Loading...
HomeMy WebLinkAboutOrdinance 9910C-10410 -.~^~' '~ ORDINANCE NO AN ORDINANCE DECREASING THE UNRESERVED, UNDESIGNATED FUND BALANCE OF THE GENERAL FUND OF THE CITY OF FORT WORTH FOR FISCAL YEAR 1986-1987 BY $1,814,000 AND APPROPRIATING SAID SUM TO MUNICIPAL SERVICE IMPROVEMENT FUND 33, PROJECT 004102, EMERGENCY STRUCTURAL REPAIRS, FOR THE PURPOSE OF REPLACING THE STRUCTURAL BEAMS AND ROOF SYSTEM ABOVE THE CITY COUNCIL CHAMBERS, PROVIDING FOR A SEVERABILITY CLAUSE, MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES AND REPEALING ALL PRIOR ORDINANCES IN CONFLICT HEREWITH, PROVIDING FOR ENGROSSMENT AND ENROLLMENT, AND PROVIDING AN EFFECTIVE DATE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH SECTION 1 That the unreserved, undesignated Fund Balance of the General Fund of the City of Fort Worth for fiscal year 1986-1987 is hereby decreased by appropriating $1,814,000 to Municipal Service Improvement Fund 33, Project 004102, Emergency Structural Repairs, for the purpose of replacing the structural beams and roof system above the City Council Chambers SECTION 2 Should any portion, section or part of a section of this Ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections or parts of sections of this Ordinance, which said remaining provisions shall be and remain in full force and effect ~~ SECT OIL 31~ That this Ordinance shall be cumulative of Ordinance No 9690 and all other ordinances and appropriations amending the same except in those instances where the provisions of this Ordinance are in direct conflict with such other ordinances and appropriations, in which instances said conflicting provisions are hereby expressly repealed SECTION 4 The City Secretary of the City of Fort Worth is hereby directed to engross and enroll this ordinance by copying the caption and effective date of this Ordinance in the minutes of the City Council and by filing the Ordinance in the ordinance records of the City SECTION 5 That this Ordinance shall take effect and be in full force and effect from and after the date of its passage, and it is so ordained APPROVED AS TO FORM AN EGALITY City Attorney Date ~-~ `g~ ADOPTED f~~/ X / EFFECTIVE C,~ MASTER FILE+J ~ ~~t~yB ~ ~-/ ~~CCOUN~6~2 SRAN:rf'ORT.ATIQGdlE?U6[~Y .lyl~?le~®~ ~ D (~/~ ~®I(^(/ (/ ~1~,/ lV~ ~®!/ 0 W I/ !/ W ~L/u/ U U/~~l/~~ (G® U (L MATER DATE REFERENCE SUBJECT AWARD OF CONTRACT - EMERGEN Y PAGE NUMBER REPAIRS TO CITY HALL ROOF STRUCTU E 2 7-14-87 C-10410 lof RECOMMENDATION It is recommended that the City Council: 1. adopt the attached supplemental appropriation ordinance, appropriating an additional $1,814,000 in the General Fund, Fund O1, No-departmental Account 90-91-00, and decreasing the Unreserved, Undesignated Fund Balance of the General Fund by $1,814,000.00. 2. authorize the City Manager to approve the transfer of $1,814,000 from General .Fund O1, Non-departmental Account 90-91-00 to Municipal Service Improvement Fund 33, Project 004102, Emergency Structural Repairs. 3. authorize the City Manager to execute an emergency contract with Bob McCaslin Anchor Co. for the demolition and construction work required to repair the roof structural system and related damages at the Fort Worth Municipal Office Building in an amount not to exceed $1,518,860.00, including $50,000 in contingency allowance, 4. authorize the City Manager to execute an amendment to City Secretary Contract No. 14080 with V. Aubrey Hall um ArchitectslPlanners to provide the necessary design and structural engineering services related to the above repair work in an amount not to exceed $104,540; 5. authorize the City Manager to execute an emergency contract with Southwestern Laboratories, Inc. to provide the materials testing services incidental to the testing of the existing structure and to the contractural requirements during demolition and reconstruction of the new roof system in an amount not to exceed $25,000, and, 6. authorize the City Manager to execute an amendment to City Secretary Contract No. 15484 with McCord & Mendenhall, Inc. to provide Construction Management services during the performance of the above repair work in an amount not to exceed $105,000.00. BACKGROUND During the process of completing the, construction of the third floor, serious defects were discovered in the main structural beams and roof system above the City Council Chambers. Further examination revealed