Loading...
HomeMy WebLinkAboutOrdinance 10100ORDINANCE NO. /O/~D AN ORDINANCE DETERMINING THE NECESSITY Ft~R AND ORDERING AND PROVIDING FOR THE IMPROVE~TFT OF RANDOL MILL ROAD UNIT II, AND WOODHAVEN BOULEVARD UNIT III, AS HEREINAFTER SET FORTH ; APPROVING NS; ORDERING AND APPROVING ESTIMATE OF COSTS; LETTING CONTRACT TO NEWELL & NEWELL, LTD. PARTNERSHIP FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVEMENTS; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF ASSESSMENI~ AGAINST ABUI'rING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS OF SUCH IMPROVES; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE OOUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE CONIPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Director of Transportation and Public Works for the City of Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed the improvement of RANDOL MILL ROAD UNIT II AND WOODHAVEN BOULEVARD UNIT III which is hereby designated Project No. 30-036812-00 , (said improvements being hereinafter referred to as the "Project"); WHEREAS, the Project shall entail the improvement of the street, avenue, alley, highway, boulevard, drive, public place, square or any portions thereof (hereinafter referred to singly and collectively as the "highway"), and shall be accomplished by filling, grading, raising, paving, repaving, repairing, constructing, reconstructing, realigning, widening, narrowing or straightening said highway, or the curbs, gutter or sidewalks and any appurtenances or incidentals thereto, including drains or culverts; WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of the costs of the Project; WHEREAS, the City of Fort Worth has advertised and received bids, in accordance with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other applicable laws, such that a contract may be awarded for the construction of the Project; NOW, THEREFORE: -1- ~A BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. There exists a public necessity for the improvement of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, to wit: RANDOL MILL ROAD UNIT II AND WOODHAVEN BOULEVARD UNIT III ,it is hereby ordered a e Pro3e~carri ou an constru according to the Plans and Specifications, and any amendments thereto, for Project No. 30-036812-00 , said Plans and Specifications being hereby specifically approve anc adopted. II . The estimated cost of the Project based on the estimate of the City Engineer is $5,440,333.53. The estimated cost of the Project shall be paid partly by the City of Fort Worth and partly by assessments to the property abutting the Project and the owners thereof. The assessments to the property abutting the Project and the owners thereof shall be levied in accordance with the requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and shall not be more than all the costs of constructing, reconstructing, repairing, and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the cost of the remaining improvements comprising the Project. In any event, said assessments shall not exceed the special benefits to the abutting property and its owners, as enhanced by the Project. The City of Fort Worth shall pay the balance of the cost of the Project not assessed against the property abutting the Project and the owners thereof. The amounts assessed against the abutting properties and the owners thereof shall constitute a first and prior lien upon such properties and a personal liability of the owners thereof and shall be payable upon the acceptance by the City of Fort Worth of the Project after its completion. Said assessments shall be due and payable on or before 30 days after the acceptance by the City of Fort Worth of the ,Project, except that, if the abutting owner so elects, by complying with the terms hereinafter set forth, said assessments may be paid in installments. Said assessments may be paid in five (5) equal, consecutive annual installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project, and each subsequent installment to be due and payable on an annual basis on each consecutive anniversary date of the acceptance of the Project; in the alternative, said assessments may be paid in forty-nine (49) equal