Loading...
HomeMy WebLinkAboutOrdinance 10126. ~ _ ,~ ORDINANCE NO. O AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND PROVIDING FOR THE IMPROVII~NT OF WESTERN CENTER BOULEVARD, PHASE I AND II AS HEREINAFTER SET FORTH; APPROVING PROJECT PLANS AND ~PECrFrCATIONS; ORDERING AND APPROVING ESTIMATE OF COSTS; LETTING CONTRACT 'I'0 J.L. BERTRAM CONSTRUCTION AND ENGINEERING, INC. FOR PHASE I ,FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVEt~NTS; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS OF SUCH IMPROVF~NiENTS; DIRECTING THE CITY SECRETARY Ta FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRAN'r COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Director of Transportation and Public Works for the City of Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed the improvement of WESTERN CENTER BOULEVARD PHASE I AND II,which is hereby designated Project No. 90-136067-00 (said improvements being hereinafter referred to as the "Project"); WHEREAS, the Project shall entail the improvement of the street, avenue, alley, highway, boulevard, drive, public place, square or any portions thereof (hereinafter referred to singly and collectively as the "highway"), and shall be accomplished by filling, grading, raising, paving, repaving, repairing, constructing, reconstructing, realigning, widening, narrowing or straightening said highway, or the curbs, gutter or sidewalks and any appurtenances or incidentals thereto, including drains or culverts; WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of the costs of the Project; WHEREAS, the City of Fort Worth has advertised and received bids, in accordance with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other applicable laws, such that a contract may be awarded for the construction of the Project; NOW, THEREFORE: -1- BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. There exists a public necessity for the improvement of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, to wit: (A) WESTERN CENTER BOULEVARD PHASE I, to construct a portion of the storm drain system for eighteen hundred (1800) linear feet easterly from the west pro- perty line of Lot 1, Block 1, Northbrook Addition and it is hereby ordered that the Project be carried out and constructed according to the Plans and Specifications, and any amendments thereto, for Project No. 90-136067-00 , said Plans and Specifications being hereby specifically approved and adopted. (B) WESTERN CENTER BOUT~TARD PHASE II, to construct a thirty-six (36) foot wide roadway on the south side of a of a one-hundred and twenty foot Right-Of Way from Interstate I-35 North to four-hundred and seventy (470) feet west of Pacesetter Drive. It is hereby ordered that plans and specifications for phase II be prepared for the improvement of the project and that the project be carried out and constructed thereto, for project No. 90-136067-00. II. The estimated cost of the Project based on the estimate of the City Engineer is $ 1,282,005.291 The estimated cost of the Project shall be paid partly by the City of Fort Worth and partly by assessments to the property abutting the Project and the owners thereof. The assessments to the property abutting the Project and the owners thereof shall be levied in accordance with the requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and shall not be more than all the costs of constructing, reconstructing, repairing, and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the cost of the remaining improvements comprising the Project. In any event, said assessments shall not exceed the special benefits to the abutting property and its owners, as enhanced by the Project. The City of Fort Worth shall pay the balance of the cost of the Project not assessed against the property abutting the Project and the owners thereof. The amounts assessed against the abutting properties and the owners thereof shall constitute a first and prior lien upon such properties and a personal liability of the owners thereof and shall be payable upon the acceptance by the City of Fort Worth of the Project after its completion. Said assessments shall be due and payable on or before 30 days after the acceptance by the City of Fort Worth of the Project, except that, if the abutting owner so elects, by complying with the terms hereinafter set forth, said assessments may be paid in installments. Said assessments may be paid in five (5) equal, consecutive annual installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project, -2- ~~. «. and each subsequent installment to be due and payable on an annual basis on each consecutive anniversary date of the acceptance of the Project; in the alternative, said assessments may be paid in forty-nine (49) equal consecutive monthly installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project. Any owner electing to pay the assessment in installments, as provided for herein, as a condition precedent to such election, must execute a promissory note and mechanic's and materialmen's lien contract evidencing the owner's intent to pay the assessment in accordance with the terms of one of the alternatives hereinabove set forth. In any case in which the owner elects to pay the assessment in installments under either of the alternatives specified, the assessment shall bear interest from the date of acceptance of the Project at the rate of eight percent (8g) per annum. Should any installment not be paid on its due