HomeMy WebLinkAboutContract 47610 CITY SECRETARY
CONTRACT W.
Developer and Project Information Cover Sheet:
Developer Company Name: Golden Triangle Retail Partners, LTP
Address, State,Zip Code: 3001 Knox Street, Suite 207, Dallas Texas 75205
Phone &Email: 214-445-2207/dleblanc@hanoverproperty.com
Authorized Signatory, Title: Richard E LeBlanc, President
Project Name and Brief Crawford Farms Plaza
Description:
Project Location: SW corner of N Beach Street and Golden Triangle Boulevard, Tarrant
County Texas
Plat Case Number: FS-15-184 Plat Name: Crawford Farms Plaza
Mapsco: 022N Council District: 7 City Project Number: 100049
CFA Number: 2016-008 DOE Number: N/A
To be completed b taff
Received by, Date:
City of Fort Worth,Texas OFFICIAl-RF-CORC
Standard Community Facilities Agreement CI"Ty SECRETARY
CFA Official Release Date: 10.07.2015F'�'�W(�R'TH,TX
Page 1 of 11
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Golden Triangle Retail Partners LTD
("Developer"), desires to make certain specific improvements as described below and on the
exhibits attached hereto ("Improvements") related to a project generally described as Crawford
Farms Plaza ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas
("City"); and
WHEREAS, the City has no obligation to participate in the cost of the Improvements or
Project; and
WHEREAS, any future City participation in this CFA is subject to the availability of
City funds and approval by the Fort Worth City Council and shall be memorialized as an
amendment to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Proj ect.
NOW, THEREFORE, for and in consideration of the covenants and conditions
contained herein, the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby
incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply
with all provisions of said Policy in the performance of its duties and obligations hereunder
and to cause all contractors hired by Developer to comply with the Policy in connection
with the work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section 11, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
City of Fort Worth;Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 2 of l l
further acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by
Developer for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike
manner and in accordance with all City standards and the City-approved construction
plans, specifications and cost estimates provided for the Project and the exhibits attached
hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) N. Sewer (A-1) M_ Paving (B) U. Storm Drain (B-1) El. Street Lights &
Signs (C) —1.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section 11, paragraph 7 of the Policy and the contracts shall be
administered in conformance with paragraph 8, Section 11, of the Policy. Developer shall
ensure its contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
is To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed
and bonded to do work in public ways and/or prequalified to perform
water/wastewater construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the
City for one hundred percent(100%) of the contract price of the infrastructure for
a period of two (2) years from the date of final acceptance insuring the
maintenance and repair of the constructed infrastructure during the term of the
City of Fort Worth,"Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 3 of 11
maintenance bond. All bonds to be furnished before work is commenced and to
meet the requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work
contemplated herein to provide insurance equal to or in excess of the amounts
required by the City's standard specifications and contract documents for
developer-awarded infrastructure construction contracts. The City shall be
named as additional insured on all insurance required by said documents and
same will be evidenced on the Certificate of Insurance (ACORD or other state-
approved form) supplied by the contractor's insurance provider and bound in the
construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available; to require the contractor to allow the construction to
be subject to inspection at any and all times by City inspection forces, to not
install or relocate any sanitary sewer, storm drain, or water pipe unless a
responsible City inspector is present and gives his consent to proceed, and to
make such laboratory tests of materials being used as may be required by the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 4 of 11
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community
facilities to be installed hereunder.
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements
across property owned by Developer and required for the construction of the current and
future improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character, whether real or asserted, brought
for or on account of any injuries or damages sustained by any persons (including
death) or to any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by said Developer,
its contractors, subcontractors, officers, agents or employees, or in consequence of
any failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with, the construction of the infrastructure
contemplated herein, whether or not such injuries, death or damages are caused, in
whole or in part, by the alleged negligence of the Citv of Fort Worth, its officers,
servants, or employees. Further, Developer will require its contractors to indemnify,
and hold harmless the City for any losses, damages, costs or expenses suffered by the
City or caused as a result of said contractor's failure to complete the work and
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 5 of 11
construct the improvements in a good and workmanlike manner, free from defects, in
conformance with the Policy, and in accordance with all plans and specifications.