consecutive monthly installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project. Any owner electing to pay the assessment in installments, as provided for herein, as a condition precedent to such election, must execute a promissory note and mechanic's and materialmen's lien contract evidencing the owner's intent to pay the assessment in accordance with the terms of one of the alternatives herei.nabove set forth. In any case in which the owner elects to pay the assessment in installments under either of the alternatives specified, the assessment shall bear interest from the date of acceptance of the Project at the rate of eight percent (8$) per annum. Should any installment not be paid on its due date, the City of Fort Worth shall have the option to accelerate the entire unpaid balance of the assessment and declare the same to be immediately due and payable; this and other terms governing any default in the payment of any installment shall be set forth in the mechanic's and materialman's lien contract and shall be uniform among all owners executing the contract. -2- ., f..~ In addition, the City Attorney shall have the authority to authorize terms of payment different than those specified herein when the Director has previously determined that an extreme financial hardship exists. III. Bids having been requested by appropriate advertisement, as required by Articles 1105b and 2368a and the lowest bid of NEWELL & NEWEL, LTD. PARTNERSHIP having been found to be the lowest and best bid for the making and construction of said Project, the contract therefor is hereby awarded to NEWII~L & NEWELL, LTD. PARTNERSHIP at and for the amount of $5,901,244.43. To provide for the payment of said contract and the indebtedness incurred thereby, there is hereby appropriated out of available funds and current revenues of the City, an amount sufficient to pay the indebtedness so incurred. Notice shall be given and a hearing shall be held prior to making or levying any assessment against any property abutting the Project or its owners, as required by Article 1105b, Section 9. The notice of the hearing required under said statute shall be published in a newspaper of the City of Fort Worth at least three (3) times, the first publication to be made at least twenty-one (21) days before the hearing date. Written notice shall be personally given to all persons or entities claiming or owning an interest in the property abutting the Project and shall be mailed at least fourteen (14) days before the hearing in the manner specified by Article 1105b, Section 9. Said hearing shall be held before the City Council of Fort Worth, Texas, on the 17 TH DAY OF MAY,1988, at 10:00 A.M. IV. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessments made and levied and all proceedings taken and had in accordance with and under the terms of Article 1105b and the Charter of the City of Fort Worth, Texas. V. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice of the authorization and approval of the Project and the pendency of the assessment proceedings authorized hereunder. VI. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Books of the City Council and by filing the complete ordinance in the appropriate ordinance records of this city. ~_ VII. This ordinance shall take effect and be in full force and effect from and after the date of its passage. ~, PASSED AND APPROVED THIS '~ DAY OF -----L~ ~ ~ 19~~. _ APPROVED AS TO FORM AND LEGALITY: City Attorney Date: ACCOrJN?iiYQ 2.' - N,arER aor~;,ntslaariora a' DACE REFEitE1dCE SUBJECT: AWARD OF CONTRACT FOR CONSTRUCTI N PaaE NUMBER 4/19/88 ~*C-10924 OF~A^16~~INCH WATER MAIN~EXTENSI~ON~AND icr 7 SEWER MAIN IN RANDOL MILL ROAD, UNIT I; ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOODHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF- LOOP 820, UNIT II; ASSESSMENT PAVING OF WOODHAVEN BOULEVARD FROM NEW RANDOL MILL ROAD 316 LINEAR FEET, SOUTH UNIT III RECOMMENDATION It is recommended that the City Council: 1) approve the following bond fund transfers: FROM TO AMOUNT REASON 94-009905-00 94-036812-00 $273,504.77 To provide funds Special Assessments Assessment Paving for property owner's Unspecified Randal Mill Road share