HomeMy WebLinkAboutOrdinance 10010T.
ORDINANCE No. / ~~ l
ORDINANCE ACCEPTING IMPROVETS ON A PORTION OF TRINITY BOULEVARD AND
PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH AUSTIN PAVING
COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED
AMID PERFORM®; DIRECTING THE ISSUANCE, EXDCUTION AND DELIVERY OF
CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMEN7.'S LEVIED AFTER GIVING
EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME
OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY 'TO ENGROSS AND
ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE
BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE
COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND
PROVIDING AN EFFECTIVE DATE.
W[~REAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with AUSTIN PAVING COMPANY for the making and construction of certain street
improvements on the hereinafter described portions of streets, avenues and public
places in said City, to-wits
TRINITY BOULEVARD From Euless South Main Street easterly to the
west property line of Post Oak Village II
Addition, known and designated as Project
No. 21-036808-00, a seven-inch thick
reinforced concrete pavement with seven-inch
high attached concrete curb on a six-inch
thick lime stabilized subgrade, so that the
roadway will be a double thirty-six foot
roadway with a twenty-eight foot wide median
on a hundred and twenty foot right-of-way.
-1-
by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance No. 9755 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and
against the real and true owners thereof; and,
~, the City Council of the City of Fort Worth, Texas, has, upon
review, found and determined that, in some instances, in order to effect substantial
justice and equality, it is desirable and necessary to grant and issue certain credits
against some one or more of the assessments levied by Ordinance No. 9755 , and
WE~REEAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract
therefore;
NOW THEREFORE,
BE IT ORDAINID BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT;
I.
The improvements on each of the portions of street, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and
performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name of
the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is
directed to attest same and impress thereon the corporate seal of the City, all in
accordance with the proceedings relating to such improvements and assessments. The
certificates shall be numbered, shall describe the property against which the
assessment has been levied, shall, where ]mown, state the name or names of the true
owners of the respective parcels of property assessed and shall be issued in an amount
equal to the difference between the principal amount of the assessment and the amounts
of any credit issued thereon. The numbers of the certificates, with the property
descriptions to be shown on the respective certificates, together with the names of
the owners of said property, the principal amount of the assessment, the respective
credits, if any which are hereby authorized, granted and allowed aginst the principal
amount of some one or more of the assessments heretofore levied, and the principal
amount for which each certificate is to be issued after giving effect to such credit,
if any, are hereby enumberated and itemized as follows:
.. , w ., -.
III.
When each of the certificates has been dully executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
N.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth,
Texas, and by filing the complete ordinance in the appropriate Ordinance Records of
said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVF~ THIS __1~day of ~ ~~ , 19~.
APPROVID AS TO FORM AND LEGALITY:
City Attorney
-3-
