Loading...
HomeMy WebLinkAboutOrdinance 7312 ORDINANCE NO, ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF Pearl Avenue AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH T., aRTMFS & CQ- - TN( FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE, WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with � . rrimec & Co— Tnr-_ , for the making and construction of certain street improvements on the hereinafter described Portions of streets, avenues and public places in said City, to-wit- UNIT 1: PEARL AVENUE From Long Avenue to NGT 35th Street, known and designated as Project No. 104-24000-246, Unit 1. UNIT 2: N. HARDY STREET From Fort Worth & Denver Railroad to 33rd Street, known and designated as Project No. 104-24000- 246, Unit 2. UNIT 3: WHITE SETTLEMENT ACCESS ROAD From Carroll Street to Vacek Street, known and designated as Project No. 104-24000-246, Unit 3. UNIT 4: RUDD STREET From Dillard Street to Birdell Street, known and designated as Project No. 104-24000-246, Unit 4. UNIT 5: WINDOWMERE From Edgewood Terrace to 480' east, known and designated as Project No. 104-24000-246, Unit 5. UNIT 6: LENA STREET From Ramey Avenue to 116' north of Callahan Street, known and designated as Project No. 104-24000-246, Unit 6. WHEREAS,-by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 7178 . a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and,, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined thato in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by. Ordinance No. 7178 and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described., and have been inspected and found to be in complete accordance with the contract therefor; NOW, THE FORE, BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets2 avenues and public places hereinabove described be., and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. Ii. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in-evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro— perty assessed andshall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates,, together with the names of the owners of said property, the principal amount of the assessment,, the respective credits., if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE FROM LONG AVENUE TO N14 35TH STREET, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WORTH HILLS ADDITION Beginning at the northwest corner of Long Avenue and Pearl Avenue Curtis Williams 2 & 3 9 75' Pavement $3.03 $227.25 2708 NW 30th Res. 751 Curb & Gutter 3.47 260.25 76106 $487.50 Mrs. Mary Brown 4 9 50' Pavement $3.03 $151.50 748 Hemlock Res. 501 Curb & Gutter 3.47 173.50 Stockton, Calif. $325.00 Emma Lee Wilson 5 9 50' Pavement $3.03 $151.50 Address unknown Res. 50' Curb & Gutter 3.47 173.50 $325.00 Smith Custom Homes, Inc. 6 9 50' Pavement $3.03 $151.50 4508 Emerson Res. 50' Curb & Gutter 3.47 173.50 76119 $325.00 Elgin Willis 7 9 50' Pavement $3.03 $151.50 3306 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 1. PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE FROM LONG AVENUE TO NW 35TH STREET Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WORTH HILLS ADDITION City of Fort Worth 8 9 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 - 0 - Esther Gillis 9 9 50' Pavement $3.03 $151.50 3317 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Pearline Robinson 10 9 