Change Order Request
Project Namel Coma Ground Tank S Rehabilitation Cly Sac# 46695
ClWftjed#(s)j Fort Worth Water Dept Pr*d#02314); MWnfe w Maetoo Tame Inc.(
A*ctDewkAm I Rapek oW repallating of OWN VxM storage tank
Hlaetua Tetcaa lrtc Change Order 4 Date 1/18/2016
C4 P mjsd Mgr. Fartda S 5oderya,PE CIV kspeft David Hemarrdw
Dept Walar Contract Thne
Totals (CD)
Ork*w Contract Amount $1,488,675.00 $1,488,675.00 150
Extras to Date $0.00 g0
Credits to Date
PendMg Charge Orders(In M&C Process)
Contract Cost to Deb $Iig 675.00 $1488,675.00 240
ount of Change Order 419,27620 -$19,276.20 0
Revised Contract Amount 1,4 ,398.80 $1,469,398.80 240
Odg W Funds Available for Change Orders $0.00
Ramairtrg Funds Available for tie CO $0.00
Additional FwWq(it necessary)
CHAMGE ORDERS ba QATE jtltK;LWM THIS ONLY AS%OF ORIGNAL CONTRACT -1.20%
WALLOWAKECONTRACTAM UNT(ORIGNALCONTRACT COST+2M $1,860,843.75
AVMTM FORCHAMORM
This Charge Order covers multiple items and alminstkm of a few bid Items.
IF
Note,Tone Extension of 90 days is also included in this Charge Order. �"�� 0��► '
The additional details may be found in the subsequent pages. ci9
�g QQ
i moo°
A b • --� ��; o
tO�o�f1UVV�O
1AN 2
2 2016 '
Maky f Kayse ity Seca:•etaty
It is understood and agreed that the acceptm of this Change Order by fie contrador oonskABs an a000rd and satisfaction and represents payment
in full(boor time and money)for all costs wising oul of,or incidental lo,the above Change Order.
Qmkw ot'a Name a Mmko for e
Blastco Texas Inc Stave Wissing/Vidinia Harp 1/18/16
DeOa
Nirav Patel/CP NawW C p. }VC{cL,1 1/18/2016 Farids S.Goderya,PE "Lb
Awir d Direclor Dale
I k Andrew T Cronberg,PE r John Robert Carma ! 16
Amd"CIVAlb 4Atttritilwt Data
Doug Black / 6 Jesus J Chapa _/
M&C Number WA M&C Data Approved WA I Rr 110Rr'
�J"t
i.t T` , Y
m
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Como Ground Storage Tank GS Repair&Rehabilitation City Sec# 46695
Client Project# Fort Worth Water Dept(Project#02314); Kleinfelder ;Blastco Texas Inc.4465
Project Description Repair and repainting of existing ground storage tank
Contractor Blastco Texas Inc Change Order# 0 Date I 1/18/2016
City Project Mgr. Farida S Goderya,PE City Inspector F David Hemandez Kleinfelder
ADDITIONS
unit Unitos o a
Flush rain Installation Water .
:Rx weld at exis ig manway ater .
3 PCM#I, Repair Existing weld on 4"patch plate Water 1.00 LS $250.00 $250.00
Seal weld the exterior cornice in two locations Water
5 PCM#3:Blast and paint the exterior cornice Water 1.00 LS $75,500.00 $75,500.00
6 PCM#3:Cut off Rafter End Water 83.00 EA $75.00 $6,225.00
Water $117,723.80
Sub ota -tions
Change Order Additions Page 2 of 3
( Y
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Como Ground Storage Tank(GST)Repair&Rehabilitation City Sec# 46695
Client Project# Fort Worth Water Dept(Project#02314); Kleinfelder( ;Blastco Texas Inc.4465
Project Description Repair and repainting of existing ground storage tank
Contractor Blastoo Texas Inc Change Order# 0 Date 1/18/2016
City Project Mgr, Farida S Goderya,PE City Inspector I David Hernandez Kleinfelder
DELETIONS
ITEM DESCRIPTION DEP I Qty Unit Unit Cost Total
Bid Item No.12(Remove&Replace some of Existing Circle Beams)
1 Water 250.00 LF $200.00 $50,000.00
2 Bid Item No.14(Wall Plate Patch Repair) Water 1,500.00 SF $38.00 $57,000.00
3 Bid Item No.15(Corrosion Pit Welding Repairs) Water 100.00 GAL $300.00 $30,000.00
Water $137,000.00
Sub Total Deletions $137,000.00
Change Order Deletions Page 3 of 3
PROPOSED CONTRACT MODIFICATION (PCM)#1
PROJECT: 6.0 MG Como Ground Storage Tank PROJECT NUMBER:
OWNER: City of Fort Worth 02314
CONTRACTOR: Blastco Inc.
