HomeMy WebLinkAboutOrdinance 10178ORDINANCE N0.
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVENIE~FT OF MEADOWBROOK BOULE~TARD AND RANDOL
MILL ROAD, AS HEREINAFTER SET FORTH; APPROVING PROJECT PLANS AND
5'P~'CIFICA'TIONS; ORDERING AND APPROVING ESTIMATE OF COSTS; LETTING
CONTRACT TO APAC-TEXAS, TEXAS BITULITHIC DIVISION, FOR THE MAKING
AND CONSTRUCTION OF SUCH IMPROVENIEI~PTS; MAKING APPROPRIATIONS FOR
THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING
PROVISIONS FOR THE LEVY OF .ASSESSMENTS AGAINST ABUTTING PROPERTIES
AND THE OWNERS THEREOF FOR A PART OF THE COSTS OF SUCH
IMPROVIl~'I'S; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF
ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRANT
COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUBSEQUENT
PROCEEDINGS RELATING TO SAID STREET IMPROVEN~NTS ARE AND SHALL BE
IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES;
AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS
ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF
THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE
APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the Director of Transportation and Public Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of MEADOWBROOK BOULEVARD, AND RANDOL MILL ROAD, which is hereby
designated Project No. 21-036719-00 (said improvements being hereinafter
referred to as the "Project");
WHEREAS, the Project shall entail the improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
WHEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT. ANN., Articles 11O5b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
-1-
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
There exist a public necessity for the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or amendments thereto.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$ 1,242,275.41. The estimated cost of the Project shall be paid partly by the
City of Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to the property abutting the
Project and the owners thereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort Worth of the Project after its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8$) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III.
Bids having been requested by appropriate advertisement, as required by Articles
1105b and 2368a and the lowest bid of APAC-TEXAS, TEXAS BITULITHIC DIVISION,
having been found to be the lowest and best bid for the making and construction
of said Project, the contract therefor is hereby awarded to APAC-TEXAS, TEXAS
BITULITHIC DIVISION, at and for the amount of $ 1,160,996.65.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the 1st day of November, 1988 at
7:00 P.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
. ~ ..
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage. ~
PASSED AND APPROVED TfiIS ~` DAY OF i~ ~~~~
19~~. ~
APPROVID AS 'I'0 FnRM AND LEGALITY:
City Attorney
Date:
1~.
=i~.
_~p~r
•e~totp ;-~~
~~~ •.; I[t EuLESS ~ r
e r . •tu«.
~
e lel -
".' » - S •
~
. t
,
i
t
'~ ~_~
•
• MNRST
i r ~
.... i _. ~. ~
~ ~ ~
a tew••• ~•t _ I . ~t
, t.
Q
w w •t. RICML~NO
' ~u t ''
ate t
~
.• a 111~LTOr e11L1! . n :n. • • „tiw , = S
.• - ~+ t! t ~~
•
-,- ~^~
~
4 f+f ~ _lere T
_ _ f w C:
L • ~ Ya~ e
~~ ~ Y
'
•w.r. - M
It t t45 n•t•
~ t_wa tnae .n
a.Yt• tawl ~.•
rw~.•t ,
,: YC p
t e ~
~
•
w aw. . e
rr e
•
•M~ i wew.
e e
s
e
tww
,owe
t
Ft ..w C • •i e 7
. ., +.t
n • at
.. ~
M
M ~
.N.
_~
'~r ~
a ~
~~rtEGO =
~
.rw t }
wt ~« ~ •. f
. ww~ ~ r•.
• WLO~TM C
e .i
, fJI10[M! C •
Q T
~
O ~. w.w
i~ _ LKee Mei
fRM w . w
taw MrN 1
~~
f~ i
i ~ Me
t
4 i
e =
S
G
r •.
N
~
~ _ ~ FOREST = kl-glew -~ •
~ - .
~ ~Ma
$ : - 1.
1
f
e Ile s E
KE EWI
~
..
