HomeMy WebLinkAboutOrdinance 9924ORDINANCE NO.
AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND
PROVIDING FOR THE IMPROVEMENT OF SYCAMORE SCHOOL RD. (UNIT~I & II),
AS HEREINAFTER SET FORTH; APPROVING PROJECT PLANS AND
SPECIFICATIONS; ORDERING AND APPROVING ESTIMATE OF COSTS; LETTING
CONTRACT TO AUSTIN PAVING COMPANY FOR THE
MAKING AND CONSTRUCTION OF SUCH IMPROVEMETPI'S; MAKING
APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY
INCURRED; MAKING PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST
ABUTTING PROPERTIES AND THE OWNERS TEiEREOF FOR A PART OF THE COSTS
OF SUCH IMPROVEMENTS; DIRECTING THE CITY SECRETARY TO FILE A
NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF
TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL
SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMII~PTS ARE
AND SHALL BE IN ACCORDANCE WITH ARTICLE 11O5b OF VERNON'S TEXAS
CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND
ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE
BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN
THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN
EFFECTIVE DATE.
WHEREAS, the Director of Transportation and Public Works for the City of Fort
Worth, Texas (hereinafter referred to as the "Director"), has proposed the
improvement of Sycamore School Road (Units I & II) , which is hereby designated
Project No. 67-023192-00 (said improvements being hereinafter referred
to as the "Project");
WE~REAS, the Project shall entail the improvement of the street, avenue, alley,
highway, boulevard, drive, public place, square or any portions thereof
(hereinafter referred to singly and collectively as the "highway"), and shall be
accomplished by filling, grading, raising, paving, repaving, repairing,
constructing, reconstructing, realigning, widening, narrowing or straightening
said highway, or the curbs, gutter or sidewalks and any appurtenances or
incidentals thereto, including drains or culverts;
WIlEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of
the costs of the Project;
WHEREAS, the City of Fort Worth has advertised and received bids, in accordance
with TEX. REV. CIV. SPAT. ANN., Articles 11O5b and 2368a, and other
applicable laws, such that a contract may be awarded for the construction of the
Project; NOW, THEREFORE:
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
-1-
I.
There exists a public necessity for the improvement of the hereinafter described
portions of streets, avenues and public places in the City of Fort Worth, Texas,
to wit: SYCAMORE SCHOOL ROAD (UNIT I) - FROM~CROV~EY ROAD WESTWARD 'I'0 THE CEN-
TERLINE OF THE ATCHESON TOPEKA & SANTA FE RAILROAD RIGHT-OF-WAY; and SYCAMORE
SCHOOL ROAD (UNIT II) - FROM 100 FEET EAST OF McCART AVENUE EASTWARD TO THE CEN-
TERLINE OF THE ATCHESON TOPEKA & SANTA FE RAILROAD RIGHT-OF-WAY.
and it is hereby ordered that the Project be carried out and constructed
according to the Plans and Specifications, and any amendments thereto, for
Project No. 67-023192-00 , said Plans and Specifications being hereby
specifically approved and adopted.
II.
The estimated cost of the Project based on the estimate of the City Engineer is
$ 1,736,373.45 The estimated cost of the Project shall be paid partly by the
City of Fort Worth and partly by assessments to the property abutting the
Project and the owners thereof. The assessments to the property abutting the
Project and the owners thereof shall be levied in accordance with the
requirements of TEX. REV. CIV. STAT. ANL~., Article 1105b (hereinafter
referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and
shall not be more than all the costs of constructing, reconstructing, repairing,
and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the
cost of the remaining improvements comprising the Project. In any event, said
assessments shall not exceed the special benefits to the abutting property and
its owners, as enhanced by the Project. The City of Fort Worth shall pay the
balance of the cost of the Project not assessed against the property abutting
the Project and the owners thereof.
The amounts assessed against the abutting properties and the oHmers thereof
shall constitute a first and prior lien upon such properties and a personal
liability of the owners thereof and shall be .payable upon the acceptance by the
City of Fort Worth of the Project after its completion. Said assessments shall
be due and payable on or before 30 days after the acceptance by the City of Fort
Worth of the Project, except that, if the abutting owner so elects, by complying
with the terms hereinafter set forth, said assessments may be paid in
installments. Said assessments may be paid in five (5) equal, consecutive
annual installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project,
and each subsequent installment to be due and payable on an annual basis on each
consecutive anniversary date of the acceptance of the Project; in the
alternative, said assessments may be paid in forty-nine (49) equal consecutive
monthly installments, the first installment to be due and payable no later than
thirty (30) days after the acceptance by the City of Fort Worth of the Project.
Any owner electing to pay the assessment in installments, as provided for
herein, as a condition precedent to such election, must execute a promissory
note and mechanic's and materialmen's lien contract evidencing the owner's
intent to pay the assessment in accordance with the terms of one of the
alternatives hereinabove set forth. In any case in which the owner elects to
pay the assessment in installments under either of the alternatives specified,
the assessment shall bear interest from the date of acceptance of the Project at
the rate of eight percent (8~) per annum. Should any installment not be paid on
its due date, the City of Fort Worth shall have the option to accelerate the
entire unpaid balance of the assessment and declare the same to be immediately
due and payable; this and other terms governing any default in the payment of
any installment shall be set forth in the mechanic's and materialman's lien
contract and shall be uniform among all owners executing the contract.
