Loading...
HomeMy WebLinkAboutOrdinance 9854• ~ Y A--~ .y., rd u ~~ ORDINANCE N0. a(' AN ORDINANCE DETERMIlVING THE NECESSITY FOR AND ORDERING AND PROVIDING FOR THE IMPROVEMENT OF ANDREW AVENUE , AS HEREINAb'.PER SET FORTH; ORDERING AND APPROVING ESTIMATE OF COSTS; MAKING REVISIONS FOR THE LEVY OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OW1~RS THEREOF FOR A PART OF THE COSTS OF SUCH IMPROVEI~`PS; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THI5 ORDINANCE WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLARING THAT THIS ORDINANCE AND ALL SUffiEQUENr PROCEEDINGS RELATING TO SAID STREET IMPROVEI~V`IS ARE AND SHALL BE IN ACCORDANCE WITH ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY; AND PROVIDING AN EFFECTIVE DATE. WE]EREAS, the Director of Transportation and Public Works for the City of Fort Worth, Texas (hereinafter referred to as the "Director"), has proposed the improvement of Andrew Avenue , which is hereby designated Project No. 67-040124-00 (said improvements being hereinafter referred to as the "Project"); WHEREAS, the Project shall entail the improvement of the street, avenue, alley, highway, boulevard, drive, public place, square or any portions thereof (hereinafter referred to singly and collectively as the "highway"), and shall be accomplished by filling, grading, raising, paving, repaving, repairing, constructing, reconstructing, realigning, widening, narrowing or straightening said highway, or the curbs, gutters or sidewalks and any appurtenances or incidentals thereto, including drains or culverts; WHEREAS, the City Engineer of the City of Fort Worth has prepared an estimate of the costs of the Project; NOW, THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. There exists a public necessity for the Project, and it is hereby ordered that Plans and Specifications be prepared for the improvement of the Project and that the Project be carried out and constructed according to the Plans and Specifications, and any changes or amendments thereto. -1- ~: ; ~~ II. The estimated cost of the Project based on the estimate of the City Engineer is $ 83,200. The estimated cost of the Project shall be paid partly by the City of Fort Worth and partly by assessments to the property abutting the Project and the owners thereof. The assessments to the property abutting the Project and the owners thereof shall be levied in accordance with the requirements of TEX. REV. CIV. STAT. ANN., Article 1105b (hereinafter referred to as "Article 1105b"), and the City Charter of Fort Worth, Texas, and shall not be more than all the costs of constructing, reconstructing, repairing, and realigning curbs, gutters and sidewalks and nine-tenths (9/10ths) of the cost of the remaining improvements comprising the Project. In any event, said assessments shall not exceed the special benefits to the abutting property and its owners, as enhanced by the Project. The City of Fort Worth shall pay the balance of the cost of the Project not assessed against the property abutting the Project and the owners thereof. The amounts assessed against the abutting properties and the owners thereof shall constitute a first and prior lien upon such properties and a personal liability of the owners thereof and shall be payable upon the acceptance by the City of Fort Worth of the Project after its completion. Said assessments shall be due and payable on or before 30 days after the acceptance by the City of Fort Worth of the Project, except that, if the abutting owner so elects, by complying with the terms hereinafter set forth, said assessments may be paid in installments. Said assessments may be paid in five (5) equal, consecutive annual installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project, and each subsequent installment to be due and payable on an annual basis on each consecutive anniversary date of the acceptance of the Project; in the alternative, said assessments may be paid in forty-nine (49) equal consecutive monthly installments, the first installment to be due and payable no later than thirty (30) days after the acceptance by the City of Fort Worth of the Project. Any owner electing to pay the assessment in installments, as provided for herein, as a condition precedent to such election, must execute a promissory note and mechanic's and materialmen's lien