~
aw
t~
..»
r
-
• Fiee1 i... _t
•• 'r
~
~ ~ •~
! ~ ~ in i N~~ ~
e
s s
~vEae!~N ::~- =e _
C w `
---w --~-
e r
_ ._ ~ ~ t • r • t
~
~ I •w ~ t ;
r.. • f u.a
` I ~
\\ \
}
t -
~ e..ww
.
w
~ ~~ ~ ~ r
s _
'
s ,
" ~.e s •
~
ow a... a
;
~~ Aenee "a, N ~
. w ~ •r Oet O.e~t ..r S ~ r ~ • Pw.`
t
'
'~• iwN
s
aw - t f
w •..t ~ •M9,fl 0 ~. '
~
e w `
• Z
~
i
_ + ~
I ~ M»te
ra 1t. wee
~ - -
wA •^
b • ~Vw•w~.-
t ~ •~
t
r coulerr
V
..
NEADOWBROOK ~ULEVAP~
(E~STCHASE TO VILLAGE CREFJO
RAf~OL P1I LL ROAD
(I-30 TO P'E~DO-'r~BR00K BOULEVARD)
PROJECT Noe 21-036719-00
.
Project No. 21-036719-00, Randol Miil Road, From Meadowbrook Boulevard to the Overpass bridge
`at Interstate 30, constructing a seven-inch thick reinforced concrete pavement with a seven
winch high attached concrete curb on a six-inch thick lime stabilized subgrade so that the
finished roadway width will vary with a forty-eight foot minimum on a variable Right-Of~1ay.
Six-inch thick concrete driveway approaches will be Constructed where shown on the plans.
Project No. 21-036719-00, Meadowbrook Boulevard, from Eastchase Parkway to Village Creek
bridge, constructing a seven-inch thick reinforced concrete pavement with a seven inch high
attached concrete curb on a six-inch thick lime stabilized subgrade so that the finished
roadway will consist of two thirty-six foot wide traffic lanes with a twenty-eight foot wide
median on a one hundred and twenty foot Right-Of-Way. Six-inch thick concrete driveway
.approaches will be constructed where shown on the plans.
aWI~R & LEGAL DESCRIPTION ZONI19; FRONTAGE
NORTHSIDE
000005302803
STEPHEN D. HIBBARD
8701 MEADOWBROOR DR
FT WORTH TX 76112
BLR 1 IAT 1 A
RATE AMOtJNr
PIKE VIEW OARS ADDITION
CF 152.00'PAVEMII~Tr
104.75'CURB
152.00'ST. LIGHTS
193.90 SF. DR APP
68.68 10439.36
1.99 208.45
4.82 732.64
0.00 0.00
11380.45
ASSESSMENT
11380.45
ADJUSTED:*, **
000004329546
FORT WORfiH CITY
TR 2
JOHN SMITH SURVEY A-1446
E 189.00'PAVEMEDTr
0.00 0.00
0.00
AU ASSESSMENT
-1-
OWNER & LDG.AL DESCRIPTION ZONING
SOUTHSIDE
000004710134
TEXAS UTILITIES
2001 BRYAN ZnWF.R
DAj,LAS, TX 75201
TR 4A
FRONTAGE RATE
WTL.LIAM WELCH SURVEY A-1668
595.00'ADJUSTID
A 545.00'PAVII~NT 68.68
538.00'CURB 1.99
545.00'ST. LIGHTS 4.82
545.00'DRAINAGE 29.25
37430.60
1070.62
2626.90
15941.25
57069.37
ASSESSMENT
57069.37
AQ7USTID:*, *** (VAUANr IAT)
000005302412
MEADOWBROOK JV.
$ ROY A. BUSBY & 00.
1701 RIVER RUN
FORT WORTH, TX 76107
TR SD04
ADJUSTID: (VACANT LOT)
000005302374
MEADOWBROOK JV.
$ ROY A. BUSBY & 00.
