HomeMy WebLinkAboutOrdinance 10475ORDINANCE N0. D
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEMENT OF THIRTY-FOURTH STREET, FROM ROSS
AVENUE TO NORTH MAIN STREET , AS ;
PROJ PLANS AND SPECIFICATIONS; ORDERING AND APPROVING ESTIMATE
OF COSTS; LETTING CONTRACT TO L. D. CONATSER CONTRACTORS IN THE
AMOUNT OF $147,757.50, FOR THE MAKING AND CONSTRUCTION OF SUCH
IMPROVFI~IENTS; MAKING APPROPRIATIONS FOR TI3E PURPOSE OF PAYING THE
INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF
ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR
A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY
SECRETARY ~ FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WTTH THE
COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS
ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET
IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF
VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO
ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME
IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE
ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, the Director of Transportation and Pub]_ic Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of THIRTY-FOURTH STREET, FROM ROSS AVENUE TO NORTH MAIN STREET,
which is hereby designated Project No. 67-040197-00, (said improvements being
hereinafter referred to as the "Project");
Wf~REAS, the Project shall entail the improvement: of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
WHEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
-1-
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WOR'T'H, TEXAS, THAT:
I.
There exist a public necessity for the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or amendments thereto.
II.
he estimated cost of the Project based on the estimate of the City Engineer is
155,145.38. The estimated cost of the Project shall be paid partly by the
y ort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to the property abutting the
Project and the owners thereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/lOths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort Worth of the Project after its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
-2-
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III .
Bids having been requested by appropriate advertisement, as required by Articles
1105b and 2368a and the lowest bid of L. D. CONAT5ER CONTRACTORS, having been
found to be the lowest and best bid for the making and construction of said
Project, the contract therefore is hereby awarded to L. D. CONATSER
CONTRACTORS, at and for the amount of $147,757.50.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of th.e hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the 16TH day of JANUARY, 1990
at 10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
-3-
.. ,.
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASS AND APPROVED THIS ~ DAY OF ___-
19.
APPROVED AS TO FORM AND LEGALITY:
City Attorney
Date : _ _ _
-4-
k
~t `
~a~~ ®f ' IF®~°~ ~®~°~~. ~C~.~~~
MA5tEp FILE•1 ~
~ ACCOUNTINO.2 s o e
7ftANSPORTATION~PUBLIC WORK3+
NAYER
ti
q0 i DA~E TION 4 REFERENCE SUBJECT AWARD OF CONTRACT FOR THE PAGE
NUMBER ASSESSMENT PAVING OF 34TH STREET, 4
' 12-19-89 C-12062 ROSS AVENUE TO NORTH MAIN STREET 1of
L. D. CONATSER CONTRACTORS)
RECOMMENDATION
It is recommended that the City Council
1. Approve the following fund transfers
- From To Amount Reason
94-009905-00 67-040197-00 $20,780.38 To move property ~
Special Assessments 34th Street, owners' share of
Unspecified Ross to N. Main cost from Revolving
Fund to Project
Account.
67-040901-00 67-040197-00 $82,649.87 T'o provide funds
Inner City Streets 34th Street, for the City's share
Unspecified Ross to N. Main of construction
cost.
76-206081-35 76-206081-42 $44,327.25 To provide funds
Twelfth Year 34th Street, for street improve-
CDBG Inner City Ross to N. Main menu .
Streets
2. Authorize the City Manager to execute a contract with L.D. Conatser
Contractors, in the amount of $147,757.50 and 45 working days for the
construction of 34th Street, Ross Avenue to North Main Street,
3. Declare the necessity for and order the improvements to 34th Street from
Ross Avenue to North Main Street,
4. Authorize the assessment of a portion of the cost of the improvements
against the owners of the abutting propel°ty,
5. Approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
6. Establish January 16, 1990, as the date of the benefit hearing,
7. Authorize the preparation of assessment rolls and notification of pro-
perty owners in accordance with the provisions of Article 1105b of
Vernon's Annotated Civil Statutes, and
DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR THE PAGE
NUMBER ASSESSMENT PAVING OF 34TH STREET, 2 __ a, 4_
12-19-89 C-12062 ROSS AVENUE To NORTH MAIN ST~Fr --
(L. D. CONATSER CONTRACTORS)
^' Yl.fr .,p,t,
8. Adopt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 7 above, and other applicable =requirements
of Article 1105b, Vernon's Annotated Civil Statutes.
DISCUSSION
The 1986-88 Capital Improvement Program approved in March, 1986, included
funds for the improvement of 34th Street from Ross Avenue to North Main
Street. The street is located in Far North Side Target Area, and CDBG funds
will provide 30% of the construction cost since the street was never con-
structed to City standards. 34th Street from Ross tb North Main is residen-
tial with the exception of one business site on the corner of 34th and North
Main Street.