-2-
~ r.
s .. i.
In addition, the City Attorney shall have the authority to authorize
terms of payment different than those specified herein when the Director has
previously determined that an extreme financial hardship exists.
III.
Bids having been requested by appropriate advertisement, as required by Articles
1105b and 2368a and the lowest bid of Austin Paving Company ,
having been found to be the lowest and best bid for the making and construction
of said Project, the contract therfor is hereby awarded to Austin Paving
Company , at and for the amount of $ 1,653,689.00.
To provide for the payment of said contract and the indebtedness incurred
thereby, there is hereby appropriated out of available funds and current revenues
of the City, an amount sufficient to pay the indebtedness so incurred.
Notice shall be given and a hearing shall be held prior to making or levying any
assessment against any property abutting the Project or its owners, as required
by Article 1105b, Section 9. The notice of the hearing required under said
statute shall be published in a newspaper of the City of Fort Worth at least
three (3) times, the first publication to be made at least twenty-one (21) days
before the hearing date. Written notice shall be personally given to all
persons or entities claiming or owning an interest in the property abutting the
Project and shall be mailed at least fourteen (14) days before the hearing in
the manner specified by Article 1105b, Section 9. Said hearing shall be held
before the City Council of Fort Worth, Texas, on the 1st day of September, 1987,
at 10:00 A.M.
IV.
The improvements provided for herein shall be made and constructed, notice
given, hearing held and assessments made and levied and all proceedings taken
and had in accordance with and under the terms of Article 1105b and the Charter
of the City of Fort Worth, Texas.
V.
The City Secretary is directed to prepare, sign and file with the County Clerk
of Tarrant County, Texas, a notice of the authorization and approval of the
Project and the pendency of the assessment proceedings authorized hereunder.
VI.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Books of the City Council and by
filing the complete ordinance in the appropriate ordinance records of this city.
-3-
~~ t 4 ,. ~
_ l
VII.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS 2 DAY OF ,
19~.
APPROVED AS Zl~ FORM AND I~7GALITY:
City Attorney
-4-
"~ City of Fort V6~orth texas
Accourvrcf~:a ~ ~
SR/ld;3~R7;AT1C~l~PUf4LlC V,~y®~ ~~~ Co~~,~c~lC ~®~~~~a~~~~®~,
~'1B.T.ER AD Mffdf57RATitift d
DATE REFERENCE SUBJEC,~+WARD OF ONTRA 0 N VING PACE
NUMBER OF SYCAMORE SCHOOL ROAD (UNITS 1 A 0 2) 4
8-4-87 C-1045 5 FROM McCART AVENUE TO CROWLEY ROAD 1°r
RECOMMENDATION
' It is recommended that the City Council.
1, approve the following bond fund transfer•
FROM
TO
AMOUNT REASON
94-009905-00 94-023192-00 $598,416.79 To provide funds for
Special Assessments Sycamore,School Road the property owners
Unspecified from McCart Avenue share of the construc-
to Crowley Road tion cost.
2. authorize the City Manager to execute a contract with Austin Paving Co: in
the amount of $1,653,689.00 for Sycamore School Road (Units I and II)
based on their low bid,
3. authorize the assessment of a portion of the cost of the improvements
against the owners of the abutting property;
4. approve the estimate of cost and amounts to be assessed as stated in the
Engineer's Estimate,
5. establish September 1, 1987, as the date of the benefit hearing;
6 authorize the preparation of assessment rolls and notification of property
owners in accordance with the provisions of Article 1105b of Vernon's
Texas Civil Statutes; and
7. adopt an ordinance reflecting the City Council's authorization and
approval of Items 2 through 6 above, and other applicable requirements of
Article 1105b, Vernon's Annotated Texas Statutes.
Rnrkr_aniiNn
The 1986-88 Capital Improvement Program approved by the voters in March 1986,
incl uded funds for the improvement of Sycamore School Road from Crowley Road to
McCart Avenue. Since 1979, there have been five Community Facilities Agreements
which involve segments of Sycamore School Road. Land- improvements along the
street and adjacent neighborhoods are generating substantial traffic on the
existing narrow and deteriorated roadway pavement. Sycamore School Road is
being constructed from Mc Cart to Crowley Road to link with recently constructed
sections west of McCart and east of Crowley Road. The improvement of the
Crowley Road - Sycamore School Road intersection is not part of this project
but will be improved as part of the State Department of Highways and Public
Transportation's overall improvement project on Crowley Road now under design.
DATE REFERENCE suB~Ea~WARD OF CONTRACT FOR ASSESSMENT PA ING PACE
NUMBER OF SYCAMORE SCHOOL ROAD (UNITS 1 AND 2 2 4
8-4-87 C-10455 FROM McCART AVENUE_TO CROWLEY ROAD °f-
This project is located in Council District'"No. 6.