1701 RIVIIt RUN STE 900
FORT WORTH, TX 76107
TR 5D2 & SD3
ADJI]STID
WILLIAM WELCH SURVEY A-1668
E 150.00'PAVEME[~TT
150.00'CURB
150.00'ST. LIGHTS
150.00' DRAII~,GE
68.68
1.99
4.82
29.25
WILLL~NI WELCH SURVEY A-1668
E 277.00'PAVII~TT
250.00'CURB
277.00'ST. LIGHTS
277.00' DRAINP-GE
279.95 SF DR. APP
MEDIAN OPENING
68.68
1.99
4.82
29.25
2.41
11,148.64
PRE-PAID
10302.00
298.50
723.00
4387.50
75/11.UU
19024.36
497.50
1335.14
8102.25
674.68
11,148.64
40,782,57
11148,64
15711.00
40782,57
-2-
~7
I~'ADOWBROOK BOULEVARD AND RANDOL MILL ROAD
The following Community Facilities Agreements provided the Developer's
contribution towards the street improvement cost for adjacent lots.
Pike View Addition Block 2, Lot 1
CFA #14088 11/6/84 $ 31,422.00
Pike View Addition Block 1, Lot 1R
CFA (short form) #13814 5/30/84 $ 15,000.00
Palmnold Meadows Addition Block 1, Lot 1A & 23B,
and Block 2 Lots 1A & 16B
CFA #11224 8/27/80 $ 13,215.00
Randol Crossing Addition Block 1, Lot 1
CFA #13252 8/30/83 $ 88,346.00
Randol Crossing Addition Block 1, Lot 2
CFA #13343 10/11/83 $ 35,550.00
Mill Valley Addition Block 1, Dot s 1, 2R & 3
CFA #13609 3/9/84 $ 65,440.00
Pike View Addition Block 3, Lot 1
CFA #14865 2/12/86 $ 36,973.22
TOTAL $285,946.22
-3-
.
MEADOWBROOR BOiJLEVARD AND RANDOL A'IILL ROAD
COST DISTRIBUTION:
A. PROPERTY OWNERS BY ASSF~SSNIE[ATP .............................$ 124,943.39
A.1 street construction $ 119,525.71
A.2 street lights $ 5,417.68
A.3 street construction prepaid $ 11,148.64
A.4 street construction and street
lights balance $ 113,794.75
B. DEVELAPER CX)NIRIBUTION BY CONIIr1U1~TITY FACILITIES AC~Et~P.. $ 285, 946.22
B.1 street construction $ 268,021.99
B.2 street lights $ 17,924.23
B.3 all are prepaid
C. ARLINGTON CITY'S SHARE ....................................$ 380,370.26
C.1 50~ of $ 710,972.50 = $ 355,486.23
C.2 7$ of Engr. x $ 355,486.23 = $ 24,884.03
C.3 All are prepaid
D. FORT WORTH CITY ...........................................$ 451,015.24
D.1 street construction $ 382,170.10
D.2 street lights $ 12,459.71
D.3 78 Engr. x $ 805,510.42 = $ 56,385.73
E. TOTAL ESTIMATED PROJECT QOS'P ..............................$1,242,275.41
F. $ 677,465.12 (55$) OF THE ESTIMATID PROJECT OOST HAS BEEN PREPAID.
Credit for curb inlets
** Full credit for driveway approaches less than ten years old.
*** Credit for 50 feet of barricade, no access onto the property.
-4-
v~..
aA~reR ~IL~a --y
rcouNTlN~.z ~l.,a~~ ~~ .lL " ~~°t ~®~'~~~ IL ~.'~.~.~
2ANSPORTAT(DY~PUBLEC WDRK~ /J~~®~ ~~ ]~ ~®~~~~~ ,(~®~~~~~~ Y ~~
AfER AD(~71N(STRATIOPt ~ ,//~\~/f/j/ lj~,(/(/~ (~/ ~/l7+)W/ I~LfYO
DATE REFERENCE SUBJECT AWARD OF CONTRACT, ASSESSMENT PAGE
NUMBER PAVING OF MEADOWBROOK BOULEVARD, FROM 4
10-04-88 **C-11229 EASTCHASE PARKWAY TO VILLAGE CREEK a°e
BRIDGE, AND RANDOL MILL ROAD FROM I-30
TO MEADOWBROOK BOULEVARD
RECOMMENDATIONS
It is recommended that the City Council
1 approve the following bond fund and interfund transfers
FROM TO AMOUNT REASON
94-009905-00 21-036719-00 $108,377.07 To move property
Special Assessments Meadowbrook, owners' share of
Unspecified Randol Mill cost from Revolving
Fund to project
account.
