HomeMy WebLinkAboutOrdinance 7611 ORDINANCE NO, -7 6
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BASIL AVENUE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
SRA 'RT 11,13MIC CQMM FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE,
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with Texas Bitulithic Company , for the snaking and construction of
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-vit.-
UNIT
o-vitoUNIT is BASIL AVENUE From Grady Lee Street to California Parkway South,
known and designated as Project No. 104-24000-260,
Unit 1.
UNIT 2 : CAMILLA STREET From Essex Street to Beach Street, known and designated
as Project No. 104-24000-260, Unit 2.
UNIT 3 : FRANCIS DRIVE From West Elixabeth Lane to Doreen Avenue, known and
designated as Project No. 104-24000-260, Unit 3,
WH MS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 7403 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting on each
of the above described portions of streets, avenues and public places and against the real
and true owners thereof; and,
W=AS, the City Council of the City of Fort Worth, Texas, has, upon re—
view, found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 74039 and
?SEAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described, and
have been inspected and found to be in complete accordance with the contract therefor;
NOW, TH71LEFORE,
BE IT OR DAIN30 BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with re—
ference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true, owners of the respective parcels of pro—
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The numbers
of the certificates, with the property descriptions to be shown on the respective certifi—
cates, together with the names of the owners of said property, the principal amount of the
assessment, the respective credits, if any which are hereby authorized, granted and allowed
against the principal amount of some one or more of -the assessments heretofore levied, and the
principal amount for which each certificate is to be issued after giving effect to such credit,
if any, are hereby enumerated and itemized as follows:
r
IZIe
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS 3 D day of 10 LA &U sT 19 -17
APPROVED AS TO FORM AND LEGALITY:
City Attorney
PROJECT NO, 104-24000-260, UNIT I, BASIL AVENUE FROM GRADY LEE STREET TO CALIFORNIA PARKWAY S.
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide
concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways and four-foot
wide concrete sidewalk will be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE GREENBRIAR ADDITION
Beginning at the northwest corner of Grady Lee and Basil
International Kings' A-1 34 170' Existing facilities
Table, Inc. Comm. 72' Pavement $12.64 $ 910.08
2468 West 11th 187' Sidewalk 5.72 $1069.64
Eugene, Oregon 97402 $1,979.72
California Parkway intersects
EAST SIDE
Alvin M. Neighbors 1 29 104.60' Slant lot adjusted to:
1517 California Parkway So. Te-s. 44' Existing facilities
Fort Worth, Texas 76134 50' Pavement $ 3.42 $ 171.00
50' Curb & Gutter 5.08 254.00
76' Sidewalk 5.72 434.72
140 Sq. ft. Driveway 1.54 215.60
$1,075.32
Alley 201
Russell D. Washburn 21 29 104.601 Existing facilities -0-
1409 69th Res.
Sacramento, California
UNIT I:
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)....$ 3,055.04
TOTAL COST TO CITY OF FORT WORTH.. .. ... .. ......$ 8,340.70
TOTAL CONSTRUCTION COST. .... ....... .... ...... ..$11,395.94
PROJECT NO. 104-24000-260, UNIT II: CAMILLA STREET FROM ESSEX STREET TO BEACH STREET, to be
improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick crushed stone base with seven-inch high concrete curb and eighteen-inch wide concrete
gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed
where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE WM. JAMES ADDITION
Beginning at the northeast corner of Essex and Camilla
Mrs. Herbert Schieme w1/2-12 104.13' Pavement $ 4.46 $ 464.42
2555 Camilla H 104.13' Curb & Gutter 4.04 420.69
Fort Worth, Texas 76105 Res. 85 Sq. Ft. Driveway 1.54 130.90
$1,016.01
COLONIAL MANOR ADDITION
Colonial Southwest, Inc. 181.39' Pavement $12.13 $2,200.26
P. 0. Box 3080 1 1 181.39' Curb & Gutter 4.04 732.82
Fort Worth, Texas 76105 'EF $2,933.08
Beach Street intersects
SOUTH SIDE
Colonial Manor 1 2 221.81 Pavement $12.13 $2,690.43
P. 0. Box 3080 CF 221.8' Curb & Gutter 4.04 896.07
Fort Worth, Texas 76105 $3,586.50
Essex Street intersects WM. JAMES ADDITION
Mrs. F. L. Jecker El/2-J 130' Side Lot adjusted to:
c/o Billye Wright Res. 100' Curb & Gutter $ 4.04 $ 404.00
8624 Trinton $ 404.00
Dallas,, TX 75227
UNIT II:
