ORDINANCE N0. GYM
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEMENT' OF IARIN AVENUE , FROM MILLER AVENUE
Ta HUGHES AVENUE , BURTON AVENUE, FROM FARRELL LANE 2'0 STALCUP
ROAD, FARRF.T,T, LANE, FROM COTTEY STREET 'TO FITZHUGH STREET AND
VIRGIL STREET, FROM IRIS STREET TO VILLAGE CREEK ROAD, AND VIRGIL
STREET, FROM WIMAN DRIVE TO ANGLIN DRIVE AS HEREINAFTER SET FORTH;
APPROVING PROJECT PLANS AND SPECIFICATIONS; ORDERING AND APPROVING
ESTIMATE OF COSTS; LETTING CONTRACT 'I'0 HARROD PAVING COMPANY, INC.
FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVE[~'IEN'I'S; MAKING
APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY
INCURRID; MAKING PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST
ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS
OF SUCH IMPROVEMENTS; DIRECTING THE CITY SECRETARY 'TO FILE A
NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF
TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL
SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENTS ARE
AND SHALL BE IN ACCORDANCE WITH ARTICLE 11O5b OF VERNON'S TEXAS
CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY `I~0 ENGROSS AND
ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE
BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN
THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the Director of_ Transportation and Public Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of LORIN AVENUE, FROM MILLER AVENUE 'I'0 HUGHES AVENUE, BURTON STREET,
FROM FARRELL LANE 'ISO STALCUP ROAD, FAR_RELL LADE, FROM COTTEY STREET TO FITZHUGH
STREET AND VIRGIL STREET, FROM LOIS STREET TO VILLAGE CREEK ROAD, AND VIRGIL
STREET, FROM WIMAN DRIVE TO ANGLIN DRIVE which is hereby designated Project No.
067-040137-00, (said improvements being hereinafter referred to as the
"Project");
WHEREAS, the Project shall entail the improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
Wf1EREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
There exist a public necessity for the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or amendments thereto.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$388,609.78 The estimated cost of the Project shall be paid partly by the
City of Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to the property~~~rabutting the
Project and the owners thereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as ".Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort Worth of the Project after its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of_ Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under eit'ner of the alternatives specified,
the assessment shall bear interest from the date of acceptance o:E the Project at
the rate of eight percent (8~) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
In addition, the City Attorney shall have the authority to authorize
terms of payment different than tc~iose specified herein when the Director has
previously determined that an extreme financial hardship exists.
III .
Bids having been requested by appropriate advertisement, as required by Articles
1105b and 2368a and the lowest bid of_ fiARROD PAVING COMPANY, INC. having been
found to be the lowest and 'oest bid for the making and construction of said
Project, the contract therefore is hereby awarded to HARROD PAVING COMPANY,
INC., at and for the amount of $ 370,104.55.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the 20th day of December 1988,
at 10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
~.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
VII .
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
.~~
PASSE~f~~ APPROVED THIS ~ DAY OF ~ ,
19_1~'~•
APPROVED AS TO E~RM AND LEGALITY:
City Attorney
Date:
:.~: _ .,
~.
ACGOlIN7iNG 2 ~j~t~ ~/~ Jl ~t19"~ ~®D°`,h,~ ~~i~'lA„~'
JRANSpORI'ATIONrf~UBLIC .Wp g,
V1A7'ER ADMINIa7RA'Pi6N ~3
REAL, pROpEtt7't
DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR RECONSTRU - PAGE
NUMBER TION OF PORTIONS OF LORIN AVENUE 4
11/22/88 C-11312 LANE ~ ' °f
IMPROUEMENT OF VIRGIL STREET, AND
RELATED WATER MAIN REPLACEMENT
RECOMMENDATIONS
It is recommended that the City Council
1. approve the following bond fund and interfund transfers
FROM TO AMOUNT REASON
94-009905-00 67-040137-00 $ 396.48 To move property
Special Assessments Lorin, Burton owner's share of
Farrell, Virgil cost from Revolving
Fund to project
account.