21-036901-00 21-036719-00 $232,286 07 To provide City's
Streets in New Meadowbrook, share of construction
Additions Randol Mill cost.
94-009905-00 30-032344-00 $ 5,417.68 To move property
Special Assessments Meadowbrook, owners' share of
Unspecified Randol Mill street light cost
Lights to project account
30-032901-00 30-032344-00 $ 3,259 71 To provide City's
Street Lights Meadowbrook, share of street
Unspecified Randol Mill light cost
Lights
2 authorize the City Manager to execute a contract with APAC-Texas, Texas
Bitulithic Division, based on their low bid of $1,160,996.65 for the
construction of Meadowbrook Bou levard and Randol Mill Road,
3 authorize the assessment of a portion of the cost of the improvements
against the. owners of the abutting property,
4. approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
5 establish November 1, 1988, as the date of the benefit hearing;
6 authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
Vernon's Texas Civil Statutes, and
7 adapt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 6 above, and other applicable requirements
of Article 1105b, Vernon's Texas Civil Statutes.
~s
DATE REFERENCE SUB.IECT AWARD OF CONTRACT, ASSESSMENT PACE
NUMBER pAVTNG OF MEADOWBROOK BOULEVARD FROM 2 4
10-04-88 **C-11229 EASTCHASE PARKWAY TO VILLAGE CREEK °f
BRIDGE, AND RANDOL MILL ROAD FROM I-30
TO MEADOWBROOK BOULEVARD
DISCUSSION
Meadowbrook Boulevard, from Eastchase Parkway to the Village Creek Bridge,
and Randol Mill Road, from I-30 to Meadowbrook Boulevard, are two-lane
undivided thoroughfares of county-type construction. Development in the area
and the accompanying increases in traffic volumes have resulted in the need
to widen and upgrade the streets.
These streets adjoin property developed under seven different Community
Facilities Agreements. One section of Meadowbrook Boulevard is on the border
between the cities of Arlington and Fort Worth, the City of Arlington, under
the terms of Contract No. 10274 (M&C C-4451) has agreed to participate in the
cost of the improvements for this section on a fifty-fifty basis. In order to
facilitate the computation of Arlington's share of the cost, the section of
Meadowbrook Boulevard that borders the City of Arlington was bid separately
from the remainder of the project
This project is located in Council District 4.
PROJECT DESCRIPTION
STREET
Meadowbrook Boulevard
Randol Mill Road
PROPOSED IMPROVEMENTS
Meadowbrook Boulevard
LIMITS
Eastchase Parkway to
Village Creek Bridge
I-30 to Meadowbrook
Boulevard
ROADWAY
WIDTH/FEET
Double 36
48' (Min.)
R.O.W.
WIDTH/FEET
120
Variable
It is proposed to improve Meadowbrook Boulevard by constructing a seven-inch
thick reinforced concrete pavement with a seven-inch high attached concrete
curb on a six-inch thick lime stabilized subgrade so that the finished
roadway will consist of two 36-foot wide traffic lanes with a 28-foot wide
median on a 120-foot right-of-way. Six-inch thick concrete driveway
approaches will be constructed where shown on the plans.