of construc- Unit II and Woodhaven Lion cost. Boulevard Unit III 94-036812-00 30-036812-00 $273,507.77 To move property Assessment Paving Assessment Paving owner's share of Randal Mill Road Randal Mill Road cost from Revolving Unit II and Unit II and Woodhaven Fund to Project Woodhaven Boulevard Boulevard Unit III Account. Unit III 94-009905-00 94-032301-00 13,972.36 To provide funds for Special Assessments Street Light the property owner's Unspecified Installation for share of the street Randal Mill Road light installation. Unit II 94-032301-00 30-032301-00 13,972.36 To move property Street Light Street Light owner's share of Installation for Installation for cost from Revolving Randal Mill Road, Randal Mill Road Fund to Project Unit II Unit II Account. 30-031901-00 30-032301-00 18,500.00 To provide City's Signals Randal Mill Road share of street Unspecified Street Lights lights and signal conduit installation. DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR CONSTRUCTI N PAGE 4I19l88 NUMBER OF A 16 INCH 'WATER MAIN EXTENSION AND 2 7 **C-10924 IMPROVEMENTS TO AN EXISTING SANITARY ----- °f -----~ SEWER MAIN IN RANDOL MILL ROAD, UNIT I; ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOODHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF LOOP 820, UNIT II; ASSESSMENT PAVING OF WOODHAUEN BOULEVARD FROM NEW RANDOL MILL ROAD 316 LINEAR FEET, SOUTH UNIT III 30-032129-00 30-032301-00 15,000.00 To provide City's C. Brown Estates Randol Mill Road share of street Street Lights light installation. 30-032901-00 30-032301-00 3,903.24 To provide City's Street Lights Randol Mill Road share of street Unspecified Street Lights light installation. 2) authorize the City Manager to execute a contract with Newell and Newell Limited Partnership in the amount of $5,901,244.43 based on their low bid and consisting of (a) $459,184.60 for the construction of a 16-inch water main extension and appurtenances (Project No. 81-015001-00), Unit I; (b) $260,789.80 for the construction of 6, 8, and 10-inch sanitary sewers and appurtenances (Project No. (58-017027-00), Unit I, and (c) $5,181,270.03 for street, drainage, bridge improvements and street lights (Project No. 30-036812-00), Units II and III: 3) authorize the assessment of a portion of the cost of the improvements against the owners of the abutting property; 4) approve the estimate of costs and amounts to be assessed as stated in the Engineer's Estimate; 5) establish May 17, 1988, as the date of the benefit hearing, 6) authorize the preparation of assessment rolls and notification of property owners in accordance with the provisions of Article 1105b of Uernon's Texas Civil Statutes; and 7) adopt an ordinance reflecting the City Council's authorization and approval of Items 2 through 6 above, and other applicable requirements of Article 1105b, Vernon's Texas Civil Statutes. Disr_~~tsinn Randol Mill Road is designated as a future major thoroughfare in the City's Master Thoroughfare Plan. Current activities such as the on-going construction of the new Handley-Ederville Road and bridge over the Trinity River interface with this project. Vigorous development in the adjacent River Bend Addition and two executed Community Facilities Agreements, C. Brown Estates (City -.,,. S_ ~ c _Y DATE REFERENCE sua~ECr: AWARD OF CONTRACT FOR CONSTRUCTI N PAGE NUMBER 4/19/88 OF A 16 INCH WATER MAIN EXTENSION AND 3 7 **G-10924 IMPROVEMENTS TO AN EXISTING SANITARY ---- or ____ SEWER MAIN IN RANDOL MILL ROAD, UNIT I; ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOODHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF LOOP 820, UNIT II, ASSESSMENT PAVING OF WOODHAVEN BOULEVARD FROM NEW RANDOL MILL ROAD 316 LINEAR FEET, SOUTH UNIT III Secretary Contract No. 13966) and River Bend Addition (City Secretary Contract No. 15882) have precipitated the need to improve Randol Mill Road as a high usage eastlwest arterial street facility. Randol Mill Road from Woodhaven Boulevard to 550 feet west of Loop 820 is proposed to be constructed with permanent concrete paving. Temporary concrete pavement will be constructed for 550 linear feet east to Loop 820 right-of- way. Permanent paving to Loop 820 will be constructed in