Loading...
HomeMy WebLinkAboutContract 44487-FP4 DepartyTm f.TPW Const Services DOE# Dat 7 Project Manager - cm S:c�tA�r � n Risk Management S.Cana v - 'IT 0 RT H o COMRlACT WO. D.O.E. Brotherton CF2A Westerman/Scanned ❑ Th P Proceeding people have been Contacted comruing the request 'AT ION AND PUBLIC WORKS ,��0 01" G 5— for final payment&have released this project for such payment. )F PROJECT COMPLETION Clearance Conducted By Etta Racy D.O.E.J* 6981 qyzl87 Regarding contract 116981 for ROLLING MEADOWS EAST PHASE 2-WATER&SEWER as required by the WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as c t TE Original Contract Prices: $232,494.48 Amount of Approved Change Orders: FEB 2 3 2016 56,688.00 N2 1 Revised Contract Amount: , 5239,182.48 Total Cost Work Completed: $239,182.48 Less Deductions: Liquidated Damages: Days @ S210.00/Day Pavement Deficiencies: Total Deduction Amount: Total Cost Work Completed: $239,182.48 Less Previous Payments: $0.00 Final Payment Due 5239,182.48 z. rb ReccfmrnenYed for Acceptance Date Asst. Director, TPW - Infrastructure Design and Construction Accepted / DtltTe --.— Asst. Director, WATER DEP TMENT J�s� Asst. City Manager Date Comments: P265-541200-602150205583,P275-541200-702130205583 OFFICIAL RECORD CITY SECRETARY EM.AY'LrZJD FT.WORTH,TX MAR 2016 -a,2U,5-- 0 2055- FEB 2 3 2016 C,0=5-5- City Project Numbers 02055 e►�,�.._....� DOE Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2142014 Project Funding Project Manager Buckley City Secretary Contract Number 116981 Inspectors LAYER / JOHNSON Contract Date Contractor KART CONSTRUCTION&EQUIPMENT Contract Time 50 CD P O BOX 1522 Days Charged to Date 224 CD HURST, TX 76053 Contract is •000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $239,182.48 Less %Retained $0.00 Net Earned $239,182.48 Earned This Period $239,182.48 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 /Day $0.00 LessPavemeut Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0,00 Balance Due This Payment $239.182.48 Monday,July 13,2015 Page 5 of 5 Ipw2i5-- 02055 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name ROLLING MEADOWS EAST PHASE 2 Contract Limits Project Type WATER do SEWER City Project Numbers 02055 DOE Number 6981 Estimate Number l Payment Number I For Period Ending ?/4/1014 CD City Secretary Contract Number 116981 Contract Time SCD Contract Date Days Charged to Date 224 Project Manager Buddey Contract is 100.00 Complete Contractor KART CONSTRUCTION do EQUIPMENT P O BOX 1522 HURST, TX 76053 Inspectors LAYER / JOHNSON Monday,July 13,2015 Pale 1 of 5 City Project Numbers 02055 DOE Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number 1 Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2/4/2014 Project Funding WATER Item Description of Items Estimated Estimated Completed Completed No P Unit Unit Cost P P Quanity Total Quanity Total 1 8"PVC WATER LINE,CO#1 1850 LF $20.20 $37,370.00 1850 $37,370.00 2 8"GATE VALVE&BOX 3 EA $1,077.49 $3,232.47 3 $3,232.47 3 FIRE HYDRANT W/6"GATE VALVE 2 EA $3,379.00 $6,758.00 2 $6,758.00 4 DUCTILE IRON WATER FITTTNGS 0.9 TN $6,710.00 $6,039.00 0.9 $6,039.00 W/RESTRAINT 5 CONCRETE BLOCKING TYPE B 2.9 CY $100.40 $291.16 2.9 $291.16 6 WATER SERVICE,I"TAP TO MAIN 56 EA $377.00 $21,112.00 56 $21.112.00 7 2"IRRIGATION SERVICE 2 EA $1,652.00 $3,304.00 2 $3,304.00 8 WATER SERVICE I"LINE 1446 LF $6.05 $8,748.30 1446 $8,748-30 9 METER BOX CLASS A 58 EA $88.95 $5,159.10 58 $5,159.10 10 TRENCH SAFETY 1795 LF $0.60 $1,077.00 1795 $1,077.00 11 18"STEEL CASING CO#1 40 LF $60.00 $2,400.00 40 $2,400.00 12 8"45'BENDS CO#1 4 EA $275.00 $1,100.00 4 $1,100.00 13 8"GATE VALVE CUT IN CO#1 1 EA $2,077.00 $2,077.00 1 $2,077.00 Sub-Total of Previous Unit $98,668.03 $98,668.03 SEWER Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total I 8"SANITARY SEWER MAIN 925 LF $20.75 $19,193.75 925 $19,193.75 2 8"SANITARY SEWER MAIN 460 LF $22-80 $10,488.00 460 $10,488.00 3 8"SANITARY SEWER MAIN 920 LF $21.45 $19,734.00 920 $19,734.00 4 12"ROCK RIP RAP 225 SY $61.90 $13,927-50 225 $13,927.50 5 MANHOLE-STD 4'DIA 9 EA $2,326.00 $20,934.00 9 $20,934.00 6 MANHOLE-STD 4'DIA. 3 EA $2,985.00 $8,955-00 3 $8,955.00 7 MANHOLE-VACUUM TEST 9 EA $121.00 $1,089.00 9 $1,089.00 8 MANHOLE-INTERIOR PROTECTIVE COATING 18 VF $198.50 $3,573.00 18 $3,573.00 9 SEWER SERVICE 4"TAP 78 EA $348.00 $27,144.00 78 $27,144.00 10 4"SEWER SERVICE WITH CLEANOUTS 747 LF $3.85 $2,875.95 747 $2,875.95 11 4"SEWER SERVICE WITH CLEANOUTS 1445 LF $4.10 $5,924.50 1445 $5,924.50 12 REMOVE EXIST 4"SEWER SERVICE 18 EA $198-00 $3,564.00 18 $3,564.00 Monday,July 13,2015 Page 2 of 5 City Project Numbers 02055 DOE Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number 1 Contract Limits Payment Number I Project Type WATER&SEWER For Period Ending 2/4/2014 Project Funding 13 TRENCH SAFETY 2305 LF $0.25 $576.25 2305 $576.25 14 POST CONSTRUCTION CCTV 2305 LF $1.10 $2,535.50 2305 $2,535.50 Sub-Total of Previous Unit $140,514.45 $140,514.45 Monday,July 13,2015 Page 3 of 5 City Project Numbers 02055 DOE Number 6981 Contract Name ROLLING MEADOWS EAST PHASE 2 Estimate Number I Contract Limits Payment Number 1 Project Type WATER&SEWER For Period Ending 2/412014 Project Funding Contract Information Summary Original Contract Amount $232,494.48 Change Orders Change Order Number 1 $6,688.00 Total Contract Price $239,182.48 Date - —A- Total Cost of Work Completed $239,182.48 Less %Retained $0.00 Net Earned $239,182.48 Earned This Period $239,182.48 �uP ` Retainage This Period $0.00 Dat ! Less Liquidated Damages Projed M / Days G /Day $0.00 Z'2-2' (v LessPavement Deficiency $0.00 Asst f 0irqMr1TPW-Infnastructune Design and Construction Less Penalty $0.00 } / at Z 2yI,1 Less Previous Payment WOO *Director!Contracting Depamn TT Plus Material on Hand Less 15% $0.00 I. Balance Due This Payment $239,182.48 py Mauty,.ltdy 13,200 Page 4 of 5 FORTWORTH rev 03/05/07 TRANSPORTATION&PUBLIC WORKS FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 1 NAME OF PROJECT: Rolling Mcadows East Phase 2 PROJECT NO.: 02055 CONTRACTOR: Kart Cons=tiW DOE NO. 6981 PERIOD FROM 07/08/13 TO: 01/17/14 FINAL INSPECTION DATE: 17-Jan WORK ORDER EFFECTIVE 7/8/2013 CONTRACT TIME 50 O WD& CD DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH CHARGED CREDITED MONTH CHARGED CREDITED DURING DURING 1. 16. 2. 17. 3. 18. 4. 19. 5. 20. 6. 21. 7. 22. 8. 23. 9. 24. 10. 25. 11. 26. 12. 27. 13. 28. 14. 29. 15. 30. 31. SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS* DAYS TOTAL &HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS THIS 224 PERIOD PREVIOUS PERIOD TOTALS TO DATE r224 *REMARKS; No Liquidated Damages to be Chargcd to this Contract CQ RAR DATE INSPECTOR DATE APM T ENGINEERING DEPARTMENT 1& The City of Fort Worth-1000 Throckmorton Street-Fort Worth,TX 76012-6311 (817)392-7941 -Far.