date, the City of Fort Worth shall have the option to accelerate the entire unpaid balance of the assessment and declare the same to be immediately due and payable; this and other terms governing any default in the payment of any installment shall be set forth in the mechanic's and materialman's lien contract and shall be uniform among all owners executing the contract. In addition, the City Attorney shall have the authority to authorize terms of payment different than those specified herein when the Director has previously determined that an extreme financial hardship exists. III. Bids having been requested by appropriate advertisement, as required by Articles 1105b and 2368a and the lowest bid of J.L. BER'I'RAM CONSTRUCTION AND ENGINEERING INC. having been found to be the lowest and best bid for the making and and construction of said Project, the contract therefor is hereby awarded to J.L. BERTRAM CONSTRUCTION AND ENGINEERING , INC. at and for the amount of $270,734.60. To provide for the payment of said contract and the indebtedness incurred thereby, there is hereby appropriated out of available funds and current revenues of the City, an amount sufficient to pay the indebtedness so incurred. Notice shall be given and a hearing shall be held prior to making or levying any assessment against any property abutting the Project or its owners, as required by Article 1105b, Section 9. The notice of the hearing required under said statute shall be published in a newspaper of the City of Fort Worth at least three (3) times, the first publication to be made at least twenty-one (21) days before the hearing date. Written notice shall be personally given to all persons or entities claiming or owning an interest in the property abutting the Project and shall be mailed at least fourteen (14) days before the hearing in the manner specified by Article 1105b, Section 9. Said hearing shall be held before the City Council of Fort Worth, Texas, on the 19th day of JULY, 1988 at 10:00 A.M. IV. -3- ,.:. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessments made and levied and all proceedings taken and had in accordance with and under the terms of Article 1105b and the Charter of the City of Fort Worth, Texas. V. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice of the authorization and approval of the Project and the pendency of the assessment proceedings authorized hereunder. VI. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Books of the City Council and by filing the complete ordinance in the appropriate ordinance records of this city. VII. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED~~ APPROVED THIS / ~ DAY OF r 19--~d~;L-' APPROVED AS 'PO FORM AND LEGALITY: ~~L~ /~~~City Attorney Date: ~ `~-~~ -4- ~ ^r ~ ~ M ACCOUiVTi;~~G 2 °' ~ _ ~ 7RANSFORTAT[ON~PU86/,~\J~(~rlq~,. ®~ /r]~~~// 11 ~®~1) // ~1V11 ~/II // ~®~]17-1) ~jVl-~1 ~1) Q ~~/~~// // ~®/M- ./ V , ~i~f~~ eau/ LL.SV ~/ (jail/ // 1/~ ((i lV \~~ ,// (/ l/ l{i l/ l/ lb ((i((/ u./ Illli lV Q Ili N Q'r'~R ADMINISiRA'FiOta ~' DATE 6-14-88 REFERENCE NUMBER .**C-11033 SUBJECT AWARD OF CONTRACT FOR PHASE I STORM DRAIN SYSTEM IN BOULEVARD AND ESTABLISHMENT OF CONSTRUCT WESTERN CE A BENEFIT ON O~ACE TER 4 1of HEARING DATE FOR ASSESSMENT PAVING OF WESTERN CENTER BOULEVARD, PHAS E I AND II, I-35W TO 470' WEST OF PACESETT ER DRIVE RECOMMENDATION. It is recommended tha t the City Council. 1 approve the following interfund and bond fund transfers. FROM TO AMOUNT REASON 94-009905-00 90-136067-00 $478,414 11 To move property Special Assessments Western Center Blvd. owner's share of Unspecified I-35W to 470' West of cost from Revoly- Pacesetter Drive ing Fund to Project Account 90-136901-00 90-136067-00 $569,222 94 To provide funds New Development Western Center Blvd for the City's Unspecified I-35W to 470' West of share of construc- Pacesetter Drive tion cost 94-009905-00 89-032060-00 $ 35,555 22 To move property Special Assessments Street Light owner's share of Unspecified Installation for cost from Revolving Western Center Blvd. Fund to Project I-35W to 470' West of Account Pacesetter Drive 2 authorize the City Manager to execute a contract with J.L Bertram Construction and Engineering, Inc in the amount of $270,734 60 based on its low bid for the installation of Phase I storm drain system in Western Center Boulevard, 3. authorize the assessment of a portion of the cost of the improvements against the owners of the abutting property, 4. approve the estimate of costs and amounts to be assessed as stated in the Engineer's Estimate, 5. establish July 19, 1988, as the date of the benefit hearing, 6 authorize the preparation of assessment rolls and notification of property owners in accordance with the provisions of Article 1105b of Vernon's Texas Civil Statutes, and 7. adopt an ordinance reflecting the City Council's authorization and approval of Items 2 through 6 above, and other applicable requirements of Article 1105b, Vernon's Texas Civil Statutes DATE 6-14-88 REFERENCE su94~RD OF CONTRACT FOR CONSTRUCTION OF PAGE NUMBER **C-11033 PHASE„I^STORM DRAIN SYSTEM4IN^WESTERN^CENTER 2 of 4 HEARING DATE FOR ASSESSMENT PAVING OF WESTERN CENTER BOULEVARD, PHASE I AND II, I-35W TO 470' WEST OF PACESETTER DRIVE DisrussrnN On May 24, 1988, (M&C C-10983), the City Council approved a community facilities Agreement with the Tandy Corporation for Northbrook Addition, Block 1, Lot 1, the site for the Tandy facility now under construction Included