HomeMy WebLinkAboutContract 46412-FP1 Depart t TP&W Const. Services
DOE# Dat CITY SECRETARY` C
Project an gera i
Risk Manageme t ana OLT WORTH, .
D.O.E. Brotherton
CFA Westerman/Scanned 6-7
The Proceeding people have been CpfaWed concerning the request for final
payment&have released this projeft for such payment. — co.-? 9
TION AND PUBLIC WORKS (� �O I
Clearance Conducted By Shameka Kennedy PROJECT COMPLETION J
D.O.E. Ns: 7250
C P/LlOzz 9�
Regarding contract 117250 for THOMAS CROSSING PH 6-WATER&SEWER as required by the C S{#
WATER DEPARTMENT as approved by City Council on N/A through M&C N/A the director of the
WATER DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works
Department has accepted the project a
DLA
Original Contract Prices: $227,819.03
MARY42016 01
Amount of Approved Change Orders: No
Revised Contract Amount: �---��
Total Cost Work Completed: $227,819.03
Less Deductions:
Liquidated Damages: Days @$210.00/Day
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed: $227,819.03
Less Previous Payments: $0.00
Final Payment Due $227,819.03
Recom ended or Acceptance Date
Asst. Director, TPW - Infrastructure Design and Construction
Accepted -- - -- - -- - Date- —
Asst. pirector, WATER DEPARTMENTAk
lZ1�/
Asst. 4Mager Date
Comments: P265-541200-606150229983,P275-541200-706130229983 OFFICIAL RECORD
CITY SECRETARY
FT.WORTH,1rX
'� a(O5-
MAR 14 2016 �'g (oo l - Co aagq
City Project Numbers 02299 By. DOE Number 7250
Contract Name THOMAS CROSSING PH 6 Estimate Number 1
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 2/17/2016
Project Funding
Project Manager Lang City Secretary Contract Number 117250
Inspectors LAYER / ODEN Contract Date
Contractor VENUS CONSTRUCTION COMPANY Contract Time 40 CD
1426 S.MAIN P O BOX 90 Days Charged to Date 270 CD
MANSFIELD, TX 76063 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $227,819.03
Less %Retained $0.00
Net Earned $227,819.03
Earned This Period $227,819.03
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPovement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $227,819.03
Wednesday,February 17,2016 Page 4 of 4
P 1�(P"S-- 0 � q
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name THOMAS CROSSING PH 6
Contract Limits
Project Type WATER&SEWER
City Project Numbers 02299
DOE Number 7250
Estimate Number I Payment Number I For Period Ending 2/17/2016
CD
City Secretary Contract Number 117250 Contract Time 4(rD
Contract Date Days Charged to Date 270
Project Manager Long Contract is 100.00 Complete
Contractor VENUS CONSTRUCTION COMPANY
1426 S.MAIN P O BOX 90
MANSFIELD, TX 76063
Inspectors LAYER / ODEN
Wednesday,February 17,2016 Page 1 of 4
City Project Numbers 02299 DOE Number 7250
Contract Name THOMAS CROSSING PH 6 Estimate Number I
Contract Limits Payment Number I
Project Type WATER&SEWER For Period Ending 2/17/2016
Project Funding
WATER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
----- ---------------------------------- --
1 DUCTILE IRON WATER FITTINGS 1 LF $8,965.32 $8,965.32 1 $8,965.32
W/RESTRAINT
2 6"PVC WATER PIPE 12 LF $50.00 $600.00 12 $600.00
3 8"PVC WATER PIPE 2005 EA $21.45 $43,007.25 2005 $43,007.25
4 FIRE HYDRANT 2 EA $2,660.55 $5,321.10 2 $5,321,10
5 1"WATER SERVICE 47 EA $695.83 $32,704.01 47 $32,704.01
6 6"GATE VALVE 2 EA $600.00 $1,200.00 2 $1,200.00
7 8"GATE VALVE 4 EA $977.41 $3,909.64 4 $3,909.64
---------------------------------------
Sub-Total of Previous Unit $95,707.32 $95,707.32
SEWER
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-----------------------------------------
