HomeMy WebLinkAboutContract 46272-FP2 Department f P&W Const. Services
DOE# Date
Project anager �Z �
Risk Management J. Pa " TWORTH. cis r,/' ` - (�&
D.O.E. Brotherton ��' �.� A -rU'��Z
CFA Westerman/Scanned
The Proceeding people have been cofitacted cor ceming the request for final
payment&have released this project for such payment. ATION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy li PROJECT COMPLETION
D.O.E. Ns: 7263
0-5W`/&;z 72-
Regarduig contract 117263 for DYNATEN ADDITION-STORM DRAIN as required by the
TRANSPORTATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Contract Prices: $1,583.00
Amount of Approved Change Orders: N2
Revised Contract Amount:
Total Cost Work Completed: $1,583.00
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed; $1,583.00
Less Previous Payments: $0.00
Final Payment Due $1,583.00
— ��x V"W_-6 -—�_ _
Retromende for Acce p tante Date
Asst. Director, TPW - Infrastructure Design and Construction
/ ate/
Accepted --- - r Date - -- -
DireEtor, TRANSPORTATION & PUBLIC WORKS
Asst. City Manager Date
Comments: 0205-541200-205760231283
CITY SEGRETARV
FEB 0 3 2016 n. '3RT%TX
Initial:` � U i
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name DYNATEN ADDITION
Contract Limits
Project Type STORM DRAIN
City Project Numbers 02312
DOC Number 7263
Estimate Number 1 Payment Number I For Period Ending 10/8/2015
CD
City Secretary Contract Number 117263 Contract Time 1X1)
Contract Date Days Charged to Date 85
Project Manager Long Contract is 100,00 Complete
Contractor BEAR CREEK CONSTRUCTION,LTD,
4950 HANSON DR,
IRVING, TX 75038
Inspectors LAYER / HOUSTON
Thursday,Octobra 08,2015 P*ge 1 of4
City Project Numbers 02312 DOE Number 7263
Contract Name DYNATEN ADDITION Estimate Number I
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 10/8/2015
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 30"RCP CLASS M 20 ;F $72.00 $1,440.00 20 $1,440.00
2 TRENCH SAFETY 20 LF $7.15 $143.00 20 $143.00
------------------------------------------
Sub-Total of Previous Unit $1,583.00 $1,583.00
----—--————--————--—--——--————-----—---—--
Thursday,October 08,2015 Page 2 of 4
City Project Numbers 02312 DOL Number 7263
Contract Name DYNATEN ADDITION Estimate Number I
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 10/8/2015
Project Funding
Contract Information Summary
Original ContractAmount $1,583.00
Chance Orders
Total Contract Price $1,583.00
�Z
Date Total Cost of Work Completed $1,583.00
C N c) / Less %Retained $0.00
✓-
Date / !/G Net Earned $1,583.00
lnspcction S} a Earned This Period $1,583.00
Retainage This Period $0.00
Date Less Liquidated Damages
Project Manager
Days @ /Day $0.00
2. � Date f' !� LessPavement Deficiency $0.00
Asst.Din. iorfrl'W-Infrastructure Design and Construction Less Penalty $0.00
IJ t J Ditto Less Previous Payment $0.00
DirccWr10&ntmcting Department Plus Material on Hand Less 15% $0,00
Balance Due This Payment $1,583.00
I
t
R
TburAW,Ootober08,2015 PjW3 of4
City Project Numbers 02312 DOE Number 7263
Conti-act Name DYNATEN ADDITION Estimate Number 1
Contract Limits Payment Number I
Project Type STORM DRAIN For Period Ending 10/8/2015
Project Funding
Project Manager Long City Secretary Contract Number 117263
Inspectors LAYER / HOUSTON Contract Date
Contractor BEAR CREEK CONSTRUCTION,LTD, Contract Time 120 CD
4950 HANSON DR. Days Charged to Date 85 CD
IRVING, TX 75038 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
---------------------------------------
Total Cost of Work Completed $1,583.00
Less %Retained $0.00
Net Earned $1,583.00
Earned This Period $1,583.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $1,583.00
I
i
i
Thursday,October 08,2015 Page 4 of 4
I
i
i
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO. 1
NAME OF PROJECT: Dynaten Addition
PROJECT NO.: 2312 CONTRACTOR: Bear Creek Construction
DOE NO. 7263
PERIOD FROM 07/06/15 TO: 09/25/15 FINAL INSPECTION DATE: 28-Sep-15
WORK ORDER EFFECTIVE 7/6/2015 CONTRACT TIME 120 O WD OO CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 0 0 0 0 85 85
PERIOD
PREVIOUS 0
RIOD 0 0 0 0 0
PE
TOTALS 0 0 0 0 85 85
TO DATE
*REMARKS:
i
!
CTOR DATE INSPE-CTO i DATE
ENGINEERMG DERARTMEN-T
The City of Fort Worth+1000 Tluo&morton Suet•Fort Wordy,TX 76012-6311
(817)392-7941•Fax(817)392-7845
FORTWORTH REV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
1) CONTRACTOR&PROJECT DATA
Nance of Contractor Projecl Narne
Bear Creek Construction D oaten Addition
DOE Inspector DOENumber
Garey Houston 7263
DOE Inspector Project Manager
❑Water ❑Waste Water P]Storm Drainage ❑Pavement Aaron Long
Initial Contract Amount Project Dculty
$1,583.00 O Simple O Routine O Complex
Final Contract Amount Date
$1,583.00 10/7/2015
II)PERFORMANCE EVALUATION
0-Liade nate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT x APPLICABLE /N) RATING 0-4 MAX SCORE SCORE
1 Submission of Documents 2 Y 4 8 8
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 4 60 60
6 Finished Product 15 Y 4 60 60
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 4 60 60
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 1 20 20
11 Pro a Restoration 5 Y 4 20 20
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 448
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 448
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS)*100%) 448 / 448 = 100%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standane! 60%to<80%=Good X095=Exvellent
Inspector's Comments(INCLUDING EsXPLANATION Or BONUS POINTS AWARDED)
Signature DOE Inspector Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMFNiS
_ TRANSPORTATION AND PUBLIC WORKS
- The City of Fort Worth•1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941•Fam(817)392-7845
ERC TS
BONDING COMPANY,
POWER OF ATTORNEY
Know All Persons By These Presents,that MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,
INC.,both being corporations of the State of Iowa(herein collectively called the'Companies")do hereby make,constitute and appoint,
individually,
Sea Williams; Dawn Davis; Debbie Smith; Dennis C Dowd; Donnie Doan; Kae Perdue;
Kristi Meek; LaCrisha Wynne;Walter J De La Rosa
their true and lawful Attomey(s)•in-Fact,to make,execute,seal and delver on behalf of the Companies,as Surety,bonds,undertakings
and other written obligations In the nature thereof,subject to the limitation that any such instrument shall not exceed the amount of.
SEVENTEEN MILLION($17,000,000.00)DOLLARS
This Prover-of-Attorney Is granted and is signed and sealed by facsimile under and by authority of the following By-Laws adopted by the
Board of Directors of Merchants Bonding Company(Mutual)on April 23,2011 and adopted by the Board of Directors of Merchants
National Bonding,Ina,on October-24,2011.
'The President,Secretary,Treasurer,or any Assistant Treasurer or any Asslstent Secretary or arty Vice President shall have power and
authority to appoint Attomeye-In-Fact,and to authorize them to execute on behalf of the Company,and attach the seal of the Company
thereto,bonds and undertakings,recognizances,contracts of indemnity and otherwritings obligatory in the nature thereof."
"The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of
Attorney or Certification thereof authorizing the execution and delivery of any bond,undertaking,recognizance,or other suretyship
obligations of the Company,and such signature and seal when so used shall have the same force and effect as though manually fixed."