conjunction. with the State Department of Highways and Public Transportation at a later date when the new Randol Mill Road bridge over Loop 820 is re-constructed. Woodhaven Boulevard will be extended north from its existing pavement for 316 linear feet to tie-in with the new Randol Mill Road alignment. Project Description Street Limits Roadway Width/feet Double 26 48 ROW Width/feet Randol Mill Road From Woodhaven Boulevard Unit II to 550' west of Loop 820 Woodhaven Boulevard From new Randol Mill Road Unit III south 316 linear feet Proposed Improvements Unit I 120 68 The work to be performed under this contract consists of the construction of approximately 7,484 linear feet of 16-inch water main and appurtenances and construction of a concrete cap of approximately 2,842 linear feet on an existing sanitary sewer main and the replacement of approximately 1,127 linear feet of existing 6, 8, and 10-inch sanitary sewer and appurtenances. Unit II Randol Mill Road is proposed to be improved by constructing an eight-inch thick reinforced concrete pavement with seven-inch high monolithic concrete curb on an eight-inch thick lime stabilized subgrade. Six-inch thick concrete driveway approaches will be constructed where shown on the plans. A bridge will be constructed over a drainageway serving 2,250 acres. DATE REFERENCE susrECT AWARD OF CONTRACT FOR CONSTRUCTI N PACE NUMBER 4/19/88 OF A 16 INCH WATER MAIN EXTENSION AND 4 6 **C-10924 J~MPR(IVEMENTS TO AN EXISTING SANITARY. - ~' -~-~ SEWER MAIN IN RANDOL MILL ROAD, UNIT I; ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOODHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF LOOP 820, UNIT II; ASSESSMENT 'PAVING OF WOODHAVEN BOULEVARD FROM NEW RANDOL MILL ROAD 316 LINEAR FEET, SOUTH UNIT III Unit III Woodhaven Boulevard will be extended north from its existing pavement for 316 linear feet to tie-in with the new Randol Mill Road alignment. It is proposed to be constructed of eight-inch reinforced concrete pavement with seven-inch high monolithic concrete curb on an eight-inch thick lime stabilized subgrade. On March 3, 1988, the following bids were received• Bidders Unit I Units II & III (Water and Sanitary (Streets) Total Sewer) Amount Bid Newell and Newell $ 719,974.40 $ 5,181,270.03 $5,901,244.43* Limited Partnership Austin Paving Company 694,238.31 5,474,169.04 6,168,407.35 J. L. Bertram Construction 712,493.16 5,486,809.55 6,199,302.71 and Engineering, Inc. Martin K. Eby Construction 906,575.60 5,375,515.95 6,282,091.55 Engineering, Inc. L. H. Lacy Company 664,933.20 5,879,359.86 6,544,293.06 H. B. Zachry Company 703,695.19 6,043,533.48 6,747,228.67 Brown and Blakney, Inc. 855,153.15 6,092,314.33 6,947,467.48 *Overall low bidder. Contract documents stipulated that contract would be awarded to the overall low bidder and separate contracts would not be awarded to unit low bidders. The low bidder is in compliance with the City's MBE/WBE Policy. There were 432 working days alloted for completion of the project. Engineers Estimate of Cost for Street and Drainage Improvements and Street Lights ~. DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR CONSTR..UCTIO PAGE 4/19/88 NUMBER OF A 16 INCH WATER MAIN EXTENSION AND 5 7 **C-10924 IMPROVEMENTS TO AN EXISTING SANITARY -°` -- SEWER MAIN IN RANDOL MILL ROAD, UNIT I, ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOOOHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF LOOP 820, UNIT II; ASSESSMENT PAUING OF WOODHAVEN BOULEVARD FROM NEW RANDOL MILL ROAD 316 LINEAR FEET, SOUTH UNIT III Based on standard City policy and the low bid prices, the following assessment rates have been established• 8-inch thick reinforced concrete pavement $ 59.36/lf 7-inch high monolithic concrete curb 1.63/lf 6-inch thick concrete driveway approaches 1.71/sf Drainage 39.25/lf Bridge 5 11/lf Street Lights 5.15/lf The total project cost for street and drainage improvements and new street lights is distributed as follows: Total cost to property owners Total cost to City of Fort Worth Project Financing Unit I Water Developer's Share Tota] developer's share of project cost (..100% of water facilities through the 8-inch size) City's Share Water Total City's share of