(817)392-7845 Y r.w[s w.wi $RTLIGP�-[YCAV - }�Itwuua.'oi v CHANGE ORDER No. 1 SITE UTILITIES Date: 09.20.13 To: Rome Barnes Project: Rolling Meadows East Ph 2 City: Fort Worth,Tx Explanation: Please see below for materials needed on layout change for 8"water line. UTILITIES ITEM DESCRIPTION CITY UNIT UNIT BID TOTAL BID 1 8"PVC WATER LINE 55 LF $20.20 1,111,00 2 16"STL.CASING 40 J LF $60.00 2,400.00 3 8"45 DEG.BENDS w BLOCKING 4 EA $275.00 1 100.00 4 8"GATE VALVE CUT-IN ON EX. LINE 1 EA $2,077.00 2,077.00 PLEASE SIGN AND SEND BACK AND MAKE A COPY FOR YOUR RECORDS: Barbara Morgan Larry Gonzalez Vice President Estimator Office: 817-282-8000 817.282.8000 Cell: 940-781-5039 817.201.1622 Email bmorgan@kartcoinc.com IRonzalezt0kartcoinc.com DEVELOPER-AWARDED-PROJECT CHANGE ORDER PROJECT NAME. Rolling Meadows East-Phase 2A-1 CHANGE CONTRACT: (A)Water.(B)Sewer,(C)Paving D Dralna e (E)Streetlights ORDER No: CFA# 2013.022 CITY PARTICIPATION: No CITY PROJECT# 2055 DOE# 6981 Al WATER PROJECT# P265.602150205583 SEWER PROJECT P275.7021302.05.583 FILE# W-2258 INSPECTOR- Phone No PROJECT MANAGER: Phone No, ^� Y CONTRACT UNIT WATER SEWER PA DRAINAGE STREET LIGHTS CONTRACT Developer Developer Developer Developer Developer DAYS Cost awead Cost __ alow Cost91LWCost Cost ORIGINAL CONTRACT $911980.03 1140,514.48 $277,687.75 $278,107.60 $36,486.97 EXTRAS TO DATE $8,888.00 CREDITS TO DATE CONTRACT TO DATE $98,668.03 $140 514.45 $277,697 75 1 $278 107.60 1 $36,486.97 0 AMOUNT OF PROP CHANGE ORDER Rf.VISED CONTRACT AMOUNT $88,888.03 1140.514 46 1277,897.78 $278.107.60 $36.486.97 0 TOTAL REVISED CONTRACT AMOUNT PER UNIT $98,648.03 $140,514.45 $277,697.75 $278,107.60 $36,486.97 REVISED COST SHARE Dov.Cost: $811,474.80 OW Gose $0.00 TOTAL REVISED CONTRACT $831,474.80 Revised 10-12.2011 Page 1 You are directed to make the followingthan es in the contract documents CITY BID ITEM PAY ITEM# f OUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 1 3311.0262 55 LF 8"PVC water Line $ 20.20 2 3305.1002 40 LF 16"Steel Casing $ 60.00 3 3011.0001 4 EA 8"45 deg Bends wt Blocking S 275.00 J 3312.3003 1 EA 8"Gate Valve Cutin on Ex Line S 2.077.00 RECOMMENDED: APPROVED: APPROVED: 1 mg Er�m r) ,Deverope+l iContract By By Fly- Name �Y Kf��S/t�� �E _Name �Gr%C— Gr� _ Name _ Title I QO_SrGT AA&ft(A4 F� Tilkt �D \ Title rRevisM1 10 12 2011 Page 2 FORT WORTH REV:02/20/07 TRANSPORTATION AND PUBLIC WORKS PERFORMANCE EVALUATION OF CONTRACTOR CONTRACTOR&PROJECT DATA Name of Contractor Project Name Kart Construction Rolling Meadows East Phase 2 DOE Inspector DOE Number Wade Johnson 6981 DOE Inspector Project Manager Q Wager O Waste Water❑ Storm Drainage❑ Pavement Fred Ehia Initial Contract Amount Project Difficully $232,494.48 O Simple OO Routine O Complex Final Contract Amount Date $239,182.48 1/24/2014 II)PERFORMANCE EVALUATION 0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent ELEMENT WEIGHT x APPLICABLE Y/N RATING 0-4 MAX SCORE SCORE 1 Submission of Documents 2 Y 4 8 8 2 Public Notifications 5 N 3 Plans on Site 5 Y 4 20 20 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 N 9 Daily Clean Up 5 N 10 Citizen's Complaint Resolution 5 N 11 Property