contract evidencing the owner's intent to pay the assessment in accordance with the terms of one of the alternatives hereinabove set forth. In any case in which the owner elects to pay the assessment in installments under either of the alternatives specified, the assessment shall bear interest from the date of acceptance of the Project at the rate of eight percent (8~) per annum. Should any installment not be paid on its due date, the City of Fort Worth shall have the option to accelerate the entire unpaid balance of the assessment and declare the same to be immediately due and payable;- this and other terms governing any default in the payment of any installment shall be set forth in the mechanic's and materialman's lien contract and shall be uniform among all owners executing the contract. In addition, the City Attorney shall have the authority to authorize -~ terms of payment different than those specified herein when the Director has previously determined that an extreme financial hardship exists. ,, :~ ,~~ III. Notice shall be given and a hearing shall be held prior to making or levying any assessment against any property abutting the Project or its owners, as required by Article 1105b, Section 9. The notice of the hearing required under said statute shall be published in a newspaper of the City of Fort Worth at least three (3) times, the first publication to be made at least twenty-one (21) days before the hearing date. Written notice shall be personally given to all persons or entities claiming or owning an interest in the property abutting the Project and shall be mailed at least fourteen (14) days before the hearing in the manner specified by Article 1105b, Section 9. Said hearing shall be held before the City Council of Fort Worth, Texas, on the th day of April, 1987, at 10:00 A.M. ~T~ Iv. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessments made and levied and all proceedings taken and had in accordance with and under the terms of Article 1105b and the Charter of the City of Fort Worth, Texas. V. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice of the authorization and approval of the Project and the pendency of the assessment proceedings authorized hereunder. VI. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Books of the City Council and by filing the complete ordinance in the appropriate ordinance records of this city. VII. This ordinance shall take effect and be in full force and effect from and after the date of its passage . ~~~ l~- PASS~ AND APPROVID THIS ,~%(/ DAY OF v/ , 19~~-. APPROVID AS TO FORM AND T,FYtAT•ITY: C~ City Attorney Date: -~- ~`Y~ ~, pity of .1Fo~°t ~®~°th, ~e~cas MASTER F146 Z' ~ •/ 111 ~{..W lyJ/ ® U ~ U IV~1V ~®~L1V I/ 1li~~lV ~t./®~0 !! W IVIV~~~~rV ~® U IV ACCOUNTING 2 DATE e~ REFERENCE sus~ECTAUTHORIZATION OF PROJECT AND ESTAB ISH- PAGE SRANSPORTATI~~NjPU(3LtC.4Y0RKS-~ NUMBER MENT OF BENEFIT HEARING DATE, ASSESSMENT 3 3=31- PAVING OF ANDREW AVENUE FROM WILLIE Sl'RE T '°f ti.4rER Aor/~t tsTRaTlori { TO ELGIN STREET REAL PROPEk~ ''=5 RECOMMENDATION _. _ __ ~t._a s recor~mended that the City ~Counci 1 ~~ '~~~ ~ -~~1:-`~~ ~d2c1~~e the necessity for and. order the improvements to Andrew Avenue from Y,~____+ ~ -_,-~=-Willie Street to Elgin Street; ~---_ -~ '~2. authorize the assessment of a portion of the cost of the improvements ~~~'`- against the owners of the abutting property; 3. approve the estimates of cost and amounts to be assessed as stated in the engineer's estimate; 4, establish Apri 1, 1987, as the date of the benefit hearing; 5. authorize the preparation of assessment ro11s and notification of property owners in accordance with the provisions of Article 1105b of Vernon's Annotated Civil Statutes, and 6, adopt an ordinance reflecting the City Council's authorization and approval of Items 1 through 5 above and other applicable requirements of Article 1105b, Vernon's Annotated Civil Statutes. ORIGIN OF PROJECT Andrew Avenue, from Willie Street to Elgin Street in Council District 5, was selected by the Neighborhood Advisory Council for the Stop Six Special Emphasis Area for reconstruction. On November 11, 1985, the Community Development Council approved the street for inclusion in the 1986-88 CDBG Inner City .St°reets Program which was approved by the City Council on January 7, 1986 (M&C G-6532). Under this program, grants are available to low-and moderate-income resident property owners to assist in the payment of assessments. .- On July 3, 1986,Y the Transportation and Public Works Department sent letters to the'°property owners on the street to determine whether or not they were in favor of the paving. The responses were as follows RESULTS OF POLL-CARD SURVEY FOR AGAINST NO RESPONSE TOTAL Property Owners 8 (27%) 10 (34%) 12 (39%) 30 Resident 8 (40%) 6 (30%) 6 (30%) 20 Non~residerit 0 ( 0%) 4 (40%) 6 (60%) 10 DATE 3-31-87 REFERENCE NUMBER G-701.9 SUBJECT AUTHORIZATION OF MENT OF BENEFIT HEARING PAVING OF. ANDREW AVENUE PROJECT AND ESTA DATE, ASSESSMEN FROM. WILLIE STR LISHpA~E 2 3 E-fi- °f - TO ELGIN STREET Front Footage Represented 401' (27%) 513' (34%) 586' (39%) 1500 ' Resident 401' (38%) 313' (30%) 336' (32%) 1050' Non-Resident 0' ( 0%) 200' (44%) 250' (56%) 450' A total of 20 property owners, or 67 percent, representing 66 percent of the front footage, either favored or did not oppose the paving; 75% ~of the owners favoring the project expressed a preference for concrete pavement. All of the adjacent property is platted, the zoning is "B-Two Family". The existing street has an asphalt penetration .pavement in poor condition with curb and gutter. PROPOSED IMPROVEMENTS It is proposed to improve Andrew Avenue with a 5 inch concrete pavement on a 6 inch lime-stabilized subgrade, with a 7 inch high supewimposed concrete curb, 6 inch thick concrete driveway approaches where required, and 4 inch thick concrete sidewalks. The new roadway will be 30 feet wide in the existing 60 feet of right-of-way. _ . ENGINEER'S ESTIMATE OF COST Total estimated costs for this project are as follows• Roadway Construction $72,347 Engineering Design, Inspection and Admin. (15%:) 10 853 Total 8 ,2 0 The established rates for residential assessments for calendar year 1987 are as follows. `Five-inch thick reinforced concrete pavement $20.54 /LF '-Seven-inch high attached concrete curb 1.79 /LF f• Six-inch thick concrete driveway approach 3.21 /SF* Four=inch thick concrete sidewalk 2.68/SF* *(Based on most current bid prices) The Director of Real Property Management has advised the staff as to the amount of enhancement to property values that will result from the proposed improvements, and the individual assessments have been adjusted accordingly. For Andrew Avenue, these adjustments reduced the property owners' share substantially. The cost of the project is therefore distributed as follows: Total Cost to Property Owners $ 8,870.56 (11%) City-at-Large Cost $74,329.44 (89%) DATE REFERENCE sue~ECTAUTHORIZATION OF PROJECT AND ESTAB ISH-PAGE NUMBER MENT OF BENEFIT HEARING DATE, ASSESSMENT 3 3 3-31-87 G-7019 PAVING OF ANDREW AVENUE FROM WILLIE STRE T- _°r_ -_ TO ELGIN STREET WATER AND SANITARY SEWER FACILITIES Water and sanitary sewer facilities are in place to serve all the adjacent lots, but a six inch water line will be replaced due to age in service. PROJECT COST AND FINANCING Sufficient funds are available in Street Improvements Fund 67, Project No. 040901-00, Street Reconstruction Unspecified, for the City's construction cost, and in Project No. 095103-00, Engineering Salaries, for design cost. A bond fund transfer to Project No. 040124-00, Andrew Avenue, will be recommended at a later date. Sufficient funds are available in Special Assessments Fund 94 to finance the property owners' assessment costs. Sufficient funds are available in the CDBG Fund 76, Project No. 206080-35, Index Code 500330, to finance assessment grants for any qualifying low or moderate-income resident property owners. AUTHORIZATION OF PROJECT In accordance with the provisions of Article 1105b of Vernon's Annotated Texas Civil Statutes, it is proposed that the City Council approve the estimates of cost for the proposed project, conduct a benefit hearing, and levy assessments for the project prior to the completion of pans and the soliciting of bids for construction. DAI:do APPROVED BY c-r~ cou~ci< AS ~?~ ~~~ ~~~ ~~. '~ ~~' /, Cftg ~ooretaxp of the Adopted 0~ d~nar~ce No. ~ - c;<tp ~f Foat wow ~„~~ SUBMITTED FOR TH ~ CITY MANAGER'S ~ OFFICE BY ~ DISPOSITION BY COUNCIL. PROCESSED BY ^ APPROVED ORIGINATING ^ OTHER (DESCRIBE) DEPARTMENT HEAD: Gar Santerre CITY SECRETARY FOR ADDITIONAL INFORMATION n CONTACT Drolet 7805 DATE