50' Pavement $3.03 $151.50 5817 Diaz Res. 50' Curb & Gutter 3.47 173.50 76107 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Rodger Gross 11 9 50' Pavement $3.03 $151.50 3321 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Elbert Penson 12 9 50' Pavement $3.03 $151.50 2707 Lee Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 NW 34th Street intersects 2. PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE Continued: BLOCK. OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WORTH BILLS ADDITION Maud Stewart McGill 1 & 2 5 100' Pavement $3.03 $303.00 3401 Pearl Res. 100' Curb & Gutter 3.47 347.00 76106 $650.00 Major Moore Estate 3 5 50' Pavement $3.03 $151.50 c/o Lillian Morris Res. 50' Curb & Gutter 3.47 173.50 3121 Ross $325.00 76106 Jack Battie 4 5 50' Pavement $3.03 $151.50 3405 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 City of Fort Worth 5 5 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 - 0 - Catherine Younger 6 & 7 5 100' Pavement $3.03 $303.00 3413 Pearl Res. 100' Curb & Gutter 3.47 347.00 76106 41 Sq. Ft. Driveway 1.33 54.53 $704.53 Clara M. Patterson 8 & 9 5 100' Pavement $3.03 $303.00 5209 Woodmoor Res. 100' Curb & Gutter 3.47 347.00 Austin, Texas $650.00 3. PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WORTH HILLS ADDITION Idee & Mabel Craft 10 5 35' Pavement $3.03 $106.05 1601 Dillard Res, 35' Curb & Gutter 3.47 121.45 76105 41 Sq. Ft. Driveway 1.33 54.53 $282.03 NW 35th Street intersects EAST SIDE WORTH HILLS ADDITION Vernon Foster 11 6 35' Pavement $3.03 $106.05 2901 Ross Res. 35' Curb & Gutter 3.47 121.45 76106 $227.50 City of Fort Worth 12 6 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 - 0 - Margie Lee Greathouse 13 6 50' Pavement $3.03 $151,50 3223 Refugio Res. 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Drive 1.33 54.53 $379.53 Leona Thompson 14 6 50' Pavement $3.03 $151,50 3412 Pearl Res, 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1,33 54.53 $379.53 Selma E. Bennett 15 6 50' Pavement $3.03 $151.50 3410 Pearl Res, 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1,33 54.53 $379.53 4. PROJECT NO.104-24000-2462 UNIT 1; PEARL AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE WORTH HILLS ADDITION Odessa M. Leonard 16 6 50' Pavement $3.03 $151.50 c/o Louis Washington Res. 50' Curb & Gutter 3.47 173.50 3412 Clinton $325.00 76106 Leona Thompson 17 6 50' Pavement $3.03 $151.50 3406 Pearl Res, 50' Curb & Gutter 3,47 173.50 76106 41 Sq. Ft. Driveway 1.33 54.53 $379.53 Odessa Holley 18 6 50' Pavement $3.03 $151.50 3404 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 41 Sq. Ft. Driveway 1.33 54.53 $379.53 Hubert Flowers 19 6 50' Pavement $3.03 $151.50 3402 Pearl Street Res, 50' Curb & Gutter 3.47 173.50 76106 41 Sq. ft. Driveway 1.33 54.53 $379.53 Mary Pearson 20 6 50' Pavement $3.03 $151.50 3400 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 Yq 34th Street intersects 5. PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE WORTH HILLS ADDITION Louis Stidham 13 8 50' Pavement $3.03 $151.50 3322 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Chester Lynn Stidham 14 8 50' Pavement $3.03 $151.50 3322 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 Virginia Jones 15 8 50' Pavement $3.03 $151.50 3206 Refugio Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 James Pulliam 16 8 50' Pavement $3.03 $151.50 5922 Haas Avenue Res. 50' Curb & Gutter 3.47 173.50 Los Angeles, Calif. $325.00 011ie Davis 17 8 50' Pavement $3.03 $151.50 3314 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 City of Fort Worth 18 8 50' Pavement $3.03 $151.50 Res. 50' Curb & Gutter 3.47 173.50 $325.00 - 0 - 6. PROJECT NO. 104-24000-246, UNIT 1: PEARL AVENUE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE WORTH HILLS ADDITION Katherine Brown 19 8 50' Pavement $3.03 $151.50 3310 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 85 Sq. Ft. Driveway 1.33 113.05 $438.05 Gertrude Wilson D 8 50' Pavement $3.03 $151.50 3308 Pearl Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 Major Moore Estate C 8 50' Pavement $3.03 $151.50 c/o Lillian Morris Res. 50' Curb & Gutter 3.47 173.50 3121 Ross 85 Sq. Ft. Driveway 1.33 113.05 76106 $438.05 Metropolitan Parking A & B 8 75' Pavement $3.03 $227.25 1301 Sinclair Bldg. Res. 75' Curb & Gutter 3.47 260.25 76102 $487.50 TOTAL COST TO PROPERTY OWNERS.. ... . ..... .. . . ... ... .. . .$13,283.69 TOTAL COST TO CITY OF FORT WORTH.. ..... .. . .. ...... . ...$20,528.91 (Includes $1,300.00 assessment on City owned property) TOTAL CONSTRUCTION COST. .... .. . .. . . . . . .. .. .. .... . ... ..$33,812.60 7. PROJECT NO. 104-24000-246, UNIT 2: N. HARDY STREET FROM FORT WORTH & DENVER RR TO 33RD STREET' to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete driveways will be constructed where specified, BLOCK 014NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE DIXIE WAGON MANUFACTURING ADDITION Beginning at the S. W. corner of Lot 12, Block 2, Dixie Wagon manufacturing Addition Mrs. Paula Miller Fulps 12 2 50' Pavement $3.03 $151.50 2504 Vera Cruz Res. 501 Curb & Gutter 3.47 173.50 76106 118 Sq. Ft. Driveway 1.33 156.94 $481.94 Mario Mendez 13 2 50' Pavement $3.03 $151.50 3558 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 118 Sq. Ft. Driveway 1.33 156.94 $481.94 Fransisca R. Alfaro 14 2 50' Pavement $3.03 $151.50 3261 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 118 Sq. Ft. Driveway 1.33 156.94 $481.94 James E. Oden 15 & 16 2 100' Pavement $3.03 $303.00 349 W. Southern Res. 100' Curb & Gutter 3.47 347.00 Saginaw, Texas $650.00 76179 Glendora Street intersects 8. PROJECT NO. 104-24000-246, UNIT 2: N. HARDY STREET Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE DIXIE WAGON MANUFACTURING ADDITION Joe Drummond - 7 1 50' Pavement $3.03 $151.50 c/o Drummond Co. Realtors Res. 50' Curb & Gutter 3.47 173.50 2400 E. Belknap 118 Sq. Ft. Driveway 1.33 156.94 76111 $481.94 Mrs. Anita Cabral 8 1 50' Pavement $3.03 $151.50 3303 Hardy Street Res. 50' Curb & Gutter 3.47 173.50 Fort Worth, Texas 118 Sq. Ft. Driveway 1.33 156.94 76106 $481.94 Mary Pitts 9 & 10 1 100' Pavement $3.03. $303.00 3870 Davis Res. 100' Curb & Gutter 3.47 347.00 Dallas, Texas 118 Sq. Ft. Driveway 1.33 156.94 $806.94 Mrs. Jimmy L. Whatley Pitts 11 & 1 100' Pavement $3.03 $303.00 3321 N. Hardy 12 Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 33rd Street intersects EAST SIDE Mrs. Epimenia L. Torres 1 & 2 3 100' Pavement $3.03 $303.00 1505 NE 33rd Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 Mrs. Irene Gonzales 3 3 50' Pavement $3.03 $151.50 3306 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 118 Sq. Ft. Driveway 1.33 156.94 $490.94 9. PROJECT NO. 104-24000-246, UNIT 2: N. HARDY STREET Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE DIXIE WAGON MANUFACTURING ADDITION Jeronimo H. Rios 4 & 5 3 100' Pavement $3.03 $303.00 3304 N. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 236 Sq. Ft. Driveway 1.33 313.88 $963.88 Minnie Benavides 6 3 50' Pavement $3.03 $151.50 26 Devonshire Res. 50' Curb & Gutter 3.47 173.50 Bedford, Texas 118 Sq. Ft. Driveway 1.33 156.94 $481.94 Glendora Street intersects Aubrey C. Kinney 1 4 50' Pavement $3.03 $151.50 3264 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 $325.00 Bernice Taylor 2 4 50' Pavement $3.03 $151.50 3262 N. Hardy Res. 50' Curb & Gutter 3.47 173.50 76106 118 Sq. Ft. Driveway 1.33 156.94 $481.94 Mrs. Gladys Miller 3 & 4 4 100' Pavement $3.03 $303.00 3260 N. Hardy Res. 100' Curb & Gutter 3.47 347.00 76106 118 Sq. Ft. Driveway 1.33 156.94 $806.94 10. PROJECT NO, 104-24000-246, UNIT 2: N. HARDY STREET, Continued: BLOCIZ OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE DIXIE WAGON MANUFACTURING ADDITION Moates & Graham 5 4 50' Pavement $3.03 $151.50 200 Houston Street Res. 50' Curb & Gutter 3.47 173.50 76102 $325.00 TOTAL COST TO PROPERTY OWNERS. . . ... ... . . .. . ... .$ 9,356.16 TOTAL COST TO CITY OF FORT WORTH.. .... .. . . ... ..$11,391.04 TOTAL CONSTRUCTION COST. . .. .. .... . . .. .. . .. . ... .$20,747.20 11, PROJECT NO. 104-24000-246 UNIT 3'r WHITE SETTLEMENT ACCESS ROAD FROM CARROLL TO VACEK, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BAILEY'S INDUSTRIAL ADDITION Beginning at the S.W. corner of Lot 11, Block 16, Bailey's Industrial Additiox- John T. Cross Estate 11 & Wk 16 135' Frontage c/o 1st Nat'l Bank of 10 Ind. 100' Pavement $12,13 $1,213.00 P.O. Box 2260 100' Curb & Gutter 3.49 349.00 76101 215 Sq. Ft. Driveway 1.33 285.95 $1,847.95 Hubbards Garage Ek of 10 16 50' Pavement $12.13 $ 606.50 c/o Southwest Bank Ind, 50' Curb & Gutter 3.49 174.50 P.O. Box 16400 215 Sq. Ft. Driveway 1.33 285.95 76133 $1,066.95 John F. Hubbard, Sr. Wi of 9 16 50' Pavement $12.13 $ Roy E. Hubbard & Ind. 50' Curb & Gutter 3.49 174. 50 T. R. Hubbard 215 Sq. Ft. Driveway 1.33 285.95 c/o Southwest Bank $1,066.95 P.O...Box 16400 76133 A. J. Cooles Ek of 9, & Wk 16 100' Pavement $12.13 $12213.00 4708 Ranchview of 8 Ind. 100' Curb & Gutter 3.49 349.00 76109 *269 Sq. Ft. Driveway 1.33 357.77 $1,919.77 12. PROJECT NO. 104-24000-246, UNIT 3; WHITE SETTLEMENT ACCESS ROAD, Continued; BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BAILEY'S-;INDUSTRIAL ADDITION Corona Plumbing Supply Co. P. 0. Box 9339 7 & EZ of 16 155.15' Pavement $12.13 $1,881.97 76107 8 Ind. 155.15' Curb & Gutter 3.49 541.47 $2,423.44 TOTAL COST TO PROPERTY OWNERS... ... . ... . .. . .... ......$ 8,325.06 TOTAL COST TO CITY OF FORT WORTH. ... . ....... .. . .. . ...$12,399.49 TOTALCONSTRUCTION COST. .. .. ............ .. ..... .... ..$20,724.55 13. PROJECT NO. 104-24000-246, UNIT 4: RUDD STREET FROM DILIARD STREET TO BIRDELL STREET, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized sub-rade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE WALTER WILLIE ADDITION Beginning at the S. E. corner of Dillard Street and Rudd Street Versie Thomas 7 7 140' Side lot adjusted to: 1725 Dillard Res. 100' Pavement $3.03 $303.00 76105 100' Curb & Gutter 3.47 347.00 $650.00 Claudine Crenshaw 8A 12 50' Pavement $3.03 $151.50 5301 Rudd Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Percy