00
JUNE 1989
~; ~-
4PROJE,CT PJC~. 67-040155-00, UJRAINE STREET, F~Or4 SCHADT STREET 7U DEEN ROAD, to be improved by
constructing a six-inch thick reinforced concrete pavement with a seven-inch high attached
concrete curb on a six-inch thick lime stabilized subgrade, so that the finished roadway will
r"be thirty feet wide on a sixty-foot Right-~f-Jay. Four-inch thick concrete sidewalks and six-
inch thick concrete driveway approaches will be constructed where shown on the plans.
0~1NER & LEGAL DESCRIPTION
BEGINNING AT SCHADT
SOUTHSIDE
000001815334
PIELLIE LITTLE
2900 SCHAI7T
FT ~JORTH TX 76106
BLK 65 LOT 1
RESIDENCE
000000051578
ROT3E2i"0 ETl1X
CONSUELO BAEZ
2833 sc~~,aAFZrz AVE
FT F70RTH TX 76106
BLK 67 IIJT 18
ZONING FRONTAGE RATE AMOUNT ASSESSr1ENr
MORGAN H'TS ADDITION
E 134.00 'PAVEMErrr 31.28 4191.52
134.00 'CURB 3.39 454.26
492.00 ' SF SIX~JK 2.41 1185.72
126.95 'SF DR APPR 3.21 407.51
5239.01
APPRAISAL 3600.00
ARCHER ADDITION
C 128.00'PAVEr'lEC1T 31.28
128.00' CUP.~3 3.39
440.00'SF SIx7Y. 2.41
202.20'SF DR APPR 3.21
APPRAISAL
4003.84
433.92
1060.40
649.06
5147.22
3500.00
3600.00
3500.00
RES.U)r,^~ ~~.
000001806424
DOYLE FORD ~-LARP.ELL
1903 ra E 28TH ST C
FT ~40RTH TX 76106
BLK 6 LOT 10
ADJUSTED: *, VACANT IIJT
-1-
1 "1 NKX)i)Y All~ITION
138.00'PAVEMEr~r 31.28 4316.64
122.00'CURB 3.39 413.58
552.00'SF SIX~fC 2.41 1330.32
5050.54
APPRAISAL 3500.00
3500.00
'JWI~R~~ & LEGAL DESCRIPTION ZONING
a----------------------------
000001806297
DLAMO!'1D HILL,
RA~'i IST CHURCH
2814 OSCAR B
FT 67ORTH TX 76106
BIX 5 LOT 10
~HURCH BUILDING
000001806297
DIANIOr1D HILL
BAPTIST CHURCH
2814 OSCAR
FT t]ORTH TX 76106
BLK 5 UJT' 9
FROPIT.AGE v RATr,
J r7 MOODY ADDITION
140.00'PAVE'ME~TT
140.00'CURB
516.00'SF SDWK
126.95'SF DR APPR
A! 9OUNT
31.28 4379.20
3.39 474.60
2.41 1243.56
3.21 407.51
6504.87
A_1'PRAISAL 3500.00
J ri ti00DY ADDI'T'ION
B 140.00'PAVEMErIr
140.00'CURB
560.00' SF SDt•]K
31.28 4379.20
3.39 474.60
2.41 1349.60
6203.40
APPRAISAL 3500.00
vAc.Ar7'1' LOT
000001806742
AKA PENTECOSTAL
HOLINESS CHiJRCH
2900 HUTCHir1SOr1
FT ~JORTH TX 76106
BI~C 9 LOT 12
J M r100DY ADDITION
B 130.00'PAVEr'4T;NT
130.00'CURB
520.00' SF SDt 7r:
31.28 4066.40
3.39 440.70
2.41 1253.20
5760.30
APPRAISAL 3500.00
CHURCH BUILDING
000006199755
FORT WORTH ISD
3210 LANCASTER
FT YJOTrI'H TX 76107
BIX 8R LOT 1
.7 M MOODY ADDITION
B 296.00'PAVENIEr7T
296.00'CURB
1140.00'SF SDWK
126.95'SF DR APPR
31.28 9258.88
3.39 1003.44
1.21 1379.40
3.21 407.51
12049.23
APPRAISAL 45000.00
ASSESSr'IENT
3500.00
3500.00
3500.00
12049.23
AII7USTED: **, DIAMOND HILL SCHOOL
-2-
~ Y?tG
~:Ot•~f1E12 & LE~.AL DESCRIPTION ZOPJIr1G FROrdTAGE RArE AMOUPTT ASSESSMENT