Restoration 5 Y 4 1 20 20 12 After Hours Response 5 N 13 Project Completion 5 Y 4 1 20 20 TOTAL ELEMENT SCORE(A) 248 BONUS POINTS(25 Maximum)(B) TOTAL SCORE(TS) 248 III)CONTRACTOR'S RATING Maximum Score(MS)=448 pr sum of applicable element Score maximums which= 308 Rating(ITS/MS]• 100%) 248 / 308 — 81% Performance Category Excellent <20%=Inadequate 20%to<40%—Deficient 40%to<60%=Standard 60.0 to<80%=Good >_80%=Excellent Inspector's Coun eab(INCLUDING EXPLANATION OF BONUS POINTS AWARDED) Signature DOE Inspector IftelX — Signature Contractor Signature DOE Supervisor7 i CONTRACTORS COMMENTS TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth- 1000 Throck norton Street-Fort Worth,TX 76012-6311 (817)392-7941 -I=(817)392-7845 CONSTRUCTION & EQUIPMENT CO.. INC. .lanuarn ?1.2014 City of Fort Worth CFA Administration 1000 Throckmorton St. Fort Worth. TX 76102 RE: Project Name: Rolling Meadows East Phase 2Al/ DOE #6981 City Project 002055 The purpose of this letter is to aekno%vledge that we have been paid in full by Beazer Homes Texas, L.P.. for the public improvements constructed to sen-e Rolling Meadows East Phase 2A1 in Fort Worth.Texas. As a result,we hereby waive, release and relinquish all rights to assert any claim or demand for lien in connection with this project. Please feel free to contact me with am questions you ma% have. Sincereh. 1 Jerry 'Morgan. President Kart Construction and Equipment Co.. Inc. imorgan a kartcuinc.conl JM/hrm 124 5 NORWOOD DRIVE PO Box 1522 HURST. TX 76053 OFFICE 817 282 8000 FAX 817 282 8005 ICAMT CONSTRUCTION & EQUIPMENT CO.. INC. AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority,a notary public in the state and county aforesaid,on this day personally appeared JERRY MORGAN. PRESIDEN"F Of KART CONSTRUCTION R EQL IPMEN I CO.. INC.,known to me to be a credible person. who being by me duly sworn. upon his oath deposed and said: That all persons. firms.associations.corporations.or other organizations furnishing labor and.,or materials have been paid in full: That the wage scale established by the Cite Council in the Cite of Fort Worth.Texas has been paid in full: That there are no claims pending, for personal iniun and,or property damages: On Contract described as: CONSTRUCTION OF WATER. SANITARY SEWER AND STORM DRAINAGE FOR ROLLING MEADOWS PIiASL 2A FORT WORTH.TX. JE ' MORGA�RESIDENT Subscribed and s%%orn before me on this date 21S-l'ofJANUARY. 2014. No6-r Public LA;ZI T.MALE TARRANT COLRN'TY.TEXAS �""`� NUTS v PutjUC 124 S NORWOOD DRIVE PO. Box 1522 HORST. TX 76053 OFFICE 817 282 8000 FAX 817 282 8005 CONSENT OF SURETY o�n�mz TO FINAL PAYMENT �I:clurr.�1 -VA DocionieTit 6707 CONMCTOR SURF. ' Bond No 4390510 OTHER C TOO:XTIER. ARCHITECT'S 1'ROJECT NO: rno:Mr. wfJA4rtni Beazer Homes Texas. LP and City of Fort Worth 1750 Valley View Lane. Ste.200 COW?RACT FOR Utilities Dallas,TX 75234 PROIECr: CONTRACT I)ATFIj- -yAuer am f at"-wo Rolling Meadows East Phase 2 Keller-Haslet Rd &Palancar Dr., Fort Worth,TX,Tarrant County In arcordanre wiTh rhe praimians otf&.e Crnt.wt betwee,*:he Owner and the C(xuracrw a~m(ijc=xl alx).z,1"e r,4J.w"naw-sled d k*+-'f%a-rJ SureTec Insurance Company 1330 Post Oak Boulevard Suite 1100 Houston TX 77056 SURETY on bond of fllL.tn:tame pl YJ:Jde(rpu�!