TOTAL COST TO PROPERTY OWNERS (ASSESSNENTS)....$ 7,939.59
TOTAL COST TO CITY OF FORT WORTH..... ...... .. ..$12,180.17
TOTAL CONSTRUCTION COST................. ..... ..$20,119.76
PROJECT NO. 104-24000-2603, UNIT III: FRANCIS DRIVE FROM WEST ELIZABETH LANE TO DOREEN AVENUE
to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a
five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-
inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will
be constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
WEST SIDE BROADMOOR ADDITION
Beginning at the southeast corner of Lot 6, Block 1, Broadmoor Addition
Western Sizzlin' Steak 6 1 60' Pavement $12.07 $724.20
House, Inc. Apt. 60' Curb & Gutter 4.13 247.80
1517 Walton way 41 Sq. Ft. Driveway 1.54 63.14
Augusta, Ga. 30904 $1,035.14
Otis D. Pettigrew 7 1 60' Pavement $ 4.37 $262.20
5811 Fox Hill Lane ie—s. 60' Curb & Gutter 4.13 247.80
Dallas, Texas 75232 $ 510.00
Michael J. Powers 8 & 9 1 120' Pavement $ 4.37 $524.40
3308 Francis Drive $ 524.40
Fort Worth, Texas 76116
Guy Paul Jacks,, Jr. 10 & 11 1 110' Pavement $ 4.37 $480.70
3300 Francis Drive Res.
Fort Worth, Texas 76116
Doreen Avenue intersects
EAST SIDE
W. L. Forbes, Jr. 1 6 108.9' Side lot adjusted too
2712 White Settlement Rd. Res. 100' Pavement $ 4.37 $437.00
Fort Worth, Texas 76107 1001 Curb & Gutter 4.13 413.00
$ 850.00
PROJECT NO. 104-24000-2602 UNIT III: FRANCIS DRIVE, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE BROADMOOR ADDITION
David L. Forbes 18 6 90' Pavement $12.07 $1,086.30
2712 White Settlement Apt. 90' Curb & Gutter 4.13 371.70
Fort Worth, Texas 76107 $1,458.00
William M. Barlow 17 6 85 ' Pavement $12.07 $1,025.95
3149 Tex. Blvd. Apt. 85' Curb & Gutter 4.13 351.05
Fort Worth, Texas 76116 $1,377.00
UNIT III:
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS)... .$ 631235.24
TOTAL COST TO CITY OF FORT WORTH.. .............$15,366.93
TOTAL CONSTRUCTION COST. . ... .......... .........$21,602.17
ALL UNITS: TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS).. ..$17,229.87
TOTAL COST TO CITY OF FORT WORTH..... ... .. ... . .$35,888.01
TOTAL CONSTRUCTION COST.... .. ........... .......$53,117.88
FILEV
LINE City of Fort Worth, Ttxas
BAILIFF
MayorGRAHAMayor and Council Communication
DATE REFERENCE SUBJECT: PAGE
NUMBER Final Payment - Assessment Paving 1
8/30/77 FP-1248 at Three Misc. Locations. Project No. lof
Final Council action on the Project described below is requested.
Project Description
Name: Assessment Paving at Three Miscellaneous Locations.
Project No. 104-24000-260. Contract No. 8891 Dated July 19, 1976
Contractor: Texas Bitulithic Company
Contract Awarded: July 19, 1976 (M&C C-3462)
Work Order Issued: October 18, 1976
Work Order Effective: November 1, 1976
Work Began: November 1, 1976
Project Substantially Complete and Final Inspection: May 19, 1977
Final Construction Approval:
Working Time Bid: 50 Working Days
Working Time Used: 43 Working Days
Project Cost and Financing
Original Bid Price: $43,542.90
Final Contract Cost: $43,539.25
Partial Payments Previously Made: 7 Amount: $39,185.33
Final Payment Due: $4,353.92
Final Payment to be made from Project No. 104-24000-260. An engineering cost
overrun was experienced on this project due to the required redesigning of
Camilla Street to better accommodate the Colonial Manor Rest Home expansion,
on which construction started after the contract was awarded on this project.
Colonial Manor is located on both sides of Camilla Street at Beach Street. A
bond fund transfer in the about of $3,700 is required to supplement the
project account in order to make the final payment to the contractor.
Deviation from the Bid Price: Minor Deviation of $3.65
Compliance with Specifications: Tests made during construction show materials
used and required thicknesses were in compliance with Contract Specifications.
Recommendations
It is recommended that (1) A Bond Fund Transfer in the amount of $3,700 be
made from Assessment Paving Unspecified (104-24000-901) to Assessment Paving
at Three Miscellaneous locations (104-24000-260) and (2) That the Project
described be accepted by the Adoption of an Ordinance and Final Payment of
$4,353.92 be made to Texas Bitulithic Company.
GG:jc
SUBMITTED BY: DISPOSITIO BY COUNCIL: PRO ESSED B
APPROVED [I OTHER (DESCRIBE)
DATE
CITY MANAGER r