PROJECT NO 21-036808-00, TRINITY BOULEVARD FROM EULESS SOUTH MAIN STREET EASTERLY TO THE WEST PROPERTY
LINE OF POST OAK VILLAGE II ADDITION, to be improved by constructing a seven-inch thick reinforced
concrete pavement with seven-inch high attached concrete curb on a six-inch thick lime stabilized
subgrade; so that the roadway will be a double thirty-six foot roadway with a twenty-eight foot wide
median on a hundred and twenty foot right-of-way
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE
ROYCE SANDERS ADDITION
Euless Excavating, Inc 1 1 694.53' Pavement 43 22 30,017 59
1812 Kynette I * 647 53' Curb 1.76 1,139 65
Euless, Texas 76039 694.53' Street Lights 5 89 4,090 78
694.53' Drainage 22.24 15,446 35
ROYCE SANDERS ADDITION
Euless Excavating, Inc. 2 1 207.0' Pavement 43.22 8,946.54
1812 Kynette AG 207 0' Curb 1 76 364 32
Euless, Texas 76039 207.0' Street Lights 5.89 1,219.23
207 0' Drainage 22.24 4,603 68
G W. COUCH SURVEY ABST 279
Yancey Camp Mgn Co TR, lA8 75.0° Pavement 43.22 3,241.50
11518 Reeder Road C 75 0' Curb 1.76 132 00
Dallas, Texas 75234 75.0' Street Lights 5.89 441 75
75 0' Drainage 22.24 1,668 00
G. W. COUCH SURVEY ABST 279
Yancey Camp Mgn. Co TR. 1B 782.0' Pavement 43.22 33,798 04
11518 Reeder Road C * 766.0' Curb 1 76 1,348 16
Dallas, Texas 75234 782.0' Street Lights 5.89 4,605 98
782.0' Drainage 22 24 17,391 68
50,694 37
15,133 77
5,483 25
57,143 86
SUBTOTAL THIS PAGE $128,455.25
-1-
PROJECT NO 21-036808-00 TRINITY BOULEVARD FROM EULESS SOUTH MAIN STREET EASTERLY TO THE WEST PROPERTY
LINE OF POST OAK VILLAGE II ADDITION, cont.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
TARRANT MAIN STREET INTERSECTS G. W. COUCH SURVEY ABST. 279
Betty Jo Seeton, et al TR. 1J
Route 1, Box 300 AG
Morgan, Texas 76671
305.0' Pavement
305.0' Curb
305.0' Street Lights
305.0' Drainage
43 22 13,182.10
1.76 536.80
5.89 1,796.45
22.24 6,783 20
$22,298 55
(PRE-PAID)
G. W. COUCH SURVEY ABST. 279
John R. Sullivan TR. 1F 620 0' Pavement 43.22 26,796.40
8340 Meadow Road C * 589.0' Curb 1.76 1,036.64
Suite 248 620.0' Street Lights 5 89 3,651.80
Dallas, Texas 75231 620.0' Drainage 22.24 13,788.80
45,273.64
SOUTH SIDE G. W. COUCH SURVEY ABST 279
John R Sullivan TR. 1F 630.0' Pavement 43.22 27,228.60
8340 Meadow Road C * 599.0' Curb 1.76 1,054.24
Suite 248 630.0' Street. Lights 5.89 3,710.70
Dallas, Texas 75231 630.0' Drainage 22.24 14,011.20
46,004.74
TOWN OF TARRAPPT
Derr Const. Co. 1 17 159.50 Pavement 43.22 6,893.59
P 0 Box 637 I 159.50 Curb 1.76 280 72
Euless, Texas 76039 159.50 Street Lights 5.89 939.45
159.50 Drainage 22 24 3,547 28
11,661 04
SUBTOTAL THIS PAGE $125,237 97
-2-
• ~
PROJECT NO 21-036808-00, TRINITY BOULEVARD FROM EULESS SOUTH MAIN STREET EASTERLY TO THE WEST PROPE_RTY_
LINE OF POST OAK VILLAGE II ADDITION, cont.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
TARRANT MAIN STREET INTERSECTS G.W, COUCH SURVEY, ASST. 279
Yancey Camp Mgn. Co. TR. 1B
11518 Reeder Road C
Dallas, Texas 75234
315.0' Pavement 43 22 13,614.30
315 0' Curb 1.76 517 44
315.0' Street Lights 5 89 1,855 35
315.0' Drainage 22 24 7,005 60
22,992 69
Yancey Camp Properties TR, 2B
11518 Reeder Road AG
Dallas, Texas 75234
G W. COUCH SURVEY, ABST 279
475.0' Pavement 43 22 20,529 50
475.0° Curb 1.76 836 00
475.0' Street Lights 5.89 2,797 75
475.0' Drainage 22.24 10,564.00
34,727 25
Yancey Camp Properties TR. 2B 2A1
11518 Reeder Road E
Dallas, Texas 75234
G.W. COUCH SURVEY, ABST. 279
120 0' Pavement 43 22 5,186 40
120.0' Curb 1 76 211 20
120.0' Street Lights 5.89 706 80
120.0' Drainage 22 24 2,668 80
8,773 20
Yancey Camp Properties TR. 2B1A1
11518 Reeder Road AG
Dallas, Texas 75234
G.W COUCH SURVEY, ABST. 279
310.0' Pavement
* 294.0' Curb
310 0' Street Lights
310.0' Drainage
43.22 13,398 20
1 76 517.44
5.89 1,825 90
22 24 6,894 40
22,635 94
SUBTOTAL THIS PAGE
*Adjusted for inlets.
-3-
$89,129.08
~.