.,
PROJECT DESCRIPTION
' STREET
' Sycamore School
Road
IMPROVEMENTS
LIMITS
McCart Avenue
to Crow1 ey Road
WIDTH-FEET
Double 36
t ~
1 ~,
R.O.W.
WIDTH-FEET
120
Sycamore Schoo] Road (Units I and II) will be constructed with a seven-inch
thick reinforced concrete pavement with seven-inch high superimposed concrete
curb on a six-inch thick lime stabilized subgrade, so that the finished roadway
will be a double thirty-six foot wide roadway with a twenty-eight foot wide
median on a one hundred twenty-foot wide right-of-way. Median openings, and
six-inch thick reinforced concrete driveway approaches will be constructed
where specified on the plans,
RECEIPT OF BIDS
Bids ,for this project were received on June 11, 1987, after being advertised on
.May 14 and Z1, 1987, with 210 working days allotted to complete the project.
The bids are tabulated as follows
BIDDER AMOUNT
s
Austin Paving Co. $1,653,689:.00
,S.R.O. Asphalt, Inc. 1,682,367.75
APAC-Texas, Inc, 1,707,119.00
L.D. Connecter Contractors 1,717,379.50
L.H. Lacy Co. 1,745,415.50
J.L. Bertram Const. & Engrs. Co. 1,749,115.54
Ed Bell Construction Co. 1,882,263.05
The low bidder has complied with the City of Fort Worth Minority Business
Enterprise Policy for this bid.
ENGINEERS ESTIMATE OF COST
Based on standard City policy and the low bid prices, the following assessment
rates have been established• ,
f t 1
`~ ~„
r ~~'~ r
DATE REFERENCE suB~EaAWARD OF CONTRACT FOR ASSESSMENT PA
NUMBER OF SYCAMORE SCHOOL ROAD (UNITS 1 AND 2
8-4-87 C-10455 FROM McCART AVENUE TO CROWLEY ROAD
SYCAMORE SCHOOL ROAD, UNIT I
RESIDENTIAL
Seven inch thick concrete pavement $20.54/L.F.
Seven inch high concrete curb $ 1.79/L,F.
Street Tights $ 4.92/L.F.
Six inch thick concrete drive approach $ 3.12/S,F.
CnMMFRCT41
Seven inch thick concrete pavement $49.23/L.F.
Seven inch high concrete curb $ 2.71/L,F.
Street lights $ 4 92/L,F.
Drainage $13.04/L,F.
Six inch thick concrete drive approach $ 3.12JS.F.
SYCAMORE SCHOOL ROAD, UNIT II
COMMERCIAL ~ ''
_ ~° t
i
Seven inch thick concrete paving $49.23/L.F.
Seven inch high concrete curb $ 2.71/L.F.
F Street lights $ 4.92/L.F.
Drainage $48.26/L.F.
Six inch thick concrete drive approach $ 3.12/S.F.
The cost of the project is therefore distributed as follows
Sycamore School Road, Units I and II
Total Cost to Property Owners $812,310.77 (47%)
Total Cost to City of Fort Worth X924,062 68 (53%)
FINANCING
PAGE
3 4
_ of
The total cost to property owners is $812,310.77, of which $213,893.98 will be
prepaid. The balance of $598,416.79 will be provided by a bond fund transfer
from Special Assessments Fund 94, Unspecified, Project Account No 009905-00,
where sufficient funds are available, to Project Account No. 94-023192-00,
Sycamore School Road, Crowley to McCart.
The City's share of the cost is $924,062.68 for construction, which includes
$82,684.45 (5% of bid price) for engineering inspection and administration.
Sufficient funds are available in Street Improvements Fund 67, Project Account
~ j,
~.
oATE REFERENCE suB~~kWARD OF CONTRACT FOR ASSESSMENT PAV ING PAGE
NUMBER OF SYCAMORE SCHOOL ROAD (UNITS 1 AND 2) 4 4
8-4-87 C-10455 FROM Mc CART AVENUE TO CROWLEY ROAD ~F __
No. 023192-00, Sycamore Scho ol Road, Crowley to McCart, to finance the City's
portion of the construction cost. This expenditure will be made from Index Code
680405.
Inspection and administration costs will be paid from Account No. 67-095103-00,
Engineering Salaries, where sufficient funds are available. The Index Codes for
inspection labor (630046) and administration labor (630004} will be used.
DAI.dz
APPROVED BY
CITY COUNCIL
auc ~ ~~~~
Citp $ecxetary of tha
Citg of F'or~ Y+-ar.i4, is
SUBMITTED FOR THE ~
CITY MANAGER'S / ~ ~
DISPOSITION BY COUNCIL.
PROCESSED BY
OFFICE BY / ~~" ^ APPROVED
ORIGINATING ^ OTHER (DESCRIBE)
DEPARTMENT HEAD Gary Santerre CITY SECRETARY
FOR ADDITIONAL INF
CONTACT ORMATION
E
Drolet 7805 Adopted Ordinance 1'io^
. DATE