significant deficiencies in the capacity of the structure to support its required loading. As a result, numerous meetings were held between staff and consultants, who are already assigned to services in support of the third floor project, to determine the magnitude of the problem and to explore several options to resolve it. Due to the large number of defects uncovered, consultants and staff were reluctant to recommend any solution other than the complete removal of the defective structural elements and replacement with a new light-weight structural steel roof system. Although this solution is complex to design and to actually perform, it will provide the soundest structure and assure the overall integrity of the entire structure when completed. Throughout the evaluation period, consultants and staff have stressed safety as their rn imary concern in correcting the structural defects and in the finished DATE REFERENCE SUBJECT AWARD OF CONTRACT - EMERGENCY PAGE NUMBER REPAIRS TO CITY HALL ROOF STRUCTURE 2 2 7-14-87 C-10410 ar building, as well as the safety of employees and citizens whose business re- quires them to come to City Hall. The demolition process is of paramount concern, as the main structural beams measuring 84 feet in length and about 7,000 square feet of roof must be cut into smaller sections for removal. Each of these sections will weigh approximately 21,000 pounds, and, should one accidentally fall during demolition., considerable damage could affect both the work in progress and the floors below. We have therefore begun reshoring of the roof structure at the north end of the floor. At least initially, demolition work will only be permitted when City Hall is closed, between 6.00 P.M. and 6 00 A.M. City employees and the general public will be prohibited from using the entire north end of the City Hall under the construction area during these construction hours. Further, the security guard station and after-hours entrance to City Hall has been moved to the southwest entrance of the building until the work is complete. Because of the emergency nature of this work, consultants and staff have been working closely with contractors and industry representatives to determine the safest and most effective manner in which to remove the defective beams and roof. Staff is recommending that the City enter into an emergency contract with Bob McCasl in Anchor Co. to provide the complete demol i`tion and reconstruction of the affected beams and roof structure. The work includes the fabrication of a temporary weather shed which will protect the north end of the building from inclement weather once the work begins and the roof has been removed. Bob McCaslin Anchor Co, has proposed to perform the work described herein as a general contractor for a cost of $1,518,860, including $50,000 for con- tingencies, for any necessary change orders in the event that further problems are encountered during the removal and replacement of the beams and roof. In addition to the the cost of the general contractor, the following costs are known to be necessary at this time to correct the main structural beams, roof and related damages Architect and engineer's fee $104,540.00 Construction manager's fee $105,000.00 Inspection services $ 60,000.00 Materials testing laboratory fee $ 25,000.00 The overall total for the emergency work to remove and replace the main structural beams and roof is estimated to be $1,813,400. In view of the conditions that the work must be performed under and the hours of operation, seven d ays per week, staff considers the prices proposed by all prospective participants in this endeavor to be fair and reasonable. FINANCING A s-up~ental appropriation in the amount of $1,814,000 will be necessary to fund this project. A transfer to the Municipal Service Improvements Fund 33, Project 004102, Emergency Structural Repairs will then be necessary. The General Fund Unreserved, Undesignated Fund Balance will be $21,784,591 after this supplemental appropriation. APPS®V~D ~~ DAI d N ~~~~ ° oa . C~] z Adapted Ordtinance Y ~QU~C ~ SUBMITTED FOR TH CITY MANAGER'S i DISPOSITION BY COUNCIL. PROCESSED BY OFFICE BY ^ APPROVED p n OTHER (DESCRIBE) ~ p ~"~~ ~~ 3~;3~ ORIGINATING DEPARTMENT HEAD Gar Santerre ~ CI`TY SECRETARY FOR ADDITIONAL INFORMATION ~'~` CONTACT W Masse 7910 ~ T cite ~c~ta>;~ of too C:l4Y of Il'ort Wbrih, TaxeA