HomeMy WebLinkAboutOrdinance 10135,.,~
,-~ t °
ORDINANCE NO.
IN ORDINANCE DETERMII~IING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEME~FT OF PEARL AVENUE - UNIT I, MARKET
AVENUE -UNIT II, AND GOULD P.VENUE - UNIT III, AS HEREINAFTER SET
FORTH; APPROVING PROJECT PLF.NS AND SPECIFICATIONS; ORDERING AND
APPROVING ESTIMATE OF COST~~ ; LETTING CANTRACT 'I'0 4~,L~T WILLIAMS
CONSTRUCTION, INC., FOR THE; MAKING AND CONSTRUCTION OF SUCH
IMPROVIIHII~17.'S; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE
INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF
ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF' FOR
A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY
SECRETARY Ta FILE A NOTICE OF' ADOPTION OF THIS ORDINANCE WITH THE
COUIV°TY CLERK OF TARRANr CC-UNTY, TEXAS; DECLARING THAT THIS
ORDINANCE AND ALL SUBSEQUENT' PROCEEDINGS RELATING TO SAID STREET
IMPROVIIMENTS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF
VERNON'S TEXAS CIVIL STATUTE~~; AND DIRECTING THE CITY SECRETARY TO
ENGROSS AND ENROLL THIS ORDINANCE BY COPYII~iG THE CAPTION OF SAME
IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE
ORDINANCE IN THE APPROPRIATE; ORDINANCE RECORDS OF THIS CITY; AND
PROVIDING AN EFFECTIVE DATE.
,- -
WHEREAS, the Director of Transports~tion and Public Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of PEARL AVENUE - UNIT I, MARKET AVENUE - UNIT II, AND GOULD AVENUE
UNIT - III, which is hereby designated Project No. 67-040135-00 (said
improvements being hereinafter referred to as the "Project");
WHEREAS, the Project shall entail tY;~e improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving., repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drain:. or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
WHEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT. At~IN., Articles 1105b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
-1-
3, ~,
BE IT ORDAINED BY THE CITY COUNCIL OF' THE CITY OF FORT WORTH, TEXAS, THAT:
I.
There exist a public necessity for the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or a~~endments thereto.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$ 579,533.25. The estimated cost c>f the Project shall be paid partly by the
Ci~Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. Tree assessments to the property abutting the
Project and the owners thereof ;hall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the cosh; of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort Worth of the Project after its completion. Said assessments shall
be due and payable on or before 30 clays after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set Borth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to k~e due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may k~e paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the as:~essment in installments, as provided for
herein, as a condition precedent t:o such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth., In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the asses:~ment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set fortYi in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
-2-
+; a:
'~
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III.
Bids having been requested by appropriate advertisement, as required by Articles
1105b and 2368a and the lowest bi~; of WALT WILLIAMS CONSTRUCTION,INC.,having
been found to be the lowest and best: bid for the making and construction of said
Project, the contract therefor is hereby awarded to V~,LT WILLIAMS
CONSTRUCTION,INC., at and for the amount of $ 575,255.30.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written. notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth., Texas, on the 26th day of July, 1988 at
10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments. made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in th.e Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
-3-
,~
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage. ~~~
PASSE AND APPROVED THIS ___~2~L' ~ DAY OF ,
19~~.
APPROVID AS TO FORM AND LEGALITY:
City Attorney
Date:
-4-
AccouNTINC~2 pity ®f 1F®~°t q~®~th, ~~Ai~~
TRAi~{SPOFCAj{(?it'LPUtZLIC !~ ~P' ~AV (L~/ ® l/ ~ U I~/~ ~®Il/1~ U U/lL/ (~/~ ~®~~ (L/lL O Il/ ~/~~LL/~®O U/
NAYER AOYIINIS7RA'flOEI d; ~/
DATE ~ REFERENCE suB~ECr,AWARD OF CONTRACT FOR RECONSTRUCTI N PAGE
06/28/8.8', NUMBF~f~C-11052 OF PORTIONS OF PEARL, MARKET, AND GOULD, THE 4
RESURI=ACING OF 21ST STREET. AND RELATED WA1`E4~
LINE (REPLACEMENT
RECOMMENOA-T,I ON .