ENGINEER: Kleinfelder
DESCRIPTION:Additional Welding Repairs PCM No:1
NOTIFICATION TO OWNER:
The Contractor proposes to make the additions,modifications or deletions to the Work described in the Contract
Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days:
o Notify us that you concur that this change does not require a change in Contract time or amount.A Field
Order will be issued.
• Review the Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all
other costs related to this change.Impacts on Contract Time shall be shown in a revised schedule,
Included with the submitted proposal.Two(2)additional days to complete the improvements.
o Proceed with the change. Payment will be made at the unit price bid.
o Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the
Contract Documents.
By: Blastco Inc. Date: 8/07/2015
OWNERS'S RESPONSE:
We respond to your request as follows:
o We propose that this is a no cost or time change. Issue Field Order.
• We accept the attached Price/Credit Proposal with detailed cost breakdown for performing the described
change.
o We are proceeding with the change at the unit price bid.
o We are proceeding with the change under the time and materials provisions of the Contract.
By: City of Forth Worth Date: 8/10/2015
ACTION TAKEN:
o Proposed Contract Modification rejected. See comments.
o Field Order will be issued.
• Change Order will be issued
By: Kleinfelder Inc. Date: 8/10/2015
AdditionaliNotes:
The installation to be per AWWA D100.0 including"Full Penetration Welding".Two(2)additional days will be
added to the contract schedule to complete the PCM#1 improvements.
AUTHORIZED:
Date: 9/22/15
Blastco Inc.
Date: 1 2,-L) 1 1
City of FortWorth `�v-r�► G���r-}
Blastco
A TF Warren Company
Monday,August 10,2015
CP Nawal
Kleinfelder
7805 Mesquite Bend Suite 100
Irving,TX 75063
Phone: 972-868-5900
cnawal@kleinfelder.com
Re: Como Ground Storage Tank Repair and Repainting
Dear Mr. Nawal,
We are pleased to provide a proposal for the above project.
A. Scope of Work—Additional Welding Repairs
• Repair cracked welds on existing manway and reinforcing pad by gouging existing weld two
inches beyond crack and install new weld.
Pricing: $1,000.00
• Remove existing manway and re-weld back in place.
Pricing: $2,070.00
• Remove existing 4'patch plate. Cut out an 8'x8'section in the shell and install new 8'x8'
piece of 1-3/8"plate flush with shell.
Pricing: $1,200.00
• Repair existing weld on 4'patch plate.
Pricing: $250.00
If you have any questions, please do not hesitate to call.
Sincerely,
Steve Wissing 2 m
Steve Wissing
General Manager r,
Blastco Texas Inc.
Phone:281-590-3200
Email:Steve.Wissing@tfwarren.com
5514 East Hampton Drive,Houston,Texas 77039 Phone: 281-590-3200 fax: 281-590-3234
www.blastco-texas.com
PROPOSED CONTRACT MODIFICATION (PCM)#2
PROJECT: 6.0 MG Como Ground Storage Tank PROJECT NUMBER:
OWNER: City of Fort Worth 02314
CONTRACTOR: Blastco Inc.
ENGINEER: Kleinfelder
DESCRIPTION:12"Flush Drain Installation PCM No:2
NOTIFICATION TO OWNER:
The Contractor proposes to make the additions,modifications or deletions to the Work described in the Contract
Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days:
o Notify us that you concur that this change does not require a change in Contract time or amount.A Field
Order will be issued.
• Review the Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all
other costs related to this change.Impacts on Contract Time shall be shown in a revised schedule,
Included with the submitted proposal.
o Proceed with the change. Payment will be made at the unit price bid.
o Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the
Contract Documents.
By: Blastco Inc. Date: 8/7/2015
OWNERS'S RESPONSE:
We respond to your request as follows:
o We propose that this is a no cost or time change. Issue Field Order.
• We accept the attached Price/Credit Proposal with detailed cost breakdown for performing the described
change.
o We are proceeding with the change at the unit price bid.
o We are proceeding with the change under the time and materials provisions of the Contract.
By: City of Fort Worth Date: 8/10/2015
ACTION TAKEN:
o Proposed Contract Modification rejected. See comments.
o Field Order will be issued.
• Change Order will be issued.
By: Kleinfelder Inc. Date: 8/10/2015
Additional Notes:
The installation to be per AW WA D100.0 including"Full Penetration Welding".
AUTHORIZED:
Date:
9/22/15
Blastco Inc.
