HomeMy WebLinkAboutOrdinance 7828 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF CLEBURNE ROAD
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with _Austin goad QQm9any , for the making and construction of
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-wit:
UNIT 1° CLEBURNE ROAD From Sycamore School Road to McCart Street, known and
designated as Project No. 104-36000-411, Unit 1, a
seven-inch thick hot-mix asphaltic concrete pavement
on a six-inch thick lime stabilized subgrade with
seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a forty-foot roadway. Six-inch
thick concrete driveways will be constructed where
specified.
UNIT 2e McCART STREET From the southeast corner of Lot 20, Block 1, South Ridge
Addition to 1130' northerly, known and designated as Project
No. 104-36000-411, Unit 2, an eight-inch thick hot-mix
asphaltic concrete pavement on an eight-inch thick lime
stabilized subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter. The roadway will con-
sist of two thirty-six foot traffic lanes with a twenty-
eight foot median.
WIFAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 7509 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting on each
of the above described portions of streets, avenues and public places and against the real
and true owners thereof; and,
W=As, the City Council of the City of Fort Worth, Texas, has, upon re-
view, found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 7509 , and
WHMAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described, and
have been inspected and found to be in complete accordance with the contract therefor;
NOW, THMEFORE,
BE IT ORDAIN."ID BY TIT. CITY COUNCIL OF THE CITY OF FCRT WORTH,
TEXAS, THAT:
Y.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with re-
ference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The numbers
of the certificates, with the property descriptions to be shown on the respective certifi-
cates, to`.ether with the names of the owners of said property, the principal amount of the
assessment, the respective credits, if any which are hereby authorized, granted and allowed
against the principal amount of some one or more of -the assessments heretofore levied, and the
principal amount for which each certificate is to be issued after giving effect to such credit,
if any, are hereby enumerated and itemized as follows:
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of 19
APPROVED AS TO FORM AND LEGALITY:
City Attorney
PROJECT NO, 104-36000-4119 UNIT 1: CEE]BUYRNE ROAD FROM SYCAMORE SCHOOL ROAD TO MCCART
STREET, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pave-
ment on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and
eighteen-inch wide concrete gutter on a forty-fo®t roadway. Six-inch thick, concrete drive-
ways will be constructed where specified,
(BLOCK
OWNER ]LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE E. LITTILEPACE SURVEY
Candleridge Development Tract 2 1835° Pavement $15,53 $28,497,55
Corp 9 UUnzosned 1825' Curb & gutter 3.01 5,493025
7008 Candlestick Court $33,990,80
Fort Worth, Texas 76133
Trinity Cumberland Tract 2-A- 470° Pavement $ 5049 $ 2,580.30
Presbyterian Church I-A C.F. 470° Curb & gutter 3.01 19414,70
P.C. ]Box 16073 Res, Cr. 155 S.F. Driveway 1x39 215045
Fort Worth, Texas 76133 $ 4,210045
CAN1D]LERIDCE ADDITION
Candleridge BDev, Corp. 17 41 Rear lot
7008 Candlestick Court Resp 82034° Pavement $ 1,24 $ 102,10
Dort Worth, Texas 76133 82,34° Curb & gutter 3,01 247084
$ 349094
Candleridge YDev, Corp, 18 41 Rear lot
7008 Candlestick Court Res. 73.89° Pavement $ 1,24 $ 91,62
Fort Worth, Texas 76133 73089° Curb & gutter 3,01 222041
$ 314003
Candleridge YDev, Corps 19 41 Rear lot
7008 Candlestick. Court Res 63° Pavement $ 1424 $ 78012
]Fort Worth, Texas 76133 63° Curb & gutter 3001 189063
$ 267075
1.
PROJECT NO, 104-36000-411, UNIT I- CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE CANDLERIDGE ADDITION
Candleridge Dev. Corp. 20 41 Rear lot
7008 Candlestick Court Res. 67' Pavement $ 1,24 $ 83,08
Fort Worth, Texas 76133 67' Curb & gutter MI 201,67
$ 284.75
Candleridge Dev, Corp. 21 41 Rear lot
7008 Candlestick Court Te-S, 70' Pavement $ 1.24 $ 86.80
Fort Worth, Texas 76133 70' Curb & gutter 3,01 210.70
$ 297,50
Woodway Road intersects
Candleridge Dev, Corp, 13 42 110' Side lot adjusted to:
7008 Candlestick Court Res. 100' Pavement $ 5.49 $ 549.00
Forz Worth, Texas 76133 100' Curb & gutter 3001 301,00
$ 850,00
Canelertdge Dev, Corp, 12 42 110' Side lot adjusted to2
110,08 Candlestick Court Te-s. 100, $ 5,49 $ 549.00
',,Jorth, Texas 76133 100' Curb & gutter 3,01 301,00
$ 850.00
Woodacre Road intersects
Candleridge Dev. Corp, 19 43 110' Side lot adjusted to;
7008 Candlestick Court Res. 100' Pavement $ 5,49 $ 549,00
Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00
$850,00
2.
