Loading...
HomeMy WebLinkAboutContract 45482-CO2 pi Fo RT WO a-r H City of Fort Worth i Change Order Request Project Name: Sanitary Sewer Rehabilitation Contract 75, Part 1 City Sec No.: 1 45482 Project No.(s): P253-609170148083&P258-709170148083 I DOE No. L±E8 CityProj.No.:l 01480 The replacement of water and sanitary sewer mains on Devitt Street,Shaw Street, Cleburne Road, Sandage Avenue Project Description: Benbrook Boulevard and Seven Alleyways. Contractor: Ark Contracting Services,LLC. Change Order# Date: 3/1/2016 City Project Mgr. Roberto C.Sauceda City Inspector: I Ariel Duarte Phone Number: 817-392-2387 Phone Number: 817-223-2266 Dept. Water Sewer Totals Contract Time (Calender days) Original Contract Amount $158,246.00 $1,915,198.00 $2,073,444.00 240 Extras to Date Credits to Date -$3,825.00 -$3,825.00 071 Pending Change Orders(in M&C Process) Contract Cost to Date $158,246.00 $1,919,023.00 $2,077,269.00 311 Amount of Proposed Change Order $27,076.00 $27,076.00 120 Revised Contract Amount $158,246.00 $1,946,099.00 $2,104,345.00 431 Original Funds Available for Change Orders $8,000.00 $58,000.00 $66,000.00 Remaining Funds Available for this CO $8,000.00 $54,175.00 $62,175.00 Additional Funding(if necessary) 9N CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1.49% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,591,805.00 JUSTIFICATION(REASONS)FOR CHANGE ORDER M The change order will provide increased and additional pay item quantities of 8 and 10-inch pie a�,�i nt 15-inch sanitary sewer pipe, service reconnections and permeant asphalt pavement repair that e nece_s-).a4i on the project. The change order will also allow for the deletion of pay item quantities that are no longer are necessary on the project. Staff concurs with The contractor's request for 120 additional calendar days on the ooC* iv RECEIVED o� 0 MAR - 2016 9 `� �$ 0 CITY OF FORTWO111TIi CITYSECRETARY TMYber, ity Secretary 0�bdo�,o�®o° It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time art!money)for all costs arising out of,or incidental to,the above Change Order. Contractor's Company Name Contractor Name Contractor Signature Date Ark Contracting Services, LLC. Mike Plunk ZZL 1 -3 3--i1- Ins ecto Date Project Manager Date Assis t it r er t ate on tr4oqn e lsor TPW Det to Assi n o D jLe Assistant City Manager Date Council Action If Required M&C Number N/A M&C Date Approved FORT VV"RT H City Of Fort Worth Change Order Additions Project Name Sanitary Sewer Rehabilitation Contract 75, Part 1 City Sec No.: 45482 Project No.(s): P253-609170148083&P258-709170148083 DOE No. 6578 City Proj. No.: 01480 Project The replacement of water and sanitary sewer mains on Devitt Street, Shaw Street, Cleburne Road, Sandage Avenue Description Benbrook Boulevard and Seven Alleyways. Contractor Ark Contracting Services, LLC. Change Order:=2 Date: 3/1/2016 City Project Mgr. Roberto C. Sauceda City Inspector Ariel Duarte ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 5 15"Sewer Pipe Sewer 144.00 LF $135.00 $19,440.00 6 Pipe Enlargement 8" Sewer 