Developer and Project Information Cover Sheet:
Developer Company Name: M&C Development Ltd
Address, State,Zip Code: 3825 Camp Bowie Boulevard
Phone&Email: 817-665-2321 randy.lockhart@att.net
Authorized Signatory, Title: John Cockerham, President, Harrison Realty Investments, LLC, General
Partner
Project Name and Brief Huffines Boulevard
Description:
Project Location: <Huffines Blvd between Cromwell Marine Creek Road and Westgate
Drive>
Plat Case Number: FP-15-099 Plat Name: Marine Creek Ranch
Mapsco: 46D&H Council District: 2 City Project Number: 100035
CFA Number: 2015-129 DOE Number: <N/S>
To be completed by staff
Received by: /L Date:
LOFFICIALRECORD
City of Fort Worth,Texas CRETARYStandard Community Facilities AgreementCFA Official Release Date: 10.07.2015 RTH,TX
Page 1 of 1
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, M&C Development Ltd, ("Developer"), desires to make certain specific
improvements as described below and on the exhibits attached hereto ("Improvements") related
to a project generally described as Huffines Boulevard ("Project") within the City or the
extraterritorial jurisdiction of Fort Worth, Texas("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
further acknowledges that said acceptance process requires the Developer's contractor(s)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of 2
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) I , Sewer (A-1) 1 , Paving (B) C , Storm Drain (B-1) Street Lights &
Signs (C) 0.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section 11, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section II, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent (100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 3
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 4
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims,suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the City of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 5
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 6
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 7
Cost Summary Sheet
Project Name: Huffnes$oulevard
CFA No.: 2015-129 DOE No.: N/A
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction $ 62,955.00
2.Sewer Construction $ 31,775.00
Water and Sewer Construction Total $ 94,730.00
B. TPW Construction
1.Street $ 1,024,972.30
2.Storm Drain $ 46,199.60
3.Street Lights Installed by Developer $ 74,491.20
4. Signals $ -
TPW Construction Cost Total $ 1,145,663.10
Total Construction Cost(excluding the fees): $ 1,240,393.10
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 1,894.60
D. Water/Sewer Material Testing Fee(2%) $ 1,894.60
Sub-Total for Water Construction Fees $ 3,789.20
E. TPW Inspection Fee(4%) $ 42,846.88
F. TPW Material Testing(2%) $ 21,423.44
G. Street Light Inspsection Cost $ 2,979.65
H. Signals Inspection Cost $ -
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ 67,249.96
Total Construction Fees: $ 71,039.16
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 1,240,393.10
Completion Agreement=100%/Holds Plat $ 1,240,393.10
Cash Escrow Water/Sanitary Sewer-125% $ 118,412.50
Cash Escrow Paving/Storm Drain=125% $ 1,432,078.88
Letter of Credit=125%w/2yr expiration period $ 1,550,491.38 X
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 8
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
M&C Development Ltd
a Texas Limited Partnership
By:Harrrison Realty Investments,LLC
Jesus J. Chapa a Texas limited liability company
Assistant City Manager Its: General Partner
Date: 3;0;?!�
Recommended by:
Xg—e- John Cockerham
Title: President
Wendy Chi-Bfibulal, EMBA, P.E. Date: 2- 1K 1 l 4(.1
Development Engineering Manager ATTEST: (Only if required by Developer)
Water Department
Signature
Doiersig, P.E. Name:
Dir
Tr s rtation& Public Works Department
Approved as to Form & Legality:
INF Fr 0
1)8t1918S 3A' a law' 41UIA A µCCkucket ATTEST: �[$
Assistant City Attorney
M&C No. AAS
Date: 3 j��/4
aryJ. r
4e#► 1tv Casi�`G►c�e.1►�,. '. N(� City Se etary
City of Fort Worth,Texas
Standard Community Facilities Agreement OFFICIAL RECORD
CFA Official Release Date: 10.07.2015
Page 9 of 9 CITY SECRETARY
FT.WORTH,TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
Exhibit A-1: Sewer Improvements
Sewer Cost Estimate
I Exhibit B: Paving Improvements
Paving Cost Estimate
{ Exhibit 13-1: Storm Drain Improvements
{ Storm Drain Cost Estimate
i$ Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.20 15
Page 10 of 10
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100035
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
i
CREEK t
1
l e \
,q� \ Crltk / q
cy 1 S
7 �
_ llvtr pwe
S{{ 1
HILL
C..
I �
MARINE 7OMWt Cwitr
Ardw CREEK lwuumus Car
RIDCi LAKE Capis
VICINITY YAP
NO SCALE
LOCA TION MAP
MAPSCO N0. 46D&H
COUNCIL DISTRICT 2
MARINE CREEK RANCH
HUFFINES BOULEVARD
RIGHT—OF—WA Y
BEING 3.001 ACRES OF LAND LOCATED IN THE
i JOSEPH BOMAN SURVEY, ABSTRACT NO. 79,
OWNER/DEVELOPER: CITY OF FORT WORTH,
M&C DEVELOPMENT, LTD TARRANT COUNTY, TEXAS
3825 CAMP BOWIE BLVD.
u FORT WORTH, TX 78107
TEL: (817) 885-2321
CONTACT: RANDY LOCKHART
PRELIMINARY PLAT CASE NUMBER: PP-006--033
CASE NUMBER: FP-15-099
CASE NAME: MARINE CREEK RANCH
PHASE: HUFFINES BLVD.
r
12.30.15 ff
U-FF'llVES BL VD. m i m a
PROJECTpt 2652-04-01
PLAT INFORMATION
VICINITY MAP mycoside+mcinnis+associates
J. STORZ `W anoii—e --nvqicecaps an *W—,l—"
tb"ragistratlm wnba 1—2736200 east abraar A. CASCO ariingt0taxa• 76010
617-4611-1671
1 OF 10 rax: 617—:74—e7s7
•ae.mmatexas.-tam
ALL
���INE\FHDETAIL A
o
l�
to -A
tA
Col
DETAIL A DETAIL B 1
tA 6x
Q x ND Ate'
J b �
1INSTALL —
W N _NEW FH
V^ 1 1 SALVAGE b� 1
EX. FH r'
r—1' DETAIL C
DETAIL B
LEGEND
NTS
LEGEND
TAPPING
WATER LINE SLEEVE VALVE
SALVAGE v FlRE HYDRANT
EX. FH GATE VALVE
Av� NOTE. ALL WATER LINES ARE 8'UNLESS OTHERWSE NOTED
4' / INSTALLk� so o 25 so 100
NEW FH,
DETAIL C 1 inch = 50 ft.
DATE. 12.30.15
HUF'FIATES' BLVD. m i m a
PROJECT if 2852-04-01
WATER
mycosassociates
DRAW BY J STORZ
EXHIBIT "A" .��
SHEET 1 OF 1 tpi"�°"°"'""d` 1-2750
CHECKED
BY. A. CASCO z o o ...t o b r o m
arlln0ton, t.ras 76010
017-466-1671
SHEET NO. 2 OF 10 fox: 017-274-0757
....71 m.t.. ..r..l
HUFFINES BOULEVARD IMPROVEMENTS 12/31/2015
CFA PROJECT QUANTITY MATRIX
UNIT 1:WATER
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 6 7 17 18 19 20 21
1 SALVAGE FIRE HYDRANT EA. 1 2 3 $ 600.00 $ 1,800.00
2 MANHOLE ADJUSTMENT,MINOR EA. 2 2 $ 2,000.00 $ 4,000.00
3 MANHOLE ADJUSTMENT,MAJOR EA. 1 1 2 $ 600.00 $ 1,200.00
4 TRENCH SAFETY L.F. 99 99 $ 2.00 $ 198.00
5 20"CASING BY OTHER THAN OPEN CUT L.F. 45 45 $ 340.00 $ 15,300.00
6 VALVE BOX ADJUSTMENT EA. 1 2 1 1 4 $ 300.00 $ 1,200.00
7 8"DIP WATER L.F. 61 61 $ 135.00 $ 8,235.00
8 8"PVC WATER PIPE L.F. 38 38 $ 119.00 $ 4,522.00
9 FIRE HYDRANT EA 1 2 3 $ 6,700.00 $ 20,100.00
10 CONNECTION TO EX.16"WATER MAIN EA 1 1 $ 6,000.00 $ 6,000.00
11 REMOVE AND REPLACE SIDEWALK SF 40 40 $ 10.00 $ 400.00
UNITTOTAL $ 62,955.0
0
\ 1
-DETAIL A
\ \ \ HA YCO REALTY, LTD
VOL. 14192, PG. 644
DRTC \\
• a
W N b
\ \ �,\\ - '
\\`) \ RSP 6* -.. I nrasroxn aLc�'
o f \ \ P A•5 �FG1P1pEx
o \ A N \
GPS,
4
T /
DEI ALA /
LGN
• SANITARY SEWER MANHOLE
8" SANITARY SEWER LEGEND
EX. SANITARY SEWER MANHOLE NTS
EX. SANITARY SEWER LINE
50 0 25 50 100
1 inch = 50 ft.
DATE: 12.30.15 i
HUFFIXES .B-LVD. mIm a
PRO. CT ,{E 2652-04-01 I
WASTEWATER
„ mycoskie+�rx:innis+associates
DRA WN BY J. STORZ F,XMIT A-1 cH oVkwwwft tu-WkV haft-pa awhftft n plans,,
SHEET 1 OF 1 f°'rso*oUm=dw `-275°
CHECKED BY: A. CASCO 2 0 o a a.t a b r a m
arlington, t�aof2 78010
817-48g-1871
SHEET NO: 3 OF 10 fai: 817-274-8757
www.mmat4xaa.com
UNIT 2:SANITARY SEWER
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 6
1 POST CCN INSPECTION L.F. 68 68 $ 8.00 $ 544.00
2 MANHOLE VACUUM TESTING EA. 1 1 $ 120.00 $ 120.00
3 TRENCH SAFETY L.F. 68 68 $ 2.00 $ 136.00
4 16" CASING BY OTHER THAN OPEN CUT L.F. 45 45 $ 375.00 $ 16,875.00
5 8" SEWER PIPE L.F. 23 23 $ 120.00 $ 2,760.00
6 4' EXTRA DEPTH MANHOLE V.F. 5 5 $ 500.00 $ 2,500.00
7 8" SEWER PIPE (PRESSURE RATED) L.F. 45 45 $ 120.00 $ 5,400.00
8 4' MANHOLE OVER EXISTING LINE EA. 1 1 1 $ 3,440.001 $ 3,440.00
UNIT TOTAL 1 $ 31,775.00
A77
CROWAU YARDW CREM S
ROAD
TI i
I ' NAYCO REALTY, LTD
%VL 141OZ P0: 644PROP
Dalt r 10' SIDEWALK
I 14
XI TIN \ .aa
I4' SIDEWALK
}; \ MARMIE CREW RANCH
.: SLIDE 12800
PROPOSED� PR7tr
4' - 12'
VARIABLE WIDTH :.
SIDEWALK XI TING
PAVEMENT e '
VALLEY
HAYW REALTY, LTD I '
.. \ KL 14119ZTCPG 044DRT
,
HAYCO REALTY, LTDJ " CREEK RANCH
%VL 1419Z P0: 644 1 CAB. A. 5LW 12800
ORTCT +
1 a PRTCT
SLOW a
4' SIDEWALK
XI TING
10' SIDEWALK / PAVEMENT
MARINE CREEK RANCH
�::': CAB. A. SLIDE 12800
10' SIDEWALK .\
LEGEND
200 0 100 200 400
10" CONC. PAVEMENT
4" CONC. SIDEWALK
1 inch = 200 ft.
OATS: 12.30.15
HUFFINES BLVD. m 1 m a
PROTECT A 2652-04-01
PAVING
�
�Z,I, „E„ n�ry�oo�slcie�-r�Girriis+assaciat�
DRAWN BY- J. STORZ "a wm-ft own*"boom"-aww—MEN*
n1t
SCO�t SHEET 1 OF 4 tbp ro*W&m unM 1-2756
CHECKED BY A. CAS2 0 0 0.
s 8, a b r a m
orlia6tow, �ce• 76010
617-462--1671
SHEET NO. 4 OF 10 fax: 617-274-6757
www.mmataxaI.aam
SEE S �T C�E ��17
MATCE SET 1 I S S
MARIN CH
10' SIDEWALK VARpVE GREEK I CCJ D /zo146/2 i
I
RANCHa g0 .
A. SUX I \
12800 EX/ NG
PNrcr4' SIDEWALK
EXISTING
nd � PAVEMENT i P OP
RRA4' SIDEWALK
' M & C C
11\ DEVELOPMENT, VD
p
XIS77 OPRTC�D
4' SIDEWA ° � ,Uy�p D DEVfLC-MT, VD
CCI 204274828
HAYC:O REALTY, L7D tam m>�57 cwRTCr
oa
VOL. 14182.P0. 814 r ORTCT ...
pRTCi
��••�� "'t 100 M. FLOODPLAIN
MARPE CREEKCC4 D2120
OPRTCi2 _
amr r
I!
ROPOSED I MARINE CREEK RANCH
4' SIDEWALK CAR ti SLVE 8924
PRTCT a:
MARINE CREEK RANpt; AMR/Nf CREEKHOJEOWERS XI TIN RANC�I
ASSOCIA7XK M
CC#D2142249M I 4' SIDEWALK Tm 3
OPR TCT , M C ` CAB. A.PRRW 12573
DEMIWAENT, VD
CC/204274628
" OPRTCT I XISTINOSED
4' SIDEWALK„ y PAVEMENT 4'�S DEWALK
XIS TING
PAVEMENT ' I �¢ ri SID,�:WALK
LEGEND _ .
"— 200 0 too 200 400
10" CONC. PAVEMENT
4" CONC. SIDEWALK 1 inch = 200 ft.
DATE: 12.30.15
HUFFIXES BL VD. m 1 m ca
PROJECT it 2852-04-01
�
j PAVING
nVooslde+m -associates
DRAW BY- a srORz
L"XHIBIT MB" boft",ommu .aa 0—ft
SHEET 2 OF 4 1" f-vu
CHECKED BY: A. CASCO 4 0 o On
a.t a 0 r a m
arlington, taxa• 76010
617-466-1671
SHEET NO: 5 OF10 fax: 617-474-6757
•wW.mmataxax.aoo
- � CROMWAU ,�CRSEK s ♦ •♦
ROAD •♦
1 •♦
I '♦
I'1 HAYCO REALTY, LM '♦ �
10L 14192 PG 644 '♦
lI'I DRTCT '♦
Z 6
•♦ 9
RELOCATE EXIS7ING R3-88
SIGN ON NEW POLE sum L
INSTALL R3-7 RELOCATE \ ` E E RANCH
112800
SIGN ON EXIS7ING SIGN PRTCT
EXIS7ING POLE
11 �. INSTALL
R4-7 SIGN '
1, ♦\ I - -
RELOCATE C♦ I D�roS�n vALLB7'
EXIS7ING SIGN \ ( �= —
\♦ RELOCATE {
r� EXISTING SIGN f
♦ INSTALL {
�`♦ �. R6-1 SIGN � �
�•♦ CREEK RANCH
HAYCO
REALTY.P64� ♦ CAB. A. SWE 12800
DRTCT
HAYCO REALTY, LTD • PRTOr
KL 141OZ PG. 644 '� r„a,;
'♦ DRTCT r� , p
r
\ �� •, i i
,ps AUCAB. A.
SLVCREEK RANCH
2WO
h,\ •, 1 �1 i • CAB. A, SLIDE neoo
PRTCT
Y `•SC• I •
LEGEND
PROPOSED SIGNS
200 Co I 100 200 400
EXISTING SIGNS
.. . . . . PAVEMENT MARKINGS 1 inch = 200 ft.
DATE: 12.3 .15 m l m a
PROJECT It 2652-04-01 MARUVE' CRE'E'L{
RAIVCI—I mycoslde+ffx assocWw
DRAWN BY- J. STORZ PAVING +'-*"lft--w - �"'�'�-�
1 zm
Y- c+ EXHIBIT "B" • �"
CHECKED BY A. CASCO200 •aat abram
SHEET 3 OF 4 arlingto,. taro• 76010
617-469-1671
SHEET NO. 6 OF 10 fox: 517-274-5757
•��.mmataraa.eoe
SEE �� JIATC�
CF�NE SHEET 1 `� � (ThTIS•SHEET
MARIE CREEK _)
1 E CREEK I CCl2 RANCH812 '
RANCH aPRTCT
PRTCT
DEVIEWPUENT, VD.
j
\� �f M
AWERIO oR� 1 a�xiavr, Lm.
CCJ 20427,8zn
97E LEASE
HAYCO REALTY, LTD ! I WL 17099,ca7
1+q.. cpRrcr
14192 644 \ I 1
oRTr;T 1 1
2fte, i
MARINE CREEK
D"20112
X — — —
� 1
� � 1
1
! I MARY E CREEK RANCH I -
, CAB. A. SLAX 8924
PRTCT oor ro 1
HOWONNom 1 I 1 MARINE CREEK
ASSMA7W ING m INSTALL R,
TION J
CC/D2142240M
CPRTCT . R2-1 SIGN , CA9 SURE 12575
• t M &C ` PRTCT
DEWMCP ENT, LTD.
ccl 2W74829
a LPRTCT 6 -
I INSTALL
R2-1 SIGN
0 `
LEGEND �rS SHEETS �`
PROPOSED SIGNS •�•
zoo 0 100 zao aoo
t
EXISTING SIGNS .�•
. . . . . . PAVEMENT MARKINGS 1 inch = 200 ft. •`
RATE: 12.3U.15
HUAFT"IlVES BL VD. m 1 ma
PROXCT *t 2852-04-01
PAVING nWooslde+m wassodates
DRAWN BY L STORZ EXHIBIT "B"
do-mon ft awall"`weademe"6•s
SHEET 4 OF 4 tbpe"bba% f-27M
CHECKED BY A. CASCO 1:t asst A b r a m
orlinon, taiga 76010
SHEET •1 617-466-1671
SHEE NO. 7 OF 10 fa.: 617-274-6757
•aw.mmat•vaa,Com
UNIT 4:PAVING
SHEET NO. ITEM TOTALI UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 17 18 19 20 21 34 35
1 REMOVE CONC.PVMT S.Y. 111 111 $ 9.00 $ 999.00
2 REMOVE ASPHALT PVMT S.Y. 346 19 481 846 $ 8.00 $ 6,768.00
3 REMOVE CONC CURB AND GUTTER S.Y. 109 257 366 $ 5.00 $ 1,830.00
4 HYDRATED LIME TON 39 58 52 53 67 269 $ 167.00 $ 44,923.00
5 8"LIME TREATED S.Y. 2185 3246 2873 2970 3740 15014 $ 3.70 $ 55,551.80
6 10"CONC PVMT S.Y. 2030 3218 2634 2755 3493 14130 $ 46.85 $ 661,990.50
7 INSTALL 4"51DEWALK S.F. 2680 4318 6268 9145 11251 336621 5.00 $ 168,310.00
8 7"CONC CURB AND GUTTER L.F. 670 323 723 1716 $ 35.00 $ 60,060.00
9 4"SLD PVMT MARKING HAS(W) LF. 1330 1230 2560 $ 1.00 $ 2,560.00
10 4"SLD PVMT MARKING HAS(Y) LF. 1200 1200 $ 1.00 $ 1,200.00
11 8"SLD PVMT MARKING HAS(W) LF. 300 284 584 $ 2.00 $ 1,168.00
12 8"SLD PVMT MARKING HAS(Y) LF. 300 99 399 $ 2.00 $ 798.00
13 RELF RAISED MARKER TY 1-C EA. 18 14 32 $ 5.00 $ 160.00
14 REFL RA15ED MAKER TY II-A-A EA. 3 3 $ 5.00 $ 15.00
15 REFL RAISED MARKER TY II-C-R EA. 132 119 251 $ 5.00 $ 1,255.00
16 FURNISH/INSTALL ALUM SIGN GROUND MOUNT CITY STD. 3 2 5 $ 425.00 $ 2,125.00
17 INSTALL ALUM SIGN GROUND MOUNT EA. 1 1 $ 400.00 $ 400.00
18 REMOVE SIGN PANEL AND POST EA. 2 1 3 $ 200.00 $ 600.00
19 REMOVE SIGN PANEL EA. 1 1 $ 175.00 $ 175.00
20 REMOVE AND REINSTALL SIGN PANEL AND POST EA. 1 1 $ 200.00 $ 200.00
21 TRAFFIC CONTROL MO 3 3 $ 1,700.00 $ 5,100.00
22 CONCRETE RIPRAP S.Y. 48 48 $ 60.00 $ 2,880.00
23 INSTALL TYPE B PRD-13 HANDRAIL L.F. 45 45 $ 120.00 $ 5,400.00
24 REMOVE BARRICADE LF 28 28 84 28 168 $ 3.00 $ 504.00
UNITTOTAL $ 1,024,972.30
MAS CREEK
RANCH
CC/r�T2 15'RECESSED
EX. 10' CURB INLET A.0
CURB INLET EX. 21' 21'RCP �jf
RCP
EX 4X4'
SDMH +T_
Q HAYW REALTY, LIDi` 5/8" CIRF
VCL 14192 P6. 644 / ( 7RANSYSTEMS
AH& C DRTCT
DEb£Ld'AfENT, LID.
M & C
CCk2042748"
TDEbE1C'AIENT, LIR
W OPRTCT Gam// Pi h
AN7EW DRILLch of
STE LEASE QHv^f
VOL 17099, PC. 57 `� Q tb
ORTCT lA.
10'RECESSED
CURB INLET CURB INLET .
21" 21"RCP I t
RCP _ - t
EX. 4'X4' 10'RECESSED f £X. l0'
SDMH CURB INLET + CURB INLET
a EX. 21"
21"R RCP
t ! SDMH X4'
I '# FUTURE
EX
HEADWALL HAYW REALTY, LTDSTREET
EX. Ae 7 RCB HEADWALL VOL 1411OZ PO 644 ;
1
2`R
EX. 4X4'— A/ARINE CREEK X 4�
SOMH N RANCH
I
EX X 21"RCP WOW 3CAB. A SLOE 1257) —� I U
_RREEX _ W _ e _ _ PRTCT HEADWALLB. A, I HEX
EADWALL
RAN
CAwut/8924 — — — — N
PRTC, 3 I I W EX. 4X4'
' I
10' SDMH
h _
CU IIpLET 15'RECESSED 21"RCP ( i RCPT
I CURB INLET I
EX. 10'
CURB INLET
10'RECESSED ( 4 N
CURB INLET ' HAYW REALTY, LID
' VOL 14G 644
to ��T
!!' 5/8" CIRF w
LEGEND
100 0 50 100 200
EXISTING STORM SEWER LINE
PROPOSED STORM SEWER LINE
❑ STORM MANHOLE
C
CURB INLET 1 inch = 100 ft.
DA1F: 12.M.
IYUFFINES DL VD. m 1 t"1°'1 a
PROJECT , ? 2852-04-01
STORM DRAINAGE
myrasiae� a�.s
DRAWN 8Y J. STORZ EXHIBIT "B-1" "•"r"'''u"`v.' +�"."+`""""'"
Cts SHEET 1 OF 1 �°°"*''°"°""'""°'�'_v'
CHECKED �y A. CASCO 200 a a a t o 0 r a m
arlington. taxes 75010
617-469-1671
SHEET NO: 8 OF 10 1aa: 617-274-6757
•��.mmataraI,eom 111111 1
UNIT 3:STORM DRAIN
SHEET NO. ITEM TOTAL UNIT PRICE ITEM TOTAL COST
ITEM NO. BID ITEM UNIT 27 28
1 MANHOLE ADJUSTMENT, MINOR EA. 2 2 4 $400.00 $1,600.00
2 ITRENCH SAFETY L.F. 124 104 228 $0.70 $159.60
3 21" RCP,CLASS III L.F. 124 104 228 $105.00 $23,940.00
4 10' RECESSED INLET EA. 1 2 3 $3,500.00 $10,500.00
5 15' RECESSED INLET EA. 2 2 $4,500.00 $9,000.00
6 CONNECT TO EXISTING 4'STORM JUNCTION BOX EA. 2 2 $500.00 $1,000.00
UNIT TOTAL $46,199.60
CROJ/AbZL)UJUNN CR99K
ROAD
( I
( I STREETLIGHT a
(TYP)
I '
HAMO REALTY, VV
IL 1A Pc 1. .aQ
DRTCT
I I I INSTALL ` MARINE CREDO RANCH
NEW STREEEE T LIGHT SL"12600
\ _ PR1Cr
EXISTING '
STREETLIGHT
!� (TO BE REMOVED)
l � �II � wroS�D vA7.'ss'
-
\
HAY00 REALTY, LTD
\\ \ VOL 14192 Pt~ 644
HAYW RE&TY, VV ` DRTCT 1� ' CRM RANCH
VOL 14192 PG 644I�I/ CAB. A. SURE 12600
DRTCT EXISTING lI 1 _. PRTCT
\ STREETLIGHT 'S"
\\ (TO BE RELOCATED) l
r
MARINE CREEX RANCH
CA&. A. SLOE 12800
PRTCT
LEGEND /�� 4S,
E--O STREET LIGHTS 200 100 200 400
❑-°-❑ EX. STREET LIGHTS
N07E.• REPLACE nX7URE ONLY UNLESS 07HERMSE N07ED 1 inch = 200 ft.
DA7�: 1230.15
UUFFIXES BLVD. m 1 m a
PROt�CT � 2652-04-01
STREET LIGHTS
EXHIBIT "�" my�ooskie�s+aWas
DRAWN BY J. STORZ aMar•w••wr.`'""*"""''� �`'`�
SHEET 1 OF 2 "�6aismobw 1-27M
CHECKED B�: A. CASCO 200 east obram
arlinyton. taaaa 76010
617-46 A-1671
SHEET NO; S1 OF 10 fa.: 617-274-6767
•�w.mmatayae.eam
SEE SI "C"
�T'-& HERT (� SNE
� AUI� aemr __ � =)
r ARNVE CREEK I CC#DRANCH l0 2
{ WRTCT
f ,2800
e PRTCT
CC +
\y I ELOPMENZ, VD.
�`�� °
ANTERo DRILL
DEVELOPMENT. LID
MIK'LEASE ,. 10 ccr�7T 829
HAYCO REAL7% L7V {\� VVL 17099, PG 57
VOL )4192,PG 644 \ ORTCT �
ORTCT
MANbNE CREEK
CC/o81
42
• + I Tcr
MARINE CREEK RANCH
CAB. A, M"8924
PRTCT �u� �� I
AURINE COKING RANCI +
HONEONNFRS
ASS0CA1M INC.
CC/DZ1422490 to
c1ARTcr
CM OL 9,M 12373
• QEbE1NP NT, LID INSTALL NEW �', �' PR
TCT
GCJ 204274M I FOUNDATION,
10 DPRTCT POLE, AND
I FIXTURESOWN
EI
� $ S '+ � I STREETLIGHT
LEGEND �rc (TYP)
11-0 STREET LIGHTS 200 0 100 200 400 \ k,
O-0 EX. STREET LIGHTSMEN
NOTE: REPLACE FlX7VRE ONLY UNLESS 07HERMSE N07ED 1 inch = 200 ft~ '
DA TF: 12.30.15
xUFFIXES EL VD. m 1 m a
PROJECT ,�'.• 2352-04-01 S GHTS
STREET LI 4.�.�.
DRAWN 8Y J. STORZ EXHIBIT "C" - 9t-4
SHEET 2 OF 2 � ^� f-2755
CHECKED BY: A. CASCO 200 east u b r.m
arlington, toaa• 76010
817-469-1571
SHEET NO: 10 OF 10 fax: 817-274-8757
•wt.m n10 t•x 0••09m