<yYr.'p-eU 1 Kart Construction and Equipment Co,. Inc 124 South Norwood Drive Hurst.TX 76053 ,O\'TRA( OR ierebvapproves or the!i^.al-ril-m.ent to the Conramv an',agree:rhat final patment to, e ContfwTor s-!A!rn(x rdieve die Suret, t,- any of as oUiptio ns to .'reA'rt rt:(nie umJ adrlZa. WOO Beazer Homes Texas. LP and City of Fort Worth 1750 Valley View Lane, Ste. 200 Dallas,TX 75234 OWNER zs set funb tlt said SuneWt s lixma l.N)MTNr:SS NXIAER.EOF the Suety has hereunto set as!sand n. hn date January 23 2014 Oawf IN J1-17aqj(AA!MCMbfmiomwd-i- 1(A irto -m sW'4 wrd Petr SureTec Insurance Company pYh.rr Jv Trf le�'R';'r!LegtJ Cindy Fowler Attorney-in-Fact seat? Lee�Gartei G707-1994 Po-%c: 4 SureTec Insurance Company LIMITED POWER OF ATTORNEY It Know Aii Alen by These Presents, That SUREiEC INSURANCE COMPANY (the "Company'), a corporation duly organized and r 1 existing under the laws of the State of Texas, and having its principal office in Houston,Harris County, Texas.does by these presents make.constitute and appoint D Gregory Slitts,Mark R.DeWitt.Rosemary Weaver,Cindy Fowler its true and lawful Attorney-in-fact, with full power and authority hereby conferred in its name,place and stead,to execute,acknowledge and deliver any and all bonds,recoguizances, undertakings or other instruments or contracts of suretyship to include waivers to the conditions of contracts and consents of surety for: Four Million Dollars and no,100(S4.000.000 00) and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President,sealed with the corporate seal of the Company and duly attested by its Secretary,hereby ratifying and confirming all that the said Attorney-in-Fact may do in the premises. Said appointment shall continue in force until 12131 2015 and is made under and by authority of the follewino resolutions of the Board of Directors of the SureTec Insurance Company: Be it Retuned that the President,any Vice-PTeSident any Assistant Vice-President.any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and an behalf of the Company sub eci to the following provisions; Amwneyrn-Fir<r may be given full power and authority for and in the name of and of behalf of the Company,to execute,acknuwlcdge and deliver,any and all bonds,recogtiizances,contracts,agreements or indemnity and other conditional or obligatory undertakings and am and all notices and documents canceling or icn-rating the Company's liability thereunder, and any such instruments so executed by any such Attorney-in-Fac:shrill be binding upon the Company as if signed by the President and scaled and effected by the Corporate Secretary Be it Rescl rd that the signature of any authorized uLsicer and sea!of the Company heretofore or hereafter affixed to any power of attorney or t any certificate relating zhereto by facsimile,and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company w ith respect to anN bond or undertaking to which it is attached (-4dopred at a meeting held nn 2(r oJ.9pri1. In(fitness Ithereof,,SURETEC INSURANCE COMPANY has caused these presents to be signed by its President,and its corporate seat to be hereto affixed this 21st day of March.A.D 2013. SURETEC INSUkkNCE COyIPANI' W 9 ' John Isnot Jr.y President StatcofTexas ss: 7 1 County of Hams On this 31st day of March,A.D.2013 before nic persona.iy came Linn Knox it,to me&nowt:,who,being by me duly sworn,did depose