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor, whether express or implied. Further, Developer agrees that all contracts with
any contractor shall include provisions granting to the City the right to enforce such
contracts as an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastewater inspection fees and material
testing fees equal to two percent (2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent (2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not
installing the streetlights, inspection fees equal to four percent (4%) of the
developer's share of the streetlight construction cost as stated in the construction
contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period, the developer may request that the CFA be extended for one additional
year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the construction of the Improvements if at
City of Fort Worth, Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 6 of 11
the end of two (2) years from the date of this Agreement (and any extension
period) the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
(REMAINDER OF PAGE INTENTIONALLY LEFT BLANK)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 7 of 11
Cost Summary Sheet
Project Name: Crawford Farms Plaza
CFA No.: 2016-008 DOE No.: N/A
An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developers Cost
A. Water and Sewer Construction
1. Water Construction $ 25,508.23
2.Sewer Construction $ 24,193.16
Water and Sewer Construction Total $ 49,701.39
B. TPW Construction
1.Street
2.Storm Drain
3.Street Lights Installed by Developer
4. Signals $ -
TPW Construction Cost Total $ -
Total Construction Cost(excluding the fees): $ 49,701.39
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 994.03
D. Water/Sewer Material Testing Fee(2%) $ 994,03
Sub-Total for Water Construction Fees $ 1,988.06
E. TPW Inspection Fee(4%) $
F. TPW Material Testing(2%) $ -
G. Street Light Inspsection Cost $
H. Signals Inspection Cost $
H. Street Signs Installation Cost $ -
Sub-Total for TPW Construction Fees $ -
Total Construction Fees: $ 1,988.06
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 49,701.39
Completion Agreement=100%/Holds Plat $ 49,701.39
Cash Escrow Water/Sanitary Sewer=125% $ 62,126.74
Cash Escrow Paving/Storm Drain=125% $ -
Letter of Credit=125%w/2yr expiration period I $ 62,126.74
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 8 of 11
ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Golden Triangle Retail Partners,LTD
c
4Jesshapa
;rAssistant City Manager
Name: Richard E Lelanc
Date: Title: President
Recommended by: Date: 'c
Q' ATTEST: (Only if required by Developer)
Wendy Chi-B bulal, MBA, P.E.
Developmen ngineering Manager
Water Department Sidiaure
N e: A-e-�
Douglas W. Wiersig, P.E.
Director of FQR�
Transportation& Public Works Department
Approved as to Form &Legality: 8o
ATTEST:
y i.0 00000
•Uu.&Q A.
Assistant City Attorney Mary J.R#9-T/ L/
M&C No.
/A City Secretary
t
Date: „ ►/�/3�f
City of Fort Worth,Texas
rOFFICIAL RECORD
Standard Community Facilities Agreement CRETARY
CFA Official Release Date: 10.07.2015 RTH,TX
Page 9of11
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
El Attachment 1 -Changes to Standard Community Facilities Agreement
Location Map
Exhibit A: Water Improvments
Water Cost Estimate
z Exhibit A-1: Sewer Improvements
I Sewer Cost Estimate
Exhibit B: Paving Improvements
D Paving Cost Estimate
C� Exhibit B-1: Storm Drain Improvements
Storm Drain Cost Estimate
Exhibit C: Street Lights and Signs Improvements
Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 100049
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement
CFA Official Release Date: 10.07.2015
Page 11 of 11
CRAWFORD FARMS PLAZA
----T� -1 � F
SUNSET CAYLOR VEST
SUNSET
SON
y'.
I
I
S RLy }�f
a VENI
o`c
N N
KEL - HI TEJ
c
Y
I ' N
KELL
TRIANGLE TAYL b
.. HILL= y
BATE
OLN
r Creek PECAI P
N
PROJECT _
LOCATION
STAGECOACH
RAY VHITE 4
�y c
u
o
u
k
K a
I
LOCATION MAP
1"=2000'
PREPARED BY:
JACOBS
777 MMN STREET
FORT WORTH, TX 76102
81 -73 -6000
MAPSCO NO. 022N PHONEFAX 817-7735-56148
COUNCIL DISTRICT 7 Jacobs Engineering Group Inc.
Texas Registration #2966
PLAT NO. FS-15-184 CONTACT: KOFI ADDO—NYARKO
GOLDEN TRIANGLE BOULEVARD
COUNTY ROAD NO. 4012
(VARIABLE WIDTH RIGHT-OF-WAY)
LEGEND
L1 N89'45'76"E
10•x10' PUBLIC OPEN ,e iav �, PROPOSED WATER LINE
SPACE EASEMENT •� c ' 2.69 10229'
z'c a
DOCUMENT No. D215133910 p01 T OF •�000ma-vssiTEa• •0000aia-vssrtra' �10 UTILITY EASEMENT
O.P.R.T.C.T. BEG Nil IN a +s s/e•ciar
N e�1e'ss c-IM' •aesauae ea+a' CAB. A, SLIDE 10777
1vr \ —+— — — — — — P.R.T.G.T. PROPOSED GATE VALVE
T 15' PUBLIC ACCESS EASEMENT —` — — — — PROPOSED FIRE HYDRANT
CO DOCUMENT No. D2,5,339,0 I I I CROSS ACCESS EASEMENT EXISTING WATER LINE -
- O.P.R.T.C.T. C.C.M D206128435
`y z O.P.R.T.C.T.
