Loading...
HomeMy WebLinkAboutOrdinance 9932:. r ORDINANCE N0. ,,,,~~ AN ORDINANCE DETERMIl~TING THE NECESSITY FOR AND ORDERING AND PROVIDING FOR THE IMPROVE~r OF ROSEWOOD AVENUE , AS HEREINAFTER SET FORTH; APPROVING PROJECT PLANS AND SPECIFICATIONS; ORDERING AND APPROVING ESTIMATE OF COSTS; LETTING CONTRACT 'I+0 G~,I,T WILLLAMS CONSTRUCTION INC. FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVFI"1ENrS; MAKING APPROPRIATIONS FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FIR A PART OF THE COSTS OF SUCH IMPROVEMENTS; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WTTH THE OOUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID S`1'REET IMPROV'F~NTS ARE AND SHALL BE IN ACCORDANCE WTTH ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPi,F.TF. ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE. Wf1EREAS, the Director of Transportation and Public Works for the City of Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed the improvement of ROSEV4UOD AVE. ,which is hereby designated Project No. 90-136003-00 (said improvements being hereinafter referred to as the "Project" ; WHEREAS, the Project shall entail the improvement of the street, avenue, alley, highway, boulevard, drive, public place, square or any portions thereof (hereinafter referred to singly and collectively as the "highway"), and shall be accomplished by filling, grading, raising, paving, repaving, repairing, constructing, reconstructing, realigning, widening, narrowing or straightening said highway, or the curbs, gutter or sidewalks and any appurtenances or incidentals thereto, including drains or culverts; WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of the costs of the Project; W'f1F:REAS, the City of Fort Worth has advertised and received bids, in accordance with TEX. REV. CIV. STAT. ANN., Articles 1105b and 2368a, and other applicable laws, such that a contract may be awarded for the construction of the Project; NOW, THEREFORE: -1- BE IT ORDAINID BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. There exists a public necessity for the improvement of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, to wit: ROSEWOOD AVE. From MARQUITA DRIVE to ALTA MERE DRIVE and it is hereby ordered that the Project be carried out and constructed according to the Plans and Specifications, and any amendments thereto, for Project No. 90-136003-00 said Plans and Specifications being hereby specifically approved and adopted. II. The estimated cost of the Project based on the estimate of the City Engineer is $ 112,120.26. The estimated cost of the Project shall be paid partly by the City of Fort Worth and partly by assessments to the property abutting the Project and the owners thereof. The assessments to the property abutting the Project and the owners thereof shall be levied in accordance with the requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and shall not be more than all the costs of constructing, reconstructing, repairing, and realigning curbs, gutters and sidev~alks and nine-tenths (9/10ths) of the cost of the remaining improvements comprising the Project. In any event, said assessments shall not exceed the special benefits to the abutting property and its owners, as enhanced by the Project. The City of Fort Worth shall pay the balance of the cost of the Project not assessed against the property abutting the Project and the owners thereof. The amounts assessed against the abutting properties and the owners thereof shall constitute a first and prior lien upon such properties and a personal. liability of the owners thereof and shall be payable upon the acceptance by the City of Fort Worth of the Project after its completion. Said assessments shall be due and payable on or before 30 days after the acceptance by the City of Fort Worth of the Project, except that, if the abutting owner so elects, by complying with the terms hereinafter set forth, said assessments may be paid in installments. Said assessments may be paid in five (5) equal, consecutive annual instalments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project, and each subsequent installment to be due and payable on an annual basis on each consecutive anniversary date of the acceptance of the Project; in the alternative, said assessments may be paid in forty-nine (49) equal consecutive monthly installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project. Any owner electing to pay the assessment in installments, as provided for herein, as a condition precedent to such election, must execute a promissory note and mechanic's and materialmen's lien contract evidencing the owner's intent to pay the assessment in accordance with the terms of one of the alternatives hereinabove set forth. In any case in which the owner elects to pay the assessment in installments under either of the alternatives specified, the assessment shall bear interest from the date of acceptance of the Project at the rate of eight percent (8~) per annum. Should any installment not be paid on its due date, the City of Fort Worth shall have the option to accelerate the -entire unpaid balance of the assessm°nt and declare the same to be immediately due and payable; this and other terms governing any default in the payment of any installment shall be set forth in the mechanic's and materialman's lien contract and shall be uniform among all owners executing the contract. -2- j a In addition, the City Attorney shall have the authority to authorize terms of payment different than those specified herein when the Director has previously determined that an extreme financial hardship exists. III. Bids having been requested by appropriate advertisement, as required by Articles 1105b and 2368a and the lowest bid of Walt Williams Construction Inc. , having been found to be the lowest and best bid for the making and construction of said Project, the contract therefor is hereby awarded to Walt Williams Construction Inc. , at and for the amount of $ 106,781.20 . To provide for the payment of said contract and the indebtedness incurred thereby, there is hereby appropriated out of available funds and current revenues of the City, an amount sufficient to pay the indebtedness so incurred. Notice shall be given and a hearing shall be held prior to making or levying any assessment against any property abutting the Project or its owners, as required by Article 1105b, Section 9. The notice of the hearing required under said statute shall be published in a newspaper of the City of Fort Worth at least three (3) times, the first publication to be made at least twenty-one (21) days before the hearing date. Written notice shall be personally given to all persons or entities claiming or owning an interest in the property abutting the Project and shall be mailed at least fourteen (14) days before the hearing in the manner specified by Article 1105b, Section 9. Said hearing shall be held before the City Council of Fort Worth, Texas, on the 15th day of Sept 1987 at 10:00 A.M. IV. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessments made and levied and all proceedings taken and had in accordance with and under the terms of Article 1105b and the Charter of the City of Fort Worth, Texas. V. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice of the authorization and approval of the Project and the pendency of the assessment proceedings authorized hereunder. VI. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Books of the City Council and by filing the complete ordinance in the appropriate ordinance records of this city. • I ° VII. This ordinance shall take effect and be in full force and effect from and after the date of its passage . ~, ~' PASS AND APPROVED THIS J ~ ~ ~Y OF ~ r 19 ~ APPI~ AS `Ib EI~RM AND LEGALITY City Attorney Date : g P ~ _ 8 ~ t ~+^ i i~ I { ~ ~- ~ W r ~ ~ ( , ff I „ a. o AVE. I 4 i 6 TA _ ~ 6 i •~ s ~ D f ... ~ Sea. i e ~.. F O _ ,.., Q •s a e ~p Y EVJOOO 12 ;M~ ~E ; _ ~. ~~~ a Q AID I~. /-.e/ /-,QL a ci A A n •s-,e I +~ r. ~1~~1~~~~11~~~~~~~~~~./~ ROSEWOOD AVE. ~~~~ i3 ~ i4 o` 7 O ~ ~ ~ 7- R ,- 0 z I .~ 3 z .4R a ~~ ~. .. • ~_ Q _ ~ ~ ~- -~. _ G• I ~ Q~~ D ~ ~- ~ a ~ Q ri .-~ -''il tt " -~ W B W ~_ W cr~ty 60 T Q. J Q ROSEWOOD AVE. PROJECT N0. 