1 POST CCTV INSPECTION 1910 LF $1.25 $2,387.50 1910 $2,387.50
2 MANHOLE VACUUM TESTING 13 EA $125.00 $1,625.00 13 $1,625.00
3 TRENCH SAFETY 1910 LF $0.26 $496.60 1910 $496.60
4 4"SEWER SERVICE 46 EA $625.86 $28,789.56 46 $28,789.56
5 8"SEWER PIPE 1830 LF $28.44 $52,045.20 1830 $52,045.20
i
6 8"SEWER PIPE CSS BACKFILL 80 LF $40.00 $3,200.00 80 $3,200.00
7 4'MANHOLE 13 EA $3,274.45 $42,567.85 13 $42,567.85
8 4'EXTRA DEPTH MANHOLE 10 VF $100.00 $1,000.00 10 $1,000.00
---------------------------------------
Sub-Total of Previous Unit $132,111.71 $132,111.71
---------------------------------------
Wednesday,February 17,2016 Page 2 of 4
City Project Numbers 02299 DOE Number 7250
Contract Name THOMAS CROSSING PH 6 Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 2/17/2016
Project Funding
Contract Information Summary
Original Contract Amount $227,819.03
ChanzTe Orders
Total Contract Price $227,819.03
�C Ael Dat Total Cost of Work Completed $227,819.03
Contr o Less %Retained $0.00
Net Earned $227,819.03
. Date c 2
Inspection pe s Earned This Period $227,819.03
Retainage This Period $0.00
Date
a / Less Liquidated Damages
Project Menr
Days Q /Day $0.00
ate
13L1,111 LessPavement Deficiency $0.00
Asst DirI ector/TPW-Infrastructure Design and Construction Less Penalty $0.00
'l Date Less Previous Payment $0.00
Director/Contracting Department Plus Material on Band Less 15% $0.00
Balance Due This Payment $227,819.03
2
Wednesday,February 17,2016 Page 3 of 4
FORTWORTH rev 03/05/07
TRANSPORTATION &PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Thomas Crossing Phase 6
PROJECT NO.: 02299 CONTRACTOR: Venus construction
DOE NO.: 7250
PERIOD FROM:05/08/15 TO: 03/11/16 FINAL INSPECTION DATE: 16-Feb-16
WORK ORDER EFFECTIVE:5/8/2015 CONTRACT TIME: 90 0 WI(j) CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CHARGED CREDITED
DURING DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS 0 0 0 0 270 270
PERIOD
PREVIOUS 0 0 0 0 0
PERIOD
TOTALS 0 0 0 0 270 270
TO DATE
*REMARKS:
-off - 12
CONTRACTOR DATE INSPECTOR DATE
ENGINEERING DEPARTMENT
(a The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02/20/07
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I) CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Venus Construction Thomas Crossing Ph 6-Water&Sewer
DOE Inspector DOE Number
Weyman Oden 7250
DOE Inspector Project Manager
❑ Water❑ Waste Water❑ Storm Drainage❑ Pavement Mike Domenech
Initial Contract Amount Project Difficulty
$227,819.03 O Simple Routine Q Complex
Final Contract Amount Date
$227,819.03 12/25/2016
In PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 3 60 45
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 1 3 1 20 1 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 341
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 341
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS]*100%) 341 / 448 = 76%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >_80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature DOE InspectorSignature Contractor1
Signature DOE Inspector's Supervisor
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
(a The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
AFFIDAVIT
STATE OF Texas
COUNTY OF Tarrant
Before me,the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Sam McAda,
President Of Venus Construcion Co,known to me to be a credible person,
who being by me duly sworn,upon his oath deposed and said;
1
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Thomas Crossing Phase 6
BY
Sam McAda
McAda
Subscribed and sworn before me on this date 23rd of February, 2016.