� 0 15� PUBLIC ACCESS
mi . 0 D2 5188858 LOT 1, BLOCK I EXISTING GATE VALVE
y P. T.C.T. no vi CRAWFORD FARMS PLAZA
LOT 2, BIL K I I£ I •� LOT 2R-1 = CAB. A, SLIDE 10777 -- —
3 EXISTING FIRE HYDRANT
GOLDEN TRIANGLE ADDITI BLOCK 1 1O m P.R.T.C.T.
DOCUMENT No. 0(215339 0
Q O.P.R.T. T. I v
to S9J�
15' SANITARY SEWER EASEMENT I I I I I 00•{s0
DOCUMENT No. D215133910 109 �
04
O O.P.R.T.C.T.
a6
LOT ,, BLOCK 1 10' UTILITY EASEMENT
15' DRAINAGE EASEMENT I CRAWFORD FARMS PLAZA
DOCUMENT No. D215133910 CAB, A, SUOE 10777 �•A, SLIDE 10777
O,P.R.T.C.T. I I 1 I i iaa P.R.T.C.T. P.R.T.C.T.
S89'50'55"W 19515' L4
Q I I N89'50'55"E 249.72'
N
_N
I I
LOT 2R-2, BLOCK 1
O CRAWFORD FARMS PLAZA
zI I C.C.N D215188858
10.6415 ACRES P.R.T.C.T.
LL CLEARLAKE HEALTHCARE REALTY, LLC
3 C.C./ 0215030980 _
O.P.R.T.C.T. I o N 25' WATER k
ISEWER EASEMENT
N
N r
a 11 I G.GM D215188858 I N
qlzJI`- P.R.T.C.T.
C
WWTR—
m
r U m
LOT 2R-3
BLOCK 1 I �r /rc rev cur
N
i 'saa.aces sew• uao
m o
'spar aa�s sewas• tiIII NH IIII
� II� ortnAoii NNT No.
E
� ujI-
S +b
SCALE:1"
1
00'
EIANT
S 7496
<1 PROPOSED O.P.R.T.C.T.
8" WATER WATER
N EXHIBIT 'A1
'
o LOT 4, BLOCK 1N CRAWFORD FARMS PLAZA W CRAWFORDFARM
S
o CAB.A,.SLIDE 11262
589'43'57"W 2a9.a3PRT.C.T.
p'soar ass 5647* PLAZA
O
o i
O^ w Uu;au
O
Z
am�wx
I W
I I I
LL M
=vD:J
O I I I s/e'irer LOT 3, BLOCK 1 ~
tO CRAWFORD 1 AWFOFARMS PLAZA Z JACO
U I C.C.O D213253909
I
z I I I Q P.R.T.C.T.
o I I I m T7
7 MAIN STREET
FO WORTH, TX 76102
f l LOT 2R-4 I I P PHONE 817-735-6000
BLOCK 1
GOLDEN TRIANGLE BOULEVARD
COUNTY ROAD NO. 4012
(VARIABLE WIDTH RIGHT-OF-WAY)
LEGEND
10'e10' PUBLIC OPEN /e IRE L1 L2 .c CJ N89'45'16"E _
SPACE EASEMENT AAs 2.69' '40' 10229• PROPOSED SANITARY SEWER LINE
DOCUMENT No. D215133910 POI T OF v /YciRE ,/a•oRr !
O.P.R T.C.T. OOWIIN--ITER" •BpppMR_LASSIIEA•
BEG NIN CRs L10' UTILITY EASEMENT
N .11 E-i.J3' 5/8-CIRF
- -�- BASELINE—P- CAB. p R TIDE 10777 PROPOSED SANITARY SEWER MANHOLE
EXISTING SANITARY SEWER LINE -
m 15' PUBLIC ACCESS EASEMENT
DOCUMENT No. D215133910 I CROSS ACCESS EASEMENT EXISTING SANITARY SEWER MANHOLE
O.P.R.T.C.T. I I C.C.1 D206 1 2114 35 w
y Z 0.P.R.7.C.T.
