ORDINANCE N0.
AN ORDINANCE DETERMII~IING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVF~IENT OF LINCOLN AVENUE , FROM N.W. 30TH
STREET TO W. LONG AVENUE A , ~5L`T-~3RTf1•;
APPROVING PROJECT PLANS AND SPECIFICATIONS; ORDERING AND APPROVING
ESTIMATE OF COSTS; LEZTING CONTRACT 2'0 WALT WILLIAMS CONSTRUCTION,
INC. FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVEMEN')'S; MAKING
APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY
INCURRED; MAKING PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST
ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COSTS
OF SUCH IMPROVENIII~TS; DIRECTING THE CITY SECRETARY TO FILE A
NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF
TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL
SUBSEQUENT PROCEEDINGS RELATING Ta SAID STREET IMPROVEMENTS ARE
AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXAS
CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND
ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE
BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN
THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the Director of Transportation and Public Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of LINCOLN AVENUE, FROM N.W. 30TH STREET TO W. LONG AVENUE, which
is hereby designated Project No. 067-040154-00, (said improvements being
hereinafter referred to as the "Project");
WHEREAS, the Project shall entail the improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
.constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains or culverts;
WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
WHEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
-1-
~;
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
There exist a public necessity for the Project, and it is hereby ordered that
Plans and Specifications be prepared for the improvement of the Project and that
the Project be carried out and constructed according to the Plans and
Specifications, and any changes or amendments thereto.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$189,931.47 The estimated cost of the Project shall be paid partly by the
City of Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to the property abutting the
Project and the owners thereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the owners thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be payable upon the acceptance by the
City of Fort Worth of the Project after its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III .
Bids having been requested by appropriate advertisement, as required by.Articles
1105b and 2368a and the lowest bid of WALT WILLIAMS CONST., INC. having been
found to be the lowest and best bid or a ing an cons ruction of said
Project, the contract therefore is hereby awarded to WALT WILLIAMS CONST., INC.,
at and for the amount of $ 180,887.11.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current
revenues of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the November 8, 1988.
at 10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
-~-
1 ' ~ w, ~ r . .~~
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASS APPROVID THIS ~~ DAY OF /~~ ~~~~
19
APPROVID AS 'Ib FORM AND T,~AT,ITY:
/ ~,
ity Atto ey
Date : ~ ~ "~~
-$-
MAEIER fltE•1,~ ,~
~ccouNnaa,.:
TRANSI'-".1flTA~!'I~MUa~tC WORKR.r ,J~/ ,/~
MATER ADMINt81RATicNM1~~ .~1(,iy~ljy~
ftEAl VROP~R'TJaS
DATE REFERENCE sue.lECr AWARD OF CONTRACT, ASSESS- ~' PAGE
NUMBER MENT PAVING OF LINCOLN AVENUE FROM I 4
10-11-88 C-11242 W. LONG TO NW 30TH, AND RELATED '°f -
!. WATER LINE AND SANITARY SEWER
REPLACEMENT
RECOMMENDATIONS
It is recommended that the City Council
1 approve the following bond fund and interfund transfers•
FROM TO AMOUNT REASON
94-009905-00 67-040154-00 $ 21,667.00 To move property
Special Assessments Lincoln, Long owner's share of
Unspecified to 30th cost from Revolving
Fund to project
~ account.
:.
67-040901'=00 67-040154-00 $104,953 98 To provide City's
Reconstruction Lincoln, Long share of construction
Unspecified to 30th cost.
76-206080135 76-206080-47 $ 54,266 13 To provide funds for
Eleventh Year Lincoln, Long CDBG share of construc-
CDBG Inner- to 30th tion cost
City Streets
53-015901-00 53-017073-00 $105,000.00* To provide funds for
Water Capital Water Main 8-inch water main
Improvement Replacement replacement
Unspecified Lincoln Avenue
58-013901=00 58-017047-00 $ 60,000 00* To provide funds for
Sewer Capital Sanitary Sewer 8-inch sanitary sewer
Improvement Replacement replacement
Unspecified Lincoln Avenue
*Funds in excess of the bid amount are to provide for inspections and other
administrative costs
2 authorize the City Manager to execute a contract with Steed, Inc in
the amount of $144,736.00, based on its low bid for replacement of an
8~-inch wat er main and 8-inch sani tary sewer in Lincoln Avenue,
3 authorize the City Manager to execute a contract with Walt Williams
Constructi on, Inc in the amount of $180,887.11, based on its low bid
for the co nstruction of Lincoln Avenue,
t
DATE REFERENCE SUBJECT AWARD OF CONTRACT; ASSESS- PAGE
NUMBER MENT PAVING OF LINCOLN AVENUE FROM ~2 4
10-11-88 C-11242 W W 30TH A ED -°f
Y WATERLINE AND SANITARY SEWER
REPLACEMENT ~'
4. authorize the assessment of a portion of the cost of the improvements
against the owners of the abutting property on Lincoln Avenue, ,
5 approve the estimate of costs and amounts to be assessed as stated in
the Engineer's Estimate,
6 establish November 8, 1988, as the date of the benefit hearing,
7 authorize the preparation of assessment rolls and notification of
property owners in accordance with the provisions of Article 1105b of
Vern{on's Texas Civil Statutes, and
8 adopt an ordinance reflecting the City Council's authorization and
approval of Items 3 through 7 above, and other applicable requirements
of Article 1105b, Vernon's Texas Civil Statutes.