90-136003-00 -.~. . ,~ - PROJECT N0. 90-136003-00, ROSEWOOD AVENUE FROM MARQUITA DRIVE TO ALTA MERE DRIVE (SH-183) to be improved constructing a seven inch reinforced concrete pavement with a seven inch high attached concrete curb on six inch lime stabilized subgrade. Six inch thick concrete driveway approaches will be constructed where specified on the plans. A four inch thick (five foot wide) concrete sidewalk will be constructed on the north side of the street for the length of the project. The finished roadway will consist of a forty foe wide street on a sixty foot wide rightrof-way. _ BLOCK OWNER LOT ZONING BEGINNING AT MARQUITA DRIVE SOUTH SIDE Doris C. Gray lA 3001 Marquita Drive Fort Worth, TX 76116 FRONTAGE RATE AMOUNT ASSESSMENT ALTA MERE ADDITION 13 I 120.00' Pavement 120.00' Curb 46.46 5,575.20 3.15 378.00 TOTAL 5,953.20 APPRAISAL 504.00 504.00 Dunkin Custom 2B Cabinets 3005 Marquita Drive Fort Worth, TX 76116 13 60.00' Pavement I 60.00' Curb 124.95 SF DR Appr. 46.46 2,787.60 3.15 189.00 4.77 596.01 TCTAL 3,572.61 APPRAISAL 504.00 504 00 James Smith at al 24 3000 Joyce Drive Fort Worth, TX 76116 13 180.00' Pavement I 180.00' Curb 46.46 8,362.80 3.15 567.00 TOTAL 8,929.80 APPRAISAL 551.00 551.00 INTERSECTS JOYCE STREET J.J. Thomson Inc. 1 3001 Joyce Drive Fort Worth, TR 76116 14 175.00' Pavement I 175.00' Curb 163.70 SF DR Appr. 46.46 8,130.50 3.15 551.25 4.77 780.85 TOTAL 9,462.60 APPRAISAL 551,00 551.00 SU$TOTAL THIS PAGE $2,110.00 -1- $2,110.00 '' ,~ .,• ~ e PROJECT N0. 90-136003-00, ROSEWOOD AVENUE FROM MARQUITA DRIVE TO ALTA MERE DRIVE (SH-183) cont. OWNER BLOCK LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT Alta Mere Joint Venture W65' ' 14 c/o Kirkood ~ Darby, Inc.of 24 E 200 W. 7th Street Fort Worth, TX 76102 65.00' Pavement 65.00' Curb 202.45 SF DR. Appr. 46.46 3,019.90 3.1S 204.75 4.71 965.69 TOTAL 4,190.34 APPRAISAL 375.00 Fred Rogers et ux Betty A. 3000 Alta Mee Fort Worth, TX 76116 E70° 14 of 24 I 70.00' Pavement 70.00' Curb 124.95 $F DR. Appr. 46 46 3,252.20 3.15 220.50 4.77 596.01 TOTAL 4,068.71 APPRAISAL 405.00 INTERSECTS ALTA MERE DRIVE NORTH SIDE David M. Ryan c/o Pro Tax Services P.O. Box 26105 ForC Worth, TX 76116 7R 730.00' Pavement I 730,00' Curb 163.70 SF DR. Appr. 3250 SF Sidewalk 46.46 33,915.80 3.15 2,299.50 4.77 780.85 2.84 9,230.00 TOTAL 46,226.15 SUBTOTAL THIS PAGE 47,006.15 TOTAL COST TO PROPERTY OWNERS $49,116.15 COST TO CITX OF FORT WORTH $57,665.05 ENGINEERING INSPECTION AND ADMINISTRATION $ 5,339.06 (5% of $106,781.20 bid) TOTAL COST TO CITY OF FORT WORTH $ 63,004.11 TOTAL ESTIMATED CONSTRUCTION COST $112,120,26 NOTE $46,226.15 of the property owner cost is prepaid. 375 00 405.00 46,226.15 (PRE-PAID) -2- `~ ~ pity of Fort Worth, texas MASTER E~u may®r aid cC®u~,~~ll c~om~,~~,~~a~ion ACCOUNTlr1A•:2 9LIC ~nre~ r~n~ri~~lrr~~or~ .~ **~-10471 kEAL PR )BEk7.Y~5. RECOMMENDATION SUBJECT ^^^r~u yr wn ~ nnt, i r lM /1JJC.JJI9CIY I PAGE PAVING-ROSEWOOD AVENUE FROM MARQUITA 3 DRIVE TO ALTA MERE DRIVE 1of- It is recommended that the City Council: 1. approve the following bond fund transfers: FROM TO AMOUNT REASON 94-009905-00 94-136003-00 $ 2,890.00 Special Assessments Assessment Paving Unspecified Alta Mere. Addition 90-136901-00 90-136003-00 $57,665.05 New Development Assessment Paving Unspecified Alta Mere Addition To provide funds for the property owner's share of construction cost, To provide funds for the City's share of construction cost. 2. authorize the City Manager to execute a contract with Walt Williams Construction, Inc., in the amount of $106,781.20 based on their low bid for the construction of Rosewood Avenue from Marquita Drive to Alta Mere Drive (S.H. 183), 3. authorize the assessment of a portion of the cost of the improvements against the owners of the abutting property; 4. approve the estimate of cost and amounts to be assessed as stated in the Engineer's Estimate; 5. establish September 15, 1987, as the date of the benefit hearing; 6. authorize the preparation of assessment rolls and notification of property owners in accordance with the provisions of Article 