_t~~ ecomnended that the City Council
1. approve the following interfr,~nd, grant, and bond fund transfers
FROM( TO AMOUNT REASON
94-03(35-00 67-0405-00 $ ~~0 To move property '
Special Assessments Pearl, Market, owner's share of
Unspecified Gould and cost from Revoly-
21st Street ing Fund to Project
Account
67-040901-00 67-040135-00 $492,603 78 To provide funds
Reconstruction Pearl, Market, for the City's
Unspecified Gould and share of construc-
21st Street tion cost
45-60-90-20 53-017083-0~0 $150,000 00* To provide funds
Water and Sewer Water Main for a 6-inch water
Operating fund Replacement in main replacement
Market, Gould
and 21st Street
76-206080-35 76-206080-45 $ 82,182 52 To provide funds
Eleventh. Year Reconstruction of for construction
CDBG Inner Pearl, Market and
City Streets Gould
*Funds in excess of the bid amount are to provide for inspections and other
administrative costs
2 authorize the City Manager to execute a contract with J D Vickers,
Inc in the amount of $143,132 06, based on its lowest responsive bid
for replacement of 6-inch water lines in Market, Gould Avenue and 21st
Street,
3. aui;horize the City Manager to execute a contract with Walt Williams
Construction Company in the amount of $575,255 30, based on its low bid
for the reconstruction of Pearl, Market and Gould Avenue and the
resurfacing of 21st Street,
4 aui;horize the assessment of a portion of the cost of the improvements
against the owners of the abutting property,
5. approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
~ay<,..
DATE REFERENCE suB~ECrAWARD OF CONTRACT FOR RECONSTRUCTIO PAGE
NUMBER 0 PORTIONS OF PEARL, MARKET, AND GOULD, TH 2 4
06/28/88 **C-11052 R•SURFACING OF 21ST STREET, AND RELATED WAT ~--°f _
-LINE REE~LACEMENT
6 establish July 26, 1988, as the date of the benefit hearing,
7 authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
Vernon's Texas Civil Statutes, and
8 adopt an ordinance reflecting the City Council's authorization and
approval of Items 3 through 7 above, and other applicable requirements
of Article 1105b, Vernon's Texas Civil Statutes
ORIGIN OF PROJECT
e - Capital Improvement Program approved in March, 1986, included
funds for the improvement of F~ortions of Gould, Pearl, Market and 21st
Streets The original CIP provided for Gould to be improved from 21st to
25th, however, the block from 24t:h to 25th was accomplished under the 1982-83
CDBG Street Improvement Program The proposed contract therefore provides for
the improvement of Gould from 21s;t to 24th
The Water Department determined that the existing 6-inch water lines in
Market, Gould, and 21st are in need of replacement and advertised for bids
for this work along with the strE~et reconstruction projects
The streets are located in the Near North CDBG Special Emphasis Area Under
the provisions of the Assessment Paving Policy, as revised July 28, 1987
(M&C G-7160), no assessments are to be levied for one-and-two family
residential property on the streets being reconstructed, and Community
Development Block Grant funds will finance fifteen percent of the
construction cost
Twenty lots adjoining Pearl Avenue (Lots 13-22, Block 6, and Lots 3-12, Block
11, Rosen Heights Addition, 1st Filing) are Zoned "C" Apartment and are
therefore subject to assessments, under the Assessment Paving Policy, however,
the lots are fully improved with single family houses It is an established
and apparently stable neighborhood. It is the staff's opinion that
assessments should be waived and that such a waiver would be consistent with
the intent of the policy to provide street reconstruction in residential
neighborhoods at no cost to the residents A recommendation of waiver will be
presented to Council at the Benefit Hearing
No assessments are being levied on 21st Street because it is being resurfaced
and not reconstructed
PROJECT DESCRIPTION
STREET
nD~i t I
Pearl Avenue
ROADWAY
LIMITS WIDTH/FEET
street to ~6 Traci on
25th Street to a 36
ROW WIDTH/FEET
Unit II
Market Avenue
24th Street to
25th Street
36
60
s.