PROJECT NO, 104-36000-4119 UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE CANDLERIDGE ADDITION
Candleridge Dev. Corp. 18 43 120' Side lot adjusted to:
7008 Candlestick Court ie-s. 100' Pavement $ 5.49 $ 549,00
Fort Worth, Texas 76133 100' Curb & gutter 3.01 301000
$850.00
Cleburne Court intersects
Candleridge Dev. Corp. 12 43 120' Side lot adjusted to:
7008 Candlestick Court Res, 100' Pavement $ 5.49 $ 549A0
Fort Worth, Texas 76133 100' Curb & gutter 3,901 301.00
$850.00
Candleridge Dev. Corp, 11 43 110' Side lot adjusted to:
7008 Candlestick Court ie—s. 100' Pavement $ 5,49 $ 549,00
Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00
$850,00
Woodmoor Road intersects
Candleridge Dev, Corp. 20 44 110' Side lot adjusted to:
7008 Candlestick Court Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00
$850,00
Candleridge Dev, Corp, 19 44 110' Side lot adjusted to:
7008 Candlestick Court Tes, 100' Pavement $ 5,49 $ 549.00
Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00
$850.00
3.
PROJECT NO. 104-36000-411, UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE CANDLERIDGE ADDITION
Misty Meadow Drive intersects
Candleridge Dev. Corp. 16 45 110' Side lot adjusted to:
7008 Candlestick Court Res. 100' Pavement $5.49 $549.00
Fort Worth, Texas 76133 100' Curb & gutter 3.01 301.00
$ 850.00
J. W. WILLIAMS SURVEY
South Hills Lodge #2200 Part of 260' Pavement $5.49 $1,427.40
Loyal Order of Moose Tract 3 260' Curb & gutter 3.01 782.60
P. 0. Box 6395 CF 194 S.F. Driveway 1.39 269.66
Fort Worth, Texas 76115 $2,479.66
Candleridge Dev. Corp. Tract 3-A 400' Pavement $15.53 $6,212.00
7008 Candlestick Court Comm. 380' Curb & gutter 3.01 1,143.80
Fort Worth, Texas 76133 $7,355.80
McCart Street intersects
EAST SIDE SOUTH RIDGE ADDITION
Foster Financial Corp. 1 1 87.42' Pavement $5.49 $479.96
1101 Summit Res. 87.42' Curb & gutter 3.01 263.13
P. 0. Box 171 $ 743.07
Fort Worth, Texas
Attn: Ronald Norman
Foster Financial Corp. 2 1 70' Pavement $5.49 $384.30
1101 Summit Res. 70' Curb & gutter 3.01 210.70
P. 0. Box 171 $ 595.00
Fort Worth, Texas
Attn: Ronald Norman
4.
PRO�T- CT NO, 104-36000411, UNIT I. CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
Foster Financial Corp. 3 1 70' Pavement $ 5,49 $ 384,30
1101 Summit P.O. Box 171 Res, 70' Curb & gutter 3.01 210,70
Fort Worth, Texas $ 595.00
Attn: Ronald Norman
Foster Financial Corp. 4 1 70' Pavement $ 5,,49 $ 384,30
1101 Summit P.O. Box 171 Res. 70' Curb & 'gutter 3,01 210,70
Fort Worth, Texas $ 595.00
Attn: Ronald Norman
Foster Financial Corp, 5 1 70' Pavement $ 5,49 $ 384,30
1101 Summit P,O, Box 171 Res, 70' Curb & gutter 3,01 210.70
Fort Worth, Texas $ 595.00
Attn, Ronald Norman
Foster Financial Corp, 6 1 70' Pavement $ 5,49 $ 384,30
1101 Summit P.O. Box 171 Res, 70' Curb & gutter 3.01 210,70
Fort Worth, Texas $ 595000
Attn: Ronald Norman
Foster Financial Corp. 7 1 70' Pavement $ 5.49 $ 384,30
1101 Summit P,O, Box 171 Res, 70' Curb & gutter 3,01 210,70
Fort Worth, Texas $ 595.00
Attn: Ronald Norman
Foster Financial Corp. 8 1 70' Pavement $ 5.49 $ 384.30
1101 Summit P,O, Box 171 Res, 70' Curb & gutter MI 210,70
Fort Worth, Texas $ 595,00
Attn: Ronald Norman
5.