In connection with obligations in favor of the Florida Department of Transportation only,it is agreed that the power and authority hereby given
to the Attorney-In-Fact includes any and all consents for the release of retained percentages and/or final estimates on enginsering and
construction contracts required by the State of Florida Department of Transportation.It Is fully understood that consenting to the State of Florida
Department of Transportation making payment of the final estimate to the Contractor and/or its assignee,shall not relieve this surety company
of any of its obligations under its bond.
In connection with obligations In favor of the Kentucky Department of Highways only,it is agreed that the power and authority hereby given
to the Attorney-in-Fact cannot be modified or revoked unless prior written personal notice of such Intent has been given to the Commissioner-
Department of Highways of the Commonwealth of Kentucky at least thirty(30)days prior to the modification or revocation.
In Witness Whereof,the Companies have caused this Instrument to be signed and sealed this 30th day of October 2015
,nrrnn,,gry ,..•••..•
,,� e. 1N� Co, MERCHANTS 130NDINGCOMPANY(MUTUAL)
. ..• L t1d.•• fp•• MERCHANTS NATIONAL BONDING,INC.
,r 0Urp , O RPOy• ! .
AX,+; :rte c� 9-'�.y-4�
£��� "e_ �►:�� •z'�' `O� ora•
Ot)3 :.�= yah' 1933 y; By
s
STATE OF IOWA •��' ,►��`+` '•. .•
COUNTY OF Dallas as. yn""'ax a President
On this 30th day of October , 2015 ,before me appeared Larry Taylor,tome personally known,who being by me sworn did say that
he Is President of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.;and that the seats affixed
to the foregoing Instrument are the Corporate seals of the Companies;and that the said instrument was signed and sealed In behalf of the
Companies by authority of their respective Boards of Directors.
u WENDY WOODY
CN Commission Number 7$4654
My Commission Expires
,vire. June 20 2017
Notary Pub County,tows
(Expiration of notary s commission
does not invalidate this instrument)
I,William Wamer,Jr.,Secretary of the MERCHANTS BONDING COMPANY(MUTUAL)and MERCHANTS NATIONAL BONDING,INC.,
do hereby certify that the above and foregoing Is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies,
which is still in full force and effect and has not been amended or revoked.
In Witness Whereof,I have hereunto set my hsggp.q0,0tfixed the seat of the Companies on this 2Dth day of November 2018
a,.onNr1,� a0 G`i,�• ......�
�
0 Co,
••� `RP0
'a R •.
3 obi• R���;• - is '4.A;t.
tom•• r*';
Y
tary t
zJ {�ZOiD3• i#i ' .ti`9933 •yam;
POA 0014(6115) "'`",,.� ujriati`' l '•••..
i
i
E
EES
P
1
1
01wer
CONSENT OF Architect
SURETY COMPANY Contrnctol
TO.FINAL PAYMENT Sumiy
AIA ItOCQME NI'6707 9thcr
PROJE(..T: Install Water, anitary Sewer&Storm Drainage System at Dynaten d ton,3935 Tarrant
(nninc,addres9) Main Street,Ft.Worth,Texas 75212 Bond# TXC606901
TOs-(ownot) ARCHITECT'S PROJECT NO:
City of Fort Worth
1000 Throckmorton Street C'ONTRACT.F011- Construction
Fort Worth,TX 76102
CONTRACT DATE;: 4/20/2015
CONTRACTOR.