DATE (REFERENCE sue~ECTAWARD OF CONTRACT FOR RECONSTRUCT( N PAGE
~"uMeER 0 PORTIONS OF PEARL MARKET AND GOULD T E 3 4
06/28/88 **C-11052 _ R SURFACING OF 21ST S_T_REET, AND RELATED~WA E.~_---°f
LINE REPLACEMENT
Unit III 21st Street to 30 60
Gould Avenue 24th Street
Unit IV Clinton Avenue 40 60
21st Street to No Main
PROPOSED IMPROVEMENTS
t is propose to improve Pearl, Market and Gould by constructing a six-inch
thick reinforced concrete pavement with seven-inch high integral concrete
curb on a six-inch thick lime stabilised subgrade Four-inch thick concrete
sidewalks and six-inch thick concrete driveway approaches will be constructed
where shown on the plans
It is proposed to resurface 21st Street with a 2 inch H.M A C. overlay on the
existing base
It is proposed to replace the six inch water mains in Market, Gould and 21st
Streets
RECEIPT OF BIDS
mid-s~'or t is project were received on May 19, 1988, after being advertised
on April 28 and May 5, 1988, with 80 working days allotted The bids are
tabulated as follows
UNITS I - IV - STREET IMPROVEMENTS
TOTAL
PEARL AVE MARKET AVE GOULD ST. 21st ST. BID
BIDDERS (UNIT I) (UNIT II) (UNIT III) (UNIT IV) AMOUNT
Walt Williams
Const Inc $266,366 40 $68,735 70 $212,781 35 $27,371 85 $575,255 30
J L Bertram
Const & Engr $287,109 55 $75,143 00 $225,473 75 $25,713 95 $613,440 25
Centerlane
Const Inc $305,690 05 $81,270 80 $235,972 95 $28,410 11 $651,343 91
Austin
Paving Co $310,663 99 $89,437 05 $248,796 40 $23,254 35 $672,151 79
UNIT V - WATER IMPROVEMENTS
BID
BIDDER AMOUNT
J D Vic ers, Inc $14-06
Larry Jackson Construction, Inc $159,010 00
Atkins Brothers Equipment
Company, Inc $160,377 50
Circle "C" Construction $164,805 00
_The two low bidders are in compliance with the City's MBE/WBE policy
~~.~. Y.
DATE REFERENCE
NUMBER sue~EC:A~+IARD OF CONTRACT FOR RECONSTRUCTIO PAGE
06/28/88
--- ---- **C-11052 OF
------ - PORTIONS OF PEARL, MARKET, AND COULD, TH 4 of 4
t ti rr. nF ? ~
LINE REPLACEMENT .~
ENGINEERS ESTIMATE OF COST
ase on stan ar City policy and low bid prices, the following assessment
rates have been established
PEARL AVE MARKET AVE COULD AVE
(UNIT I) (UNIT II) (UNIT III)
6-inch thick reinforced concrete pavement $35 89/LF $35 93/LF $30.00/LF
7-inch high integral concrete curb $ 2 24/LF $ 2 24/LF $ 2.24/LF
6-inch thick concrete driveway approaches $ 2 57/SF $ 2 57/SF --
4-inch thick concrete sidewalk $ 1 82/SF $ 1 82/SF --
The assessment rates differ on each unit because separate bids were received
,
for each unit and the widths of the streets vary.
PROJECT COST AND FINANCING
n or er to finance t ~s project, an interfund transfer in the amount of
$469 00 from Special Assessment Fund 94, Project No 009905-00, Property
Owner`s Portion (where sufficient funds are available), to Street
Improvements Fund 67, Project No 040135-00, Pearl, Market, Gould and 21st,
will be necessary to move the property owners' share of the construction cost
to the project account
A bond fund transfer in the amount of $492,603 78 from Street Improvements
Fund 67, Project No 040901-00, Reconstruction Unspecified (in which
sufficient funds are available) to Project No 040135-00, Pearl, Market,
Gould and 21st, will be necessary to finance the City's share of the
construction cost Expenditures will be made from Index Code 630335
A fund transfer in the amount of $150,000.00 will be necessary from Water and
Sewer Operating Fund 45, Account No 60-90-20, Water Capital Project, Water
Department (in which sufficient funds are available) to Water Capital
Improvement Fund 53, Project No 017083-00, Water Main Replacement in Market
Avenue, Gould Avenue and 21st Street Expenditures will be made from Index
Code 620153
A grant fund transfer in the amount of $82,182 52 will also be necessary from
Community Development Block Grant Fund 76, Project No 206080-35, Eleventh
Year Inner City Streets (in which sufficient funds are available), to the
Project No 206080-45, Reconstruction of Pearl Avenue, Market Avenue and
Gould Avenue to finance the CDBG share of this construction cost
Expenditures will be made from Index Code 515833, construction
Sufficient funds are available in Street Improvements Fund 67, Project
No 095104-00, Engineering Salaries, to finance inspection, engineering and
administrative costs Expenditures will be made from Index Code 63000
~~,PRO~ED ~Y
DAI d_
c>4~/ C~~'~C~ ~
SUBMITTED FOR THE
CITY MANAGER'S
OFFICE BY David Ivory _
DISPOSITION BY COUNCIL.
^ APPROVED
PROCESSED BY
ORIGINATING
^ OTHER (DESCRIBE) Q~RS g~ pp } p
~(~`~ I>•el(y 1~{T~
DEPARTMENT HEAD Gary Santerr~e I
C
TY SECRETARY
FOR ADDITIONAL INFORMATION
CONTACT Ed Drolet 7805 ~/f~~
Adopted Ordinance ~Io. L// ~
~
/
~ /~YL
~^'~ 77~~..
Cifp $earetcuy of the
City of Fort Worth, Texoa