PROJECT NO, 104-36000-411, UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
Foster Financial Corp. 9 1 70' Pavement $ 5.49 $ 384.30
1101 Summit P.O. Box 171 Res. 701 Curb & gutter 3.01 210,70
Fort Worth, Texas $ 595.00
Attn: Ronald Norman
Foster Financial 'Corp. 10 1 75' Pavement $ 5.49 $ 411.75
1101 Summit P.O. Box 171 Res. 75' Curb & gutter 3.01 225.75
Fort Worth, Texas $ 637.50
Attn: Ronald Norman
Misty Meadow Drive So. intersects
Foster Financial Corp. 1 2 110' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549,00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850,00
Foster Financial Corp. 12 2 110' Side lot adjusted to:
1101 Summit P.O. Box 171 Res, 100' Pavement $ 5,49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
Woodmoor Road intersects
Foster Financial Corp, 1 3 115' Side lot adjusted to;
1101 Summit P.O. Box 171 Res , 100' Pavement $ 5.49 $ 549,00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attnt Ronald Norman $ 850.00
6.
PROJECT NO, 104-36000-411, UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
Foster Financial Corp. 18 3 115' Side lot adjusted to.
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5,49 $ 549,00
Fort Worth, Texas 100' Curb & gutter 3.01 301,00
Attn.- Ronald Norman $ 850,00
Santa Rita Drive intersects
Foster Financial Corp. 5 4 80' Pavement $ 5.,49 $ 439.20
1101 Summit P,O, Box 171 Res. 80' Curb & gutter 3.01 240.80
Fort Worth, Texqs $680.00
Attn: Ronald Norman
Foster Financial Corp., 4 4 70' Pavement $ 5,49 $ 384.30
1101 Summit P.O. Box 171 Res. 70' Curb & gutter 3>01 210.70
Fort Worth, Texas $ 595>00
Attn: Ronald Norman
Foster Financial Corp. 3 4 70' Pavement $ 5,49 $ 384.30
1101 Summit 'P.O. Box 171 Res. 70' Curb & gutter 3,01 210,70
Fort Worth, Texas $ 595.00
,Attn: Ronald Norman
Foster Financial Corp, 2 4 70' Pavement $ 5.49 $ 384.30
1101 Summit P.O. Box 171 Res. 70' Curb ,& gutter 3.01 210.70
Fort Worth, Texas $ 595,00
Attn- Ronald Norman
Foster Financial Corp. 1 4 80' Pavement $ 5,49 $ 43920
1101 Summit P.O., Box 171 Res- 80' Curb & gutter MI 240.80
Fort Worth, Texas $ 680400
Attn: Ronald Norman
7.
PROSECT NO. 104-36000-411, UNIT Io CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
'Holly Springs Lane intersects
Foster Financial Corp. 1 5 115' Side, lot adjusted too
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3,01 301,00
Attn- Ronald Norman $ 850.00
Foster Financial Corp. 33 5 115' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement 5 49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
Del Rio Drive intersects
Foster Financial Corp. 1 6 136.89' Side lot adjusted to:
1101 Summit P.O, Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn:, Ronald Norman $ 850.00
Foster Financial Corp, 43 6 130' Side lot adjusted to;
1161 Summit P.O. Box 171 Res, 100' Pavement $ 5,49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
Memphis Lane intersects
Foster Financial Corp. 1 7 110.01' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn.- Ronald Norman $ 850.00
8.
PROJECT NO, 104-36000-4119 UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
Foster Financial Corp. 27 7 70' Pavement $ 5.49 $ 384.30
1101 Summit P.O. Box 1.71 Res, 70' Curb & gutter 3.01 210.70
Fort Worth, Texas $ 595.00
Attn: Ronald Norman
Poster Financial Corp, 26 7 110' Side lot adjusted to:
1101 Summit P,O, Box 171 Res, 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100° Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
Blue Grass Lane intersects
Poster Financial Corp. 7 8 120' Side lot adjusted to:
1101 Summit P.O. Box 171 Res, 100' Pavement $ 5A9 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301>00
Attn,, Ronald Norman $ 850,00
Foster Financial Corp. 6 8 65' Pavement $ 5.49 $ 35685
1101 Summit P.O. Box 171 Res. 65' Curb & gutter 3.01 195.65
Fort Worth, Texas $ 552.50
Attn,- Ronald Norman
Foster Financial Corp, 5 8 60' Pavement $ 5.49 $ 329.40
1101 Summit P.O. Box 171 Res, 60' Curb & gutter 3.01 180.60
Fort Worth, Texas $ 510.00
Attn: Ronald Norman
Foster Financial Corp. 4 8 60' Pavement $ 5,49 $ 32940
1101 Summit P.O. Box 171 Res. 60° Curb & gutter 3.01 1M60
Fort Worth, Texas $ 510.00
Attn: Ronald Norman
9.