67-040901-00 67-040137-00 $324,517.59 To provide City's
Reconstruction Lorin, Burton share of construction
Unspecified Farrell, Virgil cost.
76-206080-35 76-206080-48 $ 45,190.48 To provide funds for
Eleventh Year Lorin, Burton CDBG share of con-
COBG Inner- Farrell struction cost.
City Streets
45-60-90-20 53-017080-00 $230,000.00* To provide funds for
Water and Water Main 8-inch and 6-inch
Sewer Replacement water main replace-
Lorin, Burton, ments.
Farrell, Virgil
*Funds in excess of the bid amount are to provide for inspections and other
administrative costs.
2. authorize the City Manager to execute a contract with J.D. Vickers,
Inc., in the amount of $220,491.95 based on its low bid for replacement
of 6-inch and 8-inch water mains in Lorin, Burton, Farrell and Virgil.
3. authorize the City Manager to execute a contract with Harrod Paving Co.,
Inc., in the amount of $370,104.55, based on its low bid for
reconstruction of Lorin, Burton, Farrell, and improvement of Virgil
Street.
4. authorize the assessment of a portion of the cost of the improvements
against the owners of the abutting property on Lorin Avenue,
5. approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate;
6. establish December 20, 1988, as the date of the benefit hearing;
1. authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
...- - ~ ~.
GATE REFERENCE SUBJECT AWARD OF CONTRACT FOR RECONSTRU - PAGE
NUMBER TION OF PORTIONS OF LORIN AVENUE, 2 04
11/ 2 2/ 8 8 C-11312 gllRTON STREET AND FARRELL ~ L'ANE
IMPROVEMENT OF VIRGIL STREET, AND
RELATED WATER MAIN REPLACEMENT
Vernorr's Texas Ci v i 1 St at ues, and
8 adopt an ordinance reflecting the City Council's authorization and
approval of Items 3 through 7 above, and other appl icable requirements
of Article 1105b, Vernon's Texas Civil Statutes
ORIGIN OF PROJECT
The 1986-88 Capital Improvement Program approved in March, 1986, included
funds for the improvement of portions of Lorin, Burton, Farrell and Virgil.
The Water Department determined that the water mains in Lorin, Burton,
Farrell and Virgil are in need of replacement ar~d advertised for bids for
this work along with street reconstruction projects.
The project is located in Council District 5
PROPOSED ASSESSMENTS
These streets have previously been constructed to City standards and are
located in areas qualifying for Community Development Block Grant
expenditures (Polytechnic and Stop Six Target Areas). Burton, Farrell, and
Lorin are being reconstructed, and Virgil is being improved
Iri accordance with the provisions of the Assessment Paving Policy, as revised
July 28, 1987 (M&C G-7160), assessments are not being levied against property
zoned aril used for one-arid two-family residences Two lots on Lorin are
residentially zoned but are vacant and therefore subject to assessments.