This project is located in Council District No. 2.,
PROJECT DESCRIPTION
Street Limits Width/Feet Row Width/Feet
34th Street Ross Avenue 30 60
to North Main Street
IMPROVEMENTS
It is proposed to improve this segment of 34th Street by constructing six-
inch thick reinforced concrete pavement with seven-inch high attached con-
crete curb on a six-inch thick lime stabilized subgrade, so that the finished
roadway will be thirty feet wide on a sixty foot width right-of-way. Four-
inch thick concrete sidewalk and six-inch thick concrete driveway approaches
will be constructed where shown on the plans.
RECEIPT OF SIDS
Bids for the project were received on October 26, 1989, after being adver-
tised on October 5 and 12, 1989, with 45 working clays allotted for the Base
Bid, 36 working days for Alternate No. 1, and 27 days for Alternate No. 2.
Bids received were as follows
Amount
_
Base Bid Alt. No. 1 Alt. No. 2
Bidder (45) Days (36 Days) (27 Days)
L.D. Conatser Contractors $147,757.50 $150,757.50 $155,757.50
Centerline Constructors, Inc. 148,991.20 No Bid No Bid
Walt Williams Const., Inc. $150,770.85 $150,770.85 $152,473.85
Harrod Paving Co. $155,094.20 $159,594.20 $164,094.20
Austin Paving Co. $155,976.89 $159,576.89 $164,176.89
J.L. Bertram Const. & Engr., Inc. $171,356.90 $180,356.90 $189,356.90
~j.
+. !
J``ff~//
Re
DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR THE PACE
NUMBER ASSESSMENT PAVING OF 34TH STREET, 3_ of 4
12-19-89 C-12062 ROSS AVENUE TO .NORTH MAIN STRE T
(L. D. CONATSER CONTRACTORS)
Staff's evaluation of the three low bids indicates that it would be in the
City's best interest to accept the low Base Bid in the amount of $147,757.50
and 45 working days as submitted by L. D. Conatser Contractors. This recom-
mendation is based on the relatively low traffic volumes using this roadway,
the residential nature of the street, liquidated damages as specified in the
contract ($210.00 per day) and the premium which would be paid in utilizing
Alternate No. 1 versus the number of working days which would be saved
($333.00 per day) or Alternate No. 2 versus t:he number of working days which
would be saved ($262.00 per day).
The low bidder is in compliance with the City's DBE Policy.
ENGINEER'S ESTIMATE OF COST
Based on standard City policy and the low bid prices, the following assess-
ment rates have been established
6 inch thick reinforced concrete pavement $34.06/L.F.
7 inch high attached concrete curb $ 3.52/L.F.
6 inch thick concrete driveway approaches $ 3.21/S.F'.
4 inch thick concrete sidewalk $ 3.21/S.F.
The total cost for street improvements to 34th Street is distributed as
fol 1 ows
Property owner's share of the cost $ 20,780.38 (13°1°)
City's share of the cost 134,365.00 (87%)
Total Estimated Cost $155,145.38
FINANCING
Sufficient funds are available as fol-lows for transfers
Fund Project ProjE~ct Name Amount
94 ~ ~ ~-'1S~ ~~ 009905-00 Special' Assessments $ 20,780.38
,,_ ,+ 1~w„ ; ¢ ?,~ Unspecified
67 ;I y:040901-00 Inner City Streets 82,649.87
•~t Unspecified
76 '~"''~'.~~6081-35
r. <~ .,~~ .~• 12th Year CDBG 44,327.25
~_ ~~ Inner Gity Streets
..... ._.. .z,.~ _..
i
'~ '~`
Total
$147,757.50
Upon approval and completion of Recommendation No. 1, sufficient funds will
be available as follows
~ ~~ ~
DATE REFERENCE
NUMBER SUBJECT AWARD OF CONTRACT FOR THE PAGE
ASSESSMENT PAVING OF 34TH STREET 4
4
12-19-89 C-12062 ,
ROSS AYE~UE_TO NORTH MAIN STRFFT_ 0,_
(L. D. CONATSER CONTRACTORS)
Fund Project Project Name Amount
67 040197-00 34th Street $103,430.25
76 206081-42 34th Street 44,327.25
Total $147,757.50
Expenditures will be made from Index Codes 630335 and 658815 respectively.
Sufficient funds are ava ilable in Street Improvements Fund 67, Project
No. 095106-00, Engineering Salaries, to finance engineering inspection and
administrative costs.
WWW f/6
APPROVED BY
CITY COUNCIL
DEC I9 1989
~.ttYk ~~'si~xdL.,,,
City SeC;<etoxy of tha
City of f or Wosih, Toxa~
SUBMITTED FOR THE
CITY MANAGER'S
DISPOSITION BY COUNCIL.
PROCESSED BY
OFFICE BY _
Wi ~ ~ .~ dm WU~d C APPROVED
_
ORIGINATING ~] OTHER (DESCRIBE)
DEPARTMENT HEAD
Gar~Santerre i. CITY SECRETARY
FOR ADDITIONAL INFORM TION
Lunaay 8063
Ado
ted OrdinanG'C ~m
CONTACT DATE