_ J M MOODY ADDITION1
000001806580
r1IL'Ibr1 L GREEN
12737 ROSFCRANS SPACE 84 C 138.00'P~1VFTtEt1T 31.28 4316.64
rJORL9ALK CA 90650 122.00'CURB 3.39 413.58
BIJr 7 LOT 12 580.00'SF SI7«dK 2.41 1397..80
6128.02
APPRAISAL 3500.00
3500.00
ATI7USTED: *, RESIDENCE
ARCHER ADDITION
000000051284
~'IC?CKYARDS MASONIC
LODGE
PO F30X 4156 C 128.00'PAVQ'IENT 31.28 4003.84
FT NORTH TX 76106 128.00'CURB 3.39 433.92
BLY. 60 LOT 7 582.00'SF SD6-~K 1.21 704.22
5141.98
APPPAISAL 3500,00
AD3USTED: **
MORGAr7 H': S ADDITION
000001815032
GOP.DUt1 LITTLE
2900 SCHADT E 134.00'PAVErZENT 31.28 4191.52
FT t•JORTH TX 76106 134.00'CURB 3.39 454.26
BLK 62 LET 6 464.00'SF SDWK 2.41 1118.24
202.20'SF DR APPR 3.21 649.06
6413.08
APPRAISAL 3600.00
RESIDENCE
3500.00
3600.00
-3-
z~
:~ ~~ .,
~`~;
a
LORAINE STREET, FROM SCHAIIT STREET TO DEEM ~aAD
Tne -Assessment Paving Policy as revised July 28, 1987 (M&C X7160),
provides that property zoned and used as one or two-family residential
property in target areas will not be assessed for street reconstruction.
Under this policy, the owners of the following improved property zoned and
used as one and two-family residences will not be assessed.
t~90RGAf~ HTS . ADDITION
Block 65, Lot 18
Block 66, Lots 1, 18
Block 67, Lot 1
J.M. MOODY ADDITION:
Block 6, IAt 9
Block 4, Lots 9, 10
Block 3, Lets 9, 10
Block 2, Lots 9, 10
Block 1, Lots 9, 10
Block 12, Lets 1, l2
Rt~x;k 11, LAts 1, 12
Block 10, Lets 1, 12
~31ock 9, Lot 1
Block 7, Lot 1
ARCHER ADDITI01'1:
Block 60, Lot 6
Block 61, Lots 6, 7
Block 62, Lot 7
LEGEP3D:
* Inlet Credit
** The sidewalk rate was computed at $2.41/SF. City participation is 50~
of replacement cost, $2.41 X 50$ _ $1.21/SF.
-4-
LORAINE STREET
COST DISTRIBIITION
A. PROPERTY OWNER .... .......... .. .. ........$ 43,749.23
8 FORT WORTH CITY .. .... .. .. .. .. .. $339,050.77
IMPROVEMENTS .. .. ...$304,250.77
ENGR INSP/ADMIN .. .. $ 34,800 00
(10$ of estimate $348,000 00)
C. TOTAL ESTIMATED PROJECT COST .. .. .....$382,800.00
-5-
MASTER fILE~l' ~'! - ~'
i_
ACCOUNTIN~~2
jY_
~~ANSPORTAtION~PUBLIC . RK
MATER ADMINISTRATION ~~ull!,ly/ ® //
uw.s
~~~ c~~~uc~~c~ll ~®~,~,~~,~~~~~®~,
DATE REFERENCE SUBJECT AUTHORIZATION OF PROJECT AND PAGE
NUMBER ESTABLISHMENT OF BENEFIT HEARING DATE 3
8/29/89 G-8185 FOR THE ASSESSMENT PAVING OF LORAINE 1°,
STREET FROM SCHADT STREET TO DEEN ROAD
RECOMMENDATION
_It,~' ,~_,~g,~ommended that the City Council
...~..i. I,t. ,:,.:.«
--~=~ ~appr~ove the followiny bond fund transfer
~~" ~ '~._F"R6M_ TO AMOUNT REASON
94-009905-00 67-040155-00 $43,749.23 To provide funds
Special Assessments Loraine Street for the property
Unspecified owner's share of
the street con-
struction.