Bear Creek Site Utilities&Construction,Ltd.dba Bear
Creek Construction
4950 Hanson Drive
Irving,TX 75038
hr.aecordapee whh.tbe;provisions'ol'the Contract between the Owner and the Contractor as nidicdtcd'ubove,the
Merchants Bonding Company(Mutual)
15950 North Dallas Parkway,Ste.400 SURETYCOMPANY
Dallas,Texas 75248
.on blind of Oran: name anti wttlioat nl(hnimatar)
Bear Creek Site Utilities&Construction,Ltd.dba Bear Creek Construction
4950 Hanson Drive
Irving,Texas 75038 ,CONTRACTOR,
heroby approves of the final payment to•the Contractor,and•agrcea that'fttrul.payrneato the Contractor shall-not
7elieve the Surety Comps any of any of ita obligations to(hew inscri.nonic Al d addr¢tiv
City of Fort Worth
1000 Throckmorton Street ,OWNER,
Fort Worth,Texas 76102
as sot Airth in the suld Surety Cantpaily`s bond.
IN W:1:Nrss WHEREOF,.
the Surety 1Compagy has hereunto sct A%hand this 20th day of November 2015
.Surety.G`oimBondlu
,,,..,•...,,,, M h C pany(Mutuan
Z- 1
SSgtial to Q1'A tuir Rctimmiati'm
a
�' itccC
i �� tSat Kae Perdue
-Attorney In-Fact
•IvOTr-.'fbbfoamtstobetneilasoi�ampaniondmummitoAIADWt)MFM ii7Ob,(X01.71(A4CtOR'1Ahy;ll AV1TOFPAYMI NT OF
...,.,,: DIIlTSAND I14UMS.(jumtcdition
A1A—wcutAFN1'G747•t'0K81iK1 Ot SURFTV CWP'A'dY TO MAAL PA-YMENPAPRlt,197o tiUYnON-AIA* ONE
PAOL
.`1970 IF AMF.RWAN 1NSUR,fF CIF Al2('HrtL't'_IMI. NFW VQRjK.AW.Ali'.WAS111t7=N;XC_2OW:
AFFIDAVIT
STATE OF Texas
COUNTY OF Dallas
Before me,the undersigned authority,a notary public in the state and
county aforesaid,on this day personally appeared Brian K.Holdgate, Member of
General Partner Of Bear Creek Construction,known to me to be a credible
person,who being by me duly sworn,upon his oath deposed and said;
That all persons,firms,associations,corporations,or other organizations
furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort
Worth has been paid in full;
That there are no claims pending for personal injury and/or property
damages;
On Contract described as;
Contract Description : Dynaten Annex Addition
CFA No:2014-072 DOE No,7263
BY
i ran K.Holdgate
Subscribed and sworn before me on this date 20 of November;2015.
Notary Public-'������---
Dallas County,Texas
I
DAVID TALION
Notary Public,State of Texas
My Commisslon Expires
September 21,2019
i
L
i
i
FORT WO RT H REV:02/22/07
AND TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INTORMATION Date: 10/7/2015
Name of Contractor _ ProjectNante
Bear Creek Construction Dynaten Additon
DOEInspeclor• Project Manager
Garey Houston Aaron Long _
DOENumber Project Difficulty Type of Contract
7263 O Simple OO Routine O Complex ❑Water ❑Waste Water 0 Storm Drainage ❑Pavement
Inllial Contract Amount Final Conhacl Amount
$1,583.00 $1,583.00
11)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
0-4 0-4
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 4 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 0 2 Clarity&Sufficiency of Details Y
3 Accuracy of Measured uantities 3 Applicability of Specifications
4 Dis la OfProfessionalism 4 Accuracy of Plan Quantities
5 Citizen Com Taint Resolution L/ PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowled a And/Or Problem Resolution
ADMINISTRATION 2 Availabil!tZ ofPro ectManager
I Change Order Frocess!M Time q 3 Communication
2 Tiinliness of Contractor Pgments 4 Resolution of Utili Conflicts
3 Bid Opening to Pre-Con Mee' Timeframe
TH)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMM)NTS
- - - 111ANSPORTi1 ION AND PUBLIC WORKS
The City of Fort Worth•10001hmckmorhm Sweet-Fort Worth,TX 76012-6311
(817)392-7941•Ft,.(817)392-7845