PROJECT NO, 104-36000-411, UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
Foster Financial Corp. 3 8 60' Pavement $ 5.49 $ 329.40
1101 Summit P.O. Box 171 Res, 60' Curb & gutter 3.01 180.60
Fort Worth, Texas $ 510.00
Attn: Ronald Norman
Foster Financial Corp. 2 8 60' Pavement $ 5.49 $ 329,.40
1101 Summit P.O. Box 171 Res. 60' Curb & gutter 3.01 180.60
Fort Worth, Texas $ 510.00
Attn, Ronald Norman
Foster Financial Corp. 1 8 97 ,21' Pavement $ 5.49 533.68
1101 Summit P.O, Box 171 Res. 97,21' Curb & gutter 3.01 292.60
Fort Worth, Texas $ 826.28
Attn: Ronald Norman
Foster Financial Corp, 20 8 130, Side lot z.djustea to:
1101 Summit P.O, Box 171 Res, 10 ' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3,01 301.00
Attn: Ronald Norman $ 850.00
Greenville Drive intersects
Foster Financial Corp. 1 9 120' Side lot adjusted to:
1101 Summit P,O, Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 1001 Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850,00
Foster Financial Corp. 26 9 120' Side lot adjusted to:
1101 Summit P.O. Box 171 Res, 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301,00
Attn: Ronald Norman $ 850.00
10.
PROJECT NO. 104-36000-411, UNIT I: CLEBURNE ROAD, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE SOUTH RIDGE ADDITION
Misty Meadow Drive So. Intersects
Foster Financial Corp. 1 10 120' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
Foster Financial Corp. 62 10 120' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
South Ridge Drive intersects
Foster Financial Corp. 1 11 115' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement $ 5.49 $ 549.00
Fort Worth, Texas 100' Curb & gutter 3.01 301.00
Attn: Ronald Norman $ 850.00
E. LITTLEPAGE SURVEY
McCart North Joint Venture Tract 1 427' Pavement $15.53 $6,631.31
3128 Lemmon Ave. East Unzoned 427' Curb & gutter 3.01 1,285.21
Dallas, Texas 75204 $7,916.52
C/O Mr. Rod Routen, Trustee
Southwayside Baptist Church Tract 1 186 S.F. Driveway $ 1.39 $ 258.54
301 Thornhill Drive Unzoned $ 258.54
Fort Worth, Texas 76115
UNIT I: TOTAL COST TO PROPERTY OWNERS. . . . . . . . . . . . . . . . . . . . . . .$ 93,125.09
TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . .$ 6,815.43
TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . . . . . . .$101,976.20
TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . .$201,916.72
11.
PROJECT NO. 104-36000-411, UNIT 2: McCART STREET FROM THE SOUTHEAST CORNER OF LOT 20, BLOCK
1, SOUTH RIDGE ADDITION TO 1,130' NORTHERLY, to be improved by constructing an eight-inch
thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade
with seven-inch high concrete curb and eighteen-inch wide concrete gutter. The finished
roadway will consist of two thirty-six foot traffic lanes with a twenty-eight foot median.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE SOUTH RIDGE ADDITION
Beginning at the southeast corner of Lot 20, Block 1, South Ridge Addition.
Foster Financial Corp. 20 1 Rear lot
1101 Summit P.O. Box 171 Res. 130' Pavement $ .74 $ 96.20
Fort Worth, Texas 130' Curb & gutter 3.51 456.30
Attn: Ronald Norman $ 552.50
Foster Financial Corp. 19 1 Rear lot
1101 Summit P.O. Box 171 Res. 171.27' Pavement $ .74 $126.74
Fort Worth, Texas 171.27' Curb & gutter 3.51 601.16
Attn: Ronald Norman
$ 727.90
Foster Financial Corp. 18 1 Rear lot
1101 Summit P.O. Box 171 Res. 20' Pavement $ .74 $ 14.80
Fort Worth, Texas 20' Curb & gutter 3.51 70.20
Attn: Ronald Norman $ 85.00
Foster Financial Corp. 1 1 130' Side lot adjusted to:
1101 Summit P.O. Box 171 Res. 100' Pavement $4.99 $499.00
Fort Worth, Texas 100' Curb & gutter 3.51 351.00
Attn: Ronald Norman $ 850.00
Cleburne Road intersects J. W. WILLIAMS SURVEY
Candleridge Dev. Corp. Tract 3-A 167' Pavement $22.61 $3,775.87
7008 Candlestick Court Comm. 167' Curb & gutter 3.51 586.17
Fort Worth, Texas 76133 $4,362.04
12.
