HomeMy WebLinkAboutContract 40109-A2 CITY 3ECt .r-.-r y CONTRACT NO. AMENDMENT No.2 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and URS Corporation, An AECOM Company (ENGINEER) , made and entered into City Secretary Contract No. 40109, (the CONTRACT) which was authorized by M&C C-24155 on the 6th day of April, 2010 in the amount of $963 , 641 . 91; and WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the amount of $140,838 .00 which was authorized on April 7, 2015 (M&C C-27251) ; and WHEREAS, the CONTRACT involves engineering services .for the following project: Design of Big Fossil Creek Parallel Relief Sanitary Sewer Main 402; and WHEREAS, it has become necessary to execute Amendment No.2 to the CONTRACT to redefine the project scope; NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the redefined scope of services in Attachment A dated November 19, 2015 a copy of which is attached hereto and incorporated herein. The cost to City for the revised services to be performed by Engineer totals $0 .00 2 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. LFT- L RECORD CRETARY RTH, Tk Page -1- EXECUTED and EFFECTIVE as of the date last subscribed by the city' s designated City Manager APPROVED: ENGINEER City of Fort Worth URS Corporation �j ka, Jesus J. Chapa Juam-varga—S v 41g, t Assistant City Manager 4.,Vice-President D z DATE: � �<�p DATE: 14/1(f APPROVAL RECOMMENDED: L Andrew T. Cronberg, .E. Assistant Director, 1wter Department APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A Douglas W. Black Senior Assistant City Attorney ATTEST: F®R � Mary Zele ytr r City y ?°°°°°°°°o° OFFICIAL RECORD CITY SECRETARY FT.WORTH,TX Page -2- Attachment A December 7, 2015 Redefined Scope of Services Amendment No. 2 to City Secretary 40109 Supplemental to Original Scope A. Part 2. Design of Big Fossil Creek Parallel Relief Sanitary Sewer Main 402 from the south right of way line of the TRE Railroad on the south side of SH 121 to the terminus of the project between S.H. 26 and Broadway Avenue, a distance of 9,666 linear feet, including 600 linear feet of force main of the original scope of services, as revised by Amendment 1,for the project is hereby eliminated. All pertinent references to work on, cost estimates for, or other task expectations related to Part 2 in the original scope are to be disregarded. All work product previously prepared shall be submitted to the City within 30 days. B. Parts 1 and 3. Design of Big Fossil Creek Parallel Relief Sanitary Sewer Main 402, Part 1, from the existing sanitary sewer 96-inch M-280"A" and 84-inch sanitary sewer M-338 "A" (West Fork Collectors)to the south right of way line of the TRE Railroad on the south side of SH 121, a distance of 5,144 linear feet and Part 3, from the existing Haltom City Carson Street outfall main to the existing Main M-402, of the original scope of services, as revised by Amendment 1,for the project shall be brought to completion by performance of the following: 1. Address all comments required by the Texas Water Development Board, to allow the plans to be approved for advertising. 2. Upload the final plans and specifications into the City's Buzzsaw website. 3. Upload a pdf and an excel spreadsheet of the final construction cost estimates to allow for electronic bidding. 4. Provide mylar drawings of the final plans. 5. Provide 10 unbound copies of the final specifications and contract documents. 6. Provide assistance during the bid phase. 7. Provide assistance during construction including shop drawing review. 8. Provide record drawings from the relines supplied by the City after construction of the project. FORT WORTH, December 7, 2015 Juan Vargas Vice President URS Corporation 1200 Summit Avenue, Suite 320 Fort Worth, Texas, 76102 RE: Big Fossil Creek Parallel Relief Sanitary Sewer,Ph 1,2& Haltom City Meter Station and Sewer Outfall, Phase 3-City Project#01303 Contract Amendment 2 Dear Mr. Vargas: It has become necessary to revise our contract for the above referenced project to reduce the scope of our engagement. As we near completion of Phase 1 and 3, it appears that there is insufficient funding under the terms of the contract, as amended, for your company to perform work related to Phase 2. The attached amendment to the contract officially removes your company's obligation to perform any further work for Phase 2 design. Please submit any and all work product related to Phase 2 to my attention. The attached amendment and attachments outline the City's expectations for Phases 1, 2 and 3. Please sign all four copies of the attached amendment, and return them to me within 7 days of the date of this letter. Thank you for your prompt attention to this matter. I can be contacted at (817) 392-5020 or andy.cronbergAfortworthtexas.gov if you have any questions or need additional information. Sincerely /I Andrew T. Cronberg, P. Asst. Director Attachment cc: Tony Sholola, P.E., Engineering Manager Walter Norwood, P.E., Sr. Professional Engineer Doug Black, Senior Assistant City Attorney Project File Fort Worth WATER DEPARTMENT 11 ENGINEERING AND CAPITAL IMPROVEMENTS 1111. THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAx 817-392-8195 1964.1993.2011 f:Printed on recycled paper ACOMAECOM 1950 N.Stemmons Freeway 214 741 7777 tel suite 6000 214 7419413 tax Dallas,TX 75207 www.aecom.com Letter of Transmittal To: Andrew T. Cronberg, PE Date: January 06, 2016 Assistant Director City of Fort Worth Water Dept. 1000 Throckmorton Street Fort Worth,TX 76102 From: Wendy Lopez, PE, FASCE Project Name: Big Fossil Creek Parallel Relief Sanitary Sewer—City Project#01303 Project No. SUBJECT: Contract Amendment to De-Scope Phase 2 The following is being, transmitted ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ® Other Copies Date Description 4 01/06/16 Contract Amendment No. 2 ® Attached ❑ Under separate cover Transmitted via ❑ Federal Express ❑ US Postal Service ❑ Hand Delivery ❑ Registered Mail ❑ United Parcel Service ® Courier ❑ For approval ❑ Approved as submitted ❑Approved as noted ❑ For your use ❑ For review and comment ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Return corrected prints ® As requested ❑ Other Remarks Andy,sorry for the delay. f Juan Vargas, PE Copy to Signed