ORIGIN OF'',PROJECT
The 1986;88 Capital Improvement Program approved in March, 1986, included
funds for; the improvement of portions of Lincoln Avenue '
The street is located in the Far North CDBG Special Emphasis Area and has
never been built to City standards. Under the provisions of the Assessment
Paving Policy, as revised July .28, 1987 (M&C G-7160), no assessments are to
be l'evied' fo'r one- and two-family residential property, and, Co.mmun~ity
Deve'lopmen't Block Grant funds will finance thirty percent of the project
construction cost
The Water Department has determined that the existing 8-inch water main and
the ~8-i'n'c;h sanitary sewer in Lincoln Avenue are in need of replacement; the
work was 'advertised for bids along with the paving
The street is located in Council District 2.
PROJECT 'DESCRIPTION
Unit I - Water Main and Sanitary Sewer Replacement
The Water Department will replace an aged 8-inch water main and 8-inch
sanitary sewer
Unit II - Street Construction
STREET
Lincoln Avenue
LIMITS
W Long to NW 30th
WinTN/FEET
Variable from
30 to 40
,RIGHT-OF-WAY
WIDTH/FEET
60
~~
~ti
~:~~~
a.~,r_ DATE REFERENCE SUBJECT AWARD OF CONTRACT, ASSESS- PAGE,,,
NUMBER MENT PAVING OF LINCOLN AVENUE FROM 3 4
10-11-88 C-11242 W, LONG TO NW 30TH, AND RELATED °r _
WATER LINE AND SANITARY SEWER
REPLACEMENT
PROPOSED IMPROVEMENTS
It is proposed to improve Lincoln Avenue from West Long to NW 30th Street by
constructing a six-inch .reinforced concrete pavement with a seven-inch high
attached concrete curb on a six-inch thick lime stabilized subgrade so that
the finished roadway will vary from thirty to forty feet on a sixty foot
right-of-way. Six-inch thick reinforced concrete driveway approaches and
four-inch thick reinforced concrete sidewalks will be constructed where shown
on the plans
RECEIPT O~F BIDS
Bids for this project were received on September 1, 1988, after being
advertised on August 11 and 18, 1988, with 61 working days allotted to
complete ;the project
BIDDER AMOUNT
Unit I - Water Main and Sanitary Sewer
Steed, Inc. $144,736.00
Circle C 'Construction 147,946.00
Larry H Jackson Construction 163,596.00
J D Vickers, Inc 168,687.15
Atkins Equipment Co Inc. 173,908 50
Unit I'I - Street Construction
Walt Williams Construction, Inc $180,887.11
Centerline Constructors, Inc 184,910.43
Austin Paving Company 195,111.96
J L Bertram Const & Eng., Inc 196,390.80
Harrod Paving Co Inc 199,823 46
L Grimes and Co., Inc. 295,458 12
The low bidders have complied with the City of Fort Worth's MBE/WBE Policy.
ENGINEER'S ESTIMATE OF COST
Based on standard City Policy and the low bid prices, the following
assessment rates have been established
6-inch reinforced concrete pavement $30.59/L.F.
4 7=i{nch~'':high attached concrete curb 3.14/L.F.
ri~6`=`i,nchthick concrete driveway approaches 2 72/L.F.
~f~ "4`}inch thick concrete sidewalk 1.62/S.F.
,,
,-
_-,
:„.
.
,
DATA REFERENCE SUBJECT AWARD OF CONTRACT, ASSESS- PAGE
NUMBER MENT PAVING OF LINCOLN AVENUE FROM ~,f 4
10-11-88 C-11242 _
WATER .LINE AND SANITARY SEWER `
REPLACEMENT
The Dire~'ctor of Real Property Management has advised the staff as to the
amount of enhancement 't o property values that will result from the proposed
improvements, and indiv idual assessments have been adjusted accordingly.
The project cost for st reet improvements is distributed as follows
Total cost to Prop erty Owners $ 21,667.00 (11%)
Total cost to the City of Fort Worth $168,264 47 (89~)
FINANCING'
Suficientlfunds are ava ilable as follows for transfer
FUND PROJECT NO PROJECT NAME AMOUNT
94 009905-00 Special Assessments Unspecified $ 21,667.00
67 040901-00 Reconstruction Unspecified 104,953 98
76 206080-35 Eleventh Year CDBG
Inner City Streets 54,266.13
53 015901-00 Water Capital Improvement
Unspecified 105,000.00
58 013901-00 Sewer Capital Improvement
Unspecified 60,000.00
$345- 887.E
Upon approval and com pletion of Recommendation No. 1, sufficient funds will
be available as follows
FUND PROJECT N0. PROJECT NAME AMOUNT
67 040154-00 Lincoln, Long to 30th $126,620 98
76 206080-47 Lincoln, Long to 30th 54,266 13
53 017073-00 Water Main Replacement
Lincoln Avenue 105,000 00
58 017047-00 Sanitary Sewer Replacement
Lincoln Avenue 60 000.00
$345,887. 1
Expenditures will b.e made from Index Codes 630335, 515833 and 620153,
respectively
Sufficient funds are available in Street Improvements Fund 67, Project
No 095104-00, Engineer ing Salaries, to finance inspection, a ~Yand
administrative costs E xpenditures will be made from Index Co~e~ ~~~1
y
DAI d/m/6
SUBMITTED FOR THE
CITY MANAGER'S DISPOSITION BY COUNCIL. PROCESSED BY
OFFICE BY p I ^ APPROVED
ORIGINAT-ING ^ OTHER (DESCRIBE)
DEPARTMENT HEAD• Gar Santerre Y
FOR ADDITIONAL INFORMATION C}~ ~
~~~ ~~~~' ~~' ~ ~ ~~
T•xa
~
CONTACT D.ro.let 7805 •
.
~
> ~:`~ "'
..~:
1i~