project cost $ 1,275,493.58 (23%) $ 4,164,839.95 (77%) $ 305,001.60 $ 154,183.00 $ 459,184.60 $ 260,789.80 $ 260,789.80 (Balance of project cost for Water Incremental costs of larger than 8-inch size) Total Contract Cost - Water Sanitary Sewer Total City's share of project cost (100% of sanitary sewer facilities) Total Contract Cost - Sewer DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR CONSTRUCTI N PAGE NUMBER 4/19/88 OF A 16 INCH WATER MAIN EXTENSION AND 6 7 **C-10924 ~._IMPRQVEMENTS TO AN EXI TING SANITARY ~ °' ____-` SEWER MAIN IN RANDOL MILL ROAD, UNIT I; ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOODHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF LOOP 820, UNIT II; ASSESSMENT PAVING OF WOODHAVEN BOULEVARD FROM NEW RANDOL MILL ROAD 316 LINEAR FEET, SOUTH UNIT III In accordance with the Water and Sewer Installation Policy, the developer has deposited his share of water project cost with the City. Sufficient funds for the City's share of the water project cost, including an allowance for construction engineering cost, are available in Water Capital Improvement Fund 81, Project No. 015001-00, 16-Inch Water Main, Randol Mill Road. Sufficient funds for the City's share of the sanitary sewer project cast, including an allowance for construction engineering cost, are available in Sewer Capital Improvement Fund 58, Project No. 017027-00, Sanitary Sewer Main Improvements, Randol Mill Road. Units II and III The total cost to property owners is $1,275,493.58, of which $988,016.45 is prepaid. The balance of $287,477.13 includes $273,504.77 for street and drainage improvements and $13,972.36 for new street lights. The property owner's share of costs will be provided by a bond fund transfer in the amount of $287,477.13 from Special Assessment Fund 94, Account No. 009905-00, Unspecified (where sufficient funds are available) to Project No. 036812-00 in the amount of $273,504.77 and Project No. 032301-00 in the amount of $13,972.36. In order to account for the construction cost, an interfund transfer will be necessary from the Special Assessment Fund 94, Project No. 032301-00, Randol Mill Road Street Lights (in which sufficient funds are available), to the Street Improvement Fund 30, Project No. 032301-00, Randol Mill Street Lights in the amount of $13,972.36 to finance new lights. Also, an interfund transfer from Special Assessment Fund 94, Project No. 036812-00, Randol Mill in the amount of $273,504.77 (in which sufficient funds are available), to the Street Improvement Fund 30, Project No. 036812-00, Randol Mill, will be necessary to finance the street drainage improvements. A bond fund transfer from the Street Improvement Fund 30, Project No. 031901-00, Signal Unspecified, in the amount of $18,500, Project No. 032129-00, C. Brown Estates, in the amount of $15,000 and Project No. 032901-00, Street Lights Unspecified, in the amount of $3,903.24 ( in which sufficient funds are available), to the Street Improvement Fund 30, Project No. 032301-00, Randol Mill Road Street Lights, will be necessary to finance the City's share of Street Light and Signal Conduit construction. The expenditures will be made in Fund 94 from Index Code 600957 and Index Code 680405 in Fund 30. DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR CONSTRUCTI N PAGE 4/19/88 NUMBER OF A 16 INCH WATER MAIN EXTENSION AND 7._0f 7 **C-10924 SEWER MAIN IN RANDOL MILL ROAD, UNIT I; ASSESSMENT PAVING OF RANDOL MILL ROAD FROM WOODHAVEN BOULEVARD TO 550 LINEAR FEET WEST OF LOOP 820, UNIT II, ASSESSMENT PAVING OF WOODHAVEN BOULEVARD FROM NEW RANDOL MILS ROAD 316 LINEAR FEET, SOUTH UNIT III Sufficient funds are available in the Street Improvement Fund 67, Project No. 095104-00, 87-88 Salaries to finance Engineering and Administrative costs for this project. The expenditure for Salaries will be made from Index Code 630046 . DAI wmc3 ,AP~~~d~~ ~Y 7~S CORREC ED 8 APR ~.~ 1~ ~3~~ ~~~~~~e~ ~ e~~ E~~v ~~ ~~~~ ~~~~~, ~a~a. SUBMITTED FOR THE CITY MANAGER'S David Ivory DISPOSITION Y COUNCIL. PROCESSED BY OFFICE BY gPPROVED ORIGINATING DEPARTMENT HEAO Gar Santerre • 'y TH E RIB CITY SECRETARY FOR ADD1T10NAL INFORMATION 7p ONTACT Drolet '~05 Adopted Ordnance No./:%/~ DATE C