( � VANESSA RENFRON
���— "" o�✓ * Notary Public
Notary Public N. State of Texas
Tarrant County,TX 'TFOF cY+ My Comm. Exp.07-28-2019
CONSENT OF OWNER o
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑ Bond No.PB02253100353
OTHER
PROJECT:Thomas Crossing Phase 6 PROJECT NO. 02299
TO: City of Fort Worth CONTRACT FOR:
1000 Throckmorton Street Construction
Fort Worth,TX 76102
CONTRACTOR: Venus Construction Company CONTRACT DATE:February 1,2015
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
Philadelphia Indemnity Insurance Company STS'
on Bond of
Venus Construction Company CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not
relieve the Surety Company of any of its obligations to
City of Fort Worth ,OWNER,
as set forth in the said Surety Company's bond.
i
IN WITNESS WIEREOF,
the Surety has hereunto set its hand this 23rd day of February ,2016
_Philadelphia Indemnity Insurance Company
Surety Company
Signature of Authorized Representative
Attes'>- /fL�✓ ����1'-1 Charles K.Miller AttornewIn-Fact
Title
CAid.S�t OFSUREI'YCCWANYTOFINALPAYME TI' ONEPAGE
2580
PHILADELPHIA INDEMNITY INSURANCE COrYIPANY
One Bala Plaza,Suite 100
Bala Cynwyd,PA 19004
Power of Attorney
KNOW ALL PERSONS BY THESE PRESENTS: that PHILADELPHIA It IDENIPIITY INSURANCE CONIPANY(the Company),a corporation organized and
existing under the laws of the Cotmnonwealth of Pean_sytvania,does hereby constitute and appoint: Clint Norris,Steven J.Zinecker,Jessien Luna Nfimtgomery,
Shannon Lewis and Charles K.Nfiiler of Southwest Assurance Group,Inc..
Its hue and lawful Attorney(s)in fact with full authority to execute on its behalf bonds,undertakings,recognizances and other contracts of indemnity and writings
obligatory in the nature thereof,issued in the course of its business and to bind the Company thereby,in an amount not to exceed$25,000,000
This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of
PHILADELPHIA INDEMNITY INSURANCE COMPANY ata meeting duty called the l'day of July,2011.
RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the
Company to: (1) Appoint Attorneys) in Fact and authorize the Attomey(s) in Fact to
execute on behalf of the Company bonds and undertakings,contracts of indemnity and
other writings obligatory in the nature thereof and to attach the seal of the Company
thereto; and (2) to remove, at any time, any such Attorney-in-Fact and revoke the
authority given. And,be it
FURTHER
RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any
such Power of Attorney or certificate relating thereto by facsimile,and any such Power of
Attorney so executed and certified by facsimile signatures and facsimile seal shall be
valid and binding upon the Company in the future with the respect to any bond or
undertaking to which it is attached.
N TESTIMONY WHEREOF,PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND
ITS CORPORATE SEALTO BE AFFL(ED BY ITS AUTHORIZED OFFICE THIS Tru DAY OF FEBRUARY 2013.
I -
(Seal)
Robert D.O'Leary Jr.,President&CEO
Philadelphia Indemnity Insurance Company
On this 7h day of February 2013,before me came the individual who executed the preceding instrument,to me personally known,and being by me duly sworn said that
he is the therein described and authorized officer of the PHILADELPHIA INDElYMTY INSURANCE COMPANY;that the seal affixed to said instrument is the
Corporate seal ofsaid Company;that the said Corporate Seal and his signature were duly affixed.
CDM dOciNt(=JU.-n•F OF4sW5YR1lAMf+ �
NOTARIALSMI:b'
DANIELLE PoRATH,NdaryPubAo '
My c Mratian n .,Nuntgam Cau�ry
M Comm{asiat Kest,{�ctt�X19 V!�
Notary Public: �
- i
residing at: Bala Cvmvvd PA
(Notary Seal)
My commission expires: March 22.2016
I,Craig P.Keller,Executive Vice President,Chief Financial Officer and Secretary of PHILADELPHIA NDENINITY INSURANCE COMPANY,do herby certify that
the foregoing resolution of the Board of Directors and this Power of Attorney issued pursuant thereto are-true and correct and are still in full force and effect.I do
further certify that Robert D.O'Leary Jr.,who executed the Power of Attorney as President,was on the date of execution of the attached Power of Attorney the duty
elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY,
In Testimony Whereof I have subscribed my name and affixed the facsimile seal of each Company this 23rd day of February .2o16
1
...
i.:
..........