PROJECT NO. 104-36000-411, UNIT 2: McCART STREET, Continued
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE J. W. WILLIAMS SURVEY
Candleridge Dev. Corp. Tract 3 317' Pavement $22.61 $ 7,167.37
7008 Candlestick Court CF 317' Curb & gutter 3.51 1,077.57
Fort Worth., Texas 76133 $ 8,244.94
EAST SIDE S. A. & M. G. RR SURVEY
Southwest Regional Financial Tract 3 993' less 40' credit (drainage easement)
& Management Corp. , Trustee Unzoned 953' Pavement $22.61 $21,547.33
611 Ryan Plaza, Suite 103 933' Curb & gutter 3.51 3,274.83
Arlington, Texas 76011
$24,822.16
UNIT 2: TOTAL COST TO PROPERTY OWNERS. . . . . . . . . . . . . . . . . . . . . . .$ 39,644.54
TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . .$ 316,435.66
TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . . . . . . .$ 93,945.72
TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . .$ 450,025.92
BOTH UNITS: TOTAL COST TO PROPERTY OWNERS. . . . . . . . . . . . . . . . . . . . . . .$ 132,769.63
TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . .$ 323,251.09
TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . . . . . . .$ 195,921.92
TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . .$ 651,942.64
13.
14-, V
FII]=1 City of Fort Worth, Texas
MERCHERT
BAILIFF Mayor®r and Council Communication
SMITH
DATE REFERENCE SUBJECT: Final Payment Paving and Drainage PAGE
NUMBER
Improvements to Southridge Addition Iof 9
l�/10/78 FP-1341 Units One and Two West Cleburne Road
and McCart Street Project No. 1.04-3-6411
Final Council action is requested on the project described below.
Project Description
Name : Paving and Drainage Improvements to Southridge Addition Assessment
Paving of Units One and Two West Cleburne Road and McCart Street,
Project No. 104-36411 , Contract No. 9176, dated February 7, 1977.
Contractor: Austin Road Company
Contract Awarded: February 7, 1977 (M&C C-3671)
Work Order Issued: May 24, 1977
Work Order Effective: June 21 , 1977
Work Began: June 21, 1977
Project Substantially Complete and Final Inspection Made: August 8, 1978
Final Construction Approval: September 28, 1978
Working Time Bid: 140 Working Days
Working Time Used: 160 Working Days
Project Cost and Financing
Original Bid Price: $591,114.91
Change Order No.. 1: +647,43 (A.R, 1-15;2,3,1)
Change Order No. 2: -5,249.42 (A.R. 1-15;2.3.1)
Change Order No. 3: +2,980.85 (A.R. 1-15;2.3.1)
Revised Bid Price: $589,493.77
Final Contract Cost: $576,940.39
Less 20 days liquidated damages @ $150.00 - $3,000.00
Partial Payments Previously Made: 13 Amount: $521,085.29
Final Payment Due: $52,855.10
Sufficient funds are available for the final payment to be made from Project
Number 104-36000-411. The contractor used 20 working days in addition to
the time allotted. A charge of $150.00 per day has been deducted from the
final payment as liquidated damages as provided in the contract.
Deviation from Bid Price: The final contract cost of this project is $12,533.38
or two (2) percent under the revised contract price. The savings resulted
due to minor variations between quantities estimated in the contract specifi-
cations and quantities measured and used on the job site.
Compliance with Specifications
Tests made during construction show materials used and required thicknesses
were in compliance with contract specifications.
DATE REFERENCE SUBiEcT: Final Payment Paving and Drainage PAGE
NUMBER Improvements to Southridge Addition
10/10/78 FP-1341 Units One and Two West Cleburne Road � °f -�
and McCart Street Project No. 104-36411
Recommendation
It is recommended that the project described be accepted by the adoption
of an ordinance and final payment of $52,855.10 be made to Austin Road Company.
GG:ab
SUB TTED BY: DISPOSITIO BY COUNCIL: PROCESSED/ BY
AP [_1 �•jA
PROVED OTHER (DESCRIBE) /� �_
PTSD ORDN DANCE NO. CITY SECRETARY
DATE
CITY MA AGER /o / t. 17A'