HomeMy WebLinkAboutContract 45802-A1 CITY(SECRETA J
AMENDMENT No.1 CONTACT NO. LI 1 &
TO CITY SECRETARY CONTRACT No. 45802
WHEREAS, the City of Fort Worth (CITY) and Pape-Dawson Engineers,
Inc . , (ENGINEER) made and entered into City Secretary Contract No. 45802,
(the CONTRACT) which was authorized by M&C C-26851 on the 15 day of July,
2014 in the amount of $ 78, 900 . 00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
New Irrigation Pump Station at Pecan Valley Golf Course; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee .
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated July 14, 2015, a copy
of which is attached hereto and incorporated herein. The cost to City
for the additional design services to be performed by Engineer totals
$15, 454 . 00 . (See Attached Funding Breakdown Sheet, Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $94, 354 . 00.
3 .
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a signatory,
below.
APPROVED:
City of Fort Worth
Professional Services Agreement Amendment TemplateIF���0 ��,
PMO Official Release 8/1/20128� � �� ��
Page 1 of 3
City of Fort Worth ENGINEER
Pape-Dawson E gine , Inc.
us n Alanis Kenneth L. Davis, P.E .
Assistant City Manager Vice President, - Fort Worth
DATE: j ( ! � / DATE: Ma,rr�ln )t'i w
APPROVAL RECOMMENDED:
Ric r Zavala
Dire or, Parks and Community Services Department
APPROVED AS TO FORM AND LEGALITY: M&C:
CWQ1n>___ Date:
Douglas W. Black
Assistant City Attorney
ATTEST:
Mary J. Kayser
City Secretary
8° D
00000
O'F-FI o 'L � o
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 2 of 3 —___-`___—_-_---
FUNDING BREAKDOWN SHEET
City Secretary No. 45802
Amendment No. 1
Department Fund-Account-Center Amount
PARD 39304-0800450-5580105--CO2262-C05830 $15, 454 . 00
Total : $15, 454 . 00
City of Fort Worth
Professional Services Agreement Amendment Template
PMO Official Release 8/1/2012
Page 3 of 3
PAPE-DAWSON
r ENGINEERS
July 14, 2015
Mr. Scott E. Penn
Parks and Community Services Dept.
City of Fort Worth
4200 South Freeway
Suite 220
Fort Worth, TX 76115-1499
RE: Pecan Valley Pump Station—Additional Services Request
Mr. Penn,
We have a signed contract for the Pecan Valley Pump Station project dated March 31, 2014.
The original tasks included coordination and design management, existing conditions and
topographic surveys, geotechnical surveys and report (Alpha Testing), Schematic Design,
Design Development, Construction Documents, Final Documents, Record Drawings, and
Constriction Observation. We are submitting this additional services request for the additional
scope items required by the US Army Corps of Engineers requirement for an archeological
survey. The City of Fort Worth proposes to develop a 0.6-acre tract of land in Fort Worth,
Tarrant County, Texas. The project is situated on land the City of Fort Worth leases from the
United States Army Corps of Engineers, Fort Worth District (USACE), and will require
compliance with Section 404 of the Clean Water Act. As a result, compliance with Section 106
of the National Historic Preservation Act will also be necessary.
The following scope items for additional efforts for this project are listed below:
TASK 1- BACKGROUND STUDY $1,026
Prior to initiating fieldwork, Pape-Dawson archaeologists will perform a background
literature review to ascertain whether any cultural resources constraints exist in the
project area. Archaeologists will consult the Texas Historical Commission's (THC)
online Texas Archeological Sites Atlas and Texas Historic Sites Atlas, data files at the
Dallas I San Antonia I Austin I Houston I Fort Worth
Transportation I Water Resources I Land Development I Surveying I Environmental
5700 W.Plano Pkwy.,Suite 2500,Plano,TX 75093 T:214.420.8494 www.Pape-Dawson.com
lir. Scott E.Penn
Pecan Valley Pump Station
July 14,2015
Page 2 of 4
Texas Archeological Research Laboratory, and the National Register of Historic Places
(NRHP) database to locate previously recorded cultural resources within 1 kilometer of
the project area, including those listed in the NRNP, SALs, Official State of Texas
Historical Markers (OTHMs), Recorded Texas Archeological Landmarks (RTHLs), and
cemeteries. If appropriate, Sanborn maps and other historic maps may be reviewed. This
data, along with soils and geology for the project area, will be included in the draft report.