N I4 15y' PUBLIC ACCESS No
Co- I CCMMD215188858 tENT o LOT 1, BLOCK 1 PROPOSED SANITARY SEWER LINES
•� I �, P. T.C,7. J N CRAWFORD FARMS PLAZA w
3 LOT 2, BLC�K I I E I LOT 2R-1 - CAB. A. SLIDE 10777 ARE 8 UNLESS STATED OTHERWISE
GOLDEN TRIANGLE ADOITI IBLOCK 1 P.R,T.C.T.
io rn
DOCUMENT No. T,15l339 0 m I
II
Q O.P.R.T. T. m
I I ��59�
15' SANITARY SEWER EASEMENT I I p �'
DOCUMENT No. D215133910
O O.P.R.T.C.T.
LOT 1, BLOCK 1 10' UTILITY EASEMENT
15' DRAINAGE EASEMENT I I I I CRAWFORO FARMS PLAZA
DOCUMENT No. D215133910 CAB. A, SLIDE 10777
CAB. A, SLIDE 10777
O.P.R.T.C.T. I I I I 1/2% P.R.T.C.T. P.R.T.C.7.
589'50'55"W 19515 L4 'Br
p N89'50'55"E 249.72'
N
N
O I I N
O o LOT 2R-2, BLOCK 1
n
O ll, CRgWFORO FARMS PLAZA
Z I I o>' C.C.# D215188858 iu
x 10.6415 ACRES P.R.T.C.T. N
LL_ CLEARLAKE HEALTHCARE REALTY, LLC ri ry
3 C.C./ 0215030980 I PROPOSED I +N
Q O.P.R.T.C.T. I 6" SANITARY N 25' WATER k x
I.N Z SEWER EASEMENT
SEWER STUB R— c.cM D215188858
1O P
a 4IZ I .R.T.C.T.
C.T. '^ -
x
W u
T n m
N
I rWW
I I 'suEx e_s5
LOT 2R-3
BLOCK 1 1/2
ORI
_ rvo
SCALE�:1"
1
00'
m -
0- DOCUMENiPUBLIC CNos 0215137496 EASEMENT �—
aN I (I I O.P.R T C.T. }
4 I WASTEWATER
EXHIBIT 'B1 '
a I I I I I R
Un I I I I I ticn m LOT 4, BLOCK 1
CRAWFORD FARMS 1PL
AZA w;
g n
CRAWFORD FARMSp CAB. A. SLIDE 1262 P.R.T.C.T.%vRRvis 5647' 58947W4 . 1/2-ORI
PLAZA'SPRY vLS 5547•
O^
4 c
O
z
m�
I m�x�o
I
m s/e•IRv LOT 3, BLOCK 1 p 0
CRAWFORD FARMS PLAZA Z
ZI QC./ D213253908
IL
z I I I Q P.R.T.C.T. 777 MAIN STREET
o I I I m FORT WORTH, TX 76102
f I LOT 2R-4 I I PHONE 817-735-6000
BLOCK 1
004243
DAP-Bm PROPOSAL
SECTION 00 42 43 Pg.
I of I
Developer Awarded Projects-PROPOSAL FORM
CRAWFORD FARMS PLAZA
UNIT PRICE BID
Projeca Item Information Bidders Proposal
Bidlist Item No. Description Specification Section No. Unit of Measure Page Bid Quantity Unit Price Bid Value
Bidlist Item No. Description 7-S
J
UNIT I:WATER IMPROVEMENTS
3305.0109 Trench Safety for Water 33 05 10 LF 222 222 $9.551 $2,120.10
3311.0001 Ductile Iron Water Fittings w/Res 3311 11 TON 0.46 0.459 $6,312.001 2 897.21
3311.0161 6"PVC Water Pie 3311 12 LF 9 9 $33.41 $300.69
3311.0241 8"Water Pie 3311 12 LF 213 213 $40.71 $8,671.23
3312.0001 Fire Hydrant 33 1240 EA 1 1 $5,341.00 $5,341.00
3312.3002 6"Gate Valve And Box 33 12 20 EA 1 1 $1,181.00 $1,181.00
3312.3003 8"Gate Valve And Box 33
1222
EA ° 2 2 $1,624.00 $3,248.00
3312.0117 Connection to Existing4"-12"Water Main 33 1225 EA 11 1 $1,749.00 $1,749.00
TOTAL UNIT I:WATER IMPROVEMENTS1 $25,508.23
Bidlist Item No, Description Specification Section No. Unit of Measure Page Bid Quantity Unit Price Bid Value
4
UNIT If:SANITARY SEWER IMPROVEMENTS
3301.0002 Post-CCN Inspection 3301 31 LF 218 218 $3.031 $660.54
3301.0101 Manhole Vacuum Testing 3301 30 EA 2 2 $132.25 $264.50