Craig P.Keller,Executive Vice President,Chief Financial Officer&Secreiar} j
PHILADELPHIA INDENT ITY INSURANCE COMPANY
. u,araaa
i
IIMPOR T ASI T NOTICE ADVISO IN PORTANTE
To obtain information or make a complaint: Para obener informacion o para someter
`('ou may call the Sureb/s toll free telephoms una gueja: Usted puede llamar al nunnero
number for information or to make a de telefono gratis de para inforrnacion o
complaint at: para someter una gueja al:
1-877-438-7459 1-877-438-7459
You may also write Philadelphia Indemnity Usted tanbien puede escribir a Philadelphia
insurance Company at: Indemnity Insurance Company at:
One Bala Plaza, Suite 100 One Bala Plaza, Suite 100
Bala Cynwyd, PA 19004 Bala Cynwyd, PA 19004
Attention: Senior Vice President and Attention: Senior Vice President and
Director of Surety Director of Surety
You may contact the Texas Department of Puede comunicarse con el Departamento
insurance to obtain information on de Seguros de Texas para obtener
companies,--coverage, rights or complaints information acerca de companias,
at: coberturas, derechos o guejas at:
1-800-252-3439. 1-890-252x3439
You may write the Texas Department of Puede escribir al Departmento de Seguros
Insurance at: de Texas:
P.O. Box 149104 P.O. Box 149104
Austin, TY 78714-9104 Austin, TX 78714-9104
Fax# 812-475-1771 Fax# 512-475=1771
Web: ht'to://v.�rniv.tdi.state.tx.us Web: hiio://41r+ivjw.tdi.state.tx.us
i
Email: Cons umerProtection,�tdi.state.tx.us Email: ConsumerProtectionCD-tdi.state_tx.us
PREMIUM OR CLAIM DISPUTES: Should DISPUTAS SOBRE PRIMAS O
you have a dispute concerning your RECLAMOS: Si tiene una disputa
premium or about a claim, you should concerniente a su prima o a un reclamo,
contact the Surety first. If the dispute is not debe comunicarse con el Surety primero. Si
resolved, you may contact the Texas no se resuelve is disputa, puede entonces
Department of insurance. -comunicarrse con el departamento (TDI).
ATTACH THIS NOTICE TO YOUR POLICY: UNA ESTE AVISO A SU POLiZA: Este
This notice is for information only and does aviso es solo para proposito de information
not become a part or condition of the y no se convierte en parte o condition del
attached document. documento adjunto.
FORTWORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Thomas Crossing,Phase 6
PROJECT NUMBER: 2299
DOE NUMBER: 7250
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 6" PVC 12
Yes 8" PVC 2005
FIRE HYDRANTS: 2 VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 1" Copper 47
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 8" PVC 1830
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Yes
NEW SERVICES: 4" PVC 46
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845
FORTWORTHREV:02'22'07
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date: 2/25/2016
Name of Contractor Project Name
Venus Construction Thomas Crossing Ph 6-Water and Sewer
DOElnspector Project Manager v
We an Oden Aaron Lon
DOE Number Project Difficulty Type of Contract
7250 0 Simple Os Routine 0 Complex ❑ water[-] Waste water❑✓ Storm Drainages Pavement
Initial Contract Amount Final Contract Amount
$227,819.03 $227,819.03
II)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accurac of Measured Quantities 3 A221icability of Specifications
4 Dis2lay Of Professionalism 4 Accuracy of Plan uantities
5 Citizen Comj2laint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting u Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Mana er
I Change Order Processing Time 13 Communication
2 Timliness of Contractor Payments 14 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor r C
Signature DOE Inspector
Signature DOE DOE Inspector's Supervisors! _
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
10 The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-7941 •Fax:(817)392-7845