Date;
City of Fort Worth
Blastco
A TF Warren Company
Wednesday,August 12,2015
CP Nawal
Kleinfelder
7805 Mesquite Bend Suite 100
Irving,TX 75063
Phone:972-868-5900
cnawalCDkleinfelder.com
Re: Como Ground Storage Tank Repair and Repainting
Dear Mr. Nawal,
We are pleased to provide a proposal for the above project,
A. Scope of Work—Install a 12"flush drain in lieu of proposed drainpipe relocation
Material Cost Difference $1,912.00
Labor Cost Difference $1,000.00
15%Mark Up $436.80
Total Additional Costs $3,348.80
�r—
If you have any questions,please do not hesitate to call.
Sincerely,
Steve W sling
Steve Wissing
General Manager
Blastco Texas Inc.
Phone:281-590-3200
Email: Steve.Wissing@ttwarren.com
5514 East Hampton Drive.Houston.Texas 77039 11honc: 281-590-3200 Fax: 281-590-3234
wwwAastco-texas.com
PROPOSED CONTRACT MODIFICATION(PCM)##3
PROJECT: 6.0 MG Como Ground Storage Tank PROJECT NUMBER:
OWNER: City of Fort Worth 02314
CONTRACTOR: Blastco Inc.
ENGINEER: Kleinfelder
DESCRIPTION:Structural Improvements PCM No:3
NOTIFICATION TO OWNER:
The Contractor proposes to make the additions,modifications or deletions to the Work described in the Contract
Documents as shown in Attachment"A". We request that you take the following action within 10 calendar days:
o Notify us that you concur that this change does not require a change in Contract time or amount.A Field
Order will be issued.
• Review the Price/Credit Proposal with detailed cost breakdown of labor,materials,equipment and all
other costs related to this change.Impacts on Contract Time shall be shown in a revised schedule,
included with the submitted proposal.
o Proceed with the change. Payment will be made at the unit price bid.
o Proceed with the change under the time and materials provisions of the Contract.
Authorization to proceed with changes must be approved by the Owner through Change Order in accordance with the
Contract Documents.
By: Blastco Inc. Date: 10/14/2015
OWNERS'S RESPONSE:
We respond to your request as follows:
o We propose that this is a no cost or time change. Issue Field Order.
• We accept the attached Price/Credit Proposal with detailed cost breakdown for performing the described
change.
o We are proceeding with the change at the unit price bid.
o We are proceeding with the change under the time and materials provisions of the Contract.
By: City of Fort Worth Date: 10/14/2015
ACTION TAKEN:
o Proposed Contract Modification rejected. See comments.
o Field Order will be issued.
• Change Order will be issued.
By: Kleinfelder Inc. Date: 8/10/2015
Additional Notes:
The installation to be per AWWA D100.0 including"Full Penetration Welding".
AUTHORIZED:
Date:
Blastco Inc.
Date:
City of Fort Worth
Blastca
<1 A TF Warren Company
Wednesday, October 14,2015
Seal Weld @ 2 Location: $30,330.00
Remove and Install with
Farida Goderya, PhD, PE Primer and Int. Coating : $75,500.00
Sr. Prof Engineer I Facilities Project Manager
Fort Worth Water Department 83 Rafters (End Cut Off): $6,225.00
Office: 817-392-8214
Cell:817-851-4910
Farida.Goderya@fortworthtexas.gov Total: $112,055.00
Re: Como Ground Storage Tank Repair and Repainting
Dear Ms. Goderya,
We are pleased to provide a proposal for the above project.
A. Scope of Work—Additional Welding Repairs
• Seal weld the four locations at the exterior cornice around the entire perimeter of the tank.
Pricing: $30/LF—2,022 LF Total
$60,660.00
• Apply sika flex to the four locations at the exterior comice around the entire perimeter of the
tank. Pricing: $15,150.00
• Apply 100%solids epoxy seam sealer to the four locations at the exterior cornice around
the entire perimeter of the tank. Pricing: $20,200.00
• Remove face of existing cornice
• Blast the interior to an SSPC-SP6 and apply one coat of Tnemec 94-1-12O at 2.5-3.5 mils
DFT and one intermediate coat of Tnemec 73 Endurashield.
Pricing: $75,500.00
• Re-install the cornice face plate in like kind to what is existing by tack welding in place.
Pricing: $25,000.00
• Cut off the ends of the rafters as needed so there Is a 60 to IT overhang.
Pricing: $75/rafter
*Blastco is requesting 60 days be added to the contract for the additional work and delays.
If you have any questions, please do not hesitate to call.
Blastco has stated
they have cut off 83
rafter ends.
5514 East Hampton Drive,Houston,Texas 77039 Phone: 281-590-3200 Fax: 281-590-3234
www.blastco-texas.com
Sincerely,
Steve Wissing
Steve Wissing
General Manager
Blastco Texas Inc.
Phone: 281-590-3200
Email: Steve.Wissing@tfwarren.com