1105b of Vernon's Texas Civil Statutes; and 7. adopt an ordinance reflecting the City Council's authorization and approval of Items 2 through 6 above, and other applicable requirements of Article 1105b, Vernon's Annotated Texas Statutes. Rnr~rr_~niitin On October 28, 1986 (M&C C-9937), the City Council approved Community Facilities Agreement No. 15337 with D.M. Ryan for Alta Mere Addition, including the improvement of Rosewood Avenue from Alta Mere Drive (SH-183) to Marquita Drive. This project is located in Council District 3. DATE REFERENCE. SUBJECT AWARD OF CONTRACT FOR ASSESSMENT PAGE NUMBER 8-18-87 **C-10471 PAVING-ROSEWOOD AVENUE FROM MARQUITA 2 of 3 DRIVE TO ALTA MERE DRIVE 4 PROJECT DESCRIPTION R.O.W. STREET LIMITS WIDTH-FEET WIDTH-FEET Rosewood Avenue From Alta Mere Drive 40 60 (SH-183} to Marquita Drive IMPROVEMENTS Rose wood Avenue is proposed to be improved by constructing a seven inch reinforced concrete pavement with a seven inch high attached concrete curb on a six inch lime stabilized subgrade. Six inch thick concrete driveway approaches will be constructed where specified on the plans. A four inch thick, five foot wide concrete sidewalk will be constructed on the north side of the street for the length of the project. RECEIPT OF BIDS Bids for this project were received on June 25, 1987, after being advertised on June 4 and 11, 1987, with 30 working days allotted to complete the project. BIDDER AMOUNT Walt Williams Construction, Inc. $106,781.20 Bob Moore, Inc. $112,366.80 Big "D" Construction Co. $126,030.00 J.L. Bertram Const. & Engrs. Co. $126,322.75 ' Austin Road Co. $131,879.66 Centerline Constructors, Inc. $138,769.50 S.R.O. Asphalt, Inc. $145,361.00 Ed Bell Construction Co. $151,723.49 The low bidder has complied with the City of Fort Worth Minority Business Enterprise Policy for this project. ENGINEERS ESTIMATE OF COST Based on standard City policy and the low bid prices, the following assessment rates have been established: 7 inch thick reinforced concrete pavement $46.46/L.F. 7 inch high attached concrete curb $ 3.15/L.F. 6 inch thick concrete driveway approaches $ 4.77/S.F. 4 inch thick concrete sidewalk $ 2.87/S.F. s ~. ~` The Director of Real Property Management has advised the staff as to the amount of enhancement to property values that will result from the proposed improvements, and individual assessments have been adjusted accordingly. ~~~. DATE REFERENCE SUBJECT AWARD OF CONTRACT FOR ASSESSMENT PAGE NUMBER PAVING-ROSEWOOD AVENUE FROM MARQUITA 3 3 8-18-87 **C-1047.1 DRIVE TO ALTA MERE DRIVE -°r_ The cost of the project is therefore distributed as follows: Total Cost to Property Owners $ 49,116.15 (44%) Total Cost to City of Fort Worth $ 63,004.11 (56%) FINANCING The total cost to property owners is $49,116.15, of which $46,226.15 is prepaid. The balance of $2,890.00 will be provided by a bond fund transfer from Special Assessments Fund 94, Account No. 009905-00, Unspecified, (where sufficient funds are available) to Project Account No. 136003-00, Assessment Paving, Alta Mere Addition. The City's share of the cost is $57,665.05 for construction and $5,339.06 (5% of bid price) for engineering inspection and administration. A bond fund transfer in the amount of $57,665.05 from Street Improvements Fund 90, Account No. 136901-00, New Development Unspecified, (in which sufficient funds are available) to Project Account No. 136003-00, Assessment Paving, Alta Mere Addition, is necessary to finance the City's portion of the construction cost. This expenditure will be made from Index Code 621458. Inspection and administration costs will be paid from Account No. 90-095103-00, Engineering Salaries, where sufficient funds are available. Index Codes for inspection labor (621227) and administration labor (621169) will be used. DAI •db APPROVED BY c~rY cou~c~L ~, ~~~ ~'~. SUBMITTED FOR TH CITY MANAGER'S • OFFICE BY ~ ORIGINATING DEPARTMENT HEAD: (_~ ~,.~~ C terre DISPOSITION BY COUNCIL. ^ APPROVED ^ OTHER (DESCRIBE) PROCESSED BY CITY SECRETARY FOR ADDITIONAL INFORMATION CONTACT Drol et 7805 Adopted Ordinance Nb^ ~~ DATE