1,098.00 LF $150.00 $164,700.00 10 Post CCTV Inspection Sewer 675.00 LF $1.00 $675.00 23 Trench Safety Sewer 587.00 LF $2.00 $1,174.00 24 6"Concrete Curb and Gutter Sewer 163.00 LF $40.00 $6,520.00 26 18"RCP Classlll Sewer 98.00 LF $80.00 $7,840.00 28 24"RCP Classlll Sewer 11.00 LF $120.00 $1,320.00 29 36"RCP Classlll Sewer 40.00 LF $160.00 $6,400.00 35 6'Wide Asphalt Pvmt Repair Sewer 794.00 LF $28.00 $22,232.00 51 Manhole Vacumm Test Sewer 3.00 EA $200.00 $600.00 52 Manhole Collars Sewer 5.00 EA $400.00 $2,000.00 53 Pipe Enlargement 10" Sewer 441.00 LF $126.00 $55,566.00 54 Reconnect Services to 8"Pipe Sewer 18.00 EA $975.00 $17,550.00 55 Reconnect Services To 10" Pipe Sewer 5.00 EA $1,320.00 $6,600.00 56 Point Repair Sewer 225.00 LF J$71.50 $16,087.50 57 Connect To Existing Drop Manhole Sewer 1.00 EA $300.00 $300.00 58 HMAC Street Repair Sewer 177.00 SY $93.50 $16,549.50 Water Sewer $345,554.00 Page 2 of 4 Additions Sub Total $345,554.00 FO R"T WO n-F H City of Fort Worth 1W 00- Change Order Deletions Project Name Sanitary Sewer Rehabilitation Contract 75,Part 1 City Sec No.: 45482 Project No.(s): P253-609170148083&P258-709170148083 DOE No. 6578 City Proj. No.: 01480 Project Description The replacement of water and sanitary sewer mains on Devitt Street, Shaw Street, Cleburne Road, Sandage Avenue Benbrook Boulevard and Seven Alleyways. Contractor Ark Contracting Services, LLC. Change Order: 111 Date 3/1/2016 City Project Mgr, Roberto C.Sauceda City Inspector: Ariel Duarte DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1 6"Sewer Pipe Sewer 15.00 LF $72.00 $1,080.00 2 8"Sewer Pipe Sewer 100.00 LF $80.00 $8,000.00 3 12"Sewer Pipe Sewer 191.00 LF $86.00 $16,426.00 7 8"CIPP Sewer 354.00 LF $75.00 $26,550.00 14 Epoxy Structure Liner Sewer 65.00 SF $14.00 $910.00 20 4"Sewer Service Sewer 17.00 EA $300.00 $5,100.00 22 Imported Embedment/Backfill Sewer 160.00 CY $25.00 $4,000.00 25 6"Concrete Valley Gutter Sewer 74.50 SY $90.00 $6,705.00 27 21"RCP Class III Sewer 40.00 LF $90.00 $3,600.00 30 Loop Detector Cable Service Sewer 200.00 LF $5.00 $1,000.00 31 14AWG Loop Detector Cable Sewer 200.00 LF $10.00 $2,000.00 34 Temporary HMAC Repair Sewer 3601.00 LF $18.00 $64,818.00 36 5"Concrete Driveway Sewer 373.00 SF $8.00 $2,984.00 38 12"DIP Sewer Pipe Sewer 139.00 LF $145.00 $20,155.00 39 16"DIP Sewer Pipe Sewer 140.00 LF $180.00 $25,200.00 40 30"Casing by other than Open Cut Sewer 244.00 LF $360.00 $87,840.00 41 36"Casing by other than Open Cut Sewer 10.00 LF $400.00 $4,000.00 43 Block Sod Replacement Sewer 100.00 SY $10.00 $1,000.00 44 12"Sewer by other than Open Cut Sewer 75.00 LF $280.00 $21,000.00 45 4"Sewer Service Private Relocation Sewer 95.00 LF $18.00 $1,710.00 47 Remove Fence Sewer 400.00 EA $10.00 $4,000.00 48 6'Wood Fence Sewer 200.00 LF $22.00 $4,400.00 49 6'Chain Link Fence Sewer 200.00 LF $30.00 $6,000.00 Water Sewer $318,478.00 Page 3 of 4 Deletions Sub Total $318,478.00 MMBE Breakdown for this Change Order MWBE;dubTrpeof Seiice Arnaunt fior thts,CO: Total Previous Change Orders :. A(�IIOUNT Total $0:00 Page 4 of 4