The assessments result in the following division of cost•
TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) ............... $342,822.30
TOTAL COST TO THE CITY OF FORT WORTH ...................... $324,223.98
TOTAL CONSTRUCTION COST ................................... $667,046.28
-4-
;; ,
~~ ~srEa FnE,vJ --~.
~it~ of 1Fo~°t Wo1,°th, ~C~~ca~
}~CC0UNTtNp.2 ~~// r~ g r)y]~ ,~1~j ~f~/ /~
iIRAN~ORTATJDN[P_UBLIC~~®~ ~~~ ~® ~1V U IL'~L (L~ ~®~~~ 11 /])']) ~~~lA{/~ ~G®~
N6 TERApMINISTRATlUN 4 ~~•/ ~Vwu ui u.~
DATE REFERENCE SUBJECT FINAL PAYMENT PAGE
NUMBER TRINITY BOULEVARD, PHASE 2 Trinity Boul vard 2
i1-17-87 ~<<,~P- 2361 (Euless S. Main to W. Post Oak Village) 1 °'
RECOMMENDATION
It is recommended that the City Council•
(1) accept by the adoption of an ordinance, for final payment, Trinity
Boulevard, Phase 2 (Euless S. Main to W. Post Oak Village) Assessment
Paving, and,
(2) authorize final pa,~nent in the amount of $40,764.94 to Austin Paving
Company.
PROJECT DESCRIPTION
Project Name
Project Number:
Contract Number
Contractor
Contract Awarded
Work Order Dated
Work Order Effective On or Before
Work Began.
Contract Time Began
Project Substantially Complete
Final Inspection Made•
Punch List Completed
Contract Time Provided•
Contract Time Charged•
Trinity Boulevard, Phase 2
(Euless S. Main to W. Post Oak Village)
Assessment Paving
21-036808-00
15357
Austin Paving Co-npany
October 7, 1986 (M&C C-9902)
November 18, 1986
December 1, 1986
December 8, 1986
December 1, 1986
July 21, 1987
July 30, 1987
August 12, 1987
90 Working Days
101 Working Days
PROJECT COST
Original Bid Price
Contract Price•
Less Liquidated Damages.
Final Contract Price•
Payments Previously Made
Amount of Previous Payments•
Final Payment Due
$622,919.30
$635,747.18
$ 3,465.00 (11 days @ $315)
$632,282.18
9
($591,517.24)
$ 40,764.94
DEVIATION FROM BID PRICE
Final measured quantities at contract unit prices yield an earned total price
for this contract of $635,747.18 which is $12,827 88 (2.06%) over the bid
price. The overrun amount is the result of differences between quantities
estimated for the contract documents and quantities actually used to complete
the work.
DATE REFERENCE SUBJECT FINAL PAYMENT PAGE
NUMBER
11-17-87 ** RINITY BOULEVARD, PHASE 2 Trinity Boulev rd 2 af_ 2._
FP- 2361
CONTRACT TIME
The contractor used eleven (11) working days in addition to the time allotted
for construction. A charge of $315.00 per day has been deducted from the final
payment as liquidated damages in accordance with the contract.
FINANCING
Sufficient funds are available in Street Improvement Fund 21, Retainage Account
205015357, $30,770.88, Encumbrance Contract No. 153576, $631.18; and Street
Improvement Fund 21, Project No. 036808-00, Trinity Boulevard-Euless S. Main to
Post Oak Village in the amount of $9,362.88 to finance this final payment.
Expenditures will be made from Index Code 642199.
COMPLIANCE WITH SPECIFICATIONS
The project has been completed in accordance with the requirements of the
contract.
DAI dmc
APPRQVED BY
CITY COI~NCIL
~~~ x~
~4~~ ~...
F ~~~-.
vnr ~€:=az~
~~ros:n, ~r~
SUBMITTED FOR THE
A
GER'S
I DISPOSITION BY COUNCIL. PROCESSED BY
BY
F ICE
O
David zVOTy
^ APPROVED 6
6
ORIGINATING ^ OTHER (DESCRIBE)
DEPARTMENT HEAD• Gary Santerre CITY SECRETARY
FOR ADDITIONAL INFORMATION b
DID
Adopted Ordpnance No
CONTACT W. Massey-7910 ~
. DATE