Crenshaw 8-B 12 110' Pavement $3.03 $333.30 5303 Rudd Res. 110' Curb & Gutter 3.47 381.70 76105 96 Sq. Ft. Driveway 1.33 127.68 $842.68 Mercer W. James 5A, 5B & 5C 12 175' Pavement $3.03 $530.25 5305 Rudd Res. 175' Curb & Gutter 3.47 607.25 76105 96 Sq. Ft. Driveway 1.33 127.68 $1,265.18 T. B. Mallicote 4A 12 150 Side lot adjusted to: 4531 Martha Lane Res. 100' Pavement $3.03 $303.00 76103 100' Curb & Gutter 3.47 347.00 $650.00 Birdell Street intersects 14. PROJECT NO. 104-24000-246, UNI' 4. RUDD STREET' Continued: 4 � BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE WALTER WILLI ADDITION Betty „Jean Cotton Johnson 1 13 150' Side lot adjusted to: & Willie L. Johnson Res. 100' Pavement $3.03 $303.00 5308 Rudd 100' Curb & Gutter 3,47 347.00 76105 96 Sq. Ft. Driveway 1.33 127.68 $777.68. Betty Strickland 4-D 13 87.3' Pavement $3.03 $264.52 5308 Rudd Res. 87.3' Curb & Gutter 3.47 302.93 76105 $567.41 New Bethany Baptist 4-C 13 87.3' Pavement $3.03 Church Res. 87.3' Curb & Gutter 3.47 $302.93 c/o Rev. W. fit.' Jones 175 Sq. Ft. Driveway 1.33 232075 5520 Fitzhugh _ $800.20 76105 Henry Hood 5-B 4 60' Pavement $3.03 $181.80 c/o Herman Willi Res. 60' Curb & Gutter 3.47 208.20 6325 Inca $390.00 76116 E. C. Hood 5-A 13 100' Pavement $3.03 $303.00 5300 Rudd Res. 100' Curb & Gutter 3.47 347.00 76105 96 Sq. Fte Driveway 1.33 127.68 $777.68 15. PROJECT NO. 104-24000-246, UNIT 4, RUDD STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE WALTER WILLI ADDITION Earl Miller 2 4 142' Side lot adjusted. to: 6901 Corona Res. 100' Pavement $3.03 $303.00 76116 100' Curb & Gutter 3.47 347.00 $650.00 TOTAL COST TO PROPERTY OWNERS. .... ..... .. .. .. .. .... . .$ 7,823.51 TOTAL COST TO CITY OF FORT WORTH. .... ... ... . .. .. . ....$12,896.12 TOTAL CONSTRUCTION COST.. . .... .. ... ..... ... .. .. .... ..$20,719.63 16. PROJECT NO. 104-24000-24.6, UNIT 5: WINDOWNERE FROM EDGEWOOD TERRACE -To 4801 EAST, to be improved by constructing a five-inch thick hot.�nilx_ asphaltic concrete pavement on a five- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a twenty-eight foot roadway that ends in an eighty foot cul-de-sac. Six-inch thick concrete driveways will be constructed where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE C. S. DEVOLLS ADDITION Beginning at the S.E. corner of Edgewood Terrace and Windowmere Bethel Primitive 5-B 129.4 Side lot adjusted to: Baptist Church Res. 100' Pavement $3.03 $303.00 1009 S. Edgewood Terrace 1001 Curb & Gutter 3.47 347.00 76105 71 Sq. Ft. Driveway 1.33 94.43 $744.43 Lois Fisher 5-C 651 Pavement $3.03 $19&.95 4713 Windowmere Res. 651 curb & Gutter 3.47 225.55 76105 71 Sq. Ft. Driveway 1,33 94.43 $516.93 George &Ella Steward 5-D 65' Pavement $3.03 $196.95 940 E. Ramey Res. 65' Curb & Gutter 3.47 225.55 76104 $422.50 Leo Taylor 5-E 651 Pavement $3.03 $19&.95 4717 Windowmere Res. 651 curb & Gutter 3,47 225.55 76105 71 Sq. Ft. Driveway 1:33 94,.43 $516.93 SOUTH SIDE - Raymond Wheatfall 4-E 65' Pavement $3.03 $196.95 4716 Windowmere Res. 651 Curb & Gutter 3.47 225.55 76105 96 Sq. Ft. Driveway 1.33 127.68 $550.18 17. PROJECT NO. 104-24000-2462UNIT 5: WINDOWMERE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE C. S. DEVOLLS ADDITION Jerry Berkowitz 4-D 65' Pavement $3.03 $196.95 729 NW 28th Street Res. 65' Curb & Gutter 3.47 225.55 76106 96 Sq. Ft. Driveway 1.33 127.68 $550.18 Jasper T. Jordan 4-C 65' Pavement $3.03 $196.95 4712 Windowmere Res. 65' Curb & Gutter 3.47 225.55 76105 96 Sq. Ft. Driveway 1.33 127.68 $550.18 Fred Blair 4-A 129.4' Side lot adjusted to: 1101 S. Edgewood Terrace Res. 100' Pavement $3.03 $303.00 76105 100' Curb & Gutter 3.47 347.00 96 Sq. Ft. Driveway 1.33 127.68 $777.68 TOTAL COST TO PROPERTY OWNERS. ..... . . ... .. .. ...