HomeMy WebLinkAboutContract 44659-CO3 CITY SECRETAW
FORT WORTH. City of Fort Worth CONTRACT NO,
Change Order Request Breakdown
Project Namel Spinks Stone Road Alsbury Improvements City Sec# 1 44659
Client Project#(s)l #1273
Change Order Submittal# 0 Date 1012012015
Contract Time
Dept. TPW Totals CD
Original Contract Amount $1,380,164.00 $1,380,164.00 240
Extras to Date $87,546.25 $87,546.25 163
Credits to Date
Pending Change Orders(in MBC Process)
Contract Cost to Date $1,467,710.25 $1,467,710.25 403
Go to ADD&DEL Tabs to Enter CO Backup .$T9",853.89 .$19,853.89
Revised Contract Amount $1,447,856.36 $1,447,856.36 403
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 4.90%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+2591o) $1,725,205.00
JUSTIRCATION(REASONS)FOR CHANGE ORDER
Quantity reconciliation based on final measurements.
A7!n 00
0 %0
ary J. K y r, City Sec>r+etary
M
AL RECORDECRETARYORTH,TX
14
o r Wo City of Fort Worth
Change Order Additions
Project Name I S inks Stone Road Alsbury Improvements City Sec# L 44659
Client Project# FT273
Change Order Submittal# F—T-1 Date 10120/2015
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit nit Cost Total
OF—Block Sod TPW 835,00Y 5.
I- Seeding,Soil Blanket Y . 5
ll- "Asph Pavement Type D T Y
II "Asph Pavement Type B TPW 106.00 SY $28.50
II-5Concrete Pavement TPW Y
IIConcrete Sidewalk TPW 7 F
II- one Ret Wall w W Face —TPW— 75. F
II- 7 Conc Ret Wall w W Sidewalk TPW 5. 0 F
III- "R P Cl III TPW 0 LF
III- 9RUFUE III TPW 14.00 LF $71.00
IV-20 ReflPav Marking Type IC TPW 11.00 Ea
V-5Conduit PVC Sch 40 TPW 2.00 LF
V-9-- rodun Box Tpye 0 TPW 2. Ea 7
VI- Conduit PVc Sch 80(B) TPW LF $12.50
T
W
TPW
TPW
TPW
TPW g41,074
Sub Total Additions
Change Order Additions Page 2 of 4
Four wogs► City of Fort Worth
V- Change Order Deletions
Project Name Spinks Stone Road Alsbury Improvements City Sec# 44659
Client Project# #1273
Change Order Submittal# Date 1012012015
DELETIONS
ITEM DESCRIPTION DEPT Qpy Unit m osTotal
1-5 REMOVED WALL TPW 6 . L 0.
I- I LINK FENCE TPW 5. L
--17- 7--SEEDING,HYD L H TPW r3,300.00Y5
I- Allowance-Miscellaneous ConstructJon PW Ea _F177-9M
1-34 Allowance-Miscellaneous Utilites TPW 1.00 Ea $20,388.22
II- Concrete Curb&Gutter TPW 7.00
11- 5Concrete Valley Gutter TPW Y 5. 0
IV-7--Refi Pav Mark Type I olid TPW 5 . 0 L
IV- Refi Pav Mark Type IIAA TPW 7. Ea W.57
TV`TT- Existing Pav Marking TPW 315.00 75
IV- Eliminate Existing Pavement Marking TPW 110.00 LF $1.115
IV- "Eliminate Existing Pav Marking TPW 5. L
--IV-76---Eliminate Ext Pav Mark Arrow TPW 7.00 Ea $35.0
IV- 7 Eliminate Ext Pav Mark Word T W Ea
IV- 9- "Pvmt Surf Prep Blast TPW 81. 0 L ---3U.75
IV- "Pvmt Surf Prep Blast TPW 501.0 L . 5
IV- "Pvmt Surf Prep Blast TPW 420.00 L
IV-K--Pvmt Surf Prep Blast Arrow TPW 3.00 Ea $5.0
IV- Pvmt Surf Prep Blast Word TPW 2.00 Ea $5.0
IV-3 Pvmt Surf Prep Blast Dbl Arrow TPW Ea
V- Conduit Sch 40 TPW . 0 L
VConduit Shd 40 TPW 361.00 L
V-10 Ground Box Type E TPW 5.00 Ea $700.90
V- Inst Highway Traffis Signal Iso TPW Ea
V-27 Veh Loop Detector Saw CutTPW 84.00 LF 7.
V- Remove round Boxes TPW Ea
V- Conduit PVC She 40 T TPW 712.00L 5
VI- Quad Alum Elec Conductor TPW 632.00 L 5
VI-7 round Box mall w Lid TPW 2.00 Ea $575.00
VI- Rdwy Illum Assy Ty 11978-A19D40 TPW Ea , 5 .
VI-9 Rdwy Ilium Assy ty 3 5 6 8 f.00 Ea 7 .
5
TPW P60,9;2827
Sub Total Deletions
Change Order Deletions Page 3 of 4
M/SBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
N/A
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
CFW Change Order Approval St-COApp12 Page 1 of 3
Routing
Assigned To: Due Date:
Assigned By: Due Time:
Links 1
fortworthgov/Aviation Proiects/01273 - Soinks Stone Road Alsbury Improvements/Contractor/Change Orders/Change
Order Breakdown Request 3 R.As
Attachments(0)
No Attachments have been added to this form.
I
https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=51500&ProcessI... 3/14/2016
CFW Change Order Approval St-COApp12 Page 2 of 3
FORT WORTHO" City of Fort Worth
-� Change Order Request Approval
(Change Order Breakdown Available in Links)
For Change Order Submittal No.: 3
Change Order No.: St-COApp12 Date Started: 2016-02-09
City Sec. No.: Date Due: 2016-03-30
Project Name: Alsbury Blvd Improvements
1273 DOE Numbers:
0
Project Numbers:
DOE 7004
Project Construction of Alsbury Blvd. from IH 35W Northbound Frontage I
Description: Road to Stone Road
Project Manager: Wilma Smith City Inspector: Michael Collier
Contractor: McClendon Construction, Inc.
COUNCIL ACTION (If Required):
M&C Log Name:
M&C Number: M&C Date:
COST AND DAYS SUMMARY:
Requested
Department: Cost($) Fund Account Center: Days:
TPW $ -19,853.89 39008-0200431-5740010--C01273-i
Total Cost: $ -19,853.89 Total Requested Days: 0
Approval Status:
I
https:Hprojectpoint.buzzsztw.com/ bz web/Forms/FonuPrint.aspx?SiteId=51.500&ProcessI... 3/14/2016
CFW Change Order Approval St-COApp12 Page 3 of 3
Approved: Yes
Comments:
User: Tara Fishback
Date: 2016-02-10 12:56 PM
Approved: Yes
Comments:
User: Justin Blair
Date: 2016-02-10 4:28 PM
Approved: Yes
Comments:
User: Wilma Smith
Date: 2016-02-10 5:16 PM
Approved: Yes
Comments:
User: Todd Estes
Date: 2016-02-11 8:08 AM
Approved: Yes
Comments:
User: Todd Blomstrom
Date: 2016-02-15 3:18 PM
Approved: Yes
Comments:
User: Doug Wiersig
Date: 2016-02-15 10:44 AM
Approved: Yes
Comments:
User: Doug Black
Date: 2016-02-19 8:56 AM
Approved: Yes
Comments:
User: Jay Chapa
Date: 2016-03-11 12:02 PM
Action Required: