HomeMy WebLinkAboutOrdinance 7178 1 } k r J I ORDINANCE NO._!__M_._ a ORDINANCE CLOSING HEARING AND LEVYING ASSESSMENTS FOR PART OF THE COST OF IMPROVING A PORTION OF—_. PEARL AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS: FIXING CHARGES AND LIENS AGAINST ABUTTING PROPERTY THEREON, AND AGAINST THE OWNERS THEREOF: PROVIDING FOR THE COLLECTION OF SUCH ASSESSMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFI- CATES IN EVIDENCE WHEREOF: RESERVING UNTO THE CITY COUNCIL THE RIGHT TO ALLOW CREDITS REDUCING THE AMOUNT OF THE RESPECTIVE ASSESSMENT. TO THE, EXTENT OF ANY, CREDIT GRANTED: DIRECTING THE CITY SECRETARY TO EN- GROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTES OF THE CITY COUNCIL OF FORT WORTH, AND BY FILING THE ORDINANCE IN THE ORDINANCE RECORDS OF SAID CITY: AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public.places in the City of Fort Worth, Texas, be improved by raising,grading, or filling same and by constructing thereon to-wit: UNIT 1: PEARL AVENUE From Long Avenue to NW 35th Street, known and designated as Project No. 104-24000-246, Unit 1, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty- eight foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 2: N. HARDY STREET From Fort Worth & Denver Railroad to 33rd Street, known and designated as Project No. 104-24000- 246, Unit 2, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 3: WHITE SETTLEMENT ACCESS ROAD From Carroll Street to Vacek Street, known and designated as 'Project No. 104-24000-246, Unit 3, a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six inch thick concrete driveways will be constructed where specified. The above,together with combined concrete curbs and gutter on proper grade and line where same are,not already so constructed, together with storm drains and other necessary incidentals and appurtenances; all of said improve- ments are to be so constructed as and where shown on the plans and in strict accordance with the Plans and Specifications therefor: and contract has been made and entered into with L. GRIMES & CO., INC. for the making and construction of such improvements on the above said portion of streets, avenues and public places. WHEREAS, estimates of the cost of the improvements of each-such portion of streets, avenues and public places were prepared and filed.and approved and adopted by the City Council of the .City, and a time and place was fixed for a hearing and the proper notice of the time, place and purpose.of said hearing was given and said hearing was had and held of the time'and place fixed therefor, to-wit, on the 2ndday of June . 19_7 9 9:30 A 4 M in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and at such hearing the following protests and objections were made, to-wit: protested that protested that protested that protested that -- -protested that -------_-----protested that -- ---- ----------- --- —- ---- --Protested that ------- --------—-- -------------Protested that protested that _ ------- —.----protested that and said hearing was continued to the present time in order to more fully accomplish the purposes thereof, and all desiring to be heard were given full and fair opportunity to be heard, and the City Council of the City having, fully considered all proper matter, is of the opinion that the said hearing should be closed and assessments should be made and levied as herein ordered: NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH. TEXAS, THAT: I. Said hearing be, and the same is hereby, closed and the said protest and objections, and any and all other protests and objections, whether herein enumerated or or not, be and the same are Hereby, overruled. II. The City Council, from the evidence, finds that the assessments herein levied should be made and levied against the respective parcels of property- abutting upon the said portions of streets, avenues and public places and against the owners of such property, and that such assessments and charges are right and proper and are substantially in proportion to the benefits to the respective parcels of property by means of the improvements in the unit for which such assessments are levied, and establish substantial justice and equality and uniformity between the respective owners of the respective properties, and between all parties concerned, considering the benefits received and burdens imposed, and further finds that in each case the abutting property assessed is specially benefited in enhanced value to the said property by means of the said improvements in the unit upon which the particular property abuts and for which assessment is levied and charge made, in a sum in excess of the said assessment and charge made against the same by this ordinance, and further finds that the apportion- ment of the cost of the improvements is in accordance with the law in force in this City, and the proceedings of the City heretofore had with reference to said improvements, and is in all respects valid and regular. M. There shall be, and is hereby, levied and assessed against the parcels ofproperty herein below mentioned, and against the real and true owners thereof (whether such owners be correctly named herein or not) the sums of money itemized below opposite the description of the respective parcels of property and the several amounts assessed against the same, and the owners thereof, as far as such owners are known, being as follows: IV. Where more than one person, firm or corporation owns an interest in any property above described, each said person, firm or corporation shall be personally liable only for its, her or his pro rata of the total assessment against such property in proportion as its, his or her respective interest bears to the total ownership of such property, and its, his or respective interest in such property may be released from the assessment lien upon pay- ment of such proportionate sum. V. The several sums above mentioned and assessed against the said parcels of property, and the owners thereof, and interest thereon at the rate of six per cent (6 1�1r) per annum, together with reasonable attorney's fees and costs of collection, if incurred, are hereby declared to be and are made a lien upon the respective parcels of property against which the same are assessed, and a personal liability and charge against the real and true owners of such property, whether such owners be correctly named herein or not, and the said liens shall be and constitute the first enforceable lien and claim against the property on which such assessments are levied, and shall be a first and paramount lien thereon, superior to all other liens and claims, except State, County, School District and City ad valorem taxes. The sums so assessed against the abutting property and the owners thereof shall be and become due and payable as follows, to-wit: in five (5) equal installments, due respectively on or before thirty (30) days, one (1), two (2), three (3), and four (4) years from the date of completion and acceptance of the improvements in the respective unit, and the assessments against the property abutting upon the remaining units shall be and become due and payable in such installments after the date of the completion and acceptance of such respective units, and shall bear interest from said date at the rate of six per cent (6 e`) per annum, payable annually with each install- ment, except as to the first installment, which shall be due and payable at the maturity thereof, so that upon the completion and acceptance of the improvements in a particular unit, assessments against the property abutting upon such completed and accepted unit shall be .and become due and payable in such installments, and with interest from the date of such completion and acceptance. Provided, however, that any owner shall have the right to pay the entire assessment, or any installment thereof, before maturity by payment of principal and accrued interest, and provided further that if default shall be made in the payment of principal or interest promptly as the same matures, then the entire amount of the assessment upon which such default is made shall, at the option of said City of Fort Worth, or its assigns, be and become immediately due and payable, and shall be collectable, together with reasonable attorney's fees and cost of collection, if incurred, PROVIDED, however, that acting through its duly authorized Director of Public Works the City of Fort Worth retains the right to authorize payment of the sums assesed against abutting property upon such completed and accepted unit in not more than forty-eight (48) equal regular monthly installments of not less than $9.00 each, the first of such installments to become due and payable not more than thirty (30) days after the completion and acceptance by the City of the particular unit. PROVIDED FURTHER, that the City Attorney is hereby empowered to authorize payments of said sums of lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result; and PROVIDED FURTHER, that such method of payments shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment by said owner or owners according to the terms thereof of the sums assessed against such property. VI. If default shall be made in the payment of any assessment, collection thereof shall be enforced either by the sale of the property by the Assessor and Collector of Taxes of said City as near as possible in the same man- ner provided for the sale of property for the non-payment of ad valorem taxes, or at the option of the City of Fort Worth, or its assigns, payment of said sums shall be enforced by suit in any court of competent jurisdic- tion, or as provided in any mechanic's or materialman's contract as aforesaid, and said City shall exercise all of its lawful powers to aid in the enforcement and collection of said assessments. VII. The total amount assessed against the respective parcels of abutting property, and the owners thereof, is in accordance with the proceedings of the City relating to said improvements and assessments thereof, and is less than the proportion of the cost allowed and permitted by the law in force in the City. VIII. Although the aforementioned charges have been fixed, levied,and assessed in the respective amounts hereinabove stated, the City Council does hereby reserve unto itself the right to reduce the aforementioned assessments by allowing credits to certain property owners where deemed appropriate. Notwithstanding the City Council has herein reserved the right to issue credits, it shall not be required to issue credits, and will not do so, if same would result in any equity and/or unjust discrimination. The principal amount of each of the several assessment certificates to be issued the City of Fort Worth, Texas, as hereinafter provided, shall be fixed and determined by deducting from the amount of any assessment hereinabove levied such amount or amounts, if any, as may hereafter be allowed by the City Council as a credit against the respective assessments. IX. For the purpose of evidencing the several,sums assessed against the respective parcels of abutting prop- erty and the,owners thereof, and the time and terms of payment, and to aid in the enforcement and collection . thereof, assignable certificates in the principal amount of the respective assessments less the amount of any re-. spective credit allowed thereon, shall be issued by the City of Fort Worth, Texas, upon completion and accept- ance by the City of the improvements in each unit of improvement as the work in such unit is completed and accepted, which certificates' shall be executed by the mayor in the name of the City and attested by the City Secretary, with the corporate seal of the City impressed thereon, and shall be payable to the City of Fort Worth, or its assigns, and shall declare the said amounts, time and terms of payment, rate of interest, and the date of the completion and acceptance of the improvements abutting upon such property for which the certificate is issued, and shall contain the name of the owner or owners, if known, description of the'property by lot and block number, or front feet thereon_, or such other desciption as may otherwise identify the same; and if the said property shall be owned .by an estate, then the description of same as so owned shall be sufficient and no error or mistake in describing any, property, or in giving the name of the owner, shall invalidate or in anywise impair such certificate, to the assessments levied. The certificates shall provide substantially that if same shall not be paid promptly upon maturity, then they shall be collectable, with reasonable attorney's fees and costs of collection, if incurred, and shall provide substantially that the amounts evidenced thereby shall be paid to the Assessor and Collector of Taxes of the City of Fort Worth, Texas, who shall issue his receipt therefor, which shall be evidence of such payment on any demand for the same, and the Assessor and Collector of Taxes shall deposit the sums so received by him forth- with with the City Treasurer to be kept and held by him in a separate fund, and when any payment shall be made in the City the Assessor and Collector of Taxes upon such certificate shall, upon presentation to him of the certificate by the holder thereof endorse said payment thereof. If such certificate be assigned then the holder thereof shall be entitled to receive from the City Treasurer the amount paid upon the presentation to him of such certificate so endorsed and credited; and such endorsement and credit shall be the Treasurer's Warrant for making such payment. Such payments by the Treasurer shall be receipted for the holder of such certificate in writing and by surrender thereof when the principal, together with accrued interest and all costs of collection and reasonable attorney's fees, if incurred, have been paid in full. Said certificates shall further recite substantially that the proceedings with reference to making the i . provements have been regularly had in compliance with the law, and that all prerequisites to the fixing of the assessment lien against the property described in such certificate and the personal liability of the owners thereof have been performed, and such recitals shall be prima facie evidence of all the matters recited in such certificates, and no further proof thereof shall be required in any court. Said certificates may have coupons attached thereto in evidence of each or any of the several installments thereof', or,may have coupons for each of the first four installments, leaving the main certificate to serve for the fifth installment, whichcouponsmay be payable to the City of Fort Worth, or its assigns may be signed with the facsimile signatures of the'Mayor and City Secretary. Said certificates shall further recite that the City of Fort Worth, Texas shall exercise all of its lawful powers, when requested so to do, to aid in the enforcement and collection thereof, and may contain recitals sub- stantially in accordance with the above and other additional recitals pertinent or appropriate thereof, and it shall not be necessary that the recitals be in the exact form above set forth, but the substance thereof shall be sufficient. The fact that such improvements may be omitted on any portion of any of said units adjacent to any premises exempt from the lien of such assessments shall not in anywise invalidate, affect or impair the lien of such assessments upon other premises. X. Full power to make and levy reassessments and to correct mistakes, errors, invalidities or irregularities, either in the assessments or in the certificates issued in evidence thereof,is,in accordance with the law in force in this City,vested in the City. XI. All assessments levied are a personal liability and charge against the real and true owners of the premises described, notwithstanding such owners may not be named, or may be incorrectly named. XII. The assessments so levied are for the improvements in the particular unit upon which the property described abuts, and the assessments for the improvements in any unit are in nowise affected by the improve- ments or assessments in any other unit, and in making assessments and in holding said hearing, the amounts assessed for improvements in any one unit have been in nowise connected with the improvements or the assess- ments therefor in any other unit. XIII. The assessments levied are made and levied under and by virtue of the terms, powers and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, known as Chapter 106 of the Acts of said Session and now shown as Article 1105b of Vernon's Texas Civil Statutes, which Act has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth, Texas. XIV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete Ordinance in the appro- priate Ordinance Records of said City. XV. This ordinance shall take effect and be in full force and effect from and after the date of its passage and it is so ordained. PASSED AND APPROVED this day of 1962. APPROVED AS TO FORM AND LEGALITY: 044nAZA A P00 City Attorney UNIT 4: RUDD STREET From Dillard Street to Birdell Street, known and designated as Project No. 104-24000-246, Unit 4, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six- inch thick concrete driveways will be con- structed where specified. UNIT 5: WINDOWMERE From Edgewood Terrace to 480' east, known and designated as Project No. 104-24000-246, Unit 5, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway ending in an eighty- foot cul-de-sac. Six-inch thick concrete driveways will be constructed where specified. UNIT 6: LENA STREET From Ramey Avenue to 116' north of Callahan Street, known and designated as Project No. 104-24000-246, Unit 6, a five-inch thick hot- mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con- crete gutter on a thirty foot roadway. Six- inch thick concrete driveways will be construct- ed where specified. PROTECT NO. 104-24000-2461 UNIT 1: PEARL AVENUE FROM LONG AVENUE TO NW 35TH STREET, to be improved by constructing A five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and- eighteen-inch wide con- crete gutter on a twenty-ei$ht foot roadway. Six-inch thick concrete driveways will 'be con- structed where specified, BLOCK OWNER L�0' ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WORTH HILLS ADDITION Beginning at the northwest corner of Long Avenue and Pearl Avenue Curtis Williams 2 & 3 9 75' Pavement $3,03 $227,25 2708 NW 30th Res, 75' Curb & Gutter 3,47 260.25 76106 $487.50 Mrs, Mary Brown 4 ,9 50' Pavement $3.03 $151.50 748 Hemlock Res, 501 Curb & Gutter 3.47 173.50 Stockton, Calif, $325.00 Emma Lee Wilson 5 �9 50' Pavement $3.03 $151.50 Address unknown Res, 50' Curb & Gutter 3.47 173.50 $325,00 Smith Custom Homes, Inc, 6 9 50' Pavement $3.03 $151.50 4508 Emerson Res. 50' Curb & Gutter 3.47 173.50 76119 $325,00 Elgin Willis 7 9 50' Pavement $3,03 $151.50 3306 Pearl Res, 50' Curb & Gutter 3.47 173,50 76106 $325.00 l< PROJECT NO., 104-24000-246, UNIT 1: PEARL AVENUE FROM LONG AVENUE TO NW 35TH STREET, Contin- ued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WORTH HILLS ADDITION City of Fort Worth 8 9 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 Esther Gillis 9 9 50' Pavement $3.03 $151.50 3317 Pearl Res, 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 ` 113.05 $438.05 Pearline Robinson 10 9 50' Pavement $3.03 $151.50 5817 Diaz Res. 50' Curb & Gutter 3.47 173.50 76107 85 Sq. Ft. Driveway 1..33 113.05 $438.05 Rodger Gross it 9 50' Pavement $3.03 $151.50 3321 Pearl Res. 50' Curb'& Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Elbert Penson 12 9 50' Pavement $3.03 $151.50 2707 Lee Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 NW 34th Street intersects M 2. I, PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE, Continued; BLOCK 01MIR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT T-TEST SIDE WORTH HILLS ADDITION Maud Stwart McGill 1 & 2 5 1.00' Pavement $3,03 $303.00 3401. Pearl Res, 100' Curb & Gutter 3.47 347,00 76106 $650.00 Major Moore Estate 3 5 50' Pavement $3,03 $151.50 c 'o Lillian Morris Res , 50' Curb & Gutter 3,47 173,50 '121 Ross $325,.00 76106 Helen Louise Davis 4 5 50{ pavement $3,,03 $151,50 °405 Pearl Res, 50' Curb & Cutter 3.47 173,50 76106 $325.00 City of Fort Worth 5 5 50' Pavement $3,03 $151.,50 Res. 50' Curb & Gutter 3,47 173,50 $325,00 Catherine Younger 6 & 7 5 1.00' Pavement $x.03 $303,00 3413 Pearl Res. 100' Curb & Gutter 3.47 347,00 76106 41 Sq, Ft. Driveway 1.33 54,53 $704, 53 - Clara M. Patterson 8 & 9 5 1.00' Pavement $3,03 $303.00 .5209 Woodinoor Res. 100' Curb Gutter 3,47 347,00 Austin Texas $650,00 I PROJECT N0-. '104-24000*246, UNIT 1s PEARL AVENUE Continued: BLOCK OWNER LOT ZONING FR- -= _RATE AMOUNT AS'SESSINT WEST IDE WORTH HILLS ADDITION I. pee .& Mabel Craft 10 5 35' Pavement $3.03 $106,05 1601 Dillard Res, 35' Curb & Gutter 3.47 121.45 76105 41 Sq. Ft. Driveway 1,33 54.53 $262.03 NW 35th Street intersects -EAST� I WORTH HILLS ADDITION Verngn'Poster 11 6 35' Pavement $3.03 $106.05 2901 RossI s. 35' Curb & Gutter 3047 121.45 76106 $227.50 City of For . Worth 12 �6 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173,50 $325.00 Margie Lee Greathouse 13 6_ 50' Pavement $3.03 $151.50 3223 Rifugio Res. 50' Curb & Gutter - ` 3,47 173.50 76106 $325.00 Leona Thompson 14 6 50' Pavement $3.03 $151.50 3412 Pearl Re'. 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1.33 54.53 $379.53 Selma E. Bennett 15 6 50' Pavement $5.03 $151,50 3410 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft, Driveway 1.33 54653 $379.53 4. FRO, "k0 ` 104-2Qi000=246. O I''T 1';' PFARL 'AVENft Continued: BLOCK OW10LR LOT ZOOM PRWtkGE X73 A1�tl0i�'T MM8SS1ENT EAST SIDE WORTH HILLS ADDITION r� Odessa M.- Leonard 16' 6 • 50' Pavex out $3.03 $151.50 c/o Louis Washingtonlei. 50' Curb & Gutter 3.47 173.50 3412. Clinton $325,00 76106. Leona Thompson 17 6 50' pavement $3.03 $151.50 3406 Pearl x 501 Curb & Gutter 3.47 173.50 76106 $325.00 Odessa Holley 18 6 50' Pavement $3,03 $151.50 3404 Pearl50' Curb & Gutter 3.47. 173,50 76106 '41 Sq. Ft. Drtve+way 1.33 54.53 $379.53 Hubart Flowers _ ons 19 6 50 Pavement - $3,.03 $18,50 3402 Pearl' Street Ras. 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1.33 54.53 $379.53 Mary Pearson 20 _ 6 50' Pavement $3.03 KVU4.50 3400 Pearl xes. 50' Curb & Gutter 3.47 173.50 76106 $325,00 NW 34th Street intersects . 5. i , PROJECT NO.' 104-24000-246, UNIT 1: PEARL AVENUE Continued: BLOCK LOOT ZONING FR�ONTGE RTE AMOUNT ASSESSMENT EAST`S`DE WORTH HILLS ADDITION Louis Stidham 13 8 50' Pavement $3.03 $151.50 3322 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 $113.05 $438.05 Chester Lym Stidham 14 8 50' Pavement $3.03 $151.5.0 3322 pearl Res, 50' Curb & Gutter 3.47 173.50 76106 $325.00 Virginia Jones 15 8 50' Pavement $3.03 $151,50 - 3206 Refugio Res. 50' Curb & Gutter 3.47 173,50 76106 85 Sq, Ft. Driveway 1.33 113.05 $438.05 James Pulliam 16 �8 50' Pavement $3.03 $151.50 5922 Haas Avenue Res. 50' Curb & Cutter 3.47 173.50 Los Angeles, Calif. $325.00 90047 011ie Davis 17 8 50' Pavement $3.03 $151.50 3314 Pearl Res. 50' Curb & Gutter 3.47 173,50 76106 85 Sq, Ft. Driveway 1.33 113.05 .$438.05 City of Fort Worth 18 8� 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 6. PROJECT NO. 10444600-246, UNIT 1: PEARL AVENUE, Continued: BLOCK amp, LOT ZONING FRONTAGE RATE AMOUNT ASSESSNENT EAST SIDE WORTH HILLS ADDITION Katherine Brown 19 a 50' Pavement $3.03 $151.50 3310 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq, Ft. Driveway 3;$43$.05 Gertrude Wilson D 8 50' Pavement $3.03 $151.50 330$ Pearl Res. 50' Curb & Gutter 3,47 173.50 76106 $325.00 Major Moore Estate C $ 50' Pavement $3.03 $151.50 - c/o Lillian Dorris Res. 50' Curb & Gutter 3.47 173.50 3121 Ross 85 Sq. Ft. Driveway 1.3$ 113.05 76106 . $438.05 Metropolitan Parking A & B 8 75' Pavement $3.03 $227.25 1301 Sinclair Bldg. Res. 75' Curb & Gutter 3.47 260.25 76102. $487.50 TOTAL COST TO PROPERTY OWNERS e..e..ee..........0$13,061.58 TOTAL COST TO CITY OF FORT WORTH.................$20,325.99 (includes $1,300.00 assessment on City owned property) TOTAL ESTIMTED CONSTRUCTION COST...........e*..$33,387.57 7. PROJECT NO. 104-24000-246, UNIT 2: N. HARDY STREET FROM FORT WORTH & DENVER RR TO 33RD STREET, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pave- ment n a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway, Six-inch thick concrete driveuays will be constructed where specified. BLOCK OWNER LOT ZONING FR--�T� RATE AMOUNT ASSESSMENT WEST SIDE DIRK WAGON MANUFACTURING ADDITION Beginning at the S,E. corner of Lot 12, Block 2, Dixie Wagon Manufacturing Addition Leo'Perkins 12 2 50' Pavement $3,03 $151.50 3159 Hutchinson Res, 50' Curb & Gutter 3.47 173,50 76106 118 Sq, Ft. Driveway 1.33 156,94 $481.94 Mario Mendez 13 2 50' Pavement • $3.03 $151,50 3558 N. Hardy Res, 50' Curb & Gutter 3,47 173.50 76106 118 Sq, Ft, Driveway 1.33 156,94 $481 .94 Fransisca R. Alfaro 14 2 50' Pavement $3,03 $151.50 3261 N. Hardy Res, 50' Curb & Gutter 3,47 173,50 76106 118 Sq, Ft. Driveway 1,33 156,94 $481.94 James E. Oden 15 & 16 2 100' Pavement $3,03 $303,00 349 W, Southern Res, 100' Curb � Gutter 3,47 347,00 Saginaw, Texas $650.00 761.79 Glendora Street intersects 8. i PROJECT 140 104'-24000-246, UNIT 20 N ' HARDY STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE DIXIE WAGON MANUFACTURING ADDITION Joe Drummond 7 1 50' Pavement $3.03 $151.50 c/o Drummond Co. Realtors Res. 50' Curb & Gutter 3.47 173.50 2400 E. Belknap 118 Sq. Ft. Driveway 1.33 156.94 76111 $481.94 Mrs-Anita :Cabral 8 ]_ 50' Pavement $3.03 $151.50 3303 Hardy Street Res. 50' Curb & Gutter 3.47 173.50 Fort Worth, -Texas 118 Sq. Ft. Driveway 1,33 156.94 7,6106 $481.94 Mary Pitts 9 & 10 l; 100' Pavement $3.03 $-303.00- 3870 Davis Res. 100' Curb & Gutter 3.47 347.00 Dallas, Texas 118 Sq. Ft. Driveway 1.33 156.94 $806.94 &E-Jimmy L. Whatley pj�= 11 & 12 �1 100' Pavement $3.03 *303.00 3321 N. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 33rd Street intersects EASTSIDE' Mrs. Epimenia Z. Torres 1,2 & 3 3 150' Pavement $3.03 $454.50 1505 NE 33rd Res. 150' Curb & Gutter 3.47 520.50 76106 118 Sq. Ft. Driveway 1.33 156.94 $1,131.94 9. PROJECT NO. 104-24000-246, UNIT 2; N.+' HARDY STREET, Continued; BLOCK OWNER LOT ZONING FRONTAGE_ RATE +AMOUNT ASSESSMENT EAS4 T 'SIDE DIXIE WAGON 14AN[1FACTURING ADDITION Jeronimo H. Rios 4 & 5 3 100' Pavement $3.03 "-$303.00 3304 N. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 Minnie Benavides 6 3 50' Pavement $3.03 $151..50 26. Devonshire Res. 50' Curb & Gutter 3.47 173;50 Bedford; Texas 118 Sq. Ft. Driveway 1.33 156.94 $481.94 Glendora Street intersects Aubrey C. Kinney 1 4 50' Pavement $3.03 $151.50 3264 N. Hardy R se 50' Curb & Gutter 3.47 173.50 76106 $325.00 Bernice Taylor 2 4 50' Pavement $3.03 $151:58 c/o John A. Page Res. 50' curb & Gutter 3.47 173.50 12816 Seagoville Rd. 118 Sq. Ft. Driveway 1.33 156.94 Mesquite, Texas $481.94 75142 Henry Miller 3 & 4 4 100' Pavement $3.03 $303,00 3260 N.. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 10. PROJ9CT `NO,,` 104-2400©-246, UNTT '2: N. 'HARDY STREET. Continued: BLOCK OiWNER LOT FRONTAGE RATE AMOUNT 'ASSESSMENT E&S�E DIXIE WAGON MANUFACTURING ADDITION Moates &Graham 5 4 50' Pavement $3.03 $151,50 200 Houston Street Res. 50' Curb & Gutter 3.47 173.50 76102 $325.00 TML COST TO PROPERTY OWNERS.....................$ 9,033.28 'TOTAL COST TO CITY OF FORT WORTH..................$j2,299.48 TOTAL ESTIMATED CONSTRUCTION COST.................$21,332.76 11. PROJECT N0," 104-24000-246, UNIT _3: _ WHITE S'E'TTLEMENT ACCESS ROAD FROM CA RROLL TO VACER, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on A six, inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSES SSMENT NORTH SIDE BAILEYS INDUSTRIAL ADDITION Beginning at the S.W. corner of Lot 11, Block 16, Bailey's Industrial Additi.oer John T. Cross Estate 11 & A 16 135' Frontage c/o 1st Nat'l Bank of 10 In 100' Pavement $12.13 $1,213.00 P.O. Box 2260 100' Curb & Gutter 3,49 349.00 76101 215 Sq. Ft. Driveway 1.33 285.95 $1,847.95 Hubbards Garage E' of 10 16 50' Pavement $12,13 $ 606.50 c/o Southwest Bank Ind. 50' Curb & Gutter 3.49 174.50 P.O. Box 16400 215 Sq, Ft. Driveway 1.33 285.95 76133 $1,066.95 John F. Hubbard, Sr. Wk of 9 16 50' Pavement $12.13 $ 606.50 Roy ,E. Hubbard & Ind. 50' Curb & Gutter 3.49 174.50 T. R. Hubbard 215 Sq. Ft. .Driveway 1.33 285.95 c/o Southwest Bank $1,066.95 P.O..-Box 16400 76133 A. J. Cooles Ek of 9, & Wj 16 100' Pavement $12.13 $1,213.00 4708 Ranchview of 8 Ind. 100' Curb & Gutter 3.49 .349.00 76109 *-269 Sq. Ft. Driveway 1.33 357,77 $1,919.77 12. PROJECT NO.' 104-24000-246, UNIT 3: WHITE SETTLEMENT ACCESS ROAD Contipued; BLOCK OWNER LOT ZONING FRONTAGE RATE AMOtM ASSESSMENT NORTH SIDE BAILEY'S INDUSTRIAL ADDITION Corona Plumbing Supply Co. P.O. Box 9339 7 & Ek of 16 155.15' Pavement $12.13 $108$1.97 76107 8 Ya—d. 155.15' Curb & Gutter 3.49 541.47 $2,423.44 TOTAL COST TO PROPERTY OWNERS....................$ 8,325.06 TOTAL COST TO CITY OF FORT WORTH.................$12,894.90 TOTAL ESTIMATED CONSTRUCTION COST......... ...... .$21,219.96 13. PROJECT NO. 104-24000-246, UNIT 4: RUDD STREET FROM DILLARD STREET TO URDELL STREET, to be, improved by constructing A five-inch.thick hot-mix.asphaltic "concrete pavementon a five- inch thick lime stabilized subgrade with seven-inch high concrete ete curb and eighteen-inch wide concrete gutter on. a twenty-eight foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNERR LOT ZONING FRONTAGE RA= AMOUNT ASSESSMENT NORTH SIDE WALTER WILLI ADDITION Beginning at the S.E. corner of Dillard Street and Rudd Street Versie Thomas 7 7 140' Side lot adjusted to 1725 Dillard Res. 100' Pavement 11 $3.03 $303,00 76105 100' Curb & Gutter 3.47 347.00 $650.00 Claudine Crenshaw 8A 12 50' Pavement $3.03 $151.50 530L Rudd Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452,68 Mercer W. James 5A, 5B & 5C 12 175' Pavement $3.03 $530-.25 5305 Rudd R se . 175' Curb & Gutter 3.47 607.25 76105 96 Sq. Ft. Driveway 1.33 127.68 $1,265.18 T. B. Mallicote 4A _12 150' Side lot adjusted to: - 4531 Martha Lane Res. 100' Pavement $3.03 $303.00 76103 100' Curb & Gutter 3.47 347.00 $650.00 Biardell Street intersects 14. PROS N0, 10444000-946 UNIT 4 RUDD STREET, Continued: BLOCK OFR LOT ZONING VRONTkGE RATE AMOUNT ASSESSMENT SOUTH SIDE WALTER WILLI ADDITION Betty jean Cotton Johnson 1 13 150' Side lot adjusted to, & Willte L. Johnson Res. 100' Pavement $3.03 $30x.00 5308 Rudd 100' Curb & Gutter 3.47 347.00 76105 96 Sq. Ft. Driveway 1.33 127.68 $777.68. Betty Strickland 4-D 13 87.3' Pavement- $3.03 $264.,52 5308 Rudd -Res, 87.3' Curb & Gutter 3.47 302.93 76105 $567.41 New Bethany Baptist 4-C 13 87.3' Pavement $3,.03 $264.52 Church Res. 87.3' Curb & Gutter 3647 302.93 c/o Rev. W. H.- Jones 175 Sq. Ft, Driveway 1.33 232075 5520 Fitzhugh $800.20 76105 Henry .Hood 5-B 4 60' Pavement $3.03 $181.80 c/o Herman Willi Res. 60' Curb & Gutter 3.47 208.20 6325 Inca $390.00 76116 E. C. Hood 5-A 13 100' Pavement $3.03 $303.00 5300 Rudd Res. 100' Curb & Gutter 3.47 347.00 76105 96 Sq. Fti Driveway 1.33 127.68 $777.68 15. PROJECT N0. 104-24000-246, UNIT 4, RUDD STREET Continued, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE WALTER WILLI ADDITION Earl Milles 2 4 1424 Side lot adjusted to; 6901 Corona Res, 100° Pavement $3,03 $301.00 76116 1001 Curb & Gutter 3.47 347.00 $650.00 TO7AL COST TO PROPERTY OWNERS..................$ 6,980.87 TOTAL COST TO CITY OF FORT WORTH...............$14,844.21 TOTAL ESTIMATED CONSTRUCTION COST..............$21,825.08 16. PROJECT NO. 104-24000446, UNIT 5: WINDOWMERE FROM EDGEWOOD TERRACE 20 480' EAST, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway that ends in as eighty foot cul-de-sac. Six-inch thick concrete driveways will be constructed where' specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE C. S. DEVOLLS ADDITION Beginning at the S.E. corner of Edgewood Terrace and Windowmere Bethel Primitive 5-B 129.4 Side lot adjusted to: Baptist Church Res. 100' Pavement $3.03 $303.00 1009 S. Edgewood Terrace 100' Curb & Gutter 3.47 347.00 76105 71 Sq. Ft. Driveway 1.33 94,43 _ $744.43.... Lois Fisher 5-C 65' Pavement $3.03 $196,.95 4713 Windowmere Res. 65' Curb & Gutter 3,47 225.55 76105 71 Sq. Ft. Driveway 1.33 94,43 $516.93 George & Ella Steward 5-D 65' Pavement $3.03 $196.95 940 E. Ramey Res. 65' Curb & Gutter 3.47 225.55 76104 $422.50 Lep Taylor 5-E 65' Pavement $3.03 $19£x.95 4717 Windowmere Res. 65' Curb & Gutter 3.47 225.55 76105 71 Sq. Ft. Driveway 1.33 94,43 $516.93 SOUTH SIDE Raymond Wheatfall 4-E 65' Pavement $3.03 $196.95 4716Windowmere Res. 65' Curb & Gutter 3.47 225.55 76105 96 Sq. Ft. Driveway 1.33 127.68 $550.18 17. PROJECT NO, 104-24000-246, UNIT 5: WINDOWMERE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE C. S. DEVOLLS ADDITION Jerry Berkowitz 4-D 65' Pavement $3,03 $196.95 729 NW 28th Street Res. 65' Curb & Gutter 3.47 225.55 76106 96 Sq, Ft. Driveway 1.33 127.68 $550.18 Jasper T. Jordan 4-C 65' Pavement $3.03 $196,95 4712 Windowmere Res. 65' Curb & Gutter 3.47 225,55 76105 96 Sq. Ft. Driveway 1.33 127.68 $550.18 Fred Blair 4-A 129.4' Side lot adjusted to: 1101 S. Edgewood Terrace Res. 100' Pavement $3.03 $303.00 76105 100' curb'& Gutter 3.47 347.00 96 Sq. Ft. Driveway 1.33 127.68 $777.68 TOTAL COST TO PROPERTY OWNERS....................$ 4,629.01 TOTAL COST_TO CITY OF. FORT WORTH..,..,.............$ 8,259028 TOTAL ESTIMATED CONSTRUCTION COST...............$12,888.29 18. PROJECT NO, 104-24000-246, UNIT 6: LENA STREET FROM RANEY AVENUE TO 116' NORTH OF CALLMN STREET, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight- een inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE MAXWELL SUBDIVISION Beginning at the N.W. corner of Ramey Avenue and Lena Street Mrs. Ruth S. Smith 22 3 116' Side lot adjusted to: 4945 Ramey Res. 100' Pavement $3.03 $303.00 76105 100' Curb & Gutter 3.47 347.00 $650.00 L. J. Parker 11 3 116' Side lot adjusted to: 5424 E. Lancaster Res. 1001 Pavement $3.03 $3&3~.00 76112 100' Curb & Gutter 3.47 347.00 41 Sq. Ft. Driveway 1.33 54.53 $704.53 Harlem Street intersects Vera Johnson 22 2 116' Side lot adjusted to: c/o Pearl Taylor Res. 100' Pavement $3.03 $303.00 1212 Belevidere 100' Curb & Gutter 3.47 347.00 Oklahoma City, Okla. $6500,00 73117 0. C. & Varnell Allen 11 _2 116' Side lot adjusted to: 1216 E'. Annie Res. 100' Pavement $3.03 $303.00 76104 100' Curb & Gutter 3.47 1341.00 $650.00 19. PROJECT NO. 104-24000-246, UNIT 6: LENA STREET FROMRAMEY AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAdE RATE AMOUNT ASSESSMENT WEST SIDE MAXWELL SUBDIVISION Callahan Street intersects Nathaniel Bennett 11 1 116` Side lot adjusted to: 1508 Elm Res, 100' Pavement $3.03 $303.00 Roswell, New Mexico 100' Curb & Gutter 3.47 347.00 $6, 0.00 EAST SIDE South Fort Worth 1 4 50' Pavement $3.03 $151.50 State Bank Res. 50' Curb 4c Gutter 3.47 173.50 P.O. Box 1480 $325.00 76101 Orvil Shaw 2 4 50' Pavement $3.03 $151.50 2209 Lena Res, 50' Curb 6, Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127,68 $452.68 Jeffery Slaughter 3 4 50' Pavement $3,03 $151,50 2301 Lena Res, 50' Curb & Gutter , 3.47 173,50 76105 96 Sq. Ft, Driveway 1,33 127.68 $452.68 Gidding Sanders 4 4 50' Pavement $1,03 $151.50 2305 Lena Res. 59' QuTb & Gutter 3.47 173.50 76105 96 Sq, Ft. Driveway 1,33 127.68 $452.68 20, PROJECT NO. 104-24000-246, UNIT 6, LEN& STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE MAXWELL SUBDIVISION Bennie Hibbler 5 4 50' Pavement $3;03 $151.50 2309 Lena Res, 50'. Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Winston H. Wilcox 6 4 50' Pavement $3.03 $151.50 2313 Lena Res. 50' Curb & Gutter 3..47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Mary Hamlett 7 4 50' Pavement $3.03 $151.50 2616 Griffith Street Res. 50' Curb & Gutter 3.47 173.50 Los Angeles, Calif. $325.00 90011 - J. C. Renfro 8 4 50' Pavement $3.03 $151.50 2319 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Ethel Jones 9 4 50' Pavement $3.03 $151.50 2401 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Willie D. Johnson 10 4 50' Pavement $3.03 $15],.50 1130 E. Tucker Res. 50' Curb & Gutter 3.47 173.50 76104 $325.00 21. PROJECT NO, 104-24000-246, UNIT 6 LENA STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE M MLL SUBDIVISION Mrs, Isabella Henderson 11 4 50' Pavement $3,03 $151.50 2409 Lena Res. 5q' Curb 4c Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1,33 127.68 $452.68 Rosie Randle 12 4 50' Pavement $3.03 $151.50 2413 Lena Res. 50' Curb & Gutter 3.47 173,50 76105 96 sq. Ft. Driveway 1.33 127.68 $452.68 Johnny Edwards 13 4 77' Pavement $3.03 $233.31 4951 Ramey Res, 77" Curb & Gutter 3,47 267.19 76105 94 Sq, Ft. Driveway 1.33 127.68 $628.18 TOTAL COST TO PROPERTY OWNERS......... ............$ 8,981.83 TOTAL COST TO CITY OF FORT WORM. . .. . . . .. . . .. .. ..$22,097,35 TOTAL ESTIMATED CONSTRUCTION COST. .. . . .. . .. . . .. .. .$31,079.18 ALL UNITS: TOTAL COST TO PROPERTY OWNERS.. . .. . .. . . .. . .. . . . .. . .. ....$ 51,011.63 TOTAL COST TO CITY OF FORT WORTH. . . ... . . . . . . . . .. .. . . .. ..$ 90,721,21 TOTAL ESTIMATED CONSTRUCTION COST. . ... .. .. . . . . .. . . . . . . . .$141,732,84 22, CITY OF FORT WORTH PUBLIC WORKS DEPARMIENT ENGINEERING DIVISION �! ASSESSMNT PAVING AT 6 LOCATIONS on THE EAST, WEST & NORTH SIDES PROJECT N4. 104-24000-246 JUNE 21V 1995 Mr. Mayor and Members of the Council.- The ouncil:The project before you for Benefit Hearing this morning, consists of the Assessment Paving at 6 Locations on the East, Borth and West Sides, under the City's Assessment Paving Program in the 1974/75 Capital improvement Program (Page A-113). We offer in evidence, MSEC Location Maps, Percentage Sheets and Engineers Preliminary Assessment Rolls. Initiation of Proiect All units were initiated by paving petitions requested and signed by a majority of the adjacent property owners. Improvements All units will be improved with residential grade hot-mix asphaltic con- crete pavement, with concrete curb, gutter and driveway approaches. Also included are required drainage lines and appurtenances. ENH&NCEWNT of Abutting Progertj It is the opinion of the Public Works Department that each parcel of abut- ting property is benefited in an amount equal to or in excess of the amount recommended for assessment. Distribution of Costs Cost to Property owners by Assessment.. ...... ........ .......$ 51,011.63 or 40% Cost to City of Fort Worth for Street Improvement. ... .... ...$ 90,721.21 or 60% Estimated Construction Cost..... . ....... . ... .. ...... ...... ..$141,732.$4 City ®f Fort Worth, Texas FILE ,/ Mayor and ILtL1V C®lI/1V//(LIL/(lil Communication DATE REFERENCE SUBJECT: Benefit Hearing - Assessment PAGE 6A'i'F Paving at 6 Locations on the East 6/2/75 G--271.6 North, � � of �_ 6i^viii 1FA On May 5, 1975 a contract was awarded for the Assessment Paving at 6 Loca- tions on the East, North and West Sides, Project No. 104-24000-246, and June 2, 1975 was set for the Benefit Hearing (M&C C-3076) . Project Description Roadway Right-of-Way Unit Street Limits Width Width-Feet 1. Pearl Avenue Long Avenue to 28 60 N.W. 35th Street 2. North Hardy St. F.W. & Denver R.R. 28 60 to N.E. 33rd Street 3. White Settlement Carroll Street to 40 65 Access Road Vacek Street 4. Rudd Street Dillard Street to 28 50 Birdell Street 5. Windowmere St. Edgewood Terrace to 28 50 480 Feet East 6. Lena Street Ramey Avenue to 116 Feet 30 50 North of Callahan Street Initiation of Project All units were initiated by paving petitions from adjacent property owners under the City's Assessment Paving Program for 1974-75, as outlined in M&C G-2294, dated 11-12-13. Improvements All units will be improved with residential grade hot-mix asphaltic con- crete pavement, with concrete curb, gutter and driveway approaches. Also included are required drainage lines and appurtenances. Enhancement of Abutting Property It is the opinion of the Public Works Department that each parcel of abut- ting property is benefited in an amount equal to or in excess of the amount recommended for assessment. DATE REFERENCE SUBJECT: Benefit Hearing - Assessment PAGE NUMBER Paving at 6 Locations on the East, 2 of 2 6/2/75 G-2716 North, and West Sid es Recommendation It is recommended that an ordinance be adopted closing the Benefit Hearing and levying the assessments as proposed. RNL:es Attachment SUBMITTED BY: DISPOSITIOf�yBY COUNCIL: PROXESSED BY APPROVED ❑ OTHER (DESCRIBE) '!`//'y(S/V1��`Lf�SJ CITY SECRETARY ou DATE CITY MANAGER f _ PROJECT NO. 104 - 24000' - 246 w velem '�•�•• to Wlui O 1 o ¢ I 31H I o z _ IAMON MOOR _ I j EV A Sr. M H V L IN r IS Mp L: UNIT 1 -� 6 lqT r S P qINl TO E KI 3 Sr HIGH S W mu SIT_2 �_ ~ D 31 TS 3 T ST a H " N •� �+ v w 30 H � C � _Q > —Am 7 yDAL4 OF > VIN ON _ a VINSON o 'Wo HAMPSHIRE BLVD NORTH W ti y. P LVDP SOUTH (j "' o v. G7 - r o =WIN M E WIND Z — c W Olt — SHAMROCK E°ORO E t ygNar CE ti H IT ST CULLEN ST 4500 h /� 05000 550 T W � ' 0CALUMET ..y AINWR GU 00 m RO aAVE I y c ST N AVE �.— ISENHOWE c 3 c a TON c AVE L 4 VE AR W .W w LE%ANDE o s ¢ a J c z w. TRU MAIV QD ,ELGI Sr. m 3 BONG BURN ST .t c o H CHARM z B R T A RRIM J N RA EA:Ta;% y CA HAN y ppNgA CD c z IN v i:: R o g. Z E :cram m RICK PL 3 0 c o MRK W IEY ` z 7 � H V ¢ 2 IN-AV c v RA Y� 6W z HARLE z LEJOH ..,rfINE _ VELMA 141 } CAROL AVE BUNCH~ ITZHUGH AV FITZAUIzf}: CREN AW _l w, w ANDERS ;•, IFITZHUGH I AVE '6 , LOCATIONS on the EAST, NORTH WEST 77 CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION SIX LOCATIONS ON THE EAST, NORTH AND WEST SIDES, PROJECT NO. 104-24000-246 On Monday, April 28, 1975, a Neighborhood Meeting was conducted by the Engineering Division of the Public Works Department in the Council Chamber, for "the Assessment Paving at Six Locations on the East, North and West Sides, Project No, 104-24000-246, Odell- Schmidt explained the procedures concerning proposed im- provements, owner participation in cost, and methods of payment to the eight property owners that were present, There were no objections raised 'on the first three units. Unit 4: Rudd Street, Mrs, Versie Thomas, owner of Lot 7, Block 7, Walter Willi Addition, objected to paving for improvements because her house faces Dillard Street. She also stated that she would like to sell her property, Unit 5: Windowmere, a delegation from the Bethel Primitive Baptist Church, located on Lot 5-B, DeVolls Addition, said that they would rather have the paving on Edgewood Terrace but had no real objections. Mr. Schmidt told them if they would get enough signatures on a petition, the City would pave Edgewood Terrace, There were no objections on Unit 6. After a short general discussion, the meeting was adjourned. FORT WORTH, TEXAS May 5 1975 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS Gentlemen and Mrs. Rimmer: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of Pearl Street and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: W. PROJECT NO. 104-24000-246, UNIT 1, PEARL STREET FROM LONG AVENUE TO NW 35tH STREET, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with' seven- inch high concrete curb and eighteen-inch wide concrete gutter on a twenty- eight foot roadway. Six-inch thick concrete driveways_ will be constructed where specified, The following assessment rates have been established: Five-inch hot-mix .asphaltic concrete pavement. (Residential zoning)...... ............ ..$3.03/L,,F, Seven-inch curb and eighteen-inch gutter ..$3.47/L,F. Six-inch thick concrete driveways.. ......0........,,,$1.33/S.F. The assessments result in the following division of cost: Total cost to property owners...ov.P .oeodoaveo. e..&$l3,061.58 Total cost to City of Fort Worth.............. ....$20,325.99 Total estimated construction cost........ .........$33,387.57 pR03ECT N0, 104-24000-246, UNIT 2, N. HARDY STREET FROM FORT WORTH & DENVER RAILROAD TO 33RD STREET, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on-,a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete driveways will be constructed where ,specified. The following assessment- rates have been established: Five-inch hot-mix asphaltic concrete pavement (Residential zoning).............*.,,..,°, .$3,03/L.F. Seven-inch curb'and eighteen-inch gutter.o.000e.,e0000ab$30'47/L.F. Six-inch thick concrete dr'iveways., ,.,,,,,,,,,,,,,,,$1.33/S.F. The assessments result in the following division of costs Total cost to property owners,, ,,,,,,,,,,,,,,,,,,.,.$ 9,033.28 Total cost to City of Fort Worth.. .... .... .... ......$12,299.48 Total estimated construction costo.00000eo.o..00..00$21,332,76 PROndT NO 104-24000-246'_: UNIT 3 WHITE SETTLEMENT'ACCESS ROAD FROM CARROLL STREET OyACEK STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway.' Six- inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Industrial zoning).................... ..$12.13/L.F. Seven-inch curb and eighteen-inch gutter..............$ 3,49/L,F, Six-inch thick concrete driveways... ... ....... .. ......$-1.33/S,F. The assessments result Ju the following division of cost: Total cost to property owners.,.,ese..o.o........o,o$ 8,325.06 Total cost to City of Fort Worth........o..e.00..o.o$l23,894.90 Total estimated construction cost.o .00.0.0.eo..0.0.0$21,219.96 Y , PROJECT NO. 104-24000-246, UNIT 4, RUDD STREET FROM DILIARD STREET TO BIRDELL STREET, to be unproved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete drive- ways will be constructed where specified. The following assessment rates have been established: Five-inch hot-mix asphaltic concrete pavement (Residential zoning). ............. ...........$3.03/L.F. Seven-inch curb and eighteen-inch gutter.. ..... ... ...... ..$3,47/L,F, Six-inch thick concrete driveways... ......................$1.33/S.F. The assessments result in the following division of cost; Total cost to property owners. . .. ... ...... .... .......$ 69980.87 Total cost to City of Fort Worth.. ...... . .......... ..$14,844.21 Total estimated construction cost............. ..... ..$21,825,08 PROJECT NO. 104-24000-246, UNIT 5, WINDOWMERE FROM EDGEWOOD TERRACE TO 480' EAST, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway ending in an eighty-foot cul-de-sac. Sax-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Five-inch hot-mix asphaltic concrete pavement (Residential zoning).. .. .............. .....e. .$3.03/L,F. Seven-inch curb and eighteen-inch gutter...................$3.47/L.F. Six-inch thick concrete driveways........... ...............$1.33/S,F. The assessments result in the following division of cost: Total cost to property owners. ... ....o....too........$ 4,'629.01 Total cost to City of Fort Worth. . ... ............ ....$ 8,259,28 Total estimated construction cost..... ... . .. ....,.....$12,888.29 PROJECT N0. 104=24000-246, 'UNIT 6 LENA STREET FRCM RAMEY AVENUE TO 116` NORTH OF CAL7AHAN =TREE' , to be improved by constructing a five-inch thick hot-mix asphaltic concrete pave- ment on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Five-inch hot-mix asphaltic concrete pavement (Residential zoning)... e,..,...e..,....e.e...$3.03/;LSF, Seven-inch curb and eighteen-inch gutter. .. ...e.eeeeeee. Six-inch thick concrete The assessments result in the following division of cost: Total cost to property Owners.. ,..ssa...,..,. .ssseese$ 8,981.83 Total cost to City of Fort Worth.. ..................$22,079.35 Total estimated construction cost.....,,............$31,079.18 ALL UNITS: TOTAL COST TO PROPERTY OWNERS,,..,......... ......... ....x,,,.$ ,51,011.63 TOTAL COST TO CITY OF FORT WORTH.... .s ......,..,e.....,.....$ 90,721,21 TOTAL ESTMTED CONSTRUCTION COST.... ... ........ ... ..... . ...$141,732.84 JACK M. GRAHAM, P.E. CITY ENGINEER m Co/vn96aa Avg k COL�/.�Yl�!/S' 8 i � 4 II ti I � 0 I '\O 4 � � q � 4t � 4•�� ... IIIi tl. � � �p I � � --esr -vr c (-3 I W t h 1 � O b l 4 v A4 � M c l � -�: �p O w 4 � 4 h I mo° � �� I •A I ro 4 i 4I V 0 b o `ry el h W a 4 w V O b oc n r � O �4� � ISIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1-020 13 .0 485 85 1250 PER CENT -INA —72,0 26.6 4.7 68.7 PARCELS OF PROPERTY 33 22 R 2 23 PER CENT 100,0 66,7 24,2 6,1 69.7 NO. OF PROPERTY OWNERS 32 22 A 2 22 PER CENT 100.0 '68.$ 25.0 6.2 68.8 I OWNERS LIVING ON STREET 17 1.4 6 —0— 1.1 PER CENT 1.00,0 F2,4 3+ 5,3 64.7 OWNERS LIVING ELSEWHERE _ 15 8 2 2 11. PER CENT 100.0 3.3 13.3 1-3.3 73,4 PROJECT NO. 104-24000-246, UNIT 1.; PEARL AVENUE From Long Avenue to NW 35th Street ''� Does not include 200' City owned property, -21 [�4 41M10IIs I �A 57 --111 ' - --�.au� _ _ �, ,r:---- rII-T-,7� ^-•1 r-'----�g7-- 1i I(r� „ ., � � S%h C T k � r ^_j �/6 � ~ / it�• i0 , 1 �' / I N�� 4 - h- rte= 61 s: N E- .fid MO. --�� s SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1.100 450 )50 5CO 350 PER CENT 1-00,0 40,9 2L7 45.5 31 .8 PARCELS OF PROPERTY 15 7 3 6 6 PER CENT 100.0 46.7 20.0 40.0 40.0 NO. OF PROPERTY OWNERS 15 7 3 6 6 PER CENT 100.0 46.7 20.0 40.0 40.0 OWNERS LIVING ON STREET 9 5 3 4 2 PER CENT 100 0 55.6 33.3 44.4 22.2 OWNERS LIVING ELSEWHERE 6 2 *-0T 2 4 PER CENT 1.00.n 33.3 33.3 66.7 PROJECT NO. 1.04-24000-246, UNIT 2.: N. HAFJ?Y STREET From Ft, Wort}-Delver Railroad to 33rd Street i - 1 - i/ o0 9 B 1 >e » /7G / 1` S c Dr 1 2 -3 I ' °o i 165• _.1 _.-__�_T -__ � _ ._ o A ,r b g51 I I I I SS ROAD =- r-2-0 A D WfdI TEc _ S'ETTC�M�':fJ 3 6 7 I R li 9 I /0i / 2 3 Y S 6 7 6 ,� /03 / I 3 T. J 6 7 B ADD. 1.9 /1 I /f /Y {5 I / /7 /B / �t ( 9 i6 �Q /7 !B SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 490 490 290 -0 200 PER CENT ZOQ.OOO,0 59.2 PARCELS OF PROPERTY 5 1 -0 4 PER CENT 100.0 100.Q 20.0 80.0 NO. OF PROPERTY OWNERS 5 S 1 -Q- 4 PER CENT 100.0 100•Y 20.0 0 OWNERS LIVING ON STREET -0- 10- 10- -0- -0- PER CENT OWNERS LIVING ELSEWHERE 5 5 1 -0- 4 PER CENT 100.0 100.0 20.0 80.0 PROJECT N0, 104-24000-246, UNIT 3: WHITE SETTLEMENT ACCESS ROAD From Carroll Street to Vaeek Street e ° "n 3 -11id, I /. �.` I r-,^�•., ;i �.—41 t = 1 1 I o-e O s 16 Q4•A i 4S 4C sa 4E i i IS 4 1 1 1 1 j 1 1 14 I. a 1• $ 8 a2 13 2 12 e. z � s 6- 9, i 10 -2 ter,-r---.r_rr-^n-T "-1---M q•e. g g s 1 1 1 • • 8•A ; 9•� kll�ll P.q i 5d I 1 I M° T 11 I 1 I I 1 44 '...6 z J t i i i i I 4 ST• i r--+-,�?SO* --� a Z • A t 1 ! 6 i ; ;•B I MIA � 1 ��,.. • 1 1 1 \40,b 1 1 V sr 0 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1142 650 472 290 380 PER CENT 100.0 5 9 71'..3 — 33.3 PARCELS OF PROPERTY 10 6 5 2 3 PER CENT 100.0 60.0 50.0 20.0 30.0 NO. OF.PROPERTY OWNERS 1.0 6 5 2 3 PER CENT 100.0 '00,0 SQ 0 20.0 30.0 OWNERS LIVING ON STREET 7 5 5 1 PER CENT 100.0 '71.4 i1.4 14 3 14.3 OWNERS LIVING ELSEWHERE 3 „0- 1 2 PER CENT 100.0 .T3 3 33.3 66.7 PROJECT NO. 104-24000-246, UNIT 4: RUDD STREET From Dillard Street tp Birdell Street - - -T-' — -rte- e4 6A P c•e >y i? !8•a Tie. 69 ® _ 9.G4.5 A 0 A 4 (/� •1 1 I 3 � t � 0V• ` I irl I I , ► I I I 1 � � r SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 649 454 194 -0- 455 PER CENT lno.o 70. 9 70.1 PARCELS OF PROPERTY 8 5 2 -O- 6 PER CENT J Q 5 25,Q 75.0 NO. OF PROPERTY OWNERS f? 5 2 -0- 6 PER PENT 1.00.0 62 �5,0 75.0 OWNERS LIVING ON STREET 6 5 2 -O- 4 PER CENT 100.0 "88.3 3 66.7 OWNERS LIVING ELSEWHERE 2 10- -0- -0- 2 PER CENT 100.0 100.0 PROJECT NO. 104-24000-246, UNIT 5: WTNDOWMERE From Zdgewood Terrace to 4801 east •u.z• i.., 16 R !! /O9L.:;,� 6 I - ---�-- Y ALO; I I /3 A /z 9 258 I ,.. 5 CAL4AHAN I 1% Ya • / i 2 3 s 6 T s I I ♦ ns ! 6 I `t /e /7 � � •,�' /* f? fb /7 /B /9 20 2/ 7,�2r �t J•� �O ? it 16 ti ••HA RL EM 3r C s ���% NA 7 / 2 3 'f 3 6 T C y /a B I I q I • Az w r I 16. /T• /B a /9 p 20; 2,i z 22 I I hv SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED 7 ---T NO. OF FRONT FEET 1257 743 493 116 648 PER CENT 100.0 59.1 39,2 9.2 51.6 PARCELS OF PROPERTY 18 12 8 1 9 PER CENT 180.0 66.7 44.4 5.6 50.0 NO. OF PROPERTY OWNERS 18 1212 8 1 9 PER CENT 100.,0 76,7 44.4 5.6 50.0 OWNERS LIVING ON STREET 11 11 7 —0— 4 PER CENT 100.0 100.0 63.6 36,4 OWNERS LIVING ELSEWHERE 7 1 1 1 5 PER CENT 1 o() (1 14.3 14.3 14.3 71.4 PROJECT NO, 104-24000-246, UNIT 6: LENA $TREET From Stamey Avenue to 116' north of Callahan PROJECT NO. 104-24000-246, UNIT _1: PEARL AVENUE FROM LONG AVENUE TO NW 35TH STREET, to be improved by constructing a five-inch thick hot-mtx asphaltic concrete pavement on afive-inch thick lime stabilized subgrade with seven*inch high concrete curb and- eighteen-inch wide con- crete gutter on a twenty-eight foot roadway. Six-incl thick concrete driveways will -be con- structed where specified, BLOCK OWER LOT ZONING FI�GE RATE AMOUNT ASSESSMENT WES_,_,TSE WORTH HILLS ADDITION Beginning at the northwest corner of. Long Avenue and Pearl Avenue Curtis Williams 2 & 3 9 75' Pavement $3.03 $227.25 2708 NW 30th Res. 75' Curb & Gutter 3,47 260.25 76106 $487,50 Mrs, Mary Brown 4 9 50' Pavement $3.03 $151.50 748 Hemlock Res. 50' Curb & Gutter 3.47 173.50 Stockton, Calif. $325;00 Emma Lee Wilson 5 9 50' Pavement $3.03 $151,50 Address unknown Res. 50' Curb & Gutter 3.47 173.50 $325.00 Smith Custom Homes, Inc. 6 9 50' Pavement $3.03 $151.50 4508 Emerson Res, 50' Curb & Gutter 3.47 173.50 76119 $325.00 Elgin Willis 7 9^ 50' Pavement $3,03 $151.50 3306 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325,00 1. PROJECT N0, 104-24000-2_46, UNIT It PEARL AVENUE FROK LONG AVENUE TO NW 35TH STREET, Contin- ued; BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST E WORTH HILLS ADDITION City of Fort Worth 8 9 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 Esther Gillis 9 9 50' Pavement $3;03 $151.50 3317 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 PearliAe Robinson 10 9 50' Pavement $3.03 $151.50 5817 Diaz Res. 50' Curb & Gutter 3.47 173.50 76107 85 Sq. Ft. Driveway 1.,33 113.05 $438.05 9 Rodger Gross 11 9 50' Pavement $3.03 $151.50 3321 Pearl Res, 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Elbert Penson 12 9 50' Pavement $3.03 $151.50 2707 Lee Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 NW 34th Street intersects -` 2. PROJECT NO. 104_24000-246, UNIT 1: PEARL lVENUE, Continued: BLOCK OWNER LOT ZONING FRON G$ RATE AMOUNT ASSESSMENT WEST SIDE WORTH HILLS ADDITION Maud Stesfyart McGill 1 & 2 5 1.00' Pavement $3..03 $303..00 '4'JI Pearl Res. 1,00` Curb & Gutter 3,47 347.00 76106 $650.00 Major Moore Estate 3 5 50' Pavement $3,03 $151.50 Cfo Lillian Morris Res., 50' Curb & Gutter 3,47 173,50 —"1 21 Ross $325.00 76116 Helen Louise Davis 4 5 50' Pavement $3,03 $151,50 3405 Pearl Res, 50' Curb & Gutter 3.47 173..50 76106 $325,00 City of Fort Worth 5 5 50' Pavement $3.03 $151...50 Res, 50' Curb & Gutter 3.47 173.50 $325,00 Catherine Younger 6 & 7 5 100' Pavement $3,03 $303,00 3413 Pearl Res. 100' Curb & Gutter 3.47 347.00 76106 41 Sr, Ft. Driveway 1,33 54.53 $704.5.31 Cl.xra M, Patterson 8 & 9 5 1.00' Pavement $3.03 $303,00 .5200 [•Jnodnoor Res. 100' Curr & Gutter 3,47 347,00 Au tin, Texas $650,00 i PROJECT N0. '104-24600-246, UNIT It PEARL AVENUE Continued: BLOCK OMR LOOT ZONING FR_ ONTAGE RATE AMOUNT AS:SRSSMENT WEST E WORTH HILLS ADDITION I. Dee & Mabel Craft 10 5 35' Pavement $3.03 $106,05 1601 Dillard les. 351 Curb & Gutter 3,47 121.45 761Q5 41 Sq. Ft. Driveway 1,33 54,53 -.$2$2.03 NW 35th Street intersects EAST, T SIDLE WORTH HILLS ADDITION Vernon.Foster ll 6 35' Pavement $3.03 $106.05 2901 Ross Res, 35' Curb & Gutter 3,47 121,45 76106 $227,50 City of Fort. Worth 12 _6 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173,50 $325.00 Margie Lee Greathouse 13 6 50' Pavement $3.03 $151,50 3223 Refugio Res. 50' Curb & Gutter ' 3,47 173.50 76106 $325.00 Leona Thompson 14 6 50' Pavement $3.03 $151,50 3412 Pearl Res, 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1.33 54.53$379.53 Selma E. Bennett 15 6 50' Pavement $5.03 $151.50 5410 Pearl Res. 50' Curb & Gutter 3,47 173,50 76106 41 Sq. Ft, Driveway 1.33 54053 $379.53 4. PROJECT NO.� 104-24000,246, -UNIT 1__fEARL� AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ANESSMENT EAST SIDE WORTH HILLS ADDITION Odessa M. Leonard 16 6 50' Pavement $3.03 $151.50 c/o Louis Washington Res. 50' Curb & Gutter 3.47 173.30 3412 Clinton $325.00 76106 Leona Thompson 17 6 50' Pavement $3.03 $151.50 3406 Pearl Res, 50° Curb & Gutter 3.47 173.50 76106 $325,00 Odessa Holley 18 6 50' Pavement $3.03 $151.50 3404 Pearl Res. 50' Curb &Gutter 3.47 173.50 76106 '41 Sq. Ft. Driveway 1.33 54.53 $379.53 Hubert Flowers 19 6 50° Pavement $3.03 $151..50 3402 Pearl Street Te—s. 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1.33 54.53 $379.53 Mary Pearson 20 6 50' Pavement $3.03 $151.50 3400 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 NW 34th Street intersects 5. PROJECT NO. 104-24000-246, UNIT It PEARL AVENUE Continued: BLOCK OWNER' LOT ZONING FROIMGE RATE AMOUNT ASSESSMENT EAST SIDE WORTH HILLS ADDITION Louis Stidbam 13 8 50' Pavement $3.03 $151.50 3322 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 $113.05 $438.05 Chester Lynn Stidham 14 '8 50' Pavement $3.03 $151.50 3322 Pearl Res. 50' Curb & Gutter 3047 173,50. 76106 $325.00 Virginia Jones 15 8 50' Pavement $3.03 $151,50 - 3206 Refugio Res, 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438,05 James Pulliam 16 8 50' Pavement $3,03 $151.50 5922 Haas Avenue Res. 50' Curb & Gutter 3,47 173.50 Los Angeles,, Calif. $325,00 90047 011ie Davis 17 8 50' Pavement $3.03 $151.50 3314 .Pearl rtes. 50' Curb & Gutter 3,47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 .$438.05 City of Fort Worth 18 �8 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 6. PROJECT NO. 104-24600-2469 UNIT 1: PEARL AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAS,.TSIDE WORTH HILLS ADDITION Katherine Brown 19 8 50' Pavement $3,03 $151.50 3310 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway ;"$438.05 Gertrude Wilson D 8 50' Pavement $3.03 $151050 , 3308 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325..00 Major Moore Estate C 8 50' Pavement $3,03 X151.50 c/o Lillian Morris Res, 50' Curb & Gutter 3.47 173.50 3121 Ross 85 Sq. Ft. Driveway 1.33 113.05 76106 . $438.05 Metropolitan Parking A 6; B 8 75' Pavement $3.03 $227.25 1301 Sinclair Bldg. Res. 75' Curb & Gutter 3.47 260.25 76102 .$487.50 TOTAL COST TO PROPERTY OWNERS...................$13,061.58 - TOTAL COST TO CITY OF FORT WORTH................$20,325.99 (Includes $1,300.00 assessment on City owned property) TOTAL ESTIMATED CONSTRUCTION COST...*...........$33,387.57 7. PROJECT NO. 104-24000-246, UNIT 2; N. HARDY STREET FROM F9RT WORTH & DENVER RR TO 33RD STREET, to be improved by constructing a fjve�ipch thick hot-mix asphaltic concrete pave- ment on a five-inch thick lime stabilized subgra4e with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete (;riveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT 14EST SIDE DIXIE WAGON MANUFACTURING ADDITION Beginning at the S,E, corner of Lot 12, Block 2, Dixie Wagon Manufacturing Addition Leo'Perkins 12 2 50' Pavement $3,03 $151.50 3159 Hutchinson Res. 50' Curb & Gutter 3.47 173.50 761.06 118 Sq. Ft. Driveway 1.33 156.94 $481.94 Mario Mendez 13 2 50' Pavement • $3.03 $151.50 3558 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 11.$ Sq, Ft, Driveway 1.33 156.94 $481 .94 Fransisca R. Alfaro 14 2 30' Pavement $3.03 $151.50 3261 N, Hardy Res. 50' Curb & Gutter 3,47 173.50 76106 11E Sq. Ft, Driveway 1,33 156,94 $481.94 James E. Oden 15 & 16 2 100' Pavement $3,03 $303.00 349 W. Southern Res, 100' Cvrb Gutter 3.47 347,00 Saginaw, Texas $650.00 76179 Glendora Street intersects 8. PROJECT 140," 104-24000-246^ UNIT 2, N '' HARDY STREET, Continued; BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSNENT WEST T`SIDE DIXIE WAGON MANUFACTURING ADDITION Joe Drummond 7 1 50.° Pavement $3.03 $151.50. c/o Drummond Co. Realtors Res. 501 Curb & Gutter 3.47 173.50 2400 E. Belknap 118 Sq. Ft. Driveway 1.33 156.94 76111 $481.94 Mrs-Anita Zabral 8 1 50' Pavement $3.03 $151.50 3303 Hardy Street Res, 50° Curb & Gutter 3,47 173,50 Tort Warthy__PTexas 118 Sq. Ft. Driveway 1433 156.94 76106 $481.94 Mary Pitts 9 & 10 1 100' Pavement $3.03 $303.00 3870 Davis Res. 100° Curb & Gutter 3.47 347.00 Dallas, Texas 118 Sq. Ft. Driveway 1.33 156.94 $806.94 &&,Jimmy L. Whatley Pitts 11 & 12 1 100° Pavement $3.03 $303.00 3321 N. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 33rd Street intersects EAST SIDE Mrs. Epimenia I,. Torres 1,2 & 3 3 1501 Pavement $3.03 $454.50 1505 NE 33rd Res. 150' Curb & Gutter 3.47 520.50 76106 11$ Sq. Ft. Driveway 1.33 156.94 $1,131.94 9. PROJECT NO. 104-24000-246, UNIT 2: ' N' HARDY STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST DIXIE WAGON MANUFACTURING ADDITION Jeronimo N. Rios 4 & 5 3 100' Pavement $3.03 -$303.00, 3304 N. Hardy Res. 100' Curb & Gutter 3,47 347.00 76106 118 Sq. Ft. Driveway 1,33 156.94 $806.94 Minnie Benavides 6 3 50' Pavement $3.03151.50 26 Devonshire Res. 50' Curb & Gutter 3.47 173,50 Bedford', Texas 118.Sq. Ft. Driveway 1.33 156,94 $481.94 Glendora Street intersects Aubrey C. Kinney 1 4 50' Pavement $3.03 $151.50 3264 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 Bernice Taylor 2 4 50' Pavement $3.03 $151150 c/o John A. Page Res. 50' Curb & Gutter 3.47 173.50 12816 Seagoville Rd. 118 Sq. Ft. Driveway 1.33 156..94 Mesquite, Texas $481.94 75142 Henry Miller 3 & 4 4 100' Pavement $3.03 $303.00 3260 N.. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 10. PROJECT VO.''' 104-24000-246, UNTT '2: N. 'HARDY STREET, Continued: BLOCK OWNER SOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EASE DIXIE WAGON MANUFACTURING ADDITION Moates &Graham 5 4 50' Pavement $3.03 $151.50 200 Houston Street Res. 50' Curb & Gutter 3.47 173.50 76102 $325,00 TOTAL COST TO PROPERTY OWNERS.....................$ 9,033.2$ TOTAL-COST TO CITY OF FORT WORTH..................$12,299,4$ TOTAL ESTIlK TED CONSTRUCTION COST.................$21,332.76 11, PROJECT NO." 10424060-246, UNIT 3_. WRITE SETTLEMENT ACCESS ROAD FROM CARROLL TO VACEK,, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavem_ent on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BAILEY'S INDUSTRIAL ADDITION Beginning at the S,W, corner of Lot 11, Block 16, Bailey's Industrial Additioer John T. Cross Estate 11 & A 16 135' Frontage c/o 1st Nat'l Bank of 10 Ind. 100' Pavement $12.13 $1,213.00 P.O. Box 2260 100' Curb & Gutter 3.49 349.00 76101 215 Sq. Ft. Driveway 1.33 285.95 $1,847.95 Hubbards Garage Ek of 10 , 16 50' Pavement $12.13 $ 606,50 c/o Southwest Bank Ind. 50' Curb & Gutter 3.49 174.50 P.O. Box 16400 215 Sq. Ft. Driveway 1.33 285.95 76133 $1,066.95 John F. Hubbard, Sr. Wk of 9 16 50' Pavement $12.13 $ 606.50 Roy E. Hubbard & Ind, 50' Curb & Gutter 3.49 174.50 T. R. Hubbard 215 Sq. Ft. .Driveway 1.33 285.95 c/o Southwest Bank $1,066.95 P.O.: Box 16400 76133 A. J. Cooles Ek of 9, & Wk 16 100' Pavement $12,13 $10213.00 4708 Ranchview of 8 Ind. 100' Curb & Gutter 3.49 349.00 76109 9269 Sq. Ft. Driveway 1.33 357.77 $1,919.77 12. PROJECT 'NO.' 104-24000-246, UNIT 3: WHITE SETTLEMENT ACCESS ROAD, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BAILEY'S INDUSTRIAL ADDITION Corona Plumbing Supply Co. P.O. Box 9339 7 & Ek of 16 155.15' Pavement $12.13 $15188 ..97 76107 8 Ind. 155.15' Curb & Gutter 3.49 541.47 $2,423.44 TOTAL COST TO PROPERTY OWNERS....................$ 8,325.06 TOTAL COST TO CITY OF FORT WORTH.................$12,894.90 TOTAL ESTIMATED CONSTRUCTION COST............... .$21,219.96 13. PROJ'EC'T N0, 104-24000-246, UNIT 4:_ RUDD STREET FROM DILIARD STREET 'TO BIRDELL STREET, to be, improved by constructing a five-inch,thick hot-m4ix.a4sphaltie—concrete pavement on a five- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete -driveways will be constructed wherespecified. BLOCK OWNER ' LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTR SIDE WALTER WILLI ADDITION Beginning at the S.E. corner of Dillard Street and Rudd Street Versie Thomas 7 7 140' Side lot adjusted to 1725 Dillard Res, 100' Pavement 1 1 $3.03 $303000 76105 100' Curb & Gutter 3.47 347.00 $650.00 Claudine Crenshaw 8A 12 50' Pavement $3,03 $15 .,50 5301- Rudd Res, 50' Curb & Gutter 3.47 173.50 76105 96 Sq, Ft, Driveway 1.33 127.68 $452.68 Mercer W. James 5A, 5B & 5C 12 175' Pavement $3,03 $530,.25 5305 Rudd Res. 175' Curb & Gutter 3.47 007.25 76105 96 Sq. Ft. Driveway 1,33 127.68 $1,265.18 T. B. Mallicote 4A 12 150' Side lot adjusted to: - 4531 Martha Lane Res. 100' Pavement $3,03 $303.00 76103 100' Curb & Gutter 3.47 347.00 $650.00 Birdell Street intersects 14. PROJECT N0, 104 24000=946, UNIT 4: RUDD STREET, Continued: BLOCK E LOT ZONING FR�O�N7AGE RATE AMMT ASSESSMENT SOUTH SIDE WALTER WILLI ADDITION Betty ,Jean Cotton Johnson 1 13 150' Side lot adjusted to: & Willie L. Johnson Res 100' Pavement $3.03 $301.00 5308 Rudd 100' Curb & Gutter 3,47 347.00 76105 96 Sq. Ft. Driveway 1.33 127.68 $777.68. Betty Strickland 4-D 13 87.3' Pavement $3.03 $264.52 5308 Rudd Res. 87.3' Curb & Gutter 3.47 .302.93 76105 $567.41 New Bethany Baptist 4-C 13 87.3' Pavement $3.03 $264.52 Church Res. 87.3' Curb & Gutter 3.47 302.93 c/o Rev. W. H.' Jones 175 Sq. Ft. Driveway 1.33 232075 5520 Fitzhugh $800.20 76105 Henry Hood 5-B 4 60' Pavement $3.03 $181.80 c/o Herman Willi Res. 60' Curb & Gutter 3.47 208.20 6325 Inca $390.00 76116 E. C. Hood 5-A 13 100' Pavement $3.03 $303.00 5300 Rudd Res. 100' Curb & Gutter 3.47 347,00 76105 96 Sq. Ft Driveway 1,33 127.68 $777.68 15. PROJECT NO. 104-24000-246, UNIT 4, RUDD STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE WALTER WILLI ADDITION Earl Milles 2 4 1421 Side lot adjusted to: 6901 Corona Res, 100° Pavement $3,03 $303,00 76116 100' Curb & Gutter 3,47 347.00 $650.00 TOTAL COST TO .PROPERTY OWNERS..................$ 6,980.87' TOTAL COST TO CITY OF FORT WORTH...............$14,844.21 TOTAL ESTIMATED CONSTRUCTION COST..............$21,825,08 16. PROJECT NO. 104-24000-246 UNIT 5: WINDOWMERE FROM EDGEWOOD TERRACE TO 480' EAST, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway that ends in an eighty fort cul-de-sac. Six-inch thick concrete driveways will be constructed where' specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSES T NORTH SIDE C. S. DEVOLLS ADDITION Beginning at the S.E. corner of Edgewood Terrace and Windowmere Bethel Primitive 5-B 129.4 Side lot adjusted to: Baptist Church Res. 100' Pavement $3.03 $303.00 1009 S. Edgewood Terrace 100' Curb & Gutter 3.47 347.00 76105 71 Sq Ft. Driveway ' 1.33 94.43 $744.43 Lois Fisher 5-C 65' Pavement $3.03 $196-.95 4713 Windowmere Res. 65' Curb & Gutter 3.47 225.55 76105 '71 Sq. Ft. Driveway 1.33 94.43 $516.93 George &Ella Steward 5-D 65' Pavement $3.03 $196.95 940 E. Ramey Res. 65' Curb & Gutter 3.47 225.55 76104 $422.50 Leo Taylor 5-E 65' Pavement $3.03 $196,.95 4717 Windowmere Res. 65' Curb & Gutter 3.47 225.55 76105 71 Sq. Ft. Driveway 1.33 94,.43 $516.93 S OUTH SIDE Raymond Wheatfall 4-E 65' Pavement $3.03 $196.95 4716Windowmere Res. 65' Curb & Gutter 3.47 225.55 76105 96 Sq. Ft. Driveway 1.33 127.68 $550.18 17. PROJECT NO. 104-24000,246, UNIT 5: WINDOWMERE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE C. S DEVOLLS ADDITION Jerry Berkowitz 4-D 65' Pavement $3.03 $196.95 729 NW 28th Street Res, 65' Curb & Gutter 3.47 225,55 76106 96 Sq, Ft. Driveway 1.33 127.68 $550.18 Jasper T. Jordan 4-C 65' Pavement $3.03 $196,95 4712 Windowmere Res. 65' Curb & Gutter 3.47 225,55 76105 96 Sq. Ft. Driveway 1.33 127.68 $550.18 Fred Blair 4-A 129,4' Side lot adjusted to: 1101 S. Edgewood Terrace Res. 100' Pavement $3.03 $303.00 76105 100' Curb & Gutter 3.47 347.00 96 Sq. Ft. Driveway 1.33 127.68 $777.68 TOTAL COST-TO PROPERTY OWNERS.........es.e.......$ 4,629.01 TOTAL COST-.TO CITY OF. FORT WORTH............,.,.,.$ 8,259,28 TOTAL ESTIMATED CONSTRUCTION COST...............$12,888.29 18. PROJECT N0, 104-24000-2462 UNIT 6: LENA STREET FROM RAMEY AVENUE TO 116' NORTH OF CALLAHAN STREET, to be improved by constructing a fFve-inch thick hot-mix asphalts concretecpavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight- een inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMIaNT WEST SIDE MAXWELL SUBDIVISION Beginning at the N.W. corner of Ramey Avenue and Lena Street Mrs. Ruth S. Smith 22 3 1161 Side lot adjusted to: 4945 Ramey Res, 100' Pavement $3.03 $303.00 76105 100' Curb & Gutter 3.47 347.00 $650.00 L. J. Parker 11 3 116' Side lot adjusted to: 5424. E. Lancaster Res. 100' Pavement $3.03 $30-00 76112 100' Curb & Gutter 3.47 347.00 41 Sq. Ft. Driveway 1.33 54.53 $704.53 Harlem Street intersects Vera Johnson 22 2 116° Side lot adjusted to: c/o Pearl Taylor Res. 100' Pavement $3.03 X303.00 1212 Belevidere 100° Curb & Gutter 3.47 347.00 Oklahoma City, Okla. $650:00 73117 0. C. & Varnell Allen 11 _2 116' Side lot adjusted to: 1216 Ee Annie Res. 100' Pavement $3.03 $303.00 76104 100' Curb & Gutter 3.47 347.00 $650.00 19. i PROJECT N0, 104-24000-246, UNIT 6: LENA. STREET FRAM RAMEY AVENUE, Continued: BLOCK OWNER LOT ZONING FROG GE RATE AMOUNT ASSESSMENT WEST SIDE MA LL SUBDIVISION Callahan Street intersects Nathaniel Bennett 11 1 116' Side lot adjusted to: 1508 Elm Res, 100' Pavement $3.03 $303.00 Roswell, New Mexico 100' Curb & Gutter 3.47 347,00 $650.00 EAST SIDE South Fort Worth 1 4 50' Pavement $3.03 $151.50 State Bank R . 50' Curb & Gutter 3.47 173.50 P.O. Box 1480 $325,00 76101 Orvil Shaw 2 4 50' Pavement $3.03 $151.50 2209 Lena Res, 50' (Curb & Gutter 3.47 173,50 . 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Jeffery Slaughter 3 4 50' Pavement $3,03 $151,50 2301 Lena Res, 50' Curb 4- Gutter 3.47 173.50 76105 96 $q. Ft, ]Driveway 1,33 12768 $452.68 Gidding Sanders 4 4 50' Pavement $3.03 $151,50 2305 Lena Res. 50' Curb & Gutter 3.47 173,50 76105 96 Sq. Ft, Driveway 1.33 127,68 $452.68 20, i I PROJECT NO. 104-24000-246, UNIT 6, LEM STREET, Continued; BLOCK OWNER LOT ZONING IARONTAGE RATE AMOUNT ASSESSMENT FAST SIDE MAXWELL SUBDIVISION Bennie Hibbler 5 4 50' Pavement $3;03 $151.50 2309 Lena Res, 50' Curb & Gutter 3,47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Winston H. Wilcox 6 4 50' Pavement $3.03 $.151.50 2313 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Mary Hammett 7 4 50' Pavement $3.03 $151.50 2616 Griffith Street Res. 50' Curb & Gutter 3.47 173.50 Los Angeles, Calif. $325.00 90011 J. C. Renfro 8 4 50' Pavement $3.03 $1.51.50 2319 Lena Res. 50' Curb & Gutter 3.47' 173.50 76105 96 Sq. Ft. Driveway 1,33 127.68 $452.68 Ethel Jones 9 4 50' Pavement $3.03 $151,50 2401 Lena Res. 50' Curb & Gutter 3.47 17.3.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Willie D. Johnson 10 4 50' Pavement $3.03 $151.50 1130 E. Tucker Res, 50' Curb & Gutter 3.47 173.50 76104 $325.00 21. o i PROJECT NO. 104-24000-246, UNIT 6, LFNA SLUM, Continued: BLOCK OWNER LOT ZONING FRONTAGE },LATE AMOUNT ASSESSMENT EAST SIDE MAXWELL SUBDIVISION Mrs. Isabella Henderson 11 4 50' Pavement $3,03 $151.50 2409 Lena Res, 50' Curb & Gutter 3.47 173,50 76105 96 Sq. Ft, Driveway 1.33 127,68 $452.68 Rosie Randle 12 4 50' Pavemept $3.03 $151.50 2413 Lena Res. 50' Curb ix Gutter 3.4.7 173.50 76105 96 Sq. Ft, Driveway 1.33 127.68 $452.68 Johnny Edwards 13 4 77' Pavement $3.03 $233.31 4951 Ramey Res. 77' Curb & Gutter 3.47 267.19 76105 96 Sq, Ft. Driveway 1.33 127.68 $628.18 TOTAL COST TO PROPERTY OWNERS...... . .. .....*...~..$ 8,981.83 TOTAL COST TO CITY OF FORT WORTH.. . .. . . . ... . .. .. ..$22,097.35 TOTAL ESTIMATED CONSTRUCTION C05T. .. . ... . .. . . .. .. .$31,079.18 ALL UNITS: TOTAL COST TO PROPERTY OWNERS.. . .. . . . . . .. . .. . . ... .. . ... .$ 5 .,011.63 TOTAL COST TO CITY OF FORT WORTH. ... ... . . . . .. . . . . ... . .. ..$ 90,721,21 TOTAL ESTIMATED CONSTRUCTION COST. . . .. . . .. . . . . .. .. .. .. . .$141,732,84 22,