in this agreement is a provision for the construction of the south half of Western Center Boulevard from I-35W to 470' west of Pacesetter Drive. The north half of this divided roadway was constructed previously in conjunction with the Western Technical Management Center and the Western Meadows development. The southern half of Western Center Boulevard will be constructed in two phases, the first being the installation of a portion of the storm drainage system, and the second, which will be done under a separate contract to be awarded in five to six months, being the construction of the roadway, lighting and the remainder of the drainage system Although only the contract for the Phase I drainage system improvements is being awarded at this time, the proposed Benefit Hearing will provide for full assessments for properties on the south side of Western Center Boulevard This project is located in Council District 2 PROJECT DESCRIPTION STREET Western Center Boulevard (So half only) PROPOSED IMPROVEMENTS ROADWAY LIMITS WIDTH/FEET Interstate 36' I-35W to 470' West of Pacesetter Drive ROW WIDTH/FEET 120 It is proposed to improve the south half of Western Center Boulevard by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high super-imposed concrete curb on a thirty-six foot wide traffic lane Six-inch thick driveway approaches will be constructed where shown on the plans BIDS On May 5, 1988, the following bids were received for the storm drain system (Phase I). F'y 3 sus~eckWARD OF "CONTR~AGT FOR CONSTRUCTION SSE I STORM; DRAIN SYSTEM IN WESTERN CENT HEARING •DATE FOR ASSESSMENTPAVING OF < WESTERN ,CENTER B•OULEVARO, PHASE I AND II, I-35W TO 470' WEST OF PACESETTER DRIVE BIDDERS J.L. Bertram Construction & Engineering, Inc Walt Williams Construction Co Mid-Cities Construction Inc, Murray Construction & Engineering, Inc , Circle "C"~Gonstruction Co ABC Utility Services Inc Lewis & Lewis, Inc M A Vinson Construction Co. Inc Architectural Uti 1 i t~ies•, Inc AMOUNT $270,7:34.60 ~$~,$T~~ 283;248.00 297 , 28200 317,815.00 325,934 06 346,239 70 •418,999 00 523,582 50 There were 60 working days allotted. for the completion of the project. The low bidder• is in compliance with the City's MBE/WB~E policy a , .~ Engineer's Estimate. of Cost for Street and Drainage Improvements and Street ~Li g is Based on standard City policy, low bid prices received for storm drainage facilities, and estimates of average current paving and drainage costs, the following assessment rates have been established for this project 7-inch thick reinforced concrete pavement $56 61/L.F. 7-inch high super-imposed concrete curb 2 17/L F 6-inch thick concrete driveway approaches 3 21/S.F. Drainage 38 62/L F. Street Lights 7.38/L.F. The project cost for street and drainage improvements and street lights is distributed as follows. Total cost to property owners $ 513,969 33 (40%) Total cost to City of Fort Worth $ 768,035 96 (60%) Total project cost $1,282,005.29 FINANCING The property owner's portion of the cost of street and drainage construction, $478,414 11, will be provided by an interfund transfer from Specia l Assessments Fund 94, Project No 009905-00, Special Assessments Unspecified (where sufficient funds are available) to Street Improvements Fund 90, Project No. 136067-00, Western Center Boulevard, I-35W to 470' West of Pacesetter Drive. The City's share of the cost of street and storm drain! construction will be provided by a bond fund transfer in the amount of Cr DATE rRVUnneERC,E ~I~~6T•OF CONTRACT FOR CONSTRUCTION •OF PAGE PNAS ~ I STORM BRAIN SYSTEM IN WESTERN CENTER 4-_ ~or_4_____ 6-14-88 **C-11033 enn nr,ln rcrnR HEARING DATE FOR ASSESSMENT PAVING OF WESTERN CENTER BOULEVARD, PHASE I AND II, I=35W 1'0 470' WEST OF PACESETTER DRIVE $569,222 94 from Street Improvements Fund 90, Project No. 136901-00, New Development Unspecified (where sufficient funds are available} to project No 13606'-00 Western Center Boulevard, I-35W to 470' West of Pacesetter Drive to supplement the available balance resulting from bond fund transfers as approved in M&C C-10983, Contract for Installatioh of Community•Facilities - Northbrook Addition, Lot 1, Block i Expenditures will be made from Index Code 62145$ The property owner's portion of the cost of street lights, $35,555 22, will be provided by an interfund transfer from Special Assessments Fund 94, Project No 009905-00, Special Assessments, Unspecified (where sufficient funds are available), to Light and Signal Fund 89, Project No 032060-00, Street Light Installation for Western Center Boulevard, I-35W to 470' West of Pacesetter Drive Sufficient funds are available in the referenced project account to finance the City's share of the cost of street light installation ($7,867 08) as approved in M&C C-10983, Contract for Installation of Community Facilities - Northbrook Addition, Lot 1, Block 1 Expenditures will be made from Index Code 651257. Sufficient funds are available in New Development Fund 90, Project No. 095104-00, Engineering Salaries, to finahce engineering and administrative costs for the street and storm drainage improvements DAI d ~ 6 APPROVED BY ciTY cou•~vci~ sup ~~ ~~~~ _ _~ Citq Seacetaxy of the. City of Foxt Worth, Texas SUBMITTED FOR THE CITY MANAGER'S DISPOSITION BY COUNCIL. PROCESSED BY ~ OFFICE BY ~ d__Ivor ^ gPPROVED ORIGINATING ^ OTHER (DESCRIBE) DEPARTMENT hiEAD• teY.~r.e CITY SECRETARY FOR ADDITIONAL INFORMATION Adopted Ordinance No.,~ DATE CONTACT