Loading...
HomeMy WebLinkAboutOrdinance 5429 ORDINANCE NO.- AN O.AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF UNIVERSITY DRIVE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: University Drive From West Lancaster Avenue to West 7th Street intersection including channelization of Camp Bowie Boulevard at its intersection with West 7th Street, known and designated as Unit No. 1. a 7 inch reinforced concrete surface on a 62-foot roadway. Arch Adams Street From Camp Bowie Boulevard to gest 7th Street including roadway revision of Darcy Street at its intersection with West 7th Street, known and designated as Unit No. 29 an 8 inch cement stabilized gravel base with a 2 inch Hot-mix Asphaltic Concrete surface on a 36-foot roadway. together with combined concrete curbs and gutters on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; and contract therefor has been made and entered into with Worth Construction Company ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been ex- amined. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of street, avenue and public place hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting property and the owners thereof, are as follows, to-wit: University Drive From 'West Lancaster Avenue to best 7th Street intersection including channelization of Camp Bowie Boulevard at its intersection with West 7th Street, known and designated as Unit No. 1. The estimated cost of improvements is $ 144,718.97 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $—_2_.L2 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 10.a7 the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 12.19 Arch Adams Street From Camp Bowie Boulevard to Viest 7th Street including roadway revision of Darcy Street at its intersection with Wrest 7th Streets known and designated as Unit No. 2. The estimated cost of improvements is $_ 17s743.17 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 1.98 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 0.85 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 2.86 FORT NORTH, TEXAS — 19--- TO THE HONORABLE CITY COUNCIL OF THE CITE' OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of—._University Drive and portions of sundry other streets, avenues and public places in the City of Fort North, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: University Drive From West Lancaster. Avenue to iciest 7th Street intersection including channelization of Camp Bowie Boulevard at its intersection with best 7th Street, known and designated as Unit No. 1. . The estimated cost of improvements is $__ 144,718.97 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $--2•12 --- the estimated amount per front foot to be assessed against abutting g property and the owners thereof for improvements exclusive of curb and gutter is $_-101b07__; .the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $-12.19 Arch Adams Street From Camp Bowie Boulevard to gest 7th Street including roadway revision of Darcy Street at its intersection with West 7th Street, known and designated as Unit No. 2. The estimated cost of improvements is $ 17'743.17 ..... ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is 1...98 $-----____-- - ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $_ 0.$8 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $2_86 The estimated cost of improvements is $- ------ __________; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $------__-__; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $__ _; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $- C.M. Thel in - d III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all own- ing or claiming any property abutting upon said portions of streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 13th day of September 19 65 , at 9=30 A•U• , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Ses- sion, now benig shown as Article 1105b of Vernon's Texas Civil Statutes. Such notice shall be by advertisement at least three times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least ten days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act. The City Secretary is further directed to'give personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be given by the City Secretary mailing said notice postage prepaid, to the respective owners of record of the properties to be assessed, and to any person owning or claiming any interest in said properties, to the last known address of said owner or persons. It shall not be necessary for the City Secretary to mail said notices to any owner or other person claiming an interest in the property to be assessed when the addess of such owner or other person claiming an interest in the property to.be assessed is unknown to the City Secretary and cannot be determined by the City Secretary after reasonable investigation. In this connection the City Secretary shall prepare and file with these proceedings a list of the properties to be assessed, the names of.those persons own- ing or claiming any interest in said properties to whom the notice was mailed, together with the last known address of the respective owners and those persons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties named in said list whose address was known to him, was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of the notice shall be attached to such certificate. The certificate of the City Secretary will be conclusive evidence of the facts therein recited. Failure of the City Secretary to give notice of hearing by mail as herein provided for, or failure of the owners or other persons interested to receive said notice, shall in nowise invalidate said hearing or any assessments levied pursuant to said hearing, but notice of hearing shall be sufficient, valid and binding upon all owning or claiming such abutting property or any interest therein when same shall have been given by newspaper advertisement as first hereinabove provided. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this_ 16th day of—_ –Aufust _.. 19 65 . APPROVED AS TO FORM AND LEGALITY: City AttorneyJ--- L FORT WORTH, TEXAS 119— TO 13TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of University Drive And portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: University Drive From West Lancaster, Avenue to West 7th Street intersection including channelization of Camp Bowie Boulevard at its intersection with West 7th Street# known and designated as Unit No. 1. The estimated cost of improvements is $-144718.97 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.12 the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $-10•07 ; .the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_12.19 Arch Adams Street From Camp Bowie Boulevard to West 7th Street including roadway revision of Darcy Street at its intersection with West 7th Street, known and designated as Unit No. 2. The estimated cost of improvements is $_ ,,_ 171,743*17 p the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $�1'.98 _.. ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $—Q•8 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $—_2.86 The estimated cost of improvements is $ , _ _______ _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ _.-__---; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ C.M. Thel in �— 1, City of Fort Worth, Eexas Mayor and Council Communication DATE NUMBER CE SUBJECT: Widening and Paving University PACE 8/16/65 C-553 Drive, Contract I (CIP A-167) i of 2 Council action on the project described below is requested: Project Description Nature of work; Widening and paving University Drive including intersec- tion channelization, as follows. Unit StreetRoadway Limits Width R.O.W. 1 University Drive Lancaster Avenue to West 62 feet 80 feet 7th Street 2 Arch Adams Street Camp Bowie Boulevard to 36 feet 50 feet West 7th Street Project plans provide for traffic channelization at the West Seventh Street, Bailey, and Camp Bowie intersection and also the installation of median channelizations on Camp Bowie Boulevard between Arch Adams Street and the University Drive - West 7th Street intersection. The project is included in the 1965 Capital Improvement Program (A-167), Submission of Bids Date bids received: March 16, 1965 Bidder Amount of Bid Working Days Worth Construction Co. $ 149,841.85 90 J. L. Bertram Construction 155,671.49 Engineering Inc. 90 Texas Bitulithic Company 165,020.60 90 Project Cost and Financing Appraisals to determine the estimated enhancement in land values are now in progress by independent appraisers engaged by both the City and property owners. Final recommendation on assessments will be submitted to the Council at the Benefit Hearing. Based on the low bid and computation of assessments in accordance with standard policies, $22,014.72 will be assessed against abutting property owners. The cost to the City-at-large will be approximately $142,811.32, includingengineering and miscellaneous expenses. Recommendations It is recommended that: 1) The following Bond Fund Transfer be approved: DATE REFERENCE SUBJECT: WIDENING AND PAVING UNIVERSITY NUMBER PAGE ugust 169196 0-553 DRIVE, CONTRACT PROJECT NO. 097-23000-120 2 Of 2 Amount From To Purpose $22,014,72 Revolving Fund University Drive Property owners' 042-09723-120 portion of construc- tion cost Funds are available in Project 097-23000-120 to finance the City's portion of costs. 2) That an ordinance be adopted: a. Declaring the necessity for and ordering the improvements; b. Making provisions for levying of assessments; C. Ordering the Public Works Department to prepare estimates of cost and amounts proposed to be assessed; do Awarding the contract to Worth Construction Company on its low bid of $149,841.85; and eo Making appropriations to cover the indebtedness thereby incurred for improvements to the project named above, 3) That an ordinance be adopted: ao Approving the estimates of cost and amounts proposed to be assessed; b, Setting September 20 , 1965, as the date of the Benefit Hearing, B:eln The following summaries are attached.- Attachment ttached:Attachment "A" Resume of the Project and Summary of the Neighborhood Hearing. Attachment "B1P m Distribution of cost and results of postcard survey, Attachment '►C°t m Assessment rolls in alphabetical order, SUBMITTED BY: DISPOSITION BY COUNCIL: _ -APPROVED13 OTHER (DESCRIBE) PROCESSED BY 4WETARY DATE CITY MANAGER /����