Change Order Request BreakdownCONMCT uy$y-toy
Project Name Bridge Repair and Rehabilitation at Seven Locations(2015-25) City Sec# r 46838
Client Project#(s)l GG01-539590-0202003
Contractorl North Rock Construction, LLC. PM Tariqul Islam Inspector Ali Motamed
Change Order Submittal# 0 Date 1/25/2016
Dept. T/PW Contract Time
Totals CD
Original Contract Amount $631,630.51 $631,630.51 150
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $631,630,51 $631,630.51 150
Amount of Proposed Change Order -$9,049.53 -$9,049.53
Revised Contract Amount $622,580.98 $622,580.98 150
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT -1 A7
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $789,538,14
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change order number one is for final quantities that were over the contract value as well as quantities that were under the contract value.
These additions and deletions whether from overuns due to extra amounts needed to fix failing areas or from deletions of planned quantities
being less than acutal field quantities or deletion of items to facilitate additional items.Also,four additional items were added to make possible
the full completion of the contracted items that were completed.
OvrrhCAAL RECORD
a C�8 y y(,MCR1E-1rARV
Mary J. ser i ecretary
�2g456 �89
Oi
a 5 Too
�8�99 tiEZ
FORT`VORTH City of Fort worth
Change Order Additions
Project Name Bridge Repair and Rehabilitation at Seven Locations(2015-25) City Sec# 46838
Client Project# GG01-539590-0202003
contractorl North Rock Construction,LLC, PM Tariqul Islam Inspector Ali Motamed
Change Order Submittal# Ft Date 1/25/2016
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
360-2006 CONC PMT(CONC RIF- R P)( T/P 8.
13 429-2008 CNC STIR REP(VERTICAL OR OVERHEAD) T/PW 75.44000000 SF $482.87 7.7
14 438-2002CLEAN AND SEAL EXIST JOINTS(CL-7) T I PW 51.00000000 LF $34.96 ,7 .
15 452-2009 REMOVE RAIL(METAL ELEMENTS) T/PW 3.00000000 EA $244.85 7 .55
16 450 SPECIAL RAIL(HEMPHILL ST) T I PW 3.00000000 EA $1,287.49 7
20 432-2001RIP RAP(GONG)(41N) T/PW 6.90000000 CY $1,412.60 7
21 432-2042 RIP RAP(STONE TY R)(GROUT)(18IN) T/PW 6.40000000 CY $1,961.78 $12,555.39
ADD 1 ROSEMADE-GRADING UNDER BRIDGE T/PW 1.00000000 LS $2,964.00
ADD 2 FELIX STREET TREE REMOVAL T I PW 1.00000000 LS $1,716.00 ,7 . 0
ADD 3 FELIX STREET FLOWABLE FILL REMOVAL T/PW 1.00000000 LS $1,255.90 $1,255.90
ADD 4 FELIX STREET SELECT FILL T/PW 50.00000000 CY $43.10 , 55.
T I PW $77,844.22
Sub Total Additions $77,844.22
Change Order Additions Page 1 of 1
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Bridge Repair and Rehabilitation at Seven Locations(2015-25) City Sec# 46838
Client Project# GG01-539590-0202003
Contractor North Rock Construction,LLC. PM Tariqul Islam Inspector AIi Motamed
Change Order Submittal# 0 Date 1/25/2016
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
1 347113 PORTABLE MESSAGE SIGN T/PW 2.00000000 WK 52,474.55 4,949.10
2 013513 RAILROAD COORDINATION T/PW 2.00000000 LS $4,170.57 $8,341.14
3 454-2004 ARMOR JOINT T/PW 98.25000000 LF $106.18 $10,432.19
4 110-2001 EXCAVATION(ROADWAY) T/PW 38.50000000 CY $76.12 $2,930.62
5 104-2039 REMOVE CONC(ABUT BACKWALL) T/PW 1.90000000 CY 51,903.28 $3,616.23
6 104-2015 REMOVE CONC(SIDEWALKS) T/PW 17.23000000 SY $36.22 $624.07
7 104-2027 REMOVE CONC(APPR SLAB&PAVT) T/PW 39.49000000 SY $32.71 $1,291.72
8 420-2003 CLASS C CONC(ABUT) T/PW 1.90000000 CY $2,891.05 $5,493.00
9 420-2033 CLASS S CONC(APPR SLAB) T/PW 24.80000000 CY $481.81 $11,948.89
10 420-2034 CLASS S CONC(BRIDGE SDWLK) T/PW 6.74000000 CY $417.80 $2,815.97
12 442-2048 STRUCTURAL STEEL(MISC NON-BRIDGE)(BS-EJCP) TI PW 2,394.00000000 LB $7.64 $18,290.16
18 401-2001FLOWABLE BACKFILL T/PW 85.60000000 CY $159.04 $13,613.82
19 780-2001 EPDXY INJECTION(TY IX) T/PW 4.00000000 LF 5636.71 $2,546.84
T/PW $86,893.75
Sub Total Deletions $86,893.75
I
Change Order Deletions Page 1 of 1
M/SBE Breakdown for this Change Order
MISBESub : TYPe of Servicer `Am�auntforthis CO,
SUPREME SAWING&SEAL SAWING&SEALING $765.00
Total $766=00'
Previous Change Orders
CO# DATE AMOUNT
Total
r
CFW Change Order Approval St-COApp01 Page 1 of 3
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthgov/Infrastructure Proiects/02575 - Bridge Repair and Rehabilitation at Seven Locations (2015-
25)/Contractor/Change Orders/Change Order 1 Breakdown.xls
Attachments(0)
No Attachments have been added to this form.
r
https://projeetpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?SiteId=51500&ProcessI... 2/12/2016
CFW Change Order Approval St-COApp01 Page 2 of 3
FORT WORTH. City of Fort Worth
�- - Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: St-COApp01
Change Order No.: St-COApp01 Date Started: .2016-02-01
City Sec. No.: 46838 Date Due: 2016-03-22
Project Name: Bridge Repair and Rehabilitation at Seven Locations (2015-25)
02575 DOE Numbers:
Project Numbers:
7521
Project Structural repair and rehabilitaiton of different bridge
Description: elements throughout the City.
Project Manager: Tariqul Islam City Inspector: 'Ali Motamed
Contractor: North Rock Construction, LLC
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
tpw $ -9,049.53
Total Cost: $ -9,049.53 Total Requested Days: 0
Approval Status:
https://projeetpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 2/12/2016
CFW Change Order Approval St-COApp01 Page 3 of 3
,Approved: Yes
;Comments:
..User: Johnny Gann
Date: 2016-02-01 2:53 PM
Approved: Yes
.Comments: This change order is to add 4 line items needed during contstuction and to
balance contract amount
User: Tariqul Islam
Date: 2016-02-01 3:00 PM
Approved: Yes
"Comments:
User: Riad Nusrallah
.Date: 2016-02-01 10:29 PM
;Approved: Yes
'Comments:
=User: Todd Blomstrom
Date: 2016-02-03 10:57 PM
Approved: Yes
,Comments:
;;User: Doug Wiersig
Date: 2016-02-05 3:12 PM
Approved: Yes
Comments:
User: Doug Black
';Date: 2016-02-08 5:12 PM
Approved: Yes