HomeMy WebLinkAboutContract 46892-FP2 Departmen of JP&W Const.Services
o ect M ager`-I •Lc'vV ate
P �2 01 CITY SECRETARY, ,
Risk Management J. Page ,� ZT WO RT H® COCT W
D.O.E. Brotherton - It
CFA Westerman/Scanned '1270
The Proceeding people have been 06tacted concerning the request for final
payment&have released this project for such payment. ATION AND PUBLIC WORKS
Clearance Conducted By Shameka Kennedy F PROJECT
COMPLETION
D.O.E. Ni?: 7409
Regarding contract 117409 for MARINE CREEK RANCH PH 9A as required by the
TRANSPORTATION& PUBLIC WORKS as approved by City Council on N/A through IVI&C N/A the director
of the TRANSPORTATION&PUBLIC WORKS upon die recommendation of the Assistant Director of the
Transportation&Public Works Department has accepted the project as complete.
Original Conti-act Prices: $73,686.50
Amount of Approved Change Orders: No
Revised Contract Amount:
Total Cost Work Completed: $73,686.50
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $73,686.50
Less Previous Payments: $0.00
Final Payment Due $73,686.50
Recomniended for Acceptance Date
Asst. D' ctor, TPW - Infrastructure Design and Construction
Accepted ( Date
Director, TRANSPORTPUBLIC WORKS
Asst. City Manager Date
Comments: C205-541200-202760252383
E11lAI�E�
WtIAL.\ / , 7
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name MARINE CREEK RANCH SECTION 9A
Contract Limits
Project Type STORM DRAIN
City Project Numbers 02523
DOE Number 7409
Estimate Number I Payment Number 1 For Period Ending 1/7/2016
CD
City Secretary Contract Number 117409 Contract Time 18ED
Contract Date Days Charged to Date 219
Project Mnnager Long Contract is 100.00 Complete
Contractor BURNSCO CONSTRUCTION,INC.
6331 SOUTHWEST BLVD
PORT WORTH, TX 76132
Inspectors LAYER / VEGA
Thursday January 07,2016 Page 1 of4
City Project Numbers 02523 DOE Number 7409
Contract Name MARINE CREEK RANCH SECTION 9A Estimate Number I
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 1/7/2016
Project Funding
STORM DRAIN
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
--------------------- — --
1 REMOVE HEADWALL 1 EA $700.00 $700.00 1 $700.00
2 MEDIUM STONE RIPRAP 130 SY $45.00 $5,850.00 130 $5,850.00
3 TRENCH SAFETY 727 LF $0.50 $363.50 727 $363.50
4 21"RCP 195 LF $50.00 $9,750.00 195 $9,750.00
5 24"RCP 130 LF $52.50 $6,825.00 130 $6,825.00
6 27"RCP 358 LF $59.00 $21,122.00 358 $21,122.00
7 33"RCP 44 LF $79.00 $3,476.00 44 $3,476.00
8 4'STORM JUNCTION BOX 2 EA $3,400.00 $6,800.00 2 $6,800.00
9 33"PARALLEL HEADWALL 1 EA $2,800.00 $2,800.00 1 $2,800.00
10 10'CURB INLET 5 EA $3,200.00 $16,000.00 5 $16,000.00
Sub-Total of Previous Unit $73,686.50 $73,686.50
i
P
i
E
r
f
i
1
f
t
t
i
i
Thursday,January 07,2016 Page 2 of 4
I
I
f
i
t
1
I
City Project Numbers 02523 DOE Number 7409
Contract Name MARINE CREEK RANCH SECTION 9A Estimate Number 1
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 1/7/2016
Project Funding
Contract Information Summary
Original Contract Amount $73,686.50
Change Orders
Total Contract Price $73,686.50
Date Total Cost of Work Completed $73,686.50
Contra J /1 Less %Retained $0.00
Date /5
/// Net Earned $73,686.50 Inspection SEarned This Period $73,686.50
u erv'
Retainage This Period $0,00
y
Date / 71
Less Liquidated Damages
Project Manager /
Days® /Day $0.00
Dae �'h7'��i LessPavementDeficiency $0.00
Ass. ' ctorr PW-Infrastructure Design and Construction Less Penalty $0.00
`�`�' L"J' Date �� Less Previous Payment $0.00
Director/ ontracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $73,686,50
i
it
I
Thursday,January 07,2016 Page 3 of4
City Project Numbers 02523 DOE Number 7409
Contract Name MARINE CREEK RANCH SECTION 9A Estimate Number 1
Contract Limits Payment Number 1
Project Type STORM DRAIN For Period Ending 1/7/2016
Project Funding
Project Manager Long City Secretary Contract Number 117409
Inspectors LAYER / VEGA Contract Date
Contractor BURNSCO CONSTRUCTION,INC. Contract Time 180 CD
6331 SOUTHWEST BLVD Days Charged to Date 219 CD
FORT WORTH, TX 76132 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $73,686.50
Less %Retained $0.00
Net Earned $73,686.50
Earned This Period $73,686.50
Retainage This Period $0.00
Less Liquidated Damages
G
0 Days a $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $73,686.50
3
gP
f
Thursday,January 07,2016 Page 4 of 4
i
1
i
i
i
FORTWORTH rev 03/05/07
TRANSPORTATION&PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Marine Creek Ranch Section 9A
PROJECT NO.: 02523 CONTRACTOR: Burnsco Construction,INC
DOE NO.: 7409
PERIOD FROM:05/18/15 TO: 12/22/15 FINAL INSPECTION DATE:
WORK ORDER EFFECTIVE:5/18/2015 CONTRACT TIME: 180 O WD O CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS
PERIOD 219
PREVIOUS
PERIOD 0
TOTALS
TO DATE 19
*REMARKS:
CONTRA OR DATE INSPECTOR DATE
E\GENI-EERIIyG DEP_ARMIENT
(a The Citi-of Fort Worth•1000 Thmckmorton Street•Fort Worth,TX-76012-6311
(817)392-7941 •Fat:(817)392-7845
FORTWORTHREV:02120/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name oJContractor Project Name
Burnsco Construction,Inc. Marine Creek Ranch Section 9A
DOE Inspector DOE Nmnber
Alex Vega 7409
DOE Inspector Project Manager
❑ Water ❑ Waste Water 2 Storm Drainage ❑ Pavement Aaron Long
Initial Contract Amount Project Difficulty
$73,686.50 0 Simple O Routine O Complex
Final Contract Amount Date
$73,686.50 1/7/2016
II)PERFORMANCE EVALUATION
0-Inadequate I -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 N
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 4 60 60
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 4 20 20
t0 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 Atter Hours Response 5 N
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 346
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 346
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 408
Rating([TS/l%1S1*100%) 346 / 408 = 85%
Performance Category Excellent
<20%=hiadeduate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE Inspector �� Signature Contractor
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311
(817)392-7941 -Fay:(817)392-7845
I tam+ f
{
1 E
A -.\ I
t j
t, i aft
i Ely 3i 1
t + 1�
9
3 11 11
jr� + ;
lQU
zi
i
alif
by
4 i t ? , I 4�4 'I ,,ii• i .4 i"; ]i : ` r 1 i x S - -
E
i ; fe
iI
` b
I � I F +
MI?12� I:t � �� s G
r�wt
� KI �a�
01 RL
i a �j DIY
-t x ?: p �_� C 4 III Y E
fi,.^47�tw UI C74 rn:ci. =e. TI`ii>I :s� sR i c
i
i
I
FORTWORTHREV:02/22/07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date: 1/7/2016
Name of Contractor Project Naive
Burnsco Construction, INC Marine Creek Ranch Section 9A
DOE Inspector Project 11anger
Alex Vega Aaron Long
DOE NumberProjectDriculty Type of Contract
7409 Simple O Routine O Complex ❑ Water ❑ Waste Water O Storm Drainage ❑ Pavement
Initial Contract A,nount Final Contract Amount
$73,686.50 1$73,686.50
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector• 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector l_ 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism L 4 Accuracy of Plan Quantities (_.
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs I Knowledge And/Or Problem Resolution 1-
ADMINISTRATION 2 Availability of Project Manager L(
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments �. 4 Resolution of Utility Conflicts t_
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
i
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor ��
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000'Ihroclmorton Street•Fort Worth,TX 76012-6311
(817)392-7941•I=(817)392-7845
I