Randol Mill Road
It is proposed to improve Randol Mill Road by constructing a seven-inch thick
reinforced concrete pavement with a seven-inch high attached concrete curb on
a six-inch thick lime stabilized subgrade so that the finished roadway will
vary with a 48-foot minimum on a variable width right-of-way Six-inch thick
concrete driveway approaches will be constructed where shown on the plans
DATE REFERENCE SUBJECT AWARD OF CONTRACT, ASSESSMENT PAGE
NUMBER PAUING OF MEADOWBROOK BOULEVARD, FROM 3 4
10-04-88 **C-11229
EASTCHASE PARKWAY TO VILLAGE CREEK °f
BRIDGE, AND RANDOL MILL ROAD FROM I-30
TO MEADOWBROOK BOULEVARD
BIDS
On August 18, 1988, bids were received after being advertised on July 28 and
August 4, .1988, with 110 working days allotted to complete the project.
BIDDER AMOUNT
APAC-Texas, Texas Bitulithic Division $1, 6996.65
J.L. Bertram Const, and Engr., Inc. 1,171,462.45
Walt Williams Const., Inc 1,189,712.05
Ed Bell Const Co 1,245,476.22
Uvalde Const. Co. 1,284,287.10
Austin Paving Co. 1,376,426.26
Gifford Electric, Inc Bidder disqualified, non-responsive to bid
documents
The low bidder is in compliance with the City's MBE/WBE Policy.
ENGINEER'S ESTIMATE OF COST
Based on standard City policy and the low bid prices, the following
assessment rates have been established
Meadowbrook Boulevard
7-inch reinforced concrete paving
7-inch high concrete curb
Street lights
Drainage
6-inch concrete driveway approaches
$68.68/L.F.
1.99/L.F.
4.82/L.F.
29 25/L.F.
2 41/S.F.
Randol Mill Road
7-inch reinforced concrete paving
7-inch high concrete curb
Street lights
Drainage
6-inch concrete driveway approaches
50.63/L.F.
1.82/L.F.
4.82/L.F.
29 25/L.F.
2.41/S.F.
The total cost for street improvements and street lights is distributed as
follows
Total cost to City of Arlington $380,370.26 (31%)
Total cost to Fort Worth property owners 410,889.61 (33%)
Total cost to City of Fort Worth 451,015.54 (36%)
1,242,275.41
DATE REFERENCE
NUMBER suB~ECT AWARD OF CONTRACT, ASSESSMENT `PAGE
10-04-88` **G-11229 ~ PAVING OF MEADOWBROOK BOULEVARD, FROM 4 ,f"4
BRIDGE, AND RANDOL MILL ROAD FROM I-30
TO MEADOWBROOK BOULEVARD
PROJECT FINANCING
Upon approval and completion of the recommended bond fund and interfund
transfers for which there are sufficient funds, sufficient funds will be
available in the Street Improvement Fund 21, Project No. 036719-00,
Meadowbrook, Randol Mi11 Road, to finance the street portions of the
contract, and in Street Improvements Fund 30, Project No. 032344-00,
Meadowbrook, Randol Mill Lights, to finance the street light portions of the
contract This expenditure will be made from Index Codes 642199 and 680405
respectively.
Sufficient funds are available in Street Improvements Fund 67, Project
No. 0'95104-00, Engineering Salaries, to finance engineering and
administration costs for this project. The expenditure for salaries will be
made frorn Index Code 630004.
Payment from the City of Arlington will be received prior to execution of the
contract documents
Community Facilities Agreements in the amount of $285,946.22 in the property
owner's share will be pre-paid before the benefit hearing date and recorded
in the project accounts
OAI •m/6
APPROVED BY
CITY COUNCIL
ocr ~ ~~~a
~~~
Cfty Seasetary of thQ
City of Fbxt aVostkt, T$xW
SUBMITTED FOR THE
CITY MANAGER'S
David Ivory
DISPOSITION BY COUNCIL:
AP
R
V
D
PROCESSED BY
OFFICE BY ^
P
O
E
ORIGINATING
• Gary Santerre ^ OTHER (DESCRIBE)
DEPARTMENT HEAD CITY SECRETARY
FOR ADDITIONAL INFORMATION Ed Drolet 7805
CONTACT adopted Ordinance No~
DATE