CDBG funds will finance fifteen percent of the construction cost for the
streets being reconstructed
PROJECT DESCRIPTION
Uriit I - Water Main Replacement
The Water Department will replace 8-inch and 6-inch water mains in Lorin,
Burton, Farrell and Virgil
Uri it II - Street Construction
ROADWAY R 0 W
STREET LIMITS WIDTH/FEET WIDTH/FEET
Lorin Avenue Miller to Hughes 30 50
Burton Street Stalcup to Farrell 30 50
Farrell Lane Cottey to Fitzhugh 30 50
Virgil Street Wiman to Anglin and 30 50
Lois to Village Creek
PROPOSED IMPROVEMENTS
It is proposed to improve Lorin Avenue, Burton Street and Farrell Lane by
constructing a six-inch reinforced concrete pavement with a seven-inch high
~,;,
DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR RECONSTRU - PAGE
NUMBER TION OF PORTIONS OF LORIN AVENUE, 3 04
11-22-88 _~11~12_ BURTON STREEI,~{D FARRELL. LAND., -~
IMPROVEMENT OF VIRGIL STREET, AND
RELATED WATER MAIN REPLACEMENT
attached concrete curb orr a six-inch thick lime stabilized subgrade so that
the finished roadways will be thirty feet wide orr a fifty foot right-of-way
Virgil Street will be improved with extensive base reconstruction arrd a
two-ir-ch HMAC overlay orr arr existing thirty-foot wide roadway
RECEIPT OF BIDS
Bids for this project were received orr October 6, 1988, after being
advertised on September 15 and 22, 1988, with 100 working days allotted to
complete the project
BIDDER AMOUNT
Unit I, Water Main
J D Vickers, Irrc $220,491 95
Larry H Jackson Corrst Co Inc ?_42,525 45
Atkins Bros Equipment Co Irrc 256,083 95
~'~~~?~;,L ~ Conatser Corrst Co Inc 257,591 70
`Circle C Corrst Ins 264,917 95
Tri-Tech Construction, Ins 308,924 20
Nall-Albert Construction 325,627 20
Hawkos Corrst Co Irrc 344,449 20
Unit II, Street Construction
Harrod Paving Co Inc $370,104 55
Centerline Constructors, Inc 377,547 49
Walt Williams Corrst Inc 381,957 13
Austin Paving Co 388,057.03
J L Bertram Construction 395,696 90
and Engineering, Inc
The low bidders have complied with the City's MBE/WBE Policy
ENGINEER'S ESTIMATE OF COST
Based or- standard City Pol icy and the low bid prices, the following
assessrnerrt rates have been established
6-inch reinforced concrete pavement $29 25/L F
7-inch high attached concrete curb $ 2 58/L F
The Di`re'ctor of~ Real Property Marragernerrt has advised the staff as to the
amount of errharrcemerrt to property values that will result from the proposed
improvements, and individual assessments have been adjusted accordingly
The project cost for street improvements is distributed as follows
fi,~
,}~sti ~+.
DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR RECONSTRU - PAGE
NUMBER TION OF PORTIONS OF LORIN AVENUE, 4 0~
11-22-88_ C-11312 _.BURI(lN STRFFTr AN(1 FARRFI L LAN
IMPROVEMENT OF VIRGIL STREET, ANO
RELATED WATER MAIN REPLACEMENT
Total cost to Property Owners $ 396 48 ( 0 1%)
Total cost to the City of Fort Worth $375,181 92 (99 9%)
FINANCING
Sufficient funds are available as follows for transfer
FUND PROJECT NO PROJECT NAME AMOUNT
94 009905-00 Special Assessments Unspecified $ 396 48
67 040901-00 Reconstruction Unspecified 324,517.59
76 206080-35 Eleventh Year CDBG, 45,190 48
Inner City Streets
45 60-90-20 Water and Sewer Operation 230,000 00
X600,104 55
Upon approval and completion of Recommendation No 1, sufficient funds will
be av ai 1 abl e as fol 1 ows
FUND PROJECT NO PROJECT NAME AMOUNT
67 040137-00 Lorin, Burton, Farrell, Virgil $324,914.07
76 206080-48 Lorin, Burton, Farrell 45,190.48
53 017080-00 Water Capital Improverrerit 230,000.00
600,104 55
Expenditures will be made from Index Codes 630335, 515833 and 620153,
respectively
Suff i (, i er~t funds are avai 1 able iri Street Improvements Fund 67, Project
No 095105-00, Engineering Salaries, to finance inspection, engineering and
administrative costs Expenditures will be made froir Index Code 630004
DAI dJmmc#3
APPROVED BY
CfTY COUNCIL
NOV 22 i9~8
~~~~
cis sew®t~ ~ ~e
SUBMITTED FOR THE
CITY MANAGER'S David
OFFICE BY
Ivor
Y DISPOSITION BY COUNCIL.
[] APPROVED PROCESSED BY
f7 OTHER (DESCRIBE)
ORIGINATING
DEPARTMENT HEAD Gary Santerre C1TV SECRETARY
FOR ADDITIONAL INFORMATION
O r le~ ~rCJlf!('1~C2 NO.
A~oP
CONTACT E Dro l e t J
7$ DATE