$ 4,629.01 TOTAL COST TO CITY OF FORT WORTH. . ..... ... . ... .$ 52899.05 TOTAL CONSTRUCTION COST. .... . .. . .. . ... .... .. .. .$10,528.06 Is. PROJECT N0, 104-24000-246, UNIT 6: LENA STREET FROM RAMEY AVENUE TO 116' NORTH OF CALLAIIAN e STREET, to be improvedby constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight- een inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE MAXWELL SUBDIVISION Beginning at the N.W. corner of Ramey Avenue and Lena Street Mrs. Ruth S. Smith 22 -3 116' Side lot adjusted to: - 4945 Ramey Res. 100' Pavement $3.03 $303.00 76105 100' Curb & Gutter 3.47 347.00 $650.00 L. J. Parker 11 3 116' Side lot adjusted to: 5424 E. Lancaster Res. 100' Pavement $3.03 $303.00 76112 100' Curb & Gutter 3.47 347.00 41 Sq. Ft. Driveway 1.33 54.53 $704,53 Harlem Street intersects Vera Johnson 22 2 116' Side lot adjusted to; c/o Pearl Taylor Res. 100' Pavement $3.03 $303.00 1212 Belevidere 100' Curb & Gutter 3.47 347.00 Oklahoma City, Okla. $650:00 73117 0. C. & Varnell Allen 11 2 116' Side lot adjusted to: 1216 E. Annie Res. 100' Pavement $3.03 $303.00 76104 100' Curb & Gutter 3.47 347.00 $650.00 19. PROJECT NO. 104.-24000-246, UNIT 6; LENA STREET FROM RAMEX AVENUE, Continued; BLOCK OW'i3ER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE MAXWELL SYBDIVIS ION Callahan Street intersects Nathaniel Bennett 11 1 116' Side lot adjusted to; 1508 Elm Res, 100' Pavement $3,03 $303,00 Roswell, New Mexico 100' Curb & Gutter 3.47 347.00 $650.00 EAST SIDE South Fort North 1 4 50' Pavement $3,03 $151.50 State Bank Res, 50' Curb & Gutter 3.47 173.50 P.O. Box 1480 $325.00 761.01 Orvil Shaw 2 4 50' Pavement $3,03 $151.50 2209 Lena Res, 50' Curb & Gutter 3.47 173,50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Jeffery Slaughter 3 4 50' Pavement $3.03 $151,50 2301 Lena Res, 50' Curb & Gutter 3,47 173.50 76105 96 Sr. Ft, Driveway x..33 127.68 $452.68 Giddi_ng Sanders to 4 50' Pavement $3..03 $151.50 2305 Lena Res, 50' Curb & Gutter 3.47 173.50 76105 96 Sq, Ft. Driveway 1..33 127,68 $452.68 20, PROJECT NO. 104-24000-246, UNIT 6, LENA STREET, Continued, BLOCK OWNER LOT ZONING IRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE MAXWELL SUBDIVISION Bennie Hibbler 5 4 50' Pavement $3,03 $151.50 2309 Lena Res. 50' Curb & Gutter 3,47 173,50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Winston H. Wilcox 6 4 50' Pavement $3.03 $151.50 2313 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq, Ft. Driveway 1.33 127.68 $452.68 Mary Hamlett 7 4 50' Pavement $3.03 $151.50 2616 Griffith Street Res. 50' Curb & Gutter 3.47 173.50 Los Angeles, Calif. $325.00 90011 J. C. Renfro 8 4 50' Pavement $3.03 $151.50 2319 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq, Ft, Driveway 1.33 127.68 $452.68 Ethel Jones 9 4 50' Pavement $3.03 $15-1.50 2401 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Willie D. Johnson 10 4 50' Pavement $3.03 $151.50 1130 E. Tucker Res. 50' Curb & Gutter 3.47 173.50 76104 $325.00 21. PROJECT NO. 104-24000-246, UNIT 6, LENA STREET, Continued: BLOCK 014NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE MAXWELL SUBDIVISION Mrs. Isabella Henderson 11 4 50' Pavement $3.03 $151.50 2409 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Rosie Randle 12 4 50' Pavement $3.03 $151.50 2413 Lena Res. 50' Curb & Gutter 3.47 173.50 76105 96 Sq. Ft. Driveway 1.33 127.68 $452.68 Johnny Edwards 13 4 77' Pavement $3.03 $233.31 4951 Ramey Res. 77' Curb & Gutter 3.47 267.19 76105 96 Sq. Ft. Driveway 1.33 127.68 $628.18 TOTAL COST TO PROPERTY OWNERS. .. ... .. ... .. .. .. . . ..$ 8,981.83 TOTAL COST TO CITY OF FORT WORTH.. .... ...... ... ...$21,821.26 TOTAL CONSTRUCTION COST. ... .... . ... ..... ..... . . ...$30,803.09 ALL UNITS: TOTAL COST TO PROPERTY OWNERS. ........ .... . . ...... .. ... ...$ 523,399.26 TOTAL COST TO CITY OF FORT WORTH. .. .... .. . ... .. . ...... . . . .$ 84,935.87 TOTAL CONSTRUCTION COST. . . .. .. .. . .. . .. . ........ ... ... .. . ..$137,335.13 22. UNE City of Fort Worth, Texas BA LIFE ®� and Council Communication DATE REFERENCE SUBJECT: Final Payment-Assessment Paving PAGE NUMBER 2/16,776 FP-1128e Six Locations on the East, North and 1of 2 ides Final Council action on the project described below is requested. Project Description Name: Assessment Paving at Six Locations on the East, North and West Sides, Project No. 104-24000-246 Contractor: L. Grimes and Co. , Inc. Contract Awarded: May 5, 1975 (M&C C-3076) Work Order Issued: July 16, 1975 Work Order Effective: July 21, 1975 Work Began: July 21, 1975 Date of Final Inspection and Approval: December 16, 1975 Working Time Bid: 76 Working Days Working Time Used: 73 Working Days Project Cost and Financing Original Bid Price: $126,547.18 Change Order No. 1: - 2,053.15 (A.R. 1-15, 2,2) Change Order No. 2 + 3,120.00 (A.R. 1-15,2.3.1) Revised Bid Price: 127,614.03 Final Contract Cost: 124,850.12 Partial Payments Previously Made: $108,359.62 Final Payment Due: $16,490.50 Final payment to be made from Project Number 104-24000-2.46. A bond fund transfer is needed in the amount of $1,387.63, from Revolving Fund for additional driveways built at the request of property owners. Deviation from Bid Price: The final contract cost of this project is $2,763.91 or 2.16 percent under the Revised Bid Price. The savings re- sulted because (1) it was not necessary to construct subdrain, and (2) Lbore were minor differences between quantities.estimated in the contract documents and quantities actually measured and 'used at the job site. Compliance with Specifications Tests made during construction show materials used and required thicknesses were in compliance with contract specifications. i DATE REFERENCE SUBJECT: Final Payment-Assessment Paving PAGE NUMBE2/16/76 FP-1128 at Six Locations on the East, North and 2 or _ 2 Recommendations It is recommended that 1) A bond fund transfer be approved in the amount of $1,387.63 from 042-09724-901, unspecified streets revolving fund to 042-10424-246, Assessment Paving at Six Locations on the East, North and West Sides Revolving Funds and, 2) That the project described be accepted by the adoption of an ordinance and final payment of $16,490.50 be made to L. Grimes & Co. Inc. RNL:lm SUBMITTED BY: DISPOSITION,frf COUNCIL: PROCES D BY APPROVED ❑ OTHER (DESCRIBE) / �/ 'CITY SECRET DATE CITY MANAGER