TASK 2- FIELDWORK $3,264
Prior to project constriction, Pape-Dawson archaeologists will undertake an
archaeological survey of the 0.6 acre project area. Archaeologists will perform a 100%
pedestrian survey of this area supplemented by backhoe trenching in areas where
pavement will be removed and/or improvements will occur. Trenches will be excavated
in 4-6 inch layers, with a smooth blade bucket if one is available. Trenching may be
precluded by existing structures, asphalt, or other conditions. Diagnostic artifacts will be
collected for analysis and returned to the landowner or discarded with landowner
permission once the project has been completed. A representative sample of all non-
diagnostic artifacts observed during the survey will be photographed in the field but will
not be collected. Trenches will be mapped using a handheld Trimble GPS unit.
If archaeological sites are located on the property, site boundaries will be defined within
the project area. Sites will be recorded on TexSite forms in the field, and the forms will
be submitted to the Texas Archeological Research Laboratory (TARL) in order to obtain
trinomials for newly recorded sites and to update the records for previously recorded
sites.
TASK 3-REPORT $59709
Following the completion of fieldwork and analysis, Pape-Dawson will produce a draft
report that conforms to the Council of Texas Archeologists' report guidelines. The report
will detail the methods and results of the field efforts and will include maps showing the
location of any recorded archaeological sites. This report will be sent to the USACE and
to the THC for review. Once the report has been approved, Pape-Dawson will produce a
final report.
PAPE-DAWSON
r1i
ENGINEERS
Mr.Scott E.Penn
Pecan Valley Pump Station
July 14,2015
Page 3 of 4
TASK 4- ARTIFACT ANALYSIS $859
Diagnostic artifacts will be collected and brought back to Pape-Dawson in Austin for
cleaning and analysis. Artifacts may be washed in distilled water and air-dried on drying
racks or dry brushed prior to analysis. Archaeologists will analyze the artifacts according
to class and material type and will include the results in the report. After analysis is
complete, archaeologists will return or discard any collected artifacts. Paperwork will be
curated with the Texas Archeological Research Laboratory.
EXPENSES $4,596
Expenses for this project will include fees for equipment rental, backhoe and operator,
report production, and Texas Archeological Research Laboratory fees.
ASSUMPTIONS
❑ The proposed survey will encompass approximately 0.6 acres of land.
❑ Compliance with the Antiquities Code of Texas will not be necessary.
❑ If archaeological monitoring of bore entrance and exit pits is required, the associated
cultural work will be covered under a supplemental scope and budget.
❑ Assumes right-of-entry will be obtained for the project area prior to fieldwork
❑ Backhoe trenching will conform to OSHA safety standards.
❑ Pape-Dawson will contract with backhoe and operator.
❑ A maximum of three backhoe trenches will be excavated.
❑ All work will be within the boundaries of the proposed project area.
❑ Assumes one new archaeological site will be found
❑ If an historical archaeological site is discovered, archival research may be required. This
would be covered under a supplemental scope and budget
❑ If necessary, archaeological testing and/or data recovery will be covered under a
supplemental scope and budget.
❑ Only diagnostic artifacts will be collected
❑ Curation costs are an estimate only;actual costs will vary according to amount of
paperwork generated.
rdPAPE-DAWSON
ENGINEERS
Mr.Scott E. Penn
Pecan Valley Pump Station
July 14,2015
Page 4 of 4
No h►anan burials will be encountered
If historic resources survey is required, it will be covered ender a separate scope and
budget.
One round of agency comments will be addressed.
COST
Pape-Dawson will complete the above scope of work for a lump sum of$15,454.The specific
task breakdown is as follows:
TASK 1-BACKGROUND STUDY $1,026
TASK 2-FIELD WORK $3,264
TASK 3-REPORT $5,709
TASK 4-ANALYSIS & CURATION $859
LABOR TOTAL $10,858
EXPENSE TOTAL $4,596
The total adjustment to the contract is a total of$15,454 for the additional services.
Thank you for the opportunity to provide these services. If you have any questions, please do
not hesitate to contact us.
Sincerely,
Pape-Dawson Engineers,Inc. CITY OF FORT WORTH
Texas Board of Professional Engineers.Firm Registration#470
J es H. Yu, P ., LEED AP Signature:
Project Manager Name:
Title:
Date:
0i,NfARKETAIG\PROPOS:SLS\LETTERS\2015\I507\150714.do x(15-02153)61039-00
IdPAPE-DAWSON
ENGINEERS
■