ani say.that he resides to Houston, Texas, that he is President of SLFT.'IEC r SI."RANCE COMPANY, the company described in dad which executed the atu)ve i instrument,that he knows the seal of s.ud Company;tha.t_u seal affixed to said instrument is such corporate seal.that it was so ailixed b} order of the Board of Directors of said Company.and that he sigied his name therao by tike order r`'s .A ll ELfA►1L7C►aApl S 1jVu le\-,stars Praa: 1 E SLUR 0i Teus 6rt,omm Em 15'842017 Jacquelvo Maldonado,Notary Public My commission expires May 1 g.2017 ].M.Brent Beaty,Assistant Secretary of SURETF,C tNSURANCE COMPANY,do hereby certify that the above and foregoing is a tru_and torten copy of a Power of Attorney,executed by said Company,which is still in full force art,!effect;and furthermore,the rcvoluticns of the Baird of Direaor-.set out in the Power of Attorney are in full force and effcAn Given under my hand and the seal of said Comp;u:y at Houston,Texas this �irck day of ci.a W- A D .1. Bre>1<Beaty,Assistant ecretury Any instrument issued in excess of the penalty stated above is totally void and without any validity. For verification of the authority of this power you may call(713)812-0800 any business day between 8:00 am and 5.00 pm CST. i FORTWORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Rolling Meadows East Phase 2 PROJECT NUMBER: 2055 DOE NUMBER: 6981 WATER PIPE LAID SIZE TYPE OF PIPE LF N`es 8" PVC 1850 FIRE HYDRANTS: 2 VALVES(16"OR LARGER) NIA PIPE ABANDONED SIZE TYPE OF PIPE LF No DENSITIES: Yes NEW SERVICES: 1" Copper 1446 SEWER PIPE LAID SIZE TYPE OF PIPE LF Yes 8" PVC 2305 PIPE ABANDONED SIZE TYPE OF PIPE LF No DENSITIES: Yes NEW SERVICES: 4" PVC 2192 TRANSPORTATION AND PUBLIC WORKS f! The City of Fort Worth•1000 Throctmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fu:(817)392-7845 FORT WORTH REV:02/22/07 TRANSPORTATION AND PUBLIC WORKS CONTRACTOR'S EVALUATION OF CITY PROJECT INFORMATION Date: 1/24/2014 Name ofCon tractor Project Name Kart Construction Rolling Meadows East Phase 2 DOE Inspector Project Manager Wade Johnson Fred Ehia DOE Numberrojeet Delcu/h' Type of Contract 6981 O Simple OO Routine O Complex 21 Water El waste water El Storm Drainage❑ Pavement Initial Contract Amount Final Contract Amount $232,494.48 $239,182.48 H)PERFORMANCE EVALUATION 0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent ELEMENT RATING ELEMENT RATING 0-4 0-4 INSPECTION EVALUATION PLANS&SPECIFICATIONS I Availability of Inspector 1 Accuracy of Plans to Existing Conditions Z 2 Knowledge of Inspector —20arity&Sufficiency of Details 2 3 Accuracy of Measured Quantities 3 Applicability of Specifications 2 4 Display Of Professionalism nv 14 Accuracy of Plan Quantities 2 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance-Setting up Valve Crews,Labs I- 1 Knowledge And/Or Problem Resolution ADMINISTRATION 2 Availability of Project Manager Ti I Change Order Processing Time 3 Communication Z 2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts 3 Bid Opening to Pre-Con Meeting Timeframe HI)COMMENTS&SIGNATURES COMMENTS Signature Contractor Signature DOE Inspector Signature DOE Inspector's Supervisor INSPECTOR'S COMMENTS TRANSPORTATION AND PUBLIC WORKS (a The City of Fort Worth-1000 Thmckmorton Street•Fort Worth,TX 76012-6311 (817)392-7941 •Fax:(817)392-7845