2. declare the necessity for and order the improvements to Loraine Street
from Schadt Street to Deen Road,
3. authorize the assessment of a portion of the cost of Loraine Street
improvements against the owners of the abutting property,
4. approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
5. establish October 3, 1989, as the date of the benefit hearing,
6. authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
Vernon's Texas Civil Statutes, and
7. adopt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 6 above, and other applicable requirements
of Article 1105b, Vernon's Texas Civil Statutes.
nISCl1SS10N-
The 1986-88 Capital Improvement Program approved in March, 1986, included
funds for the improvement of Loraine Street from Schadt Street to Deen Road.
The street is located in the Diamond Hill target area and qualifies for
CDBG participation. Since the street was never constructed to City standards,
CDBG will fund 30% of the project cost.
This project is located in Council District No. 2.
dr 'i d
DATE REFERENCE sue~ECT AUTHORIZATION OF PROJECT AND PAGE
NUMBER ESTABLISHMENT OF BENEFIT HEARING DATE 2 3
8/29/89 G-8185 FOR THE ASSESSMENT PAVING OF LORAINE ---°r~._
STREET FROM SCHADT STREET TO DEEN ROAD
PROJECT DESCRIPTION
STREET LIMITS WIDTH/FEET ROW WIDTH/FEET
Loraine Street Schadt Street 30 60
to Deen Road ~-.~ ~`~
4 Mrv.. n ey ~
PROPOSED IMPROVEMENTS:
It is proposed to improve Loraine Street by constructing a six-inch thick
reinforced concrete pavement with a seven-inch high attached concrete curb on
a six-inch thick lime stabilized subgrade, so that the finished roadway will
be thirty feet wide on a sixty-foot right-of-way. Four-inch thick concrete
sidewalks and six-inch thick concrete driveway approaches will be constructed
where shown on the plans.
ENGINEER'S ESTIMATE OF COST.
Based on the Engineer's cost estimate, the assessment rates have been
established as follows
6" thick concrete pavement $31.28/L.F.
7 high attached concrete curb $ 3.39/L.F.
6" thick concrete driveway approaches $ 3.21/S.F.
4" thick concrete sidewalks $ 2.41/S.F.
The assessment rates result in the following division of cost:
Property Owners
Fort Worth City
Total
$ 43,749.23 (11%)
$339,050.77 (89%)
382 800.00
An independent appraiser has advised the staff as to the amount of
enhancement to property values that will result from the proposed
improvements. The assessments have been adjusted accordingly.
AUTHORIZATION OF PROJECT:
In accordance with the provisions of Article 1105b of Vernon's Annotated
Texas Statutes, it is proposed that City Council approve the estimates of
cost for the proposed project, conduct a benefit hearing and levy assessments
for the project.
FINANCING•
Sufficient funds are available as follows for transfers•
FUND
Special Assessment
Fund 94
PROJECT N0.
009905-00
PROJECT NAME
AMOUNT
Special Assessments $43,749.23
Unspecified
.,;,
J
1~
fi
~x
~,
r
-~~..?!
DATE REFERENCE SUBJECT AUTHORIZATION OF PROJECT AND PAGE
NUMBER
ESTABLISHMENT OF BENEFIT HEARING DATE
3 3
8/29/89 G-8185 of _~
STREET FROM SCHADT STREET TO DEEM ROAD
Upon approval and completion of Recommendation No. 1, sufficient funds will
be available as follows
FUND PROJECT N0. PROJECT NAME AMOUNT
Street Improvement 040155-00 Loraine,Street $43,749.23
Fund 67
Financing for the City's share of the construction cost will be established
at the time of the contract award.
DAI j
APPROVED BY
c~r~r cou~c~~
AUG ~9 1989
Kw~ S~~wr~~„.
Citp Secretnrp of the
City of Fort Worth, Texae
SUBMITTED FOR THE
CITY MANAGER'S
FF
David Ivor
DISPOSITION BY COUNCIL.
PROCESSED BY
ICE BY_
O
y ^ APPROVEp
ORIGINATING
DEPARTMENT HEAD• Gary Santerre ^ OTNER (DESCRIBE)
CITY SECRETARY
FOR ADDITIONAL IN FORIIQTTO(~et 7805
CONTACT ~IJJ 11
DATE