Loading...
HomeMy WebLinkAboutContract 44487-FP3 De;'art en ofjPW Const.Services F— D 1- � Date F—/ Project Manager Gz� (G Risk Management S. Canady l T WORTH@ awst-cmw � � T� D.O.E. Brotherton /�/f'/(�, g;OMPACT °, „, ' r�� f CFA Westerman/Scanned o Z- 2- � The Proceeding people have been Contacted concerning the request ATION AND PUBLIC WORKS for final payment&have released this project for such payment. F PROJECT COMPLETION Clearance Conducted By Etta Bacy J C l!-n�(t n�h-e6l -31)116 D.O.E. Ns: 6981 'C Regarding contract 116981 for ROLLING MEADOWS EAST PHASE 2-STORM DRAIN as required by the TRANSPORATION&PUBLIC WORKS as approved by City Council on N/A through M&C N/A the director of the TRANSPORATION&PUBLIC WORKS upon the recommendation of the Assistant Director of the Transportation&Public Works Depsu:tment has accepted the project as complete. Original Contract Prices: $278,107.60 Amount of Approved Change Orders: $8,764.00 Ns 1 Revised Contract Amount: $286,871.60 Total Cost Work Completed: $286,871.60 Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $286,871.60 Less Previous Payments: $0,00 Final Payment Due�j� $286,871.60 —�� dd Etskfi Z� •/ RecomrYlended for Acceptance Date Asst. director, TPW - Infrastructure Design and Construction ( 6J. Accepted � � r � Date Director, TRANSPORATION ZUBLIC WORKS J -- --- -- '112 Asst. Clty Manager Date Comments: C205-511200-20',760205$83 ` s ��'.� EOFFICIAL�iE�r®�dD��BiR�ETi�RYMAR 2016 V�yft rx FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name ROLLING MEADOWS EAST PHASE 2 Contract Limits Project Type STORM DRAIN City Project Numbers 02055 DOE Number 6981 Estimate Number 1 Payment Number I For Period Ending 2/4/2014 CD City Secretary Contract Number 116981 Contract Time MED Contract Date Days Charged to Date 224 Project Manager Buckley Contract is 100.00 Complete Contractor KART CONSTRUCTION&EQUIPMENT P O BOX 1522 HURST, TX 76053 Inspectors LAYER / JOHNSON Monday,July 13,2015 Page 1 of 4 City Project Numbers 02055 DOE Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number i Contract Limits Payment Number 1 Project Type STORM DRAIN For Period Ending 2(4/2014 Project Funding STORM DRAIN Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total --------------------------------------- 1 — -------- -------------- — ----- 1 66"RCP 43 LF $242.90 $10,444.70 43 $10,444.70 2 60"RCP 765 LF $168.00 3128,520.00 765 $128,520.00 3 48"RCP 654 LF $111.65 $73,019.10 654 $73,019.10 4 36"RCP 42 LF $70.I0 $2,944.20 42 $2,944.20 5 27"RCP 53 LF $48.30 $2,559.90 53 $2,559.90 6 24"RCP 100 LF $44.25 $4,425.00 100 $4,425.00 7 60"SLOPING HEADWALL 1 EA $2,627.00 $2,627.00 1 $2,627.00 8 36"SLOPING HEADWALL 1 EA $1,576.00 $1,576.00 1 $1,576.00 9 STD 5'SQ MANHOLE 1 EA $4,592.00 $4,592.00 1 $4,592.00 10 STD T SQ MANHOLE I EA $5,850.00 $5,850.00 1 $5,850.00 11 10'STD CURB INLET 6 EA $2,954.00 $17,724.00 6 $17,724.00 12 5.5'MODIFIED CURB INLET I EA $2,508.00 $2,508.00 1 $2,508.00 13 12"THICK ROCK RIP RAP 36 SY $67.75 $2,439.00 36 $2,439.00 14 18"THICK ROCK RIP RAP 225 SY $72.40 $16,290.00 225 $16,290.00 15 TRENCH SAFETY 1657 LF $0.25 $414.25 1657 $414.25 16 REMOVE EXIST 60"HEADWALL 1 EA $788.00 $788.00 1 $788.00 17 REMOVE EXIST RIP RAP 237 SY $5.85 $1,386.45 237 $1,386,45 18 UTILITIES P&P BONDS CO#1 1 LS $8,764.00 $8,764.00 1 $8,764.00 ------------- ----------------------------- Sub-Total of Previous Unit $286,871.60 $286,871.60 i i Monday,July 13,2015 Page 2 of 4 i I k City Project Numbers 02055 DOL Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 2/4/2014 Project Funding Contract Information Summary Original Contract Amount $278,107.60 Change Orders Change Order Number 1 $8,764.00 Total Contract Price $286,871.60 / -1 to r - (� Total Cost of Work Completed $286,871.60 Con r , Less %Retained $0.00 Net Earned $286,871.60 Date Earned This Period $286,871.60 Ins ctio 't ery r tJ64j�� Retainage This Period $0.00 Less Liquidated Damages P ject Man Days® /Day $0.00 Date 2! LessPavement Deficiency KOO irectorlrPW-Infrastructure Design and Construction Less Penalty $0.00 I— Date �- 2 3 � Less Previous Payment $0.00 Directb /Contracting Departni Plus Material on Hand Less 15% $0.00 Balance Due This Payment $286,871.60 Monday,July 13,2015 Page 3 of 4 City Project Numbers 02055 DOE Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number I Contract Limits Payment Number I Project Type STORM DRAIN For Period Ending 2/4/2014 Project Funding Project Manager Buckley City Secretary Contract Number 116981 Inspectors LAYER / JOHNSON Contract Date Contractor KART CONSTRUCTION&EQUIPMENT Contract Time 50 CD P O BOX 1522 Days Charged to Date 224 CD HURST, TX 76053 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $286,871.60 Less %Retained $0.00 Net Earned $286,871.60 Earned This Period $286,871.60 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $286,871.60 I I Monday,July 13,2015 Page 4 of 4 i i FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. I NAME OF PROJECT: Rolling Meadows East Phase 2 PROJECT NO.: 02055 CONTRACTOR: Kart Conshuction DOE NO. 6981 PERIOD FROM 07/08/13 TO: 01/17/14 FINAL INSPECTION DATE: 17-Jan WORK ORDER EFFECTIVE 7/8/2013 CONTRACT TIME 50 O WD* CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS PERIOD 224 PREVIOUS PERIOD TOTALS TO DATE 724 *REMARKS: No Liquidated Damages to be Charged to this Contract CON GTO DATE INSPECTOR DATE ENGPrtiEERRiG DEP_1RT.X EE-T The City of Fort Worth•1000 T hrockmorton Stmt•Fort Worth,TX 76012-6311 (817)392-7941•I=(817)392-7845 FORTWORTHREV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name ofCortractor Project Name Kart Construction Rolling Meadows East Phase 2 DOE Lnspector DOE Mmnber Wade Johnson 6981 DOELnspeclo• Project Manager ❑ Water❑ Waste Water E Storm Dralnage❑ Pavement Fred Ehia Initial Contract Amount Project Diff culty $278,107.60 O Simple OO Routine O Complex Final contract Amount Dale $286,871.60 1/24/2014 II)PERFORMANCE EVALUATION 0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT(x) APPLICABLE Y/N RATING 0-4 MAX SCORE SCORE I Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 N 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 N 9 Daily Clean Up 5 N t0 Citizen's Complaint Resolution 5 N 11 Property Restoration 5 Y 4 20 20 12 After hours Response 5 N 13 Project Completion 5 Y 4 20 20 TOTAL ELEMENT SCORE(A) 248 BONUS POINTS(25 Maximum)(B) TO'T'AL SCORE(TS) 248 III)CONTRACTOR'S RATING Maximum Score(MS)=448 or sum of applicable element score maximums which_ 308 Rating([TS/MS]*100%) 248 / 308 = 81% Performance Category Excellent <20%=h►adequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >-80%=Excellent Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector ���_ Signature Contractor Signature DOE Inspector's Supervisor �— CONTRACTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth•1000 Throckraorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fat:(817)392-7845 _ City of Fort \' orth t__'F,-k ,=,.1111 inistratlon tOOO ThrockIII orroll St, Fort'Worth. TX X6101- RE: Project\"ane: Kollin Meadow,; East Pha ,- -'Al." DOE—6Q81 r C'it\, Pri}jce; `tJ'055 The purpose oC thils letter is to ctoiU\l'lledg;�C that \tom ha\`c b,cen paid III full by Beazer Domes Texas. I-P.. Cor the PUNic improv meets Constructed to scn c Rollin-NIc'adows East Phase 2.al -*[I-*[I-. F Iort l\'orth. ")eras. \s a result_ k\e herel,\ \\al\c. release and relinquish all rights to assen any claim or ilc'nland for lull in col111e(:1 1,0I1, XVidl Chis l?t"ili�Ct. 11c8se r `i i�Ct iU l'.ilili::Ct mc :'t'Itil tll\ Clll�tiitUnti\ilU IlI1'. 1it11'C. J--rry \lortmn_ President Kart Construction and Equilllllent Co.. Inc. JM%brm 124 S NORwbCD DRIVE PO Box 1522 HURST, TX 76053 OFFICE 817 202 8000 F.x 81 7 282 6005 x.0;15 Y1_z U C-7 i'4;"s'1 -; _c�uur-fel-i'»'.i Cn-, u-1 STATE OF TEXAS C(:U-NTY tOF TARR:\, T Before me. the undersigmd authurh, a nota public in the skate and count atloresaid,oil this ilaq'personalb appeared.IERRY \IORGA.N. PRFSIDFNT Of KART CONS S EOUIP`dt N I CO._ INC.. known t:; ni-e to he a erethbO peNon. \\'ho Dell by me duly sll`4n, liht7n hitt oath doposed and said: Tai all persons. Firms. association-. cot'porations_ or t ffici"ilr i;tlt%att(lti\ fUrniti iiin?1 iiibor and or Illaterials ha\e Elton paid in 1 til: Kat We dale trifle e$iaMsEd by d t-.:l\ l.�ouivi:il in th,' Ci t-, Foii 1,Vortll, l C\as has been paid in full: That thcre art no claims pending for personal injt:r� and!or propertn dalz,ges: On Contract described as: CODS'I'I:t'C'I"10N: OF WATER. SANITARYSEWER. AND STORMI DP\-,IE\AGE FOR ROLLING i iAIE_WOWS PHASE 2A1. FORT %V0RTH. TX. B Y JERQ MRGAN,.PRESIDENT j Subscribed and svy oil before me on this date 21 S*I'of JANUARY. 201=1_ �lOTarV Pubic — P TARRANT COUNTY, TEXAS r "jT,AT � �1-it;itVISA � i 1 124 S. NO>3w000 DRIVE P.O. Box 1522 HURST. TX 76053 i OPrtc_ 817 262 8000 FAX 8 17 282 3005 f i i I s i COMESENT OF SUR5TY TO FINAL PAYNILENT Bond No 4390510 Beazer Homes Texas. LP and City of Fort Worth 1750 Valley View Lane, Ste. 200 ties Dallas- TX 75234 Rolling Meadows East Phase 2 Keller-Haslet Rd &Palancar Dr- Fort Worth,TX, Tarrant County SureTec Insurance Company 1330 Post Oak Boulevard, Suite 1100 Houston. TX 77056 Kart Construction and Equipment Co_ Inc - 124 South No(--.,,jood Drive Hurst. TX 76053 Beazer Homes Texas, LP and City of For'Worth 17'50 ValleyViewLane. Ste. 200 Dallas, TX 75234 January 23, 2014 SureTec Insurance Company A/ ell A Cindy Fowler Attomey-in-Fact G707-1994 po, 422 1305 ethic Ills urance- Com ally LINJITED POWER OF ATTOPUNEY S'nolil W {Ien k"' 1'h'st! Aae1113, 'SUPEFJ-'--C COMP ANY "Ccqapa-,C'), a coq)ornrit-.�n duly axanng it:d '. ml W." L"-. Tc.tns: ara4-f princ-ip! Orsi":.. 1[: T---�xas. do.'s b,,, 11"aK,%cco2l1:U:z Lod 2:^pflio- A Vim avic AM Auvicy-•u'-St, n0h Al poner anti I iA r.in pia an.l'SaLu"to anA deAve any and all bond,rue gnizanco5, n >'u,t i,i t od"Ci-i1.;S!r'-----'-'f--nt:3 o. tf siuret.ysL-ip to include wars;if] Df COnn'2CI-i arld cements ul'stn---ty fc::-: A"rMol Coons and rcloo(V 0GO650 CQ and w bind rh,� Conipari.; theroby as 1-ully and to ke man exam ai Ksuch bond ix..-re si,-wd b,,.-The Pr2sichcni,sealed with flue corpc,---? fl of The Company and duly are5t c by t Summn hmtQhg and cmAmIg A! In do said Attomy-Mact may do in preinises. SLiu 2ppouiltnent, shat! con�linuc! in Me imd! OWEN VA iS Uadl:r ;if-,d b,,,, aiahori�y of the Ullawk; C Pnc-ard n,"DiTpciors of di- thz;' mkav my hnraarny Asst,,mn( "Ldl i:c af.-f i-- cmvwy mtm 0 by NUMB,7mosm-': Ljfl FT�.-Lr:U:-- on and K to n=nc at Mal o-.- Cc:p-.1,%. t;) 't7 mdus m! dmumnoi am .:n:_ cr Ummomy kc CanoqA HAZY Gen=&L nd x* 00 inummms 'a ens-d DY M ink Aum"ITIMA KINK; .en;i andikwdt AzAAM a.'_ ':1''1 wdemand lit L-`!: n o-, :!ei ni:or f-J in a n ::r(-.I 10 ao: rywAno'r adfors WaNg Moot APIWO 0 GONAK 00 AW 4 1 ad WAY Ina of GOT'ny rz Too L, ut)on ny �Vv Nq V OW 4 0 WVQT 1 dgm, �3 1H Howl l',SUIRANCE COATANN �X SlYld 1! . `1' a to Qnw!vy h P%jQay,M;d 0: _Ojyryn j:S ru te i.i.-'211 St tiay 2:-.''- i SURETEC LtiSURANCE CO,.NIPANY B v: n/ ------------ John IjAs JP Arsidair Now ci-H!M,---. aT1J siy,Ula:he r-',OLS(oa- Tex3s, IA he A Pie;.__.., of SMEW PMROW CMWAM ;Q wmMg daARd A md YOH em-'uwd to .. Kwoomw Ii 4 k."S we SCA of odd compaiql to me my SAWW M Irmmou N imh ccgum,wN Char R wo in Mud n.'Wor 001- Board of DWava of s5d Compu*-;.md Ilia.h---sipd his rialtoey li F.--Swi-r 1 Puy INM. EW 10017 Jacquelyn Maldonado,Notary PuLlic co=insic-n expires,`.lay 1.37 2017 Bi-ntbvah:,=us-,'siantSeauayofSURETEC INSURAINCE CQ-'QFA-Mc,doArzycerin to G"boveand NMA,is wn and wract epy ofalPov,c, (I,,Aitoait!y,executzd by said CompwV,which is AW 1111 Qu md cfftci,and-6irt5en-nor-,,the re;olaticiai of End Board ofl)irtcton,3'!r out in the Power of Attorney are in full force and effi:cz. G -I JU1 U- A. 1 Given under my hand and the seal of said Company at Houstcri,Texas this ��P'.FrAday o redt Beaty,�Assistant euretary Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5:00 pro CST. FORTWORTHREV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY I)PROJECT INFORMATION Date: 1/24/2014 Name ofContraclor Project Name Kart Construction Rolling Meadows East Phase 2 DOE Inspector Project Manager Wade Johnson Fred Ehia DOE Number Project D 6c"10, Tjpe of Contract 6981 O Simple OO Routine O Complex ❑ Water❑ Waste Water[Z Storm Drainage[] Pavement Initial Contract Amount Final Contract Amount $278,107.60 $286,871.60 II)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent _ ELEMENT RATING ELEMENT - RATING 0-4 0-4 INSPECTION EVALUATION PLANS&SPECIFICATIONS 1 Availabili of Inspector 1 Accuracy of Plans to Existin Conditions 2 Knowledge of Inspector 2 Clari &Sufficiency of Details Z 3 Accuracy of Measured 2uantities 13 Apelicabilt of Specifications 2 4 Dis la Of Professionalism 4 Accuracy of Plan quantities 5 Citizen Com laint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting tip Valve Crews Labs 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availabili of Project Manager 1 Change Order Processing Time 3 Communication 2 Thnliness of Contractor Pa ments 4 Resolution ofUtili Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe III)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signattut DOE Inspector's Supervisor INSPECTOR'S COMMENTS _ TRANSPORTATION AND PUBLIC WORDS The City of Fort Worth-1000 Thmckmorton Street•Fort Worth,'I176012-6311 (817)392-7941•Fag:(817)392-7845