3305.0109 Trench Safety 33 05 10 LF 218 218 $4.58 $998.44
3339.1001 4'Manhole 33 39 10,33 39 20 EA 1 1 $5,410.00 $5,410.00
3331.4108 6"Sewer Pie 3331 20 LF 18 18 $26.93 $484.74
3331.4115 8"Sewer Pie 3331 20 LF 157 157 $35.11 $5,512.27
3331.4116 8"Sewer Pie CSS Backfill 13331 20LF 43 43 75.69 $3,254.67
9999.0001 Connect to ExistingManhole 00 00 00 EA 1 1 $1,866.00 $1 866.00
9999.0002 4'Water Tight Manhole with Lid Bolted Down 1000000 JEA 1 I 1 $5,742.00 $5,742.00
TOTAL UNIT It:SANITARY SEWER IMPROVEMENTS $24,193.16
BM Summary
UNIT 1:WATER IMPROVEMENTS $25,508.23
UNIT IL SANITARY SEWER IMPROVEMENTS $24,193.16
Total Construction Bid $49 701.39
Utility Contractor agrees to complete WORK for FINAL ACCEPTANCE within 2 weeks
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRIICHON SPE('ffx'ATh)N D(X'IIMENTS-DEVELOPER AWARDED PROJECTS CFA C'mt Estimate Crewfmd Ferro Bid Get hum 2016-02.02
Farm V-m Apel 2,2014 1 Oft
nn 4241
DAPDIDPROPOSAL
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
CRAWFORD FARMS PLAZA
UNIT PRICE BID
Project Item Information Bidder's Proposal
Bidlist Item No. Dcxcription Specification Section No. Unit of Measure Bid Quantity Unit Price Bid V.1-
UNIT I:WATER IMPROVEMENTS
3305.0109 Trench Safety for Water 33 05 10 LF 222 $9.55 $2,120.10
3311.0001 Ductile Iron Water Fittings w/Res 33 11 11 TON 0.459 $6,312.00 $2,89721
3311.0161 6"PVC Water Pie 3311 12 LF 9 $33.41 $300.69
3311.0241 8"Water Pie 3311 12 LF 213 $40.71 $8,671.23
3312.0001 Fire Hydrant 33 1240 EA 1 $5,341.00 $5,341.00
3312.3002 6"Gate Valve And Box 33 1220 EA 1 $1,181.00 $1,181.00
3312.3003 8"Gate Valve And Box 33 12 20EA 2 $1 624.00 $3 248.00
3312.0117 Connection to Existing4"-12"Water Main 33 12 25 EA 1 $1 749.00 $1 749.00
TOTAL UNIT I:WATER IMPROVEMENTS $25,508.23
Bidlist Item No. Dc-Iplion Speciticauon Section Na Unit of Measurc Bid Quantity 7mt 1,I,,T But Value
UNIT II:SANITARY SEWER IMPROVEMENTS
3301.0002 Post-CCTV Inspection 3301 31 LF 218 $3.03 $660.54
3301.0101 Manhole Vacuum Testing 3301 30 EA 2 $132.25 $264.50
3305.0109 Trench Safety 33 05 10 LF 218 $4.58 $998.44
3339.1001 4'Manhole 33 39 10,33 39 20 EA 1 $5,410.00 $5,410.00
3331.4108 6"Sewer Pie 3331 20 LF 18 $26.93 $484.74
3331.4115 8"Sewer Pie 3331 20 LF 157 $35.11 $5,512.27
3331.4116 8"Sewer Pie CSS Backfill 33 31 20 LF 43 $75.69 $3 254.67
9999.0001 Connect to ExistingManhole 00 00 00 EA 1 $1.8 $1 866.00
9999.00021 4'Water Tight Manhole with Lid Bolted Down 1000000 JEA I 1 1 $5,742.001 $5,742.00
TOTAL UNIT II:SANITARY SEWER IMPROVEMENTS $24,193.16
Bid Summan'
UNIT I:WATER IMPROVEMENTS $25,508.23
UNIT II:SANITARY SEWER IMPROVEMENTS $24,193.16
Total Construction Bid $49,701.39
Utility Contractor agrees